{"asOf":"2026-07-29T20:56:40.960Z","block":"3500-3599 CIVIC CENTER BLVD","blockUrl":"https://philadelphia.blockreport.homes/block/3500-3599-civic-center-blvd","address":"3501 CIVIC CENTER BLVD","parcelNumber":"773001500","source":"https://property.phila.gov/?p=773001500","ownerType":"investor","kind":"commercial","isHouse":false,"home":false,"commercial":false,"residential":false,"taxExempt":true,"institutional":false,"buildingCode":"OB1","buildingCodeNew":"229","buildingClass":"GAR NO COMM AREA MAS+OTH","buildingClassNew":"PARKING GARAGE/DECK","useLabel":"Commercial","owner":"CHILDRENS HOSPITAL OF PHI","coOwner":null,"marketValue":85033400,"landAssessment":10204008,"improvementAssessment":74829392,"livableArea":378140,"yearBuilt":1970,"lastSale":{"price":3818855,"date":"2014-04-16T04:00:00Z"},"openViolations":0,"violations":[{"number":"1252068","date":"2009-02-25","code":"FC-901.6/14","title":"FIRE SUPP WET CHEM SYS MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252074","date":"2009-02-25","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252073","date":"2009-02-25","code":"FC-914.1/5","title":"ANNUAL CERT STANDBY/EMERG LITE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252072","date":"2009-02-25","code":"FC-914.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252071","date":"2009-02-25","code":"FC-914.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252070","date":"2009-02-25","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252069","date":"2009-02-25","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252066","date":"2009-02-25","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252067","date":"2009-02-25","code":"FC-505.1/1","title":"EXT ADDRESS NUMBERS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"2571483","date":"2012-08-16","code":"A-301.1/43","title":"PERMB- INSTALL DUCTWORK","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2012-09-13","underAppeal":false,"noticeUrl":null},{"number":"2571484","date":"2012-08-16","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2012-09-13","underAppeal":false,"noticeUrl":null}],"violationCases":[{"number":"192626","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2009-02-25","completedDate":"2009-09-18","noticeUrl":null,"violations":[{"number":"1252068","date":"2009-02-25","code":"FC-901.6/14","title":"FIRE SUPP WET CHEM SYS MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252074","date":"2009-02-25","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252073","date":"2009-02-25","code":"FC-914.1/5","title":"ANNUAL CERT STANDBY/EMERG LITE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252072","date":"2009-02-25","code":"FC-914.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252071","date":"2009-02-25","code":"FC-914.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252070","date":"2009-02-25","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252069","date":"2009-02-25","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252066","date":"2009-02-25","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null},{"number":"1252067","date":"2009-02-25","code":"FC-505.1/1","title":"EXT ADDRESS NUMBERS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2009-09-17","underAppeal":false,"noticeUrl":null}]},{"number":"378326","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"noticeUrl":null,"violations":[{"number":"2571483","date":"2012-08-16","code":"A-301.1/43","title":"PERMB- INSTALL DUCTWORK","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2012-09-13","underAppeal":false,"noticeUrl":null},{"number":"2571484","date":"2012-08-16","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null,"latestInvestigationDate":"2012-09-13","underAppeal":false,"noticeUrl":null}]}],"violYears":[{"y":2009,"n":9,"worst":null},{"y":2012,"n":2,"worst":null}],"investigations":[{"caseNumber":"88074","date":"2006-10-31","type":"CI INSP","status":"FAILED"},{"caseNumber":"88074","date":"2006-11-01","type":"CI INSP","status":"PASSED"},{"caseNumber":"192626","date":"2009-02-25","type":"CI INSP","status":"FAILED"},{"caseNumber":"192626","date":"2009-09-17","type":"CI INSP","status":"PASSED"}],"inspYears":[{"y":2006,"fails":1,"passes":1},{"y":2009,"fails":1,"passes":1}],"taxOwed":0,"taxSnapshot":{"available":true,"asOf":"2022-06","matched":false},"taxDelinquencySnapshotAsOf":"2022-06","taxDelinquencySnapshotAvailable":true,"lat":39.948058968997564,"lng":-75.19534147958647,"geom":{"type":"Polygon","coordinates":[[[-75.195153759,39.947804233],[-75.194894899,39.947444699],[-75.195131632,39.947336411],[-75.195407498,39.947696328],[-75.19555565,39.947629746],[-75.19602484,39.948281493],[-75.195199608,39.948647459],[-75.194715482,39.948004963],[-75.195153759,39.947804233]]]},"liDistrict":"CENTRAL WEST","certifications":[{"number":"BC-2025-017557","type":"Facade Report","inspectionDate":"2025-05-06","result":"Safe","expirationDate":"2030-05-06","buildingId":"1543525"}],"cityRecordAvailability":{"violations":true,"investigations":true,"appeals":true,"certifications":true,"permits":true,"licenses":true},"zip":"19104","beds":null,"baths":null,"stories":null,"lotArea":84600,"zoning":"CMX5","grade":"C","basement":null,"heater":null,"centralAir":null,"extCond":"4","intCond":"4","garage":null,"homestead":false,"mail":"34TH & CIVIC CENTER BLVD, PHILADELPHIA PA, 19104","mailOut":false,"appeals":[{"type":"Zoning board appeal","grounds":"PERMIT FOR THE ERECTION OF ONE (1) ACCESSORY, DOUBLE-FACED, STATICALLY ILLUMINATED FREESTANDING SIGN (SIGN #1), ONE (1) ACCESSORY, STATICALLY ILLUMINATED, FLATWALL SIGN (SIGN #2), THREE (3) ACCESSORY, DOUBLE-FACED, FREESTANDING SIGNS (SIGN ","status":"CLOSED","outcome":"Granted","date":"2015-03-25","number":"24677","relatedPermit":"575416"},{"type":"Zoning board appeal","grounds":"PERMIT FOR THE ERECTION OF   TEN (10) FREESTANDING SIGNS, ALL ACCESSORY TO AN EXISTING MEDICAL INSTITUTION.  .(SIZE AND LOCATION AS SHOWN ON THE APPLICATION)","status":"OPEN","outcome":"Granted","date":"2019-05-15","number":"36869","relatedPermit":"948301"},{"type":"ZBA Permit Denial - Variance","grounds":"PERMIT For the erection of the New Patient Tower, a new 29-story hospital building; Two levels of underground parking with a total of 149 spaces within the new structure (with a total of 454 parking spaces, 17 accessible spaces, and 23 pref","status":"Completed","outcome":"Granted","date":"2022-06-23","number":"ZP-2022-000635","relatedPermit":"ZP-2022-000635"},{"type":"BBS Permit Denial","grounds":"Preliminary Plan Review for New High-Rise Hospital Building","status":"Completed","outcome":"Approved","date":"2023-07-14","number":"PA-2022-009859","relatedPermit":null},{"type":"PAB Permit Denial","grounds":null,"status":"Prepare Meeting","outcome":null,"date":"2023-02-02","number":"PA-2022-009264","relatedPermit":null},{"type":"ZBA Permit Denial - Variance","grounds":"PERMIT FOR THE MODIFICATION OF AN EXISTING OUTDOOR MEDICAL GAS FARM – EQUIMPMENT ONLY - NO CHANGES TO THE GROSS FLOOR AREA OR ANY STRUCTURE PROPOSED; FOR THE REDUCTION OF OFF-STREET LOADING SPACES TO A TOTAL OF FIFTEEN (15) LOADING SPACES I","status":"Dismissed / Withdrawn","outcome":"Withdrawn","date":"2025-09-17","number":"ZP-2025-003422","relatedPermit":"ZP-2025-003422"}],"taxYears":[],"taxNet":0,"taxLien":false,"taxLedgerThrough":2016,"taxLedgerAvailable":true,"timesSold":3,"abated":false,"assessmentExemption":false,"exemptionBasisVerified":false,"valueSeries":[{"y":2016,"v":79764900,"taxable":0,"land":13229000,"improvement":66535900,"taxableLand":0,"taxableImprovement":0,"exemptLand":13229000,"exemptImprovement":66535900},{"y":2017,"v":79764900,"taxable":0,"land":13229000,"improvement":66535900,"taxableLand":0,"taxableImprovement":0,"exemptLand":13229000,"exemptImprovement":66535900},{"y":2018,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2019,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2020,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2021,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2022,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2023,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2024,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2025,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2026,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392},{"y":2027,"v":85033400,"taxable":0,"land":10204008,"improvement":74829392,"taxableLand":0,"taxableImprovement":0,"exemptLand":10204008,"exemptImprovement":74829392}],"taxNow":0,"familyHeld":false,"lastTransferNominal":true,"permits":[{"number":"50940","date":"2007-01-23","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-02-02","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR 2ND FLOOR SOUTHWEST AS PER SKETCH SENT TO DISTRICT OFFICE"},{"number":"57046","date":"2007-02-20","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-03-09","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE 3RD FL. SOUTHWEST PER ATTACHED SKETCHES."