{"asOf":"2026-07-25T10:20:54.965Z","block":"1600-1699 ARCH ST","blockUrl":"https://philadelphia.blockreport.homes/block/1600-1699-arch-st","address":"1622-50 ARCH ST","parcelNumber":"883058000","source":"https://property.phila.gov/?p=883058000","ownerType":"investor","kind":"offices","isHouse":false,"home":false,"commercial":true,"residential":false,"taxExempt":false,"institutional":false,"buildingCode":"DB0","buildingCodeNew":"243","buildingClass":"OFF BLD COM NO GAR MASON","buildingClassNew":"OFFICE BLDNG - High Rise","useLabel":"Offices","owner":"1650 ARCH PARTNERS LP","coOwner":null,"marketValue":69400000,"landAssessment":13880000,"improvementAssessment":55520000,"livableArea":688986,"yearBuilt":1975,"lastSale":{"price":78500000,"date":"2018-06-07T04:00:00Z"},"openViolations":9,"violations":[{"number":"2066213","date":"2011-03-29","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066211","date":"2011-03-29","code":"FC-404.4/1","title":"FIRE/EVAC PLN-UPDATE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066212","date":"2011-03-29","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066210","date":"2011-03-29","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2317382","date":"2011-10-31","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2317383","date":"2011-10-31","code":"FC-1008.1/4","title":"EGRESS DOOR LOCK MUST BE APP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2767040","date":"2013-03-05","code":"FC-409.5/1","title":"SHELTER DRILL CONDUCT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2767039","date":"2013-03-05","code":"FC-105.6/20","title":"WELDING-PERMIT REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2767038","date":"2013-03-05","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922270","date":"2013-09-04","code":"FC-2703.5/5","title":"HAZMAT-INDIV CARTON ETC LABEL","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922271","date":"2013-09-04","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922265","date":"2013-09-04","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922266","date":"2013-09-04","code":"FC-2703.5/2","title":"HAZMAT ID ABOVEGROUND TANKS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922268","date":"2013-09-04","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922272","date":"2013-09-04","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300123","date":"2014-08-19","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300124","date":"2014-08-19","code":"FC-1008.1/2","title":"EGRESS DOOR HI RISE OPEN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300125","date":"2014-08-19","code":"FC-315.2/4","title":"INT MATERIAL STORAGE EQUIP RM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300127","date":"2014-08-19","code":"FC-703.1/2","title":"FIRE-MAINTAIN FIREBLOCK","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300128","date":"2014-08-19","code":"FC-703.1/5","title":"FIRE-DOOR/HARDWARE MAINTAIN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3563158","date":"2015-05-18","code":"A-301.1/4","title":"PERMB- ALTER REPAIR INT PART","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3563159","date":"2015-05-18","code":"A-301.1/51","title":"PERME- INST/REPL/REPAIR WIRE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4039837","date":"2016-08-08","code":"A-203.3/1","title":"UNAPPROVED MAT'L OR ASSEM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4039839","date":"2016-08-08","code":"PM-310.1/1","title":"TEMP CONST-COMPLY BLDG CODE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4039838","date":"2016-08-08","code":"A-901.13/1","title":"PENALTY- NO BLDG PERM INFO","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201398","date":"2016-12-01","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201400","date":"2016-12-01","code":"FC-906.1/1","title":"FIRE EXTING-INSTALL MAX 75FT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201397","date":"2016-12-01","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201399","date":"2016-12-01","code":"FC-703.1/1","title":"FIRE-MAINTAIN ASSEMBLY","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"VI-2022-062299","date":"2022-08-18","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"COMPLIED","resolutionDate":"2023-11-21","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2022-062298","date":"2022-08-18","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"COMPLIED","resolutionDate":"2022-09-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062323","date":"2022-08-18","code":"F-315.3.3","title":"EQUIPMENT ROOMS\n","status":"COMPLIED","resolutionDate":"2023-01-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062322","date":"2022-08-18","code":"F-1004.9","title":"POSTING OF OCCUPANT LOAD\n","status":"COMPLIED","resolutionDate":"2023-01-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062314","date":"2022-08-18","code":"F-105.6.3","title":"HIGH-RISE BUILDING\n","status":"COMPLIED","resolutionDate":"2022-09-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062308","date":"2022-08-18","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2022-062311","date":"2022-08-18","code":"F-909.20.2","title":"SMOKE CONTROL SYSTEM RECORDS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2022-062302","date":"2022-08-18","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2022-062377","date":"2022-08-18","code":"L-O","title":"FAIL OBTAIN LICENSE\n","status":"COMPLIED","resolutionDate":"2022-09-22","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2023-050584","date":"2023-07-14","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2024-04-15","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2026-000504","date":"2026-01-05","code":"9-3402(2)","title":"BENCHMARKING LATE","status":"CLOSED","resolutionDate":"2026-01-06","resolution":"CLOSED - WRITTEN IN ERROR"},{"number":"VI-2026-000869","date":"2026-01-06","code":"9-3402(2)","title":"BENCHMARKING LATE","status":"CLOSED","resolutionDate":"2026-02-19","resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2026-017287","date":"2026-03-26","code":"F-105.6.3","title":"HIGH-RISE BUILDING\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"3764992","date":"2015-11-06","code":"A-301.1/55","title":"PERMP- ALTER/REPAIR/REPL PLUMB","status":"CLOSEDCASE","resolutionDate":null,"resolution":null},{"number":"3993087","date":"2015-12-29","code":"A-301.1/54","title":"PERMP- INST NEW PLUMBING","status":"COMPLIED","resolutionDate":null,"resolution":null}],"violationCases":[{"number":"270919","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2011-03-30","completedDate":"2011-10-03","violations":[{"number":"2066213","date":"2011-03-29","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066211","date":"2011-03-29","code":"FC-404.4/1","title":"FIRE/EVAC PLN-UPDATE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066212","date":"2011-03-29","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2066210","date":"2011-03-29","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"305507","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2011-11-09","completedDate":"2012-06-14","violations":[{"number":"2317382","date":"2011-10-31","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2317383","date":"2011-10-31","code":"FC-1008.1/4","title":"EGRESS DOOR LOCK MUST BE APP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"371853","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2013-03-07","completedDate":"2013-05-28","violations":[{"number":"2767040","date":"2013-03-05","code":"FC-409.5/1","title":"SHELTER DRILL CONDUCT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2767039","date":"2013-03-05","code":"FC-105.6/20","title":"WELDING-PERMIT REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2767038","date":"2013-03-05","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"400571","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2013-09-04","completedDate":"2013-10-09","violations":[{"number":"2922270","date":"2013-09-04","code":"FC-2703.5/5","title":"HAZMAT-INDIV CARTON ETC LABEL","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922271","date":"2013-09-04","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922265","date":"2013-09-04","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922266","date":"2013-09-04","code":"FC-2703.5/2","title":"HAZMAT ID ABOVEGROUND TANKS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922268","date":"2013-09-04","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2922272","date":"2013-09-04","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"448902","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2014-08-20","completedDate":"2014-09-23","violations":[{"number":"3300123","date":"2014-08-19","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300124","date":"2014-08-19","code":"FC-1008.1/2","title":"EGRESS DOOR HI RISE OPEN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300125","date":"2014-08-19","code":"FC-315.2/4","title":"INT MATERIAL STORAGE EQUIP RM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300127","date":"2014-08-19","code":"FC-703.1/2","title":"FIRE-MAINTAIN FIREBLOCK","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3300128","date":"2014-08-19","code":"FC-703.1/5","title":"FIRE-DOOR/HARDWARE MAINTAIN","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"480965","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2015-05-18","completedDate":"2015-06-25","violations":[{"number":"3563158","date":"2015-05-18","code":"A-301.1/4","title":"PERMB- ALTER REPAIR INT PART","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3563159","date":"2015-05-18","code":"A-301.1/51","title":"PERME- INST/REPL/REPAIR WIRE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"548831","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2016-08-08","completedDate":"2016-09-16","violations":[{"number":"4039837","date":"2016-08-08","code":"A-203.3/1","title":"UNAPPROVED MAT'L OR ASSEM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4039839","date":"2016-08-08","code":"PM-310.1/1","title":"TEMP CONST-COMPLY BLDG CODE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4039838","date":"2016-08-08","code":"A-901.13/1","title":"PENALTY- NO BLDG PERM INFO","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"565478","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2016-12-02","completedDate":"2017-05-10","violations":[{"number":"4201398","date":"2016-12-01","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201400","date":"2016-12-01","code":"FC-906.1/1","title":"FIRE EXTING-INSTALL MAX 75FT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201397","date":"2016-12-01","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4201399","date":"2016-12-01","code":"FC-703.1/1","title":"FIRE-MAINTAIN ASSEMBLY","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"CF-2022-084778","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"QOL FIRE SAFETY INVESTIGATOR","status":"IN VIOLATION","createdDate":"2022-08-18","completedDate":null,"violations":[{"number":"VI-2022-062299","date":"2022-08-18","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"COMPLIED","resolutionDate":"2023-11-21","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2022-062298","date":"2022-08-18","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"COMPLIED","resolutionDate":"2022-09-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062323","date":"2022-08-18","code":"F-315.3.3","title":"EQUIPMENT ROOMS\n","status":"COMPLIED","resolutionDate":"2023-01-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062322","date":"2022-08-18","code":"F-1004.9","title":"POSTING OF OCCUPANT LOAD\n","status":"COMPLIED","resolutionDate":"2023-01-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062314","date":"2022-08-18","code":"F-105.6.3","title":"HIGH-RISE BUILDING\n","status":"COMPLIED","resolutionDate":"2022-09-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-062308","date":"2022-08-18","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2022-062311","date":"2022-08-18","code":"F-909.20.2","title":"SMOKE CONTROL SYSTEM RECORDS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2022-062302","date":"2022-08-18","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"OPEN","resolutionDate":null,"resolution":null}]},{"number":"CF-2022-084828","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2022-08-18","completedDate":"2022-09-22","violations":[{"number":"VI-2022-062377","date":"2022-08-18","code":"L-O","title":"FAIL OBTAIN LICENSE\n","status":"COMPLIED","resolutionDate":"2022-09-22","resolution":"COMPLIED - OWNER REPAIR"}]},{"number":"CF-2023-066967","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"AUDITS AND INVESTIGATIONS BUILDING CERTS","status":"COMPLIED, BALANCE DUE","createdDate":"2023-07-14","completedDate":null,"violations":[{"number":"VI-2023-050584","date":"2023-07-14","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2024-04-15","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"}]},{"number":"CF-2026-000918","type":"NOTICE OF VIOLATION","priority":"ADMINISTRATIVE NOTICE OF VIOLATION","responsibility":"OOS INVESTIGATOR","status":"CLOSED","createdDate":"2026-01-05","completedDate":"2026-01-06","violations":[{"number":"VI-2026-000504","date":"2026-01-05","code":"9-3402(2)","title":"BENCHMARKING LATE","status":"CLOSED","resolutionDate":"2026-01-06","resolution":"CLOSED - WRITTEN IN ERROR"}]},{"number":"CF-2026-001546","type":"NOTICE OF VIOLATION","priority":"ADMINISTRATIVE NOTICE OF VIOLATION","responsibility":"OOS INVESTIGATOR","status":"COMPLIED, BALANCE DUE","createdDate":"2026-01-06","completedDate":null,"violations":[{"number":"VI-2026-000869","date":"2026-01-06","code":"9-3402(2)","title":"BENCHMARKING