Property report
3401 Grays Ferry Ave
Individual owner on record
10 violation rows marked OPEN in 3 active cases
The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.
Notice Of Violation
- Inspection, Testing And Maintenance
F-907.8.5 - Periodic Testing
F-901.6.4 - Hazard Identification Signs
F-5003.5
Notice Of Violation
- Fdc Locking Caps
F-912.4.1 - Inspection, Testing & Maintenance
F-901.6 - Penetrations Maintaining Protection
F-703.1 - Periodic Testing
F-901.6.4 - Suppression System Testing & Maintenance
F-903.5 - Submission Of Certifications
F-901.6.4.2
New Electrical Wiring
- New Electrical Wiring
A-301.1/50
OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.
Assessment and City record timeline
The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $3,334,600. It is not yet the billed-year tax basis.
- OPA assessment · 2026$3.3M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$3.3M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Permit · 2013-12-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-08Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-09Temporary Tents and CanopiesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-07Temporary Tents and CanopiesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-26Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-24New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-12Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-22Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-12New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-13AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-13New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-16Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-16Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-16Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-25Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-09-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-09-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-09-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-10-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-29New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-19Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-15AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-26Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-22Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-26Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-31New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-31Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-21Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-08Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-06-07New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-06-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-07-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-01New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-08Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-13Lot Line RelocationThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-14Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-21New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-21New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-29Major DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-30New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-29Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-09Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-17New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-04Fences OnlyThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-27New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-28New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-05-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-07-02Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2022-05-10INSPECTION, TESTING AND MAINTENANCEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2022-05-10PERIODIC TESTINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2022-05-10HAZARD IDENTIFICATION SIGNSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20FDC LOCKING CAPSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20INSPECTION, TESTING & MAINTENANCEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20PENETRATIONS MAINTAINING PROTECTIONA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20PERIODIC TESTINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20SUPPRESSION SYSTEM TESTING & MAINTENANCEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-07-20SUBMISSION OF CERTIFICATIONSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2023-07-20L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2023-07-20L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2023-12-19NEW ELECTRICAL WIRINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2023-12-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2022-05-11L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-01-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-07-07L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-07-08L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- License · 2022-07-14Trustees of the University of Pennsylvania: Hazardous Materials L&I license filing initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2016-09-07HEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2024-11-05HEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2005-01-28CANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2009-06-30CANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2004-04-29BROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2012-12-22BROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2001-12-26DUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2010-10-19DUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Certification · 2020-10-12Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2021-12-20Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2022-05-23Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-05-23Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-07-31Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2023-08-16Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-02-20Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-07-17Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-07-17Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-12-04Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-12-20Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-06-20Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-07-01Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-07-01Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-07-01Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Appeal · 2024-04-03ZBA Permit Denial - VarianceA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction or Additions
- PermitNew Construction
- PermitNew Construction
- CertificationSpecial Hazards Certification
- PermitFences Only
- PermitNew Construction or Additions
- PermitAddition and/or Alteration
- PermitSitework with Onsite Utility Services
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- InspectionL&I investigation
- InspectionL&I investigation
- CertificationFire Alarm Certification
- CertificationFire Alarm Certification
- CertificationFire Alarm Certification
- PermitNew construction, addition, GFA change
- CertificationSpecial Hazards Certification
- PermitMajor Demolition
- PermitAlterations
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- LicenseHEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license marked inactive
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- PermitAddition and/or Alterations
- AppealZBA Permit Denial - Variance
- PermitNew construction, addition, GFA change
- PermitNew construction, addition, GFA change
- CertificationSpecial Hazards Certification
- InspectionL&I investigation
- L&I violationNEW ELECTRICAL WIRING
- InspectionL&I investigation
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitLot Line Relocation
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- CertificationSprinkler Certification
- PermitTank Install/Removal
- PermitNew construction, addition, GFA change
- CertificationFire Alarm Certification
- L&I violationFDC LOCKING CAPS
- L&I violationINSPECTION, TESTING & MAINTENANCE
- L&I violationPENETRATIONS MAINTAINING PROTECTION
- L&I violationPERIODIC TESTING
- L&I violationSUPPRESSION SYSTEM TESTING & MAINTENANCE
- L&I violationSUBMISSION OF CERTIFICATIONS
- InspectionL&I investigation
- InspectionL&I investigation
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitNew Construction or Additions
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitRough-In
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction or Additions
- PermitSitework with Onsite Utility Services
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- LicenseTrustees of the University of Pennsylvania: Hazardous Materials L&I license filing initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- CertificationSprinkler Certification
- InspectionL&I investigation
- L&I violationINSPECTION, TESTING AND MAINTENANCE
- L&I violationPERIODIC TESTING
- L&I violationHAZARD IDENTIFICATION SIGNS
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alterations
- PermitNew construction, addition, GFA change
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitNew Construction or Additions
- PermitNew Construction or Additions
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- CertificationSprinkler Certification
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitRough-In
- PermitAlterations
- PermitNew Construction
- PermitAlterations
- PermitRough-In
- PermitAddition and/or Alteration
- PermitTemporary Tents and Canopies
- PermitTemporary Tents and Canopies
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitAddition and/or Alteration
- LicenseHEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license initially issued
- PermitNew Construction
- LicenseBROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license marked inactive
- LicenseDUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing marked inactive
- LicenseCANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license marked inactive
- LicenseCANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license initially issued
- LicenseBROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license initially issued
- LicenseDUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing initially issued
Verify the public record
Property tax
$22,629/year estimated property tax
2026 taxable assessment $1,616,614 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $3,334,600. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 7730000072026 OPA taxes $1,616,614 of $3,334,600 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.
