House report

337 Titan St

3 stories1,646 sqftRSA5built 1920

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$449K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$250K$500KZIP 19147 (Queen Village · East Passyunk) median$436K2011201420172020202320262027
Property assessmentBlock median & rangeZIP 19147 (Queen Village · East Passyunk) medianAssessmentL&I violationAppealPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record21 events · exact dates, newest first
  1. PermitAlterations
  2. PermitAddition and/or Alteration
  3. PermitAlterations
  4. PermitAlterations
  5. PermitAddition and/or Alteration
  6. AppealZBA Permit Denial - Variance
  7. PermitNew construction, addition, GFA change
  8. InspectionCSUINITIAL
  9. L&I violationPERM - MUST POST
  10. L&I violationPERMB- WK DONE W/O NOTIFY INSP
  11. L&I violationINSURANCE - POST CERT
  12. PermitMajor alteration
  13. L&I violationWALL FRACTURED
  14. L&I violationARCHITECT/ENGINEER SERVICES
  15. L&I violationWALL BULGED
  16. InspectionCSUINITIAL
  17. PermitPlumbing
  18. PermitMechanical
  19. PermitMajor alteration
  20. PermitPlumbing
  21. PermitElectrical

Flags: 1 zoning/board appeal on record · latest deed has shared-name parties; relationship unverified. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$4,883/year estimated property tax

2026 taxable assessment $348,800 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $435,900. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 021316200
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Stories
3
Interior
1,646 sqft livable area
Lot
816 sqft
Central air
Yes
Exterior condition
Above average city code 3
Interior condition
Above average city code 3
Quality grade
C+ assessor's grade
Zoning
RSA5 city zoning code
Zoning appeals
1 Completed · Granted · 2021

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

300 block of Titan St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 335 Titan St  ·  339 Titan St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 21 dated rows
  1. PermitAlterations

    Permit PP-2024-000008 · Completed

    REPAIR/REPLACE CT & FAI.

  2. PermitAddition and/or Alteration

    Permit EP-2022-004179 · Completed

    Electrical Permit for combo RP-2021-009864

  3. PermitAlterations

    Permit PP-2022-006487 · Completed

    Plumbing Permit (Exterior Building Drainage) for combo RP-2021-009864

  4. PermitAlterations

    Permit PP-2022-006488 · Completed

    Plumbing Permit (Interior) for combo RP-2021-009864

  5. PermitAddition and/or Alteration

    Permit RP-2021-009864 · Completed

    FOR THE CONSTRUCTION OF REAR DECKS ON THE 3RD FLOOR LEVEL AND ON TOP OF THE 3RD STORY LEVEL ACCESSED FROM REAR OF 3RD FLOOR TO INCLUDE ALTERATIONS THROUGHOUT TO AN EXISTING ATTACHED STRUCTURE. FOR A SINGLE FAMILY ATTACHED HOUSE. AS PER PLANS.

  6. AppealZBA Permit Denial - Variance

    Appeal ZP-2021-008426 · Completed · Granted

    Related permit ZP-2021-008426 · PERMIT FOR THE ERECTION OF REAR DECKS ON THE 3RD FLOOR LEVEL AND ON TOP OF THE 3RD STORY LEVEL ACCESSORY TO THE EXISTING SINGLE FAMILY ATTACHED HOUSE.

  7. PermitNew construction, addition, GFA change

    Permit ZP-2021-008426 · Completed

    FOR THE ERECTION OF REAR DECKS ON THE 3RD FLOOR LEVEL AND ON TOP OF THE 3RD STORY LEVEL ACCESSORY TO THE EXISTING SINGLE FAMILY ATTACHED HOUSE.

  8. InvestigationCSUINITIAL

    Case 389512 · PASSED

    The cited inspection visit was marked passed.

  9. ViolationPERM - MUST POST

    Case 503493 · Violation 3251028 · Code A-302.8/30 · RESOLVE

  10. ViolationPERMB- WK DONE W/O NOTIFY INSP

    Case 503493 · Violation 3251027 · Code A-302.11/1 · RESOLVE

  11. ViolationINSURANCE - POST CERT

    Case 503493 · Violation 3251026 · Code A-302.8/32 · RESOLVE

  12. PermitMajor alteration

    Permit 503493 · CLOSED

    DEMO EXISTING FRONT OF HOUSE BRICK AND BACK UP WALL, REBUILD FRAMED WALL SHEATHING WITH TYVEK, INSULATION & 4" BRICK VENEER.

  13. ViolationWALL FRACTURED

    Case 389512 · Violation 2849774 · Code PM-307.1/9 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  14. ViolationARCHITECT/ENGINEER SERVICES

    Case 389512 · Violation 2849772 · Code A-304.1/1 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  15. ViolationWALL BULGED

    Case 389512 · Violation 2849773 · Code PM-307.1/8 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  16. InvestigationCSUINITIAL

    Case 389512 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  17. PermitPlumbing

    Permit 409125 · COMPLETED

    REPLACE HOUSE TRAP FAI BACKWATER CHECK VALUE

  18. PermitMechanical

    Permit 325986 · COMPLETED

    INSTALL 1 HVAC UNIT WITH ASSOCIATED DUCTWORK(SFD)

  19. PermitMajor alteration

    Permit 322962 · COMPLETED

    BUILD CLOSET, REFRAME 3RD FLOOR CEILING PER SUBMITTED PLANS. REMOVE AND REBUILD BEDROOM WALLS. FRAME KITCHEN WALLS.SINGLE FAMILY DWELLING. OMIT EXCAVATION OF BASEMENT. SRUCTURAL WORK TO BE PERFORMED ON THE THIRD FLOOR IN ACCORDANCE WITH THE ENGINEERED APPROVED PLANS. INSULATION AND VENTILATION ARE TO MEET OR EXCEED THE THE REQUIREMENTS OF THE 2009 CODES FOR THE ROOF/CEILING ASSEMBLY. NO EXISTING WALLS ARE TO BE REMOVED PRIOR TO THE ENGINEER INSPECTING THE REQUIRED STRUCTURAL WORK.

  20. PermitPlumbing

    Permit 323751 · COMPLETED

    INSTALL (2)WATER CLOSETS, (2)LAVATORIES, (2)BATHTUBS AND A KITCHEN SINK

  21. PermitElectrical

    Permit 322180 · COMPLETED

    I PERSONALLY WILL BE INSTALLING THE WORK,200AMP SERVICE AND EQUIPTMENT WIRING THRU-OUT AS PER 2008 NEC

Where this comes from

Methodology & freshness

This report was assembled Jul 24, 2026, 4:02 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)