3600 Grant Ave

Property at a glanceVacant lot

Zi 3600 Grant LLC

2026 assessment
$233K OPA value, not a listing price
2027 published assessment
$532K Future roll, not the current tax bill
Neighborhood area
Torresdale Approximate · based on ZIP 19114
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $532,000. It is not yet the billed-year tax basis.

$0$500K$1.0M$532K2004200820122016202020242027
Property assessmentAssessmentL&I violationAppealPermitInspectionLicense

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record218 events · exact dates, newest first
  1. PermitNew Construction
  2. PermitNew Construction
  3. PermitNew Construction
  4. PermitNew Construction
  5. PermitNew Construction
  6. PermitNew Construction
  7. PermitNew Construction or Additions
  8. PermitNew Construction or Additions
  9. PermitNew Construction
  10. PermitNew Construction
  11. PermitNew Construction
  12. PermitNew Construction
  13. PermitNew Construction or Additions
  14. PermitNew Construction
  15. PermitNew Construction
  16. PermitNew Construction
  17. PermitNew Construction
  18. PermitNew Construction
  19. PermitNew Construction or Additions
  20. PermitNew Construction
  21. PermitNew Construction
  22. PermitNew Construction
  23. PermitNew Construction or Additions
  24. PermitNew Construction
  25. PermitNew Construction or Additions
  26. PermitNew Construction or Additions
  27. PermitNew Construction or Additions
  28. PermitNew Construction or Additions
  29. PermitNew Construction or Additions
  30. PermitNew Construction or Additions
  31. PermitNew Construction
  32. PermitNew Construction
  33. PermitNew Construction
  34. PermitNew Construction
  35. PermitNew Construction
  36. PermitNew Construction or Additions
  37. PermitNew Construction or Additions
  38. PermitNew Construction or Additions
  39. PermitNew Construction or Additions
  40. PermitNew Construction or Additions
  41. PermitNew Construction or Additions
  42. PermitNew Construction or Additions
  43. PermitNew Construction
  44. PermitNew Construction
  45. PermitNew Construction
  46. PermitNew Construction
  47. PermitNew Construction
  48. PermitNew Construction
  49. PermitNew Construction
  50. PermitNew Construction
  51. PermitNew Construction
  52. PermitNew Construction
  53. PermitNew Construction
  54. PermitNew Construction
  55. PermitNew Construction
  56. PermitNew Construction
  57. PermitNew Construction or Additions
  58. PermitNew Construction or Additions
  59. PermitNew Construction
  60. PermitNew Construction or Additions
  61. PermitNew Construction or Additions
  62. PermitNew Construction or Additions
  63. PermitNew Construction or Additions
  64. PermitNew Construction or Additions
  65. PermitNew Construction or Additions
  66. PermitNew Construction or Additions
  67. PermitNew Construction or Additions
  68. PermitNew Construction or Additions
  69. PermitNew Construction or Additions
  70. PermitNew Construction or Additions
  71. PermitNew Construction or Additions
  72. PermitNew Construction
  73. PermitNew Construction
  74. PermitNew Construction
  75. PermitNew Construction or Additions
  76. PermitNew Construction or Additions
  77. PermitNew Construction or Additions
  78. PermitNew Construction or Additions
  79. PermitNew Construction or Additions
  80. PermitNew Construction or Additions
  81. PermitNew Construction or Additions
  82. PermitNew Construction or Additions
  83. PermitNew Construction or Additions
  84. PermitNew Construction or Additions
  85. PermitNew Construction or Additions
  86. PermitNew Construction or Additions
  87. PermitNew Construction or Additions
  88. PermitNew Construction or Additions
  89. PermitNew Construction or Additions
  90. InspectionL&I investigation
  91. PermitNew Construction or Additions
  92. PermitNew Construction or Additions
  93. PermitNew Construction
  94. PermitNew Construction or Additions
  95. PermitNew Construction or Additions
  96. PermitNew Construction or Additions
  97. PermitNew Construction or Additions
  98. PermitNew Construction or Additions
  99. L&I violationEXTERIOR AREA WEEDS
  100. InspectionL&I investigation
  101. PermitNew Construction or Additions
  102. PermitNew Construction or Additions
  103. PermitNew Construction
  104. PermitNew Construction
  105. PermitNew Construction
  106. PermitNew Construction
  107. PermitNew Construction
  108. PermitNew Construction
  109. PermitNew Construction
