{"asOf":"2026-07-24T13:52:31.177Z","block":"100-199 N 18TH ST","blockUrl":"https://philadelphia.blockreport.homes/block/100-199-n-18th-st","address":"130 N 18TH ST","parcelNumber":"883061505","source":"https://property.phila.gov/?p=883061505","ownerType":"investor","kind":"offices","isHouse":false,"home":false,"commercial":true,"residential":false,"taxExempt":false,"institutional":false,"buildingCode":"DD0","buildingCodeNew":"243","buildingClass":"OFF BLD N/PKG N/COM MASON","buildingClassNew":"OFFICE BLDNG - High Rise","useLabel":"Offices","owner":"OLS OFFICE PARTNERS L P","coOwner":null,"marketValue":121983400,"landAssessment":24396600,"improvementAssessment":97586800,"livableArea":735630,"yearBuilt":1981,"lastSale":{"price":1,"date":"1997-02-28T05:00:00Z"},"openViolations":8,"violations":[{"number":"1932216","date":"2010-09-15","code":"FC-2601.2/1","title":"WELDING-PERMIT REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932214","date":"2010-09-15","code":"FC-901.6/6","title":"FA-REPAIR SYSTEM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932213","date":"2010-09-15","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932215","date":"2010-09-15","code":"FC-914.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828800","date":"2012-12-04","code":"FC-901.4/1","title":"OBTAIN PERMIT EXTEN SPRKLR SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828798","date":"2012-12-04","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828797","date":"2012-12-04","code":"FC-1008.1/1","title":"EGRESS DOOR PROPER SWING","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828799","date":"2012-12-04","code":"FC-607.2/1","title":"ELEVATORS POST EMERGENCY SIGN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828795","date":"2012-12-04","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828794","date":"2012-12-04","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828796","date":"2012-12-05","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3039417","date":"2013-11-12","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3039419","date":"2013-11-12","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3039418","date":"2013-11-12","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3217024","date":"2014-05-07","code":"A-901.13/1","title":"PENALTY- NO BLDG PERM INFO","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3217023","date":"2014-05-07","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3271158","date":"2014-07-28","code":"A-402.5/2","title":"PERMB- FINAL PRE-CO INSP","status":"CLOSEDCASE","resolutionDate":null,"resolution":null},{"number":"3330846","date":"2014-09-17","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330842","date":"2014-09-17","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330843","date":"2014-09-17","code":"FC-1027.1/1","title":"EGRESS-DEV MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330845","date":"2014-09-17","code":"FC-2703.9/6","title":"HAZMAT-SEPARATE INCOMPAT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171102","date":"2016-12-13","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171103","date":"2016-12-13","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171104","date":"2016-12-13","code":"FC-2703.4/1","title":"HAZMAT-MAINT MSDS/ON PREMISES","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171105","date":"2016-12-13","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171106","date":"2016-12-13","code":"FC-404.2/4","title":"FIRE/EVAC PLN-HI RISE-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171107","date":"2016-12-13","code":"FC-404.5/1","title":"FIRE/EVAC PLN-AVAIL EMPLOYEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171108","date":"2016-12-13","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171109","date":"2016-12-13","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171110","date":"2016-12-13","code":"FC-409.4/1","title":"SHELTER PLN-EMPLY TRNG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171111","date":"2016-12-13","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171112","date":"2016-12-13","code":"FC-703.1/1","title":"FIRE-MAINTAIN ASSEMBLY","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171113","date":"2016-12-13","code":"FC-703.1/2","title":"FIRE-MAINTAIN FIREBLOCK","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171115","date":"2016-12-13","code":"FC-703.2/2","title":"FIRE-DOOR STOP PROHIBITED","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171116","date":"2016-12-13","code":"FC-901.6/13","title":"FIRE SUPP DRY CHEM SYS MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171117","date":"2016-12-13","code":"FC-901.7/1","title":"FIRE PROT SYS MAINTENANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171119","date":"2016-12-13","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171120","date":"2016-12-13","code":"FC-906.2/2","title":"FIRE EXTING-NEEDS INSP/TAG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171121","date":"2016-12-13","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171122","date":"2016-12-13","code":"FC-912.2/1","title":"FIRE CONNECT SIGN-EXIST BLDG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171123","date":"2016-12-14","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"VI-2020-045455","date":"2020-10-29","code":"FC-13-1004.2","title":"LO SIGN","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045456","date":"2020-10-29","code":"FC-13-315","title":"COMBUSTIBLE STORAGE","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045464","date":"2020-10-29","code":"FC-13-912.4","title":"FDC SIGNAGE REQUIRED","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045459","date":"2020-10-29","code":"FC-13-404.3","title":"EVACUATION PLAN CONTENT","status":"COMPLIED","resolutionDate":"2021-01-08","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2020-045458","date":"2020-10-29","code":"FC-13-803","title":"VIOLATION OF FLAME SPREAD REQUIREMENTS FOR INTERIOR WALL & CEILING FINISH & TRIM","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045457","date":"2020-10-29","code":"FC-13-703.1.1","title":"FIREBLOCKING/DRAFTSTOPPING","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045451","date":"2020-10-29","code":"FC-13-101","title":"ADMINISTRATION GENERAL","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045452","date":"2020-10-29","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045453","date":"2020-10-29","code":"FC-13-901","title":"FIRE PROTECTION SYSTEMS","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045454","date":"2020-10-29","code":"PM15-604.3","title":"ELECTRICAL- HAZARD","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-047916","date":"2020-11-13","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2023-03-14","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2021-072504","date":"2021-10-13","code":"FC-13-1007.2","title":"EXIT SIGN ILLUMINATION","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072505","date":"2021-10-13","code":"FC-13-315","title":"COMBUSTIBLE STORAGE","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072491","date":"2021-10-13","code":"FC-13-101","title":"ADMINISTRATION GENERAL","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072495","date":"2021-10-13","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072496","date":"2021-10-13","code":"FC-13-404.3","title":"EVACUATION PLAN CONTENT","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072542","date":"2021-10-13","code":"LO-1","title":"FAIL OBTAIN LICENSE\n","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072532","date":"2021-10-13","code":"FC-13-901","title":"FIRE PROTECTION SYSTEMS","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072531","date":"2021-10-13","code":"FC-13-904.11.1","title":"CLASS K EXTINGUISHER","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072530","date":"2021-10-13","code":"FC-13-904.5","title":"WET CHEMICAL SYSTEM TEST","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072511","date":"2021-10-13","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072506","date":"2021-10-13","code":"FC-13-906.2","title":"FIRE EXTINGUISHERS TAGGED","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2024-008922","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2024-008937","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2024-008940","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2025-061682","date":"2025-08-14","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061684","date":"2025-08-14","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061687","date":"2025-08-14","code":"F-1104.3","title":"EXIT SIGN ILLUMINATION\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061813","date":"2025-08-14","code":"F-906.1","title":"FIRE EXTINGUISHERS REQUIRED\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061812","date":"2025-08-14","code":"F-906.7","title":"FIRE EXTINGUISHER HANGERS & BRACKETS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061810","date":"2025-08-14","code":"F-906.2","title":"FIRE EXTINGUISHERS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061802","date":"2025-08-14","code":"F-1031.2","title":"RELIABILITY\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061683","date":"2025-08-14","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-097269","date":"2025-12-15","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2026-07-15","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-097268","date":"2025-12-15","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2026-07-15","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"3141910","date":"2014-04-11","code":"A-302.11/1","title":"PERMB- WK DONE W/O NOTIFY INSP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3169122","date":"2014-05-07","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3177597","date":"2014-05-14","code":"A-302.11/1","title":"PERMB- WK DONE W/O NOTIFY INSP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3271135","date":"2014-07-28","code":"A-402.5/2","title":"PERMB- FINAL PRE-CO INSP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3271184","date":"2014-07-28","code":"A-104.1/1","title":"WORKMANLIKE- BUILDING CODE","status":"CLOSEDCASE","resolutionDate":null,"resolution":null}],"violationCases":[{"number":"251350","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2010-09-15","completedDate":"2012-12-04","violations":[{"number":"1932216","date":"2010-09-15","code":"FC-2601.2/1","title":"WELDING-PERMIT REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932214","date":"2010-09-15","code":"FC-901.6/6","title":"FA-REPAIR SYSTEM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932213","date":"2010-09-15","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1932215","date":"2010-09-15","code":"FC-914.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"361798","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2012-12-05","completedDate":"2013-11-14","violations":[{"number":"2828800","date":"2012-12-04","code":"FC-901.4/1","title":"OBTAIN PERMIT EXTEN SPRKLR SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828798","date":"2012-12-04","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828797","date":"2012-12-04","code":"FC-1008.1/1","title":"EGRESS DOOR PROPER SWING","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828799","date":"2012-12-04","code":"FC-607.2/1","title":"ELEVATORS POST EMERGENCY SIGN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828795","date":"2012-12-04","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828794","date":"2012-12-04","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2828796","date":"2012-12-05","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"410608","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2013-11-12","completedDate":"2014-01-16","violations":[{"number":"3039417","date":"2013-11-12","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3039419","date":"2013-11-12","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3039418","date":"2013-11-12","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"429831","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2014-05-07","completedDate":"2014-07-01","violations":[{"number":"3217024","date":"2014-05-07","code":"A-901.13/1","title":"PENALTY- NO BLDG PERM INFO","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3217023","date":"2014-05-07","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"444934","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2014-07-28","completedDate":"2014-09-05","violations":[{"number":"3271158","date":"2014-07-28","code":"A-402.5/2","title":"PERMB- FINAL PRE-CO INSP","status":"CLOSEDCASE","resolutionDate":null,"resolution":null}]},{"number":"453047","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2014-09-17","completedDate":"2014-10-22","violations":[{"number":"3330846","date":"2014-09-17","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330842","date":"2014-09-17","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330843","date":"2014-09-17","code":"FC-1027.1/1","title":"EGRESS-DEV MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3330845","date":"2014-09-17","code":"FC-2703.9/6","title":"HAZMAT-SEPARATE INCOMPAT","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"566604","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2016-12-13","completedDate":"2017-01-17","violations":[{"number":"4171102","date":"2016-12-13","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171103","date":"2016-12-13","code":"FC-1004.3/1","title":"EGRESS-ASSEM OCC SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171104","date":"2016-12-13","code":"FC-2703.4/1","title":"HAZMAT-MAINT MSDS/ON PREMISES","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171105","date":"2016-12-13","code":"FC-2703.5/4","title":"HAZMAT ID ENTRANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171106","date":"2016-12-13","code":"FC-404.2/4","title":"FIRE/EVAC PLN-HI RISE-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171107","date":"2016-12-13","code":"FC-404.5/1","title":"FIRE/EVAC PLN-AVAIL EMPLOYEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171108","date":"2016-12-13","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171109","date":"2016-12-13","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171110","date":"2016-12-13","code":"FC-409.4/1","title":"SHELTER PLN-EMPLY TRNG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171111","date":"2016-12-13","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171112","date":"2016-12-13","code":"FC-703.1/1","title":"FIRE-MAINTAIN ASSEMBLY","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171113","date":"2016-12-13","code":"FC-703.1/2","title":"FIRE-MAINTAIN FIREBLOCK","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171115","date":"2016-12-13","code":"FC-703.2/2","title":"FIRE-DOOR STOP PROHIBITED","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171116","date":"2016-12-13","code":"FC-901.6/13","title":"FIRE SUPP DRY CHEM SYS MAINT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171117","date":"2016-12-13","code":"FC-901.7/1","title":"FIRE PROT SYS MAINTENANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171119","date":"2016-12-13","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171120","date":"2016-12-13","code":"FC-906.2/2","title":"FIRE EXTING-NEEDS INSP/TAG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171121","date":"2016-12-13","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171122","date":"2016-12-13","code":"FC-912.2/1","title":"FIRE CONNECT SIGN-EXIST BLDG","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4171123","date":"2016-12-14","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"CF-2020-076803","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2020-10-29","completedDate":"2021-01-08","violations":[{"number":"VI-2020-045455","date":"2020-10-29","code":"FC-13-1004.2","title":"LO SIGN","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045456","date":"2020-10-29","code":"FC-13-315","title":"COMBUSTIBLE STORAGE","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045464","date":"2020-10-29","code":"FC-13-912.4","title":"FDC SIGNAGE REQUIRED","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045459","date":"2020-10-29","code":"FC-13-404.3","title":"EVACUATION PLAN CONTENT","status":"COMPLIED","resolutionDate":"2021-01-08","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2020-045458","date":"2020-10-29","code":"FC-13-803","title":"VIOLATION OF FLAME SPREAD REQUIREMENTS FOR INTERIOR WALL & CEILING FINISH & TRIM","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045457","date":"2020-10-29","code":"FC-13-703.1.1","title":"FIREBLOCKING/DRAFTSTOPPING","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045451","date":"2020-10-29","code":"FC-13-101","title":"ADMINISTRATION GENERAL","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045452","date":"2020-10-29","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045453","date":"2020-10-29","code":"FC-13-901","title":"FIRE PROTECTION SYSTEMS","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2020-045454","date":"2020-10-29","code":"PM15-604.3","title":"ELECTRICAL- HAZARD","status":"COMPLIED","resolutionDate":"2020-11-12","resolution":"COMPLIED - OWNER REPAIR"}]},{"number":"CF-2020-080109","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"AUDITS AND INVESTIGATIONS INVESTIGATOR","status":"CLOSED","createdDate":"2020-11-13","completedDate":"2023-03-14","violations":[{"number":"VI-2020-047916","date":"2020-11-13","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2023-03-14","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"}]},{"number":"CF-2021-100488","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2021-10-13","completedDate":"2022-01-10","violations":[{"number":"VI-2021-072504","date":"2021-10-13","code":"FC-13-1007.2","title":"EXIT SIGN ILLUMINATION","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072505","date":"2021-10-13","code":"FC-13-315","title":"COMBUSTIBLE STORAGE","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072491","date":"2021-10-13","code":"FC-13-101","title":"ADMINISTRATION GENERAL","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072495","date":"2021-10-13","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072496","date":"2021-10-13","code":"FC-13-404.3","title":"EVACUATION PLAN CONTENT","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072542","date":"2021-10-13","code":"LO-1","title":"FAIL OBTAIN LICENSE\n","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072532","date":"2021-10-13","code":"FC-13-901","title":"FIRE PROTECTION SYSTEMS","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072531","date":"2021-10-13","code":"FC-13-904.11.1","title":"CLASS K EXTINGUISHER","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072530","date":"2021-10-13","code":"FC-13-904.5","title":"WET CHEMICAL SYSTEM TEST","status":"COMPLIED","resolutionDate":"2022-01-10","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072511","date":"2021-10-13","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2021-072506","date":"2021-10-13","code":"FC-13-906.2","title":"FIRE EXTINGUISHERS TAGGED","status":"COMPLIED","resolutionDate":"2021-12-01","resolution":"COMPLIED - OWNER REPAIR"}]},{"number":"CF-2024-010699","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"BUILDING INVESTIGATOR","status":"CLOSED","createdDate":"2024-02-09","completedDate":"2024-03-07","violations":[{"number":"VI-2024-008922","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"}]},{"number":"CF-2024-010706","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"BUILDING INVESTIGATOR","status":"CLOSED","createdDate":"2024-02-09","completedDate":"2024-03-07","violations":[{"number":"VI-2024-008937","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"}]},{"number":"CF-2024-010708","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"BUILDING INVESTIGATOR","status":"CLOSED","createdDate":"2024-02-09","completedDate":"2024-03-07","violations":[{"number":"VI-2024-008940","date":"2024-02-09","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"CLOSED","resolutionDate":"2024-03-07","resolution":"CLOSED - ADMINISTRATIVELY"}]},{"number":"CF-2025-086604","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"IN VIOLATION","createdDate":"2025-08-14","completedDate":null,"violations":[{"number":"VI-2025-061682","date":"2025-08-14","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061684","date":"2025-08-14","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061687","date":"2025-08-14","code":"F-1104.3","title":"EXIT SIGN ILLUMINATION\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061813","date":"2025-08-14","code":"F-906.1","title":"FIRE EXTINGUISHERS