Land report

2639 S 58th St

Property at a glanceVacant lot

Philadelphia Housing Authority

2026 assessment
$346K OPA value, not a listing price
2027 published assessment
$346K Future roll, not the current tax bill
Neighborhood area
Cedar Park · Kingsessing Approximate · based on ZIP 19143
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $345,600. It is not yet the billed-year tax basis.

$0$250K$500K$346K2016201820202022202420262027
Property assessmentAssessmentPermit

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Every dated record27 events · exact dates, newest first
  1. PermitNew Construction
  2. PermitNew Construction or Additions
  3. PermitSitework with Onsite Utility Services
  4. PermitNew Construction
  5. PermitNew Construction
  6. PermitNew Construction or Additions
  7. PermitNew Construction or Additions
  8. PermitNew Construction or Additions
  9. PermitNew Construction or Additions
  10. PermitNew Construction or Additions
  11. PermitNew Construction
  12. PermitNew Construction
  13. PermitNew Construction
  14. PermitNew Construction or Additions
  15. PermitNew Construction or Additions
  16. PermitNew Construction or Additions
  17. PermitNew Construction
  18. PermitNew Construction or Additions
  19. PermitNew Construction or Additions
  20. PermitNew Construction
  21. PermitTank Install/Removal
  22. PermitNew Construction
  23. PermitNew Construction
  24. PermitNew Construction
  25. PermitNew Construction
  26. PermitNew Construction
  27. PermitNew construction, addition, GFA change

Verify the public record

$0/year estimated property tax

2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $345,600. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 783775200
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationFull assessment exemption shown

2026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.

Historical delinquency sources Record found

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

A separate historical parcel ledger ending in 2016 records $347.00. It is shown as historical context only.

2006$347.00 total · $0.00 principal · $0.00 interest · $0.00 penalty

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Land report

Vacant land

Vacant land. Deeds, ownership, zoning, and the public-source record follow.

What it is
Vacant lot Vacant Land Commer < Acre
Owner
Philadelphia Housing Authority
Lot size
124,280 sqft
Zoning
RMX3

Block context

2600 block of S 58th St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 2601 S 58th St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 27 dated rows
  1. PermitNew Construction

    Permit FP-2026-001505 · Issued

    FOR THE INSTALLATION OF SPRINKLER HEADS AND ASSOCIATED PIPING THROUGHOUT THE SITE-CONSTRUCTED COMMUNITY SPACE ONLY. TO BE CONNECTED TO THE SPRINKLER SYSTEM THROUGHOUT THE MODULAR PORTION OF THE BUILDING AND SERVED BY A SIX (6) INCH ON-SITE FIRE SERVICE MAIN AND SIX (6) INCH BACKFLOW PREVENTER LOCATED IN A METER PIT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE CP-2024-006501 FOR ASSOCIATED BUILDING PERMIT.

  2. PermitNew Construction or Additions

    Permit PP-2026-006235 · Issued

    Plumbing Permit for combo SP-2025-001273

  3. PermitSitework with Onsite Utility Services

    Permit SP-2025-001273 · Issued

    FOR GENERAL SITEWORK AND ONSITE UTILITY SERVICES WITH AN 8 IN SANITARY PIPE, CURB TRAP FRESH AIR INLET, 3 18 IN STORM CONNECTIONS, ONE 24 IN STORM CONNECTION, 9 INLETS, 4 U G BASIN, 30 YARD DRAINS, 42 ROOF DRAINS, 4 OUTLET CONTROL STRUCTURES, 4 IN DOMESTIC WATER, THIS IS FOR 5 BUILDING BRANCH OFF, 4 IN SANT, 2 IN WATER INTO EACH BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  4. PermitNew Construction

    Permit MP-2026-000151 · Issued

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  5. PermitNew Construction

    Permit MP-2026-000119 · Issued

    FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.

  6. PermitNew Construction or Additions

    Permit PP-2025-015476 · Issued

    NEW CONSTRUCTION OF 3 STORY 17 DWELLING RESIDENTIAL MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  7. PermitNew Construction or Additions

    Permit PP-2025-015485 · Issued

    NEW CONSTRUCTION OF 3 STORY 14 RESIDENTIAL DWELLING MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  8. PermitNew Construction or Additions

    Permit PP-2025-015483 · Issued

    NEW CONSTRUCTION OF 3 STORY 15 UNIT RESIDENTIAL MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  9. PermitNew Construction or Additions

    Permit PP-2025-015482 · Issued

    NEW CONSTRUCTION OF 3 STORY 13 RESIDENTIAL DWELLING MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  10. PermitNew Construction or Additions

    Permit PP-2025-015403 · Issued

    NEW CONSTRUCTION OF 2 SOTRY MODULAR BUILDING WITH USE OF A COMMUNITY CENTER AND 5 RESIDENTIAL DWELLING UNITS. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  11. PermitNew Construction

    Permit EP-2025-009698 · Issued

    Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, (3) EV Chargers and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment as per 2017 NEC. Provide new fire alarm work within building sprinkler room as shown on shop drawings and 2016 NFPA 72. All other work within modular units is by the modular contractor and not part of this permit application All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.

