{"asOf":"2026-07-25T20:58:37.850Z","block":"2000-2099 MARKET ST","blockUrl":"https://philadelphia.blockreport.homes/block/2000-2099-market-st","address":"2000-24 MARKET ST","parcelNumber":"883320500","source":"https://property.phila.gov/?p=883320500","ownerType":"investor","kind":"offices","isHouse":false,"home":false,"commercial":true,"residential":false,"taxExempt":false,"institutional":false,"buildingCode":"DA0","buildingCodeNew":"243","buildingClass":"OFF BLD W/COM GAR MASONRY","buildingClassNew":"OFFICE BLDNG - High Rise","useLabel":"Offices","owner":"2000 MARKET LLC","coOwner":null,"marketValue":45500000,"landAssessment":9100000,"improvementAssessment":36400000,"livableArea":696261,"yearBuilt":1973,"lastSale":{"price":45500000,"date":"2025-08-14T04:00:00Z"},"openViolations":13,"violations":[{"number":"500965","date":"2007-02-21","code":"A-000.0/11","title":"VIOL BC MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"500976","date":"2007-02-21","code":"A-000.0/11","title":"VIOL BC MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1962218","date":"2011-01-28","code":"A-301.1/53","title":"PERME- ALTER ELEC INSTALLATION","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"1973135","date":"2011-02-09","code":"A-301.1/34","title":"PERMB- INSTALL INT PARTITIONS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2155663","date":"2011-03-28","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2155662","date":"2011-03-28","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2221647","date":"2011-09-21","code":"A-000.0/1","title":"VIOL NONE FOUND","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719811","date":"2013-02-19","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719810","date":"2013-02-19","code":"FC-607.2/1","title":"ELEVATORS POST EMERGENCY SIGN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719809","date":"2013-02-19","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719812","date":"2013-02-19","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3038352","date":"2013-10-15","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3038351","date":"2013-10-15","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058604","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058614","date":"2014-01-10","code":"FC-901.6/12","title":"FIRE DEPT CONNECT REP DAM CAPS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058613","date":"2014-01-10","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058612","date":"2014-01-10","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058611","date":"2014-01-10","code":"FC-315.2/1","title":"INT MATERIAL STORAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058610","date":"2014-01-10","code":"FC-2705.2/1","title":"HAZMAT-INDOOR DISPENSE & USE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058609","date":"2014-01-10","code":"FC-2703.9/1","title":"HAZMAT-STOR GUARDED","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058608","date":"2014-01-10","code":"FC-2703.5/5","title":"HAZMAT-INDIV CARTON ETC LABEL","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058607","date":"2014-01-10","code":"FC-2703.5/2","title":"HAZMAT ID ABOVEGROUND TANKS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058606","date":"2014-01-10","code":"FC-1019.1/2","title":"EGRESS LANDING SIGN IN STAIRS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058615","date":"2014-01-10","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058605","date":"2014-01-10","code":"FC-1008.1/2","title":"EGRESS DOOR HI RISE OPEN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104512","date":"2014-01-10","code":"FC-901.4/1","title":"OBTAIN PERMIT EXTEN SPRKLR SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104511","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104524","date":"2014-01-10","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104523","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443139","date":"2015-01-09","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443137","date":"2015-01-09","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443140","date":"2015-01-09","code":"FC-13-915","title":"CERTIFICATION","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443138","date":"2015-01-09","code":"FC-13-2701","title":"GENERAL REQ.- CITE CODE SECTIO","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985361","date":"2016-06-21","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985362","date":"2016-06-21","code":"FC-915.1/2","title":"FIRE-STANDBY/EMERG ELECT TEST","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985363","date":"2016-06-21","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985359","date":"2016-06-21","code":"A-301.1/51","title":"PERME- INST/REPL/REPAIR WIRE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985365","date":"2016-06-21","code":"FC-915.1/5","title":"ANNUAL CERT STANDBY/EMERG LITE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985364","date":"2016-06-21","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985360","date":"2016-06-21","code":"A-301.1/53","title":"PERME- ALTER ELEC INSTALLATION","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985405","date":"2016-06-22","code":"PM15-604.4","title":"ELECTRICAL -WATER DAMAGED","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3987327","date":"2016-06-23","code":"FC-904.11/5","title":"FIRE EXTING-INSTALL TYPE K","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3987325","date":"2016-06-23","code":"FC-904.11/1","title":"FIRE-COMM KITCH EXHAUST CLEAN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3987326","date":"2016-06-23","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"VI-2020-055344","date":"2020-12-28","code":"FC-13-901.6","title":"FIRE SYSTEMS MAINTAINED","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055349","date":"2020-12-28","code":"FC-13-906.7","title":"EXTINGUISHER MOUNTED","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055348","date":"2020-12-28","code":"FC-13-605.6","title":"OPEN JUNCTION BOXES","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055343","date":"2020-12-28","code":"FC-13-915.1(A)","title":"FIRE SUPPRESSION CERTIFICATION","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055347","date":"2020-12-28","code":"FC-13-912.3.1","title":"FDC LOCKING CAPS","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055346","date":"2020-12-28","code":"FC-13-404.2","title":"FIRE SAFETY/EVACUATION PLAN","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055345","date":"2020-12-28","code":"FC-13-405","title":"EMERGENCY DRILL RECORD CONTENT","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2022-032219","date":"2022-05-10","code":"F-1023.9","title":"STAIRWAY IDENTIFICATION SIGNS\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032222","date":"2022-05-10","code":"F-404.2.2","title":"FIRE SAFETY PLANS\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032223","date":"2022-05-10","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032224","date":"2022-05-10","code":"F-904.12.5.2","title":"COMMERCIAL SYSTEM TEST\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2022-032225","date":"2022-05-10","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032227","date":"2022-05-10","code":"F-906.2","title":"FIRE EXTINGUISHERS\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032226","date":"2022-05-10","code":"F-909.20.2","title":"SMOKE CONTROL SYSTEM RECORDS\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032228","date":"2022-05-10","code":"F-705.2.4","title":"DOOR OPERATION\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032218","date":"2022-05-10","code":"F-1104.3","title":"EXIT SIGN ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032221","date":"2022-05-10","code":"F-405.2","title":"EMERGENCY EVAC DRILL FREQUENCY\n","status":"COMPLIED","resolutionDate":"2025-08-19","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2023-041246","date":"2023-06-12","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2026-04-29","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2025-063259","date":"2025-08-19","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"COMPLIED","resolutionDate":"2025-11-04","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2025-063260","date":"2025-08-19","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-063261","date":"2025-08-19","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-063262","date":"2025-08-19","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-087242","date":"2025-11-04","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-087243","date":"2025-11-04","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087244","date":"2025-11-04","code":"F-1013.6.2","title":"EXIT SIGN ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087245","date":"2025-11-04","code":"F-1008.3.1","title":"GENERAL ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087246","date":"2025-11-04","code":"F-509.1.1","title":"UTILITY IDENTIFICATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087247","date":"2025-11-04","code":"F-2403.4.3","title":"WASTE CANS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087248","date":"2025-11-04","code":"F-906.1","title":"FIRE EXTINGUISHERS REQUIRED\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087249","date":"2025-11-04","code":"F-906.7","title":"FIRE EXTINGUISHER HANGERS & BRACKETS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087250","date":"2025-11-04","code":"F-604.6","title":"UNAPPROVED CONDITIONS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087251","date":"2025-11-04","code":"F-912.7","title":"FDC INSPECTION, TESTING & MAINTENANCE\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2026-047474","date":"2026-06-26","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2026-047461","date":"2026-06-26","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2026-047478","date":"2026-06-26","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"3850354","date":"2016-02-23","code":"A-104.1/1","title":"WORKMANLIKE- BUILDING CODE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4189221","date":"2017-01-04","code":"A-301.1/32","title":"PERME- EXTEND SMKE DETECT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4189222","date":"2017-01-04","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"COMPLIED","resolutionDate":null,"resolution":null}],"violationCases":[{"number":"102909","type":"STANDARD","priority":"STANDARD","responsibility":"BU","status":"CLOSED","createdDate":"2007-02-26","completedDate":"2007-02-26","violations":[{"number":"500965","date":"2007-02-21","code":"A-000.0/11","title":"VIOL BC MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"102913","type":"STANDARD","priority":"STANDARD","responsibility":"BU","status":"CLOSED","createdDate":"2007-02-26","completedDate":"2007-02-26","violations":[{"number":"500976","date":"2007-02-21","code":"A-000.0/11","title":"VIOL BC MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"264906","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2011-01-28","completedDate":"2011-03-04","violations":[{"number":"1962218","date":"2011-01-28","code":"A-301.1/53","title":"PERME- ALTER ELEC INSTALLATION","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"265773","type":"CONSTRUCTION SERVICES","priority":"CONSTRUCTION SERVICES","responsibility":"DCC","status":"CLOSED","createdDate":"2011-02-09","completedDate":"2011-02-17","violations":[{"number":"1973135","date":"2011-02-09","code":"A-301.1/34","title":"PERMB- INSTALL INT PARTITIONS","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"270637","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2011-03-28","completedDate":"2012-12-20","violations":[{"number":"2155663","date":"2011-03-28","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2155662","date":"2011-03-28","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"298407","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2011-09-21","completedDate":"2011-09-21","violations":[{"number":"2221647","date":"2011-09-21","code":"A-000.0/1","title":"VIOL NONE FOUND","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"369898","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2013-02-20","completedDate":"2013-03-28","violations":[{"number":"2719811","date":"2013-02-19","code":"FC-907.4/4","title":"FIRE-PULL STATION SIGNS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719810","date":"2013-02-19","code":"FC-607.2/1","title":"ELEVATORS POST EMERGENCY SIGN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719809","date":"2013-02-19","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"2719812","date":"2013-02-19","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"407129","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2013-10-15","completedDate":"2013-12-24","violations":[{"number":"3038352","date":"2013-10-15","code":"FC-408.12/1","title":"HIRISE-PAY HIRISE FEE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3038351","date":"2013-10-15","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"416189","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2014-01-12","completedDate":"2014-03-06","violations":[{"number":"3058604","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058614","date":"2014-01-10","code":"FC-901.6/12","title":"FIRE DEPT CONNECT REP DAM CAPS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058613","date":"2014-01-10","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058612","date":"2014-01-10","code":"FC-409.1/1","title":"SHELTER PLN-REQ¿D","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058611","date":"2014-01-10","code":"FC-315.2/1","title":"INT MATERIAL STORAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058610","date":"2014-01-10","code":"FC-2705.2/1","title":"HAZMAT-INDOOR DISPENSE & USE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058609","date":"2014-01-10","code":"FC-2703.9/1","title":"HAZMAT-STOR GUARDED","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058608","date":"2014-01-10","code":"FC-2703.5/5","title":"HAZMAT-INDIV CARTON ETC LABEL","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058607","date":"2014-01-10","code":"FC-2703.5/2","title":"HAZMAT ID ABOVEGROUND TANKS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058606","date":"2014-01-10","code":"FC-1019.1/2","title":"EGRESS LANDING SIGN IN STAIRS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058615","date":"2014-01-10","code":"FC-903.6/1","title":"SPRINKLER HEADS CLEARANCE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3058605","date":"2014-01-10","code":"FC-1008.1/2","title":"EGRESS DOOR HI RISE OPEN","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"416190","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2014-01-12","completedDate":"2014-03-26","violations":[{"number":"3104512","date":"2014-01-10","code":"FC-901.4/1","title":"OBTAIN PERMIT EXTEN SPRKLR SYS","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104511","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"416191","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2014-01-13","completedDate":"2014-03-26","violations":[{"number":"3104524","date":"2014-01-10","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3104523","date":"2014-01-10","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"465530","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2015-01-09","completedDate":"2015-02-17","violations":[{"number":"3443139","date":"2015-01-09","code":"FC-13-703","title":"FIRE RESISTANCE RATING","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443137","date":"2015-01-09","code":"A-000.0/10","title":"VIOL C&I MESSAGE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443140","date":"2015-01-09","code":"FC-13-915","title":"CERTIFICATION","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3443138","date":"2015-01-09","code":"FC-13-2701","title":"GENERAL REQ.- CITE CODE SECTIO","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"540557","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2016-06-21","completedDate":"2016-07-19","violations":[{"number":"3985361","date":"2016-06-21","code":"FC-605.6/1","title":"FIRE-ELECT OPEN JUNCTION BOX","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985362","date":"2016-06-21","code":"FC-915.1/2","title":"FIRE-STANDBY/EMERG ELECT TEST","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985363","date":"2016-06-21","code":"FC-915.1/3","title":"ANNUAL CERT FIRE ALARM","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985359","date":"2016-06-21","code":"A-301.1/51","title":"PERME- INST/REPL/REPAIR WIRE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985365","date":"2016-06-21","code":"FC-915.1/5","title":"ANNUAL CERT STANDBY/EMERG LITE","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985364","date":"2016-06-21","code":"FC-915.1/4","title":"ANNUAL CERT FIRE SUPP","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3985360","date":"2016-06-21","code":"A-301.1/53","title":"PERME- ALTER ELEC INSTALLATION","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"540704","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2016-06-22","completedDate":"2016-07-19","violations":[{"number":"3985405","date":"2016-06-22","code":"PM15-604.4","title":"ELECTRICAL -WATER DAMAGED","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"541032","type":"STANDARD","priority":"STANDARD","responsibility":"CI","status":"CLOSED","createdDate":"2016-06-23","completedDate":"2016-09-06","violations":[{"number":"3987327","date":"2016-06-23","code":"FC-904.11/5","title":"FIRE EXTING-INSTALL TYPE K","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3987325","date":"2016-06-23","code":"FC-904.11/1","title":"FIRE-COMM KITCH EXHAUST CLEAN","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"3987326","date":"2016-06-23","code":"FC-904.11/4","title":"AFES-COMM KITCH SERVICE & CERT","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"CF-2020-090507","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"PROPERTY MAINTENANCE INVESTIGATOR","status":"CLOSED","createdDate":"2020-12-29","completedDate":"2025-05-16","violations":[{"number":"VI-2020-055344","date":"2020-12-28","code":"FC-13-901.6","title":"FIRE SYSTEMS MAINTAINED","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055349","date":"2020-12-28","code":"FC-13-906.7","title":"EXTINGUISHER MOUNTED","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055348","date":"2020-12-28","code":"FC-13-605.6","title":"OPEN JUNCTION BOXES","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055343","date":"2020-12-28","code":"FC-13-915.1(A)","title":"FIRE SUPPRESSION CERTIFICATION","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055347","date":"2020-12-28","code":"FC-13-912.3.1","title":"FDC LOCKING CAPS","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055346","date":"2020-12-28","code":"FC-13-404.2","title":"FIRE SAFETY/EVACUATION PLAN","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"},{"number":"VI-2020-055345","date":"2020-12-28","code":"FC-13-405","title":"EMERGENCY DRILL RECORD CONTENT","status":"CLOSED","resolutionDate":null,"resolution":"CLOSED - ADMINISTRATIVELY"}]},{"number":"CF-2022-042146","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2022-05-10","completedDate":"2025-08-19","violations":[{"number":"VI-2022-032219","date":"2022-05-10","code":"F-1023.9","title":"STAIRWAY IDENTIFICATION SIGNS\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032222","date":"2022-05-10","code":"F-404.2.2","title":"FIRE SAFETY PLANS\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032223","date":"2022-05-10","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032224","date":"2022-05-10","code":"F-904.12.5.2","title":"COMMERCIAL SYSTEM TEST\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2022-032225","date":"2022-05-10","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032227","date":"2022-05-10","code":"F-906.2","title":"FIRE EXTINGUISHERS\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032226","date":"2022-05-10","code":"F-909.20.2","title":"SMOKE CONTROL SYSTEM RECORDS\n","status":"CLOSED","resolutionDate":"2025-08-19","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2022-032228","date":"2022-05-10","code":"F-705.2.4","title":"DOOR OPERATION\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032218","date":"2022-05-10","code":"F-1104.3","title":"EXIT SIGN ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2022-08-05","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2022-032221","date":"2022-05-10","code":"F-405.2","title":"EMERGENCY EVAC DRILL FREQUENCY\n","status":"COMPLIED","resolutionDate":"2025-08-19","resolution":"COMPLIED - OWNER REPAIR"}]},{"number":"CF-2023-055032","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"AUDITS AND INVESTIGATIONS BUILDING CERTS","status":"COMPLIED, BALANCE DUE","createdDate":"2023-06-12","completedDate":null,"violations":[{"number":"VI-2023-041246","date":"2023-06-12","code":"PM15-315.2","title":"FACADES","status":"COMPLIED","resolutionDate":"2026-04-29","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"}]},{"number":"CF-2025-088441","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"FIRE SAFETY INVESTIGATOR","status":"CLOSED","createdDate":"2025-08-19","completedDate":"2025-11-04","violations":[{"number":"VI-2025-063259","date":"2025-08-19","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"COMPLIED","resolutionDate":"2025-11-04","resolution":"COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED"},{"number":"VI-2025-063260","date":"2025-08-19","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-063261","date":"2025-08-19","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"},{"number":"VI-2025-063262","date":"2025-08-19","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"CLOSED","resolutionDate":"2025-11-04","resolution":"CLOSED - REISSUED/REWRITTEN"}]},{"number":"CF-2025-120931","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"QUALITY OF LIFE COURTS","status":"IN VIOLATION","createdDate":"2025-11-04","completedDate":null,"violations":[{"number":"VI-2025-087242","date":"2025-11-04","code":"F-701.6.1.5","title":"DAMPER CERTIFICATION REPORT\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2025-087243","date":"2025-11-04","code":"F-403.11.2","title":"HIGH RISE BUILDINGS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087244","date":"2025-11-04","code":"F-1013.6.2","title":"EXIT SIGN ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087245","date":"2025-11-04","code":"F-1008.3.1","title":"GENERAL ILLUMINATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087246","date":"2025-11-04","code":"F-509.1.1","title":"UTILITY IDENTIFICATION\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087247","date":"2025-11-04","code":"F-2403.4.3","title":"WASTE CANS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087248","date":"2025-11-04","code":"F-906.1","title":"FIRE EXTINGUISHERS REQUIRED\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087249","date":"2025-11-04","code":"F-906.7","title":"FIRE EXTINGUISHER HANGERS & BRACKETS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087250","date":"2025-11-04","code":"F-604.6","title":"UNAPPROVED CONDITIONS\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"},{"number":"VI-2025-087251","date":"2025-11-04","code":"F-912.7","title":"FDC INSPECTION, TESTING & MAINTENANCE\n","status":"COMPLIED","resolutionDate":"2026-03-30","resolution":"COMPLIED - OWNER REPAIR"}]},{"number":"CF-2026-076987","type":"NOTICE OF VIOLATION","priority":"STANDARD","responsibility":"QOL FIRE SAFETY INVESTIGATOR","status":"IN VIOLATION","createdDate":"2026-06-26","completedDate":null,"violations":[{"number":"VI-2026-047474","date":"2026-06-26","code":"F-901.6","title":"INSPECTION, TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2026-047461","date":"2026-06-26","code":"F-901.6.4","title":"PERIODIC