Apartment building report

2601 Poplar St

4 stories100,000 sqftCMX2built 2021

Property at a glanceApartments

2601 Poplar Oz LLC

2026 assessment
$25M OPA value, not a listing price
2027 published assessment
$23M Future roll, not the current tax bill
Neighborhood area
Fairmount · Spring Garden Approximate · based on ZIP 19130
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $23,131,200. It is not yet the billed-year tax basis.

$0$25M$50M$23M2005200920132017202120252027
Property assessmentAssessmentL&I violationPermitInspectionLicense

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record23 events · exact dates, newest first
  1. LicenseMi Casita Poplar Inc: Food Preparing and Serving (30+ SEATS) business license marked inactive
  2. LicenseMi Casita Poplar Inc: Food Preparing and Serving (30+ SEATS) business license initially issued
  3. L&I violationWORKMANLIKE- BUILDING CODE
  4. InspectionL&I investigation
  5. PermitAddition and/or Alteration
  6. PermitAlterations
  7. PermitAddition and/or Alterations
  8. PermitRough-In
  9. PermitAddition and/or Alterations
  10. PermitAddition and/or Alteration
  11. PermitChange of Use
  12. PermitNew construction, addition, GFA change
  13. License2601 Poplar OZ LLC: Rental landlord or residential registration initially issued
  14. PermitNew Construction
  15. PermitNew Construction
  16. PermitNew Construction or Additions
  17. PermitNew Construction
  18. PermitRough-In
  19. PermitNew Construction
  20. PermitNew Construction
  21. PermitFoundation
  22. LicenseGEORGE GRAVELEY (GRAVELEY BROTHERS): Hazardous Materials L&I license filing marked inactive
  23. LicenseGEORGE GRAVELEY (GRAVELEY BROTHERS): Hazardous Materials L&I license filing initially issued

Verify the public record

$35,052/year estimated property tax

2026 taxable assessment $2,504,100 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $23,131,200. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 881809638
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationPartial assessment exemption, basis unverified

2026 OPA taxes $2,504,100 of $25,041,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.

See the assessment math →
Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Building report

Apartment building

Apartments, recorded in the City's apartments category. The public record and owner trail follow.

What it is
Apartments Vacant Land Commer < Acre
Owner
2601 Poplar Oz LLC
$ / sq ft
$231 above the $147 median for 2,826 apartments parcels citywide
Licensed units
108 active rental license
Interior area
100,000 sqft
Lot size
37,684 sqft
Stories
4
Built
2021
Zoning
CMX2

Recorded owner

Who's behind it

2601 Poplar Oz LLC · corporate / LLC owner

• Tax bills mail to 1833 Fairmount Ave, Philadelphia PA, 19130
• Holds an active rental license for this address

Block context

2600 block of Poplar St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 2623 Poplar St  ·  2625 Poplar St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗
Mi Casita Poplar IncInactive

Food Preparing and Serving (30+ SEATS) · Initial issue date Jan 26, 2024 · Terminal license date Mar 26, 2025

Landlord and residential filings

These are property registrations or landlord filings, not businesses operating at this address.

2601 Poplar OZ LLCActive

Rental · Initial issue date Jul 13, 2022 · Filed expiration Jul 12, 2027

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 23 dated rows
  1. License terminal eventMi Casita Poplar Inc: Food Preparing and Serving (30+ SEATS) business license marked inactive

    License 942656 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  2. License issue eventMi Casita Poplar Inc: Food Preparing and Serving (30+ SEATS) business license initially issued

    License 942656 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  3. ViolationWORKMANLIKE- BUILDING CODE

    Case CF-2023-081192 · Violation VI-2023-059954 · Code A-104.1/1 · CLOSED

    Resolution: CLOSED - WRITTEN IN ERROR City marked the record closed; open the case for the closing reason.

  4. InvestigationL&I investigation

    Case CF-2023-081192 · PASSED

    The cited inspection visit was marked passed.

  5. PermitAddition and/or Alteration

    Permit EP-2023-004103 · Completed

    Main Service existing. Install all new wiring throughout daycare. Install all MC cable for new lighting, receptacles, GFCI, emergency lighting, and HVAC equipment as per 2017 NEC. Relocate existing fire alarm devices throughout space as per 2016 NFPA 72. Fire panel existing.

  6. PermitAlterations

    Permit PP-2023-007182 · Completed

    INSTALL 12 WATER CLOSETS, 1 ELECTRIC WATER COOLER, 10 LAVATORIES, 2 BOOSTER PUMPS, 1 BACKFLOW PREVENTER, 1 SHOWER, 3 FLOOR DRAINS, 1 HOT WATER HEATER, 1 WASHING MACHINE BOX, 1 SUMP PUMP, 1 HAND SINK, 15 UTILITY SINKS AND 3 KITCHEN SINKS ACCORDING TO THE 2018 PPC AND PER PLANS.

