House report

416 Poplar St

3 bd3 stories2,060 sqftRSA5built 2023

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$764K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$500K$1.0MZIP 19123 (Northern Liberties · Callowhill) median$771K2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19123 (Northern Liberties · Callowhill) medianAssessmentDeed / saleLand buyAppealPermit

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record12 events · exact dates, newest first
  1. Deed / saleDeed / sale $760K
  2. PermitNew Construction or Additions
  3. PermitNew Construction or Additions
  4. PermitNew Construction
  5. PermitNew Construction or Additions
  6. PermitNew Construction
  7. PermitNew Construction
  8. PermitNew Construction
  9. AppealZBA Permit Denial - Variance
  10. PermitNew construction, addition, GFA change
  11. PermitNew construction, addition, GFA change
  12. Land buyLand record $650K

Flags: material assessment exemption; legal basis and term unverified · historical tax ledger through 2016 recorded $243 with a lien entry · 1 zoning/board appeal on record. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$2,139/year estimated property tax

2026 taxable assessment $152,800 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $770,600. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 056159900
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationPartial assessment exemption, basis unverified

2026 OPA taxes $152,800 of $764,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.

See the assessment math →
Historical delinquency sources Record found

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

A separate historical parcel ledger ending in 2016 records $242.72 and a lien entry. It is shown as historical context only.

2016$242.72 total · $119.49 principal · $5.43 interest · $3.62 penalty

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The assessment exemption gap

OPA's 2026 roll shows a partial assessment exemption. The annual difference is measurable; the reason for it and what happens after a sale are not established here.

Using OPA's taxable amount ~$2,139/year

$152,800 taxable basis

Difference to verify+$8,555/year
If the full assessment were taxable ~$10,694/year

$764,000 scenario basis

The assessment roll does not identify
  • Legal basis or program
  • Approval or expiration date
  • Treatment after a sale
  • Current Tax Center balance
Show the assessment math 2026: ($764,000 assessed − $611,200 exempt) × 1.3998% ≈ $2,139/year Full-assessment scenario: $764,000 × 1.3998% ≈ $10,694/year

Do not treat the full-assessment scenario as inevitable or assume the current relief transfers. Obtain the approval history and verify the live Tax Center account before relying on either number.

The property, on paper

OPA physical field record.

Bedrooms
3
Stories
3
Interior
2,060 sqft livable area
Lot
708 sqft
Basement
Full, finished city code A
Heat
Forced hot air city code A
Central air
Yes
Garage
1 space
Exterior condition
Newer construction city code 1
Newer construction
Interior condition
Newer construction city code 1
Newer construction
Zoning
RSA5 city zoning code
Zoning appeals
1 In Process · Complete · 2020

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

400 block of Poplar St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 414 Poplar St  ·  418 Poplar St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 23, 2026.

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 12 dated rows
  1. Recorded transfer$760K transfer

    2023

  2. PermitNew Construction or Additions

    Permit PP-2021-008418 · Completed

    FOR THE ERECTION OF A FOUR (4) STORY SINGLE-FAMILY DWELLING OF TYPE VB CONSTRUCTION WITH GARAGE AND ROOF DECK. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. **INCLUDES UNDERPINNING**

  3. PermitNew Construction or Additions

    Permit PP-2021-008419 · Completed

    FOR THE ERECTION OF A FOUR (4) STORY SINGLE-FAMILY DWELLING OF TYPE VB CONSTRUCTION WITH GARAGE AND ROOF DECK. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. **INCLUDES UNDERPINNING**

  4. PermitNew Construction

    Permit EP-2022-003336 · Completed

    New 200 amp service wire throughout as per NEC 2014

  5. PermitNew Construction or Additions

    Permit PP-2022-004456 · Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.

  6. PermitNew Construction

    Permit MP-2021-000971 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. 2 systems 3 ton each 70,000 btu 1,200 cfm, with duct work, condensers in the rear yard

  7. PermitNew Construction

    Permit FP-2021-002636 · Completed

    For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new, two (2) inch fire service line as per PWD Utility Plan dated 11/22/2019, and a new, two (2) inch backflow prevention device within the basement), throughout a new four (4) story attached structure (w/roof deck and pilot house enclosing access stairs only) to be used as Group R-3 (SFD), as per plans and hydraulic calculations.

  8. PermitNew Construction

    Permit RP-2020-016345 · Completed

    FOR THE ERECTION OF A FOUR (4) STORY SINGLE-FAMILY DWELLING OF TYPE VB CONSTRUCTION WITH GARAGE AND ROOF DECK. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. **INCLUDES UNDERPINNING**

  9. AppealZBA Permit Denial - Variance

    Appeal 39448 · In Process · Complete

    Related permit 1015789 · PERMIT FOR THE ERECTION OF AN ATTACHED BUILDING WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON SUBMITTED PLAN. FOR SINGLE FAMILY HOUSEHOLD LIVING WITH ONE ACCESSORY STRUCTURED PARKING SPACE (GARAGE).

  10. PermitNew construction, addition, GFA change

    Permit 1015789 · Cancelled

    FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND A ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.

  11. PermitNew construction, addition, GFA change

    Permit ZP-2020-000410 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND A ROOF ACCESS STRUCTURE AND FOR THE CREATION OF A SHARED EASEMENT. SIZE AND LOCATION AS SHOWN ON PLANS.

  12. Land recordLand record

    2019

Where this comes from

Methodology & freshness

This report was assembled Jul 24, 2026, 7:53 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)