The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $16,349,900. It is not yet the billed-year tax basis.
- OPA assessment · 2025$17M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2026$17M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$16M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Deed / sale · 2022Deed / sale $24MA recorded real-estate document or transfer event. The amount and date can be useful history, but the underlying deed and transfer-tax filing control the parties, consideration, and legal effect.How to read the recorded document ↗
- Permit · 2019-05-06Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-14Minor DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-07-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-29Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-29New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-11Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-11Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-11Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-11Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-04New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-09New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-09New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-12New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-10-04New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-21New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-03New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-15New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-21New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-27New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-01New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2023-08-24INTERIOR SURFACESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-08-24MANUAL FIRE ALARM BOX SIGNSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-08-24EXTERIOR STRUCTURE DOORSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-08-24FDC LOCKING CAPSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2023-08-24L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2026-03-05BENCHMARKING LATEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2026-03-05L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-12-07L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-04-16L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- License · 2007-06-05PHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2020-02-29PHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2007-02-12PHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2010-07-08PHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- InspectionL&I investigation
- L&I violationBENCHMARKING LATE
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationINTERIOR SURFACES
- L&I violationMANUAL FIRE ALARM BOX SIGNS
- L&I violationEXTERIOR STRUCTURE DOORS
- L&I violationFDC LOCKING CAPS
- InspectionL&I investigation
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- Deed / saleDeed / sale $24M
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitRough-In
- PermitRough-In
- PermitRough-In
- PermitRough-In
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitSitework with Onsite Utility Services
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- LicensePHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing marked inactive
- PermitMinor Demolition
- PermitTank Install/Removal
- LicensePHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing marked inactive
- LicensePHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing initially issued
- LicensePHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing initially issued
Verify the public record
Property tax
$40,174/year estimated property tax
2026 taxable assessment $2,870,000 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $16,349,900. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 8810006702026 OPA taxes $2,870,000 of $16,910,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.
See the assessment math →Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Building report
Apartment building
Apartments, recorded in the City's apartments category. The public record and owner trail follow.
Recorded owner
Who's behind it
Pp Ave V LLC · corporate / LLC owner
• Tax bills mail to 1385 Broadway 18th Flr, New York NY, 10018 — outside Philadelphia
Block context
1600 block of N 5th St. Compare parcels, ownership, and public-record history.
See the whole block →Next door: 1635 N 5th St · 1603-15 N 5th St
L&I licenses checked through Jul 25, 2026
No business or residential license records
No business license or residential registration matched this OPA parcel in the latest City data.
Open every source row 144 dated rows
- InvestigationL&I investigation
Case CF-2026-019726 · PASSED
The cited inspection visit was marked passed.
- ViolationBENCHMARKING LATE
Case CF-2026-019726 · Violation VI-2026-012381 · Code 9-3402(2) · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- InvestigationL&I investigation
Case CF-2026-019726 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-086215 · PASSED
The cited inspection visit was marked passed.
- ViolationINTERIOR SURFACES
Case CF-2023-086215 · Violation VI-2023-063548 · Code PM15-305.3 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- ViolationMANUAL FIRE ALARM BOX SIGNS
Case CF-2023-086215 · Violation VI-2023-063551 · Code F-907.4.2.4 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- ViolationEXTERIOR STRUCTURE DOORS
Case CF-2023-086215 · Violation VI-2023-063550 · Code PM15-304.15 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- ViolationFDC LOCKING CAPS
Case CF-2023-086215 · Violation VI-2023-063549 · Code F-912.4.1 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- InvestigationL&I investigation
Case CF-2023-086215 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction or Additions
Permit PP-2022-009088 · Completed
Interior rough plumbing, water lines to fixtures and waste line from fixtures in accordance with plumbing plans
- PermitNew Construction or Additions
Permit PP-2022-008833 · Completed
New construction, interior & exterior plumbing. +All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2022-008832 · Completed
New construction, interior & exterior plumbing. +All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2022-008827 · Completed
Interior rough plumbing including water lines to fixtures and waste lines from fixures in accordance with plans
- PermitNew Construction or Additions
Permit PP-2020-014422 · Completed
installation of rough and finish plumbing supply lines to fixtures and waste lines from fixtures 8-toilets 5-tubs 3- showers 8-lavs 4-kitchen sinks 4- clothes washer 4-dish washers
- PermitNew Construction or Additions
Permit PP-2022-008830 · Completed
Interior rough plumbing, water lines to fixtures and waste lines from fixtures in accordance with plumbing plans
- PermitNew Construction or Additions
Permit PP-2021-016025 · Completed
New construction, interior plumbing. +All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2021-016032 · Completed
New construction, interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2022-000685 · Completed
INSTALL 1 BUILDING DRAIN, 1 CURB TRAB, 1 FAI, 1 1-1/2 INCH WATER SERVICE, 1 AREA DRAIN, 1 ROOF DRAIN, 3 HUD DRAINS, 1 FLOOR DRAIN, 4 HOT WATER HEATERS, 4 KITCHEN SINKS, 11 LAVATORIES, 8 SHOWER/TUBS, 1 EJECTOR SUMP PUMP AND 8 WATER CLOSETS ACCORDING TO THE 2018 PPC.