REQUIRED\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061812","date":"2025-08-14","code":"F-906.7","title":"FIRE EXTINGUISHER HANGERS & BRACKETS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061810","date":"2025-08-14","code":"F-906.2","title":"FIRE EXTINGUISHERS\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061802","date":"2025-08-14","code":"F-1031.2","title":"RELIABILITY\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-061683","date":"2025-08-14","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"OPEN","resolutionDate":null,"resolution":null}]},{"number":"CF-2025-134047","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"QOL FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2025-12-16","completedDate":"2026-07-15","violations":[{"number":"VI-2025-097269","date":"2025-12-15","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2026-07-15","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-097268","date":"2025-12-15","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2026-07-15","resolution":"CLOSED - REISSUED/REWRITTEN"}]},{"number":"525676","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3141910","date":"2014-04-11","code":"A-302.11/1","title":"PERMB- WK DONE W/O NOTIFY INSP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"526531","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3169122","date":"2014-05-07","code":"A-301.1/46","title":"PERMB- INSTALL HVAC SYS","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"530418","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3177597","date":"2014-05-14","code":"A-302.11/1","title":"PERMB- WK DONE W/O NOTIFY INSP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"508628","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3271135","date":"2014-07-28","code":"A-402.5/2","title":"PERMB- FINAL PRE-CO INSP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"390207","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3271184","date":"2014-07-28","code":"A-104.1/1","title":"WORKMANLIKE- BUILDING CODE","status":"CLOSEDCASE","resolutionDate":null,"resolution":null}]}],"violYears":[{"y":2010,"n":4,"worst":null},{"y":2012,"n":7,"worst":null},{"y":2013,"n":3,"worst":null},{"y":2014,"n":12,"worst":null},{"y":2016,"n":20,"worst":null},{"y":2020,"n":11,"worst":null},{"y":2021,"n":11,"worst":null},{"y":2024,"n":3,"worst":null},{"y":2025,"n":10,"worst":null}],"investigations":[{"caseNumber":"61189","date":"2006-05-01","type":"CI INSP","status":"FAILED"},{"caseNumber":"61189","date":"2006-05-30","type":"CI INSP","status":"FAILED"},{"caseNumber":"61189","date":"2006-07-06","type":"CI INSP","status":"FAILED"},{"caseNumber":"61189","date":"2006-09-05","type":"CI INSP","status":"FAILED"},{"caseNumber":"81040","date":"2006-09-22","type":"CI INSP","status":"FAILED"},{"caseNumber":"81040","date":"2006-09-22","type":"CI INSP","status":"PASSED"},{"caseNumber":"81293","date":"2006-09-25","type":"CI INSP","status":"FAILED"},{"caseNumber":"81293","date":"2006-09-25","type":"CI INSP","status":"PASSED"},{"caseNumber":"83703","date":"2006-10-06","type":"CI INSP","status":"PASSED"},{"caseNumber":"83703","date":"2006-10-06","type":"CI INSP","status":"FAILED"},{"caseNumber":"84094","date":"2006-10-10","type":"CI INSP","status":"FAILED"},{"caseNumber":"84094","date":"2006-10-10","type":"CI INSP","status":"PASSED"},{"caseNumber":"87568","date":"2006-10-27","type":"CI INSP","status":"FAILED"},{"caseNumber":"87848","date":"2006-10-30","type":"CI INSP","status":"FAILED"},{"caseNumber":"87848","date":"2006-10-30","type":"CI INSP","status":"PASSED"},{"caseNumber":"87848","date":"2006-10-30","type":"CI INSP","status":"PASSED"},{"caseNumber":"87568","date":"2007-03-07","type":"CI INSP","status":"PASSED"},{"caseNumber":"61189","date":"2009-03-06","type":"CI INSP","status":"PASSED"},{"caseNumber":"251350","date":"2010-09-14","type":"CI INSP","status":"FAILED"},{"caseNumber":"251350","date":"2010-10-26","type":"CI INSP","status":"FAILED"},{"caseNumber":"251350","date":"2010-12-21","type":"CI INSP","status":"FAILED"},{"caseNumber":"251350","date":"2011-04-11","type":"CI INSP","status":"PASSED"},{"caseNumber":"361798","date":"2012-12-04","type":"CI INSP","status":"FAILED"},{"caseNumber":"361798","date":"2013-05-02","type":"CI INSP","status":"FAILED"},{"caseNumber":"361798","date":"2013-06-14","type":"CI INSP","status":"CLOSED"},{"caseNumber":"361798","date":"2013-11-12","type":"PRECOURT","status":"PASSED"},{"caseNumber":"410608","date":"2013-11-12","type":"CI INSP","status":"FAILED"},{"caseNumber":"410608","date":"2013-12-17","type":"CI INSP","status":"FAILED"},{"caseNumber":"410608","date":"2014-01-16","type":"CI INSP","status":"PASSED"},{"caseNumber":"429831","date":"2014-05-07","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"429831","date":"2014-06-16","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"429831","date":"2014-07-01","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"444934","date":"2014-07-28","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"444934","date":"2014-09-05","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"453047","date":"2014-09-17","type":"CI INSP","status":"FAILED"},{"caseNumber":"453047","date":"2014-10-22","type":"CI INSP","status":"PASSED"},{"caseNumber":"566604","date":"2016-12-13","type":"CI INSP","status":"FAILED"},{"caseNumber":"566604","date":"2017-01-17","type":"CI INSP","status":"PASSED"},{"caseNumber":"CF-2020-076803","date":"2020-10-29","type":null,"status":"FAILED"},{"caseNumber":"CF-2020-080109","date":"2020-11-16","type":null,"status":"FAILED"},{"caseNumber":"CF-2020-076803","date":"2021-01-08","type":null,"status":"PASSED"},{"caseNumber":"CF-2021-100488","date":"2021-10-13","type":null,"status":"FAILED"},{"caseNumber":"CF-2021-100488","date":"2021-12-01","type":null,"status":"FAILED"},{"caseNumber":"CF-2021-100488","date":"2022-01-10","type":null,"status":"PASSED"},{"caseNumber":"CF-2020-080109","date":"2023-03-14","type":null,"status":"PASSED"},{"caseNumber":"CF-2024-010699","date":"2024-02-09","type":null,"status":"FAILED"},{"caseNumber":"CF-2024-010706","date":"2024-02-09","type":null,"status":"FAILED"},{"caseNumber":"CF-2024-010708","date":"2024-02-09","type":null,"status":"FAILED"},{"caseNumber":"CF-2024-010706","date":"2024-03-07","type":null,"status":"PASSED"},{"caseNumber":"CF-2024-010708","date":"2024-03-07","type":null,"status":"PASSED"},{"caseNumber":"CF-2024-010699","date":"2024-03-07","type":null,"status":"PASSED"},{"caseNumber":"CF-2025-086604","date":"2025-08-15","type":null,"status":"FAILED"},{"caseNumber":"CF-2025-134047","date":"2025-12-16","type":null,"status":"FAILED"},{"caseNumber":"CF-2025-134047","date":"2026-02-06","type":null,"status":"FAILED"},{"caseNumber":"CF-2025-134047","date":"2026-07-15","type":null,"status":"PASSED"}],"inspYears":[{"y":2006,"fails":10,"passes":6},{"y":2007,"fails":0,"passes":1},{"y":2009,"fails":0,"passes":1},{"y":2010,"fails":3,"passes":0},{"y":2011,"fails":0,"passes":1},{"y":2012,"fails":1,"passes":0},{"y":2013,"fails":3,"passes":1},{"y":2014,"fails":4,"passes":4},{"y":2016,"fails":1,"passes":0},{"y":2017,"fails":0,"passes":1},{"y":2020,"fails":2,"passes":0},{"y":2021,"fails":2,"passes":1},{"y":2022,"fails":0,"passes":1},{"y":2023,"fails":0,"passes":1},{"y":2024,"fails":3,"passes":3},{"y":2025,"fails":2,"passes":0},{"y":2026,"fails":1,"passes":1}],"taxOwed":0,"taxSnapshot":{"available":true,"asOf":"2022-06","matched":false},"taxDelinquencySnapshotAsOf":"2022-06","taxDelinquencySnapshotAvailable":true,"lat":39.956398792598286,"lng":-75.17012058491784,"geom":{"type":"Polygon","coordinates":[[[-75.169397757,39.956423424],[-75.169444493,39.956196654],[-75.170844348,39.956374292],[-75.170796245,39.95660021],[-75.169397757,39.956423424]]]},"liDistrict":"CENTRAL WEST","certifications":[{"number":"BC-2022-009977","type":"Facade Report","inspectionDate":"2010-09-23","result":"Safe with Repair","expirationDate":"2015-09-23","buildingId":"1425020"},{"number":"BC-2021-007002","type":"Damper Certification","inspectionDate":"2021-03-01","result":"Certified","expirationDate":"2025-03-01","buildingId":"1425020"},{"number":"BC-2022-007480","type":"Facade Report","inspectionDate":"2022-04-19","result":"Safe with Repair","expirationDate":"2027-04-19","buildingId":"1425020"},{"number":"BC-2023-009751","type":"Damper Certification","inspectionDate":"2023-05-05","result":"Certified","expirationDate":"2027-05-05","buildingId":"1425020"},{"number":"BC-2023-018247","type":"Fire Alarm Certification","inspectionDate":"2023-05-12","result":"Certified","expirationDate":"2024-05-12","buildingId":"1425020"},{"number":"BC-2023-019816","type":"Sprinkler Certification","inspectionDate":"2023-07-27","result":"Deficient","expirationDate":null,"buildingId":"1425020"},{"number":"BC-2024-011769","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2023-12-02","result":"Certified","expirationDate":"2024-12-02","buildingId":"1425020"},{"number":"BC-2024-015441","type":"Special Hazards Certification","inspectionDate":"2024-02-05","result":"Certified","expirationDate":"2025-02-05","buildingId":"1425020"},{"number":"BC-2024-017749","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2024-03-12","result":"Certified","expirationDate":"2025-03-12","buildingId":"1425020"},{"number":"BC-2024-011578","type":"Fire Alarm Certification","inspectionDate":"2024-04-23","result":"Certified","expirationDate":"2025-04-23","buildingId":"1425020"},{"number":"BC-2024-025810","type":"Sprinkler Certification","inspectionDate":"2024-07-24","result":"Deficient","expirationDate":null,"buildingId":"1425020"},{"number":"BC-2024-028992","type":"Sprinkler Certification","inspectionDate":"2024-07-24","result":"Certified","expirationDate":"2025-07-24","buildingId":"1425020"},{"number":"BC-2025-022564","type":"Sprinkler Certification","inspectionDate":"2024-09-18","result":"Certified","expirationDate":"2025-09-18","buildingId":"1425020"},{"number":"BC-2025-006462","type":"Fire Alarm Certification","inspectionDate":"2025-02-25","result":"Certified","expirationDate":"2026-02-25","buildingId":"1425020"},{"number":"BC-2025-016270","type":"Damper Certification","inspectionDate":"2025-06-17","result":"Certified","expirationDate":"2026-06-17","buildingId":"1425020"},{"number":"BC-2026-003005","type":"Sprinkler Certification","inspectionDate":"2025-07-30","result":"Deficient","expirationDate":null,"buildingId":"1425020"},{"number":"BC-2025-026421","type":"Sprinkler Certification","inspectionDate":"2025-07-30","result":"Deficient","expirationDate":null,"buildingId":"1425020"},{"number":"BC-2025-022811","type":"Special Hazards Certification","inspectionDate":"2025-08-29","result":"Certified","expirationDate":"2026-08-29","buildingId":"1425020"},{"number":"BC-2026-015148","type":"Sprinkler Certification","inspectionDate":"2025-09-22","result":"Certified","expirationDate":"2026-09-22","buildingId":"1425020"},{"number":"BC-2026-002536","type":"Fire Alarm Certification","inspectionDate":"2025-11-20","result":"Deficient","expirationDate":null,"buildingId":"1425020"},{"number":"BC-2026-008492","type":"Fire Alarm Certification","inspectionDate":"2025-11-20","result":"Certified","expirationDate":"2026-11-20","buildingId":"1425020"},{"number":"BC-2025-030813","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2025-11-21","result":"Certified","expirationDate":"2026-11-21","buildingId":"1425020"},{"number":"BC-2026-006378","type":"Fire Alarm Certification","inspectionDate":"2026-02-26","result":"Certified","expirationDate":"2027-02-26","buildingId":"1425020"},{"number":"BC-2026-016333","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2026-04-26","result":"Certified","expirationDate":"2027-04-26","buildingId":"1425020"},{"number":"BC-2026-013113","type":"Damper Certification","inspectionDate":"2026-05-01","result":"Certified","expirationDate":"2027-05-01","buildingId":"1425020"},{"number":"BC-2026-017608","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2026-06-19","result":"Certified","expirationDate":"2027-06-19","buildingId":"1425020"},{"number":"BC-2026-019898","type":"Special Hazards Certification","inspectionDate":"2026-07-14","result":"Certified","expirationDate":"2027-07-14","buildingId":"1425020"}],"cityRecordAvailability":{"violations":true,"investigations":true,"appeals":true,"certifications":true,"permits":true,"licenses":true},"zip":"19103","beds":null,"baths":null,"stories":30,"lotArea":33098,"zoning":"CMX5","grade":"B","basement":null,"heater":null,"centralAir":null,"extCond":"3","intCond":"3","garage":null,"homestead":false,"mail":"555 E LANCASTER AVE, RADNOR PA, 19087","mailOut":true,"appeals":[{"type":"Building standards appeal","grounds":"ON 3/16/07 DEPARTMENT OF LICENSE AND INSPECTION ISSUED REFUSAL OF PERMIT FOR APPLICATION #45700.","status":"OPEN","outcome":"APPROVED","date":"2007-06-25","number":"1991","relatedPermit":null},{"type":"Building standards appeal","grounds":"DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED NOTICE OF REFUSAL FOR APPLICATION #451877.","status":"OPEN","outcome":"APPROVED","date":"2013-06-19","number":"20449","relatedPermit":"451877"},{"type":"Building standards appeal","grounds":"ON 8/29/13 DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED NOTICE OF REFUSAL FOR APPLICATION #482883.","status":"CLOSED","outcome":"APPROVED","date":"2013-10-11","number":"21241","relatedPermit":"482883"}],"taxYears":[],"taxNet":0,"taxLien":false,"taxLedgerThrough":2016,"taxLedgerAvailable":true,"timesSold":0,"abated":false,"assessmentExemption":false,"exemptionBasisVerified":false,"valueSeries":[{"y":2016,"v":95461700,"taxable":95461700,"land":9929400,"improvement":85532300,"taxableLand":9929400,"taxableImprovement":85532300,"exemptLand":0,"exemptImprovement":0},{"y":2017,"v":95461700,"taxable":95461700,"land":9929400,"improvement":85532300,"taxableLand":9929400,"taxableImprovement":85532300,"exemptLand":0,"exemptImprovement":0},{"y":2018,"v":96481300,"taxable":96481300,"land":14472195,"improvement":82009105,"taxableLand":14472195,"taxableImprovement":82009105,"exemptLand":0,"exemptImprovement":0},{"y":2019,"v":109234200,"taxable":109234200,"land":16385130,"improvement":92849070,"taxableLand":16385130,"taxableImprovement":92849070,"exemptLand":0,"exemptImprovement":0},{"y":2020,"v":112511200,"taxable":112511200,"land":16876680,"improvement":95634520,"taxableLand":16876680,"taxableImprovement":95634520,"exemptLand":0,"exemptImprovement":0},{"y":2021,"v":112511200,"taxable":112511200,"land":16876680,"improvement":95634520,"taxableLand":16876680,"taxableImprovement":95634520,"exemptLand":0,"exemptImprovement":0},{"y":2022,"v":112511200,"taxable":112511200,"land":16876680,"improvement":95634520,"taxableLand":16876680,"taxableImprovement":95634520,"exemptLand":0,"exemptImprovement":0},{"y":2023,"v":117869300,"taxable":117869300,"land":23573860,"improvement":94295440,"taxableLand":23573860,"taxableImprovement":94295440,"exemptLand":0,"exemptImprovement":0},{"y":2024,"v":117869300,"taxable":117869300,"land":23573860,"improvement":94295440,"taxableLand":23573860,"taxableImprovement":94295440,"exemptLand":0,"exemptImprovement":0},{"y":2025,"v":121670700,"taxable":121670700,"land":24334140,"improvement":97336560,"taxableLand":24334140,"taxableImprovement":97336560,"exemptLand":0,"exemptImprovement":0},{"y":2026,"v":121670700,"taxable":121670700,"land":24334140,"improvement":97336560,"taxableLand":24334140,"taxableImprovement":97336560,"exemptLand":0,"exemptImprovement":0},{"y":2027,"v":121983400,"taxable":121983400,"land":24396600,"improvement":97586800,"taxableLand":24396600,"taxableImprovement":97586800,"exemptLand":0,"exemptImprovement":0}],"taxNow":1703146,"familyHeld":false,"lastTransferNominal":false,"permits":[{"number":"48487","date":"2007-01-08","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2008-03-18","scope":"INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS"},{"number":"45700","date":"2007-01-12","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2007-07-30","scope":"REMOVE EXISTING PRE-ACTION SPRINKLER SYSTEM ON 3RD FL. SERVER ROOM IN \"A FULLY SPRINKLERED HIGHRISE BLDG\". PREVIOUS SPRINKLER PERMIT # 24643. NOTE: THE HIGH-RISE BUILDING SHALL BE MAINTAINED AND AUTO. SPRINKLERED THRUOUT."},{"number":"64422","date":"2007-04-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-12-26","scope":"INTERIOR ALTERATIONS AS PER PLANS"},{"number":"66942","date":"2007-04-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-03","scope":"INSTALL 100 AMP SERVICE AND EQUIPMENT, INSTALL VOICE AND DATA FOR PHONE SERVICE, CAT5 D/B, INSTALL (6) OUTLETS, (2) SWITCHES, (2) 48\" CEILING LIGHTS. (CC DISTRICT)"},{"number":"65782","date":"2007-04-24","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-08-20","scope":"INSTALL PRE-FAB WALK-OVER REFLECTION POOL WITH 42\" HIGH PROTECTIVE BARRIERS PER SUBMITTED SEALED PLANS."},{"number":"72379","date":"2007-04-30","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2007-12-18","scope":"INSTALL DOMESTIC WATER, SANITARY AND VENT PIPING FOR 2 SINKS, 2 INDIRECT WASTE AND 3 FLOOR DRAINS"},{"number":"71516","date":"2007-05-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-02-28","scope":"INTERIOR ALTERATIONS, AS PER PLANS"},{"number":"70163","date":"2007-05-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-08-11","scope":"MODIFY DUCT TO ACCOMODATE NEW OFFICE LAYOUT PER SUBMITTED SEALED PLANS. ADD'L ELEC. PERMIT."},{"number":"77689","date":"2007-05-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":null,"scope":"(O) SK"},{"number":"78118","date":"2007-05-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-02-28","scope":"RELOCATE (18) REGISTERS/DIFFUSERS TENANT (RBC DAIN RAUCHER)"},{"number":"79485","date":"2007-05-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2008-02-28","scope":"RELOCATION OF SPRINKLER HEADS (100) AND NO EXTERIOR WORK ON THIS PERMIT."},{"number":"79589","date":"2007-05-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-08-06","scope":"(17TH FLOOR) INSTALLATION OF 120 CAT 5E PLENUM RATED 4 PAIR CABLE FROM THE USER LOCATION TO THE TELECOM ROOM ON THE 17TH FLOOR. INSTALLATION OF J HOOK SUPPORT EVERY 4-5' FROM THE STRUCTURE ABOVE THE DROP CEILING."},{"number":"77777","date":"2007-05-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-08-10","scope":"INTERIOR ALTERATIONS AS PER PLAN."},{"number":"77323","date":"2007-06-05","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2008-08-11","scope":"SELECTIVE DEMO ON EXISTING SYSTEM, MODIFY AND EXTEND EXISTING WET SPRINKLER SYSTEM FOR NEW TENANT"},{"number":"73054","date":"2007-06-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-01-27","scope":"INSTALLATION OF 90 TELECOMMUNICATION POINTS WITH ASSOCIATED TEMINATION RACKS. (CC DIST)"},{"number":"86054","date":"2007-07-03","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-07-30","scope":"BOARD OF BUILDING STANDARDS CASE # 1991. PREVIOUS SPRINKLER PERMIT # 24643, 45700."},{"number":"81757","date":"2007-07-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-08-28","scope":"11TH FLOOR, RENOVATIONS OF CONFERENCE AREAS, ALL NEW LIGHTING AND BRANCH CIRCUITS. ALL PANELS ARE EXISTING. FIRE ALARM SYSTEM WILL BE SEPARATE PERMIT."},{"number":"101192","date":"2007-09-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-08-11","scope":"INTERIOR ALTERATIONS AS PER PLAN -1 6TH FLOOR - PHASE 4"},{"number":"93133","date":"2007-09-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-08-28","scope":"FURNISH & INSTALL NEW DEVICES IN RENOVATION AREA."},{"number":"109065","date":"2007-10-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL (10-15) DUAL CATEGORY 5E, PLENUM CABLES, LONGEST RUN 150' (CC DIST)"},{"number":"109472","date":"2007-10-16","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2007-12-03","scope":"FURNISH AND INSTALL 2 COFFEE MAKERS, 2 SINKS 2 HOT WATER HEATS AND 1 ICE MAKER"},{"number":"109959","date":"2007-11-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-06-21","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT. INSTALL (389) LIGHT FIXTURES, (56) WALL SWITCHES, (1) LIGHTING CONTACTOR, (165) RECEPTACLES, (14) EXIT LIGHTS, (7) HVAC FEED, (1) 208/120 VOLT PANEL, (1) 30 KVA TRANSFORMER.(CC DIST)"},{"number":"111592","date":"2007-11-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALLATION OF 90 TELECOMM POINTS WITH ASSOCIATED TERMINATION RACKS."},{"number":"109434","date":"2007-11-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-10-02","scope":"INTERIOR DEMO EXISTING & INSTALL NEW DUCT WORK, DIFFUSERS, RELOCATE, AS PER PLANS, UTILIZING EXISTING SYSTEM."},{"number":"114337","date":"2007-12-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 9 SPEAKER/STROBES, 1 STROBE & CONNECT TO EXISTING SYSTEM."