TESTING\n","status":"OPEN","resolutionDate":null,"resolution":null},{"number":"VI-2026-047478","date":"2026-06-26","code":"F-903.5","title":"SUPPRESSION SYSTEM TESTING & MAINTENANCE\n","status":"OPEN","resolutionDate":null,"resolution":null}]},{"number":"657575","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"3850354","date":"2016-02-23","code":"A-104.1/1","title":"WORKMANLIKE- BUILDING CODE","status":"COMPLIED","resolutionDate":null,"resolution":null}]},{"number":"734435","type":null,"priority":null,"responsibility":null,"status":"CLOSED","createdDate":null,"completedDate":null,"violations":[{"number":"4189221","date":"2017-01-04","code":"A-301.1/32","title":"PERME- EXTEND SMKE DETECT","status":"COMPLIED","resolutionDate":null,"resolution":null},{"number":"4189222","date":"2017-01-04","code":"A-402.1/1","title":"COMPL CONCEAL- BLDG PERM WORK","status":"COMPLIED","resolutionDate":null,"resolution":null}]}],"violYears":[{"y":2007,"n":2,"worst":null},{"y":2011,"n":5,"worst":null},{"y":2013,"n":6,"worst":null},{"y":2014,"n":16,"worst":null},{"y":2015,"n":4,"worst":null},{"y":2016,"n":12,"worst":null},{"y":2017,"n":2,"worst":null},{"y":2020,"n":7,"worst":null},{"y":2022,"n":10,"worst":null},{"y":2023,"n":1,"worst":null},{"y":2025,"n":14,"worst":null},{"y":2026,"n":3,"worst":null}],"investigations":[{"caseNumber":"84526","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84543","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84568","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84570","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84574","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84576","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84577","date":"2006-10-12","type":"BC INSP","status":"PASSED"},{"caseNumber":"84715","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84718","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84719","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84722","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84794","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84797","date":"2006-10-13","type":"BC INSP","status":"PASSED"},{"caseNumber":"84800","date":"2006-10-13","type":"BC INSP","status":"FAILED"},{"caseNumber":"86448","date":"2006-10-23","type":"BC INSP","status":"PASSED"},{"caseNumber":"86449","date":"2006-10-23","type":"BC INSP","status":"FAILED"},{"caseNumber":"87734","date":"2006-10-30","type":"BC INSP","status":"PASSED"},{"caseNumber":"87741","date":"2006-10-30","type":"BC INSP","status":"PASSED"},{"caseNumber":"87750","date":"2006-10-30","type":"BC INSP","status":"PASSED"},{"caseNumber":"87751","date":"2006-10-30","type":"BC INSP","status":"PASSED"},{"caseNumber":"86449","date":"2007-01-08","type":"BC INSP","status":"PASSED"},{"caseNumber":"84800","date":"2007-02-21","type":"BC INSP","status":"CLOSED"},{"caseNumber":"102909","date":"2007-02-21","type":"BC INSP","status":"PASSED"},{"caseNumber":"102913","date":"2007-02-21","type":"BC INSP","status":"PASSED"},{"caseNumber":"264906","date":"2011-01-28","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"265773","date":"2011-02-09","type":"BP_BLDG","status":"FAILED"},{"caseNumber":"265773","date":"2011-02-16","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"264906","date":"2011-03-04","type":"BP_BLDG","status":"PASSED"},{"caseNumber":"270637","date":"2011-03-28","type":"CI INSP","status":"FAILED"},{"caseNumber":"270637","date":"2011-04-26","type":"CI INSP","status":"FAILED"},{"caseNumber":"270637","date":"2011-07-01","type":"CI INSP","status":"FAILED"},{"caseNumber":"270637","date":"2011-07-26","type":"CI INSP","status":"FAILED"},{"caseNumber":"298407","date":"2011-09-19","type":"CI INSP","status":"PASSED"},{"caseNumber":"270637","date":"2012-12-20","type":"CI INSP","status":"PASSED"},{"caseNumber":"369898","date":"2013-02-19","type":"CI INSP","status":"FAILED"},{"caseNumber":"369898","date":"2013-03-27","type":"CI INSP","status":"PASSED"},{"caseNumber":"407129","date":"2013-10-15","type":"CI INSP","status":"FAILED"},{"caseNumber":"407129","date":"2013-12-16","type":"CI INSP","status":"FAILED"},{"caseNumber":"407129","date":"2013-12-24","type":"CI INSP","status":"PASSED"},{"caseNumber":"416189","date":"2014-01-10","type":"CI INSP","status":"FAILED"},{"caseNumber":"416190","date":"2014-01-10","type":"CI INSP","status":"FAILED"},{"caseNumber":"416191","date":"2014-01-11","type":"CI INSP","status":"FAILED"},{"caseNumber":"416190","date":"2014-03-06","type":"CI INSP","status":"FAILED"},{"caseNumber":"416189","date":"2014-03-06","type":"CI INSP","status":"PASSED"},{"caseNumber":"416191","date":"2014-03-06","type":"CI INSP","status":"FAILED"},{"caseNumber":"416190","date":"2014-03-26","type":"CI INSP","status":"PASSED"},{"caseNumber":"416191","date":"2014-03-26","type":"CI INSP","status":"PASSED"},{"caseNumber":"465530","date":"2015-01-09","type":"CI INSP","status":"FAILED"},{"caseNumber":"465530","date":"2015-02-17","type":"CI INSP","status":"PASSED"},{"caseNumber":"540557","date":"2016-06-21","type":"CI INSP","status":"FAILED"},{"caseNumber":"540557","date":"2016-06-22","type":"CI INSP","status":"CLOSED"},{"caseNumber":"540704","date":"2016-06-22","type":"CI INSP","status":"FAILED"},{"caseNumber":"541032","date":"2016-06-23","type":"CI INSP","status":"FAILED"},{"caseNumber":"540704","date":"2016-07-18","type":"CI INSP","status":"PASSED"},{"caseNumber":"540557","date":"2016-07-18","type":"CEASE INSP","status":"PASSED"},{"caseNumber":"541032","date":"2016-09-02","type":"CI INSP","status":"PASSED"},{"caseNumber":"CF-2020-090507","date":"2020-12-29","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-042146","date":"2022-05-11","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-042146","date":"2022-08-05","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-055032","date":"2023-06-12","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-055032","date":"2023-09-26","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-055032","date":"2025-03-21","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-055032","date":"2025-05-06","type":null,"status":"FAILED"},{"caseNumber":"CF-2022-042146","date":"2025-08-19","type":null,"status":"PASSED"},{"caseNumber":"CF-2025-088441","date":"2025-08-19","type":null,"status":"FAILED"},{"caseNumber":"CF-2025-088441","date":"2025-11-04","type":null,"status":"PASSED"},{"caseNumber":"CF-2025-120931","date":"2025-11-04","type":null,"status":"FAILED"},{"caseNumber":"CF-2025-120931","date":"2026-03-30","type":null,"status":"FAILED"},{"caseNumber":"CF-2023-055032","date":"2026-05-21","type":null,"status":"PASSED"},{"caseNumber":"CF-2025-120931","date":"2026-06-26","type":null,"status":"FAILED"},{"caseNumber":"CF-2026-076987","date":"2026-06-26","type":null,"status":"FAILED"}],"inspYears":[{"y":2006,"fails":2,"passes":18},{"y":2007,"fails":0,"passes":3},{"y":2011,"fails":6,"passes":3},{"y":2012,"fails":0,"passes":1},{"y":2013,"fails":3,"passes":2},{"y":2014,"fails":5,"passes":3},{"y":2015,"fails":1,"passes":1},{"y":2016,"fails":3,"passes":3},{"y":2020,"fails":1,"passes":0},{"y":2022,"fails":2,"passes":0},{"y":2023,"fails":2,"passes":0},{"y":2025,"fails":4,"passes":2},{"y":2026,"fails":3,"passes":1}],"taxOwed":0,"taxSnapshot":{"available":true,"asOf":"2022-06","matched":false},"taxDelinquencySnapshotAsOf":"2022-06","taxDelinquencySnapshotAvailable":true,"lat":39.9532814044794,"lng":-75.17377698235036,"geom":{"type":"Polygon","coordinates":[[[-75.173278351,39.95344107],[-75.173375989,39.953007222],[-75.174273857,39.953121074],[-75.174179654,39.953555661],[-75.173278351,39.95344107]]]},"liDistrict":"CENTRAL WEST","certifications":[{"number":"BC-2022-002132","type":"Facade Report","inspectionDate":"2018-04-05","result":"Safe with Repair","expirationDate":"2023-04-05","buildingId":"1384194"},{"number":"BC-2022-000650","type":"Special Hazards Certification","inspectionDate":"2021-11-23","result":"Certified","expirationDate":"2022-11-23","buildingId":"1384194"},{"number":"BC-2022-006997","type":"Special Hazards Certification","inspectionDate":"2022-05-24","result":"Certified","expirationDate":"2023-05-24","buildingId":"1384194"},{"number":"BC-2023-003188","type":"Special Hazards Certification","inspectionDate":"2023-02-10","result":"Certified","expirationDate":"2024-02-10","buildingId":"1386901"},{"number":"BC-2023-016923","type":"Special Hazards Certification","inspectionDate":"2023-07-25","result":"Certified","expirationDate":"2024-07-25","buildingId":"1384194"},{"number":"BC-2023-016797","type":"Special Hazards Certification","inspectionDate":"2023-08-15","result":"Certified","expirationDate":"2024-08-15","buildingId":"1384194"},{"number":"BC-2023-026053","type":"Sprinkler Certification","inspectionDate":"2023-09-28","result":"Certified","expirationDate":"2024-09-28","buildingId":"1384194"},{"number":"BC-2023-020975","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2023-10-14","result":"Certified","expirationDate":"2024-10-14","buildingId":"1384194"},{"number":"BC-2024-005966","type":"Special Hazards Certification","inspectionDate":"2024-02-23","result":"Certified","expirationDate":"2025-02-23","buildingId":"1384194"},{"number":"BC-2024-006601","type":"Sprinkler Certification","inspectionDate":"2024-02-26","result":"Certified","expirationDate":"2025-02-26","buildingId":"1384194"},{"number":"BC-2024-025844","type":"Fire Alarm Certification","inspectionDate":"2024-05-02","result":"Deficient","expirationDate":null,"buildingId":"1384194"},{"number":"BC-2024-029006","type":"Sprinkler Certification","inspectionDate":"2024-10-11","result":"Certified","expirationDate":"2025-10-11","buildingId":"1384194"},{"number":"BC-2024-030627","type":"Special Hazards Certification","inspectionDate":"2024-11-08","result":"Certified","expirationDate":"2025-11-08","buildingId":"1384194"},{"number":"BC-2025-008607","type":"Special Hazards Certification","inspectionDate":"2025-04-02","result":"Deficient","expirationDate":null,"buildingId":"1384194"},{"number":"BC-2025-010345","type":"Special Hazards Certification","inspectionDate":"2025-04-16","result":"Certified","expirationDate":"2026-04-16","buildingId":"1384194"},{"number":"BC-2025-015619","type":"Special Hazards Certification","inspectionDate":"2025-05-20","result":"Certified","expirationDate":"2026-05-20","buildingId":"1384194"},{"number":"BC-2025-024144","type":"Fire Alarm Certification","inspectionDate":"2025-08-11","result":"Certified","expirationDate":"2026-08-11","buildingId":"1384194"},{"number":"BC-2025-023554","type":"Fire Alarm Certification","inspectionDate":"2025-08-19","result":"Certified","expirationDate":"2026-08-19","buildingId":"1384194"},{"number":"BC-2025-023364","type":"Emergency and Standby Power Systems Certification","inspectionDate":"2025-09-06","result":"Certified","expirationDate":"2026-09-06","buildingId":"1384194"},{"number":"BC-2025-027127","type":"Special Hazards Certification","inspectionDate":"2025-10-07","result":"Certified","expirationDate":"2026-10-07","buildingId":"1384194"},{"number":"BC-2026-017549","type":"Fire Alarm Certification","inspectionDate":"2025-12-30","result":"Deficient","expirationDate":null,"buildingId":"1384194"},{"number":"BC-2026-004779","type":"Facade Report","inspectionDate":"2026-02-18","result":"Safe","expirationDate":"2031-02-18","buildingId":"1384194"},{"number":"BC-2026-009398","type":"Smoke Control Certification","inspectionDate":"2026-03-02","result":"Certified","expirationDate":"2027-03-02","buildingId":"1384194"},{"number":"BC-2026-007112","type":"Special Hazards Certification","inspectionDate":"2026-03-16","result":"Certified","expirationDate":"2027-03-16","buildingId":"1384194"},{"number":"BC-2026-015106","type":"Damper Certification","inspectionDate":"2026-04-16","result":"Certified","expirationDate":"2030-04-16","buildingId":"1384194"}],"cityRecordAvailability":{"violations":true,"investigations":true,"appeals":true,"certifications":true,"permits":true,"licenses":true},"zip":"19103","beds":null,"baths":null,"stories":29,"lotArea":40800,"zoning":"CMX4","grade":"C+","basement":null,"heater":null,"centralAir":null,"extCond":"3","intCond":"3","garage":null,"homestead":false,"mail":"C/O TIDE REALTY CAPITAL LLC 2800 QUARRY LAKE DRIVE STE 130, BALTIMORE MD, 21209","mailOut":true,"appeals":[{"type":"Zoning board appeal","grounds":"PERMIT FOR THE CREATION OF A SEATING AREA WITH REMOVABLE / SEASONAL TABLES AND CHAIRS \nUNDER TWO (2) PREVIOUSLY APPROVED FABRIC UMBRELLAS AT THE EXTERIOR PLAZA AREA. \nPROPOSED SEATING AREA TO BE ACCESSORY TO AND ON THE SAME LOT WITH AN EXIS","status":"OPEN","outcome":"Granted","date":"2010-12-15","number":"13995","relatedPermit":"311616"},{"type":"ZBA Permit Denial - Variance","grounds":"Maximum sign area allowed 50 sq. ft. proposed sign area -96.97 sq. ft.","status":"Completed","outcome":"Granted","date":"2020-11-19","number":"ZP-2020-005653","relatedPermit":"ZP-2020-005653"}],"taxYears":[],"taxNet":0,"taxLien":false,"taxLedgerThrough":2016,"taxLedgerAvailable":true,"timesSold":4,"abated":false,"assessmentExemption":false,"exemptionBasisVerified":false,"valueSeries":[{"y":2016,"v":88695100,"taxable":88695100,"land":12240000,"improvement":76455100,"taxableLand":12240000,"taxableImprovement":76455100,"exemptLand":0,"exemptImprovement":0},{"y":2017,"v":92125900,"taxable":92125900,"land":23031475,"improvement":69094425,"taxableLand":23031475,"taxableImprovement":69094425,"exemptLand":0,"exemptImprovement":0},{"y":2018,"v":110000000,"taxable":110000000,"land":27500000,"improvement":82500000,"taxableLand":27500000,"taxableImprovement":82500000,"exemptLand":0,"exemptImprovement":0},{"y":2019,"v":109000000,"taxable":109000000,"land":21800000,"improvement":87200000,"taxableLand":21800000,"taxableImprovement":87200000,"exemptLand":0,"exemptImprovement":0},{"y":2020,"v":122831500,"taxable":122831500,"land":24566300,"improvement":98265200,"taxableLand":24566300,"taxableImprovement":98265200,"exemptLand":0,"exemptImprovement":0},{"y":2021,"v":111000000,"taxable":111000000,"land":22200000,"improvement":88800000,"taxableLand":22200000,"taxableImprovement":88800000,"exemptLand":0,"exemptImprovement":0},{"y":2022,"v":118500000,"taxable":118500000,"land":23700000,"improvement":94800000,"taxableLand":23700000,"taxableImprovement":94800000,"exemptLand":0,"exemptImprovement":0},{"y":2023,"v":118000000,"taxable":118000000,"land":23600000,"improvement":94400000,"taxableLand":23600000,"taxableImprovement":94400000,"exemptLand":0,"exemptImprovement":0},{"y":2024,"v":102000000,"taxable":102000000,"land":20400000,"improvement":81600000,"taxableLand":20400000,"taxableImprovement":81600000,"exemptLand":0,"exemptImprovement":0},{"y":2025,"v":47000000,"taxable":47000000,"land":9400000,"improvement":37600000,"taxableLand":9400000,"taxableImprovement":37600000,"exemptLand":0,"exemptImprovement":0},{"y":2026,"v":45500000,"taxable":45500000,"land":9100000,"improvement":36400000,"taxableLand":9100000,"taxableImprovement":36400000,"exemptLand":0,"exemptImprovement":0},{"y":2027,"v":45500000,"taxable":45500000,"land":9100000,"improvement":36400000,"taxableLand":9100000,"taxableImprovement":36400000,"exemptLand":0,"exemptImprovement":0}],"taxNow":636909,"familyHeld":false,"lastTransferNominal":false,"permits":[{"number":"46185","date":"2007-01-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-04-12","scope":"INTERIOR ALTERATIONS OF EXISTING OFFICE SPACE"},{"number":"51567","date":"2007-01-22","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-04-12","scope":null},{"number":"50786","date":"2007-01-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-07-16","scope":"REMOVE 25 LIGHT FIXTURES, RELOCATE 13 LIGHT FIXTURES, REPLACE 12 LIGHT FIXTURES WITH NEW. INSTALL 7 LIGHT SWITCHES, INSTALL 35 RECEPTACLES. ALL EXISTING CIRCUITS TO BE RE-USED, NO NEW CIRCUITS. VOICE/DATA BACKBOXES ONLY, NO FIRE ALARM."},{"number":"52268","date":"2007-01-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-04-12","scope":"RELOCATION OF 7 DIFFUSERS/REGISTERS (13TH FLOOR - WEBER GALLAGHER)"},{"number":"51972","date":"2007-01-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-09-05","scope":"INTERIOR ALTERATIONS TO OFFICE SPACE ON THE 18TH FLOOR."},{"number":"54423","date":"2007-02-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-03-13","scope":"13TH FLOOR 12 NEW VOICE AND DATA DROPS"},{"number":"55260","date":"2007-02-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-08-27","scope":"RELOCATE 2 EXISTING SPEAKER STROBES INTO NEW WALL NO WIRING CHANGES RELOCATE 2 EXISTING SPEAKER STROBES INTO NEW WALL NO WIRING CHANGES"},{"number":"64747","date":"2007-03-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":null,"scope":"(O) SK (1) FX"},{"number":"65225","date":"2007-03-28","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-05-31","scope":"RELOCATION OF 19 DIFFUSERS/REGISTERS, 14TH FLOOR (AJILON)"},{"number":"65678","date":"2007-04-02","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-12-04","scope":"INTERIOR FIT-OUT FOR DENTAL OFFICE AS PER PLAN."},{"number":"66361","date":"2007-04-03","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-05-31","scope":null},{"number":"67426","date":"2007-04-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-02-10","scope":"INSTALL 15 LOCATIONS CONSISTING OF 1 CAT5E PLENUM DATA AND 1 CAT5E PLENUM VOICE CABLE.(CC DIST)"},{"number":"66187","date":"2007-04-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-05-30","scope":"INTERIOR ALTERATION TO SUITE, NEW PARTITIONS, DOORS, LIGHTING, ELECTRICAL/DATA AND FINISHES AS PER PLANS"},{"number":"69402","date":"2007-04-16","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-05-29","scope":null},{"number":"68650","date":"2007-04-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2007-06-28","scope":"INTERIOR ALTERATIONS FOR A PARTIAL 8TH FLOOR TENANT SPACE. AS SHOWN ON THE APPROVED PLANS."},{"number":"71905","date":"2007-04-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":null,"scope":"(O) SK (1) FX"},{"number":"71940","date":"2007-04-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"14TH FLOOR RM 1401, INSTALL 20 NEW CAT5E VOICE AND DATA DROPS AT 10 LOCATIONS THROUGHOUT OFFICE SPACE (1 VOICE AND 1 DATA AT EACH LOCATION) WITH THE LONGEST RUN AT 90 FEET (CENTER CITY DISTRICT)"},{"number":"72354","date":"2007-04-30","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-12-04","scope":null},{"number":"72887","date":"2007-05-01","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-05-29","scope":"RELOCATE 10 DIFFUSERS/REGISTERS (14TH FLOOR, ARANGO & GEORGE)"},{"number":"73344","date":"2007-05-03","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2007-07-23","scope":null},{"number":"73641","date":"2007-05-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-28","scope":"INSTALLATION OF 26 RECEPTACLES, 1 PANEL, 16 OCCUPANCY SENSORS, 2 2X2 FIXTURES, 10 TELE/DATA DROPS, RELOCATE 31 FIXTURES WITH ALL NECESSARY CONDUIT & WIRING."},{"number":"76041","date":"2007-05-15","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-06-28","scope":"RELOCATE 12 DIFFUSERS/REGISTERS (8TH FLOOR, CARPATHIA OFFICES)"},{"number":"69505","date":"2007-05-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-08","scope":"REPLACE (2) OLD FIRE ALARM DEVICES, INSTALL (5) NEW FIRE ALARM DEVICES ( CC DIST)"},{"number":"67326","date":"2007-05-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-09","scope":"INSTALLING 25 DOWN LTS, RELOCATE (25) 2X4 LTS, INSTALL TRACK LTS & PENDENTS. INSTALL (32) RECEPTS & 3 FURNITURE WHIPS & 2 POKE THRU'S (CC DIST)"},{"number":"77709","date":"2007-05-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":null,"scope":"(O) SK"},{"number":"75055","date":"2007-05-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2007-08-20","scope":"INSTALLATION OF 52 RECEPTS, 29 VOICE/DATA DROPS, 18 SWS, 4 OCCUPANCY SENSORS, FIRE ALARM HORNS, 5 FA STROBES, 55 RELOCATED 2'X4' FL LT FXTS, 3 RELOCATED 2'X2' FL LT FXTS AND ALL NECESSARY WIRE AND CONDUIT AND 5 EXIT SIGNS (CC DIST)"},{"number":"79349","date":"2007-05-29","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2007-11-05","scope":"INSTALL WATER AND SEWER TO SEVEN (7) DENTIST CHAIRS, (1) BATHROOM, 2 PIECES, (1) MOP SINK, (1) LAUNDRY CONNECTION."},{"number":"80776","date":"2007-06-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-02-14","scope":"INSTALL RECEPTACLES, AUTOCLAVE, ULTRASONIC CLEANER, EXHAUST FAN, HEAT PUMP, 6 X-RAY MACHINES, 2 VACUUM PUMPS, AIR COMPRESSOR, CONDENSATE PUMP, CIRCULATING PUMP, WATER HEATER, 2 PANELS, TRANSFOORMER, 43 LIGHTS, 16 SWITCHES & 1001 480V FEEDER."},{"number":"75868","date":"2007-08-03","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Expired","completedDate":"2021-02-24","scope":"INSTALL 43 CAT 5E DATA AND 38 CAT 3 VOICE LINES LONGEST RUN 185' ALL PLENUM CABLE (CC DIST) INSTALL 43 CAT 5E DATA AND 38 CAT 3 VOICE LINES LONGEST RUN 185' ALL PLENUM CABLE (CC DIST)"},{"number":"46068","date":"2007-08-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-12-10","scope":"INSTALL CEILING & SUB-FLOOR DETECTORS, SPEAKERS, STROBES, RELEASE & ABORT STATIONS FOR PRE-ACTION FIRE ALARM SYSTEM."},{"number":"96066","date":"2007-09-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-03-13","scope":"FIRE ALARM: ADDITION OF 5 SPEAKER/STROBES AND 1 STROBE"},{"number":"84119","date":"2007-09-27","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2007-10-02","scope":"HVAC AS PER PLAN"},{"number":"109662","date":"2007-10-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-06-24","scope":"INTERIOR RENOVATION CONSISTING OF NEW CEILING, LIGHTING, DEMISING INSULATED & FULL HEIGHT PARTITIONS, SUITE ENTRANCE & INTERIOR OFFICE DOORS & FINISHES."},{"number":"110365","date":"2007-11-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-06-24","scope":"REPLACE REVOLVING DOOR W/ NEW VESTIBULE - DOORS ALL WORK WITHIN PROPERTY LINE - NO EXTENSIONS, NO STRUCTURAL CHANGES - SAME FOOT PRINT"},{"number":"113142","date":"2007-11-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-03-08","scope":"FIXTURE INSTALLATION"},{"number":"107487","date":"2007-11-02","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2007-12-04","scope":"C.O."},{"number":"113372","date":"2007-11-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-13","scope":"RELOCATE 8 DIFFUSERS/REGISTERS - 6TH FLOOR - PUBLIC PRIVATE VENTURE"},{"number":"113373","date":"2007-11-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-06-24","scope":"RELOCATE 19 DIFFUSERS/REGISTERS - 28TH FLOOR - KOLSBY GORDON"},{"number":"117312","date":"2007-11-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2008-08-08","scope":"FIXTURE INSTALLATION"},{"number":"117827","date":"2007-11-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-09-25","scope":"INSTALLATION OF 5 CAT5E TELE/DATA DROPS, LONGEST RUN 50' AS PER 2005 NEC (CC DISTRICT)"},{"number":"117876","date":"2007-11-27","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":null},{"number":"117828","date":"2007-11-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-05-16","scope":"FIRE ALARM: ADDITION OF 12 SPEAKER/STROBES AND 2 SPEAKERS AS PER NFPA72. INSTALLATION OF 70 RECEPTS, 157 FLOURESCENT FIXTURES 7 OCCUPANCY SENSORS, 1 EXHAUST FAN, 29 SWITCHES, 6 EXIT SIGNS AND 2 PANELS DATA, 40 PHONE JACKS/DATA DROPS AS PER 2005 NEC (CC DISTRICT)"},{"number":"118983","date":"2007-11-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-05-19","scope":"PROVIDE POWER AND CONTROL WIRING FOR ACCESS CONTROL DOORS AT MAIN ENTRANCE TO BANK, FIRE ALARM CONNECTIONS TO CONTROLLER BY OTHERS AS PER 2005 NEC (CC DISTRICT)"},{"number":"122103","date":"2007-12-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-08-05","scope":"RENOVATION OF EXISTING COMMERCIAL OFFICE SPACE"},{"number":"138286","date":"2008-03-14","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":null},{"number":"142744","date":"2008-04-07","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-06-04","scope":"INSTALLATION OF 20 RECEPTS, 10 OCCUPANCY SERSORS, 1 EXIT LIGHT, 13 - 2X4 FLUORESCENT LIGHT FIXTURES, AND 10 TELE/DATA DROPS, SELECTIVE DEMO AS PER 2005 NEC (CC DISTRICT)"},{"number":"147810","date":"2008-05-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-11-06","scope":"INTERIOR ALTERATIONS AS PER PLAN.PERMIT TO INCLUDE THE DEMOLITION OF EXISTING PARTITIONS AND THE INSTALLATION OF NON-COMBUSTIBLE WALLS AND CEILINGS TO CREATE ADDITIONAL OFFICE SPACE. SEPARATE PERMITS REQUIRED FOR ELECTRICAL,HVAC, AND FIRE SUPPRESSION."