Property at a glanceApartments

Groom Investments LLC

2026 assessment
$3.2M OPA value, not a listing price
2027 published assessment
$7.3M Future roll, not the current tax bill
Neighborhood area
Old City · Society Hill Approximate · based on ZIP 19106
Street view of 230-36 Vine St
From the street · imagery © Google

The property record, over time

Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history, not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $7,299,900; it is not yet the billed-year tax basis.

Assessment history · all dated City records marked on the line

$0$5.0M$10M$7.3M2004200820122016202020242027
Property assessmentAssessmentTeardownL&I violationAppealPermitInspectionLicense

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record37 events · exact dates, newest first
  1. L&I violationWORKMANLIKE- BUILDING CODE
  2. InspectionL&I investigation
  3. InspectionL&I investigation
  4. L&I violationWORK NOT ACCORDING TO PLANS
  5. InspectionL&I investigation
  6. PermitNew Construction
  7. L&I violationWALKWAY NOT PROVIDED
  8. InspectionL&I investigation
  9. PermitAddition and/or Alteration
  10. PermitChange of Use
  11. InspectionL&I investigation
  12. PermitExcavation
  13. TeardownDemolished
  14. PermitMajor Demolition
  15. PermitAlterations
  16. PermitParty Wall Protection
  17. PermitFull Demolition
  18. InspectionL&I investigation
  19. PermitNew Construction
  20. InspectionL&I investigation
  21. L&I violationSTRUCTURAL REPAIR
  22. L&I violationUNSAFE STRUCTURE
  23. L&I violationEXTERIOR WALLS
  24. InspectionL&I investigation
  25. PermitNew construction, addition, GFA change
  26. AppealZBA Permit Denial - Special Exception
  27. PermitNew construction, addition, GFA change
  28. InspectionL&I investigation
  29. InspectionL&I investigation
  30. AppealZBA Permit Denial - Variance
  31. PermitNew construction, addition, GFA change
  32. InspectionL&I investigation
  33. L&I violationEXTERIOR STRUCT DEC FEATURES
  34. License11TH HOUR THEATRE COMPANY: Special Permit L&I license filing marked inactive
  35. License11TH HOUR THEATRE COMPANY: Special Permit L&I license filing initially issued
  36. LicensePAINTED BRIDE ART CENTER: Dumpster License - Public ROW L&I license filing marked inactive
  37. LicensePAINTED BRIDE ART CENTER: Dumpster License - Public ROW L&I license filing initially issued

Preparing this comparison.

Compare nearby property records

The subject property stays pinned above and is excluded from this comparable list. Repeated condominium addresses include their OPA parcel number.

Property details and source records

The visual history and live comparison stay above. Use these focused views for tax, ownership, nearby-block, and supporting City records.

The estimate, live balance, and back-tax record are different.

BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.

Estimated annual Real Estate Tax$45,008/year

2026 taxable assessment $3,215,300 × 1.3998%. This is an estimate, not a bill or account balance.

OPA also publishes a 2027 assessment of $7,299,900; it is not the 2026 billed-year value.

Official current account balanceCheck live

A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit or an amount due is not automatically “back taxes.”

OPA 881001274
Open Philadelphia Tax Center →Choose “View period balance” to see the tax year and any credit, interest, or delinquency.
Exemption classificationNo exemption shown

2026 taxable assessment equals the full assessed value.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Building report

Apartment building

Apartments, recorded in the City's apartments category. The public record and owner trail follow.

What it is
Apartments Amuse Hall Masonry
Owner
Groom Investments LLC
OPA tax treatment
Assessed $3.2M Taxable assessment on the roll
$ / sq ft
$239 above the $147 median for 2,826 apartments parcels citywide
Assessed value
$3,215,300 2026 OPA · 2027: $7,299,900
Interior area
30,576 sqft
Lot size
11,068 sqft
Stories
6
Built
2027
Zoning
CMX3

Recorded owner

Who's behind it

Groom Investments LLC · corporate / LLC owner

• Owns 2 properties across Philadelphia under this name, assessed at $7.7M combined
• Tax bills mail to 305 N 15th St, Philadelphia PA, 19102

Block context

200 block of Vine St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 226-28 Vine St  ·  222-24 Vine St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 25, 2026.

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Browse 36 dated records

Deeds, permits, inspections, licenses, violations, certifications, and appeals.

Open the City record ↗
Open the source ledger 36 dated rows
  1. ViolationWORKMANLIKE- BUILDING CODE

    Case CF-2026-064517 · Violation VI-2026-039516 · Code A-104.1/1 · SVN ISSUED

    Resolution: SVN ISSUED

  2. InvestigationL&I investigation

    Case CF-2026-063167 · PASSED

    The cited inspection visit was marked passed.

