Property report

15000 E Roosevelt Blvd

1 story318,450 sqftI1built 2025

Property at a glanceIndustrial

Byberry North Owner LLC

2026 assessment
$99M OPA value, not a listing price
2027 published assessment
$106M Future roll, not the current tax bill
Neighborhood area
Somerton Approximate · based on ZIP 19116
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $106,431,300. It is not yet the billed-year tax basis.

$0$100M$200M$106M202220232024202520262027
Property assessmentAssessmentL&I violationAppealPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record43 events · exact dates, newest first
  1. PermitSign
  2. AppealZBA Permit Denial - Variance
  3. PermitSigns (Accessory / Non-Accessory)
  4. AppealLIRB Violation Appeal
  5. AppealLIRB Violation Appeal
  6. PermitSign
  7. PermitNew Construction
  8. PermitSigns (Accessory / Non-Accessory)
  9. PermitSitework with Onsite Utility Services
  10. InspectionL&I investigation
  11. PermitNew Construction or Additions
  12. L&I violationINSTALL FIRE SUPPRESSION SYSTEM
  13. InspectionL&I investigation
  14. PermitSitework with Onsite Utility Services
  15. PermitNew Construction
  16. PermitAddition and/or Alterations
  17. PermitNew Construction
  18. PermitNew Construction
  19. PermitAddition and/or Alterations
  20. PermitNew Construction
  21. PermitRough-In
  22. PermitRough-In
  23. PermitRetaining Wall
  24. PermitNew Construction
  25. PermitNew Construction or Additions
  26. PermitAddition and/or Alterations
  27. PermitAddition and/or Alterations
  28. PermitNew Construction or Additions
  29. PermitNew Construction
  30. PermitNew Construction or Additions
  31. PermitAddition and/or Alteration
  32. PermitAddition and/or Alteration
  33. PermitNew Construction or Additions
  34. PermitNew Construction
  35. PermitNew Construction
  36. PermitNew construction, addition, GFA change
  37. PermitNew Construction
  38. PermitNew Construction
  39. L&I violationACCESSORY STRUCTURE OVER 200SQFT
  40. InspectionL&I investigation
  41. PermitNew Construction (Shell Only)
  42. PermitNew Construction (Shell Only)
  43. PermitNew construction, addition, GFA change

Verify the public record

$0/year estimated property tax

2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $106,431,300. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 884000175
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationFull assessment exemption shown

2026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Property report

Industrial property

Industrial, recorded in the City's industrial category. The public record and owner trail follow.

What it is
Industrial Vacant Land Reside Acre+
Owner
Byberry North Owner LLC
$ / sq ft
$334 above the $70 median for 3,574 industrial parcels citywide
Interior area
318,450 sqft
Lot size
2,250,673 sqft
Stories
1
Built
2025
Zoning
I1

Recorded owner

Who's behind it

Byberry North Owner LLC · corporate / LLC owner

• Tax bills mail to C/O Rockefeller Group Development Corporation 92 Headquarters Plz North Tower 9t, Morristown NJ, 07960 — outside Philadelphia

Block context

15000 block of E Roosevelt Blvd. Compare parcels, ownership, and public-record history.

See the whole block →

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 23, 2026.

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 43 dated rows
  1. PermitSign

    Permit GP-2026-000326 · Completed

    For the erection of one single-faced statically illuminated freestanding sign and eight free-standing directional signs for a total of nine accessory signs. **Separate permit required for any electrical work**

  2. AppealZBA Permit Denial - Variance

    Appeal ZP-2025-003064 · Completed · Granted

    Related permit ZP-2025-003064 · For the erection of one internally illuminated freestanding sign and eight free-standing directional signs for a total of nine accessory signs. Size and location per plan.

  3. PermitSigns (Accessory / Non-Accessory)

    Permit ZP-2025-003064 · Completed

    For the erection of one internally illuminated freestanding sign and eight free-standing directional signs for a total of nine accessory signs. Size and location per plan.

