Property report
2301 Master St
15 bd2 stories6,206 sqftRM1built 1920
Philadelphia Housing Auth
Assessment and City record timeline
The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $467,400. It is not yet the billed-year tax basis.
- OPA assessment · 2025$467K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2026$467K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$467K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Permit · 2021-04-07Combined Lot Line Relocation and New Dev…This permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-16New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-04New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-05New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-05New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-31New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-31New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-10Full DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-17Full DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-10New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-16New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-06Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-05New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-05New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-24New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-14Solar Panels and StructureThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2021-04-21ZBA Permit Denial - VarianceA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitSolar Panels and Structure
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitNew Construction
- PermitRough-In
- PermitNew Construction
- PermitRough-In
- PermitRough-In
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitFull Demolition
- PermitFull Demolition
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew construction, addition, GFA change
- AppealZBA Permit Denial - Variance
- PermitCombined Lot Line Relocation and New Dev…
Verify the public record
Property tax
$0/year estimated property tax
2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $467,400. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 8860001622026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.
Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Property report
Not a house
Apartments. OPA shows a full or near-full assessment exemption whose basis must be verified. A $0 assessment-based estimate does not prove the live Tax Center account has no prior-period balance or other charges.
Recorded owner
Who's behind it
Philadelphia Housing Auth · corporate / LLC owner
• Owns 4776 properties across Philadelphia under this name, assessed at $1.4B combined
• Tax bills mail to 2013 Ridge Ave, Philadelphia PA, 19121
Block context
2300 block of Master St. Compare parcels, ownership, and public-record history.
See the whole block →Next door: 2300-44 Master St
L&I licenses checked through Jul 25, 2026
No business or residential license records
No business license or residential registration matched this OPA parcel in the latest City data.
Open every source row 140 dated rows
- PermitNew Construction
Permit EP-2022-003982 · Completed
Electrical Permit for combo RP-2021-019430
- PermitNew Construction
Permit MP-2022-002036 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019438
- PermitNew Construction or Additions
Permit PP-2022-002966 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019443
- PermitNew Construction or Additions
Permit PP-2022-003981 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019469
- PermitNew Construction or Additions
Permit PP-2022-006197 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019414
- PermitNew Construction or Additions
Permit PP-2022-005346 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019439
- PermitNew Construction or Additions
Permit PP-2022-005349 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019438
- PermitNew Construction or Additions
Permit PP-2022-006342 · Completed
Plumbing Permit (Interior) for combo RP-2021-019465
- PermitSolar Panels and Structure
Permit GP-2023-009803 · Completed
FOR INSTALLATION OF STRUCTURAL/FASTENING COMPONENTS OF ROOF-MOUNTED SOLAR PHOTO VOLTAIC SYSTEM ON NEW CONSTRUCTION COMMUNITY CENTER BUILDING. SIZE AND LOCATION AS SHOWN ON APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK. SEE CP-2021-009268 FOR ASSOCIATED NEW CONSTRUCTION BUILDING PERMIT.
- PermitNew Construction
Permit EP-2023-009242 · Completed
Electrical & Solar: Installation of a 200 amp service that includes a CT cabinet and meter to a main distribution panel to feed 3 sub panels & a disconnect to feed solar photovoltaic system as per plans. Also to install all branch circuits to feed power & lighting as per plans and 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- PermitNew Construction
Permit MP-2023-004586 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING FAN COIL UNITS, ENERGY RECOVER UNITS, REGISTERS AND DIFFUSERS WITH ALL ASSOCIATED DUCTWORK AS PER PLANS.
- PermitNew Construction or Additions
Permit PP-2023-014352 · Completed
New construction of a one story structure serving as a community meeting space and management office as per approved plans.
- PermitNew Construction
Permit FP-2023-001731 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 6" MAIN FIRE SERVICE LINE WITH A 6" WILKINS 350 AST BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003041 · Completed
FOR THE INSTALLATION OF A 2" COMINDED DOMESTIC/FIRE SERVICE LINE AND A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS AND BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003018 · Completed
FOR THE INSTALLATION OF A 2" COMINDED DOMESTIC/FIRE SERVICE LINE AND A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS AND BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003035 · Completed
INSTALLATION OF RESIDENTIAL FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT A THREE (3) STORY STRUCTURE WITH BASEMENT AND PILOT HOUSE. THIS IS A MULTI-PURPOSE SYSTEM UTILIZING A COMBINED TWO INCH (2") DOMESTIC AND FIRE SERVICE LINE WITH REMOTE TOILET CONNECTION PER PLANS. SEPARATE PERMITS REQUIRED FOR ALL PLUMBING WORK.