LATE","status":"CLOSED","resolutionDate":"2026-02-19","resolution":"CLOSED - ADMINISTRATIVELY"}]},{"number":"CF-2026-028015","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"QOL FIRE SAFETY INVESTIGATOR","status":"IN VIOLATION","createdDate":"2026-03-26","completedDate":null,"violations":[{"number":"VI-2026-017287","date":"2026-03-26","code":"F-105.6.3","title":"HIGH-RISE BUILDING\n","status":"OPEN","resolutionDate":null,"resolution":null}]},{"number":"623039","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3764992","date":"2015-11-06","code":"A-301.1/55","title":"PERMP- ALTER/REPAIR/REPL PLUMB","status":"CLOSEDCASE","resolutionDate":null,"resolution":null}]},{"number":"650553","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3993087","date":"2015-12-29","code":"A-301.1/54","title":"PERMP- INST NEW PLUMBING","status":"COMPLIED","resolutionDate":null,"resolution":null}]}],"violYears":[{"y":2011,"n":6,"worst":null},{"y":2013,"n":9,"worst":null},{"y":2014,"n":5,"worst":null},{"y":2015,"n":4,"worst":null},{"y":2016,"n":7,"worst":null},{"y":2022,"n":9,"worst":null},{"y":2023,"n":1,"worst":null},{"y":2026,"n":3,"worst":null}],"investigations":[{"caseNumber":"70410","date":"2006-07-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"270919","date":"2011-03-29","type":"CI INSP","status":"FAILED"},{"caseNumber":"270919","date":"2011-05-05","type":"CI INSP","status":"FAILED"},{"caseNumber":"270919","date":"2011-10-03","type":"CI INSP","status":"PASSED"},{"caseNumber":"305507","date":"2011-10-31","type":"CI INSP","status":"FAILED"},{"caseNumber":"305507","date":"2011-12-15","type":"CI INSP","status":"FAILED"},{"caseNumber":"305507","date":"2012-06-11","type":"CI INSP","status":"PASSED"},{"caseNumber":"371853","date":"2013-03-05","type":"CI INSP","status":"FAILED"},{"caseNumber":"371853","date":"2013-04-17","type":"CI INSP","status":"FAILED"},{"caseNumber":"371853","date":"2013-05-24","type":"CI INSP","status":"PASSED"},{"caseNumber":"400571","date":"2013-09-04","type":"CI INSP","status":"FAILED"},{"caseNumber":"400571","date":"2013-10-09","type":"CI INSP","status":"PASSED"},{"caseNumber":"448902","date":"2014-08-19","type":"CI INSP","status":"FAILED"},{"caseNumber":"448902","date":"2014-09-23","type":"CI INSP","status":"PASSED"},{"caseNumber":"480965","date":"2015-05-18","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"480965","date":"2015-06-25","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"548831","date":"2016-08-08","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"548831","date":"2016-09-14","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"565478","date":"2016-12-01","type":"CI INSP","status":"FAILED"},{"caseNumber":"565478","date":"2017-01-18","type":"CI INSP","status":"FAILED"},{"caseNumber":"565478","date":"2017-05-10","type":"CI INSP","status":"PASSED"},{"caseNumber":"CF-2022-084778","date":"2022-08-18","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-084828","date":"2022-08-18","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-084828","date":"2022-09-22","type":null,"status":"PASSED"},{"caseNumber":"CF-2022-084778","date":"2022-09-30","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-084778","date":"2023-01-12","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-066967","date":"2023-07-14","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-066967","date":"2023-10-05","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-084778","date":"2023-11-21","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-066967","date":"2023-12-01","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-066967","date":"2024-03-01","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-066967","date":"2025-04-22","type":null,"status":"PASSED"},{"caseNumber":"CF-2026-000918","date":"2026-01-05","type":null,"status":"FAILED"},{"caseNumber":"CF-2026-000918","date":"2026-01-06","type":null,"status":"PASSED"},{"caseNumber":"CF-2026-001546","date":"2026-01-06","type":null,"status":"FAILED"},{"caseNumber":"CF-2026-001546","date":"2026-02-19","type":null,"status":"PASSED"},{"caseNumber":"CF-2026-028015","date":"2026-03-26","type":null,"status":"FAILED"}],"inspYears":[{"y":2006,"fails":0,"passes":1},{"y":2011,"fails":4,"passes":1},{"y":2012,"fails":0,"passes":1},{"y":2013,"fails":3,"passes":2},{"y":2014,"fails":1,"passes":1},{"y":2015,"fails":1,"passes":1},{"y":2016,"fails":2,"passes":1},{"y":2017,"fails":1,"passes":1},{"y":2022,"fails":3,"passes":1},{"y":2023,"fails":5,"passes":0},{"y":2024,"fails":1,"passes":0},{"y":2025,"fails":0,"passes":1},{"y":2026,"fails":3,"passes":2}],"taxOwed":0,"taxSnapshot":{"available":true,"asOf":"2022-06","matched":false},"taxDelinquencySnapshotAsOf":"2022-06","taxDelinquencySnapshotAvailable":true,"lat":39.9546683337797,"lng":-75.16768651108292,"geom":{"type":"Polygon","coordinates":[[[-75.16735393,39.95483162],[-75.16743789,39.954432448],[-75.168019619,39.954505251],[-75.167934559,39.954904269],[-75.16735393,39.95483162]]]},"liDistrict":null,"certifications":[],"cityRecordAvailability":{"violations":true,"investigations":true,"appeals":true,"certifications":false,"permits":true,"licenses":true},"zip":"19103","beds":null,"baths":null,"stories":27,"lotArea":24382,"zoning":"CMX5","grade":"A","basement":null,"heater":null,"centralAir":null,"extCond":"4","intCond":"4","garage":null,"homestead":false,"mail":"100 S BROAD ST STE 1300, PHILADELPHIA PA, 19110","mailOut":false,"appeals":[{"type":"Zoning board appeal","grounds":"PERMIT FOR THE ERECTION OF A FIRST FLOOR ADDITION FOR USE AS EXTENSION TO LOBBY AREA, THE REMOVAL OF TWO (2) ACCESSORY SIGNS, THE ERECTION OF TWO (2) SIGNS ACCESSORY TO AN EXISTING DRY CLEANERS, THE ERECTION OF ONE (1) BUILDING LOGO SIGN AN","status":"CLOSED","outcome":"Granted","date":"2011-01-05","number":"14068","relatedPermit":"313803"}],"taxYears":[],"taxNet":0,"taxLien":false,"taxLedgerThrough":2016,"taxLedgerAvailable":true,"timesSold":1,"abated":false,"assessmentExemption":false,"exemptionBasisVerified":false,"valueSeries":[{"y":2016,"v":74198700,"taxable":74198700,"land":7312500,"improvement":66886200,"taxableLand":7312500,"taxableImprovement":66886200,"exemptLand":0,"exemptImprovement":0},{"y":2017,"v":74198700,"taxable":74198700,"land":7312500,"improvement":66886200,"taxableLand":7312500,"taxableImprovement":66886200,"exemptLand":0,"exemptImprovement":0},{"y":2018,"v":91718600,"taxable":91718600,"land":18343720,"improvement":73374880,"taxableLand":18343720,"taxableImprovement":73374880,"exemptLand":0,"exemptImprovement":0},{"y":2019,"v":79000000,"taxable":79000000,"land":15800000,"improvement":63200000,"taxableLand":15800000,"taxableImprovement":63200000,"exemptLand":0,"exemptImprovement":0},{"y":2020,"v":75300000,"taxable":75300000,"land":15060000,"improvement":60240000,"taxableLand":15060000,"taxableImprovement":60240000,"exemptLand":0,"exemptImprovement":0},{"y":2021,"v":72000000,"taxable":72000000,"land":14400000,"improvement":57600000,"taxableLand":14400000,"taxableImprovement":57600000,"exemptLand":0,"exemptImprovement":0},{"y":2022,"v":70000000,"taxable":70000000,"land":14000000,"improvement":56000000,"taxableLand":14000000,"taxableImprovement":56000000,"exemptLand":0,"exemptImprovement":0},{"y":2023,"v":69000000,"taxable":69000000,"land":13800000,"improvement":55200000,"taxableLand":13800000,"taxableImprovement":55200000,"exemptLand":0,"exemptImprovement":0},{"y":2024,"v":69400000,"taxable":69400000,"land":13880000,"improvement":55520000,"taxableLand":13880000,"taxableImprovement":55520000,"exemptLand":0,"exemptImprovement":0},{"y":2025,"v":69400000,"taxable":69400000,"land":13880000,"improvement":55520000,"taxableLand":13880000,"taxableImprovement":55520000,"exemptLand":0,"exemptImprovement":0},{"y":2026,"v":69400000,"taxable":69400000,"land":13880000,"improvement":55520000,"taxableLand":13880000,"taxableImprovement":55520000,"exemptLand":0,"exemptImprovement":0},{"y":2027,"v":69400000,"taxable":69400000,"land":13880000,"improvement":55520000,"taxableLand":13880000,"taxableImprovement":55520000,"exemptLand":0,"exemptImprovement":0}],"taxNow":971461,"familyHeld":false,"lastTransferNominal":false,"permits":[{"number":"46765","date":"2007-01-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-06-28","scope":"TENANT FIT-OUT AS PER PLANS"},{"number":"49383","date":"2007-01-11","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":null,"scope":"REPLACEW ONE EXISTING PUMP AND RESERVOIR, REPLACE ONE EXISTING BREAK ROOM SINK, REPLACE ONE EXISTING HAND SINK, REPLACE ONE EXISTING DISHWASHER SMALL RESIDENTIAL TYPE, REPLACE ONE EXISTING 12 GAL ELECTRIC HOT WATER HEATER, CONNECT TO EXISTING 1 1/2\" DISCHARE LINE, CONNECT TO EXISTING 1 1/2\" FAI, CONNECT TO EXISTING WATER LINE. EXISTING WATER METER & BACKFLOW PREVENTER."},{"number":"52298","date":"2007-01-25","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-06-28","scope":null},{"number":"53178","date":"2007-01-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 36 DATA LINES & 20 VOICE LINES."},{"number":"51667","date":"2007-01-31","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-07-13","scope":"RENOVATION TO EXISTING SPACE FOR TENANT EXPANSION, INSTALL NEW PANEL, 3 HVAC FEEDS, REUSE 31 EXISTING 2X4 FIXTURES. INSTALL 43 DOWN LGIHTS, 25 WALL SWITCHES, 60 RECEPTS, 10 NEW FIRE ALARM DEVICES AND VOICE/DATA/AV CABLING"},{"number":"69310","date":"2007-04-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-17","scope":"RELOCATE (8) 2X4 LTS, 4 LT SWS, ADD 2 CEILING MTD SENSORS, ADD 5 DUPL RECEPTS. ALL WORK FROM EXISTING PANEL (CC DIST)"},{"number":"69449","date":"2007-04-16","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":null,"scope":null},{"number":"68452","date":"2007-04-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-06-28","scope":"INTERIOR ALTERATIONS ON 20TH FLOOR AS PER PLANS."},{"number":"70188","date":"2007-04-19","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-06-21","scope":null},{"number":"71511","date":"2007-04-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-09","scope":"RELOCATE (6) REGISTERS/DIFFUSERS"},{"number":"72361","date":"2007-04-30","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-06-21","scope":null},{"number":"66792","date":"2007-05-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-04","scope":"ADD 1 SPEAKER STROBE (CENTER CITY DISTRICT)"},{"number":"73687","date":"2007-05-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-06-21","scope":"INTERIOR RENOVATIONS AS PER PLAN"},{"number":"74381","date":"2007-05-15","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-06-21","scope":"HVAC & DUCT WORK AS PER PLAN."},{"number":"77665","date":"2007-06-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RE-WORK EXISTING FIXTURE LAYOUT TO ACCOMODATE NEW OFFICES (6). PROVIDE NEW RECEPTS AND JUNCTION BOXES. (CC DIST)"},{"number":"86884","date":"2007-07-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-11-23","scope":"INSTALL 4 - TELE/DAT OUTLETS AND WIRING TO EXISTING TELECOM ROOM. (CC DIST)"},{"number":"140968","date":"2008-03-26","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":null,"scope":null},{"number":"178115","date":"2008-10-08","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-02-18","scope":"TENANT FIT OUT OF RECIEVING AREA PER SUBMITTED SEALED PLANS."},{"number":"182576","date":"2008-10-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-05-24","scope":"REPLACEMENT OF EXISTING (10) LIGHT FIXTURES, (1) CEILING MOUNTED MOTION SENSOR, (1) DEDICATED 120V -20 AMP RECEPTACLE. (2) RECEPTACLES, (1) POWER WINDOW AIR CURTAIN, POWER LINE ROLLUP DOOR. RELOCATED EXISTING FIRE ALARM AUDIO/VISUAL AND (1) SPEAKER........IN ACCORDANCE WITH 2005 NEC"},{"number":"183254","date":"2008-10-27","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-01-07","scope":"HVAC, INCLUDING RAISING OF EXISTING DUCTWORK AND INSTALL NEW AIR CURTAIN FOR OFFICE BLDG."},{"number":"191222","date":"2008-12-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-12-10","scope":"INSTALL FIBER TO CONNECT TO A SYNESYS RING IN THE CITY, RACK OF BATTERIES, ROUTER, MEDIA CONVERTOR SHELF, THIS WORK IS FOR COGENT COMMUNICATIONS TO PROVIDE HIGH SPEED INTERNET TO CUSTTOMERS IN THE BUILDING (CC DISTRICT)"},{"number":"190528","date":"2008-12-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-01-12","scope":"TENANT FIT-OUT"},{"number":"193514","date":"2008-12-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-08-18","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT. INSTALL (8) LIGHT FIXTURES, (2) WALL SWITCHES, (9) RECEPTACLES, USE EXISTING CIRCUITS FROM DEMOLITION, AS PER 2005 NEC (CC DIST)"},{"number":"195476","date":"2009-01-06","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-02-18","scope":null},{"number":"195316","date":"2009-01-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-12-10","scope":"INSTALLATION OF 2\" PLENUM INNER DUCT FROM THE BASEMENT TO THE 27TH FLOOR. WE WILL INSTALL A 4\" X 4\" X 24\" PULL BOX ON EVERY FLOOR AND FIRE STOP, WE WILL ALSO INSTALL A EMON DEMON METER. THIS WORK IS FOR COGENT COMMUNICATION'S INC, ALL AS PER 2005 NEC (CC DIST)"},{"number":"282068","date":"2010-05-28","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-02","scope":"RELOCATE 16 DIFFUSERS/REGISTERS (TENANT: EPA)"},{"number":"283033","date":"2010-06-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-11-14","scope":"RELOCATE 74 EXISTING SPRINKLER HEADS (FLOORS 3, 5, 7, 9, 10, 11, 13, 14 & 16)"},{"number":"282631","date":"2010-06-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-07-02","scope":"ALTERATIONS TO INDIVIDUAL OFFICES ON 3RD,5TH,7TH,9TH,10TH,11TH,13TH,14TH AND 16TH FLOORS PER ATTACHED PLANS."