  4. AppealLIRB Violation Appeal

    Appeal HA-2024-004662 · Closed · Complete

    Late Appeal See Attached

  5. AppealLIRB Violation Appeal

    Appeal HA-2024-004663 · Closed · Complete

    Late Appeal See Attached

  6. PermitSign

    Permit GP-2025-006427 · Completed

    For the erection of three wall signs and one free-standing sign as per approved plans.

  7. PermitNew Construction

    Permit FP-2025-000778 · Completed

    Fire Suppression System Permit for combo SP-2025-000241 FOR THE INSTALLATION OF A TEN (10) INCH FIRE SERVICE LINE WITH TEN (10) INCH BACKFLOW PREVENTERS AND YARD HYDRANTS AS PER APPROVED PLANS.

  8. PermitSigns (Accessory / Non-Accessory)

    Permit ZP-2025-005746 · Completed

    For the erection of three wall signs and one free-standing sign. All signs accessory to previously approved use. Size and location per plans.

  9. PermitSitework with Onsite Utility Services

    Permit SP-2025-000241 · Completed

    FOR SITE WORK ASSOCIATED WITH THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEPARATE FIRE SUPPRESSION PERMIT REQUIRED FOR INSTALLATION OF UNDERGROUND FIRE SERVICE LINE AND ON-SITE FIRE HYDRANTS.

  10. InvestigationL&I investigation

    Case CF-2025-013670 · PASSED

    The cited inspection visit was marked passed.

  11. PermitNew Construction or Additions

    Permit PP-2025-000773 · Completed

    INSTALLATION OF LOT DRAINAGE PIPING AND INFRASTRUCTURE PIPING FOR PROPERTY, 2- 4" BACKFLOW PREVENTERS AND 4" WATER DISTRIBUTION PIPING FOOR 2 WAREHOUSES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. ANY PIPING FOR ADDITIONAL STRUCTURES SHALL REQUIRE A SEPERATE PERMIT.

  12. ViolationINSTALL FIRE SUPPRESSION SYSTEM

    Case CF-2025-013670 · Violation VI-2025-010666 · Code A-301.1/27 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  13. InvestigationL&I investigation

    Case CF-2025-013670 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  14. PermitSitework with Onsite Utility Services

    Permit SP-2024-001409 · Completed

    EARTHWORK ASSOCIATED WITH SITE PLUMBING WORK. *2018 IBC REVIEW* **SEPARATE PLUMBING PERMIT MUST BE ISSUED**

  15. PermitNew Construction

    Permit FP-2024-001122 · Completed

    INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 10" SERVICE LINE, THROUGHOUT A ONE (1) STORY STRUCTURE. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK

  16. PermitAddition and/or Alterations

    Permit FP-2024-002298 · Completed

    FOR THE INSTALLATION OF SPRINKLER HEADS TIED INTO EXISTING AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH EXISTING BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.

  17. PermitNew Construction

    Permit EP-2024-009875 · Completed

    Provide new feeders for HVAC and branch circuits for receptacles and lighting as per 2017 NEC. Provide new fire alarm devices form existing system 2016 NFPA 72.

  18. PermitNew Construction

    Permit EP-2024-009872 · Completed

    Provide new feeders for HVAC equipment, new branch circuits for receptacle and lighting and lighting controls as per 2017 NEC. Add fire alarm devices to existing system as per 2016 NFPA 72.

  19. PermitAddition and/or Alterations

    Permit FP-2024-002300 · Completed

    FOR THE INSTALLATION OF SPRINKLER HEADS TIED INTO EXISTING AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH EXISTING BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.

  20. PermitNew Construction

    Permit FP-2024-001128 · Completed

    FOR THE INSTALLATION OF A 12-INCH FIRE SERVICE LINE, 12-INCH BACKFLOW PREVENTER, FIRE PUMP AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13. *AMEND 12-19-2024: REVISE TO 10-INCH FIRE SERVICE LINE AND 10-INCH BACKFLOW PREVENTER*

  21. PermitRough-In

    Permit FP-2024-002215 · Expired

    Rough-In Permit for FP-2024-001122 Install Fire Pump and Fire Sprinkler System Through-out.