},{"number":"74724","date":"2007-12-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-01","scope":"INSTALL 95 NEW RECEPTS, 16 FURNITURE POWER FEEDS, 32 NEW SWITCHES, 285 NEW LIGHT FIXTURES. REUSE EXISTING SERVICE, NO EXPECTED CHANGE IN LOAD (CENTER CITY DISTRICT)"},{"number":"130057","date":"2008-02-01","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2008-03-18","scope":"RELOCATE (150) EXISTING SPRINKLER HEADS"},{"number":"134059","date":"2008-03-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL NEW 20KW UPS IN ROOM 'A' 150 SQUARE FEET. INTERUPT EXISTING 100 AMP FEEDER TO PANEL IN ROOM 'B' AND INSTALL INTO UPS. REFEED PANEL FROM UPS, PER 2005 NEC, NO OTHER WORK (CC DIST)."},{"number":"145596","date":"2008-05-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALLATION OF 49 TELECOMM POINTS CAT5E & CAT6 PLENUM RATED WITH ASSOCIATED TERMINATION RACKS AS PER 2005 NEC (CC DISTRICT)"},{"number":"145597","date":"2008-05-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALLATION OF 49 TELECOMM POINTS CAT5E & CAT6 PLENUM RATED WITH ASSOCIATED TERMINATION RACKS AS PER 2005 NEC (CC DISTRICT)"},{"number":"153489","date":"2008-05-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"INTERIOR ALTERATIONS, PHASES 3 AND 5, PER PLAN,"},{"number":"153486","date":"2008-05-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"INTERIOR ALTERATIONS AS SHOWN ON PLANS"},{"number":"156660","date":"2008-06-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-10-19","scope":"INSTALL 1 SINK, 1 FUNNEL FLOOR DRAIN AND 1 INDIRECT WASTE"},{"number":"157375","date":"2008-06-13","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"RELOCATE (50) SPRINKLER HEADS"},{"number":"157377","date":"2008-06-13","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"RELOCATE (60) SPRINKLER HEADS"},{"number":"154968","date":"2008-06-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-08-28","scope":"RENOVATION TO EAST SIDE CONFERENCE ROOMS, RELOCATION OF FIRE ALARM DEVICES."},{"number":"154311","date":"2008-07-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-12-26","scope":"INSTALL 130 NEW FIXTURES, 85 RECEPTS, 16 MOTION SENSORS & SWITCHES, 40 COMMUNICATION CONDUITS ONLY AS PER 2005 AND RE - INSTALL 4 EXISTING FIRE ALARM DEVICES AS PER NFPA 72"},{"number":"162751","date":"2008-07-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-10-19","scope":"FURNISH AND INSTALL TWO (2) HOT WATER HEATERS PER THE PLANS AND SPECS, DISCONNECT AND REMOVE EXISTING SINKS AND FAUCETS, TURN OVER TO BUILDING OWNER. REMOVE ALL COLD, HOT AND SANITARY PIPING BACK TO CHASE WALL AND CAP. 2 WATER HEATERS, REMOVING 8 SINKS"},{"number":"162739","date":"2008-07-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"SERVICE AND INSTALL (2) WATER COOLED CEILING HUNG AIR CONDITIONING UNITS INCLUDING DUCTWORK"},{"number":"153724","date":"2008-07-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-02-05","scope":"RELOCATE DUCTWORK TO ACCOMODATE NEW OFFICE LAYOUT"},{"number":"182166","date":"2008-10-10","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-10-19","scope":"ADD 1 SINK IN PANTRY AND 1 DRAIN FOR ICE MACHINE"},{"number":"185316","date":"2008-11-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-08-25","scope":"PHASE II INTERIOR DEMO AND ALTERATIONS ONLY, RECONFIGURATION OF SPACES, UPGRADES TO FINISHES, FURNITURE, AND EQUIPMENT, AS PER SUBMITTED PLANS. NO WORK TO EXTERIOR DOORS OR WINDOWS."},{"number":"182760","date":"2008-11-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-08-25","scope":"RECONFIGURE DUCT WORK FOR NEW CONFERENCE ROOM ON 10TH FLOOR PER SUBMITTED SEALED PLANS."},{"number":"189945","date":"2008-12-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-07","scope":"RENOVATION TO 10TH FLOOR POWER AND LIGHTING EAST SIDE CONFERENCE ROOMS FIRE ALARM WILL BE RELOCATION OF EXISTING DEVICES (CC DISTRICT)"},{"number":"185370","date":"2008-12-31","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2009-08-25","scope":"MODIFY EXISTING WET SPRINKLER SYSTEM AS PER PLANS."},{"number":"217950","date":"2009-06-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-10-26","scope":"RENOVATION OF EXISTING TENANT SPACE AS PER PLANS."},{"number":"19671","date":"2009-07-03","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2009-07-09","scope":"7/10/09 - ERECTION OF 12X65 TABLE & CHAIRS TENT TEMPORARY LIGHT TO BE PLUGGED INTO EXISTING GFI OUTLETS"},{"number":"226811","date":"2009-07-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 34 CAT 6 PLENUM UN TWISTED PAIR CABLES TO WORK AREA OUTLETS FOR DATA COMMUNICATIONS LONGEST RUN 190' AS PER 2005 NEC (CC DISTRICT)"},{"number":"237014","date":"2009-09-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":"INTERIOR ALTERATIONS TO A PORTION OF THE 27TH, 28TH AND 30TH FLOORS AS PER PLANS."},{"number":"237222","date":"2009-09-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL (130-140) CATEGORY 6/5E PLENUM CABLES - LONGEST RUN 150' AS PER 2005 NEC (CC DIST)"},{"number":"241484","date":"2009-10-08","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2010-02-17","scope":null},{"number":"241494","date":"2009-10-08","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":null},{"number":"243590","date":"2009-10-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":"FIXTURE INSTALLATION"},{"number":"243387","date":"2009-11-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-29","scope":"INSTALL NEW LIGHTING & POWER TO OFFICES, CONFERENCE ROOMS & WORKSTATIONS."},{"number":"241780","date":"2009-11-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":"HVAC ALTERATIONS ON THE 30TH FLOOR OFFICE SPACE AS PER PLANS."},{"number":"246799","date":"2009-12-15","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":"MODIFY EXISTING SPRINKLER SYSTEM IN ORDER TO ACCOMMODATE NEW TENANT WALL & CEILING LAYOUT AS PER PLANS."},{"number":"264380","date":"2010-03-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 26 DATA LINES, 1 200 PAIR CABLE & 1 250 PAIR CABLE FROM 15TH TO 16TH FLOOR. CABLES TO BE RISER & PLENUM RATED AS PER 2005 NEC ARTICLES 300.21 & 800"},{"number":"260122","date":"2010-03-04","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-04-29","scope":"INTERIOR RENOVATIONS TO THREE CONFERENCE ROOMS LOCATED ON THE 27TH FLOOR AS PER PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL AND ELECTRICAL."},{"number":"269646","date":"2010-03-31","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-10-12","scope":"RELOCATE 13 SPRINKLERS ON THE 27TH FLOOR"},{"number":"272447","date":"2010-04-15","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-03-29","scope":"REPLACE EXISTING DOMESTIC WATER SOFTNERS"},{"number":"286595","date":"2010-06-21","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-10-12","scope":"RELOCATE 22 EXISTING SPRINKLER HEADS(COMMERCIAL-28TH FLOOR)"},{"number":"291181","date":"2010-07-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-09-20","scope":"INTERIOR ALTERATIONS, AS PER PLANS FOR AN EXISTING RETAURANT. NO CHANGE IN FOOTPRINT OF NUMBER OF LAWFUL OCCUPANTS"},{"number":"293425","date":"2010-08-09","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-09-20","scope":"FURNISH AND INSTALL (3)FLOOR SINKS, CONNECT TO EXISTING SERVICES"},{"number":"292518","date":"2010-08-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-10-27","scope":"SUPPLY & INSTALL POWER & LIGHTING FOR NEW KITCHEN LAYOUT SUPPLY & INSTALL POWER FOR FLATSCREEN TV AND POWER TO EXHAUST FAN AS PER 2008 NEC"},{"number":"293316","date":"2010-09-08","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-03-30","scope":"REPIPE EXISTING FSP SYSTEM IN KITCHEN HOOD, UL-300 STANDARDS FOR NEW COOKING EQUIP, ANSUL R-102.3 GALLON"},{"number":"300477","date":"2010-09-10","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-10-12","scope":"RELOCATE 20 EXISTING SPRINKLER HEADS (26TH FLOOR)"},{"number":"297080","date":"2010-09-13","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-10-12","scope":"INTERIOR RENOVATION OF 26TH FLOOR OFFICES."},{"number":"306338","date":"2010-10-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-01-18","scope":"RENOVATIONS PER PLAN FOR 23RD FL STAFF CAFETERIA FOR DRINKER BIDDLE & REATH,LLP."},{"number":"312179","date":"2010-11-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-01-18","scope":"RELOCATE 34 EXISTING SPRINKLER HEADS (23RD FLOOR)"},{"number":"314012","date":"2010-11-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-01-18","scope":"RELOCATE (8) DIFFUSERS FOR OFFICE BLDG."},{"number":"313734","date":"2010-12-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-01-18","scope":"FURNISH AND INSTALL (2) 3\" FLOOR DRAINS(INDIRECT WASTE) AND (1) 3\" FLOOR SINK TO SERVING TROUGH (COFFEE) NO FOOD PREP WORK"},{"number":"308375","date":"2010-12-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-12-27","scope":"RENOVATION TO EXISTING TENANT SPACE,INSTALL 3 FIRE ALARM DEVISES AS PER 2008 NEC"},{"number":"317200","date":"2010-12-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-11-01","scope":"INTERIOR ALTERATIONS FOR OFFICE SPACE"},{"number":"313406","date":"2010-12-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-09","scope":"INSTALL 85 LIGHTS FIXTURES,6 WALL SWITCHES,30 RECEPTACLES, REPLACE 30 CIRCUITS 208/120 VOLT PANEL WITH A 42 CIRCUIT PANEL. ALL FEEDERS TO COMPLY WITH ARTICLE 215-2 OF THE 2008 NEC."},{"number":"20913","date":"2011-02-18","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2011-02-18","scope":"HOTWORKS: WELDING/CUTTING/SOLDERING/TORCH WORK - PERMIT EXPIRES 2/18/12."},{"number":"329410","date":"2011-03-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-08","scope":"REMOVE & RELOCATE (7) 2X2 FIXTURES AND (14) DUPLEX RECEPTACLES, RE-USE ALL EXISTING CIRCUITRY, NO NEW CIRCUITING REQUIRED, ALL AS PER 2008 NEC"},{"number":"319372","date":"2011-04-08","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2011-04-08","scope":"APPLYING FOR DIRECTORY/LOGO SIGN (ONE SIDED)"},{"number":"334716","date":"2011-04-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-05-02","scope":"FURNISH & INSTALL DUCT WORK, ONE HVAC UNIT ADD AIR DEVICES"},{"number":"343435","date":"2011-06-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-07-26","scope":"INTERIOR TENANT FITOUT OF NON LOAD BEARING PARTITIONS IN SUITE 2002. ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPRESSION WORK REQUIRE ADDITIONAL PERMITS."},{"number":"340678","date":"2011-06-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-22","scope":"INSTALL TWO (2) INTERIOR SECURITY DOORS AS PER PLANS. SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL OR SPRINKLER WORK."},{"number":"347700","date":"2011-06-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-26","scope":"FURNISH AND INSTALL ONE VAV BOX, RELOCATE ONE VAV BOX, DUCT AND NEW AIR DEVICES."},{"number":"302283","date":"2011-06-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-21","scope":"FOR HVAC ACTVITY TO INCLUDE ONE VAV BOX, DUCT AND AIR DEVICES FOR NEW OFFICE LAYOUT ON THE 26TH FLOOR OF AN EXISTING HIGH RISE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS."},{"number":"334546","date":"2011-07-21","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2011-11-01","scope":"ERECTING A 2'11 1/2\" X 16' MONUMENT SIGN."},{"number":"354054","date":"2011-07-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-10-21","scope":"RELOCATE 8 DIFFUSERS"},{"number":"358455","date":"2011-08-24","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-01-05","scope":"FIT - OUT OF OFFICE SPACE, WORK INCLUDES DRYWALL PARTITIONS, ACT & GRID, PAINTING, FLOORING AND AN ADA COMPLIANT SINK AS PER PLANS."},{"number":"361281","date":"2011-09-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-01-05","scope":"INSTALL NEW HVAC DUCT, DIFFUSERS & HEAT PUMP WITHIN OFFICE SPACE ON THE 18TH FLOOR AS PER PLAN."},{"number":"378706","date":"2011-12-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-06","scope":"INSTALLATION OF 10 TON HORIZONTAL AIR HANDLING UNIT WITH MINOR MODIFICATIONS TO DUCTWORK AND 4 DIFFUSERS(COMMERCIAL)"},{"number":"379777","date":"2012-03-09","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-03-26","scope":"FURNISH AND INSTALL HVAC DUCT, UNITS, PIPING AND AIR DEVICES FOR NEW OFFICE LAYOUT AS PER PLANS."},{"number":"390207","date":"2012-03-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-09-05","scope":"INTERIOR ALTERATIONS OF 5TH FLOOR TENANT SPACE FOR \"BENEFITS DATA TRUST\" OFFICES"},{"number":"404314","date":"2012-05-10","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-06-24","scope":"RELOCATE 20 SPINKLER HEADS (4TH FLOOR)"},{"number":"450125","date":"2013-01-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-11-20","scope":"INTERIOR ALTERATIONS AS PER PLANS."},{"number":"449393","date":"2013-01-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-11-20","scope":"FOR INTERIOR RENOVATIONS TO AN EXISTING BATHROOM ON THE 13TH FLOOR OF AN EXISTING BUILDING TO PROVIDE ACCESSIBLITY IMPROVEMENTS AS SHOWN PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK."},{"number":"447785","date":"2013-02-11","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-10-01","scope":"INSTALLATION OF TWO (2) VAV BOXES, DUCT WORK, INSULATION AND ASSOCIATED GRILLES / REGISTERS / DIFFUSERS IN AN OFFICE SPACE. SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK."},{"number":"451588","date":"2013-03-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-20","scope":"PERFORM DEMOLITION OF CABLES TO LOCAL JUNCTION BOX REUSE EXISTING CIRCUITS TO INSTALL LIGHTING IN CORRIDORS REINSTALL FIRE ALARM DEVICES OR REUSE PER 2008 NEC & NFPA 72 (COMMERCIAL/OFFICE SPACE)"},{"number":"451590","date":"2013-03-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-20","scope":"PERFORM DEMOLITION OF CABLES TO LOCAL JUNCTION BOX REUSE EXISTING CIRCUITS TO INSTALL LIGHTING IN CORRIDORS PER 2008 NEC (COMMERCIAL/OFFICE SPACE)"},{"number":"454238","date":"2013-03-22","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2013-05-06","scope":"FOR PARTIAL RESOLUTION OF DEPT. OF L&I CASE# 361798 FOR REISSUANCE OF A LAWFUL OCCUPANCY (LO) SIGN PREVIOUSLY ISSUED PER PERMIT AP# 306338 @ EMPLOYEE CAFETERIA DINING AREA WITHIN EXIST. HIGH-RISE MIXED USE OFFICE BUILDING. NO ALTERATIONS TO EXISTING SPACE PERMITTED HEREIN."},{"number":"458731","date":"2013-04-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-06-24","scope":"INSTALL DUCTWORK, MECHANICALS, FAN COILS, REGISTERS/DIFFUSERS INCLUDING WINE COOLER SPLIT SYSTEM."},{"number":"475483","date":"2013-06-04","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-11-26","scope":"RELOCATE (17) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE WALL AND CEILING LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES (8TH FLOOR)"},{"number":"482888","date":"2013-07-31","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-07-25","scope":"INTERIOR ALTERATIONS, INTERIOR DEMO AND TENANT FIT OUT, NEW PARTITIONS, FINISHES, STRUCTURAL MODIFICATIONS TO FLOOR OPENINGS AND ALTERATIONS TO OPEN COMMUNICATING TENANT STAIR WITH ADDITIONAL DRAFT CURTAINS AND SPRINKLERS. BUILDING FULLY SPRINKLERED. INCLUDED REVIEW FOR HVAC SEE AP #483619 . ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, SPRINKLERS. NO CHANGE IN USE-OCCUPANCY CLASSIFCATION, CO IS ATTACHED FOR RECORD. 20TH FLOOR ALTERATIONS UNDER SEPARATE PERMIT."},{"number":"483619","date":"2013-09-10","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-07-25","scope":"INTERIOR DEMO, RECONFIGURATION AND ALTERATION OF EXISTING HVAC SYSTEM IN CONJUNCTION WITH ALTS PERMIT AP482888. INSTALLATION OF NEW DUCTWORK AND DIFFUSERS, VAV BOXES, FAN TERMINAL UNITS, RE-BALANCING OF EXISTING UNITS AND DIFFUSERS FOR NEW FLOOR RECONFIGURATION, OFFICE LAYOUTS. 20TH FLOOR ALTS/HVAC UNDER SEPARATE PERMIT."},{"number":"490094","date":"2013-09-20","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-09-24","scope":"INSTALLATION/EXTENSION OF NFPA 13 SPINKLER COVERAGE TO EXISTING ELEVATOR MACHINE ROOM IN COMMERCIAL BUILDING DESIGN PROFESSIONAL: RUSSELL HENRY WALTERS, P.E."},{"number":"492453","date":"2013-10-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-07-25","scope":"OFFICE FITOUT AS PER 2008 NEC (OFFICE BLDG)"},{"number":"497326","date":"2013-10-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-07","scope":"INTERIOR ALTERATIONS FOR ARC RENOVATION, AS PER PLANS."},{"number":"498085","date":"2013-10-10","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-07-25","scope":"RELOCATION OF 550 SPRINKLER HEADS."},{"number":"497061","date":"2013-10-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"F & I 1,887 FIXTURES,6 WATT STOPPER LIGHTING CONTROL PNLS (435) 20AMP 120V REC,(35)20A 120V GFCI REC,(84)120V 20A POKE THRU DEVICES (234)TELE CONDUIT DROPS WITH BACK BOXES AND FA PER 2008 NEC & NFPA 72(OFFICE SPACE)"},{"number":"498026","date":"2013-10-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-02-07","scope":"FURNISH INSTALL VAV BOXES, DUCT, AIR DEVICE AND ONE SUPPLEMENTAL UNIT FOR NEW OFFICE LAYOUT AS PER PLAN."},{"number":"496419","date":"2013-11-04","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2013-11-06","scope":"LAWFUL OCCUPANCY FOR CAFETERIA/RESTAURANT FOR OFFICE EMPLOYEES ONLY WITHIN EXISTING OFFICE BUILDING AS PER PLANS."},{"number":"499026","date":"2013-11-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-01","scope":"F&I NEW LIGHTING FIXTURES & CONTROLS, F&I RECEPTS & FURNITURE FEEDS, EXTEND ALL CIRCUITS FROM DESIGNATED EXIST PANEL BOARDS, PROVIDE BOX & STRING FOR TELECOMMUNICATIONS CONTRACTOR AS PER NEC 2008 (OFFICE)"},{"number":"504643","date":"2013-11-08","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2014-02-06","scope":"INTERIOR NON-LOAD BEARING DEMOLITION ONLY AND REMOVAL OF DEBRIS (14TH FLOOR)"},{"number":"499812","date":"2013-11-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-04-14","scope":"FURNISH AND INSTALL 1250 CATEGORY 6 PLENUM CABLES, AVERAGE CABLE PULL 165 FEET AS PER 2008 NEC. INSTALLATION TO COMPLY WITH ARTICLES 300.21 & 800 OF THE 2008 NEC.FIRE STOP FLOOR PENETRATIONS AFTER REMOVAL OF EXISTING RISER CABLES."},{"number":"508161","date":"2013-11-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"REMOVE 230 EXISTING WALL MOUNTED FLUORESCENT LOCATED IN THE STAIRWELLS INSTALL (4) FEET LED FIXTURES IN THE SAME PLACE PER 2008 NEC (OFFICE BLDG)"},{"number":"508434","date":"2013-11-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-01-14","scope":"RELOCATE (31) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"508628","date":"2013-12-04","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-05-06","scope":"INTERIOR ALTERATIONS, INTERIOR DEMO AND FIT OUT, NEW PARTITIONS, FINISHES, ACCESSIBILITY UPGRADES AT 13TH FLOOR LOBBY, OFFICE SPACE, AND CORRIDOR. STRUCTURAL MODIFICATIONS TO ENCLOSE EXISTING FLOOR OPENING AT 14TH FLOOR LEVEL, CONCRETE SLAB ON STEEL DECKING. BUILDING FULLY SPRINKLERED. INCLUDED REVIEW. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING,HVAC, SPRINKLERS. NO CHANGE IN USE-OCCUPANCY CLASSIFICATION, CO IS ATTACHED FOR RECORD."},{"number":"510284","date":"2013-12-09","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2013-12-10","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR FLOORS 18,22 OF PHASE 1 ONLY."},{"number":"502817","date":"2013-12-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-07-17","scope":"INSTALL OF FIRE ALARM UPGRADE FOR ELEVATOR MODERNIZATION (OFFICE SPACE) AS PER NEC 2008 & NFPA 72"},{"number":"502818","date":"2013-12-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-01","scope":"INSTALL 5-NEW SPEAKER STROBES TO EXISTING SIMPLEX FIRE ALARM SYSTEM AS PER NEC 2008 & NFPA 72 (OFFICE SPACE)"},{"number":"511799","date":"2013-12-18","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-07-28","scope":"REPLACE (7) LAVATORIES WITH NEW"},{"number":"509421","date":"2013-12-23","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-17","scope":"ALTERATIONS TO AN EXISTING HVAC SYSTEM ON THE SEVENTH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND MECHANICAL EQUIPMENT WITH ASSOCIATED DUCTWORK.INSTALLATION OF VAV BOXES TO BE DONE IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL WORK."},{"number":"510992","date":"2014-01-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-01","scope":"TELECOMMUNICATIONS WIRING THROUGH OUT 4TH FLOOR AS PER 2008 NEC (CC DISTRICT)INSTALLATION TO COMPLY WITH ARTICLES 300.21 & 800 OF THE 2008 NEC."},{"number":"512178","date":"2014-01-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-17","scope":"FOR PARTIAL DEMOLITION OF EXIST. HVAC SYSTEM & FOR THE INSTALLATION OF TERMINAL VAV BOXES, EXHAUST FANS & DRYER EXHAUST DUCT, (57) TERMINAL GRILLES, REGISTERS, DIFFUSERS (GRDS), & ALL ASSOCIATED SUPPLY/ EXHAUST/ RETURN AIR DUCTWORK SERVING ONE (1) STORY FITNESS CENTER WITHIN A HIGH-RISE MIXED-USE OFFICE BUILDING."},{"number":"482883","date":"2014-01-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-07-25","scope":"FOR LEVEL II ALTERATIONS ON THE 20TH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHING AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK."},{"number":"519438","date":"2014-02-12","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-12-17","scope":"RELOCATE (60) EXISTING SPRINKLER HEADS ON 25TH FLOOR."},{"number":"510816","date":"2014-02-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"DEMO ENTIRE FLOOR TEMP LIGHTING THROUGHOUT INSTALL NEW LAY IN FIXTURES 2X2 IN PLACE OF EXISTING R&R EXISTING SWITCHES PER 2008 NEC (OFFICE BLDG)"},{"number":"520136","date":"2014-02-19","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-05-04","scope":"RELOCATION OF EXISTING FIRE SPRINKELRS"},{"number":"520139","date":"2014-02-19","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-05-06","scope":"RELOCATION OF SPRINKLERS"},{"number":"523707","date":"2014-03-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-09-03","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEM ON THE 20TH FLOOR OF AN EXISTING HIGH-RISE BUIDLING. COMPONENTS INCLUDE ALL REGISTERS/DIFFUSERS, FANS, EXHAUSTS AND ALL SUPPLEMENTAL DUCTWORK."},{"number":"525676","date":"2014-03-21","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-02-11","scope":"INTERIOR DEMO NON-LOAD BEARING PARTITIONS ONLY(COMMERCIAL)"},{"number":"526096","date":"2014-03-24","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-07-01","scope":"13TH FLOOR RAYMUND JAMES TENANT FIT OUT. RELOCATION OF EXISTING SPRINKLER HEADS - OFFICE BLDG"},{"number":"526531","date":"2014-04-04","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-07-01","scope":"LEVEL II INTERIOR RENOVATIONS OF EXISTING OFFICE SPACE."},{"number":"530701","date":"2014-04-15","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2014-04-17","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE 19TH AND 20TH FLOORS ONLY."},{"number":"530708","date":"2014-04-15","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-07-01","scope":"RELOCATE KITCHEN SINK AND INSTALL NEW 2\" WASTE AND VENT AND NEW WATER HEATER (OFFICE SPACE)"},{"number":"520457","date":"2014-04-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-11","scope":"ELECTRICAL RENOVATION TO THE LIGHTING FIXTURES AND PROVIDE POWER TO FURNITURE LOCATIONS INSTALL NEW LIGHT FIXTURES,SWITCHES AND RECEPTACLES PER 2008 NEC (OFFICE BLDG)"},{"number":"520742","date":"2014-04-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-12-19","scope":"INTERIOR DEMOLITION TO EXISTING OFFICE SPACE AND RESTROOMS. INTERIOR ALTERATIONS TO INCLUDE NEW NON LOAD BEARING PARTITIONS, NEW CEILING SYSTEM, NEW CORRIDORS, AND STRUCTURAL WORK TO INCLUDE FLOOR INFILL TO CREATE A VACANT SUITE. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK."},{"number":"530418","date":"2014-04-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-06-10","scope":"LEVEL II INTERIOR ALTERATIONS TO INCLUDE REMOVAL OF FINISHES IN ELEVATOR LOBBY AND RECEPTION/OPEN AREA, REMOVAL OF MISCELLANEOUS FINISHES THROUGHOUT THE FLOOR, INFILL OF SLAB OPENING AT THE CEILING(15TH FL SLBAB), REMOVAL OF EXISTING DUCTWORK BACK TO THE CORE AS PER APPROVED PLANS."},{"number":"529091","date":"2014-05-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-08-26","scope":"INSTALL NEW LIGHTING AND POWER THROUGHOUT SPACE PER 2008 NEC (OFFICE SPACE)"},{"number":"532117","date":"2014-05-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-17","scope":"INSTALL 52 CATEGORY 5E DATA CABLES AND 20 RG-6 COAX CABLES.PROVIDE AND INSTALL DATA RACK AND PATCH PANELS PER 2008 NEC. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"532953","date":"2014-05-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-08","scope":"INSTALL 19-RECESS LGT FIXTURES, 5-WALL SCONCE LGT FIXTURES, 16-2X2 LGT FIXTURES, 44-2X4 LGT FIXTURES, 10-EXIT SIGNS & 10-20AMP 120 VLOLT RECPTS AS PER NEC 2008 (OFFICE BLDG)"},{"number":"532584","date":"2014-05-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"INSTALL 1 NAC PANEL AND 15 SPEAKER STROBES AS PER NFPA72 (CC DISTRICT)"},{"number":"539451","date":"2014-06-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-10-31","scope":"INTERIOR ALTERATIONS, AS PER PLANS"},{"number":"540021","date":"2014-06-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-09-13","scope":"LEVEL II ALTERATIONS FOR TENANT FIT OUT AS PER PLAN."},{"number":"530660","date":"2014-06-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-07-01","scope":"FOR MECHANICAL ALTERATIONS INCLUDING ADDING ONE (1) VAV BOX AND ONE (1) HEAT PUMP WITH ASSOCIATED DUCTWORK AS PER APPROVED PLANS."},{"number":"546105","date":"2014-06-27","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-09-15","scope":"RELOCATE (121) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"545490","date":"2014-07-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-09-15","scope":"INSTALLATION FOR TWO TOILET ROOMS WITH SHOWER STALLS: (2)WATER CLOSETS, (2)FLOOR DRAINS, (3)LAVATORIES, (2)SHOWERS (OKAY TO ISSUE PER JOHN MCFARLANE, JR. IF CONTRACTOR IS FALSIFYING APP, REVOKE PERMIT)"},{"number":"545949","date":"2014-07-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-10-31","scope":"INSTALL ONE PANTRY WITH SAFE WASTE ON 7TH AND 8TH FLOORS, INSTALL POINT OF USE WATER HEATER AT EACH LOCATION"},{"number":"543115","date":"2014-07-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-13","scope":"INSTALLATION NEW WATER COOLED AIR CONDITIONING UNIT WITH ASSOCIATED PUMP AND PIPING, NEW DUCTWORK WITH ASSOCIATED GRILLES, REGISTERS DIFFUSERS AND FANS THROUGHOUT AN OFFICE SPACE; EXISTING VAV BOXES TO BE INSTALLED PER PLANS. SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL AND PLUMBING WORK."},{"number":"547844","date":"2014-07-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-06-09","scope":"REMOVE AND REPLACE 7 LAVS AT MEN'S AND WOMEN'S TOILET ROOM (OFFICE SPACE)"},{"number":"548737","date":"2014-07-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-10-31","scope":"RELOCATE (181) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE THE TENANT LAYOUTS AS PER ALL NFPA NO. 13 AND LOCAL CODE."},{"number":"549220","date":"2014-07-16","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-09-13","scope":"INSTALL (3)PANTRY SINKS AND ONE FLOOR DRAIN - RELOCATE ONE EXISTING SINK - REMOVE/REPLACE (6)WATER CLOSETS, (2)URINALS AND (5)LAVATORIES IN CORE TOILET ROOMS (EXISTING ROUGH-INS) - ONE DOMESTIC HOT WATER HEATER INSTALLATION"},{"number":"548070","date":"2014-07-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-09-22","scope":"INT FIT OUT OF EXISTING OFFICE SPACE"},{"number":"550149","date":"2014-07-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-09-22","scope":"RELOCATE EXISTING FIRE SPRINKLERS"},{"number":"544919","date":"2014-07-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-09","scope":"FURNISH AND INSTALL NEW LIGHTING AND RECEPTACLES FOR THE TENANT FIT OUT.INSTALL 455 LIGHT FIXTURES(FBO),147 SWITCHES & RECEPTACLES,28 FURNITURE CONNECTIONS,9 FLOOR BOXES,20 HVAC CONNECTIONS ALL EXISTING PANELS WILL BE RE-USED PER 2008 NEC (OFFICE SPACE)"},{"number":"546640","date":"2014-07-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-14","scope":"FURNISH AND INSTALL NEW LIGHTING AND RECEPTACLES FOR THE TENANT RENOVATION,INSTALL 326 LIGHT FIXTURES,297 SWITCHES AND RECEPTACLES AND 6 FLOOR BOXES ALL EXISTING PANELS WILL BE RE-USED (OFFICE SPACE)"},{"number":"550209","date":"2014-07-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-27","scope":"FURNISH & INSTALL LIGHTING & POWER AS PER NEC 2008 (OFFICE BLDG)"},{"number":"547239","date":"2014-07-31","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-10-31","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING MECHANCIAL SYSTEM, ALTERATION TO INCLCUDE THE REMOVAL/INSTALLATION OF REGISTERS, DIFFUSERS AND MECHANCIAL EQUIPMENT WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING AND MECHANICAL WORK."},{"number":"555994","date":"2014-08-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-09-22","scope":"2 KIT SINKS"},{"number":"558780","date":"2014-08-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE 16 FIRE ALARM DEVICES DUE TO CHANGES IN PROJECT PER 2008 NEC & NFPA 72(OFFICE SPACE)"},{"number":"554382","date":"2014-09-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-21","scope":"REMOVE / RELOCATE 150 VOICE DATA DROPS INSTALL CABLING TO 16 NEW VOICE/DATA LOCATION. ALL NEW CABLING TO BE PLENUM RATED PER 2008 NEC. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"557729","date":"2014-09-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-22","scope":"FOR THE INSTALLATION OOF NEW HVAC SYSTEM WITH ASSOICIATED DUCTWORK AND EQUIPMENT FOR OFFICE LAYOUT AS PER PLANS."},{"number":"553088","date":"2014-09-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-27","scope":"FURNISH AND INSTALL FIRE ALARM EQUIPMENT AS PER NFPA72 (CC DISTRICT)"},{"number":"554649","date":"2014-09-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-01-04","scope":"INSTALL 179 CAT6 DATA CABLE TO WORKSTATIONS. PROVIDE LABOR TO EXTEND D'MARC CABLE AND MOUNT EQUIPMENT RACKS AND TERMINATION PANEL IN THE SERVER CLOSET PER 2008 NEC.INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"554477","date":"2014-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-09","scope":"INSTALL FIRE ALARM EQUIPMENT PER PLANS."},{"number":"549670","date":"2014-09-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 284 CATEGORY 6 PLENUM CABLES (AVERAGE CABLE PULL 165 FEET)PER 2008 NEC (OFFICE SPACE)INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"554728","date":"2014-09-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-14","scope":"FURNISH AND INSTALL NEW FIRE ALARM DEVICES FOR TENANT RENOVATIONS PER 2008 NEC & NFPA 72(OFFICE SPACE)"},{"number":"557127","date":"2014-09-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-31","scope":"INSTALL AUDIO VISUAL CABLING & EQIPMENT IN 12 MEETING/BOARD ROOMS (OFFICE SPACE AS PER NEC 2008. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 725 OF THE 2008 NEC."},{"number":"570510","date":"2014-11-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-08-09","scope":"LEVEL II ALTERATIONS ON THE FIFTH AND SIXTH FLOORS OF AN EXISTING OFFICE BUILDING. ALTERATIONS TO INCLUDE INTERIOR DEMOLITION OF NON-LOAD PARTITIONS AND FIT OUT, NEW PARTITIONS AND FINISHES AS PER APPROVED PLANS."},{"number":"573199","date":"2014-11-18","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-08-10","scope":"COMPLETE INTERIOR RENOVATION OF EXISTING OFFICE SPACE. NO STRUCTURAL WORK OR WORK TO FACADE **SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING AND MECHANICAL WORK**"},{"number":"574156","date":"2014-11-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-08-09","scope":"MODIFICATION TO AN EXISTING MECHANICAL SYSTEM TO INCLUDE THE FOLLOWING NEW WORK: FOR THE INSTALLATION OF NEW VAV BOXES, DUCTWORK, REGISTERS/DIFFUSERS AND ALL OTHER ASSOCIATED WORK AS PER APPROVED PLANS. PROPOSED MECHANICAL WORK SHALL CORRESPOND WITH APPROVED ALTERATIONS PERMIT AP# 570510."},{"number":"576137","date":"2014-11-24","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-07-21","scope":"RELOCATE 105 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"577378","date":"2014-12-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-04-14","scope":"RELOCATE 5 DIFFUSERS."},{"number":"577449","date":"2014-12-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-04-14","scope":"RELOCATING 16 SPRINKLERS ON THE 15TH FLOOR TOILET ROOMS AND CORRIDOR"},{"number":"577478","date":"2014-12-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-06-03","scope":"INTERIOR FIT OUT, ALTERATIONS, UPGRADES TO FINISHES."},{"number":"577740","date":"2014-12-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-06-01","scope":"FURNISH AND INSTALL VAV BOXES, DUCT & AIR DEVICES FOR NEW OFFICE LAYOUT"},{"number":"579233","date":"2014-12-16","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-06-01","scope":"PLUMBING ALTERATIONS - (2)FLOOR DRAINS, (1)WATER CLOSET, (1)LAVATORY, (1)SHOWER AND (2)SINKS - WORK WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"577994","date":"2014-12-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-10","scope":"FURNISH AND INSTALL LIGHTING AND POWER PER 2008 NEC (OFFICE SPACE)"},{"number":"582885","date":"2015-01-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-07-21","scope":"INSTALLATION OF TWO PANTRY SINKS, TWO WATER HEATERS (AT EACH PANTRY SINK); REPLACE (5) LAV BOWLS IN CORE BATHS @ 5TH & 6TH FLOORS EACH"},{"number":"583167","date":"2015-01-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"F&I CAT6 AND CAT5E PLENUM RATED CABLE FOR 70 LOCATIONS.CABLE LENGTH WILL NOT EXCEED 295 AND WILL BE J-HOOK SUPPORTED IN CEILING. EACH LOCATION WILL CONSIST OF 2 CAT6 CABLES AND 1 CAT5E CABLE PER 2008 NEC (OFFICE SPACE)"},{"number":"579758","date":"2015-01-08","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-03-28","scope":"FOR LEVEL II ALTERATIONS FOR THE FITOUT OF AN EXISTING TENANT SPACE FOR THE USE OF A OFFICE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, FURNISHINGS AND FINISHES THROUGHOUT. SPACE IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK."},{"number":"584871","date":"2015-01-15","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-06-01","scope":"HANGLEY OFFICES- SPRINKLER HEAD RELOCATIONS"},{"number":"577447","date":"2015-01-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"FURNISH AND INSTALL NEW LIGHTING AND RECEPTS FOR TENANT RENOVATIONS AS PER 2008 NEC (CC DISTRICT) FURNISH AND INSTALL NEW FIRE ALARM DEVICES FOR TENANT RENOVATIONS AS PER NFPA72"},{"number":"584082","date":"2015-01-20","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-05-19","scope":"REPLACE 5- LAVATORIES IN MEN'S AND WOMAN'S RESTROOMS"},{"number":"585843","date":"2015-01-22","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-04-14","scope":"REMOVE AND REPLACE ONLY OF: (7) LAVATORIES, (6)WATER CLOSETS AND (2)URINALS"},{"number":"577721","date":"2015-01-22","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-04-08","scope":"AMEND PERMIT #573199 FOR THE REDUCTION IN SCOPE OF WORK"},{"number":"582371","date":"2015-01-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-20","scope":"INSTALL NEW LIGHTING PER 2008 NEC (OFFICE SPACE)*NO TELE/DATA OR FA*"},{"number":"587145","date":"2015-01-30","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-05-08","scope":"INTERIOR ONLY DEMO OF NON LOAD BEARING PARTITIONS. SEPARATE TENANT FIT OUT PERMIT IS REQUIRED. IN CONJUNCTION WITH AP585054 SEE PLANS FOR INTERIOR DEMO ONLY IN ADDITION WITH BATHROOM RENOVATIONS. ADD'L PERMTIS REQ: FUTURE FIT OUT PERMIT OF 29TH FLOOR IS REQUIRED PRIOR TO OCCUPANCY, ELECTRICAL, PLUMBING, HVAC, SPRINKLERS."},{"number":"585054","date":"2015-01-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-06-09","scope":"INTERIOR ONLY ALTERATIONS/RENOVATIONS OF EXISTING OFFICE FLOOR SPACE BATHROOM AREAS FOR 29TH FLOOR SHELL VACANT SPACE. SEPARATE INTERIOR DEMO ONLY PERMIT UNDER AP587145. ADD'L PERMTIS REQ: FUTURE FIT OUT PERMIT OF 29TH FLOOR IS REQUIRED PRIOR TO OCCUPANCY, ELECTRICAL, PLUMBING, HVAC, SPRINKLERS."},{"number":"587271","date":"2015-02-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-03-28","scope":"ADDING KITCHEN/LUNCHROOM TO SPACE (OFFICE SPACE) - INSTALLATION COMPLIES WITH THE STANDARDS FOR EZ-PLUMBING PERMIT (NO PLANS REQUIRED)"},{"number":"588161","date":"2015-02-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-03","scope":"REMOVE AND REPLACE 30 EXISTING LIGHTS IN COMMON CORRIDOR AND RESTROOMS PER 2008 NEC (OFFICE SPACE)"},{"number":"580308","date":"2015-02-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-03-16","scope":"FURNISH AND INSTALL 208 CAT6 PLENUM CABLES ON THE 27TH FLOOR AND FURNISH AND INSTALL 220 CAT6 PLENUM CABLES ON THE 28TH FLOOR (AVERAGE CABLE PULL 170 FEET). INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"583001","date":"2015-02-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-21","scope":"FURNISH AND INSTALL FIRE ALARM DEVICES AS PER NFPA72 (CC DISTRICT)"},{"number":"591159","date":"2015-02-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-03-28","scope":"RELOCATION OF (96) FIRE SPRINKLER HEADS."},{"number":"590867","date":"2015-02-20","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-04-21","scope":"REPLACEMENT OF SIX LAVATORIES"},{"number":"588760","date":"2015-02-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-10-27","scope":"LEVEL II ALTERATIONS AS PER PLAN.**SEPARATE PERMIT IS REQUIRED FOR MECHANICAL AND PLUMBING WORK**"},{"number":"592164","date":"2015-02-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-06-08","scope":"RELOCATE 49 EXISTING SPRINKLER HEADS."},{"number":"587209","date":"2015-03-02","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-03-28","scope":"FOR LEVEL II ALTERATIONS TO EXISTING MECHANICAL SYSTEM ON THE 15TH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE REMOVAL/INSTALLATION OF REGISTERS, DIFFUSERS AND MECHANICAL EQUIPMENT WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"593075","date":"2015-03-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-31","scope":"F/I 188 CAT6 TELE/DATA CABLES TO 99 WORKSTATIONS, 10 COAX CABLES & 10 HDMI CABLES AS PER ARTICLES 300.21, 300.22, 725 & 800 OF THE 2008 NEC."},{"number":"594418","date":"2015-03-18","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-06-08","scope":"INSTALLATION OF 2- PANTRY SINKS, CONNECT TO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"597990","date":"2015-03-24","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-03-24","scope":"90 DAY T.C.O. 6TH FLOOR"},{"number":"591146","date":"2015-03-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-03-28","scope":"INSTALLING AN AUTOMATIC CLEAN AGENT FIRE SUPPRESSION SYSTEM IN IT SERVER ROOM 1532 ON THE 15TH FLOOR OF AN EXISTING HIGH RISE OFFICE BUILDING IN ACCORDANCE WITH NFPA 2001 AND AS PER APPROVED PLANS AND SPECIFICATIONS."},{"number":"596683","date":"2015-03-27","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-06-08","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEM AND ASSOCIATED DUCTWORK, PIPING AND MECHANICAL EQUIPMENT. ALL WORK PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION."},{"number":"587199","date":"2015-03-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-05","scope":"NEW TENANT FIT OUT 42-EQUIPMENT, TERMINATIONS, 3-NEW METERS & 170-LIGHT FIXTURES AS PER NEC 2008 & FIRE ALARM DRAWING & CALCULATION WILL BE SUBMITTED ON THIS PERMIT AT LATER TIME AS PER NFPA 72"},{"number":"600959","date":"2015-04-07","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-05-14","scope":"INTERIOR DEMOLITION OF NON LOAD BEARING ASSEMBLIES"},{"number":"589895","date":"2015-04-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-12-07","scope":"DISCONNECT (7)LAVATORIES, (6)WATER CLOSETS AND (2)URINALS, FURNISH AND INSTALL SAME.. NO ADDITIONAL PIPING"},{"number":"604595","date":"2015-04-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"DISCONNECTED & RECONNECT, RECONECT 1 EXSISTING WALL FIRE ALARM DEVICE IN ELEVATOR LOBBY (ALL WORK TO COMPLY WITH 2008 NEC)"},{"number":"594605","date":"2015-04-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-06-22","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT, INTSTALL 288-LIGHTS FIXTURES, 57-LIGHT SW, 5-FLOOR RECEPT, 88-RECEPTS, 4-FURNITURE FEED, 6-EQUIPMENT FEED, 1-208/120 VOLT PANEL & 480/277 VOLT PANEL AS PER NEC 2008 CC DISTRICT"},{"number":"603357","date":"2015-05-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-07-01","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO FIT-OUT OFFICE SPACE ON THE 13TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"607095","date":"2015-05-01","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-07-01","scope":"FURNISH AND INSTALL DUCT AND AIR DEVICES FOR NEW OFFICE LAYOUT.EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS"},{"number":"609143","date":"2015-05-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-06-09","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"600912","date":"2015-05-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 167 CATEGORY 6 CABLES ON 15TH FLOOR - AVERAGE CABLE PULL 150' AS PER NEC 2008. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 800 OF THE 2008 NEC."