- PermitNew Construction
Permit FP-2022-003028 · Completed
INSTALLATION OF RESIDENTIAL FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT A THREE (3) STORY STRUCTURE WITH BASEMENT AND PILOT HOUSE. THIS IS A MULTI-PURPOSE SYSTEM UTILIZING A COMBINED TWO INCH (2") DOMESTIC AND FIRE SERVICE LINE WITH REMOTE TOILET CONNECTION PER PLANS. SEPARATE PERMITS REQUIRED FOR ALL PLUMBING WORK.
- PermitNew Construction
Permit EP-2022-003479 · Completed
Electrical Permit for combo RP-2021-019439
- PermitNew Construction
Permit EP-2022-003480 · Completed
Electrical Permit for combo RP-2021-019438
- PermitNew Construction
Permit FP-2022-003034 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH ONE 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2022-003027 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH ONE 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2022-003033 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH ONE 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2022-003042 · Completed
FOR THE INSTALLATION OF A NFPA 13D FIRE SUPPRESSION SYSTEM SERVICED BY A TWO INCH COMBINED FIRE SERVICE WITH A WATER METER ASSEMBLY. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA AND PLANS SEALED BY A DESIGN ENGINEER. FIRE SUPPRESSION SYSTEM TO BE INSTALLED IN ACCORDANCE WITH NFPA 13D STANDARD.
- PermitNew Construction
Permit FP-2022-003037 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003040 · Completed
FOR THE INSTALLATION OF A NFPA 13D FIRE SUPPRESSION SYSTEM SERVICED BY A TWO INCH COMBINED FIRE SERVICE WITH A WATER METER ASSEMBLY. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA AND PLANS SEALED BY A DESIGN ENGINEER. FIRE SUPPRESSION SYSTEM TO BE INSTALLED IN ACCORDANCE WITH NFPA 13D STANDARD.
- PermitNew Construction
Permit FP-2022-003017 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitAddition and/or Alterations
Permit FP-2022-003019 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003036 · Completed
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003039 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitRough-In
Permit FP-2023-000277 · Completed
Rough-In Permit for FP-2022-003041 Installation of 13D system throughout Suite 18
- PermitNew Construction
Permit FP-2022-003031 · Completed
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitRough-In
Permit FP-2023-000276 · Completed
Rough-In Permit for FP-2022-003040 Installation of 13D system throughout Suite 17
- PermitRough-In
Permit FP-2023-000278 · Completed
Rough-In Permit for FP-2022-003042 Installation of 13D system throughout Suite 19
- PermitNew Construction
Permit FP-2022-003038 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003029 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction
Permit FP-2022-003032 · Completed
FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitNew Construction or Additions
Permit PP-2022-003977 · Completed
Plumbing Permit (Interior) for combo RP-2021-019441
- PermitNew Construction or Additions
Permit PP-2022-003980 · Completed
Plumbing Permit (Interior) for combo RP-2021-019468
- PermitNew Construction or Additions
Permit PP-2022-006340 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019465
- PermitNew Construction or Additions
Permit PP-2022-006198 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019414
- PermitNew Construction or Additions
Permit PP-2022-003978 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019468
- PermitNew Construction or Additions
Permit PP-2022-002968 · Completed
Plumbing Permit (Interior) for combo RP-2021-019443
- PermitNew Construction or Additions
Permit PP-2022-006199 · Completed
Plumbing Permit (Interior) for combo RP-2021-019414
- PermitNew Construction or Additions
Permit PP-2022-002967 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019443
- PermitNew Construction or Additions
Permit PP-2022-002970 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019467
- PermitNew Construction or Additions
Permit PP-2022-002862 · Completed
Plumbing Permit (Interior) for combo RP-2021-019464
- PermitNew Construction or Additions
Permit PP-2022-002973 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019440
- PermitNew Construction or Additions
Permit PP-2022-002971 · Completed
Plumbing Permit (Interior) for combo RP-2021-019467
- PermitNew Construction or Additions
Permit PP-2022-003975 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019441
- PermitNew Construction or Additions
Permit PP-2022-002974 · Completed
Plumbing Permit (Interior) for combo RP-2021-019440
- PermitNew Construction or Additions
Permit PP-2022-002858 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019442
- PermitNew Construction or Additions
Permit PP-2022-002969 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019467
- PermitNew Construction or Additions
Permit PP-2022-002972 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019440
- PermitNew Construction or Additions
