Property report
2301 Sharswood St
3 stories39,200 sqftRM1built 2024
Philadelphia Housing Auth
Assessment and City record timeline
The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $861,000. It is not yet the billed-year tax basis.
- OPA assessment · 2023$413K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2024$207K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2025$215K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2026$861K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$861K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Permit · 2022-01-20Combined Lot Line Relocation and New Dev…This permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-10New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-17Minor DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-06-12Minor DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-15ExcavationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-01Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-01Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-17New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-17New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2024-04-17FAILURE TO NOTIFY PRIOR TO STARTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2024-04-17L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2024-04-19New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-19New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-19New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-19New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-06New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-08New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-06-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-02New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-13New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-22New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-23New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-27New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2024-08-28FAILURE TO PROVIDE REPORTSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2024-08-28FAILURE TO PROVIDE REPORTSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2024-08-28L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-08-28L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2024-08-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-29New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-12New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-18New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2024-09-18COMPL CONCEAL- PLUMB PERM WORKA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2024-09-18COMPL CONCEAL- PLUMB PERM WORKA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2024-09-18L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-09-18L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2024-09-19AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-20New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-24New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-24New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-26New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-09AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2024-05-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-10-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-10-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-12-05L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-12-05L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-02-25L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-02-25L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- InspectionL&I investigation
- InspectionL&I investigation
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitAlterations
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitAlterations
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- L&I violationCOMPL CONCEAL- PLUMB PERM WORK
- L&I violationCOMPL CONCEAL- PLUMB PERM WORK
- InspectionL&I investigation
- InspectionL&I investigation
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- L&I violationFAILURE TO PROVIDE REPORTS
- L&I violationFAILURE TO PROVIDE REPORTS
- InspectionL&I investigation
- InspectionL&I investigation
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- InspectionL&I investigation
- PermitAlterations
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitAlterations
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- L&I violationFAILURE TO NOTIFY PRIOR TO START
- InspectionL&I investigation
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitExcavation
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitMinor Demolition
- PermitMinor Demolition
- PermitNew construction, addition, GFA change
- PermitCombined Lot Line Relocation and New Dev…
Verify the public record
Property tax
$0/year estimated property tax
2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $861,000. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 8860000772026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.
Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Property report
Not a house
Apartments. OPA shows a full or near-full assessment exemption whose basis must be verified. A $0 assessment-based estimate does not prove the live Tax Center account has no prior-period balance or other charges.
Recorded owner
Who's behind it
Philadelphia Housing Auth · corporate / LLC owner
• Owns 4774 properties across Philadelphia under this name, assessed at $1.4B combined
• Tax bills mail to 2013 Ridge Ave, Philadelphia PA, 19121
Block context
2300 block of Sharswood St. Compare parcels, ownership, and public-record history.
See the whole block →Next door: 2302 Sharswood St
L&I licenses checked through Jul 23, 2026
No business or residential license records
No business license or residential registration matched this OPA parcel in the latest City data.
Open every source row 233 dated rows
- InvestigationL&I investigation
Case CF-2024-102871 · PASSED
The cited inspection visit was marked passed.
- InvestigationL&I investigation
Case CF-2024-102876 · PASSED
The cited inspection visit was marked passed.
- PermitAlterations
Permit PP-2025-007360 · Completed
install new 2" domestic water service for existing building.