- PermitNew Construction or Additions
Permit PP-2021-016024 · Completed
interior rough and finish plumbing supply lines to fixtures and waste line from fixtures
- Recorded transfer$24M transfer
2022
- PermitNew Construction
Permit MP-2021-008913 · Completed
MULTI FAMILY: BUILDING 11 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008922 · Completed
MULTI FAMILY: BUILDING 19 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (6) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (6) Heat Pumps. 1 in each of 6 Dwelling units. all self containing units. (60) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008923 · Completed
MULTI FAMILY: BUILDING 17 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008920 · Completed
MULTI FAMILY: BUILDING 15 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008915 · Completed
MULTI FAMILY: BUILDING 12 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008925 · Completed
MULTI FAMILY: BUILDING 18 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008917 · Completed
MULTI FAMILY: BUILDING 13 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008926 · Completed
MULTI FAMILY: BUILDING 9 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008914 · Completed
MULTI FAMILY: BUILDING 16 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008919 · Completed
MULTI FAMILY: BUILDING 14 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2021-008912 · Completed
MULTI FAMILY: BUILDING 10 EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit FP-2021-002551 · Completed
FOR THE INSTALLATION OF A TWO (2) INCH FIRE SERVICE LINE, BACKFLOW PREVENTER, AND STANDPIPES FOR AUTOMATIC FIRE SUPPRESSION SYSTEM AS PER NFPA 13 AND 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- PermitNew Construction
Permit FP-2021-002550 · Completed
FOR THE INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, BACKFLOW PREVENTER, STANDPIPES AND AUTOMATIC FIRE SUPPRESSION SYSTEM PER NFPA 13 AND 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- PermitNew Construction
Permit FP-2021-002553 · Completed
FOR THE INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, BACKFLOW PREVENTER, STANDPIPES AND AUTOMATIC FIRE SUPPRESSION SYSTEM PER NFPA 13R AND 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- PermitNew Construction
Permit EP-2020-007208 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas as PER APPROVED DRAWINGS -2017 NEC.Install fire alarm system throughout w/ low frequency sound in all sleeping areas(living rms & bedrooms) as per APPROVED DRAWINGS-2016 NFPA72. Install cable tv wiring.
- PermitNew Construction
Permit FP-2020-001936 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new 2" fire service line connected to 4" new private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #18) to be used as Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1050806 for new construction permit.
- PermitNew Construction
Permit FP-2020-001932 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new 2" fire service line connected to 4" new private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #12) to be used as Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1050800 for new construction permit.
- PermitNew Construction
Permit FP-2020-002144 · Completed
FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A FOUR (4) STORY MULTI-FAMILY DWELLING WITH BASEMENT AND ROOF DECK ACCESS STRUCTURES. SYSTEM TO INCLUDE A NEW TWO (2) INCH FIRE SERVICE LINE CONNECTING TO A NEW FOUR (4) INCH PRIVATE WATER MAIN COMING OFF OF N 5TH STREET WITH A FOUR (4) INCH BACKFLOW PREVENTION DEVICE LOCATED IN A METER PIT AS PER PWD UTILITY PLAN DATED 10/2/2020. FOUR (4) INCH MANUAL WET STANDPIPES TO BE INSTALLED IN EXIT STAIRWAY ENCLOSURES. ALL WORK TO BE DONE AS PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 AND NFPA 14 BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE AP#1050799 FOR NEW CONSTRUCTION PERMIT.