},{"number":"50263","date":"2007-03-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-12-26","scope":"NEW FINISHES INCLUDING QUARRY TILE FLOOR, VINYL WALL COVERING & ACOUSTIC CEILING;RELOCATE SERVICE COUNTER;DEMOLITION OF GWB WALL BETWEEN DINING ROOMS;RELOCATE SELF SERVICE BEVERAGE STATIONS;INSTALL NEW SEATING & DECOR;INSTALL NEW LIGHTING INSTALL NEW RESTROOM VANTIES;ALL WORK CONFINED TO DINING & RESTROOM AREA AS PER PLANS."},{"number":"64998","date":"2007-03-27","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-04-02","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR TEMPORARY CORRIDOR ON 6TH FLOOR OF WEST TOWER BUILDING"},{"number":"72623","date":"2007-05-02","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-12-26","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR 4TH FLOOR OF NEW WEST TOWER"},{"number":"69386","date":"2007-05-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-04-01","scope":"INTERIOR ALTERATIONS FOR DAS EQUIP ROOM PER PLANS"},{"number":"89660","date":"2007-07-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-02-20","scope":"INTERIOR ALTERATIONS."},{"number":"101739","date":"2007-09-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2007-10-17","scope":"13 LAV'S, 3 WATER CLOSETS, 2 MOP RECEPTACLES, 2 SERVICE SINKS, 7 SINKS"},{"number":"102559","date":"2007-10-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-02-27","scope":"INTERIOR ALTERATIONS, DOH FILE NO. 550401-01M DOH DRAWING INDEX: H-07-0696 (WEST DIST)"},{"number":"106984","date":"2007-10-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-02-02","scope":"INSTALLATION OF SANITARY WASTE AND VENT PIPING, INSTALLATION OF WATER SUPPLY PIPING, INSTALLATIONOF FIXTURES, 8 WATER CLOSETS, 2 MOP RECEPTACLLES, 8 LAV'S, 17 SINKS."},{"number":"106695","date":"2007-10-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-07-09","scope":"INSTALL NEW HVAC SYSTEM & ASSOCIATED MECHANICALS, AS PER PLANS."},{"number":"133065","date":"2008-02-25","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2009-05-28","scope":"REVISIONS TO PRIOR PERMIT 17083, EGRESS PLAN FOR ONGOING CONSTRUCTION, ALTERATIONS AS INDICATED PER SUBMITTED PLANS."},{"number":"145363","date":"2008-04-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-03-18","scope":"RENOVATIONS TO PLAYROOM AND CONSTRUCT NEW UNIT CLERK OFFICE"},{"number":"154627","date":"2008-06-12","work":"Alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-01-14","scope":"NEW MECHANICAL INSTALLATIONS, DUCT WORK, DIFFUSERS, PIPING AS PER SUBMITTED PLANS. 11 DIFFUSERS."},{"number":"181658","date":"2008-12-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-12-13","scope":"INTERIOR ALTERATIONS TO INCLUDE REDUCING THE 50-BED NICU TO A 36-BED NICU, AND RENOVATION OF EXISTING STAFF SUPPORT SPACES."},{"number":"204040","date":"2009-04-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-27","scope":"INTERIOR ALTERATIONS TO EXISTING LOBBY AREA AS PER 2005 NEC (WEST DISTRICT) FIRE ALARM SYSTEM"},{"number":"211615","date":"2009-04-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-11-30","scope":"HVAC, INCLUDING DUCTWORK, AS PER PLANS.PERMIT TO INCLUDE THE DEMOLITION OF DUCTWORK, EQUIPMENT, AND PIPING AND THE INSTALLATION OF DUCT AND EQUIPMENT TO ACCOMMODATE NEW LAYOUT OF THE NICU SECTION."},{"number":"212429","date":"2009-05-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-09-29","scope":"FIXTURE INSTALLATION"},{"number":"218363","date":"2009-06-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-01-21","scope":"CONVERT 3 EXISTING OFFICE AREAS INTO 1. NEW DRYWALL PARTITIONS AND CEILINGS AS PER PLAN."},{"number":"219095","date":"2009-08-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-03-31","scope":"INTERIOR DEMO AND INSTALLATION OF NEW DUCT WORK, DIFFUSERS, ACCESSORY MECHANICALS AS PER PLANS, AS PART OF PRIOR INTERIOR ALTERATIONS."},{"number":"233317","date":"2009-09-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-06-30","scope":"INSTERIOR RENOVATIONS TO EXISTING OFFICE AREA AS PER 2005 NEC (WEST DISTRICT)FIRE ALARM SYSTEM AS PER NFPA72"},{"number":"244633","date":"2009-10-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-05-26","scope":"INSTALLATION OF SANITARY WASTE AND VENT PIPING, INSTALLATION OF WATER SUPPLY PIPING AND FIXTURES"},{"number":"256680","date":"2010-01-12","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-01-27","scope":"INSTALLATION OF SANITARY WASTE AND VENT PIPING, WATER SUPPLY PIPING AND FIXTURES"},{"number":"304729","date":"2010-10-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-23","scope":"RENOVATION OF AN EXISTING CATH LAB AS SHOWN ON THE ATTACHED DRAWINGS, RELOCATION OF LIGHTS, INSTALLATION OF NEW CONDUIT SLEEVES AND NEW EQUIPMENT CONNECTIONS AS PER 2008 NEC (WEST DIST)"},{"number":"314691","date":"2010-12-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-10-09","scope":"INSTALLATION OF SOIL AND WATER PIPING.INSTALLATION OF WATER SUPPLY PIPING,INSTALLATION OF FIXTURES,DEMOLITION OF EXISTING PIPE AND FIXTURES"},{"number":"372436","date":"2011-12-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-04-30","scope":"HEALTH CARE FACILITY(CHOP)-RENOVATION OF PATIENT AREA STE. NEWE LIGHTING,POWER AND FIRE ALARM SYSTEMS. :DOH#'S H-11-0642, ID#550401-01 AS PER 2008 NEC.(WEST DISTRICT)"},{"number":"375287","date":"2011-12-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-07-13","scope":"ROOFTOP PV SYSTEM. PANEL AND INSTALLATION DETAILS DOCUMENTED THROUGH ATTACHED SPECIFICATIONS."},{"number":"378326","date":"2012-02-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-09-13","scope":"FITOUT OF EXISTING 12TH AND 13TH FLOOR SPACE INTO OFFICES. EXTEND EXISTING STAIR TOWER FROM THE 11TH FLOOR TO SERVE 12TH AND 13TH FLOOR. INSTALLATION OF NEW 3 STOP ELEVATOR."},{"number":"399368","date":"2012-05-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-06-20","scope":"INSTALLATION OF CAT6 PLENUM CABLE FOR VOICE & DATA, INSTALLATION TO COMPLY WITH ARTICLES 300.21,392,800 & ALL OTHER APPLICABLE ARTICLES OF THE 2008 NEC."},{"number":"393668","date":"2012-08-23","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-09-13","scope":"REPLACEENT OF (2)WATER CLOSETS, (2)LAVS, MOP SINK AND BATHROOM SINK"},{"number":"426134","date":"2012-09-12","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-09-13","scope":"FOR THE MODIFICATION OF AN EXISTING FORCED AIR HVAC SYSTEM (PHASE II) FOR THE INSTALLATION OF (60) GRILLES/REGISTERS/DIFFUSERS (GRDS), ALL ASSOCIATED RETURN/SUPPLY/EXHAUST DUCTWORK, & FIVE (5) SPLIT-SYSTEM DUCTLESS A/C UNITS, WITHIN AN EXISTING HIGH-RISE MEDICAL RESEARCH FACILITY."},{"number":"430819","date":"2012-10-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-03-08","scope":"INTERIOR FITOUT, INTERIOR DEMO OF EXISTING SHELL SPACE, NEW FINISHES, CEILING, PARTITIONS - ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, SPRINKLER SUPPRESSION AND HVAC. NO CHANGE IN USES/OCCUPANCY CLASSIFICATION"},{"number":"437156","date":"2012-12-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2013-03-08","scope":"INSTALL 6 SINKS,1 FLOOR DRAIN(RESEARCH FACILITY)"},{"number":"437164","date":"2012-12-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-03-08","scope":"INSTALLATION OF NEW SUPPLY/EXHAUST/RETURN DUCTWORK, VARIABLE AIR VOLUME BOXES, CHILLED/HOT WATER COILS & GRILLES/REGISTERS/DIFFUSERS AS PER PLANS."