- PermitAddition and/or Alterations
Permit FP-2024-002658 · Completed
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitAddition and/or Alterations
Permit FP-2024-002657 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- InvestigationL&I investigation
Case CF-2024-102871 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-102876 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-102871 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-102876 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction or Additions
Permit PP-2024-002176 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003152
- PermitNew Construction or Additions
Permit PP-2023-011031 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003149
- PermitNew Construction or Additions
Permit PP-2023-010512 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003160
- PermitNew Construction or Additions
Permit PP-2024-002173 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003144
- PermitNew Construction or Additions
Permit PP-2024-002170 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003137
- PermitNew Construction or Additions
Permit PP-2023-010264 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003146
- PermitNew Construction or Additions
Permit PP-2024-002167 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003136
- PermitNew Construction or Additions
Permit PP-2024-002182 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003139
- PermitNew Construction or Additions
Permit PP-2023-011829 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003067
- PermitNew Construction or Additions
Permit PP-2023-010509 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003161
- PermitNew Construction or Additions
Permit PP-2023-010354 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003133
- PermitNew Construction or Additions
Permit PP-2023-011035 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003154
- PermitNew Construction or Additions
Permit PP-2023-012712 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-005049
- PermitNew Construction or Additions
Permit PP-2023-011844 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003068
- PermitNew Construction or Additions
Permit PP-2023-011569 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003069
- PermitNew Construction or Additions
Permit PP-2023-011044 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003158
- PermitNew Construction or Additions
Permit PP-2023-011041 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003157
- PermitAlterations
Permit PP-2023-012163 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003178
- PermitNew Construction or Additions
Permit PP-2023-010519 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003176
- PermitNew Construction
Permit MP-2023-003320 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003160
- PermitNew Construction or Additions
Permit PP-2023-010525 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003177
- PermitNew Construction or Additions
Permit PP-2023-012717 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003159
- PermitNew Construction or Additions
Permit PP-2023-011028 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003148
- PermitAlterations
Permit PP-2023-012176 · Completed
Plumbing Permit (Interior) for combo RP-2023-003181
- PermitNew Construction or Additions
Permit PP-2023-010357 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003143
- PermitNew Construction or Additions
Permit PP-2023-010516 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003174
- PermitNew Construction or Additions
Permit PP-2024-002179 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003141
- PermitNew Construction or Additions
Permit PP-2023-011038 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003156
- ViolationCOMPL CONCEAL- PLUMB PERM WORK
Case CF-2024-102871 · Violation VI-2024-078966 · Code A-402.1/4 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- ViolationCOMPL CONCEAL- PLUMB PERM WORK
Case CF-2024-102876 · Violation VI-2024-078971 · Code A-402.1/4 · CLOSED
Resolution: CLOSED - ADMINISTRATIVELY City marked the record closed; open the case for the closing reason.
- InvestigationL&I investigation
Case CF-2024-102871 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-102876 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction
Permit MP-2023-003230 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003146
- PermitAddition and/or Alterations
Permit MP-2023-003817 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003181
- PermitAddition and/or Alterations
Permit MP-2023-003816 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003178
- PermitNew Construction
Permit MP-2023-003460 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003148
- PermitNew Construction
Permit MP-2024-000709 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003144
- PermitNew Construction
Permit MP-2023-003231 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003155
- PermitNew Construction
Permit MP-2024-000710 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003152
- PermitNew Construction
Permit MP-2024-000711 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003141
- PermitNew Construction
Permit MP-2023-003261 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003143
- PermitNew Construction
Permit MP-2024-000712 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003139
- PermitNew Construction
Permit MP-2023-003727 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003066
- PermitNew Construction
Permit MP-2023-003728 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003068
- PermitNew Construction
Permit MP-2023-003722 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003065
- PermitNew Construction
Permit MP-2023-003723 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003067
- PermitNew Construction
Permit MP-2023-003642 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003069