Permit PP-2022-002857 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019442
- PermitNew Construction or Additions
Permit PP-2022-002860 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019464
- PermitNew Construction or Additions
Permit PP-2022-002861 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019464
- PermitNew Construction or Additions
Permit PP-2022-006341 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019465
- PermitNew Construction or Additions
Permit PP-2022-003979 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019468
- PermitNew Construction or Additions
Permit PP-2022-003976 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019441
- PermitNew Construction or Additions
Permit PP-2022-002859 · Completed
Plumbing Permit (Interior) for combo RP-2021-019442
- PermitNew Construction or Additions
Permit PP-2022-005347 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019439
- PermitNew Construction or Additions
Permit PP-2022-005352 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019428
- PermitNew Construction or Additions
Permit PP-2022-005350 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019438
- PermitNew Construction or Additions
Permit PP-2022-005348 · Completed
Plumbing Permit (Interior) for combo RP-2021-019439
- PermitNew Construction or Additions
Permit PP-2022-005351 · Completed
Plumbing Permit (Interior) for combo RP-2021-019438
- PermitNew Construction
Permit MP-2022-002000 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019093
- PermitNew Construction
Permit MP-2022-001136 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019464
- PermitNew Construction
Permit MP-2022-001570 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019470
- PermitNew Construction
Permit MP-2022-001163 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019440
- PermitNew Construction
Permit MP-2022-002037 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019428
- PermitNew Construction
Permit MP-2022-001161 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019443
- PermitNew Construction
Permit MP-2022-001569 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019469
- PermitNew Construction
Permit MP-2022-002290 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019430
- PermitNew Construction
Permit MP-2022-001568 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019468
- PermitNew Construction
Permit MP-2022-001567 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019441
- PermitNew Construction
Permit MP-2022-002034 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019439
- PermitNew Construction
Permit MP-2022-002332 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019465
- PermitNew Construction
Permit MP-2022-001135 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019442
- PermitNew Construction
Permit MP-2022-002291 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019414
- PermitNew Construction
Permit MP-2022-002292 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019415
- PermitNew Construction
Permit MP-2022-002038 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019419
- PermitNew Construction
Permit MP-2022-001162 · Completed
Mechanical / Fuel Gas Permit for combo RP-2021-019467
- PermitNew Construction or Additions
Permit PP-2022-006194 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019430
- PermitNew Construction or Additions
Permit PP-2022-005353 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019428
- PermitNew Construction
Permit EP-2022-002608 · Completed
Electrical Permit for combo RP-2021-019468
- PermitNew Construction
Permit EP-2022-002609 · Completed
Electrical Permit for combo RP-2021-019469
- PermitNew Construction
Permit EP-2022-002607 · Completed
Electrical Permit for combo RP-2021-019441
- PermitNew Construction
Permit EP-2022-003481 · Completed
Electrical Permit for combo RP-2021-019428
- PermitNew Construction
Permit EP-2022-003983 · Completed
Electrical Permit for combo RP-2021-019414
- PermitNew Construction
Permit EP-2022-001896 · Completed
Electrical Permit for combo RP-2021-019442
- PermitNew Construction or Additions
Permit PP-2022-005356 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019419
- PermitNew Construction or Additions
Permit PP-2022-005355 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019419
- PermitNew Construction
Permit EP-2022-002610 · Completed
Electrical Permit for combo RP-2021-019470
- PermitNew Construction or Additions
Permit PP-2022-005357 · Completed
Plumbing Permit (Interior) for combo RP-2021-019419
- PermitNew Construction or Additions
Permit PP-2022-005238 · Completed
Plumbing Permit (Interior) for combo RP-2021-019093
- PermitNew Construction or Additions
Permit PP-2022-005236 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019093
- PermitNew Construction
Permit EP-2022-001972 · Completed
Electrical Permit for combo RP-2021-019443
- PermitNew Construction
Permit EP-2022-001897 · Completed
Electrical Permit for combo RP-2021-019464