See the assessment math →Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Property report
Commercial property
Commercial, recorded in the City's commercial category. The public record and owner trail follow.
10 open violations
Block context
3400 block of Grays Ferry Ave. Compare parcels, ownership, and public-record history.
See the whole block →Next door: 3401r Grays Ferry Ave · 3400 Grays Ferry Ave
L&I license dates · data through Jul 29, 2026
Business licenses at this address Latest pull
What L&I has registered at this OPA parcel, newest initial license date first.
Food Preparing and Serving · Initial issue date Sep 7, 2016 · Terminal license date Nov 5, 2024
Food Establishment, Retail Permanent Location · Initial issue date Jan 28, 2005 · Terminal license date Jun 30, 2009
Food Preparing and Serving (30+ SEATS) · Initial issue date Apr 29, 2004 · Terminal license date Dec 22, 2012
A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.
Open every source row 159 dated rows
- PermitAddition and/or Alterations
Permit FP-2026-000293 · Issued
INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 6" SERVICE LINE, THROUGHOUT A DETACHED UTILITY SUBSTATION. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK
- PermitAddition and/or Alteration
Permit EP-2026-003733 · Completed
Installation of a 100amp feed 480 volt from adjacent building ECR to transit garage, to a 45kva transformer 480/208-120 volt mounted in garage. This transformer will feed a 200 amp main breaker panel 30 circuit. Mount (4) blink MQ 200 Fleet chargers located in parking garage 5 feet from entrance. Install (4) 50amp 2pole circuit breakers to feed charger stations. Install submetering for this panel. All work to be done according to the 2017 NEC and per approved plans.
- PermitNew Construction
Permit EP-2026-004256 · Issued
Provide labor & material for Control Wiring to install all SSI supplied devices, modules, relays ,key switches, bell, horn & Control panel for Preaction System as per drawing Page 1-3 & equipment counts for substation room 1785 dated 2/4/26 as per 2016 NFPA 72. All wiring to be installed using EMT conduit. Excludes line voltage to panel. Hi Reach rental fees are included.
- PermitNew Construction
Permit EP-2026-001366 · Issued
Install owner furnished medium voltage switchgear, MV switches, MV transformers, DC battery rack system, power panels, lighting, receptacles, FA devices, data devices, conduit, and cabling in the new substation building. all work per approved plans NEC 2017
- PermitNew Construction or Additions
Permit PP-2025-016331 · Issued
NEW CONSTRUCTION OF COMMERCIAL SUBSTATION. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE BASE VENTING CCODE. ALL MATERIALS UTILIZED SHALL BE METALLIC. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- PermitNew Construction
Permit MP-2025-006519 · Issued
FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AND PIPING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-005927 FOR ASSOCIATED BUILDING PERMIT.
- PermitNew Construction
Permit CP-2025-005927 · Issued
NEW CONSTRUCTION OF A DETACHED ONE (1) STORY BUILDING FOR USE AS A UTILITY SUBSTATION AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- CertificationSpecial Hazards Certification
Certification BC-2025-032824 · Certified
Expires 2026-12-09
- PermitFences Only
Permit ZP-2025-010340 · Issued
FOR REMOVAL OF THE OLD FENCE AND REPLACE IT WITH NEW FENCE ON THE SAME LOCATION. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
- PermitNew Construction or Additions
Permit PP-2025-013270 · Issued
Plumbing Permit for combo SP-2025-000651 INSTALLATION OF EXTERIOR STORMWATER CONVEYANCE PIPING, DOMESTIC PIPING, AND SANITARY PIPING PER APPROVED PLANS. METALLIC PIPING TO BE USED WHERE SPECIFED IN CODE AND PER PLANS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC
- PermitAddition and/or Alteration
Permit EP-2025-004922 · Issued
Provide temporary 13.2KVA high voltage from PECO service manhole service access and PECO selector switch and run aerial cable on (11) telephone poles to new 4 section 1000 amp 13.2 to 480v Switchgear. In addition, install 8-way telecommunication duct bank around the perimeter of the property as per 2017 NEC.