- PermitNew Construction
Permit MP-2023-003325 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003177
- ViolationFAILURE TO PROVIDE REPORTS
Case CF-2024-095047 · Violation VI-2024-073151 · Code A-202.4 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationFAILURE TO PROVIDE REPORTS
Case CF-2024-095053 · Violation VI-2024-073159 · Code A-202.4 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2024-095047 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-095053 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction or Additions
Permit PP-2023-011840 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003066
- PermitNew Construction
Permit MP-2024-000708 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003137
- PermitNew Construction
Permit MP-2023-003322 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003174
- PermitNew Construction
Permit MP-2023-003467 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003158
- PermitNew Construction
Permit MP-2024-000706 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003136
- PermitNew Construction
Permit MP-2023-004046 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003159
- PermitNew Construction
Permit MP-2023-003259 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003133
- PermitNew Construction
Permit MP-2023-003318 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003161
- PermitNew Construction
Permit MP-2023-003324 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003176
- PermitNew Construction
Permit MP-2023-003465 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003156
- PermitNew Construction
Permit MP-2023-003466 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003157
- PermitNew Construction
Permit MP-2023-003464 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003154
- PermitNew Construction
Permit MP-2023-004045 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-005049
- PermitNew Construction
Permit MP-2023-003461 · Completed
Mechanical / Fuel Gas Permit for combo RP-2023-003149
- PermitNew Construction or Additions
Permit PP-2023-010268 · Completed
Plumbing Permit (Interior) for combo RP-2023-003155
- PermitNew Construction or Additions
Permit PP-2023-010267 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003155
- PermitNew Construction
Permit EP-2023-008064 · Completed
Electrical Permit for combo RP-2023-003067
- PermitNew Construction
Permit EP-2023-008062 · Completed
Electrical Permit for combo RP-2023-003065
- PermitNew Construction
Permit EP-2023-008071 · Completed
Electrical Permit for combo RP-2023-003068
- PermitNew Construction
Permit EP-2023-008068 · Completed
Electrical Permit for combo RP-2023-003066
- PermitNew Construction
Permit EP-2023-007848 · Completed
Electrical Permit for combo RP-2023-003069
- PermitNew Construction
Permit EP-2024-001544 · Completed
Electrical Permit for combo RP-2023-003141
- PermitNew Construction
Permit EP-2023-007099 · Completed
Electrical Permit for combo RP-2023-003176
- PermitNew Construction
Permit EP-2024-001545 · Completed
Electrical Permit for combo RP-2023-003139
- PermitNew Construction
Permit EP-2023-007097 · Completed
Electrical Permit for combo RP-2023-003174
- PermitAddition and/or Alteration
Permit EP-2023-008276 · Completed
Electrical Permit for combo RP-2023-003178
- PermitNew Construction
Permit EP-2023-007094 · Completed
Electrical Permit for combo RP-2023-003160
- PermitNew Construction
Permit EP-2023-007102 · Completed
Electrical Permit for combo RP-2023-003177
- PermitNew Construction
Permit EP-2023-007091 · Completed
Electrical Permit for combo RP-2023-003161
- PermitNew Construction
Permit EP-2023-007000 · Completed
Electrical Permit for combo RP-2023-003143
- PermitAddition and/or Alteration
Permit EP-2023-008283 · Completed
Electrical Permit for combo RP-2023-003181
- PermitNew Construction
Permit EP-2024-001542 · Completed
Electrical Permit for combo RP-2023-003144
- PermitNew Construction
Permit EP-2024-001543 · Completed
Electrical Permit for combo RP-2023-003152
- PermitNew Construction
Permit EP-2023-008751 · Completed
Electrical Permit for combo RP-2023-003159
- PermitNew Construction
Permit EP-2023-007440 · Completed
Electrical Permit for combo RP-2023-003158
- PermitNew Construction
Permit EP-2023-007439 · Completed
Electrical Permit for combo RP-2023-003157
- PermitNew Construction
Permit EP-2023-007438 · Completed
Electrical Permit for combo RP-2023-003156
- PermitNew Construction or Additions
Permit PP-2023-011824 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2023-003065
- PermitNew Construction
Permit EP-2023-006948 · Completed
Electrical Permit for combo RP-2023-003146
- PermitNew Construction
Permit EP-2023-006949 · Completed
Electrical Permit for combo RP-2023-003155
- PermitNew Construction
Permit EP-2023-007434 · Completed
Electrical Permit for combo RP-2023-003148
- PermitNew Construction
Permit EP-2023-006998 · Completed
Electrical Permit for combo RP-2023-003133
- PermitNew Construction
Permit EP-2024-001541 · Completed
Electrical Permit for combo RP-2023-003137
- PermitNew Construction
Permit EP-2023-007437 · Completed
Electrical Permit for combo RP-2023-003154
- PermitNew Construction
Permit EP-2023-007435 · Completed
Electrical Permit for combo RP-2023-003149
- PermitNew Construction
Permit EP-2023-008749 · Completed
Electrical Permit for combo RP-2023-005049
- PermitNew Construction
Permit EP-2024-001539 · Completed
Electrical Permit for combo RP-2023-003136
- PermitNew Construction
Permit FP-2024-000654 · Completed
FOR THE INSTALLATION OF A TWO-INCH COMBINED FIRE/DOMESTIC WATER SERVICE LINE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS, AND NFPA 13D. *SHUT-OFF VALVE TO BE INSTALLED PER CODE BULLETIN NO. 1001-R1* . IF FIELD CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF ANY WORK. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- InvestigationL&I investigation
Case CF-2024-032257 · PASSED
The cited inspection visit was marked passed.