},{"number":"150772","date":"2008-05-12","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2008-05-12","scope":"FOR THE ERECTION OF FIVE (5) NON-ILLUMINATED FLATWALL SIGNS (NO SIGN TO BE LOCATED ABOVE THE BOTTOM OF THE SECOND FLOOR) AS FOLLOWS: TWO (2) SIGNS FACING 20TH STREET (12,625 SQ. FT. EACH) TWO (2) SIGN FACING MARKET STREET (27.18 SQ. FT. AND 43.1 SQ. FT.) AND ONE (1) SAIGN LOCATED ON THE CORNER OF 20TH AND MARKET STREETS (46.3 SQ. FT.), (SIZE AND LOCATION AS SHOWN IN THE APPLICATION)"},{"number":"153781","date":"2008-05-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-09-02","scope":"RELOCATING 20 - 2X4 LIGHT FIXTURES, 15 RECEPTS, INSTALL TELE/DATA BOXES ONLY ON WIRE , RELOCATING 4 EXISTING RECEPTS INTO NEW WALLS AS PER 2005 NEC (CC DISTRICT)"},{"number":"155649","date":"2008-06-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":"FIXTURE INSTALLATION"},{"number":"154751","date":"2008-06-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-09-03","scope":"ALTERATIONS TO THE MECHANICAL DUCTWORK TO INCLUDE 20 NEW DIFFUSERS. SEE AP#150367 FOR PLANS."},{"number":"150367","date":"2008-06-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-09-03","scope":"RENOVATION OF FORMER KITCHEN AND CAFETERIA SPACE INTO OFFICE SPACE AS PER PLANS. MECHANICAL PERMIT AP#150367 ALSO INCLUDED."},{"number":"156579","date":"2008-06-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-14","scope":"RELOCATE 20 DIFFUSERS/REGISTERS - 14TH FLOOR, GVA SMITH MACK"},{"number":"157673","date":"2008-06-12","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":null},{"number":"160548","date":"2008-06-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-05","scope":"RELOCATE 8 DIFFUSERS/REGISTERS - 14TH FLOOR, SUITE 1470"},{"number":"160722","date":"2008-06-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2008-08-28","scope":"RELOCATE 14 SPRINKLER HEADS - 25TH FLOOR"},{"number":"161513","date":"2008-06-30","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-03-20","scope":"FIXTURE INSTALLATION"},{"number":"157837","date":"2008-07-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-10-28","scope":"INTERIOR RENOVATIONS"},{"number":"163390","date":"2008-07-09","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-05","scope":"RELOCATE 11 DIFFUSERS."},{"number":"157840","date":"2008-07-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-11-05","scope":"INTERIOR RENOVATIONS"},{"number":"163668","date":"2008-07-10","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":null},{"number":"164434","date":"2008-07-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"THE AREA UNDER CONSTRUCTION IS TO BE DEMOLISHED IN INTS ENTIRETY AND THEN RECONFIGURED INTO OFFICE SPACE WHERE ALLOWED, FIXTURES WILL BE RE-USED. 50+/OUTLETS WILL BE INSTALLED & (2) FLOOR BOXES INSTALLED.(41) TOTAL LIGHTING FIXTURES TO BE RE-INSTALLED OR REPLACED IN KIND, AS PER 2005 NEC (CC DIST)"},{"number":"165605","date":"2008-07-21","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2008-11-05","scope":null},{"number":"168424","date":"2008-07-31","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-03-09","scope":"FIXTURE INSTALLATION"},{"number":"168430","date":"2008-07-31","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2008-09-17","scope":"FIXTURE INSTALLATION"},{"number":"169565","date":"2008-08-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-03","scope":"INSTALLATION OF 1 NEW PANEL WITH CIRCUIT BREAKERS, 16 FLUORESCENT FIXTURES, 2 EXIT SIGNS, 22 RECEPTS, 1 SWITCH, 8 OCCUPANCY SENSORS AND 13 TELE/DATA DROPS AS PER 2005 NEC,(CC DISTRICT)"},{"number":"169566","date":"2008-08-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2008-11-03","scope":"INSTALLATION OF PANEL WITH CIRCUIT BREAKERS, 21 FLUORESCENT FIXTURES, 2 EXIT SIGNS, 19 RECEPTS, 2 SWITCH, 9 OCCUPANCY SENSORS AND 11 TELE/DATA DROPS AS PER 2005 NEC,(CC DISTRICT)"},{"number":"171112","date":"2008-08-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"ADD 26 CAT5 PLENUM RATED TELECOM OUTLETS TO EXISTING SPACE LONGEST RUN 150', RELOCATE 3 HORN STROBES USING EXISTING LOOPS AS PER 2005 NEC (CC DISTRICT)"},{"number":"180360","date":"2008-10-02","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-03-20","scope":"RELOCATE (16) DIFFUSERS"},{"number":"176410","date":"2008-10-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-11-25","scope":"INTERIOR RENOVATIONS, NEW GWB WALLS, PAINT"},{"number":"181818","date":"2008-10-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2009-04-22","scope":"FIXTURE INSTALLATION"},{"number":"182386","date":"2008-10-13","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2008-11-05","scope":null},{"number":"182524","date":"2008-10-14","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2008-12-04","scope":null},{"number":"183253","date":"2008-10-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":"RELOCATE (12) DIFFUSERS FOR OFFICE BLDG."},{"number":"182691","date":"2008-10-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2008-12-04","scope":"FOR A TENANT FIT-OUT OF AN EXISTING SPACE LOCATED ON THE SEVENTH FLOOR OF AN EXISTING HIGH RISE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY CONTRACTORS LICENSED WITH THE CITY OF PHILADELPHIA."},{"number":"184170","date":"2008-10-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"PROVIDE AND INSTALL CAT 5E CABLING TO 26 WORK STATIONS, PLENUM RATED CABLE, 4 PAIR, LONGEST RUN 150' AS PER 2005 (CC DISTRICT)"},{"number":"184184","date":"2008-10-23","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2008-11-25","scope":"FIXTURE INSTALLATION"},{"number":"181419","date":"2008-10-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-01-09","scope":"INSTALLATION OF 34 - 2X4 FLUORESCENT FIXTURES, 5 2X2 FLUORESCENT FIXTURES, 16 OCCUPANCY SENSORS, 5 EXIT SIGNS, 31 RECEPTS, 1 EXHAUST FAN, 14 TELE/DATA DROPS AND 1 NEW ELECTRICAL PANEL WITH CIRCUIT BREAKERS AS PER 2005 NEC (CC DISTRICT)"},{"number":"185532","date":"2008-11-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"ADDITION 1 NAC EXTENDER PANEL, 4 SPEAKER STROBES & 1 STROBE."},{"number":"185527","date":"2008-11-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-01-09","scope":"INSTALL 14 LIGHT FIXTURES, 3 EXIT SIGNS, 31 RECEPTACLES, 14 OCCUPANCY SENSORS, 20 TELE/DATA DROPS & PANEL. RELOCATE 8 LIGHT FIXTURES."},{"number":"194679","date":"2008-12-29","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"FURNISH AND INSTALL VOICE AND DATA POINTS 7 DUPLEX V/D LOCATIONS AND 1 SINGLE VOICE LOCATION BOTH CAT5E, LONGEST DROP 75' AS PER 2005 NEC (CC DISTRICT) FURNISH AND INSTALL VOICE AND DATA POINTS 7 DUPLEX V/D LOCATIONS AND 1 SINGLE VOICE LOCATION BOTH CAT5E, LONGEST DROP 75' AS PER 2005 NEC (CC DISTRICT)"},{"number":"190865","date":"2009-02-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"ADDITION OF FOUR (4) SPEAKER/STROBES AS PER NFPA72 (CC DISTRICT)"},{"number":"205744","date":"2009-03-24","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":"INTERIOR DEMOLITION ONLY."},{"number":"207850","date":"2009-03-31","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":null,"scope":null},{"number":"208788","date":"2009-04-06","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":"RELOCATE(7) DIFFUSERS."},{"number":"209239","date":"2009-04-07","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":null},{"number":"201640","date":"2009-04-13","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2009-06-01","scope":"INTERIOR RENOVATIONS"},{"number":"213291","date":"2009-04-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2009-10-28","scope":"INSTALL 20 RECEPTACLES, 5 SWITCHES, 10 LIGHT FIXTURES & 5 EXIT SIGNS ON EXISTING SERVICE."},{"number":"219080","date":"2009-06-03","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2010-02-18","scope":null},{"number":"216002","date":"2009-06-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-02-18","scope":"INTERIOR ALTERATIONS TO 4 FLOORS AS PER PLANS."},{"number":"226428","date":"2009-07-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-06-28","scope":"VOICE AND DATA CABLING ON FLOORS 12, 19, 20 AND 21, A TOTAL OF 630 WORKSTATIONS WITH CAT6 PLENUM CABLE, AS PER 2005 NEC (CC DIST)"},{"number":"224334","date":"2009-07-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-01-06","scope":"INSTALLATION OF LIGHTING PACKAGE AND POWER AS PER 2005 NEC (CC DISTRICT)"},{"number":"226611","date":"2009-07-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-04-28","scope":"FIXTURE INSTALLATIONS"},{"number":"226547","date":"2009-09-08","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-05-19","scope":"INTERIOR FIT OUT INCLUDING WALLS, CEILINGS, CARPET AND PAINT FOR OFFICE SPACE"},{"number":"230932","date":"2009-09-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-01-03","scope":"INSTALL FIRE ALARM SYSTEM AS PER NFPA72 (CC DISTRICT)"},{"number":"223809","date":"2010-01-14","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-01-19","scope":"ALTERATIONS TO EXISTING SPRINKLER SYSTEM"},{"number":"256416","date":"2010-01-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-04-23","scope":"INTERIOR ALTERATIONS AS PER PLANS."},{"number":"257308","date":"2010-01-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-03-29","scope":"INTERIOR ALTERATIONS AS PER PLANS"},{"number":"257311","date":"2010-01-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-03-30","scope":"INTERIOR ALTERATIONS FOR COMMON CORRIDOR AND TOILET ROOMS AS PER PLANS"},{"number":"258309","date":"2010-01-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-03-25","scope":null},{"number":"258325","date":"2010-01-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-03-25","scope":null},{"number":"258496","date":"2010-01-22","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2010-03-30","scope":null},{"number":"258503","date":"2010-01-22","work":"Fast form building","type":"L_FFORM","description":"FAST FORM BUILDING PERMIT","status":"COMPLETED","completedDate":"2010-03-29","scope":null},{"number":"259507","date":"2010-01-28","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-04-15","scope":null},{"number":"260984","date":"2010-02-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-14","scope":"INSTALL CUSTOMER SUPPLIED CAT6 PLENUM CABLES TO (93)LOCATIONS.... IN ACCORDANCE WITH 2008"},{"number":"259118","date":"2010-02-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-08-02","scope":"FURNISH & INSTALL AS PER PLANS PROVIDED AS PER 2005 NEC (CC)"},{"number":"262784","date":"2010-02-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-04-13","scope":"RELOCATE 12 DIFFUSERS/REGISTERS (8TH FLOOR, WEBER GALLAGHER OFFICES)"},{"number":"262785","date":"2010-02-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-03-29","scope":"RELOCATE 20 DIFFUSERS/REGISTERS (27TH FLOOR, DUFF & PHELPS)"},{"number":"261466","date":"2010-02-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-04-15","scope":"INTERIOR ALTERATIONS ON 8TH FLOOR AS PER PLANS."},{"number":"264304","date":"2010-03-01","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-04-15","scope":"RELOCATE 18 EXISTING SPRINKLER HEADS"},{"number":"264818","date":"2010-03-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-04-23","scope":"RELOCATION FOR (14) SPRINKLER HEADS ON THE 8TH FLOOR."},{"number":"264373","date":"2010-03-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"DEMOLITION & NEW CIRCUITRY FOR LIGHTING & POWER."},{"number":"260642","date":"2010-03-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-20","scope":"(35) DOUBLE DUPLEX RECEPTACLES, (17) FURNITURE FEEDS, (2) POKE THRUS, (25) TELEDATA STUBS, (77) REMOVE/RELOCATE 2 X 4, (8) REMOVE/RELOCATE 2X2 AS PER 2005 NEC (CC DIST)"},{"number":"265109","date":"2010-03-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-14","scope":"NEW NAC PANEL INTO BUILDING RISER, 10 SPEAKER STROBES & 2 DOOR RELAYS."},{"number":"267983","date":"2010-03-22","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-06-11","scope":"RELOCATE (46) DIFFUSERS ON THE 7TH,18TH AND 28TH FLOORS"},{"number":"267799","date":"2010-03-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-06-16","scope":"PROVIDE LABOR TO INSTALL (35) PAGING SPEAKERS WITH 18/2 PLENUM CABLE, LONGEST RUN 100'... IN ACCORDANCE WITH 2008 NEC"},{"number":"262688","date":"2010-03-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-08-02","scope":"FURNISH & INSTALL 1 NAC EXTENDER, 28 STROBES AS PER NFPA 72 (CC DISTRICT)"},{"number":"268757","date":"2010-03-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-06-11","scope":"RELOCATE (89) SPRINKLER HEADS"},{"number":"268817","date":"2010-03-25","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-06-11","scope":"INSTALL 5 SINKS, CONNECT TO EXISTING SERVICES"},{"number":"262720","date":"2010-03-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-04-23","scope":"RENOVATE EXISTING HVAC SYSTEM TO ACCOMMODATE NEW LAYOUT AS PER PLANS."},{"number":"271540","date":"2010-04-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-06-23","scope":"INTERIOR ALTERATIONS AS PER PLANS."},{"number":"271463","date":"2010-04-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-20","scope":"PROVIDE 139 CAT 5E CABLES TO FURNITURE & HARDWALL LOCATIONS."},{"number":"266548","date":"2010-04-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-07-20","scope":"FIRE ALARM: SMOKE DETECTOR, (16) SPEAKER/STROBES, (4) CONTROL MODULES, AS PER NFPA-72 (CC DIST)"},{"number":"268550","date":"2010-04-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-30","scope":"NEW POWER & LIGHTING IN SUITES 700,770.780.1850,2810 AS PER 2008 NEC (CC DISTRICT)"},{"number":"274118","date":"2010-04-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH & INSTALL LIGHTING & POWER THROUGHOUT SPACE. INCLUDES 9 DUPLEX RECEPTACLES, 23 2X4 LIGHTS, 11 SP SWITCHES, 3 OCCUPANCY SWITCHES AS PER 2008 NEC (CC DISTRICT)"},{"number":"267989","date":"2010-04-27","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-06-11","scope":"FIT-OUTS ON PORTIONS OF THE 7TH, 18TH AND 28TH FLOORS AS PER PLANS."},{"number":"275271","date":"2010-04-27","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-11-16","scope":"RELOCATE 6 EXISTING SPRINKLER HEADS (14TH FLOOR)"},{"number":"277677","date":"2010-05-06","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"RELOCATION OF 6 DIFFUSERS/REGISTERS(COMMERCIAL)"},{"number":"282073","date":"2010-05-28","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-06-16","scope":"RELOCATE 16 DIFFUSERS/REGISTERS (TENANT: MERRILL CORP.)"},{"number":"276155","date":"2010-06-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-08","scope":"INSTALL 31 SPEAKER STROBES AS PER NFPA 72 (CC DISTRICT)"},{"number":"282038","date":"2010-06-04","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-01-06","scope":"INTERIOR ALTERATIONS OF EXISTING COMMON CORRIDOR AND RESTROOMS ON THE 27TH FLOORS AS PER PLANS."},{"number":"284468","date":"2010-06-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH AND INSTALL 50 CAT5E CABLES AT 25 LOCATIONS AS PER 2008 NEC (CC DIST)"},{"number":"277863","date":"2010-06-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"INSTALL (6) SPEAKERS, INSTALL (1) NAC PANEL, AS PER NFPA-72 (CC DIST)"},{"number":"286483","date":"2010-06-21","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-01-06","scope":"RELOCATE (6) DIFFUSERS"},{"number":"285852","date":"2010-06-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-08-12","scope":"INTERIOR RENOVATIONS TO OFFICE SPACE"},{"number":"287373","date":"2010-06-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-01-06","scope":"FURNISH & INSTALL 4 BATHROOM LAVATORIES, CONNECT TO EXISTING SERVICES"},{"number":"287571","date":"2010-06-25","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-01-06","scope":"RELOCATION OF EXISTING SPRINKLER HEADS. 27TH FLOOR CORRIDORS AND RESTROOMS."},{"number":"288502","date":"2010-06-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"RELOCATE 71 EXISTING SPRINKLER HEADS (LOWER LEVEL - LOBBY)"},{"number":"291421","date":"2010-07-16","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-08-16","scope":"RELOCATE 20 SPRINKLER HEADS."},{"number":"292649","date":"2010-07-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2010-09-22","scope":"INTERIOR RENOVATIONSFOR 28TH FLOOR / SUITE #2805 OFFICE SPACE."},{"number":"288815","date":"2010-07-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH & INSTALL LIGHTING & POWER THROUGHOUT SPACE AS PER 2008 NE"},{"number":"288814","date":"2010-07-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-12-06","scope":"FURNISH & INSTALL LIGHTING & POWER THROUGHOUT SPACE AS PER 2008 NEC"},{"number":"294072","date":"2010-08-02","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-24","scope":"RELOCATE 14 DIFFUSERS/REGISTERS(COMMERCIAL)"},{"number":"294086","date":"2010-08-02","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-24","scope":"RELOCATE 2 REGISTERS/DIFFUSERS(COMMERCIAL)"},{"number":"294116","date":"2010-08-02","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-09-22","scope":"RELOCATE 12 REGISTERS/DIFFUSERS(COMMERCIAL)"},{"number":"295015","date":"2010-08-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2010-09-22","scope":"RELOCATE 4 EXISTING SPRINKLER HEADS (28TH FLOOR)"},{"number":"291454","date":"2010-08-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2010-11-09","scope":"FURNISH AND INSTALL (7) NEW SPEAKER/STROBES THROUGHOUT SPACE AS PER NFPA-72 (CC DIST)"},{"number":"296922","date":"2010-08-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-04-20","scope":"INSTALL 3 RECEPTACLES, 1 DEDICATED RECEPTACL, 2 WALL MOUNTED OCCUPANCY SENSORS & 5 TELE/DATA STUBS."},{"number":"290051","date":"2010-08-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"INTERIOR RENOVATIONS OF LOBBY UPGRADES TO FINISHES, CEILING AND LIGHTING, INTERIOR RENOVATION OF LOWER LEVEL AND NEW TOILET ROOMS AND CONFERENCE CENTER."},{"number":"296143","date":"2010-08-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-01-03","scope":"INTERIOR ALTERATIONS TO EXISTING OFFICE SPACE AS PER PLANS"},{"number":"297502","date":"2010-08-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE 4 1X5 LIGHT FIXTURE, 3 SWITCHES & 3 QUAD RECEPTACLES. NO FIRE ALARM WORK."},{"number":"288323","date":"2010-09-03","work":"Zoning/use","type":"ZP_ZON/USE","description":"ZONING/USE PERMIT","status":"COMPLETED","completedDate":"2010-09-03","scope":"LEGALIZE GROUND SIGN 70 SQ FT."},{"number":"300475","date":"2010-09-10","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-03-31","scope":"RELOCATE 140 EXISTING SPRINKLER HEADS (6TH FLOOR)"},{"number":"300217","date":"2010-09-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2010-12-28","scope":"UPGRADES, ALTERATIONS, RECONFIGURATION TO EXISTING HVAC SYSTEM, NEW DUCTWORK INSTALLATION AS PER PLANS."},{"number":"297671","date":"2010-09-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"9 SPEAKER STROBES(PER 2008 NEC CODE)"},{"number":"299713","date":"2010-10-05","work":"Sign","type":"BP_SIGN","description":"SIGN PERMIT","status":"COMPLETED","completedDate":"2011-02-17","scope":"INSTALL FLAT WALL SIGN FOR OFFICE/RETAIL SPACE."},{"number":"304407","date":"2010-10-06","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2010-12-28","scope":"FURNISH AND INSTALL (3) SINKS AND (2)OPEN SITE DRAINS. CONNECT TO EXISTING SERVICE."},{"number":"299231","date":"2010-10-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-07-26","scope":"INSTALL 4 WALL MOUNTED STROBES, 4 WALL MOUNTED SPEAKER/STROBES, 3 PULL STATIONS, 2 DOOR HOLDERS, 2 ADDRESSABLE CONTROL ZAM'S & 2 INTERPOSING RELAY MODULES. INSTALL POWER & LIGHTING THROUGHOUT LOBBY."},{"number":"302536","date":"2010-10-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-01-21","scope":"FURNISH AND INSTLL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DIST)"},{"number":"301253","date":"2010-10-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL (314) CATEGORY 6 PLENUM CABLES, AVERAGE CABLE PULL 150-160 FEET, AS PER 2008 NEC (CC DIST)"},{"number":"308718","date":"2010-10-27","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-05-18","scope":"RELOCATE 21 EXISTING SPRINKLER HEADS(COMMERCIAL)"},{"number":"309047","date":"2010-10-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-01-24","scope":"RELOCATE (4) DIFFUSERS OF OFFICE BLDG."},{"number":"309176","date":"2010-11-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-01-24","scope":"REMOVE AND REINSTALL (4)LAVATORIES. FURNISH AND INSTALL (2)LAVATORIES WITH MINOR PIPING AND WATER CLOSET AND LAV TO CREATE AN ADA BATHROOM. CONNECT TO EXISTING SERVICES."},{"number":"307909","date":"2010-11-04","work":"Use","type":"ZP_USE","description":"USE PERMIT","status":"COMPLETED","completedDate":"2010-11-04","scope":"RENOVATION OF OUTDOOR PLAZA AREA TO INCLUDE THE PLACEMENT OF TWO REMOVABLE UMBRELLAS 16 FT X 19 FT AND 17 FT HIGH"},{"number":"310172","date":"2010-11-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-01-24","scope":"FOR INTERIOR ALTERATIONS CONTAINED IN THE CORE AREA OF THE SIXTH FLOOR OF AN EXISTING HIGH RISE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. THIS WORK ACTIVITY SHALL BE PERFORMED BY A LICENSED CONTRACTOR REGISTERED WITH THE CITY OF PHILADELPHIA."},{"number":"312194","date":"2010-11-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-17","scope":"RELOCATE 2 DIFFUSERS/REGISTERS(COMMERCIAL)7TH FLOOR CORRIDOR"},{"number":"304826","date":"2010-11-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"INSTALL 12 STROBES, 18 SPEAKER STROBES, 1 NAC EXTENDER & 3 SMOKE DETECTORS."},{"number":"312351","date":"2010-11-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"INTERIOR ALTERATIONS TO EXISTING OFFICE SPACE"},{"number":"312986","date":"2010-12-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-06-24","scope":"RELOCATION OF SPRINKLER HEADS"},{"number":"315055","date":"2010-12-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-04-15","scope":"REMOVE/REINSTALL 2X2 LIGHTS IN NEW CEILING."},{"number":"314555","date":"2010-12-07","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-02-17","scope":"REMOVE AND REPLACE FOUR LAVATORIES AND FAUCETS..NO ADDITIONAL PIPING"},{"number":"313945","date":"2010-12-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-02-17","scope":"INTERIOR ALTERATIONS TO BASE BUILDING LOBBY, CORRIDOR AND TOILET ROOM AREAS."},{"number":"315886","date":"2010-12-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-03-30","scope":"INTERIOR ALTERATIONS TO A PORTION OF THE 14TH FLOOR AS PER PLANS FOR OFFICE BLDG."},{"number":"311616","date":"2010-12-16","work":"Use","type":"ZP_USE","description":"USE PERMIT","status":"COMPLETED","completedDate":"2010-12-16","scope":"APPLICATION TO SUPPLEMENT USE PERMIT NUMBER 307909 DATED NOV 4, 2010 TO INCLUDE TEMP/REMOVABLE/SEASONAL PLACEMENT OF TABLES AND CHAIRS IN UMBRELLA PLAZA AREA AS PER PLANS."