- PermitSitework with Onsite Utility Services
Permit SP-2025-000651 · Issued
FOR SITE WORK AND GENERAL EARTH DISTURBANCE IN ASSOCIATION WITH INSTALLATION OF ON-SITE UTILITIES (STORMWATER CONVEYANCE PIPING, DOMESTIC PIPING, AND SANITARY PIPING) AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR PLUMBING WORK.
- PermitAddition and/or Alteration
Permit EP-2025-008849 · Completed
Install lighting and receptacles. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. AMENDMENT: INSTALL FIRE ALARM ACCORDING TO APPROVED DRAWINGS-2017 NEC ,2016 NFPA-72.
- PermitAddition and/or Alterations
Permit FP-2025-001994 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 13 sprinkler heads
- PermitAddition and/or Alterations
Permit MP-2025-004228 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2025-004054 · Completed
LEVEL II INTERIOR ALTERATIONS FOR FIT-OUT OF 1ST FLOOR LAB SUITE 107 IN EXISTING HIGHER EDUCATIONAL RESEARCH FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. FOR USE AS A BUSINESS OCCUPANCY. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- InvestigationL&I investigation
Case CF-2023-127424 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-127424 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- CertificationFire Alarm Certification
Certification BC-2025-017910 · Certified
Expires 2026-07-01
- CertificationFire Alarm Certification
Certification BC-2025-017909 · Certified
Expires 2026-07-01
- CertificationFire Alarm Certification
Certification BC-2025-017911 · Certified
Expires 2026-07-01
- PermitNew construction, addition, GFA change
Permit ZP-2025-005206 · Issued
FOR THE DEMOLITION OF MULTIPLE BUILDING (LOCATION PER APPROVED PLAN). FOR ERECTION OF A ONE-STORY DETACHED STRUCTURE (SUBSTATION) AND RELOCATION OF 6 ADA PARKING SPACE AND ADDITION OF 2 ADA PARKING SPACE. SIZE AND LOCATION AS SHOWN ON THE APPROVED PLAN.
- CertificationSpecial Hazards Certification
Certification BC-2025-017493 · Certified
Expires 2026-06-20
- PermitMajor Demolition
Permit DP-2025-000215 · Issued
COMPLETE DEMOLITION OF SEVEN DETACHED BUILDINGS ONE AND TWO-STORY, MASONRY, CONCRETE, STEEL AND WOOD COMMERCIAL BUILDINGS (220, 230, 240, 260, 270, 280 290) AND ASSOCIATED COOLING TOWERS AND EQUIPMENT BY MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.
- PermitAlterations
Permit PP-2025-004313 · Completed
LATERAL SEAL
- CertificationSpecial Hazards Certification
Certification BC-2025-000739 · Certified
Expires 2025-12-20
- CertificationSpecial Hazards Certification
Certification BC-2024-032942 · Certified
Expires 2025-12-04
- License terminal eventHEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license marked inactive
License 713399 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- CertificationSprinkler Certification
Certification BC-2024-026152 · Certified
Expires 2025-07-17
- CertificationSprinkler Certification
Certification BC-2024-026151 · Deficient
- PermitAddition and/or Alterations
Permit FP-2023-002735 · Completed
New backflow device for 12" fire line as per approved plans.
- AppealZBA Permit Denial - Variance
Appeal HA-2024-000226 · In Process · Complete
Related permit ZP-2023-010758 · Permit for the erection of a detached structure (w/roof decks), size and location as shown on plan/application; see ZP-2023-010100 for unity-of-use permit; see ZP-2023-006073 for lot adjustment permit; see ZP-2023-002922 for proposed parki
- PermitNew construction, addition, GFA change
Permit ZP-2023-010758 · Issued
**THIS PERMIT FOR PHASES 1 & 2 COMBINED; SEE MI-2024-000272 FOR VARIANCE** For the erection of a detached structure (w/roof decks), size and location as shown on plan/application; see ZP-2023-010100 for unity-of-use permit; see ZP-2023-006073 for lot adjustment permit; see ZP-2023-002922 for proposed parking garage.