  110. PermitNew Construction
  111. PermitNew Construction
  112. PermitNew Construction
  113. PermitNew Construction
  114. PermitNew Construction
  115. PermitNew Construction
  116. PermitNew Construction
  117. PermitNew Construction
  118. PermitNew Construction
  119. PermitNew Construction
  120. PermitNew Construction
  121. PermitNew Construction
  122. PermitNew Construction
  123. PermitNew Construction
  124. PermitNew Construction
  125. PermitNew Construction
  126. PermitNew Construction
  127. PermitNew Construction
  128. PermitNew Construction
  129. PermitNew Construction
  130. PermitNew Construction
  131. PermitNew Construction
  132. PermitNew Construction
  133. PermitNew Construction
  134. PermitNew Construction
  135. PermitNew Construction
  136. PermitNew Construction
  137. PermitNew Construction
  138. PermitNew Construction or Additions
  139. PermitNew Construction or Additions
  140. PermitNew Construction or Additions
  141. PermitNew Construction or Additions
  142. PermitNew Construction or Additions
  143. PermitSitework with Onsite Utility Services
  144. InspectionL&I investigation
  145. PermitRetaining Wall
  146. PermitNew Construction
  147. PermitNew Construction
  148. PermitNew Construction
  149. PermitNew Construction
  150. PermitNew Construction
  151. PermitNew Construction
  152. PermitNew Construction
  153. PermitNew Construction
  154. PermitNew Construction
  155. PermitNew Construction
  156. L&I violationEARTH DISTURBANCE OVER 5000SQFT
  157. InspectionL&I investigation
  158. PermitNew Construction
  159. PermitNew Construction
  160. InspectionL&I investigation
  161. PermitNew Construction
  162. L&I violationRUBBISH & GARBAGE
  163. InspectionL&I investigation
  164. PermitNew Construction
  165. PermitNew Construction
  166. PermitNew Construction
  167. PermitNew Construction
  168. PermitNew Construction
  169. PermitNew Construction
  170. PermitNew Construction
  171. PermitNew Construction
  172. PermitNew Construction
  173. PermitNew Construction
  174. PermitNew Construction
  175. PermitNew Construction
  176. PermitNew Construction
  177. PermitNew Construction
  178. PermitNew Construction
  179. PermitNew Construction
  180. PermitNew Construction
  181. PermitNew Construction
  182. PermitNew Construction
  183. PermitNew Construction
  184. PermitNew Construction
  185. PermitNew Construction
  186. PermitNew Construction
  187. PermitNew Construction
  188. PermitNew Construction
  189. PermitNew Construction
  190. PermitNew Construction
  191. PermitNew Construction
  192. PermitNew Construction
  193. PermitNew Construction
  194. PermitNew Construction
  195. InspectionL&I investigation
  196. InspectionL&I investigation
  197. AppealZBA Permit Denial - Variance
  198. InspectionL&I investigation
  199. InspectionL&I investigation
  200. L&I violationVACANT STRUCTURE & LAND
  201. L&I violationRUBBISH & GARBAGE
  202. L&I violationEXTERIOR AREA WEEDS
  203. PermitNew construction, addition, GFA change
  204. L&I violationEXTERIOR AREA MOTOR VEHICLE WITHIN THE PROPERTY LINE
  205. L&I violationEXTERIOR AREA SANITATION
  206. InspectionL&I investigation
  207. PermitFull Demolition
  208. InspectionL&I investigation
  209. L&I violationRUBBISH & GARBAGE
  210. L&I violationEXTERIOR AREA WEEDS
  211. InspectionL&I investigation
  212. LicenseAQUAHAB LP: Food Establishment, Retail Permanent Location business license marked inactive
  213. LicenseAQUAHAB LP: Dumpster License - Private Property L&I license filing initially issued
  214. LicenseAQUAHA LP: Hazardous Materials L&I license filing marked inactive
  215. LicenseAQUAHA LP: Hazardous Materials L&I license filing initially issued
  216. LicenseAQUAHAB LP: Hazardous Materials L&I license filing marked inactive
  217. LicenseAQUAHAB LP: Hazardous Materials L&I license filing initially issued
  218. LicenseAQUAHAB LP: Food Establishment, Retail Permanent Location business license initially issued

Verify the public record

$3,260/year estimated property tax

2026 taxable assessment $232,900 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $532,000. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 572000031
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationNo exemption shown

2026 taxable assessment equals the full assessed value.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Land report

Vacant land

Vacant land. Deeds, ownership, zoning, and the public-source record follow.