},{"number":"316733","date":"2010-12-28","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"FURNISH AND INSTALL SINK AND WATER COOLER...CONNECT TO EXISTING SERVICES"},{"number":"320176","date":"2011-01-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"RELOCATION OF (32) SPRINKLER HEADS"},{"number":"316324","date":"2011-01-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"HVAC INCLUDING DUCTWORK AS PER PLANS."},{"number":"320636","date":"2011-01-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-02-22","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DIST)"},{"number":"319691","date":"2011-01-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALLATION OF VOICE DATA CABLING TO 35 LOCATIONS WITH NEW RACK SUING BERKTEK LANDMARK 1000 CAT 6 PLENUM RATED CABLE 23 AVG AS PER 2008 NEC(CC DISTRICT)"},{"number":"321285","date":"2011-01-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-30","scope":"RELOCATE (13) DIFFUSERS"},{"number":"321282","date":"2011-01-19","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-03-31","scope":"INTERIOR DEMO OF NON-LOAD BEARING WALLS"},{"number":"316123","date":"2011-01-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-15","scope":"RENOVATION OF EXISTING OFFICE SPACE INCLUDING NEW LIGHT FIXTURES,RECEPTACLES AND HVAC POWER,PER ATTACHED DRAWINGS,FIRE ALARM WILL BE A SEPERATE PERMIT AS PER 2008 NEC"},{"number":"320685","date":"2011-01-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-04-27","scope":"RELOCATE EXISTING LIGHTING, FURNISH AND INSTALL NEW DOWN LIGHTING, FURNISH AND INSTALL NEW DEVICES AS PER PRINT, INSTALL NEW OCCUPANCY SENSORS, ALL AS PER 2008 NEC (CC DIST)"},{"number":"323454","date":"2011-02-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-03-30","scope":"RELOCATE 18 SPRINKLER HEADS (14TH FLOOR)"},{"number":"319837","date":"2011-02-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-15","scope":"FURNISH AND INSTALL APPROXIMTELY 52 CATEGORY 5E PLENUM CABLET,LONGEST RUN 125'"},{"number":"324334","date":"2011-02-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-03-31","scope":"INTERIOR ALTERATIONS PER PLAN 29TH FLOOR - C M I OFFICES"},{"number":"325462","date":"2011-02-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-31","scope":"RELOCATE 10 DIFFUSERS IN AN OFFICE BLDG"},{"number":"325761","date":"2011-02-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-12-03","scope":"RELOCATE 50 EXISTING SPRINKLER HEADS (29TH FLOOR)"},{"number":"322738","date":"2011-02-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"EIGHT (8) SPEAKER STROBES AS PER NFPA-72 (CC DIST)"},{"number":"322393","date":"2011-03-01","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-03-15","scope":"PROVIDE AND INSTALL VOICE DATA CABLING TO 15 LOCATIONS WITH IN BLUEWOLF SPACE AS PER 2008 NEC"},{"number":"326133","date":"2011-03-01","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"24 FIXTURES FOR GANG BATHROOM FOR HI-RISE IN LOWER LEVEL"},{"number":"327750","date":"2011-03-03","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-03-26","scope":"FURNISH AND INSTALL (70) LOCATIONS OF CATEGORY 5E CABLING - LONGEST RUN 80 FEET, AS PER 2008 NEC (CC DIST)"},{"number":"324260","date":"2011-03-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH & INSTALL (3) SMOKE DETECTORS, (6) SPEAKER STROBES, (1) STROBE, (2) CONTROL ZAMS, (2) INTERPOSING RELAYS AS PER NFPA-72 (CC DIST)"},{"number":"324267","date":"2011-03-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH & INSTALL (3) SMOKE DETECTORS, (6) SPEAKER STROBES, (1) STROBE, (2) CONTROL ZAMS, (2) INTERPOSING RELAYS AS PER NFPA-72 (CC DIST)"},{"number":"325578","date":"2011-03-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-08-03","scope":"INSTALL (3) CHANDELIERS, (15) HIGH HATS AND 40' TRACK LIGHTING AS PER 2008 NEC (CC DIST)"},{"number":"325486","date":"2011-03-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-08-01","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC"},{"number":"327446","date":"2011-03-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"INSTALL (2) NEW WHSP & ASSOC DUCTWORK & GRD'S PER PLANS"},{"number":"331588","date":"2011-03-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-27","scope":"INSTALL AV SYSTEM IN CONFERENCE ROOM, THIS CONSISTS OF A NEW PROJECTOR AND NEW SCREEN, ALL CABLING WILL BE INSTALLED IN J-HOOKS, AS PER 2008 NEC"},{"number":"325576","date":"2011-03-29","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-04-20","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DIST)"},{"number":"327585","date":"2011-04-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-06-28","scope":"FURNISH AND INSTALL 5 SPEAKERS/STROBES 2 SPEAKERS AND 1 STROBE AS PER 2008 NEC"},{"number":"328787","date":"2011-04-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH AND INSTALL (16) SPEAKER/STROBES, (1) NAC EXTENDER PANEL, (1) ADDRESSABLE SIGNAL MODULE, AS PER NFPA-72 (CC DIST)"},{"number":"327199","date":"2011-05-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-06-01","scope":"ALTERATIONS TO AN EXISTING SPACE TO CREATE A OUTDOOR SEATING AREA. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. THIS WORK ACTIVITY SHALL BE PERFORMED BY CONTRACTOR(S) LICENSED WITH THE CITY OF PHILADELPHIA"},{"number":"340555","date":"2011-05-12","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-05-13","scope":"TO REMOVE EXISTING DRAIN LINE IN PLANTER,REPLACE INTO NEW DRAIN ABOVE GROUND EXCLOSURE"},{"number":"342463","date":"2011-05-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-07-01","scope":"RELOCATE 30 EXISTING SPRINKLER HEADS (BASEMENT AREA)"},{"number":"341546","date":"2011-05-25","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-12-08","scope":"INTERIOR ALTERATIONS FOR OFFICE SPACE ON PARTIAL 27TH FLR PER PLAN."},{"number":"345618","date":"2011-06-07","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-12-08","scope":"RELOCATE 60 EXISTING SPRINKLER HEADS (27TH FLOOR)"},{"number":"345962","date":"2011-06-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-08-01","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DIST)"},{"number":"344679","date":"2011-06-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-12-08","scope":"27TH FLOOR - FURNISH AND INSTALL (1)SINK - CONNECT TO EXISTING SERVICES"},{"number":"345907","date":"2011-06-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"INTERIOR ALTERATIONS. IMPROVEMENTS TO TENANT SPACE."},{"number":"347808","date":"2011-06-24","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-12-08","scope":"FOR THE INSTALLATION OF A HVAC SYSTEM INCLUDING DUCTWORK WITHIN AN EXISTING PARTIAL TENTANT SPACE. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. THIS WORK ACTIVITY SHALL BE PERFORMED BY A CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA."},{"number":"351069","date":"2011-07-05","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"RELOCATE 130 EXISTING SPRINKLER HEADS - 9TH FLOOR"},{"number":"351963","date":"2011-07-13","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"INTERIOR ALTERATIONS, AS PER PLAN FOR OFFICE BLDG. FLAME SPREAD DATA FOR FLOOR, WALL, AND CEILING COVERINGS AND/OR PRESSURIZATION TEST RESULTS DEMONSTRATING COMPLIANCE TO SECTION 708.14 OF THE 2009 INTERNATIONAL BUILDING CODE UPON THE INSPECTOR'S REQUEST. FIRE RATED ASSEMBLIES ARE REQUIRED TO BE MAINTAINED AT ALL TIMES. ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK."},{"number":"353113","date":"2011-07-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2011-12-08","scope":"INTERIOR ALTERATIONS TO EXISTING OFFICE SPACE. NO CHANGE IN OCCUPANCY."},{"number":"352866","date":"2011-07-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-12-14","scope":"FURNISH AND INSTALL LIGHTING AND POWER THRU-OUT SPACE TO MEET CODE AS PER 2008 NEC"},{"number":"348915","date":"2011-07-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"FURNISH AND INSTALL (14) SPEAKER/STROBES, (1) NAC PANEL, (2) SIGNAL ZAM, AS PER NFPA-72 (CC DIST)"},{"number":"352536","date":"2011-07-26","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-10-12","scope":"INSTALL NEW HVAC SYS INCLUDING DUCTWORK"},{"number":"351727","date":"2011-07-26","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-02-06","scope":"FOR PARTIAL INTERIOR DEMOLITION AND ALTERATIONS TO INCLUDE NEW PARTITIONS AND CEILING ON THE 12TH, 18TH AND 20TH FLOORS WITHIN AN EXISTING OFFICE BUILDING AS PER PLANS."},{"number":"354814","date":"2011-07-27","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-10-12","scope":"9TH FLOOR - FURNISH AND INSTALL (3)SINKS - CONNECT TO EXISTING SERVICES"},{"number":"355579","date":"2011-07-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-21","scope":"RELOCATE (14) DIFFUSERS FOR OFFICE."},{"number":"355581","date":"2011-07-29","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"RELOCATE (10) DIFFUSERS"},{"number":"346940","date":"2011-08-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 66 CATEGORY 5E CABLES AVG CABLE PULL 100' AS PER 2008 NEC"},{"number":"346934","date":"2011-08-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 300 CATEGORY 5E CABLES, FURNISH AND INSTALL 300 CATERGORY 6 CABLES AVG CABLE PULL 150' AS PER 2008 NEC"},{"number":"356304","date":"2011-08-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-02-06","scope":"FOR THE RELOCATION OF (37) SPRINKLE HEADS FOR HOSPITAL"},{"number":"356328","date":"2011-08-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-02-22","scope":"RELOCATE 6 SPRINKLER HEADS (27TH FLOOR)"},{"number":"356331","date":"2011-08-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2011-10-12","scope":"RELOCATE 16 SPRINKLER HEADS (9TH FLOOR)"},{"number":"356531","date":"2011-08-10","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-06","scope":"HVAC SYSTEM ALTERATIONS, INCLUDING DUCTWORK, AS PER PLANS."},{"number":"357683","date":"2011-08-11","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-11-01","scope":"INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS"},{"number":"357823","date":"2011-08-15","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2011-10-05","scope":"REMOVE AND REINSTALL (1)MOP SINK AND (6)LAVATORIES - CONNECT TO EXISTING SERVICES"},{"number":"357822","date":"2011-08-15","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-03-06","scope":"FURNISH AND INSTALL (1)SINK - CONNECT TO EXISTING SERVICES"},{"number":"358692","date":"2011-08-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-04-30","scope":"14 DUPLEX RECEPTS,22 RELOCATE EXISTING LIGHT FIXTURES, 4 MOTION SENSORS - AS PER 2008 NEC"},{"number":"360089","date":"2011-09-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"REMOVE AND RELOCATED 60 VOICE AND DATA CABLING LOCATIONS AS PER 2008 NEC"},{"number":"357993","date":"2011-09-09","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Expired","completedDate":"2021-02-24","scope":"INSTALL 22 CAT 5E PLENUM 4 PAIR CABLES INSTALL 22 CAT 5E PLENUM 4 PAIR CABLES"},{"number":"357251","date":"2011-09-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-01-09","scope":"FURNISH AND INSTALL DUPLEX RECEPTS, TELE/DATA STUB-UPS, ROUGH IN FOR SECURITY EQUIPMENT, LIGHT FIXTURES, AND INSTALL 1 NEW 100AMP PANEL AS PER 2008 NEC (CC DISTRICT)"},{"number":"358686","date":"2011-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-12-14","scope":"INSTALL 1 NAC PANEL & 19 SPEAKER STROBES AND 3 DUCT DETECTORS - AS PER 2008 NEC"},{"number":"358678","date":"2011-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"INSTALL 3 SPEAKER/STROBES & 1ADDRESS MODULE- AS PER 2008 NEC"},{"number":"363295","date":"2011-09-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2011-11-02","scope":"(15) 2 X 2'S, (4) SCONCES, (5) 4\" DOWNLIGHTS, (6) EXIT LIGHTS, AS PER 2008 NEC (CC DIST)"},{"number":"370778","date":"2011-11-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-01-05","scope":"INTERIOR ALTERATIONS AS PER PLANS."},{"number":"366053","date":"2011-11-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"(10) SPEAKER/STROBES AS PER NFPA"},{"number":"367427","date":"2011-11-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-16","scope":"INTERIOR ALTERATIONS TO OFFICE. NO CHANGE OF OCCUPANCY."},{"number":"365352","date":"2011-11-16","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-02-16","scope":"INTERIOR ALTERATIONS TO OFFICE. NO CHANGE OF OCCUPANCY."},{"number":"374449","date":"2011-11-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-02-15","scope":"OFFICE BLDG-8 DUPLEX RECEPTS,6 OCCUPANCY SENSORS,8 TELE/DATA STUBS,2 POKE THRU'S,REWORK LIGHTS,1 EXIT AS PER 2008 NEC (CC DISTRICT)"},{"number":"374565","date":"2011-11-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-01-05","scope":"RELOCATE 4 SPRINKLER HEADS ON THE 29TH FLOOR."},{"number":"374568","date":"2011-11-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-07-16","scope":"RELOCATE 772 SPRINKLER HEADS IN BASEMENT AND FLOORS 22 THRU 26"},{"number":"373608","date":"2011-11-18","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2011-12-23","scope":"INTERIOR DEMOLITION, NON-LOAD BEARING PARTITIONS ONLY (COMMERCIAL). FLOORS 22 THROUGH 26. CONTACT INSPECTOR AT DISTRIC OFFICE AT LEAST 24 HOURS PRIOR TO STARTING WORK."},{"number":"379269","date":"2011-12-16","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-02-16","scope":"RELOCATE EXISTING HEADS"},{"number":"377365","date":"2011-12-30","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-02-16","scope":"3 KS, 2 HWHM 6 LAV FAUCETS, 7 WC CARRIERS, 2 URINALS ON 10TH FLOOR. 1 KS, 1 HWH, 6 LAV FAUCETS, 7 WC CARRIERS, 2 URINAL CARRIERS ON 11TH FLOOR(COMMERCIAL)"},{"number":"376499","date":"2012-01-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-01","scope":"6 SPEAKER/STROBES AS PER NFPA 72(CC DIST)(HIGH RISE)"},{"number":"376537","date":"2012-01-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-06-13","scope":"FURNISH & INSTALL LIGHTING & POWER THROUGHOUT SPACE AS PER 2008 NEC (CC DISTRICT) OFFICE BUILDING"},{"number":"378834","date":"2012-01-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-07-16","scope":"INTERIOR RENOVATIONS TO OFFICE"},{"number":"375963","date":"2012-01-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-27","scope":"INSTALL 200 CAT AND 4 COAX CABLES ON 10TH AND 11TH FLORS. ALL CABLING WILL BE INSTALLED IN J HOOKS AND ALL SLEEVES AND PENETRATORS WILL BE FIRE STOPPED AS PER 2008 NEC(COMMERCIAL)(10TH AND 11TH FLOORS(ZURICH INSURANCE)ONLY)(CC DIST)"},{"number":"373879","date":"2012-01-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-07-06","scope":"FURNISH AND INSTALL NEW PLUMBING FOR OFFICE SPACE REHABILITATION THROUGHOUT"},{"number":"377752","date":"2012-01-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-09-25","scope":"FURNISH AND INSTALL LIGHTING AND POWER THROUGHOUT SPACE AS PER 2008 NEC(CC DIST)(COMMERCIAL OFFICE BLDG)(2000-24 MARKET STREET 22ND-26TH FLOORS)"},{"number":"382506","date":"2012-02-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"1397 CATEGORY 6 PLENUM CABLES,12 STRAND 50 MICRON PLENUM FIBEROPTIC CABLE 100 PR LEVEL 3 PLENUM CABLES,50 PAIR TIE CABLE. INSTALLATION SHALL COMPLY WITH ARTICLES 300.21,770.3 & 800.113,133,154 & 179 OF THE 2008 NEC."},{"number":"384558","date":"2012-02-22","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-07-06","scope":"INSTALLATION OF AN AUTOMATIC CLEAN AGENT FIRE SUPPRESSION SYSTEM PER ENGINEER'S PLANS IN ACCORDANCE WITH NFPA 2001 IN SERVER ROOM AT THE 22ND FLOOR LEVEL OF AN EXISTING STRUCTURE. SEPARATE ELECTRICAL PERMIT REQUIRED."},{"number":"383182","date":"2012-02-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"OFFICE SPACE-FURNISH & INSTALL ALARM DEVICES & EQUIPTMENT (CC DISTRICT)"},{"number":"387343","date":"2012-03-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-06-13","scope":"INSTALL 47 HORNS/STROBES - 14 STROBES - 9 SMOKES - 7 DUCT DETECTORS/CARD READER ASSEMBLY ON 12 DOORS - 176 SOUND MASKING SPEAKERS AND 2 SECURITY PANELS - PER 2008 NEC"},{"number":"379775","date":"2012-03-27","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2012-07-20","scope":"MECHANICAL DEMO AND FURNISH/ INSTALL NEW HVAC SYSTEMS, CONTROLS, ACESSORIES, NEW DUCT, UNITS, PIPING AND AIR DEVICES AS PER PLANS AND SPECIFICATIONS."},{"number":"391375","date":"2012-04-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-11-21","scope":"INSTALL PRE-ACTION SYSTEM FOR SERVER ROOM"},{"number":"412907","date":"2012-06-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2012-08-13","scope":"INTERIOR ALTERATIONS, AS PER PLANS."},{"number":"414574","date":"2012-07-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2012-08-13","scope":"RELOCATE 9 SPRINKLER HEADS - 14TH FLOOR."},{"number":"415913","date":"2012-07-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-08-08","scope":"REMOVE AND RELOCATE 14-2X4 FIXTURES AND 14 DUPLEX RECEPTS AS PER 2008 NEC(OFFICE)(CC DIST)"},{"number":"417243","date":"2012-07-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2012-08-13","scope":"FURNISH AND INSTALL (1) KITCHEN SINK, CONNECT TO EXISTING SERVICE"},{"number":"418580","date":"2012-07-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2012-10-12","scope":"INSTALLATION OF 34 DUAL CAT 5E LINES AS PER 2008 NEC (OFFICE BLDG)"},{"number":"427112","date":"2012-10-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-09","scope":"ADD 4-NEW SPEAKER/STROBES TO EXISTING CIRCUIT, 2 IN ELEVATOR LOBBY, 1 IN MEN'S ROOM 1 IN WOMEN'S ROOM (OFFICE BLDG) AS PER NEC 2008 & NFPA 72"},{"number":"445765","date":"2012-12-31","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-03-11","scope":"RELOCATE 27 SPRINKLER HEADS."},{"number":"445849","date":"2013-01-07","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-04-12","scope":"HVAC ALTERATIONS INCLUDING EQUIPMENT AND DUCTWORK INSTALLATION AS PER PLANS."},{"number":"445241","date":"2013-01-14","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-03-11","scope":"LEVEL 2 ALTERATIONS TO AN EXISTING OFFICE SPACE."},{"number":"446246","date":"2013-01-17","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-04-27","scope":"FURNISH AND INSTALL LIGHTING THROUGHOUT. ALL WORK DONE IN ACCORDANCE WITH 2008 NEC(OFFICE BLDG)(CC DIST)"},{"number":"450807","date":"2013-03-01","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-29","scope":"FURNISH AND INSTALL FIRE ALARM DEVICES & EQUIPMENT PER 2008 NEC & NFPA 72 (COMMERCIAL)"},{"number":"476972","date":"2013-06-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL NEW RECEPTACLES FOR SIGNS PER 2008 NEC (BANK)"},{"number":"485503","date":"2013-08-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2013-09-16","scope":"LEVEL II INTERIOR ALTERATIONS TO CREATE NEW OFFICES AND ACCESSORY ROOMS. ALTERATIONS TO INCLUDE NEW INTERIOR, NON-BEARING PARTITIONS, CASEWORK, STORAGE AREAS AND COPY ROOM. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND MECHANICAL SYSTEMS."},{"number":"490364","date":"2013-08-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2013-09-27","scope":"REMOVE & RELOCATE 8-EXISTING DUPLEX RECEPT & 7-EXISTING 2X4 FIXTURES, REUSE ALL EXISTING CIRCUITRY, NO NEW CIRCUITRY (OFFICE SPACE) AS PER NEC 2008"},{"number":"491599","date":"2013-08-27","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2013-09-16","scope":"RELOCATE (4) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT RENOVATIONS AS PER ALL NFPA NO 13 AND LOCAL CODES. (12TH FLOOR)"},{"number":"492418","date":"2013-09-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2013-09-16","scope":"RELOCATE (6) DIFFUSERS"},{"number":"516288","date":"2014-01-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-26","scope":"FOR LEVEL II ALTERATIONS OF AN EXISTING OFFICE SPACE ON THE 18TH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE DEMOLITION AND ERECTION OF PARTITION WALLS, PROVIDE FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK."},{"number":"515995","date":"2014-01-30","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-02-28","scope":"INTERIOR ALTERATIONS OF EXISTING OFFICE SPACE AS PER PLAN."},{"number":"518262","date":"2014-02-04","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-04-15","scope":"INSTALL 4 OUTLETS,2 FURNITURE FEEDS,2 NEW LIGHTS,2 SWITCHES,REBANK 13 LIGHTS PER 2008 NEC (OFFICE SPACE)"},{"number":"518577","date":"2014-02-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-02-28","scope":"RELOCATE (7) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE NEW WALL AND CEILING LAYOUT AS PER ALL NFPA 13 AND LOCAL CODES. (14TH FLOOR)"},{"number":"518928","date":"2014-02-07","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-02-26","scope":"FURNISH LABOR AND MATERIAL TO RELOCATE 10 AIR DEVICES"},{"number":"519093","date":"2014-02-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-02","scope":"INSTALL 8 DUPLEX RECEPTACLES,3 FURNITURE FEEDS AND REWORK LIGHTING AND SWITCHING AS REQUIRED BY NEW LAYOUT PER 2008 NEC (OFFICE SPACE)"},{"number":"520533","date":"2014-02-20","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-02-26","scope":"RELOCATE (4) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"520571","date":"2014-02-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL FIFTY FOUR (54) CATEGORY 5E PLENUM CABLES, AVERAGE CABLE PULL 50 FEET AS PER 2008 NEC (CC DISTRICT)"},{"number":"520572","date":"2014-02-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL FOURTY (40) CATEGORY 5E PLENUM CABLES, AVERAGE CABLE PULL 50 FEET AS PER 2008 NEC (CC DISTRICT)"},{"number":"518955","date":"2014-02-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-02-26","scope":"INSTALLATION OF KITCHEN SINK EXTEND FROM EXISTING SANITARY, VENT AND COLD WATER"},{"number":"522576","date":"2014-03-05","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-09-30","scope":"RELOCATE (42) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE THE BUILDING CLOSET LAYOUTS AS PER ALL NFPA NO. 13 AND ALLL PHILDELPHIA CODE."},{"number":"530508","date":"2014-04-15","work":"Use","type":"ZP_USE","description":"USE PERMIT","status":"COMPLETED","completedDate":"2014-04-15","scope":"FOR THE CREATION OF TWO (2) TENANT SPACES (SPACE 610 AND SPACE 620 AS MARKED ON THE PLANS) FROM ONE EXISTING TENANT SPACE. SPACE 620 TO BE VACANT, USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY. SPACE 610 FOR THE USE OF A BUISNESS AND PROFESSIONAL OFFICE WITH OTHER BUSINESS AND PROFESSIONAL OFFICES THROUGHOUT THE BUILDING AS PREVIOUSLY APPROVED. NO SIGNS ON THIS APPLICATION. SIZE AND LOCATION AS SHOWN IN APPROVED APPLICATION/PLAN."},{"number":"526814","date":"2014-04-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-06-04","scope":"FOR LEVEL II ALTERATIONS OF AN EXISTING OFFICE SPACE ON THE 6TH FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE DEMOLITION AND ERECTION OF PARTITION WALLS, PROVIDE FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK."},{"number":"531542","date":"2014-04-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-05-22","scope":"MOVING LIGHTS & ADDING RECEPTS IN NEW PARTITION WALLS (OFFICE BLDG) AS PER NEC 2008"},{"number":"533355","date":"2014-04-30","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2014-06-04","scope":"INSTALL (1) PANTRY SINK"},{"number":"534161","date":"2014-05-02","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-05-08","scope":"RELOCATE (10) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUT AS PER ALL NFPA NO. 13 AND LOCAL CODES."},{"number":"535847","date":"2014-05-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-16","scope":"RELOCATING 2 HORN STROBES IN EXISTING SPACE PER 2008 NEC & NFPA 72 (OFFICE SPACE)"},{"number":"544810","date":"2014-07-01","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-08-25","scope":"LEVEL II INTERIOR ALTERATIONS TO EXISTING OFFICE SPACE ON THE 7TH FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"546960","date":"2014-07-02","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-08-25","scope":"RELOCATE 10 SPRINKLER HEADS."