- PermitNew Construction
Permit FP-2020-001934 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new 2" fire service line connected to 4" new private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #14) to be used as Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1050802 for new construction permit.
- PermitNew Construction
Permit FP-2020-001931 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new 2" fire service line connected to 4" new private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #10) to be used as Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1050798 for new construction permit.
- PermitNew Construction
Permit FP-2020-002143 · Completed
FOR THE INSTALLATION OF A TWO (2) INCH FIRE SERVICE LINE, BACKFLOW PREVENTER, AND STANDPIPES FOR AUTOMATIC FIRE SUPPRESSION SYSTEM AS PER NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- PermitNew Construction
Permit FP-2020-001935 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new 2" fire service line connected to 4" new private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #16) to be used as Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1050804 for new construction permit.
- PermitNew Construction or Additions
Permit PP-2021-004932 · Completed
Installation of rough and finish plumbing throughout. Supply lines to fixtures, waste lines from fixtures. (8) Toilets (5) Tubs (3) Showers (8) Lavs (4) Kitchen Sinks (4) Water Heaters (1) Sump Pump (4) Clothes Washer
- PermitNew Construction
Permit FP-2020-001933 · Completed
**Amendment dated 9/1/21 to change backflow prevention device based on revised CP100 form** For the installation of an automatic wet sprinkler system in accordance with NFPA 13 (using a new two (2) inch fire service line connected to new four (4) inch private main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, with a new four (4) inch backflow within the meter pit, and two (2), four (4) inch manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure (Building #1) to be used as Vacant Commercial/Group R-2 (four (4) dwelling units), as per plans and hydraulic calculations; see AP#1034122 for new construction permit.
- PermitNew Construction or Additions
Permit PP-2021-004926 · Completed
Installation of rough and finish plumbing throughout. Supply lines to fixtures, waste lines from fixtures. (8) Toilets (5) Tubs (3) Showers (8) Lavs (4) Kitchen Sinks (4) Water Heaters (1) Sump Pump (4) Clothes Washer
- PermitNew Construction or Additions
Permit PP-2020-014414 · Completed
installation of rough plumbing supply lines to fixtures waste lines from fixtures 8-toilets 8-lavs 5-tubs 3-showers 4-kitchen sinks 4-dish washers 4-clothes washers
- PermitNew Construction or Additions
Permit PP-2020-015062 · Completed
nstallation of rough and finish plumbing through out as plans show 4-kitchen sinks 8-toilets 8-lavs 5-tubs 3- showers 4-clothes washers 4-dishwashers
- PermitNew Construction or Additions
Permit PP-2020-015075 · Completed
rough and finish through out as plans show 6-toilets 6- lavs 6-tubs 6 -kitchen sinks 6- dish washers 6-clothes washers
- PermitNew Construction or Additions
Permit PP-2020-014415 · Completed
interior rough and finish plumbing supply lines to fixtures and waste line from fixtures 8-toilets 8-lavs 5-tubs 3-showers 4-kitchen sinks 4- dish washers 4- clothes washer
- PermitNew Construction or Additions
Permit PP-2020-014429 · Completed
New construction, interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2020-015061 · Completed
installation of rough and finish plumbing as plans show 6-kitchen sinks 12-toilets 12-lavs 12-tubs 6-dishwashers 6-clothes washers
- PermitNew Construction
Permit FP-2020-001939 · Completed
FOR THE INSTALLATION OF A TWO (2) INCH FIRE SERVICE LINE WITH A FOUR (4) INCH BACKFLOW PREVENTER, AUTOMATIC FIRE SUPPRESSION SYSTEM AS PER NFPA 13, AND MANUAL WET STANDPIPE PER NFPA 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. AMENDMENT ISSUED ON 10/1/21 TO CHANGE BACKFLOW PREVENTER AS PER THE AMENDED PLANS, CP100 FORM, AND HYDRAULIC CALCULATIONS.
- PermitNew Construction
Permit FP-2020-001937 · Completed
FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH STANDPIPES, A BACKFLOW PREVENTION AT METER PIT ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. AMENDMENT 9/13/21 TO CHANGE BACKFLOW PREVENTER
- PermitNew Construction
Permit FP-2020-002034 · Completed
For the installation of a two (2) inch fire service line with backflow preventor for the installation of a fire suppression system as per NFPA 13R and standpipes per NFPA 14. All work shall be done in accordance with the approved plan and calculations.
