House report

1120 E Moyamensing Ave

3 stories1,656 sqftRSA5built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$371K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$250K$500KZIP 19147 (Queen Village · East Passyunk) median$371K201320162019202220252027
Property assessmentBlock median & rangeZIP 19147 (Queen Village · East Passyunk) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record16 events · exact dates, newest first
  1. PermitAddition and/or Alterations
  2. PermitAlterations
  3. PermitAddition and/or Alteration
  4. InspectionL&I investigation
  5. PermitAddition and/or Alteration
  6. InspectionL&I investigation
  7. InspectionL&I investigation
  8. L&I violationWORK NOT ACCORDING TO PLANS
  9. InspectionL&I investigation
  10. PermitAddition and/or Alteration
  11. L&I violationINTERIOR DEMOLITION
  12. InspectionL&I investigation
  13. Deed / saleDeed / sale $270K
  14. InspectionHCEU INSP (Housing Code Enforcement Unit inspection)
  15. L&I violationEXT ADDRESS NUMBERS
  16. InspectionHCEU INSP (Housing Code Enforcement Unit inspection)

Flags: 1 open L&I violation. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$3,786/year estimated property tax

2026 taxable assessment $270,500 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $371,100. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 021396900
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Stories
3
Interior
1,656 sqft livable area
Lot
736 sqft
Basement
Full city code D
Heat
Undetermined city code H
Exterior condition
Above average city code 3
Interior condition
Average city code 4
Quality grade
C+ assessor's grade
Zoning
RSA5 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

1100 block of E Moyamensing Ave. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 1118 E Moyamensing Ave  ·  1122 E Moyamensing Ave

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 25, 2026.

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 16 dated rows
  1. PermitAddition and/or Alterations

    Permit MP-2022-004883 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install new lennox 170000 BTU 95%Eff gas furnace 13 seer 3 ton ac with ductwork. Install additional feed and return branch lines #9

  2. PermitAlterations

    Permit PP-2022-011356 · Completed

    Install fixtures for 2.5 bathroom 1 kitchen

  3. PermitAddition and/or Alteration

    Permit EP-2022-007478 · Completed

    100AMP service--rewire outlets + switches AS PER NEC 2014 Amendment: I would like to change the electrical agency to united electrical agency (license#18286) instead of Middle Atlantic inspection

  4. InvestigationL&I investigation

    Case CF-2022-004513 · PASSED

    The cited inspection visit was marked passed.

  5. PermitAddition and/or Alteration

    Permit RP-2022-003772 · Completed

    interior renovation only as per plan. no building addition included.

  6. InvestigationL&I investigation

    Case CF-2022-016948 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. InvestigationL&I investigation

    Case CF-2022-016948 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  8. ViolationWORK NOT ACCORDING TO PLANS

    Case CF-2022-016948 · Violation VI-2022-013995 · Code A-302.10/2 · OPEN

  9. InvestigationL&I investigation

    Case CF-2022-016948 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  10. PermitAddition and/or Alteration

    Permit RP-2022-000956 · Completed

    EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). NO WORK PERMITTED IN THE BASEMENT.

  11. ViolationINTERIOR DEMOLITION

    Case CF-2022-004513 · Violation VI-2022-003088 · Code A-301.1/7 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  12. InvestigationL&I investigation

    Case CF-2022-004513 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  13. Recorded transfer$270K transfer

    2021

  14. InvestigationHCEU INSP (Housing Code Enforcement Unit inspection)

    Case 371168 · PASSED

    A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended. The cited inspection visit was marked passed.

  15. ViolationEXT ADDRESS NUMBERS

    Case 371168 · Violation 2728806 · Code FC-505.1/1 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  16. InvestigationHCEU INSP (Housing Code Enforcement Unit inspection)

    Case 371168 · FAILED

    A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended. The cited inspection visit was marked failed; later rows may show follow-up or resolution.

Where this comes from

Methodology & freshness

This report was assembled Jul 26, 2026, 12:57 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)