},{"number":"548755","date":"2014-07-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2014-09-06","scope":"RELOCATE 5 DUPLEX RECEPTACLES AND 3 SWS TO ACCOMMODATE NEW LAY OUT PER 2008 NEC (OFFICE SPACE)"},{"number":"550144","date":"2014-07-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-08-25","scope":"RELOCATE 2 DIFFUSERS"},{"number":"571712","date":"2014-11-03","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2014-11-20","scope":"INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILING ONLY. NO OTHER WORK ALLOWED UNDER THIS PERMIT. CONTACT STREETS DEPARTMENT FOR DUMPSTER PERMIT AND FOOTWAY CLOSURE."},{"number":"572341","date":"2014-11-05","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2014-12-12","scope":"RELOCATE 16 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"573476","date":"2014-11-12","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2014-12-12","scope":"RELOCATE 11 DIFFUSERS"},{"number":"573644","date":"2014-11-12","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-13","scope":"10-LGTS FIXTURES, RELOCATE 13-EXISTING LGT, 8-SW, 16-RECEPTS, 2-FLOOR RECPTS, CONECT 1-EXISTING PNLS & RELOCATE EXISTING F/A DEVICES (NO NEW WIRING) AS PER NEC 2008 & NFPA 72 (OFFICE SPACE)"},{"number":"573984","date":"2014-11-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-01-06","scope":"LOW VOLTAGE CABLING FURNISH AND INSTALL 10 CATEGORY 6 PLENUM RATED COMMUNICATION POINTS PER 2008 NEC (OFFICE SPACE)"},{"number":"572875","date":"2014-11-18","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2014-12-12","scope":"INTERIOR ALTERATIONS AS PER PLANS. CO IS ATTACHED AS A MATTER OF UPDATING RECORDS, NOT REQUIRED."},{"number":"578048","date":"2014-12-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-04-27","scope":"REMOVE AND RELOCATE 30 EXISTING 2X4 FIXTURES,13 EXISTING DOWNLIGHT FIXTURES AND 6 DUPLEX RECEPTACLES.REUSE ALL EXISTING CIRCUITING PER 2008 NEC (OFFICE SPACE)"},{"number":"576749","date":"2014-12-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-03-02","scope":"FOR LEVEL II INTERIOR ALTERATIONS ON THE 29TH FLOOR OF AN EXISTING HIGH-RISE OFFICE BUILDING. BUILDING IS FULLY SPRINKLERED. WORK TO INCLUDE NEW INTERIOR NON-BEARING PARTITIONS, CEILINGS REPLACEMENT, AND FINISHES. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **ALL ASBESTOS TO BE TREATED& REMOVED PRIOR TO COMMENCEMENT OF WORK.**"},{"number":"579477","date":"2014-12-12","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-02-03","scope":"RELOCATE (29) SPRINKLER HEADS."},{"number":"580257","date":"2014-12-29","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-04-22","scope":"LEVEL II ALTERATIONS AS PER PLAN."},{"number":"582079","date":"2014-12-30","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-02-03","scope":"RELOCATE 25 GRDS DOR NEW LAYOUT"},{"number":"581859","date":"2015-01-06","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-03-23","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO BUSINESS OFFICE SPACE IN EXISTING HIGH RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING IS FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"582888","date":"2015-01-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-28","scope":"PROVIDE AND INSTALL AUDIO VISAL CABLING IN ROOM 2916 & 130 CAT 6 PLENUM CABLES.ALL CABLING WILL BE INSTALLED IN J-HOOKS AND ALL PENETRATIONS WILL BE FIRE STOPPED PER 2008 NEC (OFFICE SPACE)"},{"number":"584657","date":"2015-01-14","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-06","scope":"INSTALL 10 RECEPTS FOR POWER,CHANGE 20 BALLASTS(NO WIRING)AS PER 2008 NEC (CC DISTRICT)"},{"number":"585842","date":"2015-01-21","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-07-02","scope":"RELOCATE 8 EXISTING SPRINKLER HEADS. (COMMERCIAL)"},{"number":"580658","date":"2015-01-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-04-27","scope":"FURNISH AND INSTALL FIRE ALARM EQUIPMENT AS PER NFPA72 (CC DISTRICT)"},{"number":"587581","date":"2015-01-30","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-03-23","scope":"RELOCATE 30 EXISTING FIRE SPRINKLER HEADS (WEBER GALLAGHER)"},{"number":"588808","date":"2015-02-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-03-23","scope":"FURNISH LABOR AND MISC MATERIAL TO RELOCATE 14 DIFFUSERS"},{"number":"589045","date":"2015-02-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-31","scope":"F/I 48 CAT6 PLENUM CABLES, 2 PATCH PANELS & 5 PLENUM HDMI CABLES FOR TV'S"},{"number":"586069","date":"2015-02-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-04","scope":"INSTALLATION OF 10 DUAL CATEGORY 5E PLENUM TELEPHONE/COMPUTER WIRES...IN ACCORDANCE WITH 2008 NEC"},{"number":"590718","date":"2015-02-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-06","scope":"REMOVE AND RELOCATE EXISTING 46-LIGHT FIXTURES AND 33-RECEPTS,NO NEW CIRCUITRY,REUSE ALL EXISTING WIRING AS PER 2008 NEC (CC DISTRICT)"},{"number":"591291","date":"2015-02-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-24","scope":"FURNISH AND INSTALL 48 CAT5E PLENUM CABLES AVERAGE CABLE PULL 150' AS PER 2008 NEC(CC DISTRICT)"},{"number":"591394","date":"2015-02-19","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-04-22","scope":"FURNISH AND INSTALL 1PANTRY SINK,CONNECT TO EXISTING SANITARY,VENT AND DOMESTIC WATER-THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"594414","date":"2015-03-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-04-22","scope":"RELOCATE 5 EXISTING SPRINKLER HEADS."},{"number":"592546","date":"2015-03-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-06","scope":"FURNISH AND INSTALL 4 NEW SPEAKER STROBE DEVICES AS PER NFPA72"},{"number":"601582","date":"2015-04-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-05-26","scope":"FOR INTERIOR ALTERATIONS TO INCLUDE THE INTERIOR DEMOLITION OF EXISTING PARTITION WALLS, NEW PARTITION WALL ERECTION, AND CEILING, FLOOR, AND WALL FINISHING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL WORK. (IEBC 2009, COMPLIANCE PATH: WORK-AREA METHOD, LEVEL II ALTERATIONS)"},{"number":"606322","date":"2015-04-29","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-05-26","scope":"RELOCATE (6) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE THE TENANT LAYOUTS AS PER ALL NFPA NO. 13 AND LOCAL CODE."},{"number":"606920","date":"2015-04-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-26","scope":"RELOCATE 10 2X4 LIGHTING, 5 SWITCHES, 12 RECEPTACLES, 6 BOX AND STRING FOR COMMUNICATION WIRING ALL WORK TO COMPLY WITH THE 2008 NEC"},{"number":"607603","date":"2015-05-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-05-26","scope":"RELOCATE 4 DIFFUSERS EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"626879","date":"2015-07-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-11-18","scope":"RELOCATE 12 EXISTING SPRINKLER HEADS 5TH FLOOR (COMMERCIAL)"},{"number":"626903","date":"2015-07-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2015-10-06","scope":"RELOCATE 9 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"628500","date":"2015-07-30","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"EXPIRED","completedDate":"2015-09-08","scope":"EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. WORK ACTIVITY WILL BE SELECTIVE DEMOLITON ON THE 7TH & 8TH FLOORS. **POST THIS PERMIT** **POST THE PROJECT INFORMATION SIGN**"},{"number":"626196","date":"2015-08-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-11-18","scope":"PARTIAL INTERIOR ALTERATIONS AND UPGRADES TO FINISHES EXISTING OFFICE SPACE AS PER PLANS"},{"number":"629342","date":"2015-08-05","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-10-06","scope":"INSTALLATION OF A KITCHEN SINK OPEN SITE DRAIN/INDIRECT WASTE; CONNECT TO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"627502","date":"2015-08-10","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-10-06","scope":"MECHANICAL DEMO AND ALTERATIONS TO EXISTING HVAC SYSTYEM, NEW DUCTWORK, DIFFUSERS,ACCESSORIES AS PER PLANS AND SCHEDULES"},{"number":"631873","date":"2015-08-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-12-03","scope":"INSTALL 12 RECEPTICLES, 7 LIGHTS, 4 HIGH HATS, AND 5 SWITCHES."},{"number":"632678","date":"2015-08-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-18","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE RELOCATION OF DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"626541","date":"2015-08-24","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2015-10-06","scope":"FOR PRESCRIPTIVE ALTERATIONS AT BUSINESS OFFICE TENANT SPACE WITHIN EXIST. MIXED-USE HIGH-RISE OFFICE BUILDING TO INCLUDE DEMO. OF INT. PARTITION WALLS, ERECTION OF PARTITION WALLS FOR OPEN OFFICE & CONFERENCE RM. SPACES & INSTALLATION OF DROP CEILING ASSEMBLY & FOR ALTERATIONS @ 8TH FLOOR AREA FOR SMALL ASSEMBLY SPACE; WORK AREA(S) TO BE FULLY SPRINKLERED. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING & FIRE SUPPRESSION WORK."},{"number":"634533","date":"2015-08-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-08-21","scope":"INSTALL 9- CAT6 PLENUM CABLES IN 3- VOICE/DATA LOCATIONS AND RELOCATE 6- CAT 5E PLENUM CABLES IN 2- VOICE/DATA LOCATIONS.. LONGEST RUN IS 200FT.... IN ACCORDANCE WITH 2008 NEC"},{"number":"629275","date":"2015-08-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2015-11-04","scope":"7TH FLOOR, SUITE 750 - AETNA TENANT SPACE ELECTRICAL/FIRE ALARM ALTERATIONS - TENANT FIT-OUT WORK PER THE APPROVED PLANS BY T.Y.LIN INTERNATIONAL DATED 07.17.2015 - FIRE ALARM TO BE INSTALLED PER THE APPROVED SIMPLEX DRAWINGS - THE INSTALLATION WILL COMPLY WITH THE 2008 NEC AND THE NFPA 72"},{"number":"634504","date":"2015-09-02","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2015-11-18","scope":"INSTALL COLD WATER LINE TO REFRIGERATOR, COFFEE MAKER AND WATER DISPENSER... CONNECT TO EXISTING DOMESTIC WATER"},{"number":"636914","date":"2015-09-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-03-18","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO EXISTING OFFICE SPACE ON 13TH FLOOR OF EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**"},{"number":"641880","date":"2015-09-30","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2015-11-04","scope":"TO AMEND PERMIT #628500 TO REFLECT CORRECT ACTIVITY. EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. PLANS. WORK ACTIVITY WILL BE SELECTIVE DEMOLITON ON THE 7TH & 8TH FLOORS. **POST THIS PERMIT** **POST THE PROJECT INFORMATION SIGN**"},{"number":"635793","date":"2015-10-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"CAT6 PLEMUM RATED CABLES (85) CAT6 CABLE APPROX 125' EACH. INSTALL 18/4 SECURITY WIRE ONLY PER 2008 NEC (OFFICE SPACE) CC DISTRICT"},{"number":"651959","date":"2015-11-13","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2015-12-15","scope":"INTERIOR DEMO OF NON-LOAD BEARING PARTITIONS ONLY (COMMERCIAL)"},{"number":"652991","date":"2015-11-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-04-14","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"653754","date":"2015-11-23","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-06-08","scope":"RELOCATE (11) DIFFUSERS, TO COMPLY WITH EZ PERMIT STANDARDS FOR DUCTWORK"},{"number":"651755","date":"2015-12-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-06-08","scope":"INTERIOR RENOVATION OF EXISTING OFFICE CORRIDOR SPACE."},{"number":"655850","date":"2015-12-03","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"REMOVE (22) EXISTING 2X2 FIXTURES & REPLACE WITH (22) NEW 2X2 FIXTURES. REUSE EXISITNG CIRCUITRY, NO NEW CIRCUITING REQUIRED AS PER 2008 NEC (CC DISTRICT)"},{"number":"657554","date":"2015-12-11","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-03-14","scope":"RELOCATE (40) SPRINKLER HEADS TO ACCOMMODATE TENANTS LAYOUT AND CEILINGS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"659665","date":"2015-12-23","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-06-08","scope":"AFTER DEMO: INSTALL MOP SINK, EXTEND FROM EXISTING SERVICE, INSTALL 4- NEW UNDER MOUNT SINKS WITH AUTO FAUCETS IN SAME LOCATION WITH NO ADDITIONAL PIPING."},{"number":"656933","date":"2015-12-28","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-03-24","scope":"INTERIOR DEMO & ALTERATIONS, NEW PARTITIONS, NEW FLOOR LAYOUT AND EXPANSION, RENOVATIONS, UPGRADES TO FINISHES, FURNISHINGS OF OFFICE SPACE. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, HVAC, SPRINKLERS."},{"number":"660657","date":"2015-12-29","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-03-14","scope":"NEW KITCHEN SINK AND WATER HEATER FOR COFFEE AREA (OFFICE SPACE)THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"660669","date":"2015-12-29","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2016-06-11","scope":"INTERIOR DEMOLITION, TO COMPLY WITH EZ PERMIT STANDARDS.EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"657575","date":"2016-01-13","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-03-16","scope":"INSTALLATION OF HVAC INCLUDING DUCTWORK AS PER PLANS. 56 REGISTERS/DIFFUSERS"},{"number":"657800","date":"2016-01-15","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-04-14","scope":"FURNISH AND INSTALL 1X4 AND 2X4 DOWNLIGHT FIXTURES,DUPLEX RECEPTACLES AND REMOVE AND RELOCATE EXISTING PANEL PER 2008 NEC (OFFICE SPACE )CC DISTRICT"},{"number":"662783","date":"2016-01-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-23","scope":"INSTALL CAT 6A CABLING WITHIN 18TH FLOOR OFFICE SPACE FOR TELEPHONE & COMPUTER NETWORK CONNECTION, LONGEST RUNNING CABLE 300' AS PER NEC 2008 CC DISTRICT"},{"number":"668011","date":"2016-02-04","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-05-25","scope":"RELOCATE (59) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"662916","date":"2016-02-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-04-14","scope":"FURNISH & INSTALL FIRE ALARM STROBES, SPEAKER-STROBES AND NAC PANEL AS PER NFPA 72"},{"number":"668127","date":"2016-02-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-22","scope":"ALTERATIONS TO EXISTING HVAC SYSTEM, INCLUDING DUCTWORK AND MECHANICAL EQUIPMENT, TO ACCOMODATE NEW OFFICE LAYOUTS ON 12TH, 19TH AND 21ST FLOORS AS PER APPROVED PLANS."},{"number":"667655","date":"2016-02-22","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-07-28","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. LEVEL II INTERIOR ALTERATIONS TO AN EXISTING OFFICE SPACE ON THE 12TH, 19TH, AND 21ST FLOOR AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ASBESTOS ABATEMENT REQUIRED PRIOR TO COMMENCEMENT OF WORK"},{"number":"673165","date":"2016-03-01","work":"Demolition","type":"BP_DEMO","description":"DEMOLITION PERMIT","status":"COMPLETED","completedDate":"2016-07-02","scope":"INTERIOR DEMOLITION ON 29TH FLOOR EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"673853","date":"2016-03-03","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-07-02","scope":"RELOCATE 4 DIFFUSERS-OFFICE BLDG EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"671893","date":"2016-03-07","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-12-13","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"678118","date":"2016-03-22","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-07-02","scope":"INSTALL PANTRY SINK, WATER HEATER, CONNECT TO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"678587","date":"2016-03-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-10-26","scope":"INSTALLING 9 2X4 LIGHTS, THREE FURNITURE FEEDS AND 1 OCCUPANCE SENSOR AS PER 2008 NEC (CC DISTRICT)"},{"number":"665952","date":"2016-04-05","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-08-21","scope":"FURNISH & INSTALL NEW LIGHT FIXTURES, OCCUPANCY SENSORS, POKE-THRUS & RECEPTACLES AS PER NEC 2008 CC DISTRICT"},{"number":"682568","date":"2016-04-07","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-07-02","scope":"RELOCATE (7) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"675351","date":"2016-04-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH & INSTALL FIRE ALARM SPEAKER/STROBE AS PER NFPA 72 CC DISTRICT"},{"number":"675414","date":"2016-04-13","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 4- CAT5E PLENUM RATED COMPUTER WIRE DROP LOCATIONS. SWING EXISTING DATA RACK 45 DEGREES... IN ACCORDANCE WITH 2008 NEC"},{"number":"684157","date":"2016-04-14","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-03-25","scope":"INSTALL 10-GAL WATER FOR SINK & 1-WATER LINE FOR COFFEE MAKERS IN NEW BREAK ROOM SINK NOTE: THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004"},{"number":"683039","date":"2016-04-19","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-09-20","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO EXISTING OFFICE SPACE ON 28TH FLOOR OF EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**"},{"number":"686754","date":"2016-04-25","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-07-02","scope":"RLOCATE 3 DIFFUSERS-EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"686137","date":"2016-05-04","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"INSTALLATION OF CATEGORY 6A CASE FOR OFFICE AND CUBICLE LOCATIONS 300' RUN AS PER NEC 2008 CC DISTRICT"},{"number":"691694","date":"2016-05-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 20- PLENUM RATED CAT 6 COMPUTER WIRE DROP LOCATIONS ... IN ACCORDANCE WITH 2008 NEC"},{"number":"695199","date":"2016-05-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE TWO HORN STROBES TO TWO CONFERENCE ROOMS PER NFPA NEC (OFFICE SPACE)"},{"number":"701973","date":"2016-06-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-06-27","scope":"TEST, INSPECT & REPAIR BUS PLUG SWITCH AND BUS DUCT DAMAGED BY ARC FIRE PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"675528","date":"2016-06-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-20","scope":"1-2X4 LAYIN FIXTURE, 4-2X2 LAYIN FIXTURE, 2-3WAY SWITCHES, 4 EXIT SIGNS, 8 SWITCHES, 4 GFCI OUTLETS, CONNECT ON POWER WHIP/ METER ONE PANEL PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"691809","date":"2016-06-28","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-08-20","scope":"INSTALLING NEW PANEL,RELOCATING CIRCUITS TO NEW PANEL,SUPPLYING 1 FURNITURE FEED, 1 FLOOR OUTLET,5 OUTLETS IN BREAK ROOM,RELOCATING RECEPTACLES IN CLOUDED AREAS,RELOCATED 4 SWITCHES AND ADDING 6 HI-HATS LIGHTING PER 2008 NEC (OFFICE SPACE) CC DISTRICT"},{"number":"704481","date":"2016-07-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-01-24","scope":"ELEVATOR LOBBY RENOVATION OF EXISTING TENANT SPACE"},{"number":"704480","date":"2016-07-12","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-07-28","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR DEMO & ALTERATIONS, NEW PARTITIONS, NEW FLOOR LAYOUT AND EXPANSION, RENOVATION, UPGRADES TO FINISHES, FURNISHINGS OF OFFICE SPACE. ASBESTOS ABATEMENT REQUIRED PRIOR TO COMMENCEMENT OF WORK. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, HVAC, SPRINKLERS."},{"number":"706505","date":"2016-07-12","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2016-10-25","scope":"RELOCATE 10 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"704978","date":"2016-07-18","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2016-11-02","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"706447","date":"2016-07-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-22","scope":"HVAC INCLUDING DUCTWORK AND MECHANICALS AS PER PLANS."},{"number":"709384","date":"2016-07-22","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-09-19","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.RELOCATE (9) DIFFUSERS, TO COMPLY WITH EZ PERMTI STANDARDS FOR DUCTWORK"},{"number":"709759","date":"2016-07-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"300 FT MAX RUN 21 CAT6A CABLE RUNS PER 2008 NEC (OFFICE SPACE) CC DISTRICT"},{"number":"714094","date":"2016-08-11","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-11-13","scope":"PROVIDE AND INSTALL 37 LOCATIONS OF 1 CAT6 PLENUM CABLES @ 140' AVERAGE. ALL CABLING WILL BE INSTALLED IN J-HOOKS, ALL PENETRATIONS WILL BE FIRE STOPPED AS PER 2008 NEC (CC DISTRICT)"},{"number":"706570","date":"2016-08-23","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL54 FURNITURE FEEDS, 12 RECEPTS, 3 EXIT SIGNS, 34 LLIGHTS, 5 SWITCHES & 3 OCCUPANCY SENSORS AS PER 2008 NEC (CC DISTRICT)"},{"number":"723956","date":"2016-09-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"REMOVE 18 EXISTING DOWN LIGHTS AND 6 EXISTING PENDANT AND REPLACE WITH NEW. EXISTING CIRCUITING TO BE REUSED PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"719689","date":"2016-09-23","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-08-24","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO EXISTING OFFICE SPACE ON 10TH & 11TH FLOORS OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**"},{"number":"726965","date":"2016-10-05","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"DEMO OLD CABLING FROM 10TH FL CEILING,INSTALL 5 CAT6A PLENUM CABLES @150' AVERAGE. ALL CABLING WILL BE INSTALLED IN J HOOKS. ALL PENETRATIONS WILL BE FIRE STOPPED AS PER NEC 2008 (CC DISTRICT)"},{"number":"728141","date":"2016-10-18","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2016-12-09","scope":"HVAC INCLUDING DUCTWORK AS PER PLANS-23 REGISTERS/DIFFUSER"},{"number":"730490","date":"2016-10-20","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2016-12-09","scope":"ADD (2) KITCHEN SINKS FOR COFFEE STATIONS FROM EXISTING PIPING.THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004"},{"number":"715636","date":"2016-10-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-24","scope":"DEMO EXISTING RECEPTS, AND LIGHTING TO INSTALL NEW AS PER 2008 NEC (CC DISTRICT)"},{"number":"725699","date":"2016-10-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-09-20","scope":"INSTALL NEW LIGHTS FIXTURES,OCCUPANCY SENSORS,POKE-THRU'S AND RECEPTACLES PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"733760","date":"2016-11-02","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-05-16","scope":"RELOCATE 10 SPRINKLER HEADS. (COMM)"},{"number":"734067","date":"2016-11-03","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-03-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"733867","date":"2016-11-08","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-05-11","scope":"RENOVATION OF EXISTING ELEVATOR LOBBY, CORRIDOR AND TOILET ROOMS. NO WORK IS BEING DONE ON ANY LOAD BEARING WALLS."},{"number":"735218","date":"2016-11-08","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-01-05","scope":"RELOCATE (10) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"734435","date":"2016-11-10","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-05-15","scope":"LEVEL II ALTERATIONS AS PER PLAN."},{"number":"736212","date":"2016-11-14","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-01-05","scope":"RELOCATE 7 DIFFUSERS."},{"number":"737057","date":"2016-11-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-11-13","scope":"PROVIDE AND INSTALL 2 CAT 6 PLENUM CALES 11 LOCATIONS @ 50' AVERAGE. ALL CABLING WILL BE INSTALLED IN J-HOOKS AND ALL PENETRATIONS WILL BE FIRE STOPPED PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"737411","date":"2016-11-17","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-05-11","scope":"FURNISH AND INSTALL 10 DUFFUSERS AND OVER EXHAUST FAN FOR SERVER CLOSET"},{"number":"736585","date":"2016-11-17","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-01-05","scope":"INSTALLATION OF SINK AND POINT OF USE WATER HEATER"},{"number":"737640","date":"2016-11-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-05-16","scope":"RELOCATE (20) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"737907","date":"2016-11-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-03-27","scope":"REMOVE 23 EXISTING 2X2 FIXTURES AND 4 EXISTING PENDANTS AND REPLACE WITH NEW. EXISTING CIRCUITING TO BE REUSED PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"729323","date":"2016-11-18","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2016-12-13","scope":"FURNISH AND INSTALL 5 SEILING MOUNT SPEAKER STROBES, 14 STROBES AND 1 NAC PANEL AS PER NFPA 72 AND FIRE ALARM DRAWINGS."