- PermitNew construction, addition, GFA change
Permit ZP-2023-010752 · Issued
**THIS PERMIT FOR PHASE 1 ONLY** For the erection of a detached structure (w/roof decks), size and location as shown on plan/application; see ZP-2023-010100 for unity-of-use permit; see ZP-2023-006073 for lot adjustment permit; see ZP-2023-002922 for proposed parking garage.
- CertificationSpecial Hazards Certification
Certification BC-2024-005959 · Certified
Expires 2025-02-20
- InvestigationL&I investigation
Case CF-2023-127424 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- ViolationNEW ELECTRICAL WIRING
Case CF-2023-127424 · Violation VI-2023-097220 · Code A-301.1/50 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2023-127424 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alteration
Permit EP-2023-009591 · Completed
install pre action system : Install new SSI supplied devices, (1) PACP, (4) Smokes detectors, (1), Pull Station (3) Bells, (2) Relay Modules. All work in accordance with the 2017 nec.
- PermitChange of Use
Permit ZP-2023-010100 · Issued
Unity of Use
- PermitLot Line Relocation
Permit ZP-2023-006073 · Issued
For the lot adjustment to create two (2) lots (Parcels "A" and "B" on survey) from one (1) existing lot (3401 GRAYS FERRY AVE), size and location as shown on plan/application.
- CertificationSprinkler Certification
Certification BC-2024-011288 · Deficient
- CertificationSprinkler Certification
Certification BC-2024-011309 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011308 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011303 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011304 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011296 · Deficient
- CertificationSprinkler Certification
Certification BC-2024-011651 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011298 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011294 · Deficient
- CertificationSprinkler Certification
Certification BC-2024-011301 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011307 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011293 · Deficient
- CertificationSprinkler Certification
Certification BC-2024-011305 · Certified
Expires 2024-08-16
- CertificationSprinkler Certification
Certification BC-2024-011310 · Certified
Expires 2024-08-16
- PermitTank Install/Removal
Permit GP-2023-005328 · Completed
REMOVAL OF ONE (1) 2,000 GALLON UNDERGROUND STORAGE HEATING OIL TANK. ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.
- PermitNew construction, addition, GFA change
Permit ZP-2023-002922 · Issued
FOR THE DEMOLITION OF SEVEN(7) EXISTING BUILDING ON LOT ; FOR THE ERECTION OF ONE(1) STRUCTURE ON THE SAME LOT ALL EXISTING STRUCTURES REMAINS. FOR THE CREATION OF ACCESSORY PARKING GARAGE FOR EIGHT HUNDRED AND FIFTY EIGHT(558) SPACE SINCLUDING WITH SIXTEEN(16) ACCESSIBLE SPACES, THREE(3) VANACCESSIBLE SPACES, EIGHTEEN(18) COMPLACR SPACES AND WITH 56 BICYCLE SPACES FROM FIRST FLOOR THROUGH TENTH(10TH ) FLOORS. ON THE SAME LOT TOTAL 1,663 PARKING SPACES AND 104 BICYCLE SPACES ) SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
- CertificationFire Alarm Certification
Certification BC-2023-015835 · Certified
Expires 2024-07-31
- ViolationFDC LOCKING CAPS
Case CF-2023-069958 · Violation VI-2023-053282 · Code F-912.4.1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationINSPECTION, TESTING & MAINTENANCE
Case CF-2023-069958 · Violation VI-2023-053283 · Code F-901.6 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationPENETRATIONS MAINTAINING PROTECTION
Case CF-2023-069958 · Violation VI-2023-053284 · Code F-703.1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationPERIODIC TESTING
Case CF-2023-069958 · Violation VI-2023-053285 · Code F-901.6.4 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationSUPPRESSION SYSTEM TESTING & MAINTENANCE
Case CF-2023-069958 · Violation VI-2023-053286 · Code F-903.5 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationSUBMISSION OF CERTIFICATIONS
Case CF-2023-069958 · Violation VI-2023-053287 · Code F-901.6.4.2 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2023-069958 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2022-042228 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alterations
Permit FP-2023-001412 · Completed
Modify (11) sprinklers in existing wet system per NFPA 13 to accommodate new floor layout as per approved plans.
- PermitAddition and/or Alteration
Permit EP-2023-003666 · Completed
INSTALL PANELS & FEEDERS,TRANSFORMERS & METERS. PROVIDE POWER TO THE MRI EQUIPMENT. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLES, FLOOR BOXES & CONDUITS & PULL STRINGS. PROVIDE POWER FOR THE MECHANICAL, & HVAC EQUIPMENT. PROVIDE POWER TO THE HEAT TRACE, SUMP PUMP PANELS & EPO EQUIPMENT. INSTALL ADDITIONAL FIRE ALARM DEVICES ON THE EXISTING FIRE ALARM SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC & 2016 NFPA-72.