- PermitAlterations
Permit PP-2023-012164 · Completed
Plumbing Permit (Interior) for combo RP-2023-003178
- PermitNew Construction or Additions
Permit PP-2023-011042 · Completed
Plumbing Permit (Interior) for combo RP-2023-003157
- PermitNew Construction or Additions
Permit PP-2023-012716 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003159
- PermitNew Construction or Additions
Permit PP-2023-012718 · Completed
Plumbing Permit (Interior) for combo RP-2023-003159
- PermitNew Construction or Additions
Permit PP-2023-010513 · Completed
Plumbing Permit (Interior) for combo RP-2023-003160
- PermitNew Construction or Additions
Permit PP-2023-011043 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003158
- PermitAlterations
Permit PP-2023-012162 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003178
- PermitNew Construction or Additions
Permit PP-2023-010511 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003160
- PermitNew Construction or Additions
Permit PP-2023-011045 · Completed
Plumbing Permit (Interior) for combo RP-2023-003158
- PermitNew Construction or Additions
Permit PP-2023-010524 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003177
- PermitNew Construction or Additions
Permit PP-2023-010265 · Completed
Plumbing Permit (Interior) for combo RP-2023-003146
- PermitNew Construction or Additions
Permit PP-2023-011040 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003157
- PermitNew Construction or Additions
Permit PP-2023-010263 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003146
- PermitNew Construction or Additions
Permit PP-2023-011027 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003148
- PermitNew Construction or Additions
Permit PP-2023-010526 · Completed
Plumbing Permit (Interior) for combo RP-2023-003177
- PermitNew Construction or Additions
Permit PP-2023-011029 · Completed
Plumbing Permit (Interior) for combo RP-2023-003148
- PermitNew Construction or Additions
Permit PP-2023-010518 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003176
- PermitNew Construction or Additions
Permit PP-2023-011037 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003156
- PermitNew Construction or Additions
Permit PP-2023-011039 · Completed
Plumbing Permit (Interior) for combo RP-2023-003156
- PermitNew Construction or Additions
Permit PP-2023-010515 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003174
- PermitNew Construction or Additions
Permit PP-2023-010520 · Completed
Plumbing Permit (Interior) for combo RP-2023-003176
- PermitNew Construction or Additions
Permit PP-2023-010517 · Completed
Plumbing Permit (Interior) for combo RP-2023-003174
- PermitNew Construction or Additions
Permit PP-2023-010510 · Completed
Plumbing Permit (Interior) for combo RP-2023-003161
- PermitNew Construction or Additions
Permit PP-2023-010508 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003161
- PermitNew Construction or Additions
Permit PP-2024-002181 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003139
- PermitNew Construction or Additions
Permit PP-2024-002178 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003141
- PermitNew Construction or Additions
Permit PP-2024-002175 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003152
- PermitNew Construction or Additions
Permit PP-2023-010356 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003143
- PermitNew Construction or Additions
Permit PP-2023-010266 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003155
- PermitNew Construction or Additions
Permit PP-2024-002172 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003144
- PermitNew Construction or Additions
Permit PP-2024-002180 · Completed
Plumbing Permit (Interior) for combo RP-2023-003141
- PermitNew Construction or Additions
Permit PP-2024-002177 · Completed
Plumbing Permit (Interior) for combo RP-2023-003152
- PermitNew Construction or Additions
Permit PP-2023-010358 · Completed
Plumbing Permit (Interior) for combo RP-2023-003143
- PermitNew Construction or Additions
Permit PP-2024-002174 · Completed
Plumbing Permit (Interior) for combo RP-2023-003144
- PermitNew Construction or Additions
Permit PP-2024-002183 · Completed
Plumbing Permit (Interior) for combo RP-2023-003139
- PermitNew Construction or Additions
Permit PP-2023-011570 · Completed
Plumbing Permit (Interior) for combo RP-2023-003069
- PermitNew Construction or Additions
Permit PP-2023-011830 · Completed
Plumbing Permit (Interior) for combo RP-2023-003067
- PermitNew Construction or Additions