  12. PermitNew Construction

    Permit EP-2025-009702 · Issued

    Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, site lighting fixtures and temporary light and power. Make final electrical connections at each modular unit. Provide new lights, devices, lighting control, power to HVAC equipment, tele-data wiring, new electrical house panels, access control, CCTV and intercom systems within community center. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings as well as new fire alarm system for community center. All other work within modular units is by the modular contractor and not part of this permit application. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.

  13. PermitNew Construction

    Permit EP-2025-009700 · Issued

    Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is by the modular contractor and not part of this permit application. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans

  14. PermitNew Construction or Additions

    Permit PP-2025-016439 · Completed

    CURB TRAPS, FAI'S, MAIN DRAINS, AND 2" WATER DISTRIBUTION

  15. PermitNew Construction or Additions

    Permit PP-2025-016483 · Issued

    Rough in Main house drain 5 in curb trap fresh air inlet and 2 in water service to the building

  16. PermitNew Construction or Additions

    Permit PP-2025-016485 · Issued

    rough in main house drain 5 in curb trap fresh air to the building

  17. PermitNew Construction

    Permit EP-2025-009697 · Issued

    Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is by the modular contractor and not part of this permit application. All work to be done according to the 2017 NEC and per approved plans. (FIRE ALARM SYSTEM IS NOT INCLUDED. )

  18. PermitNew Construction or Additions

    Permit PP-2025-015813 · Completed

    INSTALL CT, FAI, MD & 2" WDP CURB IN.

  19. PermitNew Construction or Additions

    Permit PP-2025-015818 · Issued

    INSTALL CT, FAI, MD & 2" WDP CURB IN.

  20. PermitNew Construction

    Permit EP-2025-009692 · Issued

    Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is by the modular contractor and not part of this permit application. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.

  21. PermitTank Install/Removal

    Permit GP-2025-004747 · Completed

    FOR THE REMOVAL OF ONE (1) 1,000 GALLON UNDERGROUND HEATING OIL STORAGE TANK. REMOVE ANY HEATING OIL PRODUCT/WATER FROM TANK, CLEAN TANK, CONDUCT A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTINGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED AND BACKFILL. ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES. PROVIDE THE CITY OF PHILADELPHIA WITH A TANK CLOSURE REPORT.

  22. PermitNew Construction

    Permit CP-2024-006497 · Issued

    NEW CONSTRUCTION OF A THREE (3) STORY BUILDING (BUILDING 2) FOR USE AS FIFTEEN (15) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO UTILIZE MODULAR CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**

  23. PermitNew Construction

    Permit CP-2024-006499 · Issued

    NEW CONSTRUCTION OF A THREE (3) STORY BUILDING (BUILDING 3) FOR USE AS THIRTEEN (13) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO UTILIZE MODULAR CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**

  24. PermitNew Construction

    Permit CP-2024-006501 · Issued

    NEW CONSTRUCTION OF A TWO (2) STORY BUILDING (BUILDING 5) FOR USE AS A COMMUNITY CENTER & FIVE (5) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO UTILIZE MODULAR CONSTRUCTION FOR RESIDENTIAL PORTION. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**

  25. PermitNew Construction

    Permit CP-2024-006494 · Issued

    NEW CONSTRUCTION OF A THREE (3) STORY BUILDING (BUILDING 1) FOR USE AS FOURTEEN (14) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO UTILIZE MODULAR CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**

  26. PermitNew Construction

    Permit CP-2024-006500 · Issued

    NEW CONSTRUCTION OF A THREE (3) STORY BUILDING (BUILDING 4) FOR USE AS SEVENTEEN (17) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO UTILIZE MODULAR CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**

  27. PermitNew construction, addition, GFA change

    Permit ZP-2023-010982 · Issued

    FOR THE ERECTION OF FIVE (5) DETACHED NEW STRUCTURE WITH A CELLAR. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.

Where this comes from

Methodology & freshness

This report was assembled Jul 23, 2026, 7:02 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)