- PermitNew Construction
Permit FP-2020-002092 · Completed
INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT FOUR STORY BUILDING (BUILDING 4) TO INCLUDE BACKFLOW PREVENTION ASSEMBLY, 2-INCH FIRE SERVICE LINE, AND TWO STANDPIPE RISERS.
- PermitNew Construction
Permit FP-2020-001938 · Completed
**AMENDMENT 9/9/2021 TO CHANGE BACKFLOW AS PER REVISED CP100 FORM, HYDRAULIC CALCULATIONS, AND SPRINKLER PLANS** For the installation of an automatic wet sprinkler system in accordance with NFPA 13 (using a new 2" fire service line connecting to a new 4" private water main coming off of North 5th Street as per PWD Utility Plan dated 10/2/2020, using a new 4" backflow within the meter pit, and two (2), 4" manual wet standpipes installed within the exit stairways in accordance with NFPA 14), throughout a new four (4) story attached structure to be used as Group R-2 throughout (Building #5), as per plans and hydraulic calculations; see AP#1050794 for new construction permit.
- PermitNew Construction
Permit FP-2020-001930 · Completed
**Amendment dated 9/1/21 to change backflow prevention device based on revised CP100 form** For the installation of an automatic wet sprinkler system in accordance with NFPA 13 (using a new two (2) inch fire service line off of a new four (4) inch private water main as per PWD Utility Plan dated 10/2/2020, new 4" backflow within the meter pit, and two (2), four (4) inch manual wet standpipes installed within the exit stairways as per NFPA 14), throughout a new four (4) story attached structure (Building #8), used as vacant commercial space at 1st floor with Group R-2 from 2nd to 4th floors, as per plans and hydraulic calculations; see AP#1037341 for new construction permit.
- PermitNew Construction
Permit MP-2020-005291 · Completed
Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40)Diffusers/Registers
- PermitNew Construction
Permit MP-2020-005288 · Completed
Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2020-005286 · Completed
INSTALL NEW DUCTED MINI SPLIT SYSTEM WITH SPIRAL DUCTWORK Update: 2400 BTUs per unit; efficiency rating is 19 seer and 12.5 EER; 5 registers per unit, total of 10
- PermitNew Construction
Permit MP-2020-005290 · Completed
Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40)Diffusers/Registers
- PermitNew Construction
Permit MP-2020-005285 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include installation as per attached standards. Deviations from these standards require submission of construction and site plans.*ROOFTOP UNITS ALLOWED IF ON APPROVED BUILDING PLANS*
- PermitNew Construction
Permit MP-2020-005287 · Completed
Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units. (40) Diffusers/Registers
- PermitNew Construction
Permit MP-2020-005289 · Completed
Install (4) Electric Air Handlers with ductwork, registers, grilles, and diffusers. Install (4) Heat Pumps. 1 in each of 4 Dwelling units. all self containing units.(40)Diffusers/Registers
- PermitNew Construction
Permit MP-2020-005292 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans.*ROOFTOP UNITS ALLOWED IF ON APPROVED BUILDING PLANS*
- PermitNew Construction
Permit FP-2020-002139 · Completed
FOR THE INSTALLATION OF TWO (2) INCH FIRE SERVICE LINE WITH TWO (2) INCH BACKFLOW PREVENTERS, AUTOMATIC FIRE SUPPRESSION SYSTEM AS PER NFPA 13R AND MANUAL WET STANDPIPE PER NFPA 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. SEPARATE PERMIT REQUIRED FOR ANY OTHER WORK.
- PermitNew Construction
Permit FP-2020-002147 · Completed
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13 STANDARD AND STANDPIPES DESIGNED PER NFPA 14 STANDARD SERVED BY A 2 INCH FIRE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.
- PermitRough-In
Permit FP-2020-002138 · Completed
Rough-In Permit for FP-2020-002092 Install auto wet sprinkler system throughout per NFPA 13R (BLDG #4)
- PermitRough-In
Permit FP-2020-002137 · Completed
Rough-In Permit for FP-2020-002034 Install auto wet sprinkler system throughout per NFPA 13R (BLDG 2)
- PermitRough-In
Permit FP-2020-002134 · Completed
Rough-In Permit for FP-2020-001939 Install auto wet sprinkler system throughout per NFPA 13 (BLDG #7)
- PermitRough-In
Permit FP-2020-002135 · Completed
Rough-In Permit for FP-2020-001940 Install auto wet sprinkler system throughout per NFPA 13R (BLDG #17)
- PermitNew Construction
Permit EP-2020-007912 · Completed
Install 1000 amp, 120/240v 1ph main service. Install 600 amp 1ph 7 gang meter module. Install 400 amp commercial space service. Install all wiring throughout mixed use building with 6 apartments and common areas & commercial space. Install cable wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-008031 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5-gang meter module. Install all wiring throughout 4 apartments and common areas Install cable tv wiring as per 2017 NEC. Install fire alarm system throughout as per NFPA 72.