Permit PP-2024-002166 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003136
- PermitNew Construction or Additions
Permit PP-2023-011568 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003069
- PermitNew Construction or Additions
Permit PP-2023-011841 · Completed
Plumbing Permit (Interior) for combo RP-2023-003066
- PermitNew Construction or Additions
Permit PP-2023-011825 · Completed
Plumbing Permit (Interior) for combo RP-2023-003065
- PermitNew Construction or Additions
Permit PP-2023-011839 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003066
- PermitNew Construction or Additions
Permit PP-2024-002171 · Completed
Plumbing Permit (Interior) for combo RP-2023-003137
- PermitNew Construction or Additions
Permit PP-2024-002169 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003137
- PermitNew Construction or Additions
Permit PP-2023-011828 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003067
- PermitNew Construction or Additions
Permit PP-2023-011845 · Completed
Plumbing Permit (Interior) for combo RP-2023-003068
- PermitNew Construction or Additions
Permit PP-2024-002168 · Completed
Plumbing Permit (Interior) for combo RP-2023-003136
- PermitNew Construction or Additions
Permit PP-2023-011034 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003154
- PermitNew Construction or Additions
Permit PP-2023-010353 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003133
- PermitNew Construction or Additions
Permit PP-2023-010355 · Completed
Plumbing Permit (Interior) for combo RP-2023-003133
- PermitNew Construction or Additions
Permit PP-2023-011036 · Completed
Plumbing Permit (Interior) for combo RP-2023-003154
- PermitNew Construction or Additions
Permit PP-2023-011032 · Completed
Plumbing Permit (Interior) for combo RP-2023-003149
- PermitNew Construction or Additions
Permit PP-2023-011030 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003149
- PermitNew Construction or Additions
Permit PP-2023-012711 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-005049
- PermitNew Construction or Additions
Permit PP-2023-012713 · Completed
Plumbing Permit (Interior) for combo RP-2023-005049
- PermitNew Construction or Additions
Permit PP-2023-011823 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003065
- PermitNew Construction or Additions
Permit PP-2023-011843 · Completed
Plumbing Permit (Water Distribution) for combo RP-2023-003068
- ViolationFAILURE TO NOTIFY PRIOR TO START
Case CF-2024-032257 · Violation VI-2024-026450 · Code A-402.8.1 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationL&I investigation
Case CF-2024-032257 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction
Permit FP-2024-000587 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000599 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000601 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000590 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000711 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000589 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000585 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000595 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000660 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000596 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000588 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000714 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000592 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000597 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000658 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000713 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000591 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000661 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000594 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000715 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000593 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000712 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000602 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000659 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000600 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000656 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-IN COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitNew Construction
Permit FP-2024-000598 · Completed
FOR INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13D WITH 2-INCH COMBINED SERVICE LINE AS PER APPROVED PLANS.