},{"number":"294518","date":"2010-08-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-09-28","scope":"RENOVATION TO EXISTING OFFICES, INSTALL (18) LIGHT FIXTURES, (20) SWITCHES, (63) RECEPTACLES. RELOCATE (58) LIGHT FIXTURES, REUSE EXISTING CIRCUITS FROM DEMOLITON, NO ANTICIPATED CHANGE IN LOAD AS PER 2008 NEC (CC DIST)"},{"number":"294008","date":"2010-08-11","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-03-03","scope":"INTERIOR/EXTERIOR RENOVATIONS OF EXISTING LOBBY AND ENTRANCE WAY AND SIDEWALK AREA, AS PER SUBMITTED PLANS."},{"number":"20773","date":"2010-10-22","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2010-10-22","scope":"OPERATION PERMIT FOR HOT WORK USING GAS AND ELECTRIC FOR CUTTING, WELDING, GRINDING, AND TORCH WORK ON THE 15TH FLOOR"},{"number":"304181","date":"2010-10-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-29","scope":"PROVIDE POWER FOR 3 NEW 4160V CHILLERS & 6 480V PUMPS."},{"number":"317329","date":"2010-12-20","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-03-15","scope":"INTERIOR DEMO 9TH FL NON LOAD BEARING PARTITIONS ONLY."},{"number":"318663","date":"2010-12-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-04","scope":"RELOCATE (20) DIFFUSERS, 18TH FLOOR (MCGIVNEY KLUGER)"},{"number":"319361","date":"2011-01-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-08","scope":"FURNISH AND INSTALL LIGHTING AND POWER THRU-OUT SPACE AS PER 2008 NEC"},{"number":"320182","date":"2011-01-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-02-04","scope":"RELOCATION OF (10) SPRINKLER HEADS"},{"number":"321120","date":"2011-01-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-02-04","scope":"INSTALL A PANTRY SINK IN MILLWORK, CONNECT TO EXISTING SERVICES"},{"number":"318941","date":"2011-01-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-02-04","scope":"INTERIOR RENOVATIONS TO EXISTING OFFICE SPACE AS PER PLANS."},{"number":"321959","date":"2011-01-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"8 SPEAKER STROBES AS PER 2008 NEC"},{"number":"322609","date":"2011-01-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"INSTALL 50 CAT 6 PLENUM CABLES TO 25 LOCATIONS LONGEST RUN 150' AS PER 2008 NEC"},{"number":"324626","date":"2011-02-14","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-06-07","scope":"DEMOLITION OF INTERIOR NON LOAD BEARING PARTIONS, DROP CEILINGS THROUGHOUT 26TH FLOOR OF OFFICE BLDG."},{"number":"313803","date":"2011-02-14","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2011-02-14","scope":"MODIFICATION, RENOVATION AND EXPANSION OF EXISTING GROUND FLOOR LOBBY TO INCLUDE RELOCATED ENTRANCEWAY, NEW ENTRANCE/BLDG SIGNAGE, RENOVATION OF EXISTING MONUMENT SIGN, RELOCATION OF INTERIOR TENANT SIGNAGE AS PERMITTED IN C-S COMMERCIAL IN ACCORDANCE WITH ATTACHED PLANS"},{"number":"322931","date":"2011-02-14","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2011-09-06","scope":"REVISIONS TO PRIOR PERMIT AP294008 FOR ALTERATIONS /MODIFICATIONS TO LOBBY/FACADE/ENTRANCE/SIDEWALK AREAS, AS PER SUBMITTED PLANS AND ZONING PLOT PLANS. PRIOR STREETS APPROVAL REMAIN. NO CHANGES IN USE OR OCCUPANCY."},{"number":"325817","date":"2011-02-22","work":"Use","type":"ZP_USE","description":"USE PERMIT","status":"COMPLETED","completedDate":"2011-02-22","scope":"TO SUBDIVIDE EXISTING DRY CLEANING SPACE TO CREATE SMALLER DRY CLEANING SPACE AND REMAINING PORTION TO BE USED FOR LOBBY SEATING AREA."},{"number":"311865","date":"2011-02-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-09-06","scope":"INTERIOR RENOVATIONS TO THE DRY CLEANING SPACE AND CREATION OF A LOBBY SEATING AREA AS PER PLANS."},{"number":"325951","date":"2011-02-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-09-06","scope":"INSTALL HVAC,INCLUDING DUCTOWRK AS PER PLANS"},{"number":"328028","date":"2011-03-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-09","scope":"OFFICE FIT OUT AS PER PLANS."},{"number":"328255","date":"2011-03-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RENOVATION OF EXISTING MAIN LOBBY INCLUDING NEW LIGHT FIXTURES,LIGHTING CONTROL AND RECPTACLES,FIRE ALARM WORK WILL BE UNDER A SEPERATE PERMIT AS PER 2008 NEC,NFPA-72"},{"number":"334781","date":"2011-04-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-06-09","scope":"RELOCATE 151 EXISTING SPRINKLER HEADS (26TH FLOOR)"},{"number":"334034","date":"2011-04-12","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-06-07","scope":"26TH FLOOR - FURNISH AND INSTALL (4)SINKS - CONNECT TO EXISTING SERVICES"},{"number":"334526","date":"2011-04-13","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-06-09","scope":"INSTALL NEW HVAC INCLUDING DUCTWORK"},{"number":"335085","date":"2011-04-18","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-06-09","scope":"26TH FLOOR - FURNISH AND INSTALL (7)WATER CLOSETS, (8)LAVATORIES AND (3)URINALS - CONNECT TO EXISTING SERVICES"},{"number":"336641","date":"2011-04-20","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-06-28","scope":"RELOCATE (4) DIFFUSERS"},{"number":"340218","date":"2011-05-13","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-09","scope":"INTERIOR RENOVATIONS TO PROVIDE ADA COMPLIANT BATHROOMS"},{"number":"333498","date":"2011-05-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-27","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC."},{"number":"342925","date":"2011-05-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-05","scope":"RELOCATE 10 DIFFUSERS"},{"number":"336779","date":"2011-05-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"FURNISH AND INSTALL 27 SPEAKER STROBES,1 NAC PANEL AS PER 2008 NEC,NFPA -72"},{"number":"341602","date":"2011-05-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-07-05","scope":"INTERIOR FIT OUT 19TH FLOOR OFFICES FOR \"SCHLESINGER ASSOCIATES\""},{"number":"343211","date":"2011-05-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-07-05","scope":"RELOCATE 16 SPRINKLER HEADS (19TH FLOOR)"},{"number":"343605","date":"2011-05-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-08-01","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DIST)"},{"number":"337681","date":"2011-06-01","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2011-06-22","scope":"LAWFUL OCCUPANCY SIGN FOR 4TH FLOOR CONFERENCE ROOM (ROOM 104) WITHIN EXISTING OFFICE BUILDING AS PER PLANS."},{"number":"337423","date":"2011-06-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-11-25","scope":"RELOCATE EXISTING DEVICES AND ADD 2 NEW SPEAKER/STROBES AS PER 2008 NEC,NFPA-72"},{"number":"345613","date":"2011-06-07","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-06-28","scope":"RELOCATE 4 EXISTING SPRINKLER HEADS (26TH FLOOR RESTROOMS)"},{"number":"344208","date":"2011-06-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-07-05","scope":"19TH FLOOR - FURNISH AND INSTALL (1)SINK - CONNECT TO EXISTING SERVICES"},{"number":"346201","date":"2011-06-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-27","scope":"REMOVE AND REPLACE EXISTING LIGHTING,SWITCHES AND RECEPTACLES, REPLACE EXISTING FIRE ALARM DEVICES WITH NEW AS PER 2008 NEC"},{"number":"333925","date":"2011-06-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-27","scope":"FURNISH AND INSTALL 400 CAT 6 CABLES PLENUM RATED AVG CABLES PULL 135'AS PER 2008 NEC"},{"number":"346945","date":"2011-06-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-24","scope":"FURNISH AND INSTALL 90 CAT 5E CABLES AVE PULL 75' AS PER 2008 NEC. INSTALLATION COMPLY WITH ARTICLES 300.21 & 800 OF THE 2008 NEC."},{"number":"349515","date":"2011-06-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-11-30","scope":"INTERIOR RENOVATIONS TO OFFICE SPACE ON PARTIAL 27TH FLR IN AN EXISTING OFFICE BLDG. PER PLAN."},{"number":"352856","date":"2011-07-14","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-09-11","scope":"INTERIOR DEMO OF EXISTING OFFICE SPACE. NON-STRUCTURAL, INCLUDING CEILING TILE AND CARPET."},{"number":"348916","date":"2011-07-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"FURNISH AND INSTALL (5) SPEAKER/STROBES, (1) NAC PANEL, (1) SIGNAL ZAM, AS PER NFPA-72 (CC DIST)"},{"number":"354314","date":"2011-07-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-09-11","scope":"FOR PARTIAL INTERIOR DEMOLITION AND FOR INTERIOR ALTERATIONS TO INCLUDE FRAMING, INSTALLATION OF GYPSUM WALLBOARD, NEW PARTITION WALLS AND NEW ACOUSTIC SUSPENDED CEILINGS AS PER PLANS ON THE 18TH FLOOR OF AN EXISTING OFFICE BUILDING."},{"number":"355578","date":"2011-07-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-09-11","scope":"RELOCATE (8) DIFFUSERS ON 18TH FLOOR. TENANT-SCRIPTS SWING"},{"number":"356278","date":"2011-08-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-09-11","scope":"RELOCATION OF (8) SPRINKLER HEADS"},{"number":"356454","date":"2011-08-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-09-29","scope":"REMOVE AND RELOCATE 20 2X4 FIXTURES 8 OCC SENSORS, 12 DUPLEX RECEPTACLES AND 2 DEDICATED RECEPTCLES, 8 TEL/DATA STUBS AS PER 2008 NEC"},{"number":"356332","date":"2011-08-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-09-07","scope":"RELOCATE 50 SPRINKLER HEADS (LOBBY)"},{"number":"355157","date":"2011-08-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-01","scope":"REVATION OF EXISTING CONFERENCE ROOMS INCLUDING,NEW LIGHT FIXTURES AND RELOCATION OF RECEPTACLES RE USE ALL EXISTING CIRCUITS AS PER 2008 NEC"},{"number":"360069","date":"2011-08-26","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-09-11","scope":"1 SINK"},{"number":"358679","date":"2011-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"INSTALL 1 NAC PANEL & 12 SPEAKER STROBES - AS PER 2008 NEC"},{"number":"363417","date":"2011-09-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-11-30","scope":"FURNISH AND INSTALL SINK, SHOWER WITH NO PIPING...CONNECT TO EXISTING SERVICES"},{"number":"357472","date":"2011-09-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-11-30","scope":"FOR THE INSTALLATION OF OVERHEAD CANOPY PROTECTION (SHELTER PLATFORM) FOR EXISTING OFFICE BUILDING AS PER PLAN."},{"number":"389434","date":"2012-02-24","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-04-11","scope":"INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND PARTITIONS. INITIAL SCOPE OF WORK INCLUDES SAFING OFF ELECTRICAL, MECHANICAL, PLUMBING SERVICE. INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS ONLY. NO OTHER WORK ALLOWED UNDER THIS PERMIT. CONTACT STREETS DEPARTMENT FOR DUMPSTER PERMIT AND FOOTWAY CLOSURE. THREE SETS OF PLANS DRAWN TO PROFESSIONAL QUALITY ARE TO BE SUBMITTED FOR REVIEW AND APPROVAL BY THE DEPARTMENT BEFORE WORK ON RENOVATION STARTS."},{"number":"389058","date":"2012-02-27","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-10-10","scope":"GENERAL OFFICE TENANT UPGRADES TO FINISHES, NEW PARTITIONS, CEILINGS FOR ADDITIONAL OFFICE ROOMS/LAYOUT. NO CHANGE IN USE- OCCUPANCY. ADD'L PERMITS REQUIRED : ELECTRICAL, PLUMBING, HVAC, FIRE SUPPRESSION."},{"number":"396942","date":"2012-04-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-10-02","scope":"INTERIOR ALTERATIONS ON THE 25TH FLOOR OF AN EXISTING OFFICE BUILDING AS PER THE SUBMITTED SEALED PLANS. PLUMBING, ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. FIRE RATED ASSEMBLIES ARE REQUIRED TO BE MAINTAINED AT ALL TIMES. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"392505","date":"2012-04-11","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-12-11","scope":"FURNISH AND INSTALL FLOOR DRAIN, CONNECT TO EXISTING SERVICES"},{"number":"401328","date":"2012-04-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-06-29","scope":"RELOCATE 88 SPRINKLER HEADS, 25TH FLOOR"},{"number":"403135","date":"2012-05-04","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-07-02","scope":"INTERIOR DEMOLITION OF EXISTING OFFICE SPACE."},{"number":"386408","date":"2012-05-04","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2014-10-15","scope":"REQUEST CO FOR STE 1906-OFFICE SPACE"},{"number":"403651","date":"2012-05-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"RELOCATE 10 DIFFUSERS"},{"number":"403136","date":"2012-05-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-07-24","scope":"INTERIOR RENOVATION TO EXISTING OFFICE AS PER PLAN."},{"number":"405100","date":"2012-05-15","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"RELOCATE 14 SPRINKLER HEADS"},{"number":"405413","date":"2012-05-16","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-06-27","scope":"INTERIOR DEMOLITION OF 2 RESTROOMS ON FLOOR 25., ONLY. NO LOAD BEARING OR FIRE RATED WALLS. BUILDING PERMITS TO FOLLOW THIS PERMIT."},{"number":"405427","date":"2012-05-16","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-06-29","scope":"INTERIOR DEMOLITION OF 2 RESTROOMS ON FLOOR 21, ONLY. NO LOAD BEARING OR FIRE RATED WALLS. BUILDING PERMITS TO FOLLOW THIS PERMIT."},{"number":"408138","date":"2012-05-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"RELOCATION OF (4) REGISTERS/DIFFUSERS FOR OFFICE BLDG."},{"number":"408139","date":"2012-05-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"RELOCATE (4) REGISTERS/DIFFUSERS."},{"number":"407335","date":"2012-05-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-09-17","scope":"FIT-OUT OF EXISTING BATHROOM AS OER THE SUBMITTED PLANS. PLUMBING, ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"407336","date":"2012-05-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-09-17","scope":"FIT-OUT OF EXISTING RESTROOM FOR OFFICE ON THE 21ST FLOOR AS PER PLANS."