What it is
Vacant lot Vacant Land Reside < Acre
Owner
Zi 3600 Grant LLC
Lot size
66,552 sqft
Zoning
SPPOA

Block context

3600 block of Grant Ave. Compare parcels, ownership, and public-record history.

See the whole block →

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗
AQUAHAB LPInactive

Food Establishment, Retail Permanent Location · Initial issue date May 13, 2004 · Terminal license date Jun 29, 2017

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 218 dated rows
  1. PermitNew Construction

    Permit MP-2021-008361 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018806

  2. PermitNew Construction

    Permit MP-2021-008356 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018960

  3. PermitNew Construction

    Permit MP-2021-008368 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018956

  4. PermitNew Construction

    Permit MP-2021-008363 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018954

  5. PermitNew Construction

    Permit MP-2021-008362 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018945

  6. PermitNew Construction

    Permit MP-2021-007776 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-016915

  7. PermitNew Construction or Additions

    Permit PP-2021-023409 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018960

  8. PermitNew Construction or Additions

    Permit PP-2021-023443 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018956

  9. PermitNew Construction

    Permit MP-2021-008180 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019018

  10. PermitNew Construction

    Permit MP-2021-008181 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019023

  11. PermitNew Construction

    Permit MP-2021-008188 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018986

  12. PermitNew Construction

    Permit MP-2021-008228 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018985

  13. PermitNew Construction or Additions

    Permit PP-2021-023428 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018954

  14. PermitNew Construction

    Permit MP-2021-008225 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018980

  15. PermitNew Construction

    Permit MP-2021-008226 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018982

  16. PermitNew Construction

    Permit MP-2021-008186 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019041

  17. PermitNew Construction

    Permit MP-2021-008359 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018967

  18. PermitNew Construction

    Permit MP-2021-008360 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018970

  19. PermitNew Construction or Additions

    Permit PP-2021-023419 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018970

  20. PermitNew Construction

    Permit MP-2021-008224 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018978

  21. PermitNew Construction

    Permit MP-2021-008946 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018964

  22. PermitNew Construction

    Permit MP-2021-008233 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-018973

  23. PermitNew Construction or Additions

    Permit PP-2021-023122 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018973

  24. PermitNew Construction

    Permit MP-2021-007777 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-016921

  25. PermitNew Construction or Additions

    Permit PP-2021-023422 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018806

  26. PermitNew Construction or Additions

    Permit PP-2021-023425 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018945

  27. PermitNew Construction or Additions

    Permit PP-2021-023413 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018967

  28. PermitNew Construction or Additions

    Permit PP-2021-021978 · Completed

    Plumbing Permit (Interior) for combo RP-2021-016921

  29. PermitNew Construction or Additions

    Permit PP-2021-025043 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018964

  30. PermitNew Construction or Additions

    Permit PP-2021-023106 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018978

  31. PermitNew Construction

    Permit MP-2021-008179 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019042

  32. PermitNew Construction

    Permit MP-2021-008183 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019031

  33. PermitNew Construction

    Permit MP-2021-008182 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019026

  34. PermitNew Construction

    Permit MP-2021-008176 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019053

  35. PermitNew Construction

    Permit MP-2021-008175 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019048

  36. PermitNew Construction or Additions

    Permit PP-2021-023114 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018982

  37. PermitNew Construction or Additions

    Permit PP-2021-023109 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018980

  38. PermitNew Construction or Additions

    Permit PP-2021-023001 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019018

  39. PermitNew Construction or Additions

    Permit PP-2021-021974 · Completed

    Plumbing Permit (Interior) for combo RP-2021-016915

  40. PermitNew Construction or Additions

    Permit PP-2021-023004 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019023