},{"number":"475072","date":"2013-06-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2013-06-21","scope":"REPLACE KITCHEN SINK (BUILDING PERMIT AP#458713)"},{"number":"481095","date":"2013-08-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-03-04","scope":"INTERIOR ALTERATIONS, PARTIAL INTERIOR DEMO AND RENOVATIONS TO EXISTING SPACE, FIT OUT, UPGRADES TO FINISHES, PARTITIONS. BUILDING SPRINKLERED. ADDITONAL PERMITS REQUIRED: ELECTRICAL, PLUMBING, HVAC, SPRINKLERS"},{"number":"498113","date":"2013-11-13","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2013-11-13","scope":"FOR THE ERECTION OF THREE (3) ACCESSORY, STATICALLY ILLUMINATED FLAT WALL SIGNS. SIZE AND LOCATION AS SHOWN ON APPLICATION/PLANS. ALL SIGNS ACCESSORY TO PREVIOUSLY APPROVAL HOSPITAL."},{"number":"505693","date":"2013-12-06","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2015-04-14","scope":"INSTALL 3 WALL SIGNS (SIZE AND LOCATION AS SHOWN IN PLANS)"},{"number":"524186","date":"2014-03-21","work":"Zoning","type":"ZP_ZONING","description":"ZONING PERMIT","status":"COMPLETED","completedDate":"2014-03-21","scope":"FOR THE RELOCATION OF LOT LINES TO DESIGNATE A PIECE (11,700 SF) OF EXISTING PREMISE 'B' TO EXISTING PREMISE 'A'. SIZE AND LOCATION AS SHOWN IN PLANS."},{"number":"22802","date":"2014-03-31","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2014-03-31","scope":"06/21/2014 ERECT ASSEMBLY TENT (50'X125') AT ABRAMSON BUILDING"},{"number":"532648","date":"2014-05-05","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2014-06-18","scope":"REPLACING LIGHTING SOURCE FROM NEON LIGHTS TO LED LIGHTING FOR SIGN. (SEPARATE PERMIT REQUIRED FOR ELECTRIC)"},{"number":"533746","date":"2014-06-06","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-12-10","scope":"INSTALLATION OF SANITARY WASTE AND VENT,DOMESTIC HOT AND COLD WATER AND FIXTURES.DEMO OF EXISTING FIXTURES (HEALTH CARE FACILITY)"},{"number":"543116","date":"2014-07-18","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-08-14","scope":"FOR ALTERATIONS ON THE INTERIOR OF A PARKING GARAGE TO PROVIDE SUPPORTS AND MOUNTS FOR DIRECTIONAL SIGNAGE. SEPARATE PERMITS REQUIRED FOR ELECTRICAL SYSTEMS."},{"number":"583521","date":"2015-01-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-04-24","scope":"INSTALLATION OF SANITARY WASTE AND VENT, DOMESTIC HOT AND COLD WATER PIPING AND (3)WATER CLOSETS AND (3)LAVATORIES"},{"number":"575416","date":"2015-04-14","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2015-04-14","scope":"FOR THE ERECTION OF ONE (1) ACCESSORY, DOUBLE-FACED, STATICALLY ILLUMINATED FREESTANDING SIGN (SIGN #1), ONE (1) ACCESSORY, STATICALLY ILLUMINATED, FLATWALL SIGN (SIGN #2), THREE (3) ACCESSORY, DOUBLE-FACED, FREESTANDING SIGNS (SIGN #3). ALL SIGNS ACCESSORY TO PREVIOUSLY APPROVED HOSPITAL. ALL PREVIOUSLY APPROVED SIGNS TO REMAIN. SIZE AND LOCATION AS SHOWN ON APPLICATION/PLANS."},{"number":"602506","date":"2015-05-15","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2015-08-24","scope":"INSTALLATION OF ONE (1) INTERNALLY ILLUMINATED FLAT WALL SIGN AT TOP FLOOR LEVEL AND FOR THE INSTALLATION OF ONE (1) DOUBLE FACED FREESTANDING SIGN FOR HOSPITAL AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**"},{"number":"614528","date":"2015-06-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-07-30","scope":"INSTALLATION OF TUNNEL WASHER LOCATED IN THE CHOP COLKET BUILDING AS PER THE ATTACHED DRAWINGS."},{"number":"608155","date":"2015-06-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-07-30","scope":"RENOVATION OF EXISTING NEHROLOGY OFFICE AND FILE ROOM LOCATED IN THE CHOP COKET BUILDING AS PER PLANS."},{"number":"621741","date":"2015-07-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-01-12","scope":"OVERHEAD SIDE WALK PROTECTION ALONG HEALTH CENTER DRIVE FRONTAGE AT CORNER OF CIVIC CENTER BOULEVARD. SEPARATE PERMIT REQUIRED FOR ANY ELECTRIC WORK."},{"number":"607210","date":"2015-07-20","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2015-07-20","scope":"APPLICATION FOR 6 DIRECTONAL SIGNS ON CIVIC CENTER BLVD"},{"number":"631431","date":"2015-09-08","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2016-05-30","scope":"INSTALL 1-FLATWALL SIGN (ILLUM)"},{"number":"634593","date":"2015-10-02","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2015-10-21","scope":"X1. INSTALL (1)MONUMENT SIGN @ 20' 11 1/2\" X 6' = 125 B1- (1) SET OF NON ILLUM. CHANNEL LETTERS 2'6\" X 51'2\"= 127.9 B2- (1) SET OF NON ILLUM. CHANNEL LETTERS 2'6\"X 51'2\"= 127.9 X3A.1- D/F FLAG SIGN 4'X 4' = 16 X3A.2- D/F FLAG SIGN 4' X 4' = 16"},{"number":"639372","date":"2015-10-08","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-10-20","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR SPECIAL EVENT (CAROUSEL BALL AT CHOP FACILITY) TO TAKE PLACE ON OCTOBER 24, 2015 FROM 7 PM TO 11 PM. MAIN EVENT TO OCCUR ON 1ST AND 6TH FLOORS. OTHER FLOORS ACCESSED FOR RESTROOMS. SCHEDULE OF DAYS AND TIMES OF EVENT NOTED IN APPLICATION. ATTACHED DOCUMENTS : ENGINEER'S LETTER & STAND PIPE AND FIRE ALARM CERTIFICATIONS."},{"number":"681665","date":"2016-04-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-06-28","scope":"FOR ALTERATIONS TO AN EXISTING TUNNEL WASH AREA AS PART OF A HOSPITAL AS PREVIOUSLY APPROVED UNDER PERMIT #614528"},{"number":"776782","date":"2017-05-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-31","scope":"FOR ALTERATIONS TO AN EXISTING MECHANICAL SYSTEM WITHIN A HOSPITAL AS SHOWN IN APPROVED PLANS. WORK TO INCLUDE NEW VAV BOX, EXHAUST FANS, REGISTERS/DIFFUSERS, AND ALL SUPPLEMENTAL DUCTWORK."},{"number":"776793","date":"2017-05-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-07-28","scope":"ALTERATIONS: INTERIOR PLUMBING; HOSPITAL -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUMBING CODE 2004"},{"number":"780308","date":"2017-06-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-05-31","scope":"FIT OUT OF RESEARCH LAB INCLUDING NEW SWITCHBOARDS, PANELS, TRANSFORMERS UPS FEEDERS BRANCH WIRING RECEPTACLES, LIGHTING FIXTURERS LIGHTING CONTROLS AND MECHANICAL EQUIPMENT POWER AS PER PLANS PRE 2008 NEC"},{"number":"768918","date":"2017-06-23","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-09","scope":"FOR THE INSTALLATION OF FIVE (5) CHILLERS AND FIVE (5) PUMP AND COOLING TOWER, WITH ASSOCIATED DUCTWORK, EXHAUST FAN AND REGISTERS/DIFFUSERS, AS PER APPROVED PLANS."},{"number":"768919","date":"2017-07-27","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Expired","completedDate":"2021-02-05","scope":"ALTERATION: INTERIOR PLUMBING; HIGH RISE HOSPITAL; C LEVEL AREA 5(BELOW GROUND) -THE INSTALLATION SHALL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004"},{"number":"795543","date":"2017-08-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-10-02","scope":"FIT OUT RESEARCH LAB INCLUDING NEW SPEAKERS,STROBES,SMOKE DETECTORS,HEAT DETECTORS,DUCT SMOKE DETECTORS TIE INTO EXISTING FIRE ALARM CONTROL PANEL PER NFPA 72"},{"number":"806781","date":"2017-09-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-07-11","scope":"F&I 428NCAT6 PLENUM CABLES LONGEST RUN 290FT, 2343 CAT6 PLENUM PATCH CABLES, ACCESS CONTROLS PIECES 119 DROPS, PLENUM SECURITY CALES TO ACCESS CONTROLS FROM IDF, FIBER & COPPER RISERS TO NEW IDF LONGEST RUN 650', CABLE TRAY WITHIN NEW IDF AS PER 2008 NEC (WEST DISTRICT)"},{"number":"793652","date":"2017-10-24","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-12-09","scope":"ALTERATIONS: INTERIOR PLUMBING;HIGH RISE STRUCTURE;HOSPITAL; (2)SK-1 TYPE SINKS CHOP BCC 5TH FLOOR VESTIBULE LAB - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004"},{"number":"861957","date":"2018-04-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"UPGRADE TO EXISTING MRI EQUIPMENT NEW 30KVA TRANSFEROR,DISCONNECTS AND FEEDER TO VENDOR EQUIPMENT,NEW CIRCUIT TO NEW FAN COIL UNIT PER 2008 NEC (HEALTH CARE)"},{"number":"916855","date":"2018-11-19","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2023-03-29","scope":"REPLACEMENT OF QUENCH VENT (NO CHANGE IN LOCATION)."},{"number":"933344","date":"2018-12-07","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2023-03-28","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-For the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans."},{"number":"959133","date":"2019-04-25","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"FURNISH AN INSTALL 5 DEDICATED GFI RECEPTACLES AND 1 DEDICATED DUPLEX WITH ASSOCIATED HOSPITAL,HEALTH CARE FACILITY CABLE, CONDUIT AND WIRE PER PLANS AND SPECIFICATIONS AS PER NEC 2008.(WEST DIST)"},{"number":"968299","date":"2019-05-17","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"FURNISH & INSTALL RECEPTACLES WITH ASSOCIATED HOSPITAL CARE FACILITY CABLE, CONDUIT AND WIRE PER PLANS AND SPECIFICATIONS AS PER NEC 2008."},{"number":"960721","date":"2019-07-03","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-12-01","scope":"FOR THE INSTALLATION OF PIPING AND (300) SPRINKLER HEADS ON THE 9TH FLOOR LEVEL AS PER APPROVED PLANS AND HYDRAULIC CALCULATIONS. SEPARATE PERMIT REQUIRED FOR ANY PLUMBING WORK. EXISTING FIRE PUMP AND BACKFLOW PREVENTOR TO REMAIN."},{"number":"948301","date":"2019-07-17","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2019-07-17","scope":"PREMISES A: REMOVAL OF 2 SIGNS, REPLACEMENT OF 4 SIGNS AND ERECTION OF 6 PROPOSED ACCESSORY SIGNS, SIZE AND LOCATION AS SHOWN ON THE ATTACHED PLANS"},{"number":"998733","date":"2019-08-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-10-15","scope":"FOR ADDITION AND MODIFICATION OF DUCTWORK IN A PORTION OF AN EXISTING HOSPITAL FOR USE AS A BACK UP PHARMACY SUITE. APPLICANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"999209","date":"2019-08-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-10-15","scope":"FOR THE INSTALLATION OF PARTITION WALLS, FINISHES AND FURNISHINGS IN PHARMACY SUITE IN AN EXISTING HEALTH FACILITY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEE AP#998733 FOR APPROVED PLANS AND DOCUMENTATION."},{"number":"1010472","date":"2019-10-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-12-05","scope":"FURNISH AND INSTALL LIGHTING AND DEVICES WITH ASSOCIATED HOSPITAL CARE FACILITY CABLE, CONDUIT AND WIRE PER PLANS AND SPECIFICATIONS AS PER NEC 2008"},{"number":"1029350","date":"2019-12-12","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2023-03-23","scope":"FOR LEVEL II ALTERATION TO 1ST FLOOR OF COLKET TRANSLATIONAL RESEARCH BLDG TO INCLUDE DEMO OF EXISTING INTERIOR WALLS. NEW WORK INCLUDES NEW WALL LAYOUT, NEW FLOOR AND WALL FINISHES. BUILDING IS FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEPS WORK."},{"number":"1041267","date":"2020-01-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-11-04","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"1049867","date":"2020-02-14","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-08-10","scope":"PROVIDE & INSTALL 459-CATEGORY 6 PLENUM CABLES FOR VOICE & DATA INSTALL IN J-HOOK LONGEST RUN 150' & INSTALL 1-DISPLAY & 5-CARD READERS NO RESCUE SYSTEM AS PER NEC 2017"},{"number":"FP-2020-000002","date":"2020-04-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-11-04","scope":"Relocating 15 sprinklers heads at CHOP CTRB A level Pathology Lab."},{"number":"MP-2020-000377","date":"2020-04-27","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-12-07","scope":"FOR THE INSTALLATION OF HVAC APPLIANCES, REGISTERS, DIFFUSERS AND ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTUER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK."},{"number":"1054421","date":"2020-05-07","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2023-03-15","scope":"PARTIAL DEMOLITION OF EXISTING DUCTWORK AND MECHANICAL PIPING PER PLANS; INSTALLATION OF NEW DUCTWORK, AIR TERMINAL UNITS, VAV BOXES,REGISTERS, DIFFUSERS, ASSOCIATED PIPING AND OTHER EQUIPMENT / DEVICES PER PLANS .TO ACCOMMODATE THE LEVEL A OF AN EXISTING HOSPITAL BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS.IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK ALL. SEPARATE PERMITS REQUIRED FOR ALL ELECTRICAL AND PLUMBING WORK."},{"number":"FP-2020-000320","date":"2020-05-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-12-07","scope":"We will be relocating (187) heads at CHOP CTRB 1 as pe NFPA 13"},{"number":"EP-2020-000751","date":"2020-06-12","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-11-04","scope":"(42) LED Light fixtures, (10) dimmers, (11) sensors, (3) exits, and (49) receptacles . ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC."},{"number":"EP-2020-000519","date":"2020-08-03","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-08-07","scope":"Installation of (243) LED Light Fixtures, (22) Exit Signs, Associated lighting controls, branch circuit receptacles as indicated for new offices as per 2017 NEC. Fire Alarm per attached shop drawings and NFPA 72."},{"number":"MP-2020-002475","date":"2020-08-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-11-04","scope":"For the installation of mechanical work to include registers/diffusers, ductwork, piping work, and all other work as per approved plans."},{"number":"PP-2020-005613","date":"2020-09-09","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-11-04","scope":"Demolish existing sanitary waste & vent & domestic water to facilitate installation of new. Install new domestic water and laboratory & sanitary waste and vent pipe with associate insulation. Install new fixtures."},{"number":"EP-2020-009455","date":"2020-10-30","work":"Rough-In","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-11-20","scope":"Rough-In Permit for EP-2020-009454 HORIZONTAL CABLING: Bluestone Communications, Inc. will: • Provide the labor to demo all cables as shown on demo drawings back to the designated telecom room. • Provide and install eight (8) single technology locations for installation of wall phone locations. • Provide and install one hundred (100) single technology locations. • Provide and install ninety-five (95) dual technology locations. • Provide and install one hundred and forty-seven (147) triple technology locations. • Provide and install Siemon faceplates, surface mount boxes, modular jacks, couplers and connectors as required for termination of the 4-pair and coax cables at the workstation location. • Provide and install eight (8) Siemon Category 6 UTP 48-port patch panels. These will be installed at the IDF location for termination of the 4-pair cables installed. • Provide seven hundred fifty-nine (759) Leviton Category 6 UTP modular patch cords, 5’ in length. • Provide seven hundred fifty-nine (759) Leviton Category 6 UTP modular patch cords, 7’ in length. SECURITY: Bluestone Communications, Inc. In response to the Specifications and Drawings for Children's Hospital of Philadelphia shown below: ? Sheet SE110 dated 01/06/20 ? Division 28 Specification/18 • Provide the labor to demo three (3) existing card readers and save devices for reinstallation. • Provide the labor to remove five (5) existing camera will be removed and reused which will require five (5) new data jacks at new locations. • Provide and install a total of four (4) new Verint IP cameras and licensing. Bluestone Communications, Inc. May 21, 2020 Page 2 STATEMENT OF WORK (Continued): AUDIO VISUAL: Bluestone Communications, Inc. will: • Provide and install one (1) SA-5 type room which consist of: o one (1) NEC 55\" display on a wall mount. o one (1) Chief wall box behind display. o one (1) Extron Rx behind display in wall box. o one (1) Mersive"},{"number":"PP-2020-012095","date":"2020-11-03","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-11-18","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"CP-2020-005570","date":"2020-11-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2023-03-17","scope":"FOR ALTERATIONS ON THE \"B LEVEL\" OF THE COLKET TRANSLATIONAL BUILDING OF CHOP, INCLUDING NEW INTERIOR PARTITIONS AND INTERIOR FINISHES TO CREATE BIOS M UNIT, AS PER APPROVED PLANS."