},{"number":"408377","date":"2012-06-04","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"INSTALL PANTRY SINK"},{"number":"408379","date":"2012-06-04","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"REPLACE: (7)WATER CLOSETS, (3)URINALS, (8)LAVATORIES WITH NO ADDITIONAL PIPING"},{"number":"408380","date":"2012-06-04","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"REPLACE: (7)WATER CLOSETS, (3)URINALS, (8)LAVATORIES WITH NO ADDITIONAL PIPING"},{"number":"409215","date":"2012-06-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-06-29","scope":"FURNISH & INSTALL 1 COFFEE STATION SINK, COMPLETE WITH WASTE & WATER PIPING, CONNECTED TO EXISTING PIPING BELOW (OFFICE SPACE)"},{"number":"408632","date":"2012-06-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-20","scope":"RELOCATE EXISTING FA DEVICES, FURNISH AND INSTALL WIRING FOR RECEPTS AND OFFICE FURNITURE, LT FIXTURES IN OFFICE AND HALWAYS AS PER 208 NEC(COMMERCIAL-OFFICE SPACE)(CC DIST)"},{"number":"410089","date":"2012-06-11","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-07-11","scope":"INTERIOR DEMOLITION OF 2 RESTROOMS ON FLOOR 22 ONLY. NO LOAD BEARING OR FIRE RATED WALLS - ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL AND PLUMBING"},{"number":"411490","date":"2012-06-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-09-17","scope":"INSTALLATION OF: (7)WATER CLOSETS, (9)LAVATORIES, (3) URINALS"},{"number":"412103","date":"2012-06-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"INTERIOR ALTERATIONS: FIT-OUT OF EXISTING COMMON TOILET ROOMS 22ND FLOOR."},{"number":"408343","date":"2012-06-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-04-10","scope":"LEVEL 2 ALTERATIONS OF AN EXISTING OFFICE SPACE, ALTERATIONS FOR NON LOAD BEARING INTERIOR PARTIOTIONS AS PER THE SUBMITTED PLAN. FIRE RATED ASSEMBLIES ARE REQUIRED TO BE MAINTAINED AT ALL TIMES. PLUMBING, ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"413011","date":"2012-06-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-01-15","scope":"RELOCATE 39 SPRINKLER HEADS, 22ND FLOOR"},{"number":"413144","date":"2012-06-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-09-17","scope":"RELOCATE 8 SPRINKLER HEADS"},{"number":"413145","date":"2012-06-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-07-31","scope":"RELOCATE 8 SPRINKLER HEADS"},{"number":"413470","date":"2012-06-27","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2012-07-24","scope":"INTERIOR DEMOLITION OF RESTROOMS ON 20TH FLOOR"},{"number":"413950","date":"2012-06-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"RELOCATE 4 DIFFUSERS"},{"number":"413951","date":"2012-06-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-04-03","scope":"RELOCATE 14 DIFFUSERS"},{"number":"412788","date":"2012-07-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-09-14","scope":"INTERIOR FIT OUT OF EXISTING OFFICE SPACE."},{"number":"413858","date":"2012-07-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-17","scope":"RELOCATE 52 2X4 EXISTING FIXTURES & 12 EXISITNG 2X2 FIXTURES/1 DWNLGT/3 EXIT LGTS/3 DED DUPLEX FOR COPY MACHINES/50 DUPLEX RECEPTS/7 FURNITURE FEE-WALL/2 QUSD FLOOR RECEPTS(WIREMOLDRC3 SERIES) AS PER 2008 NEC"},{"number":"415095","date":"2012-07-09","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-14","scope":"RELOCATE 4 DIFFUSERS"},{"number":"415096","date":"2012-07-09","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-09-20","scope":"RELOCATE 4 DIFFUSERS"},{"number":"413596","date":"2012-07-11","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"ALTERATIONS TO EXISTING TOILET ROOMS."},{"number":"415330","date":"2012-07-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-08-13","scope":"INTERIOR ALTERATIONS AS PER PLANS FOR THE 19TH FLOOR OFFICE SPACE. FIRE RATED ASSEMBLIES ARE REQUIRED TO BE MAINTAINED AT ALL TIMES. PLUMBING, ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"416465","date":"2012-07-16","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-09-14","scope":"RELOCATE 98 SPRINKLER HEADS (20TH FLOOR)"},{"number":"416608","date":"2012-07-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-09-25","scope":"HVAC, INCLUDING DUCTWORK 83 REGISTERS/DIFFUSERS ON THE 20TH FLOOR OF AN EXISTING OFFICE BUILDING PER THE SEALED SUBMITTED PLAN. FIRE RATED ASSEMBLIES AND DEVICES ARE REQUIRED TO BE MAINTAINED AT ALL TIMES. ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"417190","date":"2012-07-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"REMOVE AND RELOCATE 4 EXISTING 2X4 FIXTURES AND 7 EXISTING DUPLEX RECEPTACLES PER 2008 NEC"},{"number":"417712","date":"2012-07-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-08-13","scope":"PEARSON KOUTCHER - 19 FLOOR -RELOCATE 6 SPRINKLER HEADS"},{"number":"417713","date":"2012-07-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"20TH FLOOR RESTROOMS - RELOCATE 6 SPRINKLER HEADS"},{"number":"417714","date":"2012-07-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"22ND FLOOR RESTROOMS - RELOCATE 14 SPRINKLER HEADS"},{"number":"407940","date":"2012-07-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-12","scope":"INSTALL 15 NEW DUPLEX RECEPTS(NO NEW CIR REQ,RE-USE WIRE FROM DEMO),12 NEW GFI RECEPTS,1 NEW POKE THRU DEVICE,12 NEW OCCUPANCY SENSORS IN PLACE OF SINGLE POLE SW,DISCONNECT & RECONNECTE 4 EXISTING EXHAUST FANS,REMOVE /REINSTALL EXISTING LIGHT FIXTURES(NO NEW WIRING) AS PER 2008 NEC"},{"number":"417746","date":"2012-07-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-09","scope":"DISCONNECT/RECONNECT LIGHT FIXTURES-N NEW CIRCUITING. DISCONNECT/RECONNECT EXHAUST FAN FIRE ALARM DEVICE RELOCATED 8FT PER RESTROOM AS PER NEC 2008 (BLDG)"},{"number":"417185","date":"2012-07-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-08-24","scope":"REPLACE (7) WATER CLOSETS, (3) UNINALS, AND (8) LAVATORIES WITH NO ADDITIONAL PIPING."},{"number":"417187","date":"2012-07-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-10-16","scope":"FURNISH AND INSTALL (1) KITCHEN SINK, CONNECT TO EXISTING SERVICE ON 19TH FLOOR"},{"number":"417232","date":"2012-07-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-10-10","scope":"FURNISH AND INSTALL (1) WATER CLOSET, (1) LAVATORY, (1) SHOWER, AND (2) KITCHEN SINKS, CONNECT TO EXISTING SERVICES ON 20TH FLOOR."},{"number":"421216","date":"2012-08-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL OF CAT 6 VOICE & DATA CABLES FOR 53-VOICE JACKS, 73-DATA JACKS, 3-CAT 6 PATCH PANELS AS PER NEC 2008 (OFFICE BLDG)"},{"number":"421466","date":"2012-08-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-11-28","scope":"WIRE AND CONNECT 11 FIRE ALARM DEVICES RELOCATE EXISITING 03 FIRE ALARM DEVICES (TIED IN WITH PERMIT 413858) PER 2008 NEC & NFPA 72 (OFFICE BLDG)"},{"number":"417195","date":"2012-08-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-16","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT PER 2008 NEC"},{"number":"407130","date":"2012-08-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-24","scope":"FURNISH AND INSTALL 60 CATEGORY 5E PLENUM CABLES, AVERAGE CABLE PULL 110 FEET AS PER 2008 NEC (CC DIST) OFFICE SPACE"},{"number":"420707","date":"2012-09-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"INSTALL CAT 5 LOW VOLTAGE CABLE AS PER 2008 NEC"},{"number":"420266","date":"2012-09-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-04","scope":"FURNISH AND INSTALL FIRE ALARM DEVICES AND EQUIPMENT PER NFPA 72"},{"number":"411219","date":"2012-10-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-19","scope":"HVAC AS PER PLAN"},{"number":"431936","date":"2012-10-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-12-13","scope":"TENANT FIT-OUT PER PLANS, PARTIAL 21ST FLOOR OFFICES FOR DICKIE MCCAMEY AND CHILCOTE"},{"number":"433645","date":"2012-10-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-12-13","scope":"REOCATE 10 DIFFUSERS"},{"number":"434767","date":"2012-10-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-01-08","scope":"REMOVE & RELOCATE 50 EXISTING 2X4 FIXTURES AND 15 EXISTING DUPLEX RECEPTACLES REUSE ALL EXISTING CIRCUITRY NO NEW CIRCUITING REQUIRED PER 2008 NEC (OFFICE SPACE)"},{"number":"434854","date":"2012-10-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-12-13","scope":"RELOCATE (40) EXISTING SPRINKLER HEADS PER TENANT FITOUT, AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"440784","date":"2012-12-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-12-13","scope":"INSTALLATION OF (2) KITCHEN SINKS, CONNECT TO EXISTING SERVICE"},{"number":"463245","date":"2013-04-04","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-05-30","scope":"RELOCATE (31) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT WALL AND CEILING LAYOUT AS PER ALL NFPA NO.13 AND LOCAL CODES."},{"number":"464892","date":"2013-04-12","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2013-07-12","scope":"INSTALL 3 LAVS 2 WC - 2 URINALS - 1 SINK"},{"number":"462772","date":"2013-04-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-05-30","scope":"INTERIOR RENOVATIONS (LEVEL 2) OF EXISTING OFFICE SPACE. (22ND FLOOR)"},{"number":"463404","date":"2013-04-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-07-20","scope":"FURNISH & INSTALL 270 CATEGORY 5E PLENUM CABLES FOR VOICE & DATA AS PER 2008 NEC (OFFICE BLDG)"},{"number":"467577","date":"2013-05-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-11-29","scope":"HVAC, INCLUDING DUCTWORK AND MECHANICAL EQUIPMENT AS PER PLANS. 34 REGISTERS/DIFFUSERS-OFFICE BLDG"},{"number":"468418","date":"2013-05-07","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-07-26","scope":"INTERIOR RENOVATIONS OF EXISTING OFFICE SUITE AS PER PLANS."},{"number":"469234","date":"2013-05-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2013-05-30","scope":"INSTALL KITCHEN SINK"},{"number":"470024","date":"2013-05-08","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-05-30","scope":"RELOCATE (24) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT WALL AND CEILING LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES, SUITE 2502"},{"number":"465135","date":"2013-05-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-08-03","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER PLANS AND SPEC. AS PER 2008 NECSPACE"},{"number":"471042","date":"2013-05-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-08-03","scope":"REMOVE AND RELOCATE 29 EXISTING 2X4 FIXTURES AND 25 EXISTING DUPLEX FIXTURES - REUSE ALL EXISTING CIRCUITRY - AS PER 2008 NEC"},{"number":"471083","date":"2013-05-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-05-30","scope":"RELOCATE 17 DIFFUSERS"},{"number":"469053","date":"2013-06-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"FURNISH & INSTALL FIRE ALARM DEVICES & EQUIPMENT PER DRAWINGS AS PER NEC 2008 & NFPA 72 (OFFICE BLDG)"},{"number":"485440","date":"2013-07-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"6-2X2 DIR/INDIR BASKET T8 LTS, 1 EXIT LT, 5 SINGLE POLE SWITHES, 1 CEIL MNTD OCCUPANCY SENSORS, 1 LOGO SIGN FEED W/ TIME CLOCK, 2 DUP REC CEILING MNTD, 1 QUAD REC, 1 PROJ FEED, 1 VAV FEED UP TO 12KW W/ 3PH DISCNCT AS PER 2008 NEC(OFFICE BLDG)"},{"number":"503634","date":"2013-11-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-01","scope":"INTERIOR ALTERATIONS (LEVEL II) TO EXISTING OFFICE BUILDING TO INCLUDE DEMOLITION OF INTERIOR PARTITIONS, CONSTRUCTION OF NEW INTERIOR PARTITIONS AND ALL OTHER ALTERATIONS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING. SEE APP# 504259 FOR MECHANICAL PERMIT."},{"number":"504259","date":"2013-11-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-01-28","scope":"MECHANICAL ALTERATIONS ON 17TH FLOOR OF EXISTING OFFICE BUILDING AS PER APPROVED PLANS. SEE APP# 503634 FOR APPROVED PLANS."},{"number":"507111","date":"2013-12-04","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-06","scope":"FOR LEVEL II ALTERATIONS TO THE 17TH FLOOR OF AN EXISTING BUILDING, ALTERATION TO INCLUDE THE ERECTION OF PARTITION WALLS IN THE CORRIDOR AND RENOVATION OF THE BATHROOM. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRCIAL, PLUMBING, AND FIRE SUPRESSION WORK."},{"number":"509935","date":"2013-12-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-02-01","scope":"RELOCATING (49) SPRINKLERS ON THE 17TH FLOOR IN THE HNTB SPACE."},{"number":"510045","date":"2013-12-11","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-01-28","scope":"17TH FLOOR - HNTB - FURNISH AND INSTALL (2)KITCHEN SINKS"},{"number":"511797","date":"2013-12-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"INSTALL 18-2X2 FIXTURES, 3-WALL SCONCES, & 1-EXIT SIGN AS PER NEC 2008 (OFFICE BLDG)"},{"number":"512588","date":"2013-12-23","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-02-06","scope":"REMOVE EXISTING PLUMBING FIXTURES IN TOILET ROOM AND REPLACE WITH NO MODIFICATIONS TO PIPING (OFFICE SPACE)"},{"number":"513479","date":"2013-12-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-02-01","scope":"RELOCATE (10) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE NEW WALL AND CEILING LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES (17TH FLOOR CORRIDOR/RESTROOMS)"},{"number":"507848","date":"2014-01-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-04-14","scope":"FURNISH AND INSTALL ALL NECESSARY POWER,TELE/DATA & LIGHTING FIXTURES PER 2008 NEC (OFFICE SPACE)"},{"number":"515363","date":"2014-01-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-01","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR DEMOLITOIN OF PARTITIONS, DOORS, MATERIALS, AND FINISHES. INTERIOR ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, AND UPGRADES TO FINISHES AS PER APPROVED PLANS."