- PermitNew Construction
Permit FP-2020-002048 · Expired
Grading, Earthwork, E&S Control, new 6" domestic and 4" fire service lines, meter pits, new sanitary sewer main, stormwater management, landscaping, concrete and paving associated with a 147 unit project located at 1649 N. 5th (a.k.a.1617 N. 5th), all as per plans.
- PermitSitework with Onsite Utility Services
Permit SP-2020-000230 · Completed
Grading, Earthwork, E&S Control, new 6" domestic and 4" fire service lines, meter pits, new sanitary sewer main, stormwater management, landscaping, concrete and paving associated with a 147 unit project located at 1649 N. 5th (a.k.a.1617 N. 5th), all as per plans.
- PermitNew Construction or Additions
Permit PP-2020-011829 · Completed
Grading, Earthwork, E&S Control, new 6" domestic and 4" fire service lines, meter pits, new sanitary sewer main, stormwater management, landscaping, concrete and paving associated with a 147 unit project located at 1649 N. 5th (a.k.a.1617 N. 5th), all as per plans.
- PermitNew Construction
Permit EP-2020-007985 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas.Install cable tv wiring as per 2017 nec.Install fire alarm system throughout as per NFPA72.
- PermitNew Construction
Permit EP-2020-007859 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas and mechanical equipment. Install cable tv wiring. Install fire alarm system throughout as per the 2017 nec &2016 NFPA72.
- PermitNew Construction
Permit EP-2020-007929 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas as PER APPROVED DRAWINGS -2017 NEC. Install complete fire alarm system throughout w / low frequency sound in all sleeping areas as per APPROVED DRAWINGS- 2016 NFPA72. Install cable tv wiring as per 2017 NEC
- PermitNew Construction
Permit EP-2020-007925 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas per APPROVED DRAWINGS -2017 NEC.Install complete fire alarm system throughout w/ low frequency sound in all sleeping areas(living rms & bedrooms) as per APPROVED DRAWINGS -2016 NFPA72. Install cable tv wiring as per 2017 NEC
- PermitNew Construction
Permit EP-2020-008040 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5-gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV as per 2017 NEC. Install fire alarm system throughout as per NFPA 72.
- PermitNew Construction
Permit EP-2020-007907 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas.Install fire alarm system throughout as per NFPA72. Install cable tv wiring as per 2017 nec
- PermitNew Construction
Permit EP-2020-008029 · Expired
Install 800 amp, 120/240v, 1ph main service. Install 3 gang meter module for apartments & house Install 400a, 1ph ct service for commercial space. Install all wiring throughout 2 apartments and common areas & commercial space.Install cable tv wiring as per 2017 nec.Install fire alarm system throughout as per NFPA72.
- PermitNew Construction
Permit EP-2020-007213 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007856 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable tv wiring as per APPROVED DRAWINGS- 2017 NEC. Install fire alarm system throughout w/ low frequency sound in all sleeping areas, as per 2016 NFPA72. Building#12
- PermitNew Construction
Permit EP-2020-007921 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install. Install all wiring throughout 4 apartments, common areas amd mechanical equipment. Install fire alarm system throughout. Install cable tv wiring as per 2017 NEC & 2016 NFPA-72.
- PermitNew Construction
Permit EP-2020-008032 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments, common areas and mechanical equipment. Install cable tv wiring. Install fire alarm system throughout as per the 2017 NEC &2016 NFPA72.
- PermitNew Construction
Permit EP-2020-007927 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments, common areas, mechanical equipment. Install fire alarm system throughout. Install cable tv wiring as per 2017 NEC & 2016 NFPA-72.
- PermitNew Construction
Permit EP-2020-007909 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments common areas and mechanical equipment. Install fire alarm system throughout. Install cable tv wiring as per 2017 NEC & 2016 NFPA-72.
