House report

8840 Towanda Ave

5 bd5 ba2 stories10,474 sqftRSD1built 1925

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$3.1M OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$2.5M$5.0MZIP 19118 (Chestnut Hill) median$3.7M2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19118 (Chestnut Hill) medianAssessmentDeed / salePermit

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record7 events · exact dates, newest first
  1. PermitAddition and/or Alteration
  2. PermitAddition and/or Alteration
  3. PermitNew Construction or Additions
  4. PermitSolar Panels and Structure
  5. PermitAddition and/or Alteration
  6. PermitNew construction, addition, GFA change
  7. Deed / saleDeed / sale $3.1M

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$41,773/year estimated property tax

2026 taxable assessment $2,984,200 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $3,721,900. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 092304810
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
5
Bathrooms
5
Stories
2
Interior
10,474 sqft livable area
Lot
143,312 sqft
Basement
Full, finished city code A
Heat
Hot water / radiators city code B
Central air
Yes
Garage
3 spaces
Exterior condition
Average city code 4
Interior condition
Average city code 4
Quality grade
X- assessor's grade
Zoning
RSD1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

8800 block of Towanda Ave. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 8830 Towanda Ave  ·  8850 Towanda Ave

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 7 dated rows
  1. PermitAddition and/or Alteration

    Permit EP-2025-010164 · Completed

    AMENDMENT: Remove solar photovoltaic system from permit. Solar roof system is permitted separately under EP-2026-000012. Amended scope will be for interior and exterior power and lighting for proposed open porch addition and attic renovations only as per 2017 NEC. Interior wiring less than 2000 s.f. The project consists of roof replacement with a 59.544 kW DC solar photovoltaic system consisting of 827 solar photovoltaic modules, including PV inverters, batteries, electrical subpanels, and interconnection to utility meter, plus the interior and exterior power and lighting for the proposed open porch addition and attic renovations as per 2017 NEC.

  2. PermitAddition and/or Alteration

    Permit EP-2026-000012 · Completed

    Electrical installation of a complete Tesla Solar Roof system consisting of 827 roof mounted photovoltaic tiles with a total system capacity of 59.544 kW on a single family, detached residence. The majority of the roof pitch is 7:12. The scope of work also includes the installation of four (4) Tesla Powerwall 3 batteries, two (2) electrical sub panels, and interconnection to the PECO electrical meter. The solar system will operate in conjunction with the PECO utility service and will provide backup power to the existing 400A electrical service using solar energy in the event of a utility power outage.

  3. PermitNew Construction or Additions

    Permit PP-2025-016701 · Issued

    Install new water and drain lines for one tub, two toilets, two lavatories and one sink. Install 6 fixtures

  4. PermitSolar Panels and Structure

    Permit GP-2026-000014 · Completed

    FOR THE INSTALLATION OF STRUCTURAL/FASTENING COMPONENTS OF ROOF-MOUNTED SOLAR PHOTO VOLTAIC SYSTEM. SIZE AND LOCATION AS SHOWN ON APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.

  5. PermitAddition and/or Alteration

    Permit RP-2025-009250 · Issued

    FOR THE ERECTION OF A TWO-STORY REAR ADDITION AND THIRD STORY ADDITION ABOVE AN EXISTING DETACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN.

  6. PermitNew construction, addition, GFA change

    Permit ZP-2025-008862 · Issued

    FOR THE ERECTION OF A TWO-STORY REAR ADDITION AND THIRD STORY ADDITION ABOVE AN EXISTING DETACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING; SIZE AND LOCATION AS PER APPLICATION/PLAN.

  7. Recorded transfer$3.1M transfer

    2020

Where this comes from

Methodology & freshness

This report was assembled Jul 24, 2026, 9:00 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)