{"asOf":"2026-07-26T05:18:57.948Z","block":"2800-2899 S 9TH ST","blockUrl":"https://philadelphia.blockreport.homes/block/2800-2899-s-9th-st","address":"2816 S 9TH ST","parcelNumber":"395000007","source":"https://property.phila.gov/?p=395000007","ownerType":"investor","kind":"house","isHouse":false,"home":false,"commercial":false,"residential":false,"taxExempt":false,"institutional":false,"buildingCode":"JC0","buildingCodeNew":"25","buildingClass":"AMUSE HALL MASONRY","buildingClassNew":"ROW MODERN","useLabel":"House","owner":"HUTCHINSON HOLDINGS LLC","coOwner":null,"marketValue":675000,"landAssessment":135000,"improvementAssessment":540000,"livableArea":2370,"yearBuilt":2025,"lastSale":{"price":1,"date":"2022-02-07T05:00:00Z"},"openViolations":0,"violations":[],"violationCases":[],"investigations":[],"taxOwed":0,"taxSnapshot":{"available":true,"asOf":"2022-06","matched":false},"taxDelinquencySnapshotAsOf":"2022-06","taxDelinquencySnapshotAvailable":true,"lat":39.9139854600246,"lng":-75.16388008093747,"geom":{"type":"Polygon","coordinates":[[[-75.163769948,39.913995148],[-75.163780189,39.913948456],[-75.163990214,39.913975771],[-75.163979974,39.914022464],[-75.163769948,39.913995148]]]},"liDistrict":"SOUTH","certifications":[],"cityRecordAvailability":{"violations":true,"investigations":true,"appeals":true,"certifications":true,"permits":true,"licenses":true},"zip":"19148","beds":4,"baths":4,"stories":3,"lotArea":1031,"zoning":"RSA5","grade":null,"basement":"A","heater":"A","centralAir":true,"extCond":"1","intCond":"1","garage":1,"homestead":false,"mail":null,"appeals":[],"taxYears":[],"taxNet":0,"taxLien":false,"taxLedgerThrough":2016,"taxLedgerAvailable":true,"timesSold":1,"abated":false,"assessmentExemption":false,"exemptionBasisVerified":false,"valueSeries":[{"y":2024,"v":61000,"taxable":61000,"land":61000,"improvement":0,"taxableLand":61000,"taxableImprovement":0,"exemptLand":0,"exemptImprovement":0},{"y":2025,"v":61000,"taxable":61000,"land":61000,"improvement":0,"taxableLand":61000,"taxableImprovement":0,"exemptLand":0,"exemptImprovement":0},{"y":2026,"v":650000,"taxable":650000,"land":130000,"improvement":520000,"taxableLand":130000,"taxableImprovement":520000,"exemptLand":0,"exemptImprovement":0},{"y":2027,"v":675000,"taxable":675000,"land":135000,"improvement":540000,"taxableLand":135000,"taxableImprovement":540000,"exemptLand":0,"exemptImprovement":0}],"taxNow":9099,"familyHeld":false,"lastTransferNominal":false,"permits":[{"number":"ZP-2021-001163","date":"2021-02-26","work":"New construction, addition, GFA change","type":"Zoning","description":"Zoning Permit","status":"Completed","completedDate":"2024-08-21","scope":"FOR THE ERECTION OF AN ATTACHED STRUCTURE HEIGHT NTE 38 FT. WITH ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE, ONE INTERNAL PARKING SPACE. SIZE AND LOCATION AS PER PLANS. FOR A SINGLE-FAMILY HOUSEHOLD LIVING."},{"number":"RP-2021-017482","date":"2021-12-28","work":"New Construction","type":"Residential Building","description":"Residential Building Permit","status":"Completed","completedDate":"2024-08-21","scope":"ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMEND-5-12-23-New structural solution to reinforce the first-floor structure under the garage area. Lateral bracing has been implemented. Addition of a wall for lateral bracing next to the refrigerator on the first floor. Updating relocation of the bathroom and Mechanical room in the basement and addition of a bedroom with a closet. Changing egress well and the exit door to the rear have changed positions. Addition of a powder room on the second floor. The size of the bedroom 306 (third floor) has been reduced to relocate the washer-dryer space. The second floor casements have been reorganized in the front elevation.**AMENDED-Changing the special inspections from James A Clancy to Ray Crossan.***"},{"number":"EP-2023-005096","date":"2023-06-15","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-08-20","scope":"INSTALL 200 AMP ELECTRICAL SERVICE WITH CIRCUIT BREAKER PANEL. WIRING THROUGHOUT WITH RECEPTACLES, SWITCHES AND LIGHTING. INSTALL 120 VOLT HARDWIRE SMOKE DETECTOR ACCORDING TO THE 2017 NEC."},{"number":"PP-2023-008515","date":"2023-07-05","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-08-01","scope":"INSTALL 1 INCH WATER SERVICE, BUILDING DRAIN, CURB TRAP AND FAI ACCORDING TO THE 2018 PPC."},{"number":"PP-2023-009489","date":"2023-07-11","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-08-21","scope":"Install new PVC and PEX piping throughout single-family dwelling. Install 18 fixtures when ready. Basement: (1) Sewage ejector (1) Water heater (1) W.C. (1) LAV (1) Shower 1st Floor: (1) W.C. (1) LAV (1) Shower 2nd Floor: (1) Kitchen sink (1) LAV (1) W.C. 3rd Floor: (1) Laundry connection (2) W.C. (2) LAV (2) Shower"},{"number":"FP-2023-001850","date":"2023-09-14","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-08-21","scope":"FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS."},{"number":"MP-2023-002830","date":"2023-09-24","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-08-21","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Installation of Single HVAC Unit with 2 zones."},{"number":"ZP-2026-006660","date":"2026-07-17","work":"Change of Use","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"Limited Lodging"}],"storyTag":"New construction","storyDelta":null,"timeline":[{"y":2021,"k":"permit","w":"New construction, addition, GFA change"},{"y":2021,"k":"permit","w":"New Construction"},{"y":2023,"k":"permit","w":"New Construction"},{"y":2023,"k":"permit","w":"New Construction or Additions"},{"y":2023,"k":"permit","w":"New Construction or Additions"},{"y":2023,"k":"permit","w":"New Construction"},{"y":2023,"k":"permit","w":"New Construction"},{"y":2025,"k":"sale","p":725000},{"y":2026,"k":"permit","w":"Change of Use"}],"rented":false,"licenses":[],"licenseActivity":[],"businessLicenseSourceDate":"2026-07-25","signals":[{"kind":"post-purchase-work","level":"watch","title":"Post-purchase work pattern","summary":"A recorded purchase followed by 1 permit event matches the early part of a renovate-and-resell sequence.","evidence":["purchase recorded in 2025","permit activity in 2026"],"caveat":"This does not show that the property is listed or that a sale is planned."}],"legalChecks":[],"closingChecks":[{"title":"Property Sales Certification","body":"The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.","action":"Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-property-sales-certification/"},{"title":"Date-effective City Property Payoff","body":"The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.","action":"Request the City statement effective through settlement; read every period and invoice.","url":"https://www.phila.gov/guides/philadelphia-tax-center/what-to-do/"},{"title":"Professional title and water-lien searches","body":"OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.","action":"Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.","url":"https://www.phila.gov/2026-04-07-why-title-insurance-is-your-best-friend-when-buying-a-home-in-philadelphia/","secondaryUrl":"https://www.phila.gov/services/water-gas-utilities/pay-or-dispute-a-water-bill/resolve-water-liens-judgments/"}]}