- PermitNew Construction
Permit EP-2020-007906 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments, common areas and mechanical equipment .Install fire alarm system throughout . Install cable tv wiring as per 2017 NEC and 2016 NFPA-72.
- PermitNew Construction
Permit EP-2020-007850 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable tv wiring, wiring for all mechanical equipment, Install fire alarm system throughout as per 2017 nec &2016 nfpa-72.
- PermitNew Construction
Permit EP-2020-007916 · Completed
Install 1000 amp, 120/240v 1ph main service. Install 600a 1ph 7 gang meter module. Install 400a commercial space service. Install all wiring throughout mixed use building with 6 apartments and common areas & commercial space .Install fire alarm system throughout as per NFPA72. Install cable tv wiring.
- PermitNew Construction
Permit EP-2020-007218 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007231 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007926 · Expired
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007919 · Completed
Install 1000 amp, 120/240v 1ph main service. Install 600 amp 1ph 7 gang meter module. Install 400 amp commercial space service. Install all wiring throughout mixed use building with 6 apartments and common areas & commercial space. Install cable wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007210 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007908 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable tv wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007858 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas. Install cable TV wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007222 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas PER APPROVED DRAWINGS -2017 NEC. Install fire alarm system throughout with low-frequency sound in sleeping areas(living rms & bedrooms)as PER APPROVED DRAWINGS-2016 NFPA72. Install cable tv wiring as per 2017 NEC.
- PermitNew Construction
Permit EP-2020-007159 · Completed
Install 400 amp, 120/240v 1ph main service. Install 5 gang meter module. Install 5 gang meter module. Install all wiring throughout 4 apartments and common areas Install cable television wiring as per 2017 NEC. .Install fire alarm system throughout as per 2016 NFPA 72.
- PermitNew Construction
Permit EP-2020-007155 · Completed
Install 400a, 120/240v 1 ph main service. Install 5 gang meter module .Install all wiring throughout 4 apartments & common area. Install fire alarm system throughout as per NFPA72. Install cable tv wiring as per NFPA70
- PermitNew Construction
Permit 1050818 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050810 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050808 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050813 · Expired
FOR THE ERECTION OF A THREE (3) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY ONE PILOT HOUSE AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050812 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050816 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1017800 · Expired
NEW CONSTRUCTION OF AN ATTACHED THREE (3) STORY MIXED-USE STRUCTURE. FOR A VACANT COMMERCIAL SPACE AT THE GROUND FLOOR[NEW USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY] AND A TWO-FAMILY HOUSEHOLD LIVING ABOVE WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE ** ENTIRE BUILDING TO BE SPRINKLERED AS PER NFPA 13.**IBC 2018 **SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK**
- PermitNew Construction
Permit 1050807 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050821 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050817 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050819 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050811 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1017793 · Expired
FOR THE ERECTION OF A THREE (3) STORY STRUCTURE FOR USE AS A VACANT COMMERCIAL SPACE ON THE FIRST FLOOR WITH A TWO-FAMILY DWELLING ABOVE WITH A PRIVATE ROOF DECK ACCESSED BY ONE PILOT HOUSE AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 SYSTEM. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR ACCESSORY PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050815 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050809 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050820 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050814 · Expired
FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050796 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL: FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050804 · Completed
AMENDMENT 2: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT AP#1050804 TO DOCUMENT CHANGE IN FRAMING MEMBERS AS SHOWN PER AMENDED STRUCTURAL PLANS SEALED BY STRUCTURAL ENGINEER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDMENT 1: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL: FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** .PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050806 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1017808 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050803 · Completed
AMENDMENT 2: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT AP#1050803 TO DOCUMENT CHANGE IN FRAMING MEMBERS AS SHOWN PER AMENDED STRUCTURAL PLANS SEALED BY STRUCTURAL ENGINEER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDMENT 1: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050801 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050800 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1034122 · Completed
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS SIX (6) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC**
- PermitNew Construction
Permit 1050795 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050792 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050805 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050793 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050797 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050794 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050799 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050802 · Completed
AMENDMENT 2: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT AP#1050802 TO DOCUMENT CHANGE IN FRAMING MEMBERS AS SHOWN PER AMENDED STRUCTURAL PLANS SEALED BY STRUCTURAL ENGINEER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDMENT 1 : FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1050798 · Completed
AMENDMENT: FOR THE REMOVAL OF BATHROOM IN THE BASEMENT LEVEL AS SHOWN PER AMENDED PLANS WITH CHANGES TO DUTIES AND RESPONSIBILITIES FORM FOR SPECIAL INSPECTIONS. SEE ORIGINAL SCOPE BELOW. ORIGINAL:FOR THE ERECTION OF A FOUR (4) STORY STRUCTURE FOR USE AS FOUR-FAMILY DWELLING WITH A PRIVATE ROOF DECK ACCESSED BY TWO PILOT HOUSES AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING REQUIRED TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R AND STANDPIPES TO BE PROVIDED IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. *2018 IBC* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ACCESSIBLE UNITS (TYPE A) ON SITE ARE LOCATED IN BUILDING #21, 23, AND 25. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** PLEASE SEE AP#1017808 FOR APPROVED PLANS AND DOCUMENTATION.