  22. PermitRough-In

    Permit FP-2024-002214 · Completed

    Rough-In Permit for FP-2024-001128 Provide Fire Pump & Fire Sprinkler System throughout.

  23. PermitRetaining Wall

    Permit GP-2024-006269 · Completed

    FOR THE CONSTRUCTION OF RETAINING WALL AND SOUND WALL AT THE NORTHWESTERN CORNER OF THE PROPERTY. AS PER APPROVED PLANS.

  24. PermitNew Construction

    Permit EP-2024-008931 · Completed

    Provide temporary power for construction including (1) 15 KV feeder from utility, (1) pad mount transformer, utility metering, (1) 480V 200 amp feeder and panelboard, (2) 480V 100 amp feeders and panelboards, (2) 15KVA transformers and (2) 208V 50 amp feeders and panelboards.

  25. PermitNew Construction or Additions

    Permit PP-2024-012569 · Completed

    INSTALL 5 WATER CLOSETS, 1 URINAL, 6 LAVATORIES, 1 ELECTRIC WATER COOLER, 3 FLOOR DRAINS, 1 MOP SINK, 1 SINK, 2 SUPPLY OUTLET BOXES, 1 ROOF DRAIN AND 1 HOT WATER HEATER ACCORDING TO THE 2018 PPC AND PER PLANS.

  26. PermitAddition and/or Alterations

    Permit MP-2024-003928 · Completed

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  27. PermitAddition and/or Alterations

    Permit MP-2024-003929 · Completed

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  28. PermitNew Construction or Additions

    Permit PP-2024-009939 · Completed

    INSTALL 5 WATER CLOSETS, 1 URINAL, 3 FLOOR DRAINS, 1 HOT WATER HEATER, 1 ELECTRIC WATER COOLER, 1 MOP SINK, 4 ROOF DRAINS, 1 KITCHEN SINK, 6 LAVATORIES, 1 SHOWER, 2 SUPPLY OUTLET BOXES AND 1 WATER HYRANI ACCORDING TO THE 2018 PPC AND PER PLANS.

  29. PermitNew Construction

    Permit MP-2024-001049 · Completed

    FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.

  30. PermitNew Construction or Additions

    Permit PP-2024-010077 · Completed

    ROOF DRAINS FROM 5 FT. OUTSIDE BUILDING TO SITE WORK. SANITARY MAIN AND WATER MAIN FROM CURB AND THROUGHOUT BUILDING. STORM SEWER FROM CURB TO SITE WORK PER 2018 PPC AND APPROVED PLANS 2 FLOOR DRAINS 13 HOSE BIBBS 16 ROOF DRAINS 1 BACKFLOW PREVENTER LISTED ON CP-100

  31. PermitAddition and/or Alteration

    Permit CP-2024-003379 · Completed

    FOR A TENANT FIT-OUT TO AN EXISTING STRUCTURE (BLDG 2). FOR THE CREATION OF AN OFFICE SPACE ACCESSORY TO A WAREHOUSE CENTER. ALTERATIONS TO INCLUDE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT THROUGHOUT AS PER APPROVED PLANS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**

  32. PermitAddition and/or Alteration

    Permit CP-2024-003372 · Completed

    FOR A TENANT FIT-OUT TO AN EXISTING STRUCTURE. FOR THE CREATION OF AN OFFICE SPACE ACCESSORY TO A WAREHOUSE CENTER. ALTERATIONS TO INCLUDE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT THROUGHOUT AS PER APPROVED PLANS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**

  33. PermitNew Construction or Additions

    Permit PP-2024-009514 · Completed

    ROOF DRAINS FROM ROOF TO 5 FT. OUTSIDE BUILDING TO SITE WORK. SANITARY MAIN AND WATER MAIN FROM CURB AND THROUGHOUT BUILDING. STORM SEWER FROM CURB TO SITE WORK SANITARY SEWER PERMIT #202404176 STORM SEWER PERMIT #202404178 PRIVATE COST WATER CONTRACT #90310

  34. PermitNew Construction

    Permit EP-2024-004766 · Completed

    Provide medium voltage service, switchgear, secondary feeders and equipment, site lighting, warehouse lighting, convenience receptacles, fire alarm and HVAC power. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.

