House report

409 Cross St

3 bd · 2 ba · 2 stories · 984 sqft · RSA5 · built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$241K OPA value, not a listing price
2027 published assessment
$244K Future roll, not the current tax bill
Neighborhood area
Queen Village · East Passyunk Approximate · based on ZIP 19147
Street view of 409 Cross St
From the street · imagery © Google
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

Assessed value
$241,200 2026 billed-year assessment · 2027: $244,200 · built 1920
Price / sq ft
$248 block $269 · below block
Assessment change
+23% +2%/yr since 2016 · 2027 +1% vs 2026
Est. tax bill / yr
$1,977 0.82% effective
Jun 2022 tax snapshot
No match not proof the account is current
Times sold
4
$0$250K$500KZIP 19147 (Queen Village · East Passyunk) median$244K200720112015201920232027
Property assessmentBlock median & rangeZIP 19147 (Queen Village · East Passyunk) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record20 events · exact dates, newest first
  1. PermitAddition and/or Alteration
  2. PermitAlterations
  3. PermitAddition and/or Alteration
  4. PermitAddition and/or Alterations
  5. InspectionL&I investigation
  6. InspectionL&I investigation
  7. PermitAddition and/or Alteration
  8. InspectionL&I investigation
  9. InspectionL&I investigation
  10. InspectionL&I investigation
  11. L&I violationUNSAFE STRUCTURE
  12. L&I violationARCHITECT/ENGINEER SERVICES
  13. L&I violationEXTERIOR WALLS
  14. L&I violationINTERIOR COMPONENT DETERIORATED
  15. L&I violationROOF DEFICIENCIES
  16. InspectionL&I investigation
  17. Deed / saleDeed / sale $260K
  18. Deed / saleDeed / sale $149K
  19. Deed / saleDeed / sale $79K
  20. Deed / saleDeed / sale $265K

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$1,977/year estimated property tax

2026 taxable assessment $141,200 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $244,200. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 011283400
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
3
Bathrooms
2
Stories
2
Interior
984 sqft livable area
Lot
768 sqft
Basement
Full, finished city code A
Heat
Forced hot air city code A
Central air
No
Exterior condition
Average city code 4
Interior condition
Average city code 4
Quality grade
C assessor's grade
Zoning
RSA5 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

400 block of Cross St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 407 Cross St  ·  411 Cross St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 23, 2026.

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 20 dated rows
  1. PermitAddition and/or Alteration

    Permit EP-2024-003782 · Completed

    Amend permit 9/15/2024 - Remove old 100 amp panel and install new 100 amp panel with main breaker All new rewire of home All new switches, outlets, and smoke detectors new cable wire in bedrooms and living rooms. All work to follow 2017 NEC codes.

  2. PermitAlterations

    Permit PP-2024-006600 · Completed

    10 FIXTURES 2.5 Bathrooms , washer dryer , hot water heater

  3. PermitAddition and/or Alteration

    Permit RP-2024-005689 · Completed

    EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. This is a follow up permit after the completion of the Make Safe permit at the same address. Interior work including Sheetrock, new kitchen, bathrooms, Interior Doors. MEP permits by each trade.

  4. PermitAddition and/or Alterations

    Permit MP-2024-001023 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Install (1) One HVAC and duct work - Gas Furnace 92% efficient, 60,000 BTU,1200 CFM and 2 Ton Condenser in back yard

  5. InvestigationL&I investigation

    Case CF-2023-050047 · PASSED

    The cited inspection visit was marked passed.

  6. InvestigationL&I investigation

    Case CF-2023-050047 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. PermitAddition and/or Alteration

    Permit RP-2023-012087 · Completed

    MAKE SAFE PERMIT TO COMPLY WITH CF-2023-050047 TO INCLUDE REPAIRS/REPLACEMENT OF EXTERIOR WALLS AND FRAMING PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT ADDRESSED IN APPROVED PLANS.

  8. InvestigationL&I investigation

    Case CF-2023-050047 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  9. InvestigationL&I investigation

    Case CF-2023-050047 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  10. InvestigationL&I investigation

    Case CF-2023-050047 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  11. ViolationUNSAFE STRUCTURE

    Case CF-2023-050047 · Violation VI-2023-037995 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  12. ViolationARCHITECT/ENGINEER SERVICES

    Case CF-2023-050047 · Violation VI-2023-037996 · Code A-304.1/1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  13. ViolationEXTERIOR WALLS

    Case CF-2023-050047 · Violation VI-2023-037997 · Code PM15-304.1(G) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  14. ViolationINTERIOR COMPONENT DETERIORATED

    Case CF-2023-050047 · Violation VI-2023-037998 · Code PM15-305.1(A) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  15. ViolationROOF DEFICIENCIES

    Case CF-2023-050047 · Violation VI-2023-037999 · Code PM15-304.1(H) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  16. InvestigationL&I investigation

    Case CF-2023-050047 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  17. Recorded transfer$260K transfer

    2014

  18. Recorded transfer$149K transfer

    2012

  19. Recorded transfer$79K transfer

    2007

  20. Recorded transfer$265K transfer

    2007

Where this comes from

Methodology & freshness

This report was assembled Jul 24, 2026, 7:29 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)