},{"number":"EP-2020-009454","date":"2020-11-20","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-07-13","scope":"HORIZONTAL CABLING: Bluestone Communications, Inc. will: • Provide the labor to demo all cables as shown on demo drawings back to the designated telecom room. • Provide and install eight (8) single technology locations for installation of wall phone locations. • Provide and install one hundred (100) single technology locations. • Provide and install ninety-five (95) dual technology locations. • Provide and install one hundred and forty-seven (147) triple technology locations. • Provide and install Siemon faceplates, surface mount boxes, modular jacks, couplers and connectors as required for termination of the 4-pair and coax cables at the workstation location. • Provide and install eight (8) Siemon Category 6 UTP 48-port patch panels. These will be installed at the IDF location for termination of the 4-pair cables installed. • Provide seven hundred fifty-nine (759) Leviton Category 6 UTP modular patch cords, 5’ in length. • Provide seven hundred fifty-nine (759) Leviton Category 6 UTP modular patch cords, 7’ in length. SECURITY: Bluestone Communications, Inc. In response to the Specifications and Drawings for Children's Hospital of Philadelphia shown below: ? Sheet SE110 dated 01/06/20 ? Division 28 Specification/18 • Provide the labor to demo three (3) existing card readers and save devices for reinstallation. • Provide the labor to remove five (5) existing camera will be removed and reused which will require five (5) new data jacks at new locations. • Provide and install a total of four (4) new Verint IP cameras and licensing. Bluestone Communications, Inc. May 21, 2020 Page 2 STATEMENT OF WORK (Continued): AUDIO VISUAL: Bluestone Communications, Inc. will: • Provide and install one (1) SA-5 type room which consist of: o one (1) NEC 55\" display on a wall mount. o one (1) Chief wall box behind display. o one (1) Extron Rx behind display in wall box. o one (1) Mersive Solstice POD behind display in wall"},{"number":"MP-2020-005471","date":"2020-12-04","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2023-03-15","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEMS TIED INTO EXISTING SYSTEMS, ASSOCIATED DUCT WORK, PIPING,TEN (10) REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION"},{"number":"EP-2020-010083","date":"2020-12-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-07-12","scope":"Installation of (12) 2x2 LED Lights, (7) Chain Hung LED Lights, (15) 20 Amp receptacles, Various Lab Equipment connections, (2) 225 amp panels, (2) 30 KVA Transformers, (2) 100 amp panels, (2) air compressors. ALL WORK TO BE DONE ACCORDING TO APPROVED DRAWINGS, **NO FIRE ALARM ON THIS PERMIT,SEPARATE PERMIT REQUIRED**"},{"number":"FP-2020-002411","date":"2020-12-16","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2023-03-28","scope":"FOR THE RELOCATION OF SPRINKLER HEAD AS PART OF AN EXISTING SPRINKLER SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT A PORTION OF AN EXISTING AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA."},{"number":"MP-2020-006098","date":"2021-01-21","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2021-12-02","scope":"For the installation of mechanical work to include registers/diffusers, appliances, ductwork, and all other work as per approved plans."},{"number":"SP-2021-000353","date":"2021-06-27","work":"General Earth Disturbance ONLY","type":"Site / Utility Permit","description":"Site / Utility Permit","status":"Expired","completedDate":"2023-05-03","scope":"FOR SITE WORK ONLY AS SHOWN PER APPROVED PLANS AND DOCUMENTATION, SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK INCLUDING DEMOLITION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2020-011363","date":"2021-07-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-07-12","scope":"Renovation of the 10th Floor. Installation of (521) LED lights, (228) Lighting control devices, (420) receptacles, (850') wiremold, (44) exits, (34) 150 amp lab panels, (1) 4000 amp substation, (1) 2500 KVA Transformer, 13.2 KV Switch as per 2017 NEC. Install (22) ceiling speaker strobes, (50) wall speaker strobes, (20) smoke detectors, (8) duct detectors, (4) door hold openers as per 2016 NFPA 72."},{"number":"PP-2021-014724","date":"2021-08-12","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Expired","completedDate":"2023-03-15","scope":"Remove curb trap and seal lateral"},{"number":"OP-2021-000556","date":"2021-09-03","work":"Temporary Tents and Canopies","type":"Operations","description":"Operations Permit","status":"Expired","completedDate":"2022-05-01","scope":"temporary tent to be used for covid screening- due to flooded building as per 2018 Philadelphia Fire Department."},{"number":"ZP-2021-013024","date":"2021-10-11","work":"Change of Use","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"Unity of Use"},{"number":"ZP-2021-005437","date":"2021-10-11","work":"New construction, addition, GFA change","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"FOR THE PARTIAL DEMOLITION AND THE RECONSTRUCTION OF THE EXISTING UNDERGROUND ACCESSORY PARKING GARAGE FOR REMOVAL OF UPPER & LOWER PARKING GARAGE AND FOR ERECTION OF LEVEL A & LEVEL B UNDERGROUND GARAGE TO CREATE ONE HUNDRED SEVENTY-EIGHT (178) SPACES (INCLUDING 6 ADA SPACES / VAN ACCESSIBLE, 9 PREFERENTIAL SPACES AND 4 COMPACT SPACES) AND ALL OTHER EXISTING AND PREVIOUSLY APPROVED USES AND STRUCTURES TO REMAIN. SIZES AND LOCATIONS AS SHOWN ON THE APPLICATION / PLANS. (FOR UNITY-OF-USE, SEE PERMIT #ZP-2021-013024)."},{"number":"DP-2021-001324","date":"2022-02-10","work":"Major Demolition","type":"Demolition","description":"Demolition Permit","status":"Expired","completedDate":"2024-07-30","scope":"FOR THE COMPLETE PARTIAL DEMOLITION OF AN EXISTING UNDERGROUND PARKING GARAGE, WORK TO BE COMPLETED BY MECHANICAL MEANS . ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR PEDESTRIAN PROTECTION SHALL BE REQUIRED AS REFERENCED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK."},{"number":"SP-2021-000379","date":"2022-02-17","work":"Foundation","type":"Site / Utility Permit","description":"Site / Utility Permit","status":"Expired","completedDate":"2023-05-22","scope":"FOR FOUNDATION AND SITE WORK FOR UNDERGROUND PARKING GARAGE ACCESSORY TO HEALTH FACILITY, WORK TO INCLUDE EXCAVATIONS, UNDERPINNING, INSTALLATION OF TEMPORARY SUPPORT OF EXCAVATION WITH SOIL NAILS. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"SP-2021-000553","date":"2022-02-17","work":"Foundation","type":"Site / Utility Permit","description":"Site / Utility Permit","status":"Issued","completedDate":null,"scope":"FOR FOUNDATION AND SITE WORK FOR UNDERGROUND PARKING GARAGE ACCESSORY TO HEALTH FACILITY, WORK TO INCLUDE EXCAVATIONS, UNDERPINNING, INSTALLATION OF TEMPORARY SUPPORT OF EXCAVATION WITH SOIL NAILS. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2021-008494","date":"2022-04-18","work":"New Construction (Shell Only)","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR THE PARTIAL ERECTION/RECONSTRUCTION OF AN UNDERGROUND PARKING GARAGE ACCESSORY TO A HEALTH CARE FACILITY. PARTIAL ERECTION UNDER THIS PERMIT DUE TO CONNECTION OF PARKING GARAGE TO FUTURE HIGH RISE BUILDING ON ADJACENT LOTS TO BE DONE AT A FUTURE PHASE. BUILDING TO BE FULLY SPRINKLERED. SIZE AND LOCATION AS SHOWN PER APPLICATION/PLANS. PROPOSAL TO BE GRANTED VARIANCE UNDER BBS VARIANCE NO. MI-2021-005314. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"ZP-2022-000635","date":"2022-06-15","work":"New construction, addition, GFA change","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"For the erection of the New Patient Tower, a new 29-story hospital building; Two levels of underground parking with a total of 149 spaces within the new structure (with a total of 454 parking spaces, 17 accessible spaces, and 23 preferential parking spaces provided on the entire zoning lot); 19 total loading spaces on the entire zoning lot; 309 bicycle parking spaces on the entire zoning lot, size and location as shown on the plans with all other previously approved uses and structures to remain."},{"number":"CP-2022-006898","date":"2023-03-13","work":"New Construction","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION OF REMAINING PORTION OF UNDERGROUND PARKING GARAGE STRUCTURE (SEE PERMIT CP-2021-008494 & MI-2021-005314 FOR INITIAL PHASE) WITH ACCESSORY STORAGE AND SHELL AREAS FOR FUTURE CONSTRUCTION OF HOSPITAL TOWER AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED AND INCLUDE STANDPIPES. SEPARATE PERMITS REQUIRED FOR FUTURE ABOVEGROUND TOWER STRUCTURE. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**"},{"number":"GP-2023-003046","date":"2023-05-08","work":"Tower Crane","type":"General","description":"General Permit","status":"Issued","completedDate":null,"scope":"PERMIT TO BE APPROVED FOR THE ASSEMBLY AND DISASSEMBLY OF ASSOCIATED TWO (2) TOWER CRANES TO BE LOCATED ENTIRELY WITHIN PROPERTY LINES, NO ENCROACHMENT OF PUBLIC FOOTWAYS PROPOSED AS PER DESIGN ENGINEERED PLANS AND SPECIFICATIONS. TOWER CRANES TO REMAIN ON SITE FOR DEMOLITION OF EXISTING BUILDING AND ERECTION OF PROPSED BUILDINGS ON SITE. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK."},{"number":"ZP-2022-011745","date":"2023-08-30","work":"Signs (Accessory / Non-Accessory)","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"For the erection of six (6) freestanding accessory non-illuminated signs to remain during construction activities on the lot for a period greater than six (6) months. Sizes and locations as shown on ZBA-stamped proviso plans."},{"number":"PP-2023-013182","date":"2023-10-09","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Installation of underground sanitary waste, sanitary vent and rainwater pipe, valves and fittings up to plaza drains. 20 storm drains."},{"number":"CP-2024-000469","date":"2024-06-19","work":"New Construction (Shell Only)","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION OF A TWENTY-SIX (26) STORY HIGH-RISE SHELL HOSPITAL BUILDING AS PER APPROVED PLANS AND PA DOH APPROVAL. SEE PERMITS SP-2021-000553, CP-2021-008494 & CP-2022-006898 FOR CONSTRUCTION OF UNDERGROUND PARKING STRUCTURE AND FOUNDATION SYSTEM. SEPARATE PERMIT REQUIRED FOR FIT-OUT AND CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 7/4/26 AMEND NEW CONSTRUCTION PERMIT CP-2024-000469 TO INCLUDE HELIPAD AT 27TH/28TH FLOORS AS PER APPROVED PLANS."},{"number":"EP-2024-006257","date":"2024-07-24","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"ELECTRICAL CORE & SHELL INFRASTRUCTURE FOR NEW CONSTRUCTION OF A TWENTY-SIX (26) STORY HIGH-RISE SHELL HOSPITAL BUILDING AS PER APPROVED PLANS AND PA DOH APPROVAL.INSTALL TWO MV SERVICE GEAR LINEUPS FOR (4) INCOMING PECO SERVICES. INSTALL (8) DOUBLE ENDED SUBSTATIONS, (5) 2500kW DIESEL GENERATORS, (2) PARALLELING GEAR LINEUPS, AND (6) FLYWHEEL UPS LINEUPS. INSTALL (590) PANELBOARDS AND (184) DRY TYPE TRANSFORMERS (<112.5kVA). INSTALL APPROX (6000) LIGHT FIXTURES AND (2400) RECEPTACLES. PROVIDE POWER FOR MECHANICAL EQUIPMENT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. **NO FIRE ALARM , FITOUT OR TELE DATA ON THIS PERMIT** **SEPARATE PERMITS REQ'D** NO FIRE ALARM , FITOUT OR TELE DATA ON THIS PERMIT , **SEPARATE PERMITS REQ'D**"},{"number":"CP-2024-006043","date":"2024-12-03","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-08-07","scope":"FOR LEVEL I ALTERATION TO THE PROCEDURE ROOMS ON THE 11TH FLOOR AS PER APPROVED PLANS."},{"number":"EP-2024-011919","date":"2024-12-30","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"INSTALL TELECOMMUNICATION WIRING THROUGHOUT BUILDING ACCORDING TO THE 2017 NEC AND PER PLANS."},{"number":"ZP-2024-012661","date":"2025-01-16","work":"New construction, addition, GFA change","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"FOR THE RECONFIGURATION OF THE PREVIOUSLY APPROVED GARAGE AS PART OF AN EXISTING UNITY-OF-USE LOT. LEVEL A & LEVEL B UNDERGROUND GARAGE TO CREATE A TOTAL OF FOURTEEN (414) PARKING SPACES (INCLUDING 23 ADA SPACES / VAN ACCESSIBLE, 21 PREFERENTIAL SPACES, AND 25 COMPACT SPACES) AND ALL OTHER EXISTING AND PREVIOUSLY APPROVED USES AND STRUCTURES TO REMAIN. SIZES AND LOCATIONS AS SHOWN ON THE APPLICATION / PLANS. (FOR UNITY-OF-USE, SEE PERMIT #ZP-2021-013024)."},{"number":"PP-2025-002610","date":"2025-03-03","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-08-07","scope":"FURNISH & INSTALL NEW LAB WASTE, LAB VENT & DOMESTIC WATER PIPING TO (2) CUP SINKS IN THE NEW FUME HOOD. 2 FIXTURES PER PPC"},{"number":"FP-2025-000302","date":"2025-03-19","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF TEMPORARY STANDPIPE AS PER APPROVED PLANS. *SEPARATE PERMITS REQUIRED FOR PERMANENT STANDPIPES.*"},{"number":"FP-2025-000584","date":"2025-03-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-08-07","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. MK FIRE PROTECTION RELOCATING 9 SPRINKLER HEADS TO PROCEDURE ROOMS ON 11TH FLOOR"},{"number":"MP-2025-002260","date":"2025-05-02","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-08-07","scope":"FOR ALTERATIONS TO EXISTING LABORATORY DUCTWORK AT THE 11TH FLOOR OF THE COLKET TRANSLATIONAL RESEARCH BUILDING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2024-006043 FOR ASSOCIATED BUILDING PERMIT."},{"number":"FP-2025-001004","date":"2025-05-14","work":"Rough-In","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-11-20","scope":"Rough-In Permit for FP-2025-000753 Install fire sprinklers for Levels A&B including 2) fire pumps fed by 2) backflows from 2) 8\" taps Tower to be submitted on in future Fire Sprinkler permit"},{"number":"EP-2025-002788","date":"2025-05-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-07-28","scope":"Remove and and re-install 3 light fixtures, demo 9 devices, and provide 2 new circuits to fume hoods as per 2017 NEC."},{"number":"CP-2025-002644","date":"2025-06-02","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR THE ERECTION OF AN UNDERGROUND TANK VAULT AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED MEP AND TANK INSTALLATION WORK."},{"number":"CP-2025-002642","date":"2025-06-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION FIT-OUT OF LEVELS 1-7 OF A NEW HIGH-RISE HOSPITAL BUILDING (SEE PERMIT CP-2024-000469 FOR CORE AND SHELL APPROVAL) AS PER APPROVED PLANS AND PA DOH APPROVALS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 6/10/26 AMEND FIT-OUT PERMIT CP-2025-002642 TO INCLUDE ADDITIONAL FIT OUT OF SPACES ON THE FIRST AND SIXTH FLOORS AS PER APPROVED PLANS AND PA DOH APPROVAL."},{"number":"SP-2025-000708","date":"2025-06-18","work":"Excavation","type":"Site / Utility Permit","description":"Site / Utility Permit","status":"Issued","completedDate":null,"scope":"FOR EXCAVATION WORK AS PER PLANS."},{"number":"PP-2025-008152","date":"2025-06-23","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-07-18","scope":"Replace (3) 8\" Curb Traps & FAI"},{"number":"EP-2025-005561","date":"2025-06-23","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"INSTALL WIRING, LIGHTING, LIGHTING CONTROLS, POWER AND RECEPTACLE OUTLETS FROM THE 4th TO THE 8th FLOOR OF ALL OPERATING ROOM AND SUPPORTING AREA. ALL WORK DONE ACCORDING TO THE 2017 NEC AND PER PLANS."},{"number":"PP-2025-000069","date":"2025-07-09","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION CORE AND SHELL. SCOPE OF WORK AS FOLLOWS: Interior Core and shell plumbing for tie-ins taking place at a later date. Domestic water supply risers for future use. Sanitary/Vent stacks Roof drains and rainwater piping ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. Mechanical fuel/gas permit required for all gas work."},{"number":"CP-2025-003785","date":"2025-08-13","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION FIT-OUT OF LEVELS 16-20 OF A NEW HIGH-RISE HOSPITAL BUILDING (SEE PERMIT CP-2024-000469 FOR CORE AND SHELL APPROVAL) AS PER APPROVED PLANS AND PA DOH APPROVALS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**"},{"number":"PP-2025-007446","date":"2025-08-14","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Installation of standard Plumbing fixtures, water piping, Grease waste piping, sanitary piping. Install mop basins(18), indirect waste stand pipe and piping, electric water cooler (12), eye wash (19), kitchen equipment(40), clinical service sinks(4),floor drains and floor sinks. This work is only for Fit-out work on floors A-. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. ALL MECHANICAL, ELECTRICAL, AND FIRE SUPPRESSION WORK SHALL BE APPLIED FOR UNDER THEIR DESIGNATED PERMIT TYPES."},{"number":"MP-2025-004254","date":"2025-09-15","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"MP-2025-004727","date":"2025-09-29","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS."},{"number":"MP-2025-003801","date":"2025-10-02","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS."},{"number":"EP-2025-007328","date":"2025-10-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"NEW CONSTRUCTION ELECTRICAL FIT-OUT OF LEVELS 16-20 OF A NEW HIGH-RISE HOSPITAL BUILDING. INSTALL ALL POWER, RECEPTACLES, LIGHTING, AND LIGHITNG CONTROLS FOR ALL PATIENT ROOMS AND SUPPORT AREAS. ALL WORK TO DONE ACCORDING TO THE 2017 NEC AND PER PLANS. *** FIRE ALARM NOT ON THIS PERMIT.***"},{"number":"EP-2025-009538","date":"2025-10-30","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"INSTALLATION OF A COMPLETE FIRE ALARM SYSTEM WITH PULLS, HORNS, STROBES, EM LIGHTS AND PANELS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS."},{"number":"EP-2025-005386","date":"2025-10-31","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"FURNISH & INSTALL ELECTRICAL POWER, LIGHTING, AND LIGHTING CONTROLS AS PER NEC 2017 FOR LEVELS B THRU 3 FIT-OUT. SERVICE IS NOT INCLUDED IN THIS APPLICATION."},{"number":"MP-2025-003785","date":"2025-11-03","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"FP-2025-002262","date":"2025-11-17","work":"Rough-In","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-06-22","scope":"Rough-In Permit for FP-2025-002261 Core and shell protection only for Floors 1-29; Fire pumps located on A level on previous permit; full shell coverage on Floors 10,11,21-27 only; all other floors will be permitted under future fit-out permit."},{"number":"FP-2025-000753","date":"2025-11-19","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 TO AN EXISTING 8\" SERVICE LINE TO INCLUDE TWO (2) 8\" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY, TWO (2) FIRE PUMPS AS PER NFPA 20, AND THREE (3) STANDPIPE RISERS COMPLYING WITH NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK."},{"number":"PP-2025-015374","date":"2025-12-02","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"CURB TRAP, MAIN DRAIN, FAI"},{"number":"FP-2025-002243","date":"2025-12-03","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT FLOORS 8 AND 9, AND STANDPIPES COMPLYING WITH NFPA 14 AS PER THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. *SEE ASSOCIATED SUPPRESSION PERMITS FOR FIRE PUMP, BACKFLOW PREVENTION ASSEMBLIES AND ADDITIONAL COVERAGE AREAS - SEE PR-2021-001529 FOR RELATED BUILDING/TRADES PERMITS*"},{"number":"PP-2025-015570","date":"2025-12-03","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2026-05-22","scope":"AMENDED 05.15.26 TO INCLUDE Kindly, amend permit to include a 15\" storm trap with FAI vents 1400 sq. ft. ditch as per the attached request. Thanks. UPDATED PA1 2026-1322435 INSTALL 10\" Curb trap, main drain, and FAI. PA1 2025-3290361"},{"number":"PP-2025-014909","date":"2025-12-04","work":"New Construction or Additions","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Amend Permit 5/22/2026 - Link to parent building permit Performing plumbing water supply, drainage piping from riser mains to fixtures"},{"number":"FP-2026-000284","date":"2026-02-20","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF SPRINKLER HEADS THROUGHOUT THE 14TH AND 15TH FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 AND PA DOH APPROVAL BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE CP-2024-000469 FOR ASSOCIATED BUILDING PERMIT."},{"number":"FP-2026-000291","date":"2026-02-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE EXTENSION OF AN EXISTING AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL SPRINKLER HEADS THROUGHOUT THE 17TH THROUGH 20TH FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 AND PA DOH APPROVAL BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE CP-2025-003785 FOR ASSOCIATED FIT-OUT BUILDING PERMIT."},{"number":"MP-2026-000145","date":"2026-03-02","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR A NEW MECHANICAL WORK TO ACCOMMODATE A PORTION OF AN EXISTING STRUCTURE.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **"},{"number":"ZP-2026-001279","date":"2026-03-27","work":"Signs (Accessory / Non-Accessory)","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF TWO (2) ILLUMINATED BUILDING IDENTIFICATION SIGNS ALONG CIVIC CENTER BLVD AND EAST SERVICE DRIVE, READING “ROBERTS CHILDREN’S HEALTH” WITH LOGO. SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLAN."},{"number":"FP-2025-002241","date":"2026-04-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT FLOORS 1, 2, 3, 4, 6, AND 7 ACCORDING TO THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. **SEE THE ASSOCIATED FIRE SUPPRESSION PERMITS FOR THE FIRE PUMP, BACKFLOW PREVENTION ASSEMBLIES AND ADDITIONAL COVERAGE AREAS - FP-2025-002243, FP-2025-000753, AND FP-2025-002261***. PA DOH APPROVAL UNDER DWG. INDEX # H-26-0240 (H-24-0044/H-25-0386) AND FILE NO. ID #550401-02."},{"number":"FP-2026-000535","date":"2026-04-09","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF NEW SPRINKLER HEADS ON THE 16TH FL. OF \"NEW PATIENT TOWER\" AS AN EXTENSION TO AN EXISTING AUTOMATIC WET SPRINKLER SYSTEM COMPLYING PER NFPA 13 STANDARD. ALL WORK TO BE DONE PER APPROVED PLANS/ HYDRAULIC CALCULATIONS AND PA DOH APPROVAL. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA."},{"number":"GP-2026-002070","date":"2026-06-01","work":"Tank Install/Removal","type":"General","description":"General Permit","status":"Issued","completedDate":null,"scope":"FOR INSTALLATION OF THREE (3) FUEL-OIL TANKS IN UNDERGROUND ENCLOSURE PER APPROVED PLANS, MANUFACTURER'S SPECIFICATIONS AND PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL STANDARDS."},{"number":"FP-2025-002261","date":"2026-06-11","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT FLOORS 10,11,21-27, AND STANDPIPES COMPLYING WITH NFPA 14 AS PER THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. *SEE ASSOCIATED SUPPRESSION PERMITS FOR FIRE PUMP, BACKFLOW PREVENTION ASSEMBLIES AND ADDITIONAL COVERAGE AREAS - SEE PR-2021-001529 FOR RELATED BUILDING/TRADES PERMITS*"},{"number":"MP-2026-003567","date":"2026-07-06","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF GAS PIPING AS PER APPROVED PLANS."},{"number":"ZP-2025-003422","date":null,"work":"New construction, addition, GFA change","type":"Zoning","description":"Zoning Permit","status":"Refused","completedDate":"2025-09-18","scope":null}],"storyTag":"Torn down & rebuilt","storyDelta":0.16,"timeline":[{"y":2025,"k":"permit","w":"Addition and/or Alterations"},{"y":2025,"k":"permit","w":"New Construction or Additions"},{"y":2025,"k":"permit","w":"New Construction or Additions"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Signs (Accessory / Non-Accessory)"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Tank Install/Removal"},{"y":2026,"k":"permit","w":"New Construction"},{"y":2026,"k":"permit","w":"New Construction"}],"rented":false,"licenses":[{"number":"406895","type":"Hazardous Materials","status":"Inactive","businessName":"TURNER CONSTRUCTION COMPANY","legalName":"TURNER CONSTRUCTION COMPANY","address":"3501 CIVIC CENTER BLVD","revenueCode":"3335","rentalCategory":null,"units":null,"issuedDate":"2007-04-17","latestIssueDate":"2007-04-17","expirationDate":"2007-11-30","inactiveDate":null},{"number":"503872","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"ARAMARK/CHOP (COLKET TRANSL. RESEARCH BLDG)","legalName":"ARAMARK/CHOP","address":"3501 CIVIC CENTER BLVD","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2010-06-01","latestIssueDate":"2019-04-03","expirationDate":"2020-04-30","inactiveDate":"2020-06-29"},{"number":"519280","type":"Dumpster License - Private Property","status":"Inactive","businessName":"CHILDRENS HOSPITAL OF PHILADELPHIA","legalName":"CHILDRENS HOSPITAL OF PHILADELPHIA","address":"3501 CIVIC CENTER BLVD","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2010-11-10","latestIssueDate":"2013-04-20","expirationDate":"2012-07-31","inactiveDate":null},{"number":"678209","type":"Dumpster License - Private Property","status":"Active","businessName":"CHILDRENS HOSPITAL OF PHILADELPHIA","legalName":"CHILDRENS HOSPITAL OF PHILADELPHIA","address":"3501 CIVIC CENTER BLVD","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2015-09-21","latestIssueDate":"2015-09-21","expirationDate":null,"inactiveDate":null},{"number":"0956799","type":"Food Preparing and Serving","status":"Inactive","businessName":"Dr Coffee Jr LLC","legalName":"Dr Coffee Jr LLC","address":"3501 CIVIC CENTER