- PermitNew Construction
Permit 1037333 · Completed
FOR THE NEW CONSTRUCTION OF A FOUR-STORY STRUCTURE WITH TWO PILOTHOUSES TO ACCESS ROOF DECK WITH 42-INCH GUARD RAILS, FOR USE AS VACANT COMMERCIAL IN BASEMENT AND FIRST FLOOR (SEPARATE CERTIFICATE OF OCCUPANCY REQUIRED PRIOR TO OCCUPANCY) AND SIX (6) DWELLING UNITS ON FLOORS 2-4, AS PER APPROVED PLANS. AMENDMENT AS OF 10/23/2020: TO AMEND THE SPECIAL INSPECTIONS FORM AND DUTIES AND RESPONSIILTIES FORM TO REFLECT NEW INSPECTIONS AND SPECIAL INSPECTIONS AGENCY.
- PermitNew Construction
Permit 1037341 · Completed
FOR THE ERECTION OF AN ATTACHED FOUR-STORY STRUCTURE WITH A CELLAR AND A ROOF DECK WITH ROOF ACCESS STRUCTURES AS PER PLANS. FOR A VACANT COMMERCIAL UNIT AT THE GROUND FLOOR AND BASEMENT WITH TWO (2) DWELLING UNITS PER FLOOR (FLOORS 2, 3, & 4), TOTAL 6 DWELLING UNITS. UPPER LEVEL ROOF DECK WITH ACCESS FROM TWO (2) PILOT HOUSES. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. AMENDMENT (11/2/2020) TO AMEND PREVIOUSLY APPROVED PERMIT TO REVISE BASEMENT FLOOR PLAN, DELETE BATHROOM AND CHANGES PER REVISED PLANS PROVIDED. TO UPDATE AND REVISE SPECIAL INSECTION DOCUMENTS. NO CHANGES TO APPROVED CERTIFICATE OF OCCUPANCY AMENDMENT (12/2/20200) TO CLARIFY ROOF ASSEMBLY AND REVISE ELEVATION AS PER PLANS.
- License terminal eventPHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing marked inactive
License 408438 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitMinor Demolition
Permit 970322 · Completed
COMPLETE DEMOLITION OF THREE DETACHED AND ONE SEMI-DETACHED ONE-STORY, MASONRY, CONCRETE AND WOOD INDUSTRIAL BUILDINGS BY HAND AND MECHANICAL METHODS. SPECIAL INSPECTIONS REQUIRED AND TO BE PERFORMED BY POULSON & ASSOCIATES. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. PORTIONS OF COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. **21 DAY POSTING PERIOD WAIVED PER ZBA CASE NO. 34022**
- PermitTank Install/Removal
Permit 973552 · Completed
EXCAVATE AND REMOVE (2) 2000 GALLON, (1) 4000 GALLON AND (1) 8000 GALLON UNDERGROUND TANKS PREVIOUSLY CLOSED IN PLACE. The removal must comply with the regulations of the Pennsylvania Department of Environmental Protection (PADEP). EPA CERTIFICATION & CLOSURE REPORT TO BE SUBMITTED TO INSPECTOR.
- License terminal eventPHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing marked inactive
License 399633 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventPHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Hazardous Materials L&I license filing initially issued
License 408438 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventPHILA SKID COMPANY INCOPORATED - PALLETS PLUS: Dumpster License - Private Property L&I license filing initially issued
License 399633 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 26, 2026, 9:31 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)