  41. PermitNew Construction or Additions

    Permit PP-2021-023025 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018986

  42. PermitNew Construction or Additions

    Permit PP-2021-023118 · Completed

    Plumbing Permit (Interior) for combo RP-2021-018985

  43. PermitNew Construction

    Permit FP-2022-002082 · Completed

    INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1" COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  44. PermitNew Construction

    Permit FP-2022-002107 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  45. PermitNew Construction

    Permit FP-2022-002110 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  46. PermitNew Construction

    Permit FP-2022-002109 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  47. PermitNew Construction

    Permit FP-2022-002108 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  48. PermitNew Construction

    Permit FP-2022-002093 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  49. PermitNew Construction

    Permit FP-2022-002102 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 1" MAIN FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  50. PermitNew Construction

    Permit FP-2022-002077 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  51. PermitNew Construction

    Permit FP-2022-002106 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  52. PermitNew Construction

    Permit FP-2022-002084 · Completed

    INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1" COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  53. PermitNew Construction

    Permit FP-2022-002104 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  54. PermitNew Construction

    Permit FP-2022-002103 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  55. PermitNew Construction

    Permit FP-2022-002105 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  56. PermitNew Construction

    Permit FP-2022-002069 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  57. PermitNew Construction or Additions

    Permit PP-2022-012036 · Completed

    CT, FAI, MD, WD 1IN.

  58. PermitNew Construction or Additions

    Permit PP-2022-012044 · Completed

    CT, FAI, MD, WD 1IN.

  59. PermitNew Construction

    Permit FP-2022-002068 · Completed

    FOR THE INSTALLATION OF A 1-INCH COMBINED DOMESTIC/FIRE WATER SERVICE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.

  60. PermitNew Construction or Additions

    Permit PP-2022-012057 · Completed

    CT, FAI, MD, WD 1IN.

  61. PermitNew Construction or Additions

    Permit PP-2022-012006 · Completed

    CT, FAI, MD, WD 1IN.

  62. PermitNew Construction or Additions

    Permit PP-2022-012043 · Completed

    CT, FAI, MD, WD, 1IN.

  63. PermitNew Construction or Additions

    Permit PP-2022-012055 · Completed

    CT, FAI, MD, WD 1IN.

  64. PermitNew Construction or Additions

    Permit PP-2022-012058 · Completed

    CT, FAI, MD, WD 1IN.

  65. PermitNew Construction or Additions

    Permit PP-2022-011989 · Completed

    CT, FAI, MD, WD 1IN.

  66. PermitNew Construction or Additions

    Permit PP-2022-011993 · Completed

    CT, FAI, MD, WD 1IN.

  67. PermitNew Construction or Additions

    Permit PP-2022-011995 · Completed

    CT, FAI, MD, WD 1IN.

  68. PermitNew Construction or Additions

    Permit PP-2022-011990 · Completed

    CT, FAI, MD, WD 1IN.

  69. PermitNew Construction or Additions

    Permit PP-2022-011991 · Completed

    CT, FAI, MD, WD 1IN.

  70. PermitNew Construction or Additions

    Permit PP-2022-011996 · Completed

    CT, FAI, MD, WD, 1IN.

  71. PermitNew Construction or Additions

    Permit PP-2022-012007 · Completed

    CT, FAI, MD, WD 1IN.

  72. PermitNew Construction

    Permit FP-2022-002070 · Completed

    FOR THE INSTALLATON OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-018945 FOR ASSOCIATED BUILDING PERMIT.

  73. PermitNew Construction

    Permit FP-2022-002081 · Completed

    FOR THE INSTALLATON OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-018960 FOR ASSOCIATED BUILDING PERMIT.

  74. PermitNew Construction

    Permit FP-2022-002076 · Completed

    FOR THE INSTALLATON OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-018956 FOR ASSOCIATED BUILDING PERMIT.