  35. PermitNew Construction

    Permit EP-2024-004761 · Completed

    Provide medium voltage service, switchgear, secondary feeders and equipment, site lighting, warehouse lighting, convenience receptacles, and HVAC power as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.

  36. PermitNew construction, addition, GFA change

    Permit ZP-2024-005756 · Completed

    FOR THE REMOVAL OF A PREVIOUSLY APPROVED 6’ FENCE AND FOR THE ERECTION OF RETAINING WALL AND SOUND WALL AT THE NORTHWESTERN CORNER OF THE PROPERTY, WHICH IS LOCATED OUTSIDE OF ALL SIGHT TRIANGLES FOR TRAFFIC TRAVELING ALONG SOUTHAMPTON RD.; SIZE AND LOCATION AS SHOWN ON THE PLAN

  37. PermitNew Construction

    Permit EP-2024-003479 · Completed

    Provide a 600 amp temporary service for construction office trailers and building . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. gfci PROTECTION IS TO BE FOR ALL TEMP.RECEPTACLES PER:590.6 .

  38. PermitNew Construction

    Permit MP-2024-001048 · Completed

    INSTALLATION OF HVAC SYSTEM FOR SHELL WAREHOUSE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW* AMENDMENT APPROVED 6/18/24 AMEND MECHANICAL PERMIT MP-2024-001048 TO CHANGE LOUVER SIZES AS PER APPROVED PLANS.

  39. ViolationACCESSORY STRUCTURE OVER 200SQFT

    Case CF-2024-021282 · Violation VI-2024-017441 · Code A-301.1/76 · COMPLIED

    Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  40. InvestigationL&I investigation

    Case CF-2024-021282 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  41. PermitNew Construction (Shell Only)

    Permit CP-2023-002592 · Completed

    AMENDMENT II: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT CP-2023-002592 TO DOCUMENT STAMPED STRUCTURAL PLANS FOR BUILDING 2. ALL WORK TO BE DONE PER APPROVED PLANS. AMENDMENT I: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT CP-2023-002592 TO DOCUMENT CHANGE IN WASTER HAULER COMPANY. ORIGINAL: **SHELL PERMIT** FOR THE ERECTION OF A DETACHED NON-COMBUSTIBLE STRUCTURE TO INCLUDE FIRE PUMP ROOM, INSULATION INSTALLATION, AND SLAB-ON-GRADE SHALLOW FOUNDATION.**IECC 2018, ADDITIONAL EFFICIENCY PACKAGE: HIGH-EFFICIENCY HVAC. SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, FIRE SUPPRESSION, AND FIT-OUT ALTERATION WORKSCOPES.**

  42. PermitNew Construction (Shell Only)

    Permit CP-2022-005952 · Completed

    *SHELL PERMIT* FOR THE ERECTION OF A DETACHED ONE (1) STORY STRUCTURE. FOR USE AS A STORAGE OCCUPANY (SHELL ONLY). BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13 THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, FIRE SUPPRESSION, AND FIT-OUT ALTERATION WORKSCOPES.

  43. PermitNew construction, addition, GFA change

    Permit ZP-2020-007697 · Completed

    FOR THE ERECTION OF TWO (2) DETACHED STRUCTURES (BUILDING #1 & 2) ON THE SAME LOT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLANS. (**See additional comments from the CDR Committee and Staff at the September 14th 2021 meeting include the following: The applicant should continue to engage with an arborist over the next three years (or beyond) to monitor the establishment of the large number of trees proposed for the site. The applicant should also create a landscape maintenance plan for the site, which should include methods to control the spread of invasive species. The applicant should create more spacing or staggering of the row of evergreen trees in front of Building 1**)

Where this comes from

Methodology & freshness

This report was assembled Jul 23, 2026, 8:45 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)