House report

703 Corinthian Ave

3 stories3,078 sqftRM1built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$910K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$1.0M$2.0MZIP 19130 (Fairmount · Spring Garden) median$910K2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19130 (Fairmount · Spring Garden) medianAssessmentL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record20 events · exact dates, newest first
  1. InspectionL&I investigation
  2. InspectionL&I investigation
  3. PermitMake Safe Permit For RP
  4. InspectionL&I investigation
  5. InspectionL&I investigation
  6. InspectionL&I investigation
  7. InspectionL&I investigation
  8. InspectionL&I investigation
  9. PermitAddition and/or Alteration
  10. L&I violationUNSAFE STRUCTURE
  11. L&I violationEXTERIOR WALLS
  12. L&I violationARCHITECT/ENGINEER SERVICES
  13. InspectionL&I investigation
  14. InspectionL&I investigation
  15. PermitAddition and/or Alteration
  16. L&I violationEXTERIOR STRUCT UNSAFE COND 8
  17. L&I violationEXTERIOR STRUCT UNSAFE COND 7
  18. L&I violationUNSAFE STRUCTURE
  19. InspectionCSUINITIAL
  20. PermitAlteration

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$12,742/year estimated property tax

2026 taxable assessment $910,300 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $910,300. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 151096600
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationNo exemption shown

2026 taxable assessment equals the full assessed value.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Stories
3
Interior
3,078 sqft livable area
Lot
1,990 sqft
Basement
Full city code D
Heat
Undetermined city code H
Garage
1 space
Exterior condition
Average city code 4
Interior condition
Average city code 4
Quality grade
C+ assessor's grade
Zoning
RM1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

700 block of Corinthian Ave. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 705 Corinthian Ave  ·  707 Corinthian Ave

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 20 dated rows
  1. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  2. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  3. PermitMake Safe Permit For RP

    Permit RP-2024-004526 · Completed

    FOR THE REPLACEMENT OF THE DAMAGED PORTION OF THE FRONT WALL TO RESOLVE CASE CF-2023-092175. ALL WORK TO BE DONE PER APPROVED PLANS AND ENGINEERING INSPECTION LETTER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE CF-2023-092175. "IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION." **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN NINE (9) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.**

  4. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  5. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  6. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  8. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  9. PermitAddition and/or Alteration

    Permit RP-2023-010887 · Expired

    **MAKE SAFE PERMIT** FOR REPLACEMENT OF OUTER WYTHE OF FRONT EXTERIOR WALL, TIE SECOND WYTHE TO EXISTING JOIST, LINTEL REPLACEMENT, REPOINTING, TEMPORARY SHORING TO COMPLY WITH VIOLATION CASE #CF-2023-092175. NOT TO EXCEED SCOPE OF WORK NOTED IN ENGINEER'S REPORT AND SHOWN ON APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON THE VIOLATIONS. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION.

  10. ViolationUNSAFE STRUCTURE

    Case CF-2023-092175 · Violation VI-2023-067752 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  11. ViolationEXTERIOR WALLS

    Case CF-2023-092175 · Violation VI-2023-067753 · Code PM15-304.1(G) · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  12. ViolationARCHITECT/ENGINEER SERVICES

    Case CF-2023-092175 · Violation VI-2023-067754 · Code A-304.1/1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  13. InvestigationL&I investigation

    Case CF-2023-092175 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  14. InvestigationL&I investigation

    Case 723428 · PASSED

    The cited inspection visit was marked passed.

  15. PermitAddition and/or Alteration

    Permit 1052071 · Completed

    EZ EXTERIOR WALL COVERINGS- For the Applications of Exterior Wall Coverings as per attached standards. Deviations from these standards require submission of construction and site plans. rEMOVE AND REPLACE FRONT WALL. REPAIR BARGE BOARD ON SIDE OF STRUCTURE.

  16. ViolationEXTERIOR STRUCT UNSAFE COND 8

    Case 723428 · Violation 211988078 · Code PM15-304.1H · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  17. ViolationEXTERIOR STRUCT UNSAFE COND 7

    Case 723428 · Violation 211988080 · Code PM15-304.1G · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  18. ViolationUNSAFE STRUCTURE

    Case 723428 · Violation 211988081 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  19. InvestigationCSUINITIAL

    Case 723428 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  20. PermitAlteration

    Permit 799532 · EXPIRED

    EZ MASONRY FACADE PERMIT STANDARDS - ONE FAMILY DWELLING - MASONRY FRONT WALL - REMOVE EXISTING _ STORY FRONT MASONRY WALL 14' X 30'. REPLACE WITH NEW 8 INCH MASONRY WALL, (4" BRICK & 4" BLOCK) ON EXISTING FOUNDATION. WINDOWS AND DOOR SAME LOCATION. NEW DOOR OPENING FOR 36 INCH DOOR. FLASH ROOF TO NEW FRONT. HORIZANTAL REINFORCEMENT EVERY 24 INCHES. INSTALL RETURNS INTO PARTY WALLS FOR STRUCTURAL CONNECTION. FLASH AND SEAL ROOF. INSTALL 2 X 4 FRAME WALL, R-19 INSULATION AND SHEETROCK ON INTERIOR FRONT WALL FOR FINISH. NO OTHER WORK ALLOWED UNDER THIS PERMIT. CONTACT DISTRICT INSPECTOR FOR INITIAL INSPECTION AT LEAST 24 HOURS PRIOR TO STARTING WORK. REMOVE AND REPLACE FRONT WALL

Where this comes from

Methodology & freshness

This report was assembled Jul 29, 2026, 6:00 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)