  75. PermitNew Construction or Additions

    Permit PP-2022-011872 · Completed

    CT, FAI, MD, WD 1" WDP

  76. PermitNew Construction or Additions

    Permit PP-2022-011902 · Completed

    CT, FAI, MD, 1" WDP

  77. PermitNew Construction or Additions

    Permit PP-2022-011802 · Completed

    CT, FAI, MD, WD 1" WDP

  78. PermitNew Construction or Additions

    Permit PP-2022-011903 · Completed

    CT, FAI, MD, 1" WDP

  79. PermitNew Construction or Additions

    Permit PP-2022-011869 · Completed

    CT, FAI, MD, WD 1" WDP

  80. PermitNew Construction or Additions

    Permit PP-2022-011901 · Completed

    CT, FAI, MD, 1" WDP

  81. PermitNew Construction or Additions

    Permit PP-2022-011803 · Completed

    CT, FAI, MD, WD 1" WDP

  82. PermitNew Construction or Additions

    Permit PP-2022-011898 · Completed

    CT, FAI, MD, 1" WDP

  83. PermitNew Construction or Additions

    Permit PP-2022-011806 · Completed

    CT, FAI, MD, WD 1IN.

  84. PermitNew Construction or Additions

    Permit PP-2022-011805 · Completed

    CT, FAI, MD, WD 1IN.

  85. PermitNew Construction or Additions

    Permit PP-2022-011804 · Completed

    CT, FAI, MD, WD 1IN.

  86. PermitNew Construction or Additions

    Permit PP-2022-011790 · Completed

    CT, FAI, MD, WD 1IN.

  87. PermitNew Construction or Additions

    Permit PP-2022-011797 · Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.

  88. PermitNew Construction or Additions

    Permit PP-2022-011725 · Completed

    INSTALL CT, FAI, MD, 1" WDP

  89. PermitNew Construction or Additions

    Permit PP-2022-011701 · Completed

    INSTALL CT, FAI, MD, 1" WDP.

  90. InvestigationL&I investigation

    Case CF-2022-071426 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  91. PermitNew Construction or Additions

    Permit PP-2022-011681 · Completed

    CT, FAI, MD, WD 1IN.

  92. PermitNew Construction or Additions

    Permit PP-2021-022984 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019053

  93. PermitNew Construction

    Permit MP-2021-008148 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019082

  94. PermitNew Construction or Additions

    Permit PP-2021-022979 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019048

  95. PermitNew Construction or Additions

    Permit PP-2021-022994 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019042

  96. PermitNew Construction or Additions

    Permit PP-2021-023020 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019041

  97. PermitNew Construction or Additions

    Permit PP-2021-023010 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019031

  98. PermitNew Construction or Additions

    Permit PP-2021-023007 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019026

  99. ViolationEXTERIOR AREA WEEDS

    Case CF-2022-071426 · Violation VI-2022-051968 · Code PM15-302.4 · COMPLIED

    Resolution: COMPLIED - BY ENFORCEMENT ACTION City marked this violation complied with; check the resolution date and live case for what was accepted.

  100. InvestigationL&I investigation

    Case CF-2022-071426 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  101. PermitNew Construction or Additions

    Permit PP-2021-022987 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019058

  102. PermitNew Construction or Additions

    Permit PP-2021-022990 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019067

  103. PermitNew Construction

    Permit MP-2021-008150 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019071

  104. PermitNew Construction

    Permit MP-2021-008146 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019080

  105. PermitNew Construction

    Permit MP-2021-008178 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019067

  106. PermitNew Construction

    Permit MP-2021-008177 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019058

  107. PermitNew Construction

    Permit MP-2021-008145 · Completed

    Mechanical / Fuel Gas Permit for combo RP-2021-019077

  108. PermitNew Construction

    Permit EP-2022-006278 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  109. PermitNew Construction

    Permit EP-2022-006276 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  110. PermitNew Construction

    Permit EP-2022-006285 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  111. PermitNew Construction

    Permit EP-2022-006289 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  112. PermitNew Construction

    Permit EP-2022-006294 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  113. PermitNew Construction

    Permit EP-2022-006293 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  114. PermitNew Construction

    Permit EP-2022-006296 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  115. PermitNew Construction

    Permit EP-2022-006269 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  116. PermitNew Construction

    Permit EP-2022-006290 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  117. PermitNew Construction

    Permit EP-2022-006272 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC.