- PermitInterior Non-Load-Bearing Wall Demo.
Permit GM-2024-002898 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitInterior Non-Load-Bearing Wall Demo.
Permit GM-2024-002865 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitExcavation
Permit SP-2023-000626 · Issued
For the excavation and site work only for the construction of 56 townhomes as per approved plans.
- PermitNew Construction
Permit RP-2023-003069 · Completed
Erection of a two-story structure to use a two family household living (SUITE 30A , 30B). Details as shown on plan..
- PermitNew Construction
Permit RP-2023-003136 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003133 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003137 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003143 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003141 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK. AMEND PERMIT 8-6-2025 to update the Design Professional of Responsible Charge.
- PermitNew Construction
Permit RP-2023-003144 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK. AMEND PERMIT 8-6-2025 to update the Design Professional of Responsible Charge.
- PermitNew Construction
Permit RP-2023-003139 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003152 · Completed
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK. AMEND PERMIT 8-6-2025 to update the Design Professional of Responsible Charge.
- PermitNew Construction
Permit RP-2023-003154 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003067 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO (2) FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003148 · Completed
7/23/2025-amended to revise the DPRC-SI to James Behler, ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitAddition and/or Alteration
Permit RP-2023-003181 · Completed
Renovation of existing 3-story Single Family dwelling to include new finishes, insulation, and roof over existing structure. FRAMING TO REMAIN. DRYWALL THROUGHOUT-AS PER PLAN. NO EXCAVATING PERMITTED ON THIS PERMIT. **AMENDED TO INCLUDE 13D SYSTEM.SEPERATE SPRINKLER PERMIT REQUIRED, NO OTHER CHANGES APPROVED ON THIS PERMIT. ****7/23/25-James Behler added as new DPRC-SI. No other changes approved on this permit**
- PermitNew Construction
Permit RP-2023-003158 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003157 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003149 · Completed
7/23/2025-amended to revise the DPRC-SI to James Behler, ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003146 · Completed
Amend Permit b8/10/2025 to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003155 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003066 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO (2) FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003156 · Completed
7/23/2025-amended to reflect change in DPRC-SI to James Behler ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003068 · Completed
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO (2) FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-005049 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003159 · Completed
7/23/2025-amended to revise the DPRC-SI to James Behler, ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. Excavation Permit No SP-2023-000626 must be issued prior to the start of work.
- PermitNew Construction
Permit RP-2023-003176 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, SP-2023-000626, MUST BE ISSUED PRIOR TO THE START OF WORK**7/23/25-James Behler added as new DPRC-SI. No other changes approved on this permit**
- PermitNew Construction
Permit RP-2023-003160 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, SP-2023-000626, MUST BE ISSUED PRIOR TO THE START OF WORK**7/23/25-James Behler added as new DPRC-SI. No other changes approved on this permit**
- PermitNew Construction
Permit RP-2023-003065 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO (2) FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** EXCAVATION PERMIT NO SP-2023-000626 MUST BE ISSUED PRIOR TO THE START OF WORK.