BLVD","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2024-07-19","latestIssueDate":"2024-07-19","expirationDate":"2025-07-18","inactiveDate":"2025-09-16"}],"licenseActivity":[{"number":"0956799","type":"Food Preparing and Serving","businessName":"Dr Coffee Jr LLC","legalName":"Dr Coffee Jr LLC","issuedDate":"2024-07-19","latestIssueDate":"2024-07-19","closureDate":"2025-09-16","expirationDate":"2025-07-18","inactiveDate":"2025-09-16","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"678209","type":"Dumpster License - Private Property","businessName":"CHILDRENS HOSPITAL OF PHILADELPHIA","legalName":"CHILDRENS HOSPITAL OF PHILADELPHIA","issuedDate":"2010-11-10","latestIssueDate":"2015-09-21","closureDate":null,"expirationDate":null,"inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"503872","type":"Food Preparing and Serving (30+ SEATS)","businessName":"ARAMARK/CHOP (COLKET TRANSL. RESEARCH BLDG)","legalName":"ARAMARK/CHOP","issuedDate":"2010-06-01","latestIssueDate":"2019-04-03","closureDate":"2020-06-29","expirationDate":"2020-04-30","inactiveDate":"2020-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"406895","type":"Hazardous Materials","businessName":"TURNER CONSTRUCTION COMPANY","legalName":"TURNER CONSTRUCTION COMPANY","issuedDate":"2007-04-17","latestIssueDate":"2007-04-17","closureDate":"2007-11-30","expirationDate":"2007-11-30","inactiveDate":null,"status":"Inactive","statusLabel":"Inactive","active":false}],"businessLicenseSourceDate":"2026-07-28","signals":[{"kind":"transition-activity","level":"watch","title":"Recent transition activity","summary":"The property has an unusually active paper trail worth monitoring for the next permit, inspection, deed, or listing.","evidence":["12 permit events since 2023"],"caveat":"Record activity alone does not establish that a sale or redevelopment is planned."}],"legalChecks":[{"id":"use-occupancy","level":"attention","title":"Zoning approval is not the occupancy file","finding":"Use permit #498113: COMPLETED.","why":"Philadelphia says a zoning approval or Property Sales Certification can identify a use without proving that it was established under the Building Code. A change of use, unit count, exits, or fire rating can require a Building Permit and Certificate of Occupancy.","action":"Verify the lawful use, unit count, associated construction permits, and Certificate of Occupancy with L&I.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-certificate-of-occupancy/"},{"id":"permit-status","level":"attention","title":"A permit row needs file-level verification","finding":"51 permits not marked completed: 768919 (Expired), 916855 (Expired), 933344 (Expired), 959133 (Issued), 968299 (Issued). At least one row also carries a completion date, so the City fields conflict.","why":"Issued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.","action":"Open the permit file and confirm final inspections, holds, and any resulting occupancy certificate.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"investigations","level":"verify","title":"Failed inspections are dated events—not the current condition","finding":"2 failed, 2 passed, and 0 CLOSED investigation outcomes are in the fetched history; the latest dated visit was PASSED on Sep 17, 2009.","why":"A PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.","action":"Open the parent case/permit for each material failure and confirm its later disposition.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"business-license","level":"verify","title":"A historical business license is not current operating authority","finding":"Hazardous Materials #406895: Inactive; Food Preparing and Serving (30+ SEATS) #503872: Inactive since Jun 29, 2020; Dumpster License - Private Property #519280: Inactive; Food Preparing and Serving #0956799: Inactive since Sep 16, 2025","why":"A license record proves the licensed activity existed at that time. An inactive or expired license does not establish that the business still operates—or that it may legally reopen under the same use.","action":"If business income matters, verify the current tenant, use registration, and active license in eCLIPSE.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/licenses/business-licenses/"},{"id":"deed-chain","level":"verify","title":"The latest nominal transfer is not a market sale—or a title opinion","finding":"The latest deed in the assembled record moved for nominal consideration.","why":"A $1 or nominal deed can be a valid family, estate, or entity transfer. It does not establish a sale price, clear title, or by itself prove a tangled title.","action":"Read the recorded deed and have the title search confirm every grantor, grantee, estate/probate step, lien, and authority to sell.","url":"https://www.phila.gov/services/property-lots-housing/get-a-copy-of-a-deed-or-other-recorded-document/"},{"id":"full-tax-exemption","level":"verify","title":"OPA shows a full exemption; its legal basis is unverified","finding":"OPA currently marks the land and building assessment fully tax-exempt; BlockReport does not receive the exemption determination or basis.","why":"Full OPA exemptions can have different legal bases, including government, religious, charitable/institutional, veteran, or other treatment. The current owner/use record is not a buyer’s tax forecast.","action":"Confirm the exact exemption basis, buyer eligibility, and next tax-year treatment directly with OPA.","url":"https://www.phila.gov/departments/office-of-property-assessment/tax-exemptions-and-abatements/"},{"id":"commercial-trash","level":"verify","title":"A separate Commercial Trash account may apply","finding":"OPA classifies the parcel as commercial. BlockReport does not receive a current Commercial Trash account balance.","why":"Philadelphia charges qualifying small commercial, mixed-use, and multi-unit properties that use City collection; exemptions and private collection can change applicability. A use category alone does not prove a fee is due.","action":"Check the Commercial Trash account inside the date-effective Property Payoff.","url":"https://www.phila.gov/2026-06-09-pay-your-trash-fee-bill-by-june-30/"},{"id":"violations","level":"clear","title":"No open violation; closed history remains relevant","finding":"The fetched record shows 0 open and 11 historical violations across 2 cases.","why":"A closed case is materially better than an open one, but it does not by itself prove that every altered use, unit, or concealed condition matches today’s approvals.","action":"Use the closed cases to target the inspection and occupancy-file review.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/violation-and-order-types/"},{"id":"building-certifications","level":"clear","title":"Filed system certifications are current in this dataset","finding":"Facade Report: Safe through May 6, 2030","why":"Fire-protection certifications apply to the named system and inspection period only; they are not a whole-building safety certificate. Philadelphia generally requires annual sprinkler, standpipe, fire-alarm, special-hazard, and emergency-power inspections where those systems exist.","action":"Confirm the certificate covers every applicable system and remains accepted by L&I.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/maintenance-certifications/fire-protection-certifications/"}],"closingChecks":[{"title":"Property Sales Certification","body":"The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.","action":"Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-property-sales-certification/"},{"title":"Date-effective City Property Payoff","body":"The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.","action":"Request the City statement effective through settlement; read every period and invoice.","url":"https://www.phila.gov/guides/philadelphia-tax-center/what-to-do/"},{"title":"Professional title and water-lien searches","body":"OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.","action":"Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.","url":"https://www.phila.gov/2026-04-07-why-title-insurance-is-your-best-friend-when-buying-a-home-in-philadelphia/","secondaryUrl":"https://www.phila.gov/services/water-gas-utilities/pay-or-dispute-a-water-bill/resolve-water-liens-judgments/"}]}