Apartment building report

2002-04 Frankford Ave

1 story5,751 sqftCMX2built 1900

Property at a glanceIndustrial building

Individual owner on record

2026 assessment
$1.1M OPA value, not a listing price
2027 published assessment
$1.3M Future roll, not the current tax bill
Neighborhood area
Fishtown · East Kensington Approximate · based on ZIP 19125
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar
Open L&I record

1 violation row marked OPEN in 1 active case

The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.

Open City history ↗
Case CF-2024-115983

Periodic Testing

IN VIOLATION

Opened Oct 30, 2024 · Latest inspection FAILED · Dec 6, 2024

  • Periodic TestingF-901.6.4

OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $1,278,100. It is not yet the billed-year tax basis.

$0$1.0M$2.0M$1.3M2021202220232024202520262027
Property assessmentAssessmentL&I violationAppealPermitInspectionCertification

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record25 events · exact dates, newest first
  1. CertificationSprinkler Certification
  2. CertificationSprinkler Certification
  3. CertificationFire Alarm Certification
  4. AppealLIRB Violation Appeal
  5. InspectionL&I investigation
  6. L&I violationPERIODIC TESTING
  7. L&I violationSUBMISSION OF DEFICIENCIES
  8. InspectionL&I investigation
  9. CertificationSprinkler Certification
  10. CertificationFire Alarm Certification
  11. PermitSign
  12. PermitSigns (Accessory / Non-Accessory)
  13. PermitAlterations
  14. PermitAddition and/or Alterations
  15. PermitAddition and/or Alteration
  16. PermitAddition and/or Alteration
  17. PermitChange of Use
  18. PermitNew Construction or Additions
  19. PermitNew Construction or Additions
  20. PermitAddition and/or Alteration
  21. PermitNew Construction
  22. PermitRough-In
  23. PermitNew Construction
  24. PermitAddition and/or Alteration
  25. PermitNew construction, addition, GFA change

Verify the public record

$3,407/year estimated property tax

2026 taxable assessment $243,400 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $1,278,100. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 881001322
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationPartial assessment exemption, basis unverified

2026 OPA taxes $243,400 of $1,083,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.

See the assessment math →
Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Where the record looks off

Conflicts in City paperwork. Flags on the data, not the property.

"Built 1900" is usually a placeholder

Philadelphia records use 1900 as a stand-in when the real construction year was never documented. Treat the age as unknown, not as 120+ years.

Building report

Apartment building

Industrial building, recorded in the City's apartments category. The public record and owner trail follow.

2 open violations

What it is
Industrial building Ind Warehouse Masonry
Owner
Individual owner on record Individual name redacted
$ / sq ft
$222 above the $147 median for 2,826 apartments parcels citywide
Corridor
Frankford and Susquehanna city commercial corridor
Interior area
5,751 sqft
Lot size
2,435 sqft
Stories
1
Built
1900
Zoning
CMX2

Block context

2000 block of Frankford Ave. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 2000 Frankford Ave  ·  2006-10 Frankford Ave

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 25 dated rows
  1. CertificationSprinkler Certification

    Certification BC-2026-015615 · Certified

    Expires 2027-05-11

  2. CertificationSprinkler Certification

    Certification BC-2025-016015 · Certified

    Expires 2026-05-15

  3. CertificationFire Alarm Certification

    Certification BC-2025-027359 · Certified

    Expires 2026-04-18

  4. AppealLIRB Violation Appeal

    Appeal HA-2024-005236 · Closed · Complete

    see attached Late Appeal

  5. InvestigationL&I investigation

    Case CF-2024-115983 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  6. ViolationPERIODIC TESTING

    Case CF-2024-115983 · Violation VI-2024-088911 · Code F-901.6.4 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  7. ViolationSUBMISSION OF DEFICIENCIES

    Case CF-2024-115983 · Violation VI-2024-088912 · Code F-901.6.4.1 · COMPLIED

    Resolution: COMPLIED - BY ENFORCEMENT ACTION City marked this violation complied with; check the resolution date and live case for what was accepted.

  8. InvestigationL&I investigation

    Case CF-2024-115983 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  9. CertificationSprinkler Certification

    Certification BC-2024-019479 · Deficient

  10. CertificationFire Alarm Certification

    Certification BC-2024-017995 · Certified

    Expires 2025-05-06

  11. PermitSign

    Permit GP-2023-005084 · Completed

    FOR THE ERECTION OF ONE (1) NON-ILLUMINATED DOUBLE-FACED PROJECTING SIGN. SIZE AND LOCATION AS PER APPROVED PLAN. SIGN ACCESSORY TO BUSINESS AND PROFESSIONAL OFFICE ON THE FIRST FLOOR OF AN EXISTING STRUCTURE.