},{"number":"736317","date":"2016-11-22","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"RELOCATE 24 LIGHT FIXTURES,INSTALL THREE OCCUPANCY SENSORS, 10 RECEPTACLES, 2 GFCI, 3 FURNITURE FEEDS, DIGITAL METER AND ONE-100AMP 3-PHASE POWER PANEL AS PER 2008 NEC (CC DISTRICT)"},{"number":"738543","date":"2016-12-15","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-22","scope":"FOR LEVEL II ALTERATIONS TO EXISTING MECHANICAL SYSTEM ON 14TH FLOOR LEVEL OF AN EXISTING BUILDING, ALTERATIONS TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND MECHANICAL APPLIANCES WITH ASSOCIATED DUCTWORK. MECHANICAL APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"743428","date":"2016-12-15","work":"Use","type":"ZP_USE","description":"USE PERMIT","status":"COMPLETED","completedDate":"2016-12-15","scope":"FOR THE USE OF PERSONAL SERVICES ACCESSORY TO PREVIOUSLY APPROVED BUSINESS USE ON THE 14TH FLOOR OF AN EXISTING BUILDING. NO CHANGE IN HEIGHT OR AREA TO THE EXISTING BUILDING. NO SIGNS ON THIS APPLICATION."},{"number":"737910","date":"2016-12-15","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-07-28","scope":"***ASBESTOS ABATEMENT REQUIRED PRIOR TO THE START OF ANY WORK.***FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR THE USE OF PERSONAL SERVICES ACCESSORY TO BUSINESS OCCUPANCY ON THE 14TH FLOOR LEVEL OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"738433","date":"2016-12-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-25","scope":"INSTALL NEW LIGHT FIXTURES, OCCUPANCY SENSORS AND RECEPTACLES AS PER NEC 2008 (CC DISTRICT)"},{"number":"745137","date":"2017-01-13","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-05-11","scope":"REMOVE AND REPLACE 4- LAVATORIES"},{"number":"753090","date":"2017-01-23","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Expired","completedDate":"2022-05-13","scope":"INSTALLATION OF CAT6A AND FIBER OPTIC CABLING WITHIN 14TH FLOOR OFFICE SPACE.... IN ACCORDANCE WITH 2008 NEC"},{"number":"745449","date":"2017-01-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-07-25","scope":"FURNISH AND INSTQALL 5 CEILING MOUNT SPEAKER STROBES AS PER NFPA72 (CC DISTRICT)"},{"number":"761322","date":"2017-02-22","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-09-13","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"764624","date":"2017-03-07","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-09-26","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"763765","date":"2017-03-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-04-28","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"763770","date":"2017-03-17","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-04-28","scope":"LEVEL II ALTERATION AS PER PLAN."},{"number":"770276","date":"2017-03-28","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-04-28","scope":"RELOCATE (2) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"770355","date":"2017-03-29","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-04-28","scope":"RELOCATE (10) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"770920","date":"2017-03-30","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"INSTALL 31 CAT 6 COMMUNICATION POINTS PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"769358","date":"2017-04-25","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-07-17","scope":"REMOVE 8 SWITCHES,5 RECEPTACLES AND INSTALL 8 NEW SWITCHES,8 RECEPTACLES,1 POWER WHIP AND REBANKING EXISTING PER 2008 NEC (OFFICE SPACE)CC DISTRICT"},{"number":"769360","date":"2017-04-26","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2017-08-17","scope":"REPLACE (15)2X4 LIGHTS,(1)2X2 LIGHT,(2)3WAY SWITCHES,(2)OCC SENSORS,2 FLOOR RECEPTACLES,3 FURNITURE FEEDS AND 5 QUAD OUTLETS PER 2008 NEC (OFFICE SPACE)HORN STROBES IN WALLS TO BE DEMOED PER NFPA 72"},{"number":"791384","date":"2017-06-23","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2017-09-25","scope":"INTERIOR ALTERATIONS TO CREATE NEW OFFICE SPACE ON THE 13TH FLOOR OF AN EXISTING OFFICE BUILDING AS PER PLANS. SEPARATE M, E, P AND FSS PERMITS REQUIRED."},{"number":"795818","date":"2017-06-28","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-07-22","scope":"RELOCATE (20) EXISTING SPRINKLER HEADS IN ORDER TO ACCOMMODATE TENANT LAYOUTS AS PER NFPA NO. 13 AND ALL LOCAL CODES."},{"number":"791785","date":"2017-07-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-03-19","scope":"LEVEL II ALTERATIONFOR OFFICE RENOVATIONS AS PER PLANS.** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S.**"},{"number":"803383","date":"2017-07-27","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2017-09-25","scope":"RELOCATE 12 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"801452","date":"2017-08-01","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2017-09-25","scope":"HVAC, INCLUDING RELATED DUCTWORK WITHIN THE 9TH FLOOR OFFICE SPACE AS PER PLANS."},{"number":"798228","date":"2017-08-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"FURNISH AND INSTALL 264 CAT 6 PLENUM CABLES ON 2ND FLOOR. F&I 376 CAT 6 PLENUM CABLES ON 3RD FLOOR.F&I 196 CAT 6 PLENUM CABLES ON 4TH FLOOR AVERAGE CABLE PULL 120 FEET PER 2008 NEC (OFFICE SPACE)"},{"number":"804835","date":"2017-08-16","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-03-19","scope":"FURNISH AND INSTALL DUCT, AIR DEVICES, EXHAUST FAN & VAV BOXES FOR NEW OFFICE LAYOUT ON THE 2ND, 3RD AND 4TH FLOORS AS PER PLANS."},{"number":"808834","date":"2017-08-16","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-03-19","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"810587","date":"2017-08-24","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2018-03-19","scope":"REMOVE 4- EXISTING PANTRIES AND INSTALL 5- NEW PANTRIES"},{"number":"812413","date":"2017-08-30","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2017-09-25","scope":"INSTALL 1- PANTRY SINK, 1- 6- GALLON WATER HEATER IN A PAN, 1- OPEN SITE DRAIN, CONNECT TO EXISTING SANITARY, VENT AND DOMESTIC WATER"},{"number":"793357","date":"2017-09-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-05-14","scope":"INSTALL 35 LED LIGHTS ON EXISTING CIRCUITS, 14 RECEPTACLES, 3 FURNITURE WHIPS, MOVE HORN STROBE FROM DEMO WALL, 8 SWITCHES AND 5 OCCUPANCY SENSORS AS PER 2008 NEC (CC DISTRICT)"},{"number":"803787","date":"2017-09-08","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-03-19","scope":"FURNISH AND INSTALL 378 LIGHT FIXTURES, 213 RECEPTACLES & SWITCHES AND 3 FLOOR BOXES. REUSE EXISTING PANELS AS PER NEC 2008 CC DISTRICT"},{"number":"811788","date":"2017-09-28","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2018-04-05","scope":"AMEND BLDG PERMIT #791785 TO DELETE SMOKE CURTAIN AS PER PLANS. SEE BBS VARIANCE CASE # 0518-96."},{"number":"827405","date":"2017-11-03","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-01-24","scope":"LEVEL II ALTERATIONS - RENOVATION OF EXISTING ELEVATORY LOBBY, COMMON CORRIDORS AND RESTORMM NO-LOAD BEARING WALLS BEING AFFECTED."},{"number":"831204","date":"2017-11-10","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-05-23","scope":"REPLACE 16-EXISTING 2X2 LIGHT FIXTURES AND 4-PENDANT FIXTURES WITH NEW,EXISTING CIRCUITING TO BE REUSED,NO NEW CIRCUITING REQUIRED AS PER 2008 NEC (CC DISTRICT)"},{"number":"831245","date":"2017-11-10","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2018-06-04","scope":"FURNISH LABOR AND MATERIAL TO RELOCATE 7 AIR DEVICES AND MISC DUCT. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"831259","date":"2017-11-10","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2018-06-01","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"832500","date":"2017-11-21","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2018-06-12","scope":"REMOVE AND REPLACE FOUR LAVS"},{"number":"840888","date":"2017-12-20","work":"Administrative","type":"BP_ADMINST","description":"ADMINISTRATIVE PERMIT","status":"COMPLETED","completedDate":"2018-01-09","scope":"TEMPORARY CERTIFICATE OF OCCUPANCY FOR 4TH FLOOR"},{"number":"820853","date":"2018-03-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-05-21","scope":"FURNSIH AND INSTALL 1 NEW SPEAKER/STROBE AND 6 NEW STROBES.RELOCATE 14 EXISTING DEVICE REUSE EXISTING PANELS PER NFPA 72 (OFFICE SPACE)"},{"number":"888198","date":"2018-07-11","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-01-25","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING PARITAL 12TH FLOOR OFFICE SPACE IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. ** SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK **"},{"number":"894368","date":"2018-07-17","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-01-25","scope":"RELOCATE 10 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"895079","date":"2018-07-19","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-01-25","scope":"FOR THE INSTALLATION IF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"892231","date":"2018-07-20","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2018-09-04","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR THE USE OF A BUSINESS OCCUPANCY ON THE 7TH FLOOR LEVEL OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK."},{"number":"895651","date":"2018-07-20","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-11-09","scope":"REMOVE AND RELOCATE (8)1X4 LIGHT FIXTURES,(4)1X2 LIGHT FIXTURES & (3)2X4 LIGHT FIXTURES. INSTALL (5)CC SENSORS AND 5 DUPLEX RECEPTACLES.NO CIRCUITRY REQUIRED PER 2008 NEC (OFFICE SPACE)"},{"number":"896146","date":"2018-07-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2018-09-04","scope":"INSTALL ONTO EXISTING 100AMP SUB PANEL 7-120VOLT RECEPTACLES, 3 SWITCHES RELOCATE 6 LIGHTS & 4 DATE OUTLETS CAT5E PLENUM RATED WIWTH THE LONGEST RUN 75' AS PER 2008 NEC (CC DISTRICT)"},{"number":"895193","date":"2018-07-24","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":null,"scope":"LOW VOLTAGE TELECOMMUNICATIONS CAT6 CABLING (10).... IN ACCORDANCE WITH 2008 NEC (OFFICE)"},{"number":"903005","date":"2018-09-21","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-10-02","scope":"NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS (PRESCRIPTIVE METHOD) AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK."},{"number":"926289","date":"2018-11-09","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-04","scope":"PROVIDE & INSTALL 13-NEW CAT6 PLENUM CABLES @ 150', RELOCATE 24-EXISTING CAT6 CABLES, ALL CABLING WILL BE INSTALLED IN J-HOOKS AND ALL PENTRATIONS WILL BE FIRE STOPPED **NO WORK ON RESCUE SYSTEM AS PER NEC 2008 CC DISTRICT"},{"number":"929330","date":"2018-11-21","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-04-03","scope":"INSTALL 120VAC CIRCUITS FOR 8-NEW CUBICLE FURNITURE,INSTALL 30-PLENUM RATED CAT6 TELE-COM CABLING FOR NEW CUBICLE FURNITURE WITH A LONGEST RUN OF ABOUT 150FT FOR NEW CUBICLE FURNITURE AND INSTALL RECEPT FOR NEW TV AS PER 2008 NEC (CC DISTRICT)"},{"number":"933033","date":"2018-12-06","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-02-28","scope":"RELOCATE 28 SPRINKLER HEADS"},{"number":"930220","date":"2018-12-06","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-01-11","scope":"REMOVE/RELOCATE LIGHTING FIXTURES, INSTALL RECEPTACLES AND POWER PER PLANS AND SPECS AND IN ACCORDANCE WITH NEC 2008."},{"number":"935996","date":"2018-12-18","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"EXPIRED","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"934896","date":"2018-12-27","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-01-11","scope":"INSTALL (5) NEW SPEAKER/STROB, INSTALL (1) DUAL RELAY, AND RELOCATE (4) EXISTING SPEAKER/STROBE. PER NEC 2008"},{"number":"945451","date":"2019-02-05","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-05-22","scope":"LEVEL II ALTERATION OF EXISTING SPACE TO INCLUDE PARTITIONS AS PER PLAN. ** SEPERATE PERMITS WILL BE REQUIRED FOR M.E.P.WORK ** *IEBC 09*"},{"number":"947217","date":"2019-02-06","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-05-08","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"945420","date":"2019-02-11","work":"Major alteration","type":"BP_ALTER","description":"ALTERATION PERMIT","status":"COMPLETED","completedDate":"2019-03-29","scope":"LEVEL II ALTERATIONS AS PER PLANS *IEBC 09*"},{"number":"950188","date":"2019-02-19","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-29","scope":"INSTALLING 8-NEW 120V OUTLETS, RELOCATING 8-EXISTING LIGHTS, 5-NEW SWITH/OCCUPANCY SENSORS, INSTALLING 7-DATA DROPS, MAY NEED TO RELOCATE HORN/STROBE, SAME ITEM, PER 2008 NEC"},{"number":"950909","date":"2019-02-22","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-03-29","scope":"RELOCATE 4 EXISTING SPRINKLER HEADS (COMMERCIAL)"},{"number":"954361","date":"2019-03-05","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-03-29","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS."},{"number":"954381","date":"2019-03-08","work":"Mechanical","type":"BP_MECH","description":"MECHANICAL PERMIT","status":"COMPLETED","completedDate":"2019-10-02","scope":"HVAC, INCLUDING DUCTWORK, AS PER PLANS. (8) REGISTERS/DIFFUSERS."},{"number":"955681","date":"2019-03-08","work":"Plumbing","type":"PP_PLUMBNG","description":"PLUMBING PERMIT","status":"COMPLETED","completedDate":"2019-05-08","scope":"FURNISH & INSTALL SANITARY, SANITARY VENT & DOMESTIC WATER PIPE FURNISH & INSTALL 1 PANTRY SINK"},{"number":"955264","date":"2019-04-02","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2020-01-29","scope":"FURNISH & INSTALL NEW FIRE ALARM SPEAKER STROBES & STROBE ONL DEVICES AS PER NFPA 72 CC DISTRICT"},{"number":"960418","date":"2019-04-04","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-11-04","scope":"INSTALL ADDRESSABLE SMOKE DETECTORS FOR ELEVATOR RECALL, HEAT DETECTORS FOR SHUNT TRIP INITIATION FOR HIGH RISE ELEVATORS AND FREIGHT ELEVATORS AS PER NFPA 72. (CC DIST)"},{"number":"950218","date":"2019-04-16","work":"Electrical","type":"EP_ELECTRL","description":"ELECTRICAL PERMIT","status":"COMPLETED","completedDate":"2019-04-24","scope":"TENANT FIT OUT RENOVATION, NEW LED LIGHTING AND RECEPTACLES AS PER 2008 NEC. (WEST DIST)"},{"number":"969263","date":"2019-04-23","work":"Suppression","type":"BP_FIRESUP","description":"SUPPRESSION PERMIT","status":"COMPLETED","completedDate":"2019-05-08","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13) - FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS."},{"number":"989161","date":"2019-06-27","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2021-04-07","scope":"SHELTER PLATFORM PERMIT- Erection of 2 sidewalk shelter platforms one 200 l.f. & one 168 l.f. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit is required for sidewalk closure prior to the start work."},{"number":"1013176","date":"2019-09-24","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Completed","completedDate":"2020-10-01","scope":"EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans."},{"number":"1023188","date":"2019-11-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2022-09-13","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO EXISTING OFFICE SPACE ON 12TH & 18TH FLOORS OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018* **SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**"},{"number":"1030909","date":"2019-11-27","work":"New Construction","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-09-09","scope":"Relocate 31 existing sprinkler heads"},{"number":"1030384","date":"2019-12-05","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-05-06","scope":"FURNISH & INSTALL LIGHTING LIGHTING CONTROLS BRANCH CIRCUITS RECEPS AS PER DRAWINGS AND IN ACCORDANCE WITH 2017 NEC CC DIST"},{"number":"1034330","date":"2019-12-12","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-05-24","scope":"118 CAT 6A VOICE/DATA CABLES AS PER 2017 NEC"},{"number":"1034272","date":"2019-12-17","work":"New Construction","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Expired","completedDate":"2021-07-23","scope":"FURNISH AND INSTALL ONE VAV BOX, DUCT AND AIR DEVICES FOR NEW OFFICE CONFIGURATION ON 12TH AND 18TH FLOORS AS PER APPROVED PLANS."},{"number":"1034048","date":"2019-12-27","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-05-07","scope":"FURNISH & INSTALL FIRE ALARM DEVICES AS PER CITY APPROVED DRAWINGS AND IN ACCORDANCE WITH '16 NFPA 72."},{"number":"1030389","date":"2020-01-02","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"INSTALL FIRE PHONES INSIDE ELEVAGTOR LOBBIES STAIR TOWERS & MECHANICAL ROOMS UPGRADE HEAT DETECTORS SMOKE DETECTORS AND DUCT DETECTORS ALL WORK PERFORMED AS PER DRAWINGS AND IN ACCORDANCE WITH NFPA 72 (C.C. DIST.)"},{"number":"1048150","date":"2020-02-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-09-18","scope":"FOR LEVEL I ALTERATIONS TO REMOVE AND REPLACE FLOOR, WALL, AND CEILING FINISHES, DECORATIVE MATERIALS, AND TRIM, WITHIN THE GROUND FLOOR ELEVATOR LOBBY OF AN EXISTING HIGH-RISE OFFICE BUILDING, AS PER PLANS; NO OTHER WORK ON THIS PERMIT; BUILDING IS FULLY SPRINKLERED AS PER NFPA 13; MEANS OF EGRESS TO BE MAINTAINED AT ALL TIMES DURING WORK."},{"number":"1051892","date":"2020-04-08","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-09-17","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) FOR RENOVATION TO EXISTING 29TH FLOOR IN AN EXISTING HIGH-RISE OFFICE BUILDING. ALTERATION TO INCLUDE THE DEMOLITION OF EXISTING WALL PARTITION AND THE ERECTION OF NEW WALL PARTITION AND PROVIDE FINISHES AND FURNISHING THROUGHOUT THE DESIGNATED WORK AREA AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED **2018**SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**"},{"number":"PP-2020-001056","date":"2020-04-22","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-09-17","scope":"Install supply and DWV pipe to listed fixtures per 2018 Philadelphia Plumbing Code."},{"number":"EP-2020-001017","date":"2020-04-27","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-17","scope":"Replace existing luminaries on the existing branch circuits per 2017 NEC."},{"number":"EP-2020-000974","date":"2020-05-14","work":"Rough-In","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-05-14","scope":"Rough-In Permit for EP-2020-000973"},{"number":"CP-2020-001221","date":"2020-05-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2020-11-17","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS.SEPARATE PERMITS REQUIRED MEP AND FIRE SUPPRESSION WORK. **IEBC 2018**"},{"number":"EP-2020-000973","date":"2020-05-26","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-16","scope":"Furnish & Install receptacles, new lights, occupancy sensors and relocate existing lights in accordance with 2017 NEC CC district."},{"number":"EP-2020-001093","date":"2020-05-26","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-09-16","scope":"Furnish & Install new fire alarm devices on the 29th FLR as per drawings and in accordance with 2016 NFPA72 ."},{"number":"PP-2020-002569","date":"2020-05-28","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2020-11-17","scope":"For Interior Plumbing to include • Furnish and install [1] new sink and faucet. Tie into existing services as per 2018 Philadelphia Plumbing Code."},{"number":"EP-2020-002383","date":"2020-05-29","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-06-10","scope":"Provide and install 9 cat6 plenum cables at an average of 150'. All cabling will be installed in j-hooks per NEC 2017."},{"number":"MP-2020-000956","date":"2020-06-02","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-11-17","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans."},{"number":"FP-2020-000072","date":"2020-06-03","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-12-19","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. (29th Floor) Relocate 46 Heads in 3 Phases Phase 1 26 Heads Phase 2 8 heads Phase 3 12 Heads"},{"number":"MP-2020-001552","date":"2020-07-07","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2020-09-17","scope":"Furnish and install seven VAVS with controls , ductwork, and diffusers to accommodate new layout as per approved plans."},{"number":"FP-2020-001229","date":"2020-07-30","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2021-04-14","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinkler heads in the elevator lobby (1048150)"},{"number":"FP-2020-001176","date":"2020-08-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-09-18","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Relocate (8) sprinkler heads in the lobby (1048150)"},{"number":"EP-2020-002130","date":"2020-08-13","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2020-10-20","scope":"Relocate 18 2x4 Troffers, relocate 3 Hi-hats, Relocate 3 Wall washers, Installing 5 Receptacles , Relocating 10 Receptacles,"},{"number":"FP-2020-000305","date":"2020-09-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2020-11-17","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of 23 Sprinkler Heads on the 13th floor as per attached standards. Deviations from these standards require submission of construction and site plans."},{"number":"ZP-2020-005653","date":"2020-11-03","work":"Signs (Accessory / Non-Accessory)","type":"Zoning","description":"Zoning Permit","status":"Completed","completedDate":"2021-05-04","scope":"for the erection of an accessory free standing sign accessory to existing business and professional services and other existing uses as previously approved in an existing structure ( size and location as shown on the plan)"},{"number":"PP-2020-013030","date":"2020-11-18","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2021-05-18","scope":"Furnish and install [1] pantry sink, [1] open site drain and [1] water heater"},{"number":"CP-2020-005566","date":"2020-11-18","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2021-05-18","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES, AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK."},{"number":"FP-2020-001929","date":"2020-11-19","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2021-05-18","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2020-005566) Relocate (20) sprinkler heads on the 6th floor as per NFPA 13. See CP-5566"},{"number":"EP-2020-008852","date":"2020-11-24","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-02-22","scope":"Wire 18 receptacles, 3 GFCI, 1 floor receptacle, 4 furniture outlets, 17 2x4 LED lights, 27 Hi-hat lights, 3 pendants, 1 linear pendent, switches and occupancy sensors, 8 data lines as per 2017 NEC. Relocate horn strobes if needed as per 2016 NFPA 72."},{"number":"MP-2020-005210","date":"2020-11-30","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2021-05-18","scope":"INSTALLATION OF HVAC SYSTEM ON PORTION OF 6TH FLOOR IN EXISTING HIGHRISE BUILDING. ALL WORK TO BE DONE IN ACCORDANCE WITH APPROVED PLANS."},{"number":"CP-2020-006624","date":"2020-12-04","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2022-04-12","scope":"For level 2 alterations to existing structure including replacing an existing glass vestibule roof with a TPO roof and finishing interior space with drywall and carpet as per plans."},{"number":"CP-2020-006391","date":"2021-01-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2021-05-07","scope":"For prescriptive alterations (without a change of occupancy) to a Group B tenant (Suite #2760, \"Duff & Phelps\") on the 27th floor of an existing high-rise office building, as per plans; separate permits required for all MEP/FSP work; building is fully sprinklered as per NFPA 13 w/standpipes within exit stairways."