- PermitNew Construction
Permit EP-2022-003483 · Completed
Electrical Permit for combo RP-2021-019419
- PermitNew Construction
Permit EP-2022-003405 · Completed
Electrical Permit for combo RP-2021-019093
- PermitNew Construction or Additions
Permit PP-2022-006193 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019430
- PermitNew Construction or Additions
Permit PP-2022-006195 · Completed
Plumbing Permit (Interior) for combo RP-2021-019430
- PermitNew Construction or Additions
Permit PP-2022-005354 · Completed
Plumbing Permit (Interior) for combo RP-2021-019428
- PermitNew Construction
Permit EP-2022-004096 · Completed
Electrical Permit for combo RP-2021-019465
- PermitNew Construction
Permit EP-2022-003984 · Completed
Electrical Permit for combo RP-2021-019415
- PermitNew Construction
Permit EP-2022-001974 · Completed
Electrical Permit for combo RP-2021-019440
- PermitNew Construction
Permit EP-2022-001973 · Completed
Electrical Permit for combo RP-2021-019467
- PermitNew Construction or Additions
Permit PP-2022-005237 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019093
- PermitNew Construction or Additions
Permit PP-2022-006202 · Completed
Plumbing Permit (Interior) for combo RP-2021-019415
- PermitNew Construction or Additions
Permit PP-2022-006200 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019415
- PermitNew Construction or Additions
Permit PP-2022-006201 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019415
- PermitNew Construction or Additions
Permit PP-2022-003983 · Completed
Plumbing Permit (Interior) for combo RP-2021-019469
- PermitNew Construction or Additions
Permit PP-2022-003985 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019470
- PermitNew Construction or Additions
Permit PP-2022-003984 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-019470
- PermitNew Construction or Additions
Permit PP-2022-003986 · Completed
Plumbing Permit (Interior) for combo RP-2021-019470
- PermitNew Construction or Additions
Permit PP-2022-003982 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-019469
- PermitFull Demolition
Permit ZP-2022-009281 · Issued
FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES ON LOT
- PermitFull Demolition
Permit ZP-2022-009397 · Issued
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE ON LOT
- PermitNew Construction
Permit RP-2021-019430 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019464 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019468 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019439 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019442 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019415 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019467 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019438 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019470 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019469 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO INCLUDE SIGNED AND SEALED ENGINEERED TRUSS DRAWINGS.
- PermitNew Construction
Permit RP-2021-019443 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019414 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019441 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019428 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit CP-2021-009268 · Completed
For new construction of an one-story structure, serving as a community meeting space and management office as per approved plans. Building to be fully sprinklered. Separate permits required for MEP &FP work.
- PermitNew Construction
Permit RP-2021-019465 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. AMENDMENT #1: AMEND TO SUBMIT ENGINEER SEALED TRUSS DRAWINGS FOR UTILIZING TRUSSES TO THE FLOOR-CELLING ASSEMBLIES.
- PermitNew Construction
Permit RP-2021-019093 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019440 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew Construction
Permit RP-2021-019419 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- PermitNew construction, addition, GFA change
Permit ZP-2021-006886 · Completed
FOR THE ERECTION OF ONE (1) ATTACHED STRUCTURE (STRUCTURE A) AND ONE (1) SEMI-DETACHED STRUCTURE (STRUCTURE B). SIZE AND LOCATION AS SHOWN ON APPLICATION/PLAN
- AppealZBA Permit Denial - Variance
Appeal ZP-2020-001489 · Completed · Granted
Related permit ZP-2020-001489 · PERMIT FOR THE LOT ADJUSTMENT TO CREATE ONE (1) NEW LOT (PARCEL A) FROM FORTY FIVE (45) EXISTING DEEDED LOTS. FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES. FOR THE ERECTION OF ONE (1) ATTACHED STRUCTURE (STRUCTURE A) AND ONE (1) S
- PermitCombined Lot Line Relocation and New Dev…
Permit ZP-2020-001489 · Completed
FOR THE LOT ADJUSTMENT TO CREATE ONE (1) NEW LOT (PARCEL A) FROM FORTY FIVE (45) EXISTING DEEDED LOTS. FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES.
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 27, 2026, 5:35 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)