House report

929 Clinton St

1 bd1 ba2,494 sqftRM1built 1900

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$1.4M OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$1.0M$2.0MZIP 19107 (Washington Square West · Chinatown) median$1.1M2015201720192021202320252027
Property assessmentBlock median & rangeZIP 19107 (Washington Square West · Chinatown) medianAssessmentPermit

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Every dated record2 events · exact dates, newest first
  1. PermitRoof Covering Replacement
  2. PermitWall Covering Replacement

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$17,707/year estimated property tax

2026 taxable assessment $1,265,000 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $1,100,000. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 888057756
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Where the record looks off

Conflicts in City paperwork. Flags on the data, not the property.

"Built 1900" is usually a placeholder

Philadelphia records use 1900 as a stand-in when the real construction year was never documented. Treat the age as unknown, not as 120+ years.

The property, on paper

OPA physical field record.

Bedrooms
1
Bathrooms
1
Interior
2,494 sqft livable area
Lot
1 sqft
Heat
Forced hot air city code A
Central air
Yes
Exterior condition
Above average city code 3
Interior condition
Above average city code 3
Quality grade
C+ assessor's grade
Zoning
RM1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

900 block of Clinton St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 929 Clinton St  ·  929 Clinton St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 2 dated rows
  1. PermitRoof Covering Replacement

    Permit GM-2025-008616 · Expired

    EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Existing Roofs as per attached standard. Deviations from these standards require submission of construction and site plans. Replacement of sheathing in excess of 10% of roof area shall not be applicable to the EZ permit process. No work to front facade, no work to exterior windows or doors(As per PHC conditions). Remove existing roofing material on 5th floor patio roof and replace with APP modified bitumen.

  2. PermitWall Covering Replacement

    Permit GM-2025-008781 · Expired

    EZ EXTERIOR WALL COVERINGS - For the Applications of Exterior Wall Coverings as per attached standards. Deviations from these standards shall result in permit revocation and require submission of construction and site plans. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work. No work to front facade, no work to exterior windows or doors(As per PHC conditions).

Where this comes from

Methodology & freshness

This report was assembled Jul 25, 2026, 2:06 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)