},{"number":"FP-2021-000038","date":"2021-01-12","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2021-05-07","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2020-006391) Relocate (7) sprinkler heads on the 27th floor in \"Duff & Phelps\" suite 2760"},{"number":"MP-2021-000384","date":"2021-01-25","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2021-05-07","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES -(relocate [3] thermostats and [18] diffusers. Provide air balance report.) For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. (Note: rooftop installations will require plans unless it has already been included on any approved alteration plans."},{"number":"GP-2021-001045","date":"2021-02-04","work":"Sign","type":"General","description":"General Permit","status":"Completed","completedDate":"2021-05-04","scope":"For the erection of one (1) accessory freestanding sign as per approved plans. Separate permit required for any electrical work."},{"number":"EP-2020-010792","date":"2021-02-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-04-26","scope":"We will change 20, 2x4 LED Light fixtures on existing circuits.3 2x2 LED fixtures on existing circuits. 2 Exit sjgns, 3 Ceiling mount Occupancy sensors, three switches in the new offices. 9 Quad Receptacles 7 Duplex Outlets, 6 furniture whips for power, and 47 Data drops as per 2017 NEC. May relocate two horn strobes if in the way."},{"number":"CP-2021-001785","date":"2021-04-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2021-09-02","scope":"FOR LEVEL II ALTERATIONS TO INCLUDE PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES, AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK."},{"number":"FP-2021-001026","date":"2021-04-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2021-09-02","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (8) sprinkler heads on the 9th floor Suite 900 (CP-2021-001785)"},{"number":"ZP-2021-002501","date":"2021-04-23","work":"Signs (Accessory / Non-Accessory)","type":"Zoning","description":"Zoning Permit","status":"Issued","completedDate":null,"scope":"FOR THE ERECTION OF ONE(1) D/F BANNER SIGN AND FOR THE ERECTION OF THREE(3) WINDOW SIGNS. SIZE AND LOCATION AS SHOWN IN THE APPLICATION."},{"number":"PP-2021-006892","date":"2021-04-26","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Expired","completedDate":"2022-08-11","scope":"Remove existing pantry sink and replace with new in same location"},{"number":"EP-2021-003563","date":"2021-05-03","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-08-12","scope":"Removing some existing lights replacing with new LED lights relocation some lighting Receptacles one 100 amp panel as per 2017 NEC. Fire Alarm with new in the space connected to existing Alarm As per 2016 NFPA 72"},{"number":"EP-2021-004303","date":"2021-05-04","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-04-18","scope":"Provide conduit & power to LED floodlight in front of building in accordance with 2017 NEC CC district."},{"number":"MP-2021-002476","date":"2021-05-05","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2021-09-02","scope":"FOR MECHANICAL ALTERATIONS ON THE NINTH FLOOR OF AN EXISTING COMMERCIAL BUILDING TO INCLUDE THE INSTALLATION OF VAV BOX, NEW REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS."},{"number":"CP-2021-002605","date":"2021-05-20","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-04-02","scope":"FOR LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) PER APPROVED PLANS AT FLOORS 22 THROUGH 26. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION."},{"number":"MP-2021-003273","date":"2021-05-21","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-04-02","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Furnish labor and material to relocate 12 diffusers for new office layout)."},{"number":"FP-2021-001472","date":"2021-05-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-04-02","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (18) sprinkler heads on the 22nd & 23rd floors as per NFPA 13 (CP-2021-002605)"},{"number":"PP-2021-010931","date":"2021-06-21","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-04-04","scope":"Replace (4) Lavatories utilizing existing rough in"},{"number":"CP-2021-003652","date":"2021-07-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-04-04","scope":"LEVEL I ALTERATION TO A COMMON CORRIDOR ON THE 14TH FLOOR OF AN EXISTING HIGHRISE STRUCTURE AS PER APPROVED PLANS. NO CHANGE IN OCCUPANCY. NO OTHER WORK THIS PERMIT. SEPARATE PERMIT REQUIRED FOR ALL OTHER WORK."},{"number":"FP-2021-001874","date":"2021-07-06","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-04-04","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (25) sprinklers on the 14th floor (CP-2021-003652)"},{"number":"EP-2021-007043","date":"2021-07-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-09-07","scope":"Install new light fixtures in accordance with the 2017 NEC CC district."},{"number":"EP-2021-006260","date":"2021-07-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2021-09-08","scope":"Install receptacles, light fixtures, switches & occupancy sensors in accordance with 2017 NEC CC district."},{"number":"EP-2021-006863","date":"2021-07-26","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-03-17","scope":"Install (5) fire alarm speaker-strobes & (1) strobe as per drawings and in accordance with APPROVED DRAWINGS-2016 NFPA72 and 2018 PHILA FIRE CODE."},{"number":"CP-2021-005823","date":"2021-10-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2022-01-26","scope":"FOR A LEVEL II INTERIOR ALTERATION TO the 14th FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF NEW WALL PARTITIONS AND TO PROVIDE FINISHES AND FURNISHINGS THROUGHOUT . ALL WORK TO BE DONE PER APPROVED PLANS.**BUILDING IS FULLY SPRINKLERED**IEBC 2018** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRED AN AMENDED PERMIT**"},{"number":"PP-2021-017984","date":"2021-10-12","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2022-01-25","scope":"Furnish and install [1] pantry sink and [1] water heater"},{"number":"FP-2021-002911","date":"2021-10-18","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2022-01-25","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (12) sprinkler heads on the 14th floor as per NFPA 13 (CP-2021-005823)"},{"number":"EP-2021-010481","date":"2021-10-21","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-01-12","scope":"Install 18 receptacles, 6 120-volt LED light fixtures as per 2017 NEC."},{"number":"EP-2021-012690","date":"2021-11-01","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-01-07","scope":"Furnish and Install Dual Cat6 Plenum Rated Data Cables. Furnish and Install Single Cat6 Plenum Rated cables for Wireless Access points as per 2017 nec"},{"number":"MP-2021-006656","date":"2021-11-04","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2022-01-25","scope":"FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE VAV BOX, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK."},{"number":"PP-2020-011221","date":"2021-11-23","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Expired","completedDate":"2022-12-09","scope":"Furnish and install [1] sink with a 2-gallon electric hot water heater in a pan with burst buster valve according to the 2018 PPC."},{"number":"CP-2022-003051","date":"2022-06-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-02-01","scope":"FOR A LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 7TH, 8TH AND 9TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. WORK ALSO TO INCLUDE THE ALTERATION OF THE WATER CLOSETS. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2022-001948","date":"2022-07-20","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-01-30","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 170 sprinkler heads on the 7th, 8th, & 9th floors"},{"number":"PP-2022-011670","date":"2022-08-18","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-01-30","scope":"Furnish and install [5] pantry sinks, [5] 6 gallon water heaters and [5] open site drains. Provide labor and material to extend from existing sanitary, vent and domestic cold water mains."},{"number":"MP-2022-004188","date":"2022-08-25","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-01-30","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2022-008943","date":"2022-09-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2022-11-14","scope":"Install 390 light fixture, 24 exit, 92 switch, 161 receptacle, 22 furniture power, 14 equipment power. Fire Alarm: Install 53 speaker/strobe, 6 strobe, 3 NAC panel, 3 smoke detector, 7 module as per APPROVED DRAWINGS-2017 NEC ,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"CP-2023-000222","date":"2023-01-20","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-07-28","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO OFFICE SPACE ON THE SIXTH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"PP-2023-001168","date":"2023-01-31","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-07-28","scope":"INSTALL 2 new pantry sinks, bottle filling station, hot water heater."},{"number":"MP-2023-000364","date":"2023-02-08","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-07-28","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2023-000619","date":"2023-02-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-06-29","scope":"Provide receptacles and light fixtures for alterations. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS( NO FIRE ALARM IS APPROVED ON THESE DRAWINGS)-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D.**"},{"number":"EP-2023-001264","date":"2023-02-09","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-05-26","scope":"• Furnish & install (121) Category 6a plenum cables from the MDF to the customer indicated workstation locations in the below quantities: • (36) Locations- (2) Cat 6a cables • (5) FB1 Locations- (2) Cat 6a cables • (3) FB2 Locations- (2) Cat 6a cables • (5) FB3 Locations- (3) Cat 6a cables & (1) HDMI to TV • (8) WAP locations- (2) Cat 6a cables • (2) Camera locations- (1) Cat 6a cable As per 2017 nec"},{"number":"FP-2023-000234","date":"2023-02-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-07-28","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2023-000222) Relocate (104) Sprinkler Heads on the 6th Floor"},{"number":"CP-2023-000669","date":"2023-02-21","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2023-04-10","scope":"FOR LEVEL II INTERIOR ALTERATION TO AN EXISTING TENANT SPACE ON THE 14TH FLOOR IN AN EXISTING 29 STORY OFFICE BUILDING AS PER APPROVED PLANS."},{"number":"FP-2023-000413","date":"2023-02-22","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2023-04-06","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2023-000669) Relocate (2) Sprinkler Heads in Suite 1470 on the 14th fl. as per NFPA 13"},{"number":"PP-2023-002385","date":"2023-02-22","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2023-04-06","scope":"Remove and Replace Break Room Sink with new sink in same location"},{"number":"MP-2023-000858","date":"2023-02-24","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2023-04-06","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Relocate[1] existing thermostat, relocate [3] diffusers, and provide air balance report)."},{"number":"EP-2023-001653","date":"2023-03-13","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-04-10","scope":"Replace the existing fluorescent lighting with LED troffer and Hi Hats Moving two receptacles, Adding two quad receptacles and two single receptacle. reusing existing switching and motion detectors as per 2017 nec"},{"number":"EP-2023-001495","date":"2023-03-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-06-29","scope":"Install fire alarm system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"CP-2023-003939","date":"2023-07-21","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-08","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO THE BASEMENT LEVEL OF AN EXISTING OFFICE BUILDING TO CONVERT CONFERENCE ROOMS TO AN ACCESSORY FITNESS CENTER WITH LOCKER ROOMS AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"CP-2023-003936","date":"2023-07-21","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-02","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING SIXTH FLOOR OFFICE SPACE TO CREATE AMENITY AND CONFERENCE SPACE AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**"},{"number":"PP-2023-010484","date":"2023-07-27","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-02-02","scope":"Adding bathroom and coffee station SEVEN FIXTURES"},{"number":"CP-2023-003694","date":"2023-07-28","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-12-23","scope":"LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO AN EXISTING TENANT SPACE ON THE 1ST FLOOR OF AN EXISTING HIGH-RISE BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS. AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** AMENDMENT: AMENDMENT OF PERMIT IS NOT REQUIRED THE SUB-PERMITS ELECTRICAL AND PLUMBING PERMITS ARE REQUIRED TO BE AMENDED."},{"number":"FP-2023-001853","date":"2023-08-02","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-12-23","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans."},{"number":"FP-2023-001817","date":"2023-08-02","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-01-29","scope":"RELOCATE (36) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2023-003159","date":"2023-08-02","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-12-23","scope":"Mechanical / Fuel Gas Permit for combo CP-2023-003694"},{"number":"FP-2023-001816","date":"2023-08-02","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-02-02","scope":"RELOCATE (43) SPRINKLER HEADS AS PER NFPA"},{"number":"PP-2023-009883","date":"2023-08-07","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Cancelled","completedDate":"2024-09-26","scope":"Plumbing Permit (Interior) for combo CP-2023-003694"},{"number":"EP-2023-006707","date":"2023-08-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2023-12-28","scope":"Electrical Permit for combo CP-2023-003694 AMENDMENT: Furnish & Install Fire Alarm Per Plans -2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"PP-2023-010486","date":"2023-08-10","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-01-29","scope":"Plumbing as per plan"},{"number":"MP-2023-003253","date":"2023-08-21","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-02-02","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2023-003938","date":"2023-09-22","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-02-02","scope":"FOR LEVEL II ALTERATIONS TO THE SIXTH FLOOR (6TH) OF THE EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE REMOVAL OF OF PARTITION WALLS AND TO PROVIDE FINISHES/FURNISHINGS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"MP-2023-003254","date":"2023-10-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-01-29","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2023-008996","date":"2023-10-16","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-01-09","scope":"Install 56 light fixture, 3 exit, 18 switch, 1 time clock, 20 receptacle, 7 equipment power as per 2017 NEC. Fire Alarm: 3 speaker/strobe, 1 duct detector, and 1 NAC panel as per 2016 NFPA 72."},{"number":"EP-2023-008999","date":"2023-10-16","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-01-22","scope":"Install 138 light fixture, 4 exit, 35 switch, 1 time clock, 48 receptacle, 7 floor receptacle, 11 equipment power. Fire Alarm: 8 speaker/strobe, 2 strobe, 1 smoke detector, 1 NAC panel. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE."},{"number":"EP-2023-010048","date":"2023-10-23","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-01-22","scope":"Renovation to 6th floor corridor. Install 13 light fixtures AS PER NEC 2017"},{"number":"EP-2023-010212","date":"2023-10-30","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-01-30","scope":"Furnish and Install (23) Cat6 Plenum Rated cables 1- Cat6 per various Fitness Equipment location. AS PER NEC 2017"},{"number":"EP-2023-010211","date":"2023-10-30","work":"New Construction","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-01-30","scope":"Furnish & Install 90 Cat 6 Plenum Cabling AS PER NEC 2017"},{"number":"GP-2023-009467","date":"2023-11-09","work":"Sign","type":"General","description":"General Permit","status":"Completed","completedDate":"2024-01-24","scope":"FOR THE ERECTION OF ONE(1) BANNER SIGN AND FOR THE ERECTION OF THREE(3) WINDOW SIGNS. **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**"},{"number":"GM-2024-001163","date":"2024-02-07","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Completed","completedDate":"2024-02-26","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"CP-2024-000795","date":"2024-02-13","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-06-12","scope":"FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ). WORK TO ACCOMODATE AN EXISTING SPACE LOCATED ON THE 27TH FLOOR. ALTERATIONS TO INCLUDE SELECTIVE PARTITION DEMOLITION AND THE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING IS FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**"},{"number":"GM-2024-001677","date":"2024-02-22","work":"Interior Non-Load-Bearing Wall Demo.","type":"General Permit Minor","description":"General Permit Minor","status":"Completed","completedDate":"2024-03-20","scope":"For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work."},{"number":"EP-2024-001967","date":"2024-03-06","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-06-06","scope":"Furnish & Install (127) Category 6 Plenum Cables for Data & Voice Furnish & Install (5) Composite Cables for Access Control / Install Access Control Hardware"},{"number":"CP-2024-000922","date":"2024-03-09","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-06-07","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS THE LEVEL OF FIRE PROTECTION **"},{"number":"FP-2024-000439","date":"2024-03-11","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-06-01","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 60 heads on the 27th floor"},{"number":"EP-2024-002139","date":"2024-03-18","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-06-01","scope":"Furnish and install 23 duplex outlets, 10 TV outlets, 1 quad, 7 GFI's, 2 dedicated, 10 furniture feeds, 2 floor cores, 1 AC unit and 6 relocated VAV's Lighting - 12 PL-1, 31 PL-2, 4 PL-3, 5 PL-4, 10 R-1, 22 R-2 and 6 exit signs, 11 ceiling occupancy sensors, 5 wall motion and 9 dimmers as per 2017 NEC. Install Fire Alarm as per drawings and 2016 NFPA 72."},{"number":"PP-2024-003073","date":"2024-03-21","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-06-01","scope":"• Furnish and install [1] Sink, [1] 6 Gallon Water Heater with drain pan, expansion tank & flood stop valve, [2] Supply Boxes, [1] Water Filter. • Provide labor and material to extend from existing sanitary, vent and domestic water. 3 FIXTURES"},{"number":"CP-2024-001713","date":"2024-03-29","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-09-17","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 10TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2024-000637","date":"2024-04-04","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-07-01","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (53) SPRINKLER HEADS ON THE 10TH FLOOR AS PER NFPA 13"},{"number":"MP-2024-001589","date":"2024-04-04","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-06-05","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans."},{"number":"MP-2024-001449","date":"2024-04-05","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-06-01","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2024-003474","date":"2024-04-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-06-01","scope":"Furnish and install 9 duplex outlets, 2 quad receptacles, 3 dedicated receptacles, 2 floor cores, one furniture feed, 61 2x2's and 9 downlights . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**"},{"number":"CP-2024-002084","date":"2024-04-16","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2024-07-19","scope":"FOR A LEVEL I INTERIOR ALTERATION TO CORRIDOR AREA LOCATED ON THE 10TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO BE PERFORMED PER APPROVED PLANS . BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**"},{"number":"FP-2024-000802","date":"2024-04-17","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2024-07-19","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (14) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2024-001823","date":"2024-04-18","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-07-01","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS.** ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**"},{"number":"PP-2024-005441","date":"2024-04-24","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-07-01","scope":"Remove and replace (2) existing pantry sinks, connecting to existing piping. WITHOUT PIPING."},{"number":"MP-2024-001859","date":"2024-04-29","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2024-07-19","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 4 existing diffusers with no wall penetrations within a single common corridor area, in compliance with attached signed EZ Permit Standards, Ductwork and Warm-Air Appliances Form"},{"number":"EP-2024-003665","date":"2024-04-30","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Expired","completedDate":"2025-06-11","scope":"We are to replace existing fluorescent light fixtures with new LED fixtures. One for one, in the same locations. Using existing wiring"},{"number":"EP-2024-004123","date":"2024-05-01","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-06-11","scope":"Install 159 light fixture, 7 exit, 54 switch, 50 receptacle, 5 floor receptacle, 17 furniture power, 13 equipment power as per 2017 NEC. Fire Alarm: Install 24 speaker/strobe, 5 strobe, 1 smoke detector, 1 NAC panel as per 2016 NFPA 72."},{"number":"PP-2024-005437","date":"2024-05-31","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-06-05","scope":"Remove and replace (1) existing pantry sink, connecting to existing piping. WITHOUT PIPING."},{"number":"EP-2024-005703","date":"2024-06-14","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-07-22","scope":"Install 4 access doors with readers"},{"number":"EP-2024-005001","date":"2024-07-08","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-07-10","scope":"Re-install (15) light fixtures, (5) exits, and (2) switches as per 2017 NEC. Fire Alarm: Install (8) speaker/strobe as per 2016 NFPA 72."},{"number":"EP-2024-006579","date":"2024-07-10","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2024-09-13","scope":"1) Install a 2-post relay rack and bolt it to the floor in the MDF. a. Neatly dress the cable bundle into the rack. b. Install patch panels. c. Install a rack shelf. d. Install vertical cable management units. e. Install (1) horizontal rack mount power strip. f. Properly ground rack using #6 grounding wire. 2) Install approximately (138) Category 6 data cables from 24-port patch panels to PC & Printer locations per Floor Plans provided or where site contact would like them. a. Terminate 568B on provided jacks at station end. b. Terminate 568B on provided patch panel in the equipment room. c. Label and Test. d. Mount patch panels on 2-post rack. e. Route cable through furniture as needed. 