- PermitNew Construction or Additions
Permit PP-2023-006326 · Completed
INSTALL 2 INCH WATER SERVICE, 1 BUILDING DRAIN, 1 MOP SINK, 1 BACKFLOW PREVENTER, 2 KITCHEN SINKS, 1 SUMP PUMP AND 2 FLOOR DRAINS ACCORDING TO THE 2018 PPC AND PER PLANS.
- CertificationSpecial Hazards Certification
Certification BC-2023-011257 · Certified
Expires 2024-05-23
- PermitAddition and/or Alterations
Permit FP-2023-001025 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (35) sprinkler heads to accommodate interior alterations in building 250, 1st floor
- PermitNew Construction
Permit MP-2023-001754 · Completed
FOR THE INSTALLATION OF A VRF SYSTEM AND ELECTRIC HUMIDIFIERS SERVING A MRI ROOM AND SURROUNDING OFFICE SPACES. INSTALLATION INCLUDES CHILLED WATER PIPING FOR MRI FROM ROOFTOP CHILLERS, REFRIGERANT PIPING FOR VRF SYSTEM, CONDENSATE PIPING FOR FAN COIL UNITS, AND GRILLES / REGISTERS / DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE CP-2023-000822 FOR ASSOCIATED BUILDING FIT-OUT PERMIT.
- PermitRough-In
Permit EP-2023-003697 · Completed
Rough-In Permit for EP-2023-003666 MacDonald Electric will provide panels feeders and devices per the electrical drawings. MacDonald Electric will furnish and install all new lighting and controls per the drawings. MacDonald electric will provide additional fire alarm devices as shown. As per 2017 nec and nfpa 72
- PermitAddition and/or Alteration
Permit EP-2023-002788 · Completed
INSTALL (2) 100 AMP PANELS & FEEDERS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, & RECEPTACLES. PROVIDE POWER FOR THE MECHANICAL & HVAC EQUIPMENT. RELOCATE EXISTING & INSTALL NEW FIRE ALARM DEVICES ON THE EXISTING FIRE ALARM SYSTEM. ALL WORK IN ACCORDANCE WITHTHE 2017 NEC & 2016 NFPA-72.
- PermitAddition and/or Alteration
Permit CP-2023-000822 · Completed
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FIRST FLOOR OF AN EXISTING RESEARCH LAB BUILDING (BLDG 250) TO INSTALL AN MRI AND ASSOCIATED OFFICE SPACE AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitNew Construction or Additions
Permit PP-2023-004302 · Completed
Plumbing Permit for combo SP-2023-000150
- PermitSitework with Onsite Utility Services
Permit SP-2023-000150 · Completed
FOR SITE WORK INCLUDING EXCAVATION FOR UTILITY SERVICES AS PER PLANS.
- PermitAddition and/or Alterations
Permit MP-2023-001050 · Completed
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW LAB LAYOUT ON THE SECOND FLOOR OF AN EXISTING RESEARCH FACILITY AS PER APPROVED PLANS. *2018 IMC REVIEW*
- PermitAddition and/or Alterations
Permit FP-2023-000722 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating (33) sprinkler heads to accommodate layout changes in 2nd floor units 250-260
- PermitAddition and/or Alteration
Permit CP-2023-000356 · Completed
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 2ND FLOOR LEVEL OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAlterations
Permit PP-2023-002654 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alterations
Permit FP-2022-002875 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (162) fire sprinklers from existing branch line outlets to accommodate new wall & ceiling layout.
- PermitAddition and/or Alterations
Permit MP-2022-004735 · Completed
FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE CP-2022-004341 FOR ASSOCIATED BUILDING ALTERATIONS PERMIT.
- PermitAddition and/or Alteration
Permit EP-2022-007972 · Completed
Electrical fitout for the fourth(4th fl) building 250 . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. ** FIRE ALARM PORTION IS APPROVED UNDER A SEPARATE PERMIT&DRAWINGS,BOTH ARE BY MADDEN ELECTRIC**
- PermitAddition and/or Alteration
Permit EP-2022-008186 · Completed
Provide (14) 1x4 light fixtures, (1) wall sconce, (2) exit signs, (3) ceiling sensors, (2) switches, and clean and relamp (10) existing light fixtures. Provide (5) duplex outlets, (1) weatherproof outlet, power to motorized damper, power to AHU and condenser, and (1) panelboard. Fire alarm work includes (2) pull stations, (4) horn strobes, and (1) smoke detector with remote indicator . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- PermitAddition and/or Alterations
Permit MP-2022-004218 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, FAN COIL UNITS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitAddition and/or Alteration
Permit EP-2022-008422 · Completed
INSTALL FIRE ALARM SYSTEM ON FOURTH FLOOR smokes, and av devices as per 2016 NFPA 72.