- PermitNew Construction
Permit RP-2023-003177 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, SP-2023-000626, MUST BE ISSUED PRIOR TO THE START OF WORK**7/23/25-James Behler added as new DPRC-SI. No other changes approved on this permit**
- PermitNew Construction
Permit RP-2023-003174 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, SP-2023-000626, MUST BE ISSUED PRIOR TO THE START OF WORK****7/23/25-James Behler added as new DPRC-SI. No other changes approved on this permit**
- PermitNew Construction
Permit RP-2023-003161 · Completed
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, SP-2023-000626, MUST BE ISSUED PRIOR TO THE START OF WORK
- PermitAddition and/or Alteration
Permit RP-2023-003178 · Completed
Renovation of existing 3-story Single Family dwelling to include new finishes, insulation, and roof over existing structure. FRAMING TO REMAIN. DRYWALL THROUGHOUT-AS PER PLAN. NO EXCAVATING PERMITTED ON THIS PERMIT. **AMENDED TO INCLUDE 13D SYSTEM.SEPERATE SPRINKLER PERMIT REQUIRED, NO OTHER CHANGES APPROVED ON THIS PERMIT.**
- PermitMinor Demolition
Permit DP-2023-000533 · Completed
FOR THE COMPLETE DEMOLITION OF FIVE (5) DETTACHED THREE-STORY, RESIDENTIAL STRUCTURE VIA HAND AND MECHANICAL DEMOLITION . ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR PEDESTRIAN PROTECTION SHALL BE REQUIRED WITHIN 5 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. WORK TO INCLUDE THE PROTECTION OF THE EXTERIOR WALL OF THE OF THE ADJACENT PROPERTY EXPLOSE BY THE DEMOLITION OPERATION IN ACCORDANCE WITH THE PROVISION OF THE PARTY WALL PROTECTION STANDARD. USE OF OF WALL COVERING TO BE PROVIDED PER PRESCRIPTIVE PROVISION OF THE 2018 IBC.
- PermitMinor Demolition
Permit DP-2023-000396 · Completed
FOR THE COMPLETE DEMOLITION OF ONE EXISTING SEMI-ATTACHED THREE-STORY, RESIDENTIAL STRUCTURE VIA HAND DEMOLITION . ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR PEDESTRIAN PROTECTION SHALL BE REQUIRED WITHIN 5 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. WORK TO INCLUDE THE PROTECTION OF THE EXTERIOR WALL OF THE OF THE ADJACENT PROPERTY EXPLOSE BY THE DEMOLITION OPERATION IN ACCORDANCE WITH THE PROVISION OF THE PARTY WALL PROTECTION STANDARD. USE OF OF WALL COVERING TO BE PROVIDED PER PRESCRIPTIVE PROVISION OF THE 2018 IBC.
- PermitNew construction, addition, GFA change
Permit ZP-2022-001318 · Completed
FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES ON LOT EXCEPT ONE(1) STRUCTURE REMAINS. FOR THE ERECTION OF FIVE(5) STRUCTURES ON LOT (NTE 38' HIGH); WITH ACCESSORY SEVEN(7) SURFACE PARKING SPACES INCLUDING WITH TWO(2) ACCESSIBLE SPACES INCLUDING WITH ONE(1) VAN ACCESSIBLE SPACE AND WITH THIRTY-FIVE(35) 1A CLASS BICYCLE SPACES IN AN ACCESSIBLE ROUTE ( Each dwelling will have an interior bicycle parking space in an accessible route) . SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
- PermitCombined Lot Line Relocation and New Dev…
Permit ZP-2021-009390 · Completed
FOR THE LOT ADJUSTMENT TO CREATE ONE(1) PARCEL "PARCEL A" FROM FIFTY-SIX(56) OPA ACCOUNTS "( 2301, 2303, 2305, 2307, 2309, 2311,2313, 2315, 2317, 2319,2321,2323, 2325, 2327,2329, 2331,2333,2335,2337,2339,2341, 2343,2345,2347,2349 SHARSWOOD,2302,2304,2306,2308,2310,2312,2314,2316,2318,2320,2322,2324,2326,2328,2330,2332,2334,2336,2338,2340,2342,2344,2346,2348,2350 STEWART ST AND 1424 N 23RD ST,1426 N 23RD ST, 1428 N 23RD ST, 1430 N 23RD ST, 1432 N 23RD ST AND 1434 N 23RD STREET). SIZE AND LOCATION AS SHOWN IN THE APPLICATION
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 24, 2026, 7:33 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)