  118. PermitNew Construction

    Permit EP-2022-006273 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  119. PermitNew Construction

    Permit EP-2022-006279 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  120. PermitNew Construction

    Permit EP-2022-006271 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC.

  121. PermitNew Construction

    Permit EP-2022-006297 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  122. PermitNew Construction

    Permit EP-2022-006274 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  123. PermitNew Construction

    Permit EP-2022-006300 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  124. PermitNew Construction

    Permit EP-2022-006299 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  125. PermitNew Construction

    Permit EP-2022-006282 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  126. PermitNew Construction

    Permit EP-2022-006291 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  127. PermitNew Construction

    Permit EP-2022-006277 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  128. PermitNew Construction

    Permit EP-2022-006288 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  129. PermitNew Construction

    Permit EP-2022-006267 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC.

  130. PermitNew Construction

    Permit EP-2022-006287 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  131. PermitNew Construction

    Permit EP-2022-006283 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  132. PermitNew Construction

    Permit EP-2022-006301 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  133. PermitNew Construction

    Permit EP-2022-006284 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  134. PermitNew Construction

    Permit EP-2022-006280 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  135. PermitNew Construction

    Permit EP-2022-006281 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  136. PermitNew Construction

    Permit EP-2022-006298 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  137. PermitNew Construction

    Permit EP-2022-006292 · Completed

    Install 200 amp main service. Install 40 circuit main breaker panel. Install all wiring throughout new construction Single family dwelling. Install Cable tv wiring according to the 2017 NEC

  138. PermitNew Construction or Additions

    Permit PP-2022-004729 · Issued

    Plumbing Permit for combo SP-2022-000051

  139. PermitNew Construction or Additions

    Permit PP-2021-022902 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019071

  140. PermitNew Construction or Additions

    Permit PP-2021-022897 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019082

  141. PermitNew Construction or Additions

    Permit PP-2021-022892 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019080

  142. PermitNew Construction or Additions

    Permit PP-2021-022887 · Completed

    Plumbing Permit (Interior) for combo RP-2021-019077

  143. PermitSitework with Onsite Utility Services

    Permit SP-2022-000051 · Issued

    Sitework for the exterior utilities and onsite stormwater management system installlation.

  144. InvestigationL&I investigation

    Case CF-2022-012270 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  145. PermitRetaining Wall

    Permit GP-2022-001221 · Completed

    FOR THE INSTALLATION OF A REINFORCED CONCRETE RETAINING WALL PER APPROVED PLAN

  146. PermitNew Construction

    Permit FP-2022-000547 · Completed

    INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1" COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  147. PermitNew Construction

    Permit FP-2022-000546 · Completed

    INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1" COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  148. PermitNew Construction

    Permit FP-2022-000548 · Completed

    INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1" COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  149. PermitNew Construction

    Permit FP-2022-000544 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  150. PermitNew Construction

    Permit FP-2022-000545 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  151. PermitNew Construction

    Permit FP-2022-000543 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRONKLERS AS PER PLANS.

  152. PermitNew Construction

    Permit FP-2022-000498 · Completed

    FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ENTIRE SITE SERVED BY A BACKFLOW PREVENTION DEVICE LOCATED IN A METER PIT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-019058 FOR ASSOCIATED BUILDING PERMIT.

  153. PermitNew Construction

    Permit FP-2022-000497 · Completed

    FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ENTIRE SITE SERVED BY A BACKFLOW PREVENTION DEVICE LOCATED IN A METER PIT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-019067 FOR ASSOCIATED BUILDING PERMIT.

  154. PermitNew Construction

    Permit FP-2022-000495 · Completed

    FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ENTIRE SITE SERVED BY A BACKFLOW PREVENTION DEVICE LOCATED IN A METER PIT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-019077 FOR ASSOCIATED BUILDING PERMIT.

  155. PermitNew Construction

    Permit FP-2022-000496 · Completed

    FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A NEW ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ENTIRE SITE SERVED BY A BACKFLOW PREVENTION DEVICE LOCATED IN A METER PIT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE RP-2021-019071 FOR ASSOCIATED BUILDING PERMIT.