- PermitAlterations
Permit PP-2022-011299 · Completed
INSTALL 10 LAB SINKS AND 1 KITCHEN SINK ACCORDING TO THE 2018 PPC.
- PermitAddition and/or Alteration
Permit CP-2022-004341 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO ROOM 118 IN AN EXISTING ANIMAL TRAINING CENTER (BLDG 6470) AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- PermitAddition and/or Alteration
Permit CP-2022-004100 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FOURTH FLOOR OF AN EXISTING RESEARCH LABORATORY FACILITY (BUILDING 250) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alterations
Permit MP-2022-002995 · Completed
FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE PHOENIX AIR VALVES, VRF FAN COIL UNITS, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK.
- License issue eventTrustees of the University of Pennsylvania: Hazardous Materials L&I license filing initially issued
License 900679 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2022-006017 · Completed
Install (26) light fixture, (3) exit, (18) switch, (85) receptacle, (6) equipment power, (1) 208/120 volt panel Fire Alarm: install (5) horn/strobe, (1) module (1) power supply as per 2017 NEC and NFPA 72
- PermitAddition and/or Alterations
Permit FP-2022-001588 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2022-001645) RELOCATE (16) FIRE SPRINKLER HEADS ON SECOND FLOOR LAB SUITE 210
- PermitAlterations
Permit PP-2022-008214 · Completed
INSTALLATION OF FOUR FIXTURES AS PER PPC 2018
- CertificationSprinkler Certification
Certification BC-2023-003233 · Deficient
- InvestigationL&I investigation
Case CF-2022-042228 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- ViolationINSPECTION, TESTING AND MAINTENANCE
Case CF-2022-042228 · Violation VI-2022-032308 · Code F-907.8.5 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationPERIODIC TESTING
Case CF-2022-042228 · Violation VI-2022-032307 · Code F-901.6.4 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationHAZARD IDENTIFICATION SIGNS
Case CF-2022-042228 · Violation VI-2022-032309 · Code F-5003.5 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- PermitAddition and/or Alteration
Permit CP-2022-001645 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR FIT-OUT OF SECOND FLOOR LAB SUITE 210 IN EXISTING HIGHER EDUCATIONAL RESEARCH FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2022-000275 · Completed
Install smoke detectors, audio/visual notification appliances and strobes .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS. 2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE. As per NFPA 72
- PermitAddition and/or Alteration
Permit EP-2022-000593 · Completed
Furnish and Install 201 CAT 6 plenum 4 pair station cables Furnish and install 6 rated cable supports Furnish and install 5 48-port CAT 6 patch panels in existing rack space Furnish and install a 6 strand single optical fiber between south rack and north rack as per 2017 nec
- PermitAlterations
Permit PP-2021-023050 · Completed
Expansion of 3rd floor existing lab to include the sanitary,domestic and vent piping with connections to the existing outlets. To include 3 Kitchen sinks and 8 Lab sinks.
- PermitAddition and/or Alterations
Permit MP-2021-007946 · Completed
For fitout for space per plans utilizing VRF Indoor Units, connected to existing Branch Selector Boxes and Condensers as per plans.
- PermitAddition and/or Alterations
Permit FP-2022-000020 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (120) fire sprinkler heads to accommodate new wall & ceiling layout on 3rd Fl. (CP-2021-008624)
- PermitAddition and/or Alteration
Permit EP-2021-014404 · Completed
Install lights, receptacles, switches and power to HVAC. Install panels as per 2017 NEC
- CertificationSpecial Hazards Certification
Certification BC-2022-000055 · Certified
Expires 2022-12-20
- PermitAddition and/or Alterations
Permit FP-2021-003654 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (37) Fire Sprinkler Heads Suite 100 - (1st floor) (CP-2021-005837)
- PermitNew construction, addition, GFA change
Permit ZP-2021-011645 · Completed
FOR COMPLETE DEMOLITION OF FOUR (4) EXISTING ONE-STORY STRUCTURE AND ERECTION OF ONE (1) DETACHED STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN.
- PermitAddition and/or Alteration
Permit CP-2021-008624 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR EXPANSION OF EXISTING THIRD FLOOR LABORATORY SUITE AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2021-013195 · Completed
Install 53 light fixtures, 7 exit lights, 13 switches, 77 receptacles, 2 furniture feeds, 8 equipment power, 1 208/120 volt panel as per 2017 NEC. Fire Alarm: Install 13 horn/strobes, 1 smoke detector, 2 relays, and 1 NAC panel as per 2016 NFPA 72.
