House report

419 W Ontario St

2 bd1 ba2 stories672 sqftRM1built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$37K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar
Open L&I record

4 violation rows marked OPEN in 1 active case

The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.

Open City history ↗
Case 579673

Unsafe structure case

IN VIOLATION

Opened Apr 20, 2017 · Latest inspection FAILED · Jun 22, 2026

  • Interior UnsafePM15-305.1
  • Exterior Struct Unsafe Cond 7PM15-304.1G
  • Unsafe StructurePM15-108.1
  • Architect/Engineer ServicesA-304.1/1
Open the City notice and correction details ↗

OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$100K$200KZIP 19140 (Hunting Park · Nicetown–Tioga) median$47K2003200720112015201920232027
Property assessmentBlock median & rangeZIP 19140 (Hunting Park · Nicetown–Tioga) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record32 events · exact dates, newest first
  1. InspectionL&I investigation
  2. InspectionL&I investigation
  3. InspectionL&I investigation
  4. InspectionL&I investigation
  5. InspectionL&I investigation
  6. InspectionL&I investigation
  7. InspectionL&I investigation
  8. InspectionL&I investigation
  9. InspectionL&I investigation
  10. InspectionL&I investigation
  11. InspectionL&I investigation
  12. InspectionCSUINITIAL
  13. InspectionCSUINITIAL
  14. InspectionCSUINITIAL
  15. InspectionCSUINITIAL
  16. InspectionCSUINITIAL
  17. L&I violationINTERIOR UNSAFE
  18. L&I violationEXTERIOR STRUCT UNSAFE COND 7
  19. L&I violationUNSAFE STRUCTURE
  20. L&I violationARCHITECT/ENGINEER SERVICES
  21. InspectionCSUINITIAL
  22. L&I violationARCHITECT/ENGINEER SERVICES
  23. InspectionCSUINITIAL
  24. InspectionCSUINITIAL
  25. PermitMajor alteration
  26. Deed / saleDeed / sale $5K
  27. InspectionCSUINITIAL
  28. L&I violationWALL DETERIORATED
  29. L&I violationWALL PARTIALLY COLLAPSED
  30. L&I violationVACANT BLDG UNSEC/UNSAFE CSU
  31. L&I violationFLOOR/CEILING PARTIALLY COLL
  32. InspectionL_INITIAL

Flags: 4 L&I violation rows marked OPEN · $5K recorded in the June 2022 delinquency snapshot; verify current balance · historical tax ledger through 2016 recorded $7K with a lien entry. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$515/year estimated property tax

2026 taxable assessment $36,800 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $46,800. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 193243900
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationNo exemption shown

2026 taxable assessment equals the full assessed value.

Historical delinquency sources Record found

$5,340.72 was recorded for this parcel in Philadelphia's June 2022 delinquency snapshot for 2016–2021. That amount may have been paid, reduced, or increased since; it is not a current payoff figure.

$2,814.96 principal$972.67 interest$194.45 penalty$1,358.64 other charges
6years recorded 2016–2021tax periods 2016-06-20last payment in snapshot Yesactionable flag Nopayment agreement Nobankruptcy flag Noassessment appeal

The snapshot’s 2022 context used $16,200 total assessment, $16,200 taxable, and $0 exempt/abated. Those historical fields can differ from today’s OPA exemption status.

A separate historical parcel ledger ending in 2016 records $6,678.38 and a lien entry. It is shown as historical context only.

2005$834.09 total · $82.14 principal · $82.54 interest · $5.75 penalty2006$372.66 total · $149.02 principal · $136.36 interest · $10.43 penalty2007$356.82 total · $149.02 principal · $122.94 interest · $10.43 penalty2008$366.90 total · $161.18 principal · $118.47 interest · $11.28 penalty2009$349.78 total · $161.18 principal · $103.96 interest · $11.28 penalty2010$332.67 total · $161.18 principal · $89.46 interest · $11.28 penalty2011$344.44 total · $177.13 principal · $82.37 interest · $12.40 penalty2012$337.29 total · $183.97 principal · $68.99 interest · $12.88 penalty2013$328.32 total · $190.58 principal · $54.32 interest · $13.34 penalty2014$1,128.22 total · $687.29 principal · $134.02 interest · $48.11 penalty2015$1,055.23 total · $687.29 principal · $72.16 interest · $48.11 penalty2016$871.96 total · $717.96 principal · $10.76 interest · $7.18 penalty

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
2
Bathrooms
1
Stories
2
Interior
672 sqft livable area
Lot
720 sqft
Exterior condition
Vacant city code 6
Vacant
Interior condition
Below average city code 5
Quality grade
C assessor's grade
Zoning
RM1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

400 block of W Ontario St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 421 W Ontario St  ·  423 W Ontario St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 32 dated rows
  1. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  2. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  3. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  4. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  5. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  6. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  8. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  9. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  10. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  11. InvestigationL&I investigation

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  12. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  13. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  14. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  15. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  16. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  17. ViolationINTERIOR UNSAFE

    Case 579673 · Violation 211938346 · Code PM15-305.1 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  18. ViolationEXTERIOR STRUCT UNSAFE COND 7

    Case 579673 · Violation 211938347 · Code PM15-304.1G · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  19. ViolationUNSAFE STRUCTURE

    Case 579673 · Violation 211938345 · Code PM15-108.1 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  20. ViolationARCHITECT/ENGINEER SERVICES

    Case 579673 · Violation 211938344 · Code A-304.1/1 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  21. InvestigationCSUINITIAL

    Case 579673 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  22. ViolationARCHITECT/ENGINEER SERVICES

    Case 178221 · Violation 4229263 · Code A-304.1/1 · RESOLVE

  23. InvestigationCSUINITIAL

    Case 178221 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  24. InvestigationCSUINITIAL

    Case 178221 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  25. PermitMajor alteration

    Permit 602777 · EXPIRED

    MAKE SAFE PERMIT - REPAIRS TO ROOF AND WALL WITH LIKE IN KIND MATERIALS TO RESOLVE CASE #178221. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #178221. CONTACT STREETS DEPARTMENT FOR DUMPSTER PERMIT AND FOOTWAY CLOSURE PERMITS. SEPARATE PERMIT REQUIRED FOR RENOVATION.

  26. Recorded transfer$5K transfer

    2015

  27. InvestigationCSUINITIAL

    Case 178221 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  28. ViolationWALL DETERIORATED

    Case 178221 · Violation 4229259 · Code PM-307.1/11 · RESOLVE

  29. ViolationWALL PARTIALLY COLLAPSED

    Case 178221 · Violation 4229260 · Code PM-307.1/12 · RESOLVE

  30. ViolationVACANT BLDG UNSEC/UNSAFE CSU

    Case 178221 · Violation 4229261 · Code PM-307.1/19 · RESOLVE

  31. ViolationFLOOR/CEILING PARTIALLY COLL

    Case 178221 · Violation 4229262 · Code PM-307.1/6 · RESOLVE

  32. InvestigationL_INITIAL

    Case 5504 · CLOSED

    City marked the record closed; open the case for the closing reason.

Where this comes from

Methodology & freshness

This report was assembled Jul 31, 2026, 5:53 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)