House report

715 S 8th St

5 bd3 ba2,574 sqftRM1built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$919K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$500K$1.0MZIP 19147 (Queen Village · East Passyunk) median$906K2009201220152018202120242027
Property assessmentBlock median & rangeZIP 19147 (Queen Village · East Passyunk) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record18 events · exact dates, newest first
  1. PermitAlterations
  2. PermitAddition and/or Alteration
  3. PermitAddition and/or Alteration
  4. PermitAddition and/or Alterations
  5. InspectionL&I investigation
  6. PermitAddition and/or Alteration
  7. InspectionL&I investigation
  8. L&I violationPLANS REQUIRED TO COMPLY
  9. InspectionL&I investigation
  10. Deed / saleDeed / sale $947K
  11. Deed / saleDeed / sale $700K
  12. PermitPlumbing
  13. PermitZoning
  14. PermitMajor alteration
  15. PermitElectrical
  16. PermitDemolition
  17. PermitPlumbing
  18. PermitDemolition

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$11,462/year estimated property tax

2026 taxable assessment $818,800 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $906,300. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 023230200
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
5
Bathrooms
3
Interior
2,574 sqft livable area
Lot
1,072 sqft
Basement
Full, finished city code A
Heat
Hot water / radiators city code B
Central air
Yes
Exterior condition
Above average city code 3
Interior condition
Above average city code 3
Quality grade
B- assessor's grade
Zoning
RM1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

700 block of S 8th St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 713 S 8th St  ·  717 S 8th St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 18 dated rows
  1. PermitAlterations

    Permit PP-2025-006046 · Completed

    Fixture replacement for the following fixtures 3 toilets, 2 lavatories, tub, wet bar

  2. PermitAddition and/or Alteration

    Permit EP-2025-001702 · Completed

    Amended 3/11/25 Remove and replace existing devices switches receptacles lighting throughout the entire house. Wiring exhaust fans in the bathrooms relocate receptacles in the room to the hallway outside the bathroom and relocate three-way switching in the living room. Michael Wilson is part of the contracting team. Remove and replace existing devices switches receptacles lighting throughout the entire house. Wiring exhaust fans in the bathrooms installing a receptacle in the basement for a wall mounted television and relocate receptacles in the room to the hallway outside the bathroom and relocate three-way switching in the living room. Michael Wilson is part of the contracting team.

  3. PermitAddition and/or Alteration

    Permit RP-2024-012988 · Completed

    EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.

  4. PermitAddition and/or Alterations

    Permit MP-2024-004962 · Completed

    Replacement installation of 2 existing hvac systems, NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areas

  5. InvestigationL&I investigation

    Case CF-2021-042819 · PASSED

    The cited inspection visit was marked passed.

  6. PermitAddition and/or Alteration

    Permit RP-2021-010092 · Completed

    For the installation od a new guard rail around the perimeter of an existing roof deck, repairs to the roof covering and access door roof covering per plans.

  7. InvestigationL&I investigation

    Case CF-2021-042819 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  8. ViolationPLANS REQUIRED TO COMPLY

    Case CF-2021-042819 · Violation VI-2021-031510 · Code A-301.6/1 · COMPLIED

    Resolution: COMPLIED - BY ENFORCEMENT ACTION City marked this violation complied with; check the resolution date and live case for what was accepted.

  9. InvestigationL&I investigation

    Case CF-2021-042819 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  10. Recorded transfer$947K transfer

    2020

  11. Recorded transfer$700K transfer

    2012

  12. PermitPlumbing

    Permit 285248 · COMPLETED

    REPLACE CURB TRAP AND SECTION OF MAIN DRAIN

  13. PermitZoning

    Permit 254852 · COMPLETED

    ROOF TOP SUN DECK

  14. PermitMajor alteration

    Permit 229823 · COMPLETED

    RENOVATION OF INTERIOR SPACE, REMOVE NON-BEARING PARTITION WALL AND ERECT NEW 1/2 GWB WALLS INSTALL NEW DOORS, REMOVE AND REPLACE WINDOWS AS PER PLAN.

  15. PermitElectrical

    Permit 242679 · COMPLETED

    INSTALL 200A SERVICE, 25 HIGH HATS, 8 120V SMOKE DETECTORS, 35 RECEPTACLES, 15 SWITCHES & 10 LIGHT FIXTURES.

  16. PermitDemolition

    Permit 232984 · COMPLETED

    STUCCO REAR. DEMO FRONT FACADE (COMMERCIAL WINDOW) FIRST FLOOR REPLACE WITH BRICK ON EXISTING FOUNDATION. LIMESTONE LINTELS INCLUDED.

  17. PermitPlumbing

    Permit 235009 · COMPLETED

    INSTALL WATER AND DRAIN LINES TO 1 KITCHEN SINK, 2 TOILETS, 2 LAV'S, 2 BATHTUBS

  18. PermitDemolition

    Permit 222703 · COMPLETED

    REMOVE ENTIRE DEBRIS IN HOUSE(FLS 1-4) AND DEMO NON- BEARING PARTITION WALL AND DROP TILE CEILING FOR SFD.

Where this comes from

Methodology & freshness

This report was assembled Jul 26, 2026, 10:59 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)