- PermitAddition and/or Alterations
Permit MP-2021-006585 · Completed
FOR MECHANICAL ALTERATIONS TO EXISTING OFFICE SPACE TO INCLUDE NEW AC'S, VAV AIR TERMINALS, WITH ASSOCIATED REGISTERS/DIFFUSERS AND DUCTWORK, AS PER APPROVED PLANS.
- PermitAlterations
Permit PP-2021-017475 · Completed
Plumbing work for lab/office fit out sanitary ,domestic and vent connection will tie into existing utilities. Fixtures to include 2-Cup sinks,1-Lab Sink and 1-pantry Sink
- PermitAddition and/or Alteration
Permit CP-2021-005837 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR ALTERATIONS TO LAB/OFFICE SPACE ON THE FIRST FLOOR OF AN EXISTING HIGHER EDUCATIONAL FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit CP-2021-005776 · Expired
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR ALTERATIONS TO LAB/OFFICE SPACE ON THE 2ND FLOOR OF AN EXISTING HIGHER EDUCATIONAL FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alterations
Permit MP-2021-001969 · Completed
FOR THE INSTALLATION/FIT-OUT OF AN HVAC MECHANICAL SYSTEM TO NEW LAB/OFFICE SPACE, INCLUDING DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2021-001971 · Completed
FOR THE INSTALLATION OF HVAC APPLIANCES, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATION.
- PermitAddition and/or Alterations
Permit MP-2021-001970 · Completed
FOR THE INSTALLATION OF HVAC APPLIANCES, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATION.
- PermitAddition and/or Alteration
Permit EP-2021-003481 · Completed
Renovation to existing space: Install (32) lights, (9) switch, (42) receptacle, (4) equipment power, (1) 208/120 volt panel as per 2017 NEC. Install (14) fire alarm device as per drawings and 2016 NFPA 72.
- PermitAddition and/or Alteration
Permit EP-2021-003477 · Completed
Renovation to existing space: Install (32) lights, (9) switch, (42) receptacle, (4) equipment power, (1) 208/120 volt panel, (14) fire alarm devices as PER APPROVED DRAWINGS -2017 NEC AND 2016 NFPA-72.
- PermitAddition and/or Alterations
Permit FP-2021-000816 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (16) fire sprinkler heads from existing branch line outlets to accommodate new wall & ceiling layout. 2nd floor, building 250. Suite 200 (CP-2021-000989)
- PermitAddition and/or Alterations
Permit FP-2021-000815 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (37) fire sprinkler heads from existing branch line outlets to accommodate new wall & ceiling layout. Building 250, third floor suite 330/340. (CP-2021-001022)
- PermitAddition and/or Alterations
Permit FP-2021-000827 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (19) fire sprinkler heads from existing branch line outlets to accommodate new wall & ceiling layout. Building 250 , suite 220 (CP-2021-000999)
- PermitAddition and/or Alteration
Permit EP-2021-003482 · Completed
Renovation to existing space: Install (36) lights, (9) switch, (29) receptacle, (6) equipment power, (1) 208/120 volt panel, (13) fire alarm devices as per APPROVED DRAWINGS 2017 NEC AND 2016 NFPA-72.
- PermitAlterations
Permit PP-2021-004769 · Completed
Plumbing work for a Lab fit out to consist of 2- Lab sinks,1-cup sink, and 1-Kitchen sink
- PermitNew Construction or Additions
Permit PP-2021-004773 · Completed
Alterations: Interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
- PermitNew Construction or Additions
Permit PP-2021-004774 · Completed
Plumbing work for a Lab fit out consisting of 4-Lab sinks and 1-cup sink.
- PermitAddition and/or Alteration
Permit CP-2021-000989 · Completed
FOR INTERIOR ALTERATIONS ON THE 2ND FLOOR OF AN EXISTING STRUCTURE, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2021-000999 · Completed
FOR INTERIOR ALTERATIONS ON THE SECOND FLOOR OF AN EXISTING STRUCTURE, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2021-001022 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING THIRD FLOOR LABORATORY SPACE WITHIN AN EXISTING EDUCATIONAL RESEARCH FACILITY (BUILDING 250) AS PER APROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAlterations
Permit PP-2021-001063 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alterations
Permit FP-2020-002650 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2020-006031) Relocate (9) Sprinkler Heads Throughout 3rd Floor
- PermitAddition and/or Alteration
Permit EP-2020-011044 · Completed
ADD NEW DEVICES TIE INTO EXISTING FIRE ALARM SYSTEM AS PER APPROVED DRAWINGS-2016 NFPA 72
- PermitAddition and/or Alterations
Permit MP-2020-006144 · Completed
REMOVAL AND INSTALLATION OF HVAC SYSTEM IN SUITE 318, BUILDING 197. ALL WORK DONE IN ACCORDANCE WITH APPROVED PLANS.