  156. ViolationEARTH DISTURBANCE OVER 5000SQFT

    Case CF-2022-012270 · Violation VI-2022-010224 · Code A-301.1/77 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  157. InvestigationL&I investigation

    Case CF-2022-012270 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  158. PermitNew Construction

    Permit FP-2022-000110 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  159. PermitNew Construction

    Permit FP-2022-000107 · Completed

    FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM DESIGNED PER NFPA 13D STANDARD WITH A 1 INCH COMBINE SERVICE LINE AND SPRINKLER LAYOUT AS PER PLANS.

  160. InvestigationL&I investigation

    Case CF-2021-120898 · PASSED

    The cited inspection visit was marked passed.

  161. PermitNew Construction

    Permit RP-2021-018964 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #7. **

  162. ViolationRUBBISH & GARBAGE

    Case CF-2021-120898 · Violation VI-2021-088493 · Code PM15-308.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  163. InvestigationL&I investigation

    Case CF-2021-120898 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  164. PermitNew Construction

    Permit RP-2021-018980 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #12. **

  165. PermitNew Construction

    Permit RP-2021-019042 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  166. PermitNew Construction

    Permit RP-2021-018973 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** Amend to change SIA to GeoStructures, Inc. and DPRC-SI to Jianchao Li.PE as per amended documents **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #10. **

  167. PermitNew Construction

    Permit RP-2021-019080 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  168. PermitNew Construction

    Permit RP-2021-018970 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #9. **

  169. PermitNew Construction

    Permit RP-2021-019053 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  170. PermitNew Construction

    Permit RP-2021-018967 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #8. **

  171. PermitNew Construction

    Permit RP-2021-019031 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  172. PermitNew Construction

    Permit RP-2021-018945 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #3. **

  173. PermitNew Construction

    Permit RP-2021-018985 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #14. **

  174. PermitNew Construction

    Permit RP-2021-019082 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC AS PER AMENDED DOCUMENTS. **; ** AMEND TO ADD MATT SLAB FOUNDATION, AS PER AMENDED PLAN AND DOCUMENTS. **

  175. PermitNew Construction

    Permit RP-2021-018956 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #5. **

  176. PermitNew Construction

    Permit RP-2021-019041 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  177. PermitNew Construction

    Permit RP-2021-018978 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #11. **

  178. PermitNew Construction

    Permit RP-2021-019067 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  179. PermitNew Construction

    Permit RP-2021-018806 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #2. **

  180. PermitNew Construction

    Permit RP-2021-018982 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #13. **

  181. PermitNew Construction

    Permit RP-2021-018960 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #6. **

  182. PermitNew Construction

    Permit RP-2021-019071 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  183. PermitNew Construction

    Permit RP-2021-019018 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #16. **

  184. PermitNew Construction

    Permit RP-2021-019058 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  185. PermitNew Construction

    Permit RP-2021-019023 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #17. **

  186. PermitNew Construction

    Permit RP-2021-019048 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  187. PermitNew Construction

    Permit RP-2021-019077 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  188. PermitNew Construction

    Permit RP-2021-018954 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN DOCUMENTS. **;** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #4. **

  189. PermitNew Construction

    Permit RP-2021-018986 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #15. **

  190. PermitNew Construction

    Permit RP-2021-019026 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO ADD MATT SLAB FOUNDATION AND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED PLAN AND DOCUMENTS. **

  191. PermitNew Construction

    Permit RP-2021-016740 · Completed

    FOR THE ERECTION OF BUILDING SCHEME A (UNIT 19-30) FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. B

  192. PermitNew Construction

    Permit RP-2021-016863 · Completed

    FOR THE ERECTION OF BUILDING SCHEME B (UNIT 2-17) FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  193. PermitNew Construction

    Permit RP-2021-016915 · Completed

    FOR THE ERECTION OF A DETACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** Amend to change DPRC-SI & SIA to Jianchao Li & GeoStructures Inc as per amended documents. **; ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B2 UNIT #18. **

  194. PermitNew Construction

    Permit RP-2021-016921 · Completed

    FOR THE ERECTION OF A DETACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. ** AMEND TO CHANGE DPRC-SI & SIA TO JIANCHAO LI & GEOSTRUCTURES INC., AS PER AMENDED DOCUMENTS. ** AMENDMENT TO CHANGE TO A MAT SLAB FOUNDATION AS AN ALTERNATE BY THE STRUCTURAL ENGINEER AS PART OF THE PERMIT AMENDMENT FOR B UNIT #2. **

  195. InvestigationL&I investigation

    Case CF-2021-005424 · PASSED

    The cited inspection visit was marked passed.