  7. PermitAddition and/or Alterations

    Permit MP-2023-001620 · Completed

    FOR THE INSTALLATION OF HVAC EQUIPMENT, APPLICANCES, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.

  8. PermitRough-In

    Permit EP-2023-004104 · Completed

    Rough-In Permit for EP-2023-004103 Main Service existing. Install all new wiring throughout daycare. Install all mc cable for new lighting, receptacles, gfci, emergency lighting &*hvac equipment,. Relocate existing fire alarm devices throughout space. Fire panel existing as per 2017 nec and nfpa 72

  9. PermitAddition and/or Alterations

    Permit FP-2023-001003 · Completed

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (93) sprinkler heads as per NFPA 13 and local codes

  10. PermitAddition and/or Alteration

    Permit CP-2023-002234 · Completed

    FOR LEVEL 2 ALTERATIONS FOR FIT FOR NEW DAY CARE CENTER AS PER PLANS.

  11. PermitChange of Use

    Permit ZP-2023-003051 · Issued

    Child Care - Child Care Center

  12. PermitNew construction, addition, GFA change

    Permit ZP-2022-008996 · Issued

    FOR THE ERECTION OF A RETAINING WALL AND THE REDUCTION IN NUMBER OF PARKING SPACES.

  13. License issue event2601 Poplar OZ LLC: Rental landlord or residential registration initially issued

    License 900579 · Active

    License event. Registration does not prove present operation or storefront occupancy.

  14. PermitNew Construction

    Permit MP-2020-006451 · Completed

    For the installation of mechanical/HVAC systems (including all associated ductwork, registers, diffusers, grilles, and appliances) throughout 108 dwelling units within a new four (4) story structure, as per plans.

  15. PermitNew Construction

    Permit EP-2020-007931 · Completed

    Install (2) 400a, 3ph Ct services for commercial spaces, install 400a 3ph Ct service for House, Install 1600a 3ph service for apartments. Install all wiring throughout 108 apartments, common areas, (2) commercial spaces. Install fire pump service. Install fire alarm system throughout. Install cable tv wiring. AS PER THE 2017 NEC & 2016 NFPA-72.

  16. PermitNew Construction or Additions

    Permit PP-2020-001862 · Completed

    New Plumbing throughout Pex/PVC Cast/Copper INTERIOR AND WATER SERVICES (EXTERIOR PLUMBING) AMEND TO ADD New 1" domestic water service

  17. PermitNew Construction

    Permit FP-2020-001283 · Completed

    FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13, WITH A SIX-INCH FIRE SERVICE LINE; FOR THE INSTALLATION OF A FIRE PUMP IN ACCORDANCE WITH NFPA 20; THE INSTALLATION OF A STANDPIPE SYSTEM AND THE INSTALLATION OF A BACKFLOW PREVENTION ASSEMBLY, AS PER APPROVED PLANS.

  18. PermitRough-In

    Permit EP-2020-008044 · Completed

    Rough-In Permit for EP-2020-007931 Install (2) 400a, 3ph Ct services for commercial spaces, install 400a 3ph Ct service for House, Install 1600a 3ph service for apartments. Install all wiring throughout 108 apartments, common areas, (2) commercial spaces. Install fire pump service. Install fire alarm system throughout as per NFPA72. Install cable tv wiring as per 2017 nec

  19. PermitNew Construction

    Permit EP-2020-008046 · Expired

    Install 200a, 120/240v temporary service. Install 20 circuit nema 3r panel. Install 4 panel board gfci, install building temp lighting & power on all floors for six months as per 2017 nec

  20. PermitNew Construction

    Permit CP-2020-000462 · Completed

    NEW CONSTRUCTION OF A FOUR (4) STORY STRUCTURE TO INCLUDE VACANT COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY), ONE HUNDRED EIGHT (108) DWELLING UNITS AND FIFTY-ONE (51) ACCESSORY PARKING SPACES AS PER APPROVED PLANS. **BUILDING TO UTILIZE HORIZONTAL AND VERTICAL SEPARATIONS TO CREATE THREE (3) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (BLDG 1 - TYPE IA AND BLDGS 2 & 3 - TYPE VA)** BUILDING TO BE FULLY SPRINKLERED AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 2/17/21 AMEND NEW CONSTRUCTION PERMIT CP-2020-000462 FOR CHANGES TO GROUND FLOOR LAYOUT OF STAIRS 1 & 2 AS PER APPROVED PLANS.

  21. PermitFoundation

    Permit 1054292 · Completed

    FOR THE CONSTRUCTION OF THE FOUNDATIONS OF A NEW STRUCTURE AS PER APPROVED PLANS.

  22. License terminal eventGEORGE GRAVELEY (GRAVELEY BROTHERS): Hazardous Materials L&I license filing marked inactive

    License 285862 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  23. License issue eventGEORGE GRAVELEY (GRAVELEY BROTHERS): Hazardous Materials L&I license filing initially issued

    License 285862 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

Where this comes from

Methodology & freshness

This report was assembled Jul 29, 2026, 6:57 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)