},{"number":"609788","date":"2015-05-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-09-05","scope":"REMOVE AND RELOCATE 18 2X4'S INSTALL 11 DUPLEX RECPT, 2 FURNITURE FEEDS AND 3 OCC SENSORS"},{"number":"600356","date":"2015-05-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-06-23","scope":"RENOVATION TO EXISTING SPACE FOR NEW TENANT -INSTALL 3-PULL STATION, 10-SPEAKER, 9-STROBES, 8-SPEAKER & 1-POWER SUPPLY AS PER NFPA 72"},{"number":"608712","date":"2015-05-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-11-09","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO FIT-OUT OFFICE SPACE ON THE 29TH & 30TH FLOORS OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"612371","date":"2015-05-29","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-07-01","scope":"INSTALL A PANTRY SINK, CONNECT TO EXISTING SANITARY, VENT, AND DOMESTIC WATER"},{"number":"614922","date":"2015-06-08","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-06-09","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE 6TH FLOOR ONLY"},{"number":"611821","date":"2015-06-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-09-10","scope":"FOR LEVEL II ALTERATIONS FOR THE FITOUT THE 16TH FLOOR OF AN EXISTING BUILDING FOR THE USE OF A OFFICE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, FURNISHINGS AND FINISHES THROUGHOUT. SPACE IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"618229","date":"2015-06-17","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-10-13","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"618871","date":"2015-06-19","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-07-01","scope":"RELOCATE (6) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"618905","date":"2015-06-19","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-09-10","scope":"RELOCATE 194 SPRINKLERS IN THE ANAPOL SCHWARTZ SPACE ON THE 16TH FLOOR OF ONE LOGAN SQUARE."},{"number":"619260","date":"2015-06-26","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-09-10","scope":"INSTALLATION OF 3 SINKS 2 WC 2 LAVS AND 3 WATER HEATERS INTO EXISTING SANITARY AND DOMESTIC WATER PIPING (ALL WORK TO COMPLY WITH THE 2004 PPC)"},{"number":"621251","date":"2015-06-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-12-07","scope":"RELOCATE 15 SPRINKLERS IN THE COMMON AREA ON THE 12TH FLOOR"},{"number":"618067","date":"2015-06-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-09-10","scope":"INSTALLATION OF NEW MECHANICAL SYSTEM FOR OFFICE SPACE AS PER APPROVED PLANS."},{"number":"618237","date":"2015-06-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-09-18","scope":"PARTIAL DEMOLITION AND INTERIOR ALTERATIONS INCLUDING NEW FINISHES TO COMMON MEN'S / WOMEN'S RESTROOMS AND ACCESSIBLE UNISEX TOILET ROOM IN A PORTION OF THE 30TH FLOOR OF AN EXISTING HIGH RISE BUILDING PER PLANS. SEPARATE PERMITS REQUIRED FOR ANY NEW OR MODIFICATIONS TO EXISTING MECHANICAL, ELECTRICAL, PLUMBING OR FIRE SUPPRESSION SYSTEMS."},{"number":"618057","date":"2015-07-01","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-09","scope":"REMOVAL AND INSTALLATION OF NEW MECHANICAL SYSTEM FOR OFFICE SPACE AS PER APPROVED PLANS."},{"number":"622744","date":"2015-07-07","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-09-15","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"613548","date":"2015-07-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-07-27","scope":"FURNISH & INSTALL 3-SPEAKER STROBES AS PER NFPA 72(OFFICE SPACE) CC DISTRICT"},{"number":"614548","date":"2015-07-10","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-03-17","scope":"NEW FIXTURES & ASSSOCIATED DOMESTIC WATER & WASTE PIPING THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004 ***SEE LOG*** - NOTE: SEE ADMINISTRATIVE PERMIT #632106 WHICH SHOWS THE CORRECT ADDRESS OF THE WORK AS: 1800 BENJ FRANKLIN PARKWAY (BASEMENT, 1ST, 8TH & 9TH FLOORS)"},{"number":"614809","date":"2015-07-10","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-11","scope":"MECHANICAL ALTERATIONS, INSTALLATION OF NEW DUCTWORK, DIFFUSERS, MECHANICALS"},{"number":"625195","date":"2015-07-16","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-11-09","scope":"RELOCATE (201) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"625854","date":"2015-07-20","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-07","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"618236","date":"2015-07-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-28","scope":"ELECTRIC AND FIRE ALARM WORK FOR TENANT FIT OUT PROJECT AS PER DRAWLINGS AND NEC 2008"},{"number":"622759","date":"2015-07-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-12-08","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS TO INCLUDE RENOVATION OF EXISTING CORRIDOR, UPGRADES TO FINISHES, ELEVATOR LOBBY & TOILET ROOMS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. NO STRUCTURAL WORK ON THIS PERMIT."},{"number":"623119","date":"2015-07-22","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-11-09","scope":"INSATALLATION OF DRAIN WASTE VENTING AND WATER SUPPLY TO 3 NEW PANTRIES AND 3 WATER HEATERS (ALL WORK TO COMPLY WITH THE 2004 PPC)"},{"number":"618318","date":"2015-08-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"320 LIGHTS FIXTURES,230 RECEPTACLES,3 DIMMING SYSTEM,1 UPS POWER AND PANEL,2-480 VOLT PANEL,2-120/208V PANEL AND CONDUITS FOR AV AND TELE DATA SYSTEM PER 2008 NEC (OFFICE SPACE)FIRE ALARM:72 SPEAKER STROBES AND 19 SMOKES"},{"number":"629360","date":"2015-08-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-12-07","scope":"REMOVE AND REPLACE 7- LAVATORIES, 6- WATER CLOSETS, 2- URINALS- IN SAME LOCATION, NO ADDITIONAL PIPING"},{"number":"633305","date":"2015-08-20","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-03-14","scope":"RELOCATE 68 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"637289","date":"2015-09-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-06","scope":"REMOVE AND REPLACE 38 EXISTING LIGHTS IN COMMOM CORRIDOR AND RESTROOMS - THE INSTALLATION WILL COMPLY WITH THE EZ-PERMIT STANDARD AND THE 2008 NEC"},{"number":"637287","date":"2015-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-02","scope":"REMOVE AND REPLACE 30 EXISTING LIGHTS IN COMMON CORRIDOR AND RESTROOMS THE INSTALLATION WILL COMPLY WITH THE EZ-PERMIT STANDARD AND THE 2008 NEC"},{"number":"632833","date":"2015-09-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-12-11","scope":"INT ALT TO OFFICE SPACE @ 12TH FLOOR. SEPARATE SUBMISSION FOR MEP PERMITS REQUIRED,"},{"number":"637919","date":"2015-09-18","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-04-08","scope":"REMOVE AND REPLACE 7- LAVATORIES, 6- WATER CLOSETS, 2- URINALS- IN SAME LOCATION WITH NO ADDITIONAL PIPING - THE INSTALLATION WILL COMPY WITH THE PHILADEPHIA PLUBMING CODE 2004"},{"number":"632671","date":"2015-09-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL (358) WORK AREA OUTLETS CLASSROOMS CONSISTING OF (698) PLENUM RATED CAT6 TELECOMMUNICATION,(5) RG6 AND TELECOMMUNICATION FIT OUT WITH A LONGEST RUN OF ABOUT 220 AS PER 2008 NEC (CC DISTRICT)"},{"number":"642210","date":"2015-10-13","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-11","scope":"FURNISH AND INSTALL VAV BOXES, DUCT, AIR DEVICES AND EXHAUST FANS FOR RENOVATED OFFICE SPACE."},{"number":"639674","date":"2015-10-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-02-24","scope":"INSTALL 2-4 LIGHT FIXTURES, 35-SWITCHES, 90-RECEPTACLES, 8-FURNITURE CONNECTION,WHIPS, POWER/CONTROL OF 9-WINDOW SHADES AS PER NEC 2008 & FIRE ALARM: 22-FIRE ALARM DEVICES AS PER NFPA 72 CC DISTRICT"},{"number":"649297","date":"2015-11-02","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-07-25","scope":"EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"650236","date":"2015-11-13","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-01-20","scope":"FOR THE INSTALLATION AND EXTENSION OF A FIRE SUPPRESSION SYSTEM AS PER NFPA 13 AS PER APPROVED PLANS TO EXISTING ELEVATOR MACHINE ROOM ON THE 19TH FLOOR."},{"number":"656185","date":"2015-12-04","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-12-28","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR 12TH FLOOR FOR 90 DAYS."},{"number":"662451","date":"2016-01-08","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-01-29","scope":"RELOCATE 8 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"658537","date":"2016-01-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALLATION,TERMINATION,LABELING AND TESTING OF COMMUNICATION AND AV CABLING PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"651495","date":"2016-01-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-19","scope":"ADD FIRE ALARM EQUIPMENT IN 19TH FLOOR MEZZANINE FOR ELEVATOR ROOM. ADD FIRE ALARM EQUIPMENT IN PENTHOUSSE MECHANICAL SPACE FOR FURTURE SPRINKLER PREACTION SYSTEM AS PER NFPA72 (CC DISTRICT)"},{"number":"24170","date":"2016-05-04","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2016-05-04","scope":"5/6/16 ERECT ASSEMBLY TENT 30X60"},{"number":"690206","date":"2016-06-29","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"EXPIRED","completedDate":null,"scope":"INSTALL NEW PRE-ACTION SPRINKLER SYSTEM TO A EXISTING ELECTRICAL ROOM IN THE PENTHOUSE IN ACCORDANCE WITH NFPA 13 SYSTEM AS PER PLAN. BACKFLOW EXISTING IN BASEMENT."},{"number":"700527","date":"2016-06-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-09-30","scope":"FOR LEVEL II ALTERATIONS TO EXISTING OFFICE SPACE ON 13TH FLOOR: NEW PARTITIONS FOR NEW ROOMS, NEW FINISHES, REPAIRS AND REPLACE DAMAGED CEILING TILES, INSTALLATION OF WHITE NOISE SPEAKERS AS PER PLANS. SEPARATE PERMIT REQUIRED FOR ALL ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPPRESSION WORK. NO STRUCTURAL WORK ON THIS PERMIT."},{"number":"710427","date":"2016-07-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 2-2X2 LIGHT FIXTURES, 2-SINGLE POLE SWITCHES & 4-DUPLEX RECEPTACLES AS PER NEC 2008 CC DISTRICT"},{"number":"711856","date":"2016-08-02","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-09-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.** RELOCATE 16 SPRINKLER HEADS TO CONFORM WITH NEW CEILING LAYOUT PER PFPA 13 REQUIRMENTS *"},{"number":"722402","date":"2016-11-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL POWER FOR SEF AND AND KEF PER 2008 NEC (COMMERICAL)CC DISTRICT INSTALL SMOKE DAMPERS FOR ASSOCIATED FIRE SMOKE DAMPERS PER NFPA 72"},{"number":"737908","date":"2016-11-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"LEVEL II ALTERATIONS OF AN EXISITNG OFFICE SPACE AS PER PLAN."},{"number":"742259","date":"2016-12-08","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-10-19","scope":"RELOCATE 12 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"745224","date":"2016-12-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"25TH FLOOR (MARKETING SUITE) - INTERIOR ELECTRICAL ALTERATIONS TO INCLUDE INSTALLATION OF (12)EXISTING FIXTURES WITH A NEW HOME RUN USING CIRCUIT #26 FROM PP-25A PANEL - THE INSTALLATION WILL COMPLY WITH THE 2008 NEC"},{"number":"745745","date":"2017-01-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"LEVEL ONE INTERIOR ALTERATIONS WITHIN EXISTING OFFICE SPACE."},{"number":"753891","date":"2017-01-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"755399","date":"2017-01-31","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"REPLACE PANTRY SINK, RECONNECT TO EXISTING ROUGH-IN WITH NO MODIFICATIONS."},{"number":"755692","date":"2017-01-31","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"RELOCATE SPRINKLERS"},{"number":"754177","date":"2017-02-07","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-07-10","scope":"FOR INTERIOR ALTERATIONS ON THE 25TH FLOOR OF AN EXISTING STRUCTURE, TO INCLUDE DEMOLITION AND CONSTRUCTION OF NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS."},{"number":"753611","date":"2017-03-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-04-13","scope":"REINSTALL 13-EXISTING FIXTURES AND ADD 6-NEW HOME RUN USING CIRCUITS #26 FROM LP-25A PANEL, INSTALL WIRING FOR ADDED DEVICES (BEHIND NEW WALLS) AS PER NEC 2008 CC DISTRICT AND REPLACE FIRE ALARM IN SAME LOCATIONS AS PER NFPA 72"},{"number":"777691","date":"2017-04-26","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-07-10","scope":"INSTALL SOIL, VENT, DOMESTIC WATER PIPE TO NEW PANTRY LOCATION. INSTALL ADA KITCHEN SINK AND SAFE WASTE FOR ICE MAKER"},{"number":"779037","date":"2017-04-28","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-07-10","scope":"RELOCATE (56) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"778811","date":"2017-05-09","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-10","scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING NEW DUCT, AIR DEVICES AND ONE A/C UNIT FOR NEW OFFICE SPACE AS PER PLANS."},{"number":"777088","date":"2017-06-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-20","scope":"INSTALL PANEL, TRANSFORMER, SUB-METER, LIGHT FIXTURES, WIRING DEVICES, HVAC CONNECTIONS, COMMUNICATION BOXES AND CONDUIT ONLY. AS PER 2008 NEC.INSTALL FIRE ALARM DEVICES AND CONNECT TO EXISTING BUILDING SYSTEM.AS PER NFPA 72."},{"number":"785971","date":"2017-09-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 45 WORK AREA OUTLETS CONSISTING OF CAT6 TELECOMMUNICATION CABLE TO PATCH PANELS FURNISH AND INSTALL PLENUM RATES INNER DUCT FOR RISER INSTALL PER 2008 NEC(OFFICE SPACE)CC DISTRICT"},{"number":"825990","date":"2017-10-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-01-26","scope":"RELOCATE 2 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"841795","date":"2018-01-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-10-05","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION.LEVEL I INTERIOR ALTERATIONS TO INCLUDE RENOVATION OF EXISTING CORRIDOR, UPGRADES TO FINISHES, ELEVATOR LOBBY & TOILET ROOMS(NO CHANGE TO FIXTURE COUNT OR LOCATION) AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. NO STRUCTURAL WORK ON THIS PERMIT."},{"number":"848455","date":"2018-03-01","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-03-28","scope":"FURNISH AND INSTALL 6-F2 LIGHTS,8-F3 LIGHTS AND 4-F4 LIGHTS ONLY AS PER 2008 NEC (CC DISTRICT)"},{"number":"904626","date":"2018-08-23","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2018-11-08","scope":"EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"910010","date":"2018-10-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-03-11","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING OFFICE SPACE FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVID FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"917206","date":"2018-10-09","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-02-25","scope":"RELOCATED 56 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"919142","date":"2018-11-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-25","scope":"FOR MECHANICAL ALTERATIONS TO EXISTING OFFICE SPACE, TO INCLUDE ONE (1) AC UNIT, VAV CONTROL BOXES, NEW REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS."},{"number":"919093","date":"2018-11-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL (186) CATEGORY 6 PLENUM CABLES. AVERAGE CABLE PULL 140 FEET."},{"number":"919549","date":"2018-11-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-04","scope":"INSTALL LIGHTINGS, LIGHTING CONTROLS, RECEPTACLES, POKE THRUS AND ELECTRICAL PANELS AS PER 2008 NEC (CC DISTRICT)"},{"number":"26019","date":"2018-12-10","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":null,"scope":"12/11/18 ERECT TENT: 12X65"},{"number":"933716","date":"2018-12-13","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-02-28","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING OFFICE SPACE FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVID FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"935543","date":"2018-12-17","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2019-02-28","scope":"INSTALL ONE PANTRY SINK WITH A WATER HEATER AND ALL REQUIRED PIPE PER 2004 PHILADELPHIA PLUMBING CODE"},{"number":"935541","date":"2018-12-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-28","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION IF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"933325","date":"2018-12-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-04","scope":"FURNISH & INSTALL (11) FIRE ALARM SPEAKER-STROBES, 3 RELAY MODULES AND (1) NAC PANEL AS PER NFPA 72"},{"number":"937158","date":"2018-12-21","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-02-28","scope":"RELOCATE 64 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"937773","date":"2019-01-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-13","scope":"INSTALL RECEPS FURN FEEDS PANELS TRANSFORMER LIGHT FIXTURES & LIGHTING CONTROLS AS PER PLANS AND SPECS AND IN ACCORDANCE WITH NEC 2008"},{"number":"941812","date":"2019-01-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-13","scope":"FURNISH AND INSTALL 15 SPEAKER/STROBES, 1 NAC PANEL AND 1 CONTROL MODULE AS PER NFPA. (CC DIST)"},{"number":"944197","date":"2019-01-31","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-04","scope":"INSTALLATION OF (35) COMMUNICATIONS POINTS WITH CAT 6 PLENUM CABLE FOR 12TH FLOOR FIT OUT. AS PER 2008 NEC"},{"number":"945117","date":"2019-02-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-04-08","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS (LEVEL II ALTERATIONS) AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK."},{"number":"91+9549","date":"2019-02-11","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2019-03-08","scope":"FURNISHED INSTALL 3 NEW COUNTER TOP SINKS AND FAUCETS AT EXISTING PANTRIES MODIFY EXISTING PLUMBING ROUGH IN TO ACCOMMODATE NEW LAYOUT INSTALL 3 FIXTURES AS PER 2004 PPC"},{"number":"949323","date":"2019-02-13","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-04-08","scope":"RELOCATE 9 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"949148","date":"2019-02-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-04-03","scope":"F/I 2 ENON METERS, SECURITY POWER, 4 DEDICATED RECEPTACLES, 1 DEDICATED QUAD, 5 WALL MOTIONS, 1 HWH FEED, 1 VAV FEED, 13 DUPLEX REC, 2 WALL FURN FEEDS, 18 2X4 LIGHTS, 2 EXIT SIGNS, 1 FLOOR BOX AND FIRE ALARM AS PER NEC 2008 AND NFPA 72(CC DIST)"},{"number":"951220","date":"2019-02-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-04-24","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) RENOVATIONS TO EXISTING TOILET ROOMS ON THE 26TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"952692","date":"2019-02-26","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-04-24","scope":"RELOCATE 8 EXISTING SPRINKLER HEADS ON THE 26TH FLOOR TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"952980","date":"2019-02-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-04-24","scope":"FURNISH AND INSTALL 24 NEW LIGHTS UTILIZING EXISTING WIRING AND CIRCUITS, INSTALL 4 CEILING MOTION SENSORS, PER 2008 NEC"},{"number":"950967","date":"2019-03-01","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2019-04-08","scope":"INSTALLATION OF 3 NEW FIXTURES IN ACCORDANCE WITH 2004 PPC"},{"number":"954077","date":"2019-03-04","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2019-04-16","scope":"REMOVE AND REPLACE 3-LAVS AT MENS, 4-LAVS WOMENS TOILET ROOM, INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004, NO PLUMBING DRAWINGS, BP#951220"},{"number":"950742","date":"2019-03-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-04-08","scope":"ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW OFFICE LAYOUTS ON THE 12TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS."},{"number":"26723","date":"2019-12-27","work":"Operations","type":"OPS PERMIT","description":"OPERATIONS PERMIT","status":"COMPLETED","completedDate":"2019-12-27","scope":"12/11/19 ERECT TENT: 12X65"},{"number":"1045786","date":"2020-02-13","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2022-05-12","scope":"FOR LEVEL II ALTERATIONS (WITHOUT A CHANGE OF OCCUPANCY) TO A GROUP B (OFFICE) TENANT THROUGHOUT THE ENTIRE 17TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING, AS PER PLANS; SEPARATE PERMITS REQUIRED FOR ALL MEP/FSP WORK; BUILDING IS FULLY SPRINKLERED; NO WORK WITHIN COMMON/CORE AREAS."},{"number":"1053617","date":"2020-02-28","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2022-11-03","scope":"RELOCATE APPRO (6) SPRINKLER HEADS TO ACCOMODATE A RELOCTED PARTITION & CEILING GRID"},{"number":"1053650","date":"2020-02-28","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2022-03-03","scope":"REMOVE SEVENTEEN(17) EXISTING FIXTURES IN RESTROOMS TO REPLACE TILE. REINSTALL EXISTING FIXTURES ON NEW TILE WALL AS PER PHILADELPHIA 2017 PLUMBING CODE."},{"number":"1054809-RI","date":"2020-03-04","work":"Rough-In","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-04-28","scope":"RELOCATE EXISTING FIXTURES AND RELOCATE RECEPTACLES AND SWITCHES PER 2017 NEC (CC DIST)"},{"number":"1047864","date":"2020-03-12","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2021-05-07","scope":"INSTALL STRUCTURAL STEEL FOR ROOFTOP AWNING"},{"number":"EP-2021-001336","date":"2021-04-16","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-05-21","scope":"Relocating power to existing receptacle and breaker using existing circuits. All work to comply with 2017 NEC."},{"number":"EP-2021-003912","date":"2021-05-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-05-21","scope":"Install primary recall output relay module, alternate out relay module, fire hat blink output relay module, shunt trip output relay module, smoke detector, and heat detectors as per 2017 nec & 2016 nfpa-72."