House report

1520 S 24th St

3 bd1 ba2 stories1,248 sqftRSA5built 1925

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$184K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$250K$500KZIP 19146 (Graduate Hospital · Point Breeze) median$201K2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19146 (Graduate Hospital · Point Breeze) medianAssessmentL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record18 events · exact dates, newest first
  1. InspectionL&I investigation
  2. L&I violationSPECIAL INSPECTIONS REQUIRED
  3. InspectionL&I investigation
  4. PermitAddition and/or Alteration
  5. PermitAddition and/or Alteration
  6. PermitAddition and/or Alteration
  7. PermitAlterations
  8. PermitAddition and/or Alterations
  9. PermitAddition and/or Alteration
  10. InspectionL&I investigation
  11. PermitAddition and/or Alteration
  12. InspectionL&I investigation
  13. L&I violationUNSAFE STRUCTURE
  14. L&I violationROOF DEFICIENCIES
  15. L&I violationEXTERIOR WALLS
  16. L&I violationINTERIOR STAIRS
  17. InspectionL&I investigation
  18. PermitAlteration

Flags: material assessment exemption; legal basis and term unverified. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$483/year estimated property tax

2026 taxable assessment $34,500 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $200,800. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 364143100
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationPartial assessment exemption, basis unverified

2026 OPA taxes $34,500 of $183,800 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.

See the assessment math →
Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The assessment exemption gap

OPA's 2026 roll shows a partial assessment exemption. The annual difference is measurable; the reason for it and what happens after a sale are not established here.

Using OPA's taxable amount ~$483/year

$34,500 taxable basis

Difference to verify+$2,090/year
If the full assessment were taxable ~$2,573/year

$183,800 scenario basis

The assessment roll does not identify
  • Legal basis or program
  • Approval or expiration date
  • Treatment after a sale
  • Current Tax Center balance
Show the assessment math 2026: ($183,800 assessed − $149,300 exempt) × 1.3998% ≈ $483/year Full-assessment scenario: $183,800 × 1.3998% ≈ $2,573/year

Do not treat the full-assessment scenario as inevitable or assume the current relief transfers. Obtain the approval history and verify the live Tax Center account before relying on either number.

The property, on paper

OPA physical field record.

Bedrooms
3
Bathrooms
1
Stories
2
Interior
1,248 sqft livable area
Lot
930 sqft
Basement
Basement city code I
Heat
Undetermined city code H
Central air
No
Exterior condition
Above average city code 3
Interior condition
Average city code 4
Quality grade
C assessor's grade
Zoning
RSA5 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

1500 block of S 24th St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 1518 S 24th St  ·  1522 S 24th St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 18 dated rows
  1. InvestigationL&I investigation

    Case CF-2023-119880 · PASSED

    The cited inspection visit was marked passed.

  2. ViolationSPECIAL INSPECTIONS REQUIRED

    Case CF-2023-119880 · Violation VI-2023-090627 · Code A-304.2/2 · COMPLIED

    Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  3. InvestigationL&I investigation

    Case CF-2023-119880 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  4. PermitAddition and/or Alteration

    Permit RP-2023-007032 · Completed

    For interior alterations to an existing attached single family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.

  5. PermitAddition and/or Alteration

    Permit RP-2023-005241 · Completed

    FOR FOUNDATION UNDERPINNING AND STAIR FRAMING AS PART OF AN EXISTING STRUCTURE; (BASEMENT TO REMAIN NON-HABITABLE SPACE, NO INTERIOR ALTERATION AS PART OF THIS PERMIT). SIZE AND LOCATION AS SHOWN ON THE PLANS.

  6. PermitAddition and/or Alteration

    Permit EP-2023-005114 · Completed

    Replace the old panel with new 100A panel and grounding. Wire throughout outlets, switches, light fixtures, C/O and smoke detectors as per NEC 2017 code.

  7. PermitAlterations

    Permit PP-2023-006646 · Completed

    2-WC 2-LAV 2-SHOWER/TUB 1-KS 1-LT 1-HWH

  8. PermitAddition and/or Alterations

    Permit MP-2023-002089 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80k btu furnace 95%, 3 ton coil, 3 ton condenser, all new ductwork, & 11 diffusers.

  9. PermitAddition and/or Alteration

    Permit RP-2023-003720 · Completed

    EZ PERMIT STADARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT).

  10. InvestigationL&I investigation

    Case CF-2022-090706 · PASSED

    The cited inspection visit was marked passed.

  11. PermitAddition and/or Alteration

    Permit RP-2023-002131 · Completed

    MAKE-SAFE PERMIT: FOR THE REPLACEMENT OF THE BAY WALLS, THE BAY ROOF COVERING, THE MAIN ROOF COVERING, AND DAMAGED STAIR TREADS TO RESOLVE CASE CF-2022-090706. ALL WORK TO BE DONE PER APPROVED PLANS AND ENGINEERING INSPECTION LETTER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. “A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SIX (6) FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.” A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE CF-2022-090706. "IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION."

  12. InvestigationL&I investigation

    Case CF-2022-090706 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  13. ViolationUNSAFE STRUCTURE

    Case CF-2022-090706 · Violation VI-2022-066533 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  14. ViolationROOF DEFICIENCIES

    Case CF-2022-090706 · Violation VI-2022-066534 · Code PM15-304.1(H) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  15. ViolationEXTERIOR WALLS

    Case CF-2022-090706 · Violation VI-2022-066535 · Code PM15-304.1(G) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  16. ViolationINTERIOR STAIRS

    Case CF-2022-090706 · Violation VI-2022-066536 · Code PM15-305.1(E) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  17. InvestigationL&I investigation

    Case CF-2022-090706 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  18. PermitAlteration

    Permit 743198 · COMPLETED

    INSTALL 4 INCH BRICK VENEER ON NEW CONCRETE FOOTING IN FRONT OF EXISTING MASONRY WALL AS PER 2009 IRC 703.7. MAXIMUM THICKNESS 5 INCHES. * AN INSPECTION OF EXISTING WALL TO BE SCHEDULED WITH INSPECTOR BEFORE WORK STARTS. CONTRACTOR AGREES AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR STONE & MASONRY VENEER WALLS.

Where this comes from

Methodology & freshness

This report was assembled Jul 26, 2026, 12:09 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)