},{"number":"512576","date":"2014-01-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-27","scope":"INSTALL 105 CAT6 PLENUM CABLES AT AN AVERAGE OF 125' ALL CABLING WILL BE INSTALLED IN J HOOKS AND ALL PENETRATIONS WILL BE FIRESTOPPED PER ARTICLE 300.21 OF THE 2008 NEC (CC DISTRICT)"},{"number":"510568","date":"2014-01-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"FURNISH AND INSTALL FIRE ALARM DEVICE AND EQUIPMENT PER 2008 NEC & NFPA 72 (OFFICE BLDG)"},{"number":"516602","date":"2014-01-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"RELOCATE TWO EXIT SIGNS AND ONE 2X4 FIXTURE, REWORK SWITCHING AS REQUIRED AS PER 2008 NEC (CC DISTRICT)"},{"number":"516616","date":"2014-01-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-02-06","scope":"RELOCATE 10 DIFFUSERS."},{"number":"516963","date":"2014-01-28","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-02-01","scope":"RELOCATE (4) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT WALL AND CEILING LAYOUT AS PER ALL NFPA NO 13 AND LOCAL CODES. (18TH FLOOR)"},{"number":"516964","date":"2014-01-28","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-07-31","scope":"RELOCATE (8) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT WALL AND CEILING LAYOUT AS PER ALL NFPA NO 13 AND LOCAL CODES. (22ND FLOOR)"},{"number":"517735","date":"2014-01-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-18","scope":"RELOCATE FIVE DIFFERSUERS"},{"number":"516459","date":"2014-01-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-09-18","scope":"LEVEL II ALTERATIONS AS PER PLANS"},{"number":"517859","date":"2014-01-31","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-04-15","scope":"RELOCATE 12 FIXTURES/2 FURNITURE/12 CAT6 LINES, INSTALL 8 CAT6 LINES & 1 RECEPTACLE."},{"number":"526239","date":"2014-04-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-05-21","scope":"INTERIOR RENOVATIONS TO EXISTING SPACE."},{"number":"529087","date":"2014-04-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-06","scope":"25 DUPLEX RECEPTACLES,10 QUADS,10 SWITCHES REWORK LIGHTING TO ACCOMMODATE NEW LAYOUT (OFFICE SPACE)"},{"number":"530017","date":"2014-04-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-05-21","scope":"RELOCATE 18 SPRINKLERS ON THE 17TH FLOOR"},{"number":"532192","date":"2014-04-25","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-05-21","scope":"INSTALLATION OF KITCHEN SINK- CONNECT TO EXISTING SERVICE"},{"number":"532800","date":"2014-05-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-06-25","scope":"FURNISH AND INSTALL 26 NEW DATA CABLES ON VARIOUS FLOORS PER 2008 NEC. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"532221","date":"2014-05-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-06","scope":"AKA 1622-50 ARCH STREET - 17TH FLOOR - 2 SUITES - FURNISH AND INSTALL ALL FIRE ALARM DEVICES & EQUIPMENT PER THE APPROVED PLANS/SPECS - ALL WORK WILL COMPLY WITH THE 2008 NEC AND NFPA 72"},{"number":"531925","date":"2014-05-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-29","scope":"FOR MODIFICATIONS TO AN EXISTING HVAC SYSYTEM TO INCLUDE NEW REGISTERS/DIFFUERS, FANS, EXHAUST AND SUPPLEMENTAL DUCTWORK IN A NEW OFFICE SPACE."},{"number":"544609","date":"2014-06-20","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2014-08-12","scope":"INT DEMO OF NON LOAD BEARING PARTITIONS, ACT SYSEM, FLOOR FINISHES AND ASSOCIATED MEP WORK."},{"number":"546894","date":"2014-07-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-03-11","scope":"LEVEL II INTERIOR FIT OUT OF NON LOAD BEARING PARTITIONS. **SEPARATE AMENDED PERMIT IS REQUIRED FOR SPECIAL INSPECTIONS APPROVAL**"},{"number":"555381","date":"2014-08-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-11-17","scope":"FOR INTERIOR ALTERATIONS OF THE EXISTING BATHROOMS ON THE 23RD AND 24TH FLOORS. STRUCTURE IS FULLY SPRINKLERED. NO CHANGE IN OCCUPANCY. ALL WORK PER APPROVED PLANS."},{"number":"553552","date":"2014-08-21","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-03-11","scope":"AMEND BLDG PERMIT #546894 TO DOCUMENT SPECIAL INSPECTIONS CONTRACTED TO PERFORM THE INSPECTIONS REQUIRED."},{"number":"558128","date":"2014-08-26","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-11-03","scope":"23RD & 24TH FLOOR PLUMBING ALTERATIONS - REMOVE & REPLACE PLUMBING FIXTURES IN THE MEN'S AND WOMEN'S TOILET ROOMS"},{"number":"560324","date":"2014-09-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 10-2X4, 10-1X4 & 12-WALL SCONCES AS PER NEC 2008 (OFFICE BLDG)"},{"number":"561073","date":"2014-09-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-14","scope":"INSTALL 8-2X2, 6-2X4 & 4-WALL SCONES AS PER NEC 2008 (OFFICE BLDG)"},{"number":"562062","date":"2014-09-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-05-14","scope":"RELOCATE 12-LIGHTING FIXTURES, 2-FURNITURE SYSTEM FEEDS, 12-CAT 6 DATA LINES, INSTALL 8-NEW CAT 6 DATA LINES & 1-NEW RECEPTS FOR FAX MACHINE AS PER NEC 2008 (OFFICE BLDG)"},{"number":"561406","date":"2014-09-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-12-08","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO EXISTING BATHROOMS ON THE 27TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS."},{"number":"563789","date":"2014-10-14","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-03-11","scope":"FOR THE REMOVAL OF THE EXISTING AUTOMATIC SPRINKLER SYSTEM AND FOR THE INSTALLATION OF A NEW AUTOMATIC SPRINKLER SYSTEM ON THE 23TH AND 24TH FLOORS INCLUDING A WATER CURTAIN AT THE OPEN STAIRWAY. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH NFPA 13."},{"number":"569544","date":"2014-10-22","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-11-03","scope":"RELOCATE 12 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"564600","date":"2014-10-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-03-11","scope":"FOR THE REMOVAL AND INSTALLATION OF A MECHANICAL SYSTEM THAT TIES INTO BUILDING'S EXISTING MECHANICAL SYSTEM AS PER PLANS."},{"number":"564328","date":"2014-11-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-03-11","scope":"INSTALL (2)KITCHEN SINKS W/LAUNDRY TRAY PUMPS (PER THE ENGINEERS LETTER) AND POINT OF USE ELECTRIC HOT WATER HEATERS ON THE 23RD FLOOR AND INSTALL (3)KITCHEN SINKS W/POINT OF USE ELECTRIC HOT WATER HEATERS ON THE 24TH FLOOR WHICH DRAIN BY GRAVITY"},{"number":"572887","date":"2014-11-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-12-08","scope":"REMOVE AND REPLACE PLUMBING FIXTURES WITH NO ADDITIONAL PIPING, MENS AND WOMENS ROOMS ON THE 27TH FLOOR - WORK PERFORMED IN ACCORDANCE WITH THE PHILADEPHIA PLUBMING CODE 2004"},{"number":"575015","date":"2014-11-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-08","scope":"RELOCATE (TWO) EXISTING EXHAUST UNITS FOR AN EXISTING BATHROOM AND RELOCATE 4 DIFFUSERS WITH IN THE BATHROOM."},{"number":"564655","date":"2014-11-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-04-24","scope":"RENOVATION TO EXISTING SPCAE FOR NEW TENANT. INSTALL 573 LIGHT FIXTURES, 76 LIGHT SWITCHES, 2 LIGHTING CONTROL PANEL, 257 RECEPTACLES, 32 FURNITURE FEED, 10 EQUIPMENT FEED, 4 208/120VOLT PANEL, 4 45KVA TRANSFORMER AND INSTALL SECURITY DEVICES AS PER 2008 NEC (CC DISTRICT)"},{"number":"568270","date":"2014-11-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-27","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT. INSTALL 46 SPEAKER/STROBES, 14 STROBES, 4 PULL STATIONS & 2 NAC PANEL AS PER NFPA72 (CC DISTRICT)"},{"number":"576139","date":"2014-11-24","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-12-08","scope":"RELOCATE 8 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"583570","date":"2015-01-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-03-03","scope":"LEVEL II INTERIOR RENOVATIONS OF EXISTING OFFICE SPACE."},{"number":"587583","date":"2015-01-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-03-03","scope":"RELOCATE 5 DIFFUSERS"},{"number":"587585","date":"2015-01-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-03-03","scope":"RELOCATE 12 EXISTING FIRE SPRINKLER HEADS (REASONS RESEARCH)"},{"number":"588155","date":"2015-02-03","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-03-03","scope":"FURNISH & INSTALL 1 PANTRY SINK, CONNECTO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"588445","date":"2015-02-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-27","scope":"FURNISH AND INSTALL 40 CATEGORY 6 PLENUM CABLES(AVERAGE CABLE PULL 75 FEET)PER 2008 NEC (OFFICE SPACE)"},{"number":"587954","date":"2015-02-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-08","scope":"RELOCATE 26-EXISTING LIGHTING, 7-SWITCHES, 20-RECEPTACLES, 2-FLOOR RECEPTACLES & 2-FURNITURE SYSTEM FEEDS AS PER NEC 2008 (OFFICE SPACE) CC DISTRICT"},{"number":"590360","date":"2015-02-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-08","scope":"FIRE ALARM 6-SPKR/STROBE MC WHITE CEILING, 2-BATTERY 10AH, 1-ADDRESS MOSULE CLASS B SIG, 1-DUAL RELAY IAM, IDNET & 1-COVER ADDRESS MODULE FLUSH AS PER NFPA 72(OFFICE SPACE) CC DISTRICT"},{"number":"613190","date":"2015-05-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-04-04","scope":"REMOVE AND RELOCATE 8 DUPLEX RECEPTACLES AND 24' OF EXISTING TRACK LIGHTING.REUSE ALL EXISTING CIRCUITY,NO NEW CIRCUITING REQUIRED PER 2008 NEC (OFFICE SPACE)"},{"number":"613255","date":"2015-05-28","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-06-29","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"616772","date":"2015-06-11","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-09-18","scope":"RELOCATE 4 DIFFUSERS AND 1 EXISTING 2-1/2 TON WATER SOURCE HEAT PUMP WITH DUCTWORK. ALL WITHIN EXISTING TENANT SPACE, TO COMPLY WITH EZ PERMIT DUCTWORK STANDARDS.EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"619685","date":"2015-06-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-06-29","scope":"LEVEL I INTERIOR ALTERATIONS TO GROUND FLOOR RESTAURANT WORK TO INCLUDE: INSTALLATION OF NEW DROP-CEILING"},{"number":"620120","date":"2015-06-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-08-06","scope":"INSTALL BAR SINK, HAND WASH SINK AND 2 COFFEE URNS, 1 ICE MAKER (CAFE)THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"623039","date":"2015-07-24","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-03-14","scope":"LEVEL II ALTERATIONS. FITOUT FOR CBRE TO CONSTRUCT A NEW MANAGEMENT OFFICE, CONFERENCE CENTER & SPEC OFFICE SUITE. SCOPE INCLUDES: INTERIOR DEMOLITION OF DRY WALL PARTITIONS & ACOUSTICAL CEILINGS, NEW PARTITIONS, ACOUSTICAL CEILINGS, DOORS & FRAMES, MILLWORK & FINISHES."},{"number":"635474","date":"2015-08-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-02","scope":"RE-LOCATE (6) DIFFUSERS 17TH FLOOR (HNTB)"},{"number":"635877","date":"2015-09-01","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2016-03-14","scope":"INTERIOR DEMOLITION OF NON-BEARING WALL"},{"number":"635882","date":"2015-09-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-10-23","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"641156","date":"2015-09-24","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-02-23","scope":"RELOCATE 16 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"644273","date":"2015-10-09","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-02-29","scope":"RELOCATE 58 SPRINKLERS ON 21ST FLOOR ** EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"638777","date":"2015-10-21","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-09-23","scope":"RENOVATION TO EXISTING TENANT SPACE. RELOCATE (41) LIGHT FIXTURES, INSTALL (3) SWITCH, (2) RECEPTACLES, (8) FURNITURE FEED AS PER 2008 NEC (CC DISTRICT)"},{"number":"649318","date":"2015-11-02","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-11-13","scope":"INTERIOR DEMOLITION OF NON LOAD BEARING WALLS.EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"649555","date":"2015-11-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-02-23","scope":"RELOCATE 12 DIFFUSERS. ** EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"650553","date":"2015-11-09","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-09-01","scope":"INSTALL 3- NEW KITCHEN SINKS, CONNECT TO EXISTING SANITARY, VENT AND WATER - NOTE: AMENDED ON 12.31.2015 TO INCLUDE (3)6GALLON DOMESTIC ELECTRIC HOT WATER HEATERS"},{"number":"647001","date":"2015-11-09","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-02-23","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"651090","date":"2015-11-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE 5 DOWNLIGHTS, INSTALL 3 NEW DOWN LIGHTS, 5 RECEPTACLES. ADD 2 SWITCHES AS PER 2008 NEC (CC DISTRICT) NO MAJOR ALTERATION TO SUITE"},{"number":"642327","date":"2015-11-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RENOVATION TO EXISTING TENANT SPACE. INSTALL (4) SPEAKER/ STROBE AS PER NFPA72 (CC DISTRICT)"},{"number":"651790","date":"2015-11-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-05","scope":"RELOCATE EXISTING CARD READER AND EMERGENCY DOOR RELEASE. 1-DOOR CONTACT FOR SERVER ROOM AS PER 2008 NEC (CC DISTRICT)"},{"number":"643651","date":"2015-11-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-02-17","scope":"FURNISH & INSTALL LIGHTING, OCCUPANCY SENSORS, SINGLE POLE SWITCHES & RECEPTS AS PER 2008 NEC (CC DISTRICT)"},{"number":"649549","date":"2015-11-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-02-29","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEM WITH ASSOCIATED DUCT WORK AND TWENTY-TWO (22) REGISTERS/DIFFUSERS (21ST FLOOR - MANAGEMENT OFFICE SPEC SUITE AND CONFERENCE CENTER), PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION."},{"number":"652541","date":"2015-11-17","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-12-14","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"647534","date":"2015-12-01","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 13 SPEAKER STROBES, 1 SECURITY INTERFACE AND 1 NAC PANEL AS PER NFPA 72 (OFFICE SPACE)CC DISTRICT"},{"number":"652542","date":"2015-12-07","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-02-12","scope":"LEVEL 2 INTERIOR ALTERATIONS, INTERIOR DEMO, NEW PARTITIONS, FLOOR LAYOUT, NEW FINSIHES, FIT OUT OF OFFICE SPACE ON THE 19TH FLOOR. NO CHANGE IN USE-OCCUPANCY. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, HVAC, SPRINKELRS."},{"number":"652538","date":"2015-12-07","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-05-23","scope":"INTERIOR ALTERATIONS, UPGRADES TO FINISHES, NEW NON ACOUSTICAL CEILINGS, MILLWORK AND PARTITIONS, NEW FLOORING, NEW WALL COVERING AND PAINTING EXISTING OFFICE BUILDING"},{"number":"651538","date":"2015-12-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 2-CAT6 PLENUM CABLES TO 22 LOCATIONS, NO CABLING NEEDED IN SUITE 2121, 2116, AND 2120 AREAS WITH AN AVERAGE CABLE PULL 120 FEET AS PER 2008 NEC (CC DISTRICT)"},{"number":"657579","date":"2015-12-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-01-22","scope":"INSTALL SECURITY PANEL POWER FOR MAGLOCK RELOCATE BUTTON & 1 DOOR CONTACT AS PER NEC 2008 CC DISTRICT"},{"number":"655062","date":"2015-12-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 9 SPEAKER STROBES, 1 STROBE AND 1 NAC PANEL PER NFPA 72 (OFFICE SPACE)"},{"number":"659047","date":"2015-12-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-02-23","scope":"RELOCATE (8) SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUT AND CEILINGS AS PER NFPA NO. 13 AND LOCAL CODE."},{"number":"660385","date":"2015-12-29","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-02-12","scope":"INSTALL 3- KITCHEN SINKS WITH 1- POINT OF USE ELECTRIC WATER HEATER AND 2- 6- GALLON ELECTRIC WATER HEATERS WITH PANS.. CONNECT TO EXISTING SANITARY, VENT AND WATER"},{"number":"661758","date":"2016-01-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-08","scope":"INSTALL CABLE AND SECURITY DEVICES FOR 3 DOORS. TIE INTO EXISTING FA CONTROL CIRCUIT AS PER 2008 NEC CC DISTRICT"},{"number":"661970","date":"2016-01-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-02-12","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"660153","date":"2016-01-11","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-03-11","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. LEVEL II INTERIOR ALTERATIONS FOR A TENANT SPACE EXPANSION. NEW NON LOAD BEARING PARTITIONS, UPGRADES TO FINISHES, AND ALL OTHER ASSOCIATED WORK. NO STRUCTURAL WORK ON THIS PERMIT. SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"660660","date":"2016-01-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-02-12","scope":"HVAC INSTALLATION INCLUDING DUCTWORK, HEATING COILS AND EXHAUST FANS, AS PER PLANS."},{"number":"663853","date":"2016-01-15","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-11","scope":"RELOCATE 6 DIFFUSERS TO COMPLY WITH EZ PERMIT STANDARDS FOR DUCTWORK EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"664339","date":"2016-01-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"17 RELOCATE EXISTING LIGHT,3 WALL MOUNT OCCUPANCY SENSORS,1 CEILING MOUNT OCCUPANCY SENSOR,4 DUPLEX RECEPTACLES AND 4 QUAD RECEPTACLES AS PER 2008 NEC (CC DISTRICT)"},{"number":"658752","date":"2016-01-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH & INSTALL LIGHT FIXTURES, OCCUPANCY SENSORS, SINGLE POLE SWITCHES & RECEPTACLES AS PER DRAWING AS PER NEC 2008 CC DISTRICT"},{"number":"658756","date":"2016-01-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH & INSTALL FIRE ALARM STROBES, SPEAKER-STROBES & NAC PANEL AS PER NFPA 72 CC DISTRICT"},{"number":"665030","date":"2016-01-21","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-03-11","scope":"RELOCATING 9 SPRINKLERS EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"667613","date":"2016-02-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-01","scope":"INSTALL SECURITY (FISHING) WIRING 2-POWER SUPPLIES, 2-CONTROL PANELS, 3-MAGLOCKS, 3-CARD READER, 3-DOOR CONTACTS & 2-DUPLEX RECEPTACLES AS PER NEC 2008"},{"number":"663298","date":"2016-02-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL VOICE & DATA CABLING, TOTAL OF 40 CAT 6 UTP CABLES, PLENUM LONGEST RUN 80' AS PER 2008 NEC (CC DISTRICT)"},{"number":"669641","date":"2016-02-12","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-06-10","scope":"RELOCATE 33-SPRINKLERS EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"671058","date":"2016-02-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-30","scope":"WIRE MAG LOCK, EGRESS BUTTON, REQUEST TO EXIT BUTTON AND CARD READER. POWER UP SECURITY PANEL PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"672199","date":"2016-02-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"REMOVE EXISTING LIGHT FIXTURES AND REPLACE WITH 19 NEW 2X2,14 DOWNLIGHTS AND 8 WALL SCONCES. REUSE CIRCUIT,NO NEW CIRCUITING REQ PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"672200","date":"2016-02-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-16","scope":"REMOVE EXISTING LIGHT FIXTURES AND REPLACE WITH 26 NEW 2X2,8 WALL SCONCES AND 3 PENDANT.REUSE CIRCUITRY,NO NEW CIRCUITING REQ PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"673857","date":"2016-03-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-06-21","scope":"RELOCATE 8 DIFFUSERS-OFFICE BLDG EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"674658","date":"2016-03-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE 2-EXISTING FIRE ALARM STROBES TO SUIT NEW OFFICE LAYOUT AS PER NFPA 72 CC DISTRICT"},{"number":"674761","date":"2016-03-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 9 CAT6 VOICE & DATA LINES, PLENUM RATED LONGEST DROP 150'AS PER 2008 NEC (CC DISTRICT)"},{"number":"687784","date":"2016-04-28","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"EXPIRED","completedDate":null,"scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"690732","date":"2016-05-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-08-16","scope":"REPLACEMENT ONLY OF 14- LAVATORIES, 7- WATER CLOSETS AND 3- URINALS.. NO PIPING"},{"number":"693869","date":"2016-05-20","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2017-07-17","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"695460","date":"2016-05-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-10-04","scope":"RELOCATE (31) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"693864","date":"2016-06-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-03-14","scope":"LEVEL II ALTERATION INCLUDES INTERIOR NON-LOAD BEARING RENOVATIONS"},{"number":"696726","date":"2016-06-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-03-14","scope":"HVAC INSTALLATION INCLUDING DUCTWORK AS PER PLANS."},{"number":"684161","date":"2016-06-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-08-16","scope":"ALTERATIONS TO THE TOILET ROOMS ON THE 18TH FLOOR OF AN EXISTING HIGH RISE STRUCTURE. WORK TO INCLUDE: DEMOLITION OF ALL EXISTING FINISHES; DRYWALL REPAIRS; NEW ACOUSTICAL CEILINGS; PORCELAIN FLOOR AND WALL TILES; PLUMBING FIXTURES AND PARTITIONS; PAINTING; AND WALL COVERING. NO CHANGE IN OCCUPANCY. STRUCTURE FULLY SPRINKLERED. SEPARATE PERMIT REQUIRED FOR PLUMBING, MECHANICAL AND ELECTRICAL WORK."},{"number":"705462","date":"2016-07-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-09-07","scope":"REMOVE 8-EXISTING 2X2 LIGHT FIXTURES AND REUSE EXISTING CIRCUITY REPLACE WITH KIND WITH NO ADD'L WIRING AS PER 2008 CC DISTRICT"},{"number":"705456","date":"2016-07-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-09-07","scope":"REMOVE 8-EXISTING 2X2 LIGHT FIXTURES AND REUSE EXISTING CIRCUITY REPLACE WITH KIND WITH NO ADD'L WIRING AS PER 2008 CC DISTRICT"},{"number":"697843","date":"2016-07-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-10-26","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT. RELOCATE 18 LIGHT FIXTURES, INSTALL 39 LIGHT FIXTURES, 23 LIGHT SWITCH, 50 RECEPTACLES, 12 FURNITURE FEED AND 3 HVAC FEED PER 2008 NEC (OFFICE SPACE)RELOCATE 1 EXISTING FIRE ALARM DEVICES PER NFPA 72"},{"number":"707006","date":"2016-08-10","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2016-11-01","scope":"AMENDING BUILDING PERMIT# 693864 FOR ADDITIONAL OFFICE WITHIN THE SAME FLOOR."},{"number":"718810","date":"2016-08-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-01-09","scope":"SHELTER PLATFORM PERMIT- ERECTION OF A SIDEWALK SHELTER PLATFORM AS PER ENGINEERED PLANS. STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE PRIOR TO THE START OF WORK."},{"number":"724109","date":"2016-09-23","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2017-08-25","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. EZ"},{"number":"723044","date":"2016-09-27","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-12-21","scope":"FURNISH & INSTALL A NEW EXIT GATE ON THE GROUND FLOOR AT THE SE STAIR TOWER"},{"number":"719443","date":"2016-10-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-11-04","scope":"FURNISH AND INSTALL 22 WORK AREA OUTLETS CONSISTING OF 44 NEW CAT6 TELECOMMUNICATION CABLE. RELOCATE 84 EXISTING CAT6 CABLES TO NEW WAO PER 2008 NEC CC DISTRICT"},{"number":"739123","date":"2016-11-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL(4) FLOOR FURNITURE FEEDS FOR NEW WORKSTATIONS IN EXISTING SUITE.FURNISH AND INSTALL(2) 120 VOLT QUAD RECEPTACLES IN THE EXISTING SERVER CLOSET PER 2008 NEC (OFFICE SPACE) CC DISTRICT"},{"number":"809672","date":"2017-08-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-08-14","scope":"FURNISH AND INSTALL ADDITIONAL RECEPTS AND 10 DATA DROPS BOXES ONLY WIRING WILL BE SUPPLIED BY ANOTHER ELECTRICAL CONTRACTOR AS PER 2008 NEC (CC DISTRICT)"},{"number":"816404","date":"2017-09-15","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-06","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK,REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"839746","date":"2017-12-15","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2018-07-05","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"847659","date":"2018-02-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-04-07","scope":"INTERIOR TENANT FIT OUT. DEMOLITION OF DRYWALL PARTITIONS AND ACOUSTICAL CEILINGS, CONSTRUCTION OF NEW DRYWALL PARTITIONS AND ACOUSTICAL CEILINGS DOORS FRAMES MILLWORK AND NEW FINISHES."},{"number":"854135","date":"2018-02-22","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-04-07","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"854749","date":"2018-02-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2018-04-02","scope":"INSTALL 1- PANTRY SINK, 1- POINT OF USE WATER HEATER, CONNECT TO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"853763","date":"2018-03-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-16","scope":"FURNISH AND INSTALL NEW LED DOWN LIGHTS AND 2X4 LIGHT FIXTURES, WIRING FOR SWITCHES & RECEPTACLES. USE EXISITNG ELECTRICAL SERVICE AS PER NEC 2008"},{"number":"857860","date":"2018-03-23","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-02","scope":"HVAC INCLUDING AS PER PLAN 11 REGISTER/DIFFUSES"},{"number":"861534","date":"2018-03-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-16","scope":"FURNISH AND INSTALL 41 CATEGORY 6 PLENUM CABLES PER 2008 NEC (OFFICE SPACE)*AVERAGE CABLE PULL 80 FEET*"},{"number":"860353","date":"2018-03-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-04-16","scope":"FURNISH AND INSTALL SIX FIRE ALARM SPEAKER STROBES AND ONE DOOR RELEASE RELAY. SPEAKER STROBES WIL BE CONNECTED TO NEW NAC PANEL. ALL INSTALLATIONS IN ACCORDANCE WITH 2008 NEC."},{"number":"868194","date":"2018-04-27","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-07-26","scope":"FOR LEVEL II ALTERATIONS FOR FIT-OUT ON 22ND FLOOR OF AN EXISTING OFFICE BUILDING AS PER PLAN.NO CHANGE IN OCCUPANCY. STRUCTURE FULLY SPRINKLERED. SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"871701","date":"2018-05-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-06-02","scope":"FOR LEVEL II ALTERATIONS FOR FIT-OUT ON 19TH FLOOR OF AN EXISTING OFFICE BUILDING AS PER PLAN.NO CHANGE IN OCCUPANCY. STRUCTURE FULLY SPRINKLERED. SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"877039","date":"2018-05-15","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-07-26","scope":"RELOCATE 31 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"877710","date":"2018-05-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-06-02","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"877780","date":"2018-05-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 5 DOWN LIGHTS,1 OCCUPANCY SENSOR AND 5 RECEPTACLES PER 2008 NEC (OFFICE SPACE)"},{"number":"878276","date":"2018-05-18","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2018-06-02","scope":"ONE FOR ONE REPLACEMENT OF A KITCHEN SINK TO CONNECT TO EXISTING SANITARY VENT & WATER PIPING WITH NO ADDITIONAL PIPING - THE INSTALLATION WIWLL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"880000","date":"2018-05-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-06-02","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION IF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"882757","date":"2018-06-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-08-09","scope":"INSTALL 81 LIGHT FIXTURES,22 SWITCHES,38 RECEPTACLES AND 8 FURNITURE FEEDS PER 2008 NEC (OFFICE SPACE) RELOCATE 2 SPEAKER STROBES PER NFPA 72"},{"number":"887910","date":"2018-06-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2018-07-26","scope":"ROUGH IN FOR 1 NEW SINK.INSTALL NEW SINK AND FAUCET.CONNECT TO THE EXISTING SANITARY,VENT AND WATER PIPING.REMOVE AND REPLACE ONE SINK AND FAUCET.THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"891471","date":"2018-07-06","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-07-26","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES AND RELOCATION OF DIFFUSERS - FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"894377","date":"2018-07-17","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2020-10-09","scope":"Relocate 