},{"number":"CP-2021-002968","date":"2021-07-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2022-01-10","scope":"FOR LEVEL II INTERIOR ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING."},{"number":"FP-2021-002129","date":"2021-07-30","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-01-07","scope":"Relocate (13) Sprinkler Heads on the 10th floor as per BFPA 13 See CP-002968"},{"number":"FP-2021-002227","date":"2021-08-13","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2021-12-27","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (20) sprinkler heads on the 2nd floor \"Blank Rome\" (CP-2021-003335)"},{"number":"CP-2021-003335","date":"2021-08-13","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2021-12-28","scope":"For Level II Alterations (w/o a change of occupancy) to a Group B tenant (Blank Rome) on the 2nd floor of an existing high-rise office building, as per plans; separate permits required for all MEP/FSP work; building is fully sprinklered; no signs on this permit."},{"number":"EP-2021-008732","date":"2021-08-17","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-08","scope":"Install receptacles, light fixtures, switches, provide power to HVAC units, 30kVA transformer & panel in accordance with 2017 NEC CC district."},{"number":"EP-2021-009286","date":"2021-08-27","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-08","scope":"Install receptacles, light fixtures, switches, provide power to HVAC units, 45kVA transformer & panels as per 2017 NEC."},{"number":"EP-2021-009443","date":"2021-09-16","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-08","scope":"Furnish and Install F/A Devices as per plans. Install new fire alarm devices in 2nd FLR Suite & 10th FLR Suite as per fire alarm drawings as per NFPA 72"},{"number":"MP-2021-005624","date":"2021-09-23","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2022-01-06","scope":"FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE AIR CONDITIONING UNITS, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK."},{"number":"PP-2021-015683","date":"2021-09-27","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2021-12-27","scope":"PLUMBING WORK PER PLANS."},{"number":"EP-2021-010373","date":"2021-09-29","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-28","scope":"Install (5) card read as system with low voltage electric- lock on 2nd floor using plenum rated cable CMP/FT6 with fire release (all low voltage-30V system) AS PER NEC 2017"},{"number":"PP-2021-017687","date":"2021-10-13","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2022-01-06","scope":"Scope of proposed work does not require review. Issue ez-permit."},{"number":"EP-2021-011793","date":"2021-10-29","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-21","scope":"Install fiber optics and network equipment as per 2017 nec"},{"number":"EP-2021-011786","date":"2021-10-29","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-12-21","scope":"Install voice and data cables for new tenant space as per 2017 nec"},{"number":"CP-2021-008197","date":"2021-11-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2023-08-24","scope":"FOR INTERIOR ALTERATIONS TO INCLUDE THE RENOVATION OF EXISTING TOILET ROOMS ON THE 19TH FLOOR OF AN EXISTING STRUCTURE, AS PER APPROVED PLANS."},{"number":"CP-2021-008196","date":"2021-11-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-12-05","scope":"FOR INTERIOR ALTERATIONS ON PARTIAL 19TH FLOOR, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS."},{"number":"MP-2021-005622","date":"2021-11-18","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2021-12-27","scope":"FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE VAVS, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2021-013586","date":"2021-11-24","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-01-24","scope":"Perform demo of existing light fixtures. Replace light fixtures with new. Replace receptacles with new to match. As per 2017 nec"},{"number":"EP-2021-014200","date":"2021-12-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-01-24","scope":"Preform demo of existing light fixtures. Replace light fixtures with new. Replace receptacles with new to match. ALL WORK IS TO BE DONE ACCORDING DRAWINGS-2017 NEC. ** A SEPARATE FIRE ALARM IS REQ'D **"},{"number":"FP-2021-002609","date":"2021-12-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-01-07","scope":"For the installation of an FM200 clean agent system within a server room on the 10th floor of an existing high-rise office building, as per plans; no other work on this permit; connecting to existing piping; see CP-2021-002968 for associated building permit."},{"number":"CP-2021-008910","date":"2022-01-18","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2024-05-14","scope":"FOR A LEVEL II INTERIOR ALTERATION TO A PORTION OF A 16TH FLOOR ( WHITE BOX AND RESTROOM). ALTERATIONS TO INCLUDE THE ERECTION OF NEW WALL PARTITIONS AND TO PROVIDE FINISHES AND FURNISHINGS THROUGHOUT THE DESIGNATED AREA . ALL WORK TO BE DONE PER APPROVED PLANS.**BUILDING IS FULLY SPRINKLERED**IEBC 2018** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRED AN AMENDED PERMIT**"},{"number":"FP-2022-000081","date":"2022-01-19","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-10-30","scope":"Relocate 8 Heads See CP-2021-008196 & CP-2021-008197"},{"number":"GM-2022-000883","date":"2022-02-07","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Expired","completedDate":"2023-02-03","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"CP-2022-001094","date":"2022-03-02","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2022-11-08","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING TOILET ROOMS ON THE THIRD FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"FP-2022-000697","date":"2022-03-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-10-26","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (7) sprinkler heads on the 3rd floor (CP-2022-001094)"},{"number":"PP-2022-003403","date":"2022-03-09","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2022-10-26","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"FP-2022-000725","date":"2022-04-05","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-01-17","scope":"FOR THE INSTALLATION OF THREE (3) CLEAN AGENT FIRE SUPPRESSION SYSTEMS WITH A TOTAL OF SIX (6) SPRINKLER NOZZLES WITHIN THE ELEVATOR AND ELEVATOR MACHINE ROOM, OF AN EXISTING HIGH-RISE OFFICE BUILDING, AS PER APPROVED PLANS. NO OTHER WORK ON THIS PERMIT."},{"number":"EP-2022-003834","date":"2022-04-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-11-06","scope":"Relocate fire alarm devices in space as per drawing PER NEC CODE 2017."},{"number":"EP-2022-002732","date":"2022-04-18","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-06-13","scope":"Renovation to existing Toilet Rooms: Install 22 light fixtures, 6 switches, 5 receptacles, 1 exhaust fan power only, as per 2017 NEC. Install 5 Fire Alarm horn/strobes as per 2016 NFPA 72."},{"number":"CP-2022-003853","date":"2022-07-08","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2025-05-28","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 13TH FLOOR OFFICE SPACE WITHIN AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"FP-2022-001908","date":"2022-07-13","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-03-29","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinkler heads"},{"number":"CP-2022-004173","date":"2022-07-25","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-04-24","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO THE 8TH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**"},{"number":"EP-2022-007186","date":"2022-07-26","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-03-29","scope":"Furnish and install 6 duplex receptacles, 3 pendant lights, 2 floor boxes, 4 ceiling occupancy sensors, power for one VAV, rework existing lighting and fire alarm . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"EP-2022-007597","date":"2022-08-05","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-12-14","scope":"Install (57) Cat-6 cables terminate and test in accordance will all codes. Support cables with J-hooks. AS PER NEC 2017"},{"number":"FP-2022-002054","date":"2022-08-10","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-04-24","scope":"EZ PERMIT-SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads"},{"number":"FP-2022-002112","date":"2022-08-16","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2023-03-03","scope":"FOR THE REMOVAL AND REPLACEMENT OF ONE (1) FIRE PUMP CONTROLLER AS PER APPROVED PLANS AND IN ACCORDANCE WITH PUMP CONTROLLER MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK."},{"number":"EP-2022-008163","date":"2022-08-19","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-10-04","scope":"Install receptacles, lights and occupancy sensors as per APPROVED DRAWINGS-2017 nec."},{"number":"MP-2022-004744","date":"2022-09-21","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-04-24","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor and miscellaneous material to relocate 10 diffusers for new office layout."},{"number":"MP-2022-004930","date":"2022-09-22","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2025-05-28","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Furnish labor and material to relocate 12 diffusers ONLY. NO NEW EQUIPMENT INSTALLATIONS)"},{"number":"FP-2022-002576","date":"2022-09-22","work":"Rough-In","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-10-13","scope":"Rough-In Permit for FP-2022-002567"},{"number":"CP-2022-003553","date":"2022-10-03","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-02-01","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 24TH FLOOR OFFICE SPACE WITHIN AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"PP-2022-014398","date":"2022-10-03","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-01-30","scope":"• Provide labor and material to disconnect [8] lavatories in core restroom • Provide labor and material to disconnect [7] water closets and [2] urinal in core restrooms. • Furnish and install [8] new lavatories and faucets in core restroom. Connecting to existing rough-ins. • Provide labor and material to re install [7] water closets and [2] urinals in core restrooms onto existing carriers and rough-ins. • Furnish and install [1] drinking fountain"},{"number":"EP-2022-008779","date":"2022-10-05","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-11-09","scope":"INSTALL (2) SINGLE CATEGORY 6 CABLE LOCATIONS, (17) DUAL CATEGORY 6 CABLE LOCATIONS, INSTALL A 24\"X 19\" SWING MOUNT RACK EQUIPPED WITH (1) 48 PORT PANEL, INSTALL J-HOOKS ABOVE CEILING FOR CABLE PATHWAYS"},{"number":"EP-2022-010076","date":"2022-10-06","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-01-20","scope":"Furnish and install 60 lights, 170 Ft. of tape light; 10 exit signs, 2 GFCI's and 2 meters as per 2017 NEC. Replacement of Fire Alarm as per drawings as per 2016 NFPA 72."},{"number":"MP-2022-005138","date":"2022-10-06","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-01-30","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Furnish miscellaneous duct and relocate 12 diffusers for new office layout)."},{"number":"FP-2022-002567","date":"2022-10-12","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2023-05-30","scope":"FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM AS PER NFPA 13 WITH AN EIGHT (8) INCH FIRE SERVICE LINE AND EIGHT (8) INCH BACKFLOW PREVENTER. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. A SEPARATE PERMIT IS REQUIRED FOR ANY OTHER WORK."},{"number":"FP-2022-002776","date":"2022-10-18","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-01-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 98 Sprinkler Heads"},{"number":"CP-2023-001214","date":"2023-03-30","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-05-14","scope":"FOR INTERIOR LEVEL 2 ALTERATIONS TO THE ELEVATOR LOBBY AND COMMON CORRIDOR AS PER PLANS. NO CHANGE IN OCCUPANCY CLASSIFICATION."},{"number":"FP-2023-000771","date":"2023-04-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-03-18","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 20 SPRINKLER HEADS"},{"number":"EP-2023-002971","date":"2023-04-11","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-07-31","scope":"Furnish and Install lighting and fire alarm . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"CP-2023-001995","date":"2023-04-14","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-23","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE THIRD FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2023-002016","date":"2023-04-17","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-23","scope":"FOR A LEVEL II INTERIOR ALTERATION TO 3RD FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2023-002001","date":"2023-04-17","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-23","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE THIRD FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. THE BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2023-001134","date":"2023-04-27","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-05-14","scope":"FOR A LEVEL II INTERIOR ALTERATION TO A PORTION OF A 24TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF NEW WALL PARTITIONS AND TO PROVIDE FINISHES AND FURNISHINGS THROUGHOUT THE DESIGNATED AREA . ALL WORK TO BE DONE PER APPROVED PLANS.**BUILDING IS FULLY SPRINKLERED**IEBC 2018** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRED AN AMENDED PERMIT**"},{"number":"CP-2023-002350","date":"2023-05-01","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-07-05","scope":"FOR LEVEL 2 ALTERATIONS TO EXISTING TENANT ON THE 25TH FLOOR AS PER PLANS."},{"number":"EP-2023-003796","date":"2023-05-05","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-07-13","scope":"Furnish and install electrical lighting and power . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D** Amendment: Furnish and install 10 speaker strobes and 2 control modules as per drawings."},{"number":"EP-2023-003798","date":"2023-05-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-07-13","scope":"Furnish and install electrical light and power as per drawings as per 2017 NEC. Amendment: Furnish and install 15 speaker strobes, 2 strobes, and 1 control module as per drawings and 2016 NFPA 72. Cost included in original contract value."},{"number":"EP-2023-003789","date":"2023-05-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-07-13","scope":"Furnish and install electrical lighting and power as per drawings as per 2017 NEC. Amendment: Furnish and install 17 speaker strobes, one strobe, and a control module as per drawings as per 2016 NFPA 72. Cost included in original contract value."},{"number":"FP-2023-001078","date":"2023-05-12","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-07-05","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (1) SPRINKLER HEAD IN SUITE 2520 AS PER NFPA 13"},{"number":"EP-2023-004316","date":"2023-05-12","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-08-22","scope":"Furnish and install (128) Category 6 cables to workstations. The average cable pull is 125 feet as per 2017 nec"},{"number":"EP-2023-004446","date":"2023-05-12","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-06-13","scope":"Replace Existing Lighting AS PER NEC 2017"},{"number":"MP-2023-002034","date":"2023-05-15","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-02-23","scope":"Furnish and install five (5) VAV boxes, duct and air devices for new office layout as per approved plans."},{"number":"MP-2023-002035","date":"2023-05-15","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-03-18","scope":"Furnish and install one (1) new VAV box, duct and air devices for new common corridor and elevator lobby as per approved plans."},{"number":"MP-2023-002033","date":"2023-05-15","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-02-23","scope":"Furnish and install eight (8) VAV boxes and one (1) 3/4-ton Water Source Heat Pump as per approved plans."},{"number":"PP-2023-006740","date":"2023-05-17","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-02-23","scope":"Remove and replace plumbing fixtures with new, (1) pantry sink and (1) hot water heater, connecting to existing piping."},{"number":"PP-2023-006743","date":"2023-05-17","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-02-23","scope":"Remove and replace plumbing fixtures with new, (1) pantry sink and (1) hot water heater connecting to existing piping."},{"number":"PP-2023-006748","date":"2023-05-17","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-02-23","scope":"Remove and replace plumbing fixtures with new, (1) pantry sink and (1) hot water heater, connecting to existing piping."},{"number":"MP-2023-002036","date":"2023-05-22","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-02-23","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2023-004898","date":"2023-05-30","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-10-02","scope":"• Install (64) Category 6 plenum cables & (1) RG6 coax location from the MDF to the customer indicated workstations as noted below: • (27) Workstation locations- (2) Cat 6 • (5) WAP locations- (1) Cat 6 • (5) RS locations- (1) Cat 6 • (1) TV location- (1) RG6 • Install (1) wall-mount enclosure to customer indicated location within the MDF As per 2017 nec"},{"number":"MP-2023-002168","date":"2023-06-05","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-07-05","scope":"FOR AN EZ MECHANICAL INSTALLATION. ***EZ PERMIT*"},{"number":"EP-2023-004928","date":"2023-06-13","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-03-22","scope":"1-Access panel, 1-Intrussion panel, 1-Video server, 8-card readers, 8-REX, 8-door contacts, 8-electric locks, 10-cameras, fire stopping as needed. As per 2017 nec"},{"number":"FP-2023-001459","date":"2023-06-27","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-11-20","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (101) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2023-002918","date":"2023-07-24","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-11-09","scope":"FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO SUITE 2410 OF AN EXISTING STRUCTURE, ALL WORK TO BE DONE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*"},{"number":"FP-2023-001752","date":"2023-07-25","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-23","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (35) SPRINKLER HEADS AS PER NFPA 13"},{"number":"FP-2023-001753","date":"2023-07-25","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-23","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS AS PER NFPA 13"},{"number":"FP-2023-001751","date":"2023-07-25","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-23","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (22) SPRINKLER HEADS AS PER NFPA 13"},{"number":"FP-2023-000713","date":"2023-08-01","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-09","scope":"INSTALL ONE (1) NEW FIRE SUPPRESSION SYSTEM TO INCLUDE A FIRE SERVICE AS PER NFPA 2001 ONLY FOR THE ELEVATOR ROOM. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA."},{"number":"EP-2023-007037","date":"2023-08-07","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-11-02","scope":"Fixtures, Branch wiring, panels, Fire Alarm as per 2017 NEC AND NFPA 72 AND PER PLANS"},{"number":"PP-2023-009060","date":"2023-08-08","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-11-09","scope":"FURNISH & INSTALL (2) Sinks, (1) Water Filter, (2) Floor Drains, (1) Water Heater 5 TOTAL FIXTURES"},{"number":"EP-2023-005987","date":"2023-08-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Expired","completedDate":"2024-02-28","scope":"We will be hooking up a temporary Generator. While repairs to an existing generator are being made as per 2017 nec"},{"number":"CP-2023-006061","date":"2023-11-07","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE SELECTIVE DEMOLITION AND THE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**"},{"number":"FP-2023-002960","date":"2023-12-27","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-05-15","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (72) SPRINKLER HEADS AS PER NFPA 13"},{"number":"CP-2024-000053","date":"2024-01-22","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 10TH AND 11TH FLOOR OF AN EXISTING STRUCTURE . WORK TO BE COMPLETETED WITHIN THE EXISTING OFFICE SPACES WITHIN AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"EP-2023-007955","date":"2024-01-25","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-02-22","scope":"Furnish and install 184 CAt6 cables various areas in office space for data and phone Furnish and install terminating rack. AS PER NEC 2017"},{"number":"EP-2024-000354","date":"2024-01-25","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-29","scope":"Install new receptacles, poke-thru(s), lights, & light controls as per drawings and 2017 NEC. AMENDMENT: Install fire alarm devices as per plans and 2016 NFPA 72."