  3. InvestigationL&I investigation

    Case CF-2026-064517 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  4. ViolationWORK NOT ACCORDING TO PLANS

    Case CF-2026-063167 · Violation VI-2026-038918 · Code A-302.10/2 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  5. InvestigationL&I investigation

    Case CF-2026-063167 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  6. PermitNew Construction

    Permit FP-2026-000910 · Issued

    COMBINED AUTOMATIC SPRINKLER & CLASS I MANUAL WET STANDPIPE SYSTEMS WITH SIX (6) INCH FIRE SERVICE LINE & BACKFLOW PREVENTION (BFP) ASSEMBLY TO SERVE PREVIOUSLY APPROVED MIXED-USE BUILDING. AUTOMATIC SPRINKLER SYSTEM & STANDPIPE SYSTME INSTALLATION PER NFPA 13/14. FIRE PUMP TO BE INSTALLED PER NFPA 20.

  7. ViolationWALKWAY NOT PROVIDED

    Case CF-2026-054692 · Violation VI-2026-033369 · Code B-3306.2 · SVN ISSUED

    Resolution: SVN ISSUED

  8. InvestigationL&I investigation

    Case CF-2026-054692

  9. PermitAddition and/or Alteration

    Permit CP-2026-001133 · Issued

    FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT 1ST AND 2ND FLOOR. FOR USE AS CHILD CARE-CHILD CARE CENTER AT 1ST AND 2ND FLOOR TO INCLUDE ACCESS TO ROOF DECK. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************

  10. PermitChange of Use

    Permit ZP-2026-002794 · Issued

    Child Care - Child Care Center

  11. InvestigationL&I investigation

    Case CF-2025-014944 · PASSED

    The cited inspection visit was marked passed.

  12. PermitExcavation

    Permit SP-2024-001175 · Amendment Ready For Issue

    EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION BUILDING (SEE CP-2023-004665) TO INCLUDE SHEETING AND SHORING AND UNDERPINNING WORK AS PER APPROVED PLANS. UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* **AMENDMENT APPROVED 3/26/26** AMEND EXCAVATION PERMIT SP-2024-001175 FOR CHANGES TO SHORING AND UNDERPINNING DESIGN AS PER APPROVED PLANS.

  13. PermitMajor Demolition

    Permit DP-2025-000956 · Completed

    MAKE-SAFE PERMIT: FOR THE COMPLETE DEMOLITION OF THE EXISTING ATTACHED STRUCTURE BY HAND AND MECHANICAL DEMOLITION TO RESOLVE CASE CF-2025-014944. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. “A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN FIFTEEN (15) FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.”

  14. PermitAlterations

    Permit PP-2025-009277 · Issued

    SEAL LATERAL PA20251742434 REMOVE TRAP AND HERMETICALLY SEALING THE LATERAL BY A CAP OR PLUG ."ALL EXCAVATIONS AND PLUMBING TRENCHES IN EXCESS OF 5 FEET IN DEPTH MUST HAVE APPROVED SHORING IN PLACE AT THE TIME OF INSPECTION"

  15. PermitParty Wall Protection

    Permit GM-2025-008890 · Issued

    EZ Wall Protection Permit- Obtain permits for the application of exterior wall sidings for the purpose of finishing walls exposed during demolition (including party walls and independent bearing walls abutting party walls) without submitting plans by meeting the Conditions and Design Limitations below. Any deviations from this permit standard will result in permit revocation. PARTY WALL PROTECTION PERMIT FOR FINISHING EXTERIOR PARTY WALL AFTER DEMOLITION. *STUCCO* Property is classified as a non-contributing resource to the Old City Historic District.

  16. PermitFull Demolition

    Permit ZP-2025-009376 · Issued

    FOR THE COMPLETE DEMOLITION OF THE EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.

  17. InvestigationL&I investigation

    Case CF-2025-014944 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  18. PermitNew Construction

    Permit CP-2023-004665 · Issued

    NEW CONSTRUCTION OF A SIX (6) STORY BUILDING WITH ROOF DECKS AND PILOT HOUSE FOR USE AS SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY) AND EIGHTY-FIVE (85) DWELLING UNITS WITH ACCESSORY PARKING GARAGE AS PER APPROVED PLANS. BUILDING TO UTILIZE HORIZONTAL SEPARATIONS TO CREATE TWO (2) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (BASEMENT AND 1ST FLOOR - TYPE IA AND 2ND THROUGH 6TH FLOORS - TYPE IIIB). FIRE RETARDANT TREATED STUDS AND SHEATHING REQUIRED FOR TYPE III CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. FIRE WATCH REQUIRED PER CODE BULLETIN F-2001. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 1/24/26 AMEND NEW CONSTRUCTION PERMIT CP-2023-004665 FOR STRUCTURAL AND LAYOUT CHANGES TO INCLUDE CAR LIFTS IN BASEMENT GARAGE, EXPANSION OF COMMERCIAL SPACE, REDUCTION IN NUMBER OF DWELLING UNITS TO SEVENTY-FIVE (75) AND INCLUSION OF HORIZONTAL EXITS AS PER APPROVED PLANS.