264 existing sprinkler heads (commercial)"},{"number":"892304","date":"2018-08-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-11-07","scope":"FURNISH AND INSTALL APPROXIMATELY 163 CAT 6 PLENUM CABLES FOR VOICE AND DATA PER 2008 NEC (OFFICE SPACE)"},{"number":"904619","date":"2018-09-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-12-20","scope":"LEVEL II ALTERATIONS ON 25TH FLOOR PER ATTACHED PLANS"},{"number":"914849","date":"2018-10-01","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 10 RECEPTACLES 1 FURNITURE FEED 21 LIGHTS 4 SWITCHES USE EXISTING CIRCUITS RELOCATE FA SPEAKER STROBE(OFFICE SPACE)"},{"number":"922234","date":"2018-10-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-12-20","scope":"FURNISH LABOR & MATERIAL TO RELOCATE SIX (6) DIFFUSERS"},{"number":"927055","date":"2018-11-14","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-12-20","scope":"RELOCATE 10 EXISTING SPRINKLER HEADS ON THE 25TH FLOOR TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"CP-2020-000731","date":"2020-04-21","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-11-10","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING OFFICE SPACE ON THE 22ND FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"GM-2020-001976","date":"2020-05-13","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Expired","completedDate":"2021-11-29","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"MP-2020-001069","date":"2020-06-05","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-11-10","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. *Relocation of (8) Diffusers on 22nd floor*"},{"number":"FP-2020-000663","date":"2020-06-16","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-10-06","scope":"relocate 24 sprinkler heads on the 27th floor"},{"number":"CP-2020-001570","date":"2020-06-23","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-10-06","scope":"FOR INTERIOR ALTERATIONS ON THE 27TH FLOOR OF AN EXISTING BUILDING, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS."},{"number":"MP-2020-001715","date":"2020-07-16","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-10-06","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING (21) DIFFUSERS AND (1) CEILING EXHAUST FAN WITH ASSOCIATED DUCTWORK AS PER PLANS."},{"number":"EP-2020-003577","date":"2020-07-20","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-28","scope":"Install lighting fixtures, switches, controls, receptacles and new panel RE27E and feeder as per plans and specs and in accordance with 2017 nec NEC. no fire alarm work on this permit."},{"number":"EP-2020-004956","date":"2020-07-21","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-11-02","scope":"Furnish & Install (55) Cat 6 plenum cables for voice/data as per 2017 NEC"},{"number":"EP-2020-002915","date":"2020-07-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-10-06","scope":"Furnish and install 12 duplex receptacles, 2 quads, three wall furniture feeds, one floor box, 18 new lights, 6 exit signs, 4 wall occupancy sensors, one ceiling occupancy sensor as per 2017 NEC. Install fire alarm as per 2016 NFPA 72."},{"number":"EP-2020-005788","date":"2020-08-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-25","scope":"Furnish and Install 66 low voltage Category 6 computer wire locations per 2017 NEC"},{"number":"EP-2020-004490","date":"2020-08-18","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-25","scope":"Install (1) new speaker/strobes, (6) new strobes, and (1) signal ZAM as per 2016 NFPA 72."},{"number":"FP-2020-001376","date":"2020-08-20","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-11-10","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (16) sprinkler heads on the 22nd floor"},{"number":"PP-2020-007917","date":"2020-09-03","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-10-06","scope":"Furnish and install sanitary, sanitary vent and domestic water pipe with insulation to new fixtures. Furnish and install 2 kitchen sinks and 1 electric hot water heater"},{"number":"CP-2021-009309","date":"2022-01-12","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-02-01","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE SUITE 1700 FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2022-000149","date":"2022-01-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-01-30","scope":"Relocate sprinklers to ensure the safety of the building in accordance with NFPA 13"},{"number":"MP-2022-000674","date":"2022-02-02","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-01-30","scope":"Relocate [7] Diffusers and provide air balance report. See- CP-2021-009309"},{"number":"PP-2022-001643","date":"2022-02-02","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-01-30","scope":"Demo [3] Sinks. Furnish and install [3] breakroom sink and [1] water heater Extend from existing sanitary, vent and domestic cold water to new sink locations"},{"number":"EP-2022-000697","date":"2022-03-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-09-07","scope":"Replacement and some relocation of existing lighting and switches in reception and conference area of tenant space. Relocation of existing receptacles to accommodate new layout as per 2017 NEC"},{"number":"CP-2022-000099","date":"2022-03-22","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-02-15","scope":"ALTERATION FOR THE INTERIOR RENOVATION OF FOUR FLOORS OF OFFICE SPACE WITHIN AN EXISTING 27 STORY HIGHRISE BUILDING. RENOVATION TO INCLUDE DEMOLITION OF EXISTING PARTITIONS, SUSPENDED CEILINGS, DUCTWORK, FLOORING, INSTALLATION OF NEW FIXTURES, PARTITIONS, MECHANICAL EQUIPMENT, AND FINISHES. HVAC WORK TO INCLUDE CHANGES TO DUCTWORK, SUPPLY AND RETURN GRILLS (550 NEW), MECHANICAL PIPING, AND MECHANICAL CONTROLS SYSTEM. Amendment to include minor changes to the floor layout and new operable partitions as per approved revised plans."},{"number":"MP-2022-000917","date":"2022-03-25","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2022-12-16","scope":"Mechanical / Fuel Gas Permit for combo CP-2022-000099"},{"number":"PP-2022-004311","date":"2022-04-19","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-02-15","scope":"Alterations: Interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018."},{"number":"EP-2022-004057","date":"2022-04-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-02-14","scope":"Install Category 6A, fiber and coax cabling for network, cameras and AV as per 2017 nec"},{"number":"FP-2022-001039","date":"2022-05-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-02-15","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate Sprinkler Heads on Floors 4-7 (CP-2022-000099)"},{"number":"EP-2022-002829","date":"2022-05-24","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-02-08","scope":"Remove existing fixtures, wiring, conduit, and equipment. Installation of LED light fixtures throughout the office areas, exit signs, emergency lighting circuits, power receptacles and conduit, tele/data cabling and conduit, restroom fixtures ,fire alarm . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC ,2016 NFPA-72,2018 PHILA FIRE CODE. Amendment: F&I new lights MEP rough ins at new walls Please see clouded areas on pages E112.2 and E122.2. Previously approved previously approved Fire Alarm plans for battery calculations and cut-sheet, if necessary as per 2017 nec"},{"number":"FP-2022-003277","date":"2023-01-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-01-17","scope":"FOR ALTERATIONS TO AN EXISTING AUTOMATIC SPRINKLER SYSTEM AT THE 4TH THROUGH 7TH FLOORS TO RELOCATE SYSTEM MAINS AND BRANCH LINES ONLY. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE CP-2022-000099 FOR ASSOCIATED BUILDING ALTERATIONS PERMIT. SEE FP-2022-001039 FOR RELOCATION OF SPRINKLER HEADS AT THE 4TH THROUGH 7TH FLOORS."},{"number":"CP-2023-005116","date":"2023-09-15","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-01-09","scope":"FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 17TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2023-009060","date":"2023-09-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-11-06","scope":"Installation of light fixtures/controls and general receptacles in new suite offices. Relocation only of existing low voltage cabling to new offices. AS PER NEC 2017"},{"number":"CP-2023-005497","date":"2023-10-30","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-03-01","scope":"FOR LEVEL II ALTERATION TO THE EXISTING OFFICE ON THE 25TH FLOOR AS PER APPROVED PLANS."},{"number":"FP-2023-002597","date":"2023-10-30","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-01-09","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 5 sprinkler heads to ensure the safety of the building per NFPA 13"},{"number":"MP-2023-004210","date":"2023-11-01","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-01-09","scope":"FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*"},{"number":"FP-2023-002650","date":"2023-11-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-29","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (69) SPRINKLER HEADS AS PER NFPA 13"},{"number":"PP-2023-015193","date":"2023-11-07","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-02-29","scope":"INSTALL (1) WC, (1) LAV and (1) ELECTRIC HWH."},{"number":"MP-2023-004853","date":"2023-11-14","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-02-29","scope":"FOR A NEW NECHANICAL SYSTEM INSTALLATION TO ACCOMMODATE AN EXISTING SUITE(2500) LOCATED ON THE 25TH FLOOR. WORK TO INCLUDE THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2023-010865","date":"2023-12-28","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-02-15","scope":"Install Power and Lighting per Plans -2017 NEC. AMENDMENT: Furnish & install fire alarm as per plans."},{"number":"EP-2024-000020","date":"2024-01-04","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-02-20","scope":"STATEMENT OF WORK: HORIZONTAL CABLING: Cabling will be General Category 6 plenum rated 4-pair. • Provide labor to demo existing low voltage cabling. • Provide labor to demo/repurpose existing low voltage cabling into eighteen (18) furniture mount dual locations. • Provide and install twenty-eight (28) flush mount dual locations. • Provide and install six (6) flush mount quad locations. • Provide and install twelve (12) ceiling mount dual wireless access point locations. • Provide and install three (3) floor mount dual locations. • Provide and install Panduit faceplates, surface mount boxes, floor frames and modular jacks as required for termination of the 4-pair cables at the workstation location. • Provide and install three (3) Panduit Category 6 24-port 2RU angled patch panels. These will be installed at the appropriate closet location for termination of the 4-pair cables installed. AS PER NEC 2017"},{"number":"CP-2024-006152","date":"2024-12-17","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-10-30","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING OFFICE SPACE ON THE 23RD AND 24TH FLOORS OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"EP-2025-001167","date":"2025-02-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-06-03","scope":"STATEMENT OF WORK – 23RD FLOOR: HORIZONTAL CABLING: Cabling will be Berk-Tek Category 6A plenum rated 4-pair. • Provide and install one hundred seventy (170) single locations. • Provide and install thirty (30) dual locations. • Provide and install six (6) quad locations. • Provide and install Leviton faceplates, surface mount boxes, floor frames and modular jacks as required for termination of the 4-pair cables at the workstation locations. • Provide labor to install thirty-five (35) customer-provided wireless access points. • Provide and install seven (7) Leviton Category 6A 48-port flat patch panels with four (4) Chatsworth 1RU horizontal wire managers. These will be installed at the appropriate closet location for termination of the 4-pair cables. • Provide and install sixty-three (63) Leviton Category 6A patch cords, blue in color, 5’ in length (IDF). • Provide and install one hundred twenty-eight (128) Leviton Category 6A patch cords, blue in color, 7’ in length (IDF). • Provide and install sixty-three (63) Leviton Category 6A patch cords, blue in color, 10’ in length (IDF). • Provide and install two hundred fifty-four (254) Leviton Category 6A patch cords, blue in color, 10’ ‘in length (workstation). FIBER BACKBONE CABLING: • Provide and install two (2) Berk-Tek 48-strand singlemode armored plenum rated fiber optic cables and two (2) Berk-Tek 48-strand multimode OM4 armored plenum rated fiber optic cables from Server Room 23.054 to Server Room 24.048. The singlemode cables will be left unterminated and coiled at each end for final terminations/connections by others. • Provide and install one hundred ninety-two (192) Leviton LC multimode fuse-on connectors. These will be installed for termination of each strand of fiber optic cable installed. • Provide and install two (2) Leviton 2U fiber enclosures, each equipped with four (4) loaded panels. One (1) will be installed in each of the two (2) Server Rooms for housing fiber opt"},{"number":"FP-2025-000325","date":"2025-02-19","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-10-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (67) sprinkler heads to accommodate interior alterations to 23rd and 24th floor office spaces"},{"number":"EP-2025-000844","date":"2025-03-03","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-06-13","scope":"Restore old light fixtures and install new light fixtures. Furniture floor boxes, 2 new electrical panels, devices, branch circuit wiring. No data wiring. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **Separate fire alarm permit req'd."},{"number":"PP-2025-003398","date":"2025-03-13","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-10-30","scope":"Demo of existing fixtures and associated piping Install sanitary waste and vent piping Install domestic hot and cold water piping Install five new fixtures"},{"number":"MP-2025-001422","date":"2025-03-13","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-10-30","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2025-003833","date":"2025-05-07","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-05-16","scope":"Add fire alarm devices to the existing fire alarm system as shown to the attached JCI sealed fire alarm drawings."}],"storyTag":"New construction","storyDelta":null,"timeline":[{"y":2024,"k":"permit","w":"Addition and/or Alteration"},{"y":2024,"k":"insp","w":"Inspection failed"},{"y":2024,"k":"permit","w":"Addition and/or Alteration"},{"y":2025,"k":"permit","w":"Addition and/or Alteration"},{"y":2025,"k":"permit","w":"Addition and/or Alterations"},{"y":2025,"k":"permit","w":"Addition and/or Alteration"},{"y":2025,"k":"permit","w":"Alterations"},{"y":2025,"k":"permit","w":"Addition and/or Alterations"},{"y":2025,"k":"permit","w":"Addition and/or Alteration"},{"y":2025,"k":"insp","w":"Inspection passed"},{"y":2026,"k":"viol","w":"3 L&I violations"},{"y":2026,"k":"insp","w":"L&I: 3 failed, 2 passed"}],"rented":false,"licenses":[{"number":"204728","type":"Food Preparing and Serving","status":"Inactive","businessName":"CORMOCCO INC","legalName":"CORMOCCO INC","address":"1622-50 ARCH ST","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2001-06-14","latestIssueDate":"2001-06-14","expirationDate":"2002-04-30","inactiveDate":"2012-12-22"},{"number":"298768","type":"Hazardous Materials","status":"Inactive","businessName":"DOUBLE S ASSOCIATES INC","legalName":"DOUBLE S ASSOCIATES INC","address":"1622-50 ARCH ST","revenueCode":"3335","rentalCategory":null,"units":null,"issuedDate":"2005-01-03","latestIssueDate":"2005-01-03","expirationDate":"2006-12-31","inactiveDate":"2012-07-24"},{"number":"313113","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"NEWPORT FOOD SERVICE INC","legalName":"NEWPORT FOOD SERVICE INC","address":"1622-50 ARCH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2005-04-09","latestIssueDate":"2005-09-26","expirationDate":"2006-04-30","inactiveDate":"2012-12-22"},{"number":"320428","type":"High Rise","status":"Inactive","businessName":"ARCH 1650 PARTNERS LP","legalName":"ARCH 1650 PARTNERS LP","address":"1622-50 ARCH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2005-09-15","latestIssueDate":"2014-04-30","expirationDate":"2015-04-30","inactiveDate":"2015-06-29"},{"number":"370829","type":"Food Preparing and Serving","status":"Inactive","businessName":"RAIN DROP CAFE OF ARCH STREET","legalName":"RAIN DROP CAFE OF ARCH STREET","address":"1622-50 ARCH ST","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2006-05-31","latestIssueDate":"2008-08-06","expirationDate":"2009-04-30","inactiveDate":"2012-07-10"},{"number":"383155","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"CORNUCOPIA DELI INC","legalName":"CORNUCOPIA DELI INC","address":"1622-50 ARCH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2006-08-31","latestIssueDate":"2006-08-31","expirationDate":"2007-04-30","inactiveDate":"2012-12-22"},{"number":"510772","type":"Dumpster License - Private Property","status":"Active","businessName":"ARCH 1650 PARTNERS LP","legalName":"ARCH 1650 PARTNERS LP","address":"1622-50 ARCH ST","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2010-08-06","latestIssueDate":"2013-08-03","expirationDate":null,"inactiveDate":null},{"number":"568478","type":"Food Preparing and Serving","status":"Inactive","businessName":"FUEL","legalName":"FUEL","address":"1622-50 ARCH ST","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2012-07-10","latestIssueDate":"2013-05-11","expirationDate":"2014-04-30","inactiveDate":null},{"number":"672417","type":"Food Preparing and Serving","status":"Inactive","businessName":"GREEN LINE CAFE","legalName":"GREEN LINE CAFE","address":"1622-50 ARCH ST","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2015-07-27","latestIssueDate":"2026-01-07","expirationDate":"2026-04-30","inactiveDate":"2026-06-29"},{"number":"685696","type":"High Rise","status":"Inactive","businessName":"SPUS7 1650 ARCH STREET LP (ATTN:JENNIFER CONRAD)","legalName":"SPUS7 1650 ARCH STREET LP","address":"1622-50 ARCH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2015-12-07","latestIssueDate":"2018-04-16","expirationDate":"2019-04-30","inactiveDate":"2019-06-29"},{"number":"903557","type":"High Rise","status":"Inactive","businessName":"1650 Arch Partners LP","legalName":"1650 Arch Partners LP","address":"1622-50 ARCH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2022-08-18","latestIssueDate":"2024-03-27","expirationDate":"2024-08-17","inactiveDate":"2024-10-16"}],"licenseActivity":[{"number":"903557","type":"High Rise","businessName":"1650 Arch Partners LP","legalName":"1650 Arch Partners LP","issuedDate":"2022-08-18","latestIssueDate":"2024-03-27","closureDate":"2024-10-16","expirationDate":"2024-08-17","inactiveDate":"2024-10-16","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"685696","type":"High Rise","businessName":"SPUS7 1650 ARCH STREET LP (ATTN:JENNIFER CONRAD)","legalName":"SPUS7 1650 ARCH STREET LP","issuedDate":"2015-12-07","latestIssueDate":"2018-04-16","closureDate":"2019-06-29","expirationDate":"2019-04-30","inactiveDate":"2019-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"672417","type":"Food Preparing and Serving","businessName":"GREEN LINE CAFE","legalName":"GREEN LINE CAFE","issuedDate":"2015-07-27","latestIssueDate":"2026-01-07","closureDate":"2026-06-29","expirationDate":"2026-04-30","inactiveDate":"2026-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"568478","type":"Food Preparing and Serving","businessName":"FUEL","legalName":"FUEL","issuedDate":"2012-07-10","latestIssueDate":"2013-05-11","closureDate":"2014-04-30","expirationDate":"2014-04-30","inactiveDate":null,"status":"Inactive","statusLabel":"Inactive","active":false},{"number":"510772","type":"Dumpster License - Private Property","businessName":"ARCH 1650 PARTNERS LP","legalName":"ARCH 1650 PARTNERS LP","issuedDate":"2010-08-06","latestIssueDate":"2013-08-03","closureDate":null,"expirationDate":null,"inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"383155","type":"Food Preparing and Serving (30+ SEATS)","businessName":"CORNUCOPIA DELI INC","legalName":"CORNUCOPIA DELI INC","issuedDate":"2006-08-31","latestIssueDate":"2006-08-31","closureDate":"2012-12-22","expirationDate":"2007-04-30","inactiveDate":"2012-12-22","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"370829","type":"Food Preparing and Serving","businessName":"RAIN DROP CAFE OF ARCH STREET","legalName":"RAIN DROP CAFE OF ARCH STREET","issuedDate":"2006-05-31","latestIssueDate":"2008-08-06","closureDate":"2012-07-10","expirationDate":"2009-04-30","inactiveDate":"2012-07-10","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"320428","type":"High Rise","businessName":"ARCH 1650 PARTNERS LP","legalName":"ARCH 1650 PARTNERS LP","issuedDate":"2005-09-15","latestIssueDate":"2014-04-30","closureDate":"2015-06-29","expirationDate":"2015-04-30","inactiveDate":"2015-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"313113","type":"Food Preparing and Serving (30+ SEATS)","businessName":"NEWPORT FOOD SERVICE INC","legalName":"NEWPORT FOOD SERVICE INC","issuedDate":"2005-04-09","latestIssueDate":"2005-09-26","closureDate":"2012-12-22","expirationDate":"2006-04-30","inactiveDate":"2012-12-22","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"298768","type":"Hazardous Materials","businessName":"DOUBLE S ASSOCIATES INC","legalName":"DOUBLE S ASSOCIATES INC","issuedDate":"2005-01-03","latestIssueDate":"2005-01-03","closureDate":"2012-07-24","expirationDate":"2006-12-31","inactiveDate":"2012-07-24","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"204728","type":"Food Preparing and Serving","businessName":"CORMOCCO INC","legalName":"CORMOCCO INC","issuedDate":"2001-06-14","latestIssueDate":"2001-06-14","closureDate":"2012-12-22","expirationDate":"2002-04-30","inactiveDate":"2012-12-22","status":"Inactive","statusLabel":"Inactive","active":false}],"businessLicenseSourceDate":"2026-07-24","signals":[{"kind":"record-pressure","level":"elevated","title":"Records to verify together","summary":"More than one separately dated public record deserves a current-status check.","evidence":["9 open L&I violations","failed L&I inspection activity in 2022, 2023, 2024, 2026"],"caveat":"A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue."},{"kind":"transition-activity","level":"watch","title":"Recent transition activity","summary":"The property has an unusually active paper trail worth monitoring for the next permit, inspection, deed, or listing.","evidence":["8 permit events since 2023"],"caveat":"Record activity alone does not establish that a sale or redevelopment is planned."}],"legalChecks":[{"id":"use-occupancy","level":"attention","title":"Zoning approval is not the occupancy file","finding":"Appeal #14068: CLOSED · Granted; related permit 313803. Use permit #313803: COMPLETED.","why":"Philadelphia says a zoning approval or Property Sales Certification can identify a use without proving that it was established under the Building Code. A change of use, unit count, exits, or fire rating can require a Building Permit and Certificate of Occupancy.","action":"Verify the lawful use, unit count, associated construction permits, and Certificate of Occupancy with L&I.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-certificate-of-occupancy/"},{"id":"permit-status","level":"attention","title":"A permit row needs file-level verification","finding":"3 permits not marked completed: 687784 (EXPIRED), 894377 (Expired), GM-2020-001976 (Expired). At least one row also carries a completion date, so the City fields conflict.","why":"Issued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.","action":"Open the permit file and confirm final inspections, holds, and any resulting occupancy certificate.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"violations","level":"attention","title":"9 open L&I violations","finding":"44 violation rows are retained in the City ledger.","why":"Open notices can accrue fees, block permits or license renewal, and move to court or collection. Standard initial notices generally have a 30-day appeal window; unsafe or imminently-dangerous notices have a much shorter window.","action":"Read the notice—not only the summary status—and confirm reinspection, fees, and appeal posture with L&I.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/violation-and-order-types/"},{"id":"investigations","level":"verify","title":"Failed inspections are dated events—not the current condition","finding":"24 failed, 13 passed, and 0 CLOSED investigation outcomes are in the fetched history; the latest dated visit was FAILED on Mar 26, 2026.","why":"A PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.","action":"Open the parent case/permit for each material failure and confirm its later disposition.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"building-certifications","level":"verify","title":"A fire-system permit exists, but no annual certification matched","finding":"91 fire/suppression-related permits matched; the fetched BIN certification feed returned no row.","why":"Installed systems in mixed-use and larger buildings generally require periodic certification, but applicability and limited-area exceptions vary. A missing BIN/address join is not proof of a compliance failure.","action":"Confirm what system was installed and whether a current annual certificate is required and filed.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/maintenance-certifications/fire-protection-certifications/"},{"id":"business-license","level":"verify","title":"A historical business license is not current operating authority","finding":"Food Preparing and Serving #204728: Inactive since Dec 22, 2012; Hazardous Materials #298768: Inactive since Jul 24, 2012; Food Preparing and Serving (30+ SEATS) #313113: Inactive since Dec 22, 2012; High Rise #320428: Inactive since Jun 29, 2015","why":"A license record proves the licensed activity existed at that time. An inactive or expired license does not establish that the business still operates—or that it may legally reopen under the same use.","action":"If business income matters, verify the current tenant, use registration, and active license in eCLIPSE.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/licenses/business-licenses/"}],"closingChecks":[{"title":"Property Sales Certification","body":"The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.","action":"Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-property-sales-certification/"},{"title":"Date-effective City Property Payoff","body":"The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.","action":"Request the City statement effective through settlement; read every period and invoice.","url":"https://www.phila.gov/guides/philadelphia-tax-center/what-to-do/"},{"title":"Professional title and water-lien searches","body":"OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.","action":"Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.","url":"https://www.phila.gov/2026-04-07-why-title-insurance-is-your-best-friend-when-buying-a-home-in-philadelphia/","secondaryUrl":"https://www.phila.gov/services/water-gas-utilities/pay-or-dispute-a-water-bill/resolve-water-liens-judgments/"}]}