3) Install (5) customer-provided LCD Screens (50-65\") and associated AV equipment in standard office environment. See customer for exact locations a. Reinforce wall as needed with plywood. b. Install wall mount soundbar and Logitech tap tablet on 3 of the TVs. 4) Install (5) customer-provided, pre-configured Wireless Access Points at designated locations. a. Use the provided mount to hang the WAP from the ceiling. b. Plug the data line into the ETHERNET port on the back of the WAP. 5) Install (3) customer-provided, pre-configured IP Cameras at designated locations. a. Connect new camera to new cabling. b. Work with customer to aim and focus."},{"number":"PP-2024-013404","date":"2024-09-26","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2024-12-23","scope":"Plumbing Permit (Interior) for combo CP-2023-00369"},{"number":"CP-2024-006433","date":"2024-12-17","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Expired","completedDate":"2026-05-05","scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE INFILL OF EXISTING STAIR OPENING. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************"},{"number":"CP-2025-000281","date":"2025-01-20","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-10-20","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO THE 22ND, 23RD, 24TH, 25TH, AND 26TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2025-000142","date":"2025-01-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-10-20","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (42) HEADS AS PER NFPA 13"},{"number":"CP-2025-000525","date":"2025-01-31","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO THE 10TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"EP-2025-000682","date":"2025-02-04","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-10-01","scope":"INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLES OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS. AMENDMENT: INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS."},{"number":"MP-2025-000375","date":"2025-02-06","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-10-20","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"FP-2025-000270","date":"2025-02-07","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-05-15","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (33) SPRINKLER HEADS ON THE 10TH FLOOR AS PER NFPA 13"},{"number":"PP-2025-001763","date":"2025-02-20","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-05-15","scope":"Furnish and install (2) new plumbing fixtures, (1) pantry sink and (1) electric hot water heater, connecting to existing piping."},{"number":"EP-2025-001587","date":"2025-02-25","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-05-07","scope":"INSTALL WIRING, LIGHTING, SWITCHES TELECOMMUNICATIONS WIRING AND RECEPTACLES OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS. AMENDMENT: INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS."},{"number":"MP-2025-001332","date":"2025-03-06","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-05-15","scope":"FOR AN ALTERATION TO AN EXISTING MECHANICAL SYSTEM. WORK TO ACCOMMODATE A NEW BUSINESS SPACE. INSTALLATION TO INCLUDE NEW REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2025-001820","date":"2025-03-20","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-05-07","scope":"Provide and install 103 Cat6 plenum cables at 150' average. All work will be completed per current NEC. No rescue systems work."},{"number":"PP-2025-000888","date":"2025-03-26","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2025-10-20","scope":"INTERIOR ALTERATIONS TO OFFICE. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 15 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS."},{"number":"EP-2025-004415","date":"2025-05-20","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-09-25","scope":"Relocated 30 cables to single workstation & offices, pull 25 new category 6 cable from IDF to new locations where single runs fell short during relocation terminate, label & test all new relocated cable provide all necessary patch cables for IDF & office/work station locations"},{"number":"CP-2025-003101","date":"2025-06-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2025-09-16","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 27TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE SELECTIVE DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"FP-2025-001316","date":"2025-06-25","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2025-09-16","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (19) SPRINKLER HEADS AS PER NFPA 13"},{"number":"MP-2025-003645","date":"2025-07-10","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2025-09-16","scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 9 existing diffusers, with no wall penetrations, within a single tenant space. NO PENETRATIONS OF RATED ASSEMBLIES."},{"number":"EP-2025-006396","date":"2025-07-17","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-08-27","scope":"Installation of (24) Cat-6 cables in accordance with NEC. Test and label existing cabling."},{"number":"EP-2025-006353","date":"2025-07-28","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-08-21","scope":"Install receptacles, AV Boxes & box eliminators with pull strings . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC."},{"number":"EP-2025-007595","date":"2025-09-05","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2025-09-11","scope":"Modify existing fire alarm system as per 2016 NFPA 72. Provide new devices. Relocate and demo existing devices as show on drawings. All new wiring shall be Class B."},{"number":"CP-2026-000941","date":"2026-03-19","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Completed","completedDate":"2026-07-03","scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO THE 18TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. 04/22/26 AMENDMENT: Amended Layout changes to the common corridor. The extent and length of corridor was modified. The same door openings but revised locations of those openings. As per approved plans."},{"number":"FP-2026-000531","date":"2026-03-24","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Completed","completedDate":"2026-07-03","scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 20 SPRINKLER HEADS, PER NFPA 13"},{"number":"MP-2026-001676","date":"2026-03-31","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Completed","completedDate":"2026-07-03","scope":"FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK."},{"number":"EP-2026-003022","date":"2026-04-15","work":"Addition and/or Alteration","type":"Electrical","description":"Electrical Permit","status":"Completed","completedDate":"2026-06-30","scope":"Perform alterations to the elevator lobby, corridors, and restroom areas. Work includes installation and/or modification of electrical wiring, lighting fixtures, lighting control systems, exit signs, and emergency lighting. Furnish and install fire alarm devices, including all required wiring, terminations, and connections to the existing fire alarm system. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans."},{"number":"PP-2026-004934","date":"2026-04-16","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Completed","completedDate":"2026-07-03","scope":"Remove and replace fixtures to include 7-w/c, 6-Lavatories and 2-urinals. **WITHOUT PIPING**"},{"number":"CP-2026-003449","date":"2026-06-16","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION, COMMON SPACE UPGRADES INCLUDE ELEVATOR LOBBY, COMMON CORRIDOR, AND REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"CP-2026-003455","date":"2026-06-16","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH AND 9TH FLOORS OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK."},{"number":"PP-2026-008224","date":"2026-06-18","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Furnish and install (9) plumbing fixtures, (6) kitchen sinks and (3) hot water heaters, connecting to existing piping. *WITHOUT PIPING*"},{"number":"PP-2026-008226","date":"2026-06-18","work":"Alterations","type":"Plumbing","description":"Plumbing Permit","status":"Issued","completedDate":null,"scope":"Remove and replace (15) plumbing fixtures, (6) lavatories, (7) water closets and (2) urinals, connecting to existing piping. *WITHOUT PIPING*"},{"number":"FP-2026-001241","date":"2026-06-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS ON THE 5TH FLOOR, PER NFPA 13"},{"number":"FP-2026-001242","date":"2026-06-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (133) SPRINKLER HEADS, PER NFPA 13"},{"number":"CP-2026-003712","date":"2026-06-29","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 28TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************"},{"number":"CP-2026-003694","date":"2026-07-06","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 18 TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************"},{"number":"CP-2026-003911","date":"2026-07-13","work":"Addition and/or Alteration","type":"Building","description":"Commercial Building Permit","status":"Issued","completedDate":null,"scope":"FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 5TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************"},{"number":"EP-2026-006407","date":"2026-07-14","work":"Rough-In","type":"Electrical","description":"Electrical Permit","status":"Issued","completedDate":null,"scope":"Rough-In Permit for EP-2026-006401 New lighting, lighting controls, receptacles, HVAC wiring, outlet boxes and raceways for communication. All wiring to be connected to existing panels."},{"number":"FP-2026-001455","date":"2026-07-14","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (103) SPRINKLER HEADS, PER NFPA 13"},{"number":"MP-2026-004114","date":"2026-07-20","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. ALL WORK TO BE SELF-CONTAINED WITHIN ONE DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Relocate (7) diffusers"},{"number":"MP-2026-003996","date":"2026-07-23","work":"Addition and/or Alterations","type":"Mechanical","description":"Mechanical / Fuel Gas Permit","status":"Issued","completedDate":null,"scope":"FOR INSTALLATION OF HVAC APPLICANCE, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS."},{"number":"FP-2026-001563","date":"2026-07-23","work":"Addition and/or Alterations","type":"Fire Suppression","description":"Fire Suppression Permit","status":"Issued","completedDate":null,"scope":"EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (10) SPRINKLER HEADS, PER NFPA 13"}],"storyTag":"New construction","storyDelta":-0.17,"timeline":[{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"viol","w":"3 L&I violations"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Addition and/or Alteration"},{"y":2026,"k":"permit","w":"Rough-In"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"permit","w":"Addition and/or Alterations"},{"y":2026,"k":"insp","w":"L&I: 3 failed, 1 passed"}],"rented":false,"licenses":[{"number":"208782","type":"Food Preparing and Serving (30+ SEATS)","status":"Inactive","businessName":"WOOD DINING SERVICES INC","legalName":"WOOD DINING SERVICES INC","address":"2000-24 MARKET ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2004-05-06","latestIssueDate":"2004-05-06","expirationDate":"2005-04-30","inactiveDate":"2005-12-23"},{"number":"210091","type":"Food Caterer","status":"Inactive","businessName":"WOOD DINING SERVICES INC","legalName":"WOOD DINING SERVICES INC","address":"2000-24 MARKET ST","revenueCode":"3122","rentalCategory":null,"units":null,"issuedDate":"2004-05-06","latestIssueDate":"2004-05-06","expirationDate":"2007-04-30","inactiveDate":"2007-06-20"},{"number":"299190","type":"High Rise","status":"Inactive","businessName":"TRC 2000 MARKET ASSOCIATES LP","legalName":"TRC 2000 MARKET ASSOCIATES LP","address":"2000-24 MARKET ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2004-05-20","latestIssueDate":"2009-04-30","expirationDate":"2010-04-30","inactiveDate":"2011-05-11"},{"number":"209309","type":"Food Preparing and Serving (30+ SEATS)","status":"Active","businessName":"D & D MANAGEMENT SERVICES INC","legalName":"D & D MANAGEMENT SERVICES INC","address":"2000-24 MARKET ST","revenueCode":"3121","rentalCategory":null,"units":null,"issuedDate":"2004-06-10","latestIssueDate":"2026-04-08","expirationDate":"2027-04-30","inactiveDate":null},{"number":"199287","type":"Food Establishment, Retail Permanent Location","status":"Inactive","businessName":"USHER WILLIAM R","legalName":"USHER WILLIAM R","address":"2000-24 MARKET ST","revenueCode":"3118","rentalCategory":null,"units":null,"issuedDate":"2004-07-19","latestIssueDate":"2004-07-19","expirationDate":"2005-04-30","inactiveDate":"2012-12-22"},{"number":"285919","type":"Hazardous Materials","status":"Inactive","businessName":"L M ASSOCIATES","legalName":"L M ASSOCIATES","address":"2000-24 MARKET ST","revenueCode":"3335","rentalCategory":null,"units":null,"issuedDate":"2005-01-28","latestIssueDate":"2005-01-28","expirationDate":"2009-06-30","inactiveDate":null},{"number":"512129","type":"Dumpster License - Private Property","status":"Active","businessName":"D & D MANAGEMENT SERVICES INC","legalName":"D & D MANAGEMENT SERVICES INC","address":"2000-24 MARKET ST","revenueCode":"3230","rentalCategory":null,"units":null,"issuedDate":"2010-08-19","latestIssueDate":"2013-08-03","expirationDate":null,"inactiveDate":null},{"number":"540406","type":"High Rise","status":"Inactive","businessName":"CBRE STRATEGIC US VALUE 5 HOLDINGS LLC","legalName":"CBRE STRATEGIC US VALUE 5 HOLDINGS LLC","address":"2000-24 MARKET ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2011-08-03","latestIssueDate":"2012-03-26","expirationDate":"2013-04-30","inactiveDate":"2013-11-15"},{"number":"613123","type":"High Rise","status":"Inactive","businessName":"ROSEMONT 2000 MARKET OPERATING LLC","legalName":"ROSEMONT 2000 MARKET OPERATING LLC","address":"2000-24 MARKET ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2013-12-23","latestIssueDate":"2018-05-17","expirationDate":"2019-04-30","inactiveDate":"2019-06-29"},{"number":"832619","type":"High Rise","status":"Inactive","businessName":"2000 MKT REALTY LLC","legalName":"2000 MKT REALTY LLC","address":"2000 MARKET ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2019-12-27","latestIssueDate":"2025-01-16","expirationDate":"2025-12-26","inactiveDate":"2026-02-24"},{"number":"1002430","type":"High Rise","status":"Active","businessName":"2000 Market LLC","legalName":"2000 Market LLC","address":"2000-24 MARKET ST","revenueCode":"3629","rentalCategory":null,"units":null,"issuedDate":"2026-03-18","latestIssueDate":"2026-03-18","expirationDate":"2027-03-17","inactiveDate":null}],"licenseActivity":[{"number":"1002430","type":"High Rise","businessName":"2000 Market LLC","legalName":"2000 Market LLC","issuedDate":"2026-03-18","latestIssueDate":"2026-03-18","closureDate":null,"expirationDate":"2027-03-17","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"832619","type":"High Rise","businessName":"2000 MKT REALTY LLC","legalName":"2000 MKT REALTY LLC","issuedDate":"2019-12-27","latestIssueDate":"2025-01-16","closureDate":"2026-02-24","expirationDate":"2025-12-26","inactiveDate":"2026-02-24","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"613123","type":"High Rise","businessName":"ROSEMONT 2000 MARKET OPERATING LLC","legalName":"ROSEMONT 2000 MARKET OPERATING LLC","issuedDate":"2013-12-23","latestIssueDate":"2018-05-17","closureDate":"2019-06-29","expirationDate":"2019-04-30","inactiveDate":"2019-06-29","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"540406","type":"High Rise","businessName":"CBRE STRATEGIC US VALUE 5 HOLDINGS LLC","legalName":"CBRE STRATEGIC US VALUE 5 HOLDINGS LLC","issuedDate":"2011-08-03","latestIssueDate":"2012-03-26","closureDate":"2013-11-15","expirationDate":"2013-04-30","inactiveDate":"2013-11-15","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"512129","type":"Dumpster License - Private Property","businessName":"D & D MANAGEMENT SERVICES INC","legalName":"D & D MANAGEMENT SERVICES INC","issuedDate":"2010-08-19","latestIssueDate":"2013-08-03","closureDate":null,"expirationDate":null,"inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"285919","type":"Hazardous Materials","businessName":"L M ASSOCIATES","legalName":"L M ASSOCIATES","issuedDate":"2005-01-28","latestIssueDate":"2005-01-28","closureDate":"2009-06-30","expirationDate":"2009-06-30","inactiveDate":null,"status":"Inactive","statusLabel":"Inactive","active":false},{"number":"199287","type":"Food Establishment, Retail Permanent Location","businessName":"USHER WILLIAM R","legalName":"USHER WILLIAM R","issuedDate":"2004-07-19","latestIssueDate":"2004-07-19","closureDate":"2012-12-22","expirationDate":"2005-04-30","inactiveDate":"2012-12-22","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"209309","type":"Food Preparing and Serving (30+ SEATS)","businessName":"D & D MANAGEMENT SERVICES INC","legalName":"D & D MANAGEMENT SERVICES INC","issuedDate":"2004-06-10","latestIssueDate":"2026-04-08","closureDate":null,"expirationDate":"2027-04-30","inactiveDate":null,"status":"Active","statusLabel":"Active","active":true},{"number":"299190","type":"High Rise","businessName":"TRC 2000 MARKET ASSOCIATES LP","legalName":"TRC 2000 MARKET ASSOCIATES LP","issuedDate":"2004-05-20","latestIssueDate":"2009-04-30","closureDate":"2011-05-11","expirationDate":"2010-04-30","inactiveDate":"2011-05-11","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"210091","type":"Food Caterer","businessName":"WOOD DINING SERVICES INC","legalName":"WOOD DINING SERVICES INC","issuedDate":"2004-05-06","latestIssueDate":"2004-05-06","closureDate":"2007-06-20","expirationDate":"2007-04-30","inactiveDate":"2007-06-20","status":"Inactive","statusLabel":"Inactive","active":false},{"number":"208782","type":"Food Preparing and Serving (30+ SEATS)","businessName":"WOOD DINING SERVICES INC","legalName":"WOOD DINING SERVICES INC","issuedDate":"2004-05-06","latestIssueDate":"2004-05-06","closureDate":"2005-12-23","expirationDate":"2005-04-30","inactiveDate":"2005-12-23","status":"Inactive","statusLabel":"Inactive","active":false}],"businessLicenseSourceDate":"2026-07-24","signals":[{"kind":"record-pressure","level":"elevated","title":"Records to verify together","summary":"More than one separately dated public record deserves a current-status check.","evidence":["13 open L&I violations","failed L&I inspection activity in 2022, 2023, 2025, 2026"],"caveat":"A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue."},{"kind":"transition-activity","level":"watch","title":"Recent transition activity","summary":"The property has an unusually active paper trail worth monitoring for the next permit, inspection, deed, or listing.","evidence":["10 permit events since 2023"],"caveat":"Record activity alone does not establish that a sale or redevelopment is planned."}],"legalChecks":[{"id":"building-certifications","level":"urgent","title":"A life-safety certification is deficient","finding":"Facade Report: Safe through Feb 18, 2031; Special Hazards Certification: Certified through Mar 16, 2027; Sprinkler Certification: Certified through Oct 11, 2025; Emergency and Standby Power Systems Certification: Certified through Sep 6, 2026; Fire Alarm Certification: Deficient; Smoke Control Certification: Certified through Mar 2, 2027; Damper Certification: Certified through Apr 16, 2030","why":"Fire-protection certifications apply to the named system and inspection period only; they are not a whole-building safety certificate. Philadelphia generally requires annual sprinkler, standpipe, fire-alarm, special-hazard, and emergency-power inspections where those systems exist.","action":"Request the correction/reinspection and current filed certificate.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/maintenance-certifications/fire-protection-certifications/"},{"id":"use-occupancy","level":"attention","title":"Zoning approval is not the occupancy file","finding":"Use permit #150772: COMPLETED.","why":"Philadelphia says a zoning approval or Property Sales Certification can identify a use without proving that it was established under the Building Code. A change of use, unit count, exits, or fire rating can require a Building Permit and Certificate of Occupancy.","action":"Verify the lawful use, unit count, associated construction permits, and Certificate of Occupancy with L&I.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-certificate-of-occupancy/"},{"id":"permit-status","level":"attention","title":"A permit row needs file-level verification","finding":"28 permits not marked completed: 75868 (Expired), 194679 (Issued), 357993 (Expired), 628500 (EXPIRED), 686137 (Issued). At least one row also carries a completion date, so the City fields conflict.","why":"Issued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.","action":"Open the permit file and confirm final inspections, holds, and any resulting occupancy certificate.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"violations","level":"attention","title":"13 open L&I violations","finding":"82 violation rows are retained in the City ledger.","why":"Open notices can accrue fees, block permits or license renewal, and move to court or collection. Standard initial notices generally have a 30-day appeal window; unsafe or imminently-dangerous notices have a much shorter window.","action":"Read the notice—not only the summary status—and confirm reinspection, fees, and appeal posture with L&I.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections/violation-and-order-types/"},{"id":"investigations","level":"verify","title":"Failed inspections are dated events—not the current condition","finding":"32 failed, 37 passed, and 2 CLOSED investigation outcomes are in the fetched history; the latest dated visit was FAILED on Jun 26, 2026.","why":"A PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.","action":"Open the parent case/permit for each material failure and confirm its later disposition.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/inspections-by-permit-type/"},{"id":"business-license","level":"verify","title":"A historical business license is not current operating authority","finding":"Food Preparing and Serving (30+ SEATS) #208782: Inactive since Dec 23, 2005; Food Caterer #210091: Inactive since Jun 20, 2007; High Rise #299190: Inactive since May 11, 2011; Food Establishment, Retail Permanent Location #199287: Inactive since Dec 22, 2012","why":"A license record proves the licensed activity existed at that time. An inactive or expired license does not establish that the business still operates—or that it may legally reopen under the same use.","action":"If business income matters, verify the current tenant, use registration, and active license in eCLIPSE.","url":"https://www.phila.gov/departments/department-of-licenses-and-inspections/licenses/business-licenses/"}],"closingChecks":[{"title":"Property Sales Certification","body":"The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.","action":"Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.","url":"https://www.phila.gov/services/permits-violations-licenses/get-a-certificate/get-a-property-sales-certification/"},{"title":"Date-effective City Property Payoff","body":"The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.","action":"Request the City statement effective through settlement; read every period and invoice.","url":"https://www.phila.gov/guides/philadelphia-tax-center/what-to-do/"},{"title":"Professional title and water-lien searches","body":"OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.","action":"Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.","url":"https://www.phila.gov/2026-04-07-why-title-insurance-is-your-best-friend-when-buying-a-home-in-philadelphia/","secondaryUrl":"https://www.phila.gov/services/water-gas-utilities/pay-or-dispute-a-water-bill/resolve-water-liens-judgments/"}]}