House report

125 Emily St

2 bd1 ba1,080 sqftRSA5built 1905

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$225K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$250K$500KZIP 19148 (Pennsport · Lower Moyamensing) median$231K2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19148 (Pennsport · Lower Moyamensing) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record16 events · exact dates, newest first
  1. InspectionL&I investigation
  2. InspectionL&I investigation
  3. PermitAlterations
  4. PermitAddition and/or Alterations
  5. PermitAddition and/or Alteration
  6. PermitAddition and/or Alteration
  7. InspectionL&I investigation
  8. L&I violationWORK OUTSIDE OF SCOPE
  9. L&I violationPLANS REQUIRED TO COMPLY
  10. InspectionL&I investigation
  11. PermitAddition and/or Alteration
  12. InspectionL&I investigation
  13. PermitInterior Non-Load-Bearing Wall Demo.
  14. L&I violationINTERIOR DEMOLITION
  15. InspectionL&I investigation
  16. Deed / saleDeed / sale $150K

Flags: latest deed has shared-name parties; relationship unverified. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$1,748/year estimated property tax

2026 taxable assessment $124,900 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $230,800. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 391041400
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
2
Bathrooms
1
Interior
1,080 sqft livable area
Lot
644 sqft
Basement
Full city code D
Heat
Undetermined city code H
Central air
No
Exterior condition
Average city code 4
Interior condition
Average city code 4
Quality grade
C assessor's grade
Zoning
RSA5 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

100 block of Emily St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 123 Emily St  ·  127 Emily St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 16 dated rows
  1. InvestigationL&I investigation

    Case CF-2022-111282 · PASSED

    The cited inspection visit was marked passed.

  2. InvestigationL&I investigation

    Case CF-2022-111282 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  3. PermitAlterations

    Permit PP-2023-010852 · Completed

    INSTALL NEW PLUMBING TO 11 FIXTURES.

  4. PermitAddition and/or Alterations

    Permit MP-2023-003389 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 60,000 btu 90% gas furnace with a 2 ton AC, new ductwork, & 12 diffusers.

  5. PermitAddition and/or Alteration

    Permit EP-2023-004557 · Completed

    NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 100 AMP SERVICE AS PER 2017 NEC CODE

  6. PermitAddition and/or Alteration

    Permit RP-2023-000099 · Completed

    For removal and replacement of the basement slab at the existing elevation height. Basement to remain non-habitable/storage and utilities only. NO UNDERPINNING OR EXCAVATION BELOW THE EXISTING FOUNDATION FOOTINGS IS AUTHORIZED WITH THIS PERMIT.

  7. InvestigationL&I investigation

    Case CF-2022-111282 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  8. ViolationWORK OUTSIDE OF SCOPE

    Case CF-2022-111282 · Violation VI-2022-082827 · Code A-302.10/3 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  9. ViolationPLANS REQUIRED TO COMPLY

    Case CF-2022-111282 · Violation VI-2022-082828 · Code A-301.6/1 · CLOSED

    Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.

  10. InvestigationL&I investigation

    Case CF-2022-111282 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  11. PermitAddition and/or Alteration

    Permit RP-2022-008499 · Completed

    *HOMEOWNER IS DOING THE WORK* EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. WORK IN THE BASEMENT OR CELLAR IS NOT INCLUDED ON THE EZ ALT PERMIT. Reframing non-load-bearing walls on 1st and 2nd floors, new kitchen, new bathroom, powder room on 1st. New insulation, new GWB throughout. No work in the basement. Separate permits required for Mechanical, Electric and Plumbing.

  12. InvestigationL&I investigation

    Case CF-2022-072694 · PASSED

    The cited inspection visit was marked passed.

  13. PermitInterior Non-Load-Bearing Wall Demo.

    Permit GM-2022-006627 · Completed

    EZ INTERIOR DEMOLITION - For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans.

  14. ViolationINTERIOR DEMOLITION

    Case CF-2022-072694 · Violation VI-2022-052960 · Code A-301.1/7 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  15. InvestigationL&I investigation

    Case CF-2022-072694 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  16. Recorded transfer$150K transfer

    2019

Where this comes from

Methodology & freshness

This report was assembled Jul 25, 2026, 10:36 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)