  19. InvestigationL&I investigation

    Case CF-2025-014944 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  20. ViolationSTRUCTURAL REPAIR

    Case CF-2025-014944 · Violation VI-2025-011439 · Code A-301.1/38 · COMPLIED

    Resolution: COMPLIED - OWNER DEMOLITION City marked this violation complied with; check the resolution date and live case for what was accepted.

  21. ViolationUNSAFE STRUCTURE

    Case CF-2025-014944 · Violation VI-2025-011440 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - OWNER DEMOLITION City marked this violation complied with; check the resolution date and live case for what was accepted.

  22. ViolationEXTERIOR WALLS

    Case CF-2025-014944 · Violation VI-2025-011441 · Code PM15-304.1(G) · COMPLIED

    Resolution: COMPLIED - OWNER DEMOLITION City marked this violation complied with; check the resolution date and live case for what was accepted.

  23. InvestigationL&I investigation

    Case CF-2025-014944 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  24. PermitNew construction, addition, GFA change

    Permit ZP-2022-012583 · Issued

    FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE. FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATIONS AS SHOWN ON THE PLANS. **SEE ZBA APPROVAL UNDER ZP-2022-11496** AMENDED AS OF 10/31/2023 FOR A MODIFICATION TO THE PARKING LAYOUT.** AMENDED AS OF 5/16/2025 FOR A PARKING LAYOUT MODIFICATION AND USE DETAILS.**

  25. AppealZBA Permit Denial - Special Exception

    Appeal ZP-2022-011496 · Completed · Granted with conditions

    Related permit ZP-2022-011496 · PERMIT FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE AND THE ERECTION OF AN ATTACHED BUILDING WITH BALCONIES AND TWO (2) ROOF DECKS WITH ROOF DECK ACCESS STRUCTURE. FOR USE AS SIT-DOWN RESTAURANT AND VISITOR ACCOMODATIONS (110 ROOMS)

  26. PermitNew construction, addition, GFA change

    Permit ZP-2022-011496 · Issued

    FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE AND THE ERECTION OF AN ATTACHED BUILDING WITH BALCONIES AND TWO (2) ROOF DECKS WITH ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.

  27. InvestigationL&I investigation

    Case 655096 · PASSED

    The cited inspection visit was marked passed.

  28. InvestigationL&I investigation

    Case 655096 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  29. AppealZBA Permit Denial - Variance

    Appeal ZP-2020-006249 · Completed · Granted with conditions

    Related permit ZP-2020-006249 · (Resumption Hearing 6-22-21 @10am & 8/3/21 @9:30am) PERMIT FOR THE PARTIAL DEMOLITION OF THE EXISTING ATTACHED STRUCTURE (COMPLETE REMOVAL OF THE EXISTING ROOF SYSTEM WITH NO MODIFICATIONS OR REPLACEMENT OF ANY EXISTING EXTERIOR WALL). FO

  30. PermitNew construction, addition, GFA change

    Permit ZP-2020-006249 · Issued

    FOR THE PARTIAL DEMOLITION OF THE EXISTING ATTACHED STRUCTURE (COMPLETE REMOVAL OF THE EXISTING ROOF SYSTEM WITH NO MODIFICATIONS OR REPLACEMENT OF ANY EXISTING EXTERIOR WALL). FOR THE ERECTION OF AN ADDITION WITH ROOF DECKS WITH SETBACK AT THE UPPERMOST LEVELS AND AT INTERIOR COURT. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.

  31. InvestigationL&I investigation

    Case 655096 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  32. ViolationEXTERIOR STRUCT DEC FEATURES

    Case 655096 · Violation 211951285 · Code PM15-304.8 · COMPLIED

    Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  33. License terminal event11TH HOUR THEATRE COMPANY: Special Permit L&I license filing marked inactive

    License 701678 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  34. License issue event11TH HOUR THEATRE COMPANY: Special Permit L&I license filing initially issued

    License 701678 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  35. License terminal eventPAINTED BRIDE ART CENTER: Dumpster License - Public ROW L&I license filing marked inactive

    License 297684 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  36. License issue eventPAINTED BRIDE ART CENTER: Dumpster License - Public ROW L&I license filing initially issued

    License 297684 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

What this record suggests

The City file documents 12 permits touching plumbing, roof work. 11 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.

Where this comes from

Methodology & freshness

This report was assembled Jul 26, 2026, 5:07 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)