  12. PermitSigns (Accessory / Non-Accessory)

    Permit ZP-2023-005867 · Completed

    For the issuance of one(1) non-illuminated doubled-faced projecting sign. size and location as shown in the plan.

  13. PermitAlterations

    Permit PP-2023-004374 · Completed

    Install exterior PVC storm drain line from the rear of the building to the front of the building and connect to the pre-existing storm lateral in sidewalk.

  14. PermitAddition and/or Alterations

    Permit FP-2023-000037 · Completed

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. MK Fire to relocated 30 Sprinkler heads throughout permitted area.

  15. PermitAddition and/or Alteration

    Permit EP-2022-011559 · Completed

    Supply and install 32-2x4 led lights, 7 switches, 18 receptacles and 30 dat points. All wiring in m/c cable, utilize existing service. AS PER NEC 2017

  16. PermitAddition and/or Alteration

    Permit CP-2022-005257 · Completed

    FOR LEVEL II ALTERATIONS AND CHANGE IN OCCUPANCY AT FIRST FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.

  17. PermitChange of Use

    Permit ZP-2022-010650 · Issued

    Office - Business and Professional

  18. PermitNew Construction or Additions

    Permit PP-2022-006739 · Completed

    Installing drain and water from lower unit to each fixture in the building, 9 water closet, 9 lavatories, 9 tub/shower, 5 kitchen sinks, 5 washer box, 5 water heaters.

  19. PermitNew Construction or Additions

    Permit PP-2022-007298 · Completed

    Install 6" sewer, house drain, house trap, and a 2" domestic water line

  20. PermitAddition and/or Alteration

    Permit EP-2022-005936 · Completed

    Install 600a 1ph, 120/240v main service. Install 7 gang meter module. Install all wiring throughout 5 apartments, vanilla box commercial space & common area. Install cable tv wiring as per 2017 NEC. Install fire alarm system throughout as per 2016 NFPA 72.

  21. PermitNew Construction

    Permit MP-2022-002694 · Completed

    INSTALLATION OF NEW HVAC SYSTEM FOR RESIDENTIAL PORTION OF A MIXED USE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*

  22. PermitRough-In

    Permit EP-2022-005937 · Completed

    Rough-In Permit for EP-2022-005936 Install 600a 1ph, 120/240v main service. Install 7 gang meter module. Install all wiring throughout 5 apartments, vanilla box commercial space & common area. Install cable tv wiring. Install fire alarm system throughout as per nfpa72 and 2017 nec

  23. PermitNew Construction

    Permit FP-2022-000946 · Completed

    FOR THE INSTALLATION OF A 4-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.

  24. PermitAddition and/or Alteration

    Permit CP-2021-007536 · Completed

    FOR THE ERECTION OF A TWO STORY ADDITION TO AN EXISTING ONE STORY ATTACHED STRUCTURE WITH A REAR DECK ON THE SECOND AND THIRD FOOR LEVEL. STRUCTURE FOR USE AS A VACANT COMMERCIAL SPACE ON FIRST FLOOR FRONT (SEPARATE USE PERMIT AND C.O REQUIRED PRIOR TO OCCUPANCY) AND FIVE FAMILY ( MULTI-FAMILY) HOUSEHOLD LIVING ON FIRST FLOOR REAR AND ENTIRE SECOND AND THIRD FLOOR LEVEL. TYPE B UNIT PROVIDED ON THE FIRST FLOOR LEVEL. BUILDING TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THAT START OF ANY WORK. . **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.*** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED 10/16/22 AMEND ALTERATIONS/ADDITION PERMIT CP-2021-007536 FOR CHANGES TO STRUCTURAL FRAMING AS PER APPROVED PLANS.

  25. PermitNew construction, addition, GFA change

    Permit ZP-2021-010904 · Completed

    For the erection of a two story addition over existing one story structure (maximum building height not to exceed 38 feet) with rear roof deck to use as a vacant commercial space on first floor front (separate use permit required) and five family ( multi-family) household living on first floor rear and entire second and third floors (size and location as shown on the plan).

Where this comes from

Methodology & freshness

This report was assembled Jul 24, 2026, 5:56 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)