  196. InvestigationL&I investigation

    Case CF-2021-032737 · PASSED

    The cited inspection visit was marked passed.

  197. AppealZBA Permit Denial - Variance

    Appeal ZP-2021-000912 · Completed · Granted with conditions

    Related permit ZP-2021-000912 · **Amended refusal** FOR THE COMPLETE DEMOLITION OF ALL STRUCTURES AND IMPROVEMENTS INCLUDING IN GROUND SWIMMING POOL.AMENDED AS OF 2/9/2021 TO DOCUMENT THE ERECTION OF MULTI-FAMILY HOUSEHOLD LIVING FOR THIRTY DWELLING. SIZES AND LOCATION A

  198. InvestigationL&I investigation

    Case CF-2021-032737 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  199. InvestigationL&I investigation

    Case CF-2021-005424 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  200. ViolationVACANT STRUCTURE & LAND

    Case CF-2021-032737 · Violation VI-2021-025543 · Code PM15-301 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  201. ViolationRUBBISH & GARBAGE

    Case CF-2021-032737 · Violation VI-2021-025544 · Code PM15-308.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  202. ViolationEXTERIOR AREA WEEDS

    Case CF-2021-032737 · Violation VI-2021-025545 · Code PM15-302.4 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  203. PermitNew construction, addition, GFA change

    Permit ZP-2021-000912 · Issued

    FOR THE COMPLETE DEMOLITION OF ALL STRUCTURES AND IMPROVEMENTS INCLUDING IN GROUND SWIMMING POOL.AMENDED AS OF 2/9/2021 TO DOCUMENT THE ERECTION OF MULTI-FAMILY HOUSEHOLD LIVING.

  204. ViolationEXTERIOR AREA MOTOR VEHICLE WITHIN THE PROPERTY LINE

    Case CF-2021-005424 · Violation VI-2021-004006 · Code PM15-302.8 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  205. ViolationEXTERIOR AREA SANITATION

    Case CF-2021-005424 · Violation VI-2021-004007 · Code PM15-302.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  206. InvestigationL&I investigation

    Case CF-2021-005424 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  207. PermitFull Demolition

    Permit ZP-2020-010427 · Issued

    For the complete demolition of an existing one (1) story, currently vacant structure. To resolve violation #CF-2020-015582

  208. InvestigationL&I investigation

    Case CF-2020-067118 · PASSED

    The cited inspection visit was marked passed.

  209. ViolationRUBBISH & GARBAGE

    Case CF-2020-067118 · Violation VI-2020-038174 · Code PM15-308.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  210. ViolationEXTERIOR AREA WEEDS

    Case CF-2020-067118 · Violation VI-2020-038175 · Code PM15-302.4 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  211. InvestigationL&I investigation

    Case CF-2020-067118 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  212. License terminal eventAQUAHAB LP: Food Establishment, Retail Permanent Location business license marked inactive

    License 543114 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  213. License issue eventAQUAHAB LP: Dumpster License - Private Property L&I license filing initially issued

    License 534990 · Active

    License event. Registration does not prove present operation or storefront occupancy.

  214. License terminal eventAQUAHA LP: Hazardous Materials L&I license filing marked inactive

    License 469659 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  215. License issue eventAQUAHA LP: Hazardous Materials L&I license filing initially issued

    License 469659 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  216. License terminal eventAQUAHAB LP: Hazardous Materials L&I license filing marked inactive

    License 284999 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  217. License issue eventAQUAHAB LP: Hazardous Materials L&I license filing initially issued

    License 284999 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  218. License issue eventAQUAHAB LP: Food Establishment, Retail Permanent Location business license initially issued

    License 543114 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

Where this comes from

Methodology & freshness

This report was assembled Jul 17, 2026, 7:49 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.