},{"number":"CP-2023-003550","date":"2024-02-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2025-05-28","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 9TH FLOOR LEVEL FOR USE AS PREVIOUSLY APPROVED. ALTERATIONS TO INCLUDE THE INSTALLATION OF A COMMERCIAL KITCHEN EXHAUST HOOD TYPE I. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"MP-2024-000585","date":"2024-02-06","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2025-05-28","scope":"Mechanical / Fuel Gas Permit for combo CP-2023-003550"},{"number":"MP-2024-000272","date":"2024-02-07","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2024-000254","date":"2024-02-08","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Expired","completedDate":"2025-05-28","scope":"EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. EZ KITCHEN FIRE SUPPRESSION SYSTEM"},{"number":"FP-2024-000297","date":"2024-02-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-05-15","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (196) SPRINKLER HEADS ON THE 10TH & 11TH FLOORS AS PER NFPA"},{"number":"PP-2024-001868","date":"2024-02-16","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-05-15","scope":"INSTALL 12 LAVATORIES, 10 WATER CLOSETS, 2 URINALS, 1 ELECTRIC WATER COOLER, 3 KITCHEN SINKS, 3 HOT WATER HEATERS, 11 FLOOR DRAINS AND 8 SUPPLY OUTLET BOXES ACCORDING TO THE 2018 PPC AND PER PLANS."},{"number":"CP-2024-001479","date":"2024-03-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2026-05-11","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS ARE REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*"},{"number":"EP-2024-002416","date":"2024-03-19","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-30","scope":"Provide and install 354 Cat6 plenum cables at 140 foot average. All cabling will be installed per current NEC. No rescue systems work."},{"number":"EP-2024-002418","date":"2024-03-19","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-30","scope":"Provide and install 274 Cat6 plenum cables at 140 foot average. All cabling will be installed per current NEC. No rescue systems work."},{"number":"EP-2024-003367","date":"2024-04-03","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-07-24","scope":"RELOCATE RECEPTACLE OUTLETS, LIGHTING AND SWITCHES ACCORDING TO THE 2017 NEC."},{"number":"MP-2024-001759","date":"2024-04-11","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2026-05-11","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans."},{"number":"EP-2024-003731","date":"2024-04-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-29","scope":"Install new receptacles, poke-thrus, lights & light controls as per APPROVED drawings-2017 NEC. AMENDMENT: Install fire alarm as per plans."},{"number":"CP-2024-002531","date":"2024-05-08","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO AN EXISTING STRUCTURE (FLOORS 6-10). ALTERATIONS TO INCLUDE SELECTIVE DEMOLITION AND THE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**"},{"number":"CP-2024-002905","date":"2024-05-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-08-30","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, MILLWORK, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 iebc*"},{"number":"MP-2024-002170","date":"2024-05-30","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AND PIPING AT THE 10TH AND 11TH FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND APPLIANCE MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE CP-2024-000053 FOR ASSOCIATED BUILDING PERMIT."},{"number":"FP-2024-001124","date":"2024-05-30","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-08-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS AS PER NFPA 13"},{"number":"PP-2024-006774","date":"2024-06-06","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-05-15","scope":"• Furnish and install [8] LAV-1, [4] Pantry/Breakroom Sinks, [2] Urinal [6] Water Closets, [5] Hub Drain, [3] Electric Water Heaters, [8] Floor Drains, [1] Floor SinksS-1, [2] GRD-1. • Provide labor and material to extend from existing sanitary, vent and domestic water as shown, installed to the 2018 Philadelphia Plumbing Code section 919(Philadelphia Single Stack/venting System"},{"number":"EP-2024-005355","date":"2024-06-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-08-19","scope":"Selective electrical demo as needed. Furnish and install new devices using existing circuits. Relocate existing lighting using existing wiring for new layout. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. AMENDMENT Install fire alarm as per plans."},{"number":"CP-2024-003312","date":"2024-06-17","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-10-02","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 24TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE DEMOLITION OF EXISTING WALL PARTITION AND ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2024-003335","date":"2024-06-24","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-10-04","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 15TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE DEMOLITION OF EXISTING WALL PARTITION AND ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2024-001288","date":"2024-06-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-10-02","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS AS PER NFPA 13 AND LOCAL CODE"},{"number":"EP-2024-006246","date":"2024-06-27","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-08-16","scope":"Furnish and install forty-eight (48) Category 6 cables. Average cable pull is 150 feet."},{"number":"EP-2024-006042","date":"2024-06-27","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-09-23","scope":"AMENDMENT: Install fire alarm as per plans and 2016 NFPA 72. Furnish and install new wiring for new fixtures. Furnish and install new wiring for receptacles, furniture and miscellaneous devices as shown on drawings. Installation shall comply with 2017 NEC."},{"number":"EP-2024-006656","date":"2024-07-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-09-13","scope":"Furnish & Install Dual & Single Category 6 Plenum Cabling. Furnish & Install Port Cat6 Leviton Patch Panels, Furnish & Install Mount Boxes & Face Plates"},{"number":"MP-2024-002911","date":"2024-07-11","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-08-30","scope":"FOR THE INSTALLATION OF REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO APPLIANCES ON THIS PERMIT."},{"number":"PP-2024-009889","date":"2024-07-16","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-10-02","scope":"Remove and replace (3) plumbing fixtures with new, (1) dishwasher, (1) kitchen sink and (1) water heater, connecting to existing piping."},{"number":"FP-2024-001524","date":"2024-07-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-10-04","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (16) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2024-003484","date":"2024-08-04","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-10-02","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2024-007795","date":"2024-08-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-09-24","scope":"INSTALL LIGHTING, SWITCHES AND RECEPTACLES OUTLETS. RELOCATE EXISTING LIGHTING TO ANOTHER LOCATION ACCORDING TO THE 2017 NEC AND PER PLANS."},{"number":"MP-2024-003868","date":"2024-08-28","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-10-04","scope":"FOR THE RELOCATION/INSTALLATION OF REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION."},{"number":"CP-2024-005620","date":"2024-11-04","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN OCCUPANCY CLASSIFICATION TO EXISTING GROUP B OFFICES AT THE 18TH FLOOR (SUITE 1800). BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK."},{"number":"CP-2024-006051","date":"2024-11-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-06-16","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE STAIR INFILL, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK."},{"number":"EP-2024-011630","date":"2024-12-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-30","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"MP-2024-005672","date":"2024-12-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-06-16","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 5 existing diffusers with no wall penetrations within a single tenant area, No penetrations to fire-rated assemblies."},{"number":"EP-2025-000015","date":"2025-01-06","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-05-09","scope":"Furnish and Install (5) Dual Cat6 Plenum rated cables 2- Cat6 per Location to Fix Wall Location. Furnish and Install (16) Single Cat6 Plenum Rated Cable 1- Cat6 per location to Fix Wall Location Furnish and Install (1) 48 Port Cat6 Angled Patch Panel in Existing Data Rack. Furnish and Install (26) RJ-45 Cat6 Leviton Extreme Data Outlets. Furnish and Install (26) 4- Port Face Plates Color"},{"number":"FP-2025-000010","date":"2025-01-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-05-15","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (24) SPRINKLER HEADS AS PER NFPA 13 AND LOCAL CODES"},{"number":"PP-2024-017468","date":"2025-01-10","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-06-13","scope":"8 Lav replacement and one water cooler replacement FIXTURE REPLACMENT WITHOUT PIPING Other fixture: Water cooler"},{"number":"PP-2025-000685","date":"2025-01-17","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-05-15","scope":"F&I New Sink & Faucet utilizing existing rough in"},{"number":"EP-2025-000231","date":"2025-01-20","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-04-24","scope":"Furnish & Install Power and Lighting . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CO AMENDMENT: Install fire alarm. (SEE APPROVED DRAWINGS)"},{"number":"FP-2025-000208","date":"2025-01-30","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-06-16","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2025-000250","date":"2025-01-31","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"CP-2025-001259","date":"2025-03-21","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-09-02","scope":"FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE TO EXISTING GROUP A-2 CAFE OCCUPANCY AT THE 1ST FLOOR AND MEZZANINE LEVELS. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK."},{"number":"FP-2025-000648","date":"2025-04-01","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-09-02","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (28) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2025-001882","date":"2025-04-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-09-02","scope":"FOR INSTALLATION OF DUCTWORK AND REGISTER/DIFFUSERS PER APPROVED PLANS."},{"number":"EP-2025-003296","date":"2025-04-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-07-16","scope":"152 light fixture, 8 Exit, 48 switch, 1 LCP, 51 receptacle, 4 floor receptacle, 9 equipment power, 1 208/120 volt panel . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. Fire Alarm is Not Included -NOTED: three phase receptacles are to be gfci protected per 210.8(B)(2)."},{"number":"PP-2025-003622","date":"2025-04-30","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-09-02","scope":"INTERIOR ALTERATIONS TO ONE LOGAN CAFE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING PIPIING. ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. FIXTURES AND EQUIPMENT FOR FOOD PREP ECT. SHALL BE CONNECTED TO SANITARY PIPING VIA AIR GAP WHERE REQUIRED BY CODE. GREASE INTERCEPTOR SHALL HAVE INTERNAL FLOW CONTROL AS SPECIFIED IN MANUFACTURER SPECS. VENTING SHALL BE INSTALLED AND DESIGNED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK SYSTEM."},{"number":"EP-2025-004248","date":"2025-05-05","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-07-22","scope":"Furnish and install thirty eight (38) Category 6 plenum cables from the Server Room to various locations. Average cable pull is 125 fee"},{"number":"CP-2025-003866","date":"2025-07-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-05-14","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 4TH FLOOR LEVEL SUITE 400 OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE DEMOLITION OF EXISTING WALL PARTITION AND ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2025-001571","date":"2025-08-06","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-05-14","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2025-003866* RELOCATE (62) SPRINKLER HEADS AS PER NFPA 13 (4th Floor)"},{"number":"EP-2025-007471","date":"2025-08-13","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-02-02","scope":"Furnish and install power and lighting per plans and 2017 NEC. FA Permit to be submitted at a later date when drawings are finalized."},{"number":"PP-2025-009699","date":"2025-08-14","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2026-05-14","scope":"FIXTURE REPLACEMENT WITHOUT PIPING OF LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC"},{"number":"EP-2025-009021","date":"2025-09-25","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-02-02","scope":"Install fire alarm devices . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72."},{"number":"MP-2025-005047","date":"2025-10-14","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-05-14","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"CP-2025-005256","date":"2025-10-15","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-02-12","scope":"FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 26TH FLOOR OF AN EXISTING BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2025-010436","date":"2025-10-29","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-02-09","scope":"Furnish & Install (114) Category 6 plenum cables for voice/data"},{"number":"MP-2025-005728","date":"2025-11-11","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-02-12","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Furnish labor to relocate 3 existing diffusers with no wall penetrations within a single tenant space area."},{"number":"FP-2025-002302","date":"2025-11-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-02-12","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 3 Heads"},{"number":"CP-2025-005429","date":"2025-12-03","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-04-28","scope":"FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2025-011673","date":"2025-12-17","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-02-05","scope":"Furnish and install 12 F-3, 82 ft. F-4, 80 ft. F-6, and 4 exit signs, utilizing existing circuitry. (No review for the electrical installations, work area is less than 2,000 sq Ft) Fire alarm as per drawings. In accordance with NFPA72 2016& The Philadelphia Fire code 2018"},{"number":"GM-2026-000390","date":"2026-01-14","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Expired","completedDate":"2026-07-15","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"CP-2026-000286","date":"2026-01-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2026-000509","date":"2026-02-02","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-05-21","scope":"FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 5TH FLOOR IN AN EXISTING BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2026-000191","date":"2026-02-06","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-05-19","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (21) SPRINKLER HEADS ON THE 5TH FLOOR AS PER NFPA 13"},{"number":"MP-2026-001021","date":"2026-02-18","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION."},{"number":"FP-2026-000318","date":"2026-02-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (116) SPRINKLER HEADS ON THE 14TH FLOOR, PER NFPA 13"},{"number":"CP-2026-000764","date":"2026-02-25","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-07-10","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*"},{"number":"FP-2026-000364","date":"2026-02-27","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-07-10","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 77 HEADS"},{"number":"EP-2026-001659","date":"2026-02-27","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Install telecommunications wiring for office space, including low-voltage cabling, raceways, back boxes, terminations, and supports as required. All work to be performed in accordance with the 2017 NEC."},{"number":"CP-2026-000470","date":"2026-03-02","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-06-17","scope":"FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY AT FIFTH FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"EP-2026-001640","date":"2026-03-03","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-05-11","scope":"Perform electrical upgrades to the existing 5th floor office space, including installation and/or modification of electrical panels as required, new and revised branch circuit wiring, lighting fixtures, switches, receptacles, and associated devices to support the renovated layout. Provide any necessary feeders, circuit extensions, grounding, bonding, terminations, and updated panel directories. Furnish and install a fire alarm system for the 5th floor office space, including fire alarm control equipment (as required), initiating devices, notification appliances, wiring, terminations, and testing. All devices shall be properly installed, interconnected, and programmed to provide required life safety notification and monitoring. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans."},{"number":"EP-2026-001876","date":"2026-03-06","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-06-08","scope":"Furnish and install eighty (80) Category 6 plenum cables from the IT Room to workstations."},{"number":"FP-2026-000432","date":"2026-03-09","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-06-17","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 79 SPRINKLER HEADS"},{"number":"MP-2026-001275","date":"2026-03-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-05-19","scope":"FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE A PORTION OF THE 5TH FLOOR OF AN EXISTING STRUCTURE.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **"},{"number":"MP-2026-001180","date":"2026-03-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-07-10","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2026-001924","date":"2026-03-12","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-06-01","scope":"Furnish and install 37 duplex outlets, 26 quads, 7 GFI's, 8 dedicated receptacles, 3 floor cores, 2 hot water heaters, 18 F-1, 40 F-2, 9 F-3, 14 F-4, 4 exit signs, 16 wall motions, 9 ceiling motions and two dimmers. Fire Alarm as per APPROVED drawings-2017 NEC,2016 NFPA-72."},{"number":"MP-2026-000746","date":"2026-03-17","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-06-17","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"PP-2026-002862","date":"2026-03-18","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2026-06-17","scope":"Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, with piping. ALL WORK PERFORMED PER 2018 PPC AND EZ PLUMBING STANDARD"},{"number":"PP-2026-002063","date":"2026-03-20","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"ALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS"},{"number":"PP-2026-003613","date":"2026-03-21","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2026-07-10","scope":"Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, with piping. Floor 4, not Floor 5. This application is for the 4th floor with a different building permit number. Thank you."},{"number":"EP-2026-002240","date":"2026-03-24","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-07-09","scope":"Provide and install electrical systems including three hundred ten (310) lighting fixtures, fourteen (14) exit signs, ninety (90) switches, one (1) lighting control panel, one hundred thirty-one (131) receptacle outlets, fifteen (15) floor receptacles, twenty-seven (27) furniture power connections, and six (6) equipment power connections. Furnish and install a fire alarm system including twenty-five (25) speaker/strobe notification appliances, six (6) speakers, six (6) strobes, one (1) relay, and one (1) NAC panel, including all associated wiring, terminations, and system integration. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans."},{"number":"EP-2026-002340","date":"2026-03-30","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-04-06","scope":"Furnish and install 5 duplex outlets, 1 quad, 6 floor cores and wall furniture feeds. One panel (LPLV13C). Installation shall comply with 2017 NEC."},{"number":"EP-2026-001595","date":"2026-03-30","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-06-01","scope":"Furnish and install 52 duplex outlets, 26 quad outlets, 5 GFI's, 6 dedicated outlets, 1 L530P, 1 L520P, 4 wall furniture feeds, 4 floor cores, 1 hot water heater, 1 AC unit. 43 F-1, 5 F-2, 6 F-3A, 2 F-3B, 3 F-3C, 1 F-3D, 6 F-4A, 3 F-4B, 31 F-5, 28 F-6, 1 F-7, 11 F-8, 8 exit signs, 27 dimmers, 5 wall motions and 16 ceiling motions ,Fire Alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72."},{"number":"CP-2026-001232","date":"2026-05-18","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 26TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**"},{"number":"MP-2026-002695","date":"2026-05-19","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"CP-2026-002847","date":"2026-05-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II ALTERATIONS TO INCLUDE PARITAL DEMO, NEW PARTITIONS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK."},{"number":"EP-2026-003963","date":"2026-05-21","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Furnish and install electrical wiring for power and lighting as per APPROVED drawings-2017 NEC. **Fire alarm work will be applied for separately**"},{"number":"MP-2026-003169","date":"2026-06-01","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 4 existing diffusers, with no wall penetrations, within a single tenant space, in compliance with EZ Permit standards"},{"number":"FP-2026-001031","date":"2026-06-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (6) SPRINKLER HEADS, PER NFPA 13"},{"number":"FP-2026-001024","date":"2026-06-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (88) SPRINKLER HEADS, PER NFPA 13"},{"number":"PP-2026-005841","date":"2026-06-05","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Furnish and install (10) plumbing fixtures, (4) hot water heaters, (2) kitchen sinks, (2) lavatories, (1) water closet and (1) floor drain with piping. All work to be perform according to the 2018 PPC and per approved plans."},{"number":"PP-2026-007311","date":"2026-06-05","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Install (1) hub drain for water dispenser, connecting to existing piping."},{"number":"CP-2026-003483","date":"2026-06-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE (SPACE 500). FOR USE AS A BUSINESS OCCUPANCY. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2026-005398","date":"2026-07-01","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Relocate lighting, add 10 receptacles, 3 new connect tracs, recircuit lighting controls and add three phase 100 amp panel as per 2017 NEC. Install Fire Alarm devices as per drawings and 2016 NFPA 72."},{"number":"PP-2026-008701","date":"2026-07-07","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, connecting to existing piping. *WITHOUT PIPING*"},{"number":"EP-2026-006389","date":"2026-07-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"AMEND 07-15-2026 Addition of Card Access and Camera cabling Low Voltage Voice & Data Cabling"},{"number":"FP-2026-001454","date":"2026-07-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (52) SPRINKLER HEADS, PER NFPA 13"},{"number":"EP-2026-006750","date":"2026-07-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Furnish and install low voltage security devices and cameras as per drawings. 2020 NEC."},{"number":"EP-2026-006749","date":"2026-07-22","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Furnish and install wiring for fire alarm system as per approved drawings NEC2017 & NFPA 2016"}],"storyTag":"New construction","storyDelta":null,"timeline":[{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Alterations"},{"y":2026,"k":"permit","w":"Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"insp","w":"L&I: 1 failed, 1 passed"}],"rented":false,"licenses":[{"number":"299146","type":"High Rise","status":"Active","businessName":"BRANDYWINE OPERATING PARTNERSHIP LP","legalName":"BRANDYWINE OPERATING PARTNERSHIP LP","address":"130 N 18TH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2004-04-19","latestIssueDate":"2026-05-19","expirationDate":"2027-04-30","inactiveDate":null},{"number":"316162","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"BROCK & COMPANY INC","legalName":"BROCK & COMPANY INC","address":"130 N 18TH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2005-04-30","latestIssueDate":"2012-05-05","expirationDate":"2013-04-30","inactiveDate":"2013-08-28"},{"number":"317384","type":"Food Establishment, Retail Permanent Location","status":"Inactive","businessName":"TAE & EUN Y CHOI YOUNG (LEE SHOPPE)","legalName":"TAE & EUN Y CHOI YOUNG","address":"130 N 18TH ST","revenueCode":"3118","rentalCategory":null,"units":null,"issuedDate":"2005-05-07","latestIssueDate":"2019-05-23","expirationDate":"2020-04-30","inactiveDate":"2020-06-29"},{"number":"349570","type":"Hazardous Materials","status":"Inactive","businessName":"HMC OLS II LP (FOUR SEASONS HOTEL)","legalName":"HMC OLS II LP","address":"130 N 18TH ST","revenueCode":"3335","rentalCategory":null,"units":null,"issuedDate":"2006-01-06","latestIssueDate":"2016-11-05","expirationDate":"2016-12-31","inactiveDate":"2017-03-01"},{"number":"355698","type":"Rental","status":"Inactive","businessName":"HMC OLS II LP (FOUR SEASONS HOTEL)","legalName":"HMC OLS II LP","address":"130 N 18TH ST","revenueCode":"3202","rentalCategory":null,"units":365,"issuedDate":"2006-03-07","latestIssueDate":"2015-05-12","expirationDate":"2016-02-29","inactiveDate":"2016-04-29"},{"number":"371280","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"ARAMARK SERVICES BLANK ROME LLP (ATTN:FOOD SERVICE DIRECTOR)","legalName":"ARAMARK SERVICES BLANK ROME LLP","address":"130 N 18TH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2006-06-02","latestIssueDate":"2014-05-10","expirationDate":"2015-04-30","inactiveDate":"2015-06-29"},{"number":"494659","type":"Rental","status":"Expired","businessName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","legalName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","address":"130 N 18TH ST","revenueCode":"3202","rentalCategory":null,"units":151,"issuedDate":"2010-03-02","latestIssueDate":"2014-03-08","expirationDate":"2015-02-28","inactiveDate":null},{"number":"514940","type":"Dumpster License - Private Property","status":"Inactive","businessName":"OLS OFFICE PARTNERS LP","legalName":"OLS OFFICE PARTNERS LP","address":"130 N 18TH ST","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2010-09-20","latestIssueDate":"2010-09-20","expirationDate":"2011-07-31","inactiveDate":null},{"number":"519445","type":"Dumpster License - Private Property","status":"Inactive","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","address":"130 N 18TH ST","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2010-11-15","latestIssueDate":"2010-11-15","expirationDate":"2013-07-31","inactiveDate":null},{"number":"577759","type":"Food Preparing and Serving (30+ SEATS)","status":"Active","businessName":"CULINART INC","legalName":"CULINART INC","address":"130 N 18TH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2012-11-15","latestIssueDate":"2026-04-02","expirationDate":"2027-04-30","inactiveDate":null},{"number":"602790","type":"High Rise","status":"Inactive","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","address":"130 N 18TH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2013-09-11","latestIssueDate":"2014-05-10","expirationDate":"2015-04-30","inactiveDate":"2015-06-29"},{"number":"687684","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","address":"130 N 18TH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2016-01-04","latestIssueDate":"2016-01-04","expirationDate":"2016-04-30","inactiveDate":"2016-06-29"},{"number":"728920","type":"High Rise","status":"Active","businessName":"THE LOGAN HOTEL","legalName":"THE LOGAN HOTEL","address":"130 N 18TH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2017-02-17","latestIssueDate":"2026-03-06","expirationDate":"2027-02-16","inactiveDate":null},{"number":"765029","type":"Food Preparing and Serving (30+ SEATS)","status":"Active","businessName":"SEASONS CULINARY SERVICES","legalName":"SEASONS CULINARY SERVICES","address":"130 N 18TH ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2018-02-06","latestIssueDate":"2026-03-11","expirationDate":"2027-02-05","inactiveDate":null},{"number":"766796","type":"Food Preparing and Serving","status":"Inactive","businessName":"CCFS PHILADELPHIA LLC","legalName":"CCFS PHILADELPHIA LLC","address":"130 N 18TH ST","revenueCode":"3120","rentalCategory":null,"units":null,"issuedDate":"2018-02-22","latestIssueDate":"2018-02-22","expirationDate":"2019-02-21","inactiveDate":"2019-04-22"},{"number":"830071","type":"Food Establishment, Retail Permanent Location","status":"Closed","businessName":"CHAN C HEI","legalName":"CHAN C HEI ","address":"130 N 18TH ST","revenueCode":"3118","rentalCategory":null,"units":null,"issuedDate":"2019-11-25","latestIssueDate":"2021-11-01","expirationDate":"2022-11-24","inactiveDate":"2023-01-23"},{"number":"877465","type":"High Rise","status":"Active","businessName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","legalName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","address":"130 N 18TH ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2021-09-16","latestIssueDate":"2025-08-07","expirationDate":"2026-09-15","inactiveDate":null}],"licenseActivity":[{"number":"877465","type":"High Rise","businessName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","legalName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","issuedDate":"2021-09-16","latestIssueDate":"2025-08-07","closureDate":null,"expirationDate":"2026-09-15","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"830071","type":"Food Establishment, Retail Permanent Location","businessName":"CHAN C HEI","legalName":"CHAN C HEI ","issuedDate":"2019-11-25","latestIssueDate":"2021-11-01","closureDate":"2023-01-23","expirationDate":"2022-11-24","inactiveDate":"2023-01-23","status":"Closed","statusLabel":"Inactive","active":false},{"number":"766796","type":"Food Preparing and Serving","businessName":"CCFS PHILADELPHIA LLC","legalName":"CCFS PHILADELPHIA LLC","issuedDate":"2018-02-22","latestIssueDate":"2018-02-22","closureDate":"2019-04-22","expirationDate":"2019-02-21","inactiveDate":"2019-04-22","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"765029","type":"Food Preparing and Serving (30+ SEATS)","businessName":"SEASONS CULINARY SERVICES","legalName":"SEASONS CULINARY SERVICES","issuedDate":"2018-02-06","latestIssueDate":"2026-03-11","closureDate":null,"expirationDate":"2027-02-05","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"728920","type":"High Rise","businessName":"THE LOGAN HOTEL","legalName":"THE LOGAN HOTEL","issuedDate":"2017-02-17","latestIssueDate":"2026-03-06","closureDate":null,"expirationDate":"2027-02-16","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"687684","type":"Food Preparing and Serving (30+ SEATS)","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","issuedDate":"2016-01-04","latestIssueDate":"2016-01-04","closureDate":"2016-06-29","expirationDate":"2016-04-30","inactiveDate":"2016-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"602790","type":"High Rise","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","issuedDate":"2013-09-11","latestIssueDate":"2014-05-10","closureDate":"2015-06-29","expirationDate":"2015-04-30","inactiveDate":"2015-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"577759","type":"Food Preparing and Serving (30+ SEATS)","businessName":"CULINART INC","legalName":"CULINART INC","issuedDate":"2012-11-15","latestIssueDate":"2026-04-02","closureDate":null,"expirationDate":"2027-04-30","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"519445","type":"Dumpster License - Private Property","businessName":"CCFS PHILADELPHIA LLC (FOUR SEASONS HOTEL)","legalName":"CCFS PHILADELPHIA LLC","issuedDate":"2010-11-15","latestIssueDate":"2010-11-15","closureDate":"2013-07-31","expirationDate":"2013-07-31","inactiveDate":null,"status":"Inactive","statusLabel":"Inactive","active":false},{"number":"514940","type":"Dumpster License - Private Property","businessName":"OLS OFFICE PARTNERS LP","legalName":"OLS OFFICE PARTNERS LP","issuedDate":"2010-09-20","latestIssueDate":"2010-09-20","closureDate":"2011-07-31","expirationDate":"2011-07-31","inactiveDate":null,"status":"Inactive","statusLabel":"Inactive","active":false},{"number":"494659","type":"Rental","businessName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","legalName":"10 RITTENHOUSE SQUARE CONDOMINIUM ASSOC","issuedDate":"2010-03-02","latestIssueDate":"2014-03-08","closureDate":"2015-02-28","expirationDate":"2015-02-28","inactiveDate":null,"status":"Expired","statusLabel":"Expired","active":false},{"number":"371280","type":"Food Preparing and Serving (30+ SEATS)","businessName":"ARAMARK SERVICES BLANK ROME LLP (ATTN:FOOD SERVICE DIRECTOR)","legalName":"ARAMARK SERVICES BLANK ROME LLP","issuedDate":"2006-06-02","latestIssueDate":"2014-05-10","closureDate":"2015-06-29","expirationDate":"2015-04-30","inactiveDate":"2015-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"355698","type":"Rental","businessName":"HMC OLS II LP (FOUR SEASONS HOTEL)","legalName":"HMC OLS II LP","issuedDate":"2006-03-07","latestIssueDate":"2015-05-12","closureDate":"2016-04-29","expirationDate":"2016-02-29","inactiveDate":"2016-04-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"349570","type":"Hazardous Materials","businessName":"HMC OLS II LP (FOUR SEASONS HOTEL)","legalName":"HMC OLS II LP","issuedDate":"2006-01-06","latestIssueDate":"2016-11-05","closureDate":"2017-03-01","expirationDate":"2016-12-31","inactiveDate":"2017-03-01","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"317384","type":"Food Establishment, Retail Permanent Location","businessName":"TAE & EUN Y CHOI YOUNG (LEE SHOPPE)","legalName":"TAE & EUN Y CHOI YOUNG","issuedDate":"2005-05-07","latestIssueDate":"2019-05-23","closureDate":"2020-06-29","expirationDate":"2020-04-30","inactiveDate":"2020-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"316162","type":"Food Preparing and Serving (30+ SEATS)","businessName":"BROCK & COMPANY INC","legalName":"BROCK & COMPANY INC","issuedDate":"2005-04-30","latestIssueDate":"2012-05-05","closureDate":"2013-08-28","expirationDate":"2013-04-30","inactiveDate":"2013-08-28","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"299146","type":"High Rise","businessName":"BRANDYWINE OPERATING PARTNERSHIP LP","legalName":"BRANDYWINE OPERATING PARTNERSHIP LP","issuedDate":"2004-04-19","latestIssueDate":"2026-05-19","closureDate":null,"expirationDate":"2027-04-30","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true}],"businessLicenseSourceDate":"2026-07-23","signals":[{"kind":"record-pressure","level":"elevated","title":"Records to verify together","summary":"More than one separately dated public record deserves a current-status check.","evidence":["8 open L&I violations","failed L&I inspection activity in 2021, 2025"],"caveat":"A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue."},{"kind":"transition-activity","level":"watch","title":"Recent transition activity","summary":"The property has an unusually active paper trail worth monitoring for the next permit, inspection, deed, or listing.","evidence":["11 permit events since 2023"],"caveat":"Record activity alone does not establish that a sale or redevelopment is planned."}],"legalChecks":[{"id":"use-occupancy","level":"attention","title":"Zoning approval is not the occupancy file","finding":"Use permit #319372: COMPLETED. The history also contains “PERMB- FINAL PRE-CO INSP.”","why":"Philadelphia says a zoning approval or Property Sales Certification can identify a use without proving that it was established under the Building Code. A change of use, unit count, exits, or fire rating can require a Building Permit and Certificate of Occupancy.","action":"Verify the lawful use, unit count, associated construction permits, and Certificate of Occupancy with L&I.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-certificate-of-occupancy/"},{"id":"permit-status","level":"attention","title":"A permit row needs file-level verification","finding":"39 permits not marked completed: 690206 (EXPIRED), 1045786 (Expired), 1053617 (Expired), 1047864 (Expired), CP-2021-008197 (Expired). At least one row also carries a completion date, so the City fields conflict.","why":"Issued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.","action":"Open the permit file and confirm final inspections, holds, and any resulting occupancy certificate.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"violations","level":"attention","title":"8 open L&I violations","finding":"81 violation rows are retained in the City ledger.","why":"Open notices can accrue fees, block permits or license renewal, and move to court or collection. Standard initial notices generally have a 30-day appeal window; unsafe or imminently-dangerous notices have a much shorter window.","action":"Read the notice—not only the summary status—and confirm reinspection, fees, and appeal posture with L&I.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/violation-and-order-types/"},{"id":"investigations","level":"verify","title":"Failed inspections are dated events—not the current condition","finding":"32 failed, 22 passed, and 1 CLOSED investigation outcome are in the fetched history; the latest dated visit was PASSED on Jul 15, 2026.","why":"A PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.","action":"Open the parent case/permit for each material failure and confirm its later disposition.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"building-certifications","level":"verify","title":"A filed system certification needs status or date verification","finding":"Facade Report: Safe with Repair through Apr 19, 2027; Damper Certification: Certified through May 1, 2027; Fire Alarm Certification: Certified through Feb 26, 2027; Sprinkler Certification: Certified through Sep 22, 2026; Emergency and Standby Power Systems Certification: Certified through Jun 19, 2027; Special Hazards Certification: Certified through Jul 14, 2027","why":"Fire-protection certifications apply to the named system and inspection period only; they are not a whole-building safety certificate. Philadelphia generally requires annual sprinkler, standpipe, fire-alarm, special-hazard, and emergency-power inspections where those systems exist.","action":"Confirm the result, expiration, and L&I acceptance before treating the filing as current.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/maintenance-certifications/fire-protection-certifications/"},{"id":"business-license","level":"verify","title":"A historical business license is not current operating authority","finding":"Food Preparing and Serving (30+ SEATS) #316162: Inactive since Aug 28, 2013; Food Establishment, Retail Permanent Location #317384: Inactive since Jun 29, 2020; Hazardous Materials #349570: Inactive since Mar 1, 2017; Food Preparing and Serving (30+ SEATS) #371280: Inactive since Jun 29, 2015","why":"A license record proves the licensed activity existed at that time. An inactive or expired license does not establish that the business still operates—or that it may legally reopen under the same use.","action":"If business income matters, verify the current tenant, use registration, and active license in eCLIPSE.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/licenses/business-licenses/"}],"closingChecks":[{"title":"Property Sales Certification","body":"The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.","action":"Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-property-sales-certification/"},{"title":"Date-effective City Property Payoff","body":"The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.","action":"Request the City statement effective through settlement; read every period and invoice.","url":"https://www.phila.gov/guides/philadelphia-tax-center/what-to-do/"},{"title":"Professional title and water-lien searches","body":"OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.","action":"Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.","url":"https://www.phila.gov/2026-04-07-why-title-insurance-is-your-best-friend-when-buying-a-home-in-philadelphia/","secondaryUrl":"https://www.phila.gov/services/water-gas-utilities/pay-or-dispute-a-water-bill/resolve-water-liens-judgments/"}]}