- PermitAddition and/or Alteration
Permit EP-2020-010868 · Completed
Install one 100 AMP Panel Install new fixtures, switches and receptacles As per 2017 nec
- PermitAddition and/or Alteration
Permit CP-2020-006031 · Completed
For level II alteration without change of occupancy classification at the ground floor of building #97 at the Pennovation Complex to create an office space accessory to existing research and development center as per approved plans. Separate permits required for M.E.P.S work. See AP#1002889 for the recent renovation to the building and asbestos report.
- CertificationSprinkler Certification
Certification BC-2020-000652 · Certified
Expires 2021-10-12
- PermitAddition and/or Alteration
Permit EP-2020-008060 · Completed
Installation of security systems consisting of 4 Card access panels, 6 Card Readers, 8 door contacts, 4 Rex Motions, 34 CCTV cameras as per 2017 nec
- PermitNew Construction
Permit EP-2020-000187 · Completed
PROVIDE THE SERVICE,SWITCH GEAR AND PANEL BOARDS, PROVIDE A 400KW EMERGENCY GENERATOR AND TRANSFER SWITCHES, PROVIDE BRANCH CIRCUIT POWER FOR THE LIGHTS , RECEPTACLES EXTERIOR LIGHTING,,ELEVATOR AND MECHANICAL EQUIPMENT,LIGHTNING PROTECTION SYSTEM. PROVIDE SERVICE FOR THE FIRE PUMP. INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT AS PER THE 2017NEC, 2016 NFPA-72 AND NFPA-20.
- PermitNew Construction
Permit 1043919 · Completed
FOR INSTALLTION OF A NEW WET FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 STANDARDS WITH A 6 INCH FIRE SERVICE LINE, STANDPIPES AND SPRINKLER LAYOUT AS PER PLANS. SYSTEM WILL BE BOOSTED WITH AN ELECTRIC FIRE PUMP LOCATED IN THE FIRE PUMP ROOM
- PermitRough-In
Permit EP-2020-001478 · Completed
Rough-In for EP-2020-000187
- PermitAlterations
Permit 1042304 · Expired
INSTALL 5-5" RAIN LEADERS INTO EXISTING MAIN. INSTALL 3-6" SANITARY LINES INTO EXISTING SEWER MAIN PER 2018 PHILA PLUMBING CODE
- PermitNew Construction
Permit 1034546 · Completed
FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE UNIT HEATERS, HEAT PUMPS, AIR HANDLING UNITS, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAlterations
Permit 1022178 · Completed
PLUMBING WORK FOR CORE AND SHELL BASE BUILDING TO INCLUDE THE FOLLOWING FIXTURE COUNT 4-MR 16LAV 20W/C 4EWC 1SINK 11FD 5FS
- PermitRough-In
Permit 1030658-RI · Expired
NEW 1600A PECO SERVICE SWITCH GEAR AND DISTIBUTION WITH 300KW GENERATOR STANDBY POWER NEW LIGHTING POWER AND MECHANICAL LOADS ALL PER DRAWING SUBMITTAL FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM AND DEVICES PER DRAWING SUBMITTAL. NEW 1600A PECO SERVICE SWITCH GEAR AND DISTIBUTION WITH 300KW GENERATOR STANDBY POWER NEW LIGHTING POWER AND MECHANICAL LOADS ALL PER DRAWING SUBMITTAL FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM AND DEVICES PER DRAWING SUBMITTAL.
- PermitAddition and/or Alteration
Permit 1002889 · Completed
FOR THE PARTIAL DEMOLITION OF MINOR ONE-STORY ENTRANCE AND FOR LEVEL 3 ALTERATIONS TO AN EXISTING 4-STORY BUILDING USED AS FOR EXISTING RESEARCH AND DEVELOPMENT CENTER. BUILDING TO BE FULLY SPRINKLERED. ASBESTOS TO BE REMOVED PRIOR TO THE START OF THE WORK. SEPARATE PERMITS REQUIRED FOR MEPS WORK.
- PermitTemporary Tents and Canopies
Permit 26611 · Completed
- PermitTemporary Tents and Canopies
Permit 26407 · Completed
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 964718 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. . Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations.
- PermitAddition and/or Alteration
Permit 789888 · Issued
FOR INTERIOR ALTERATIONS TO EXISTING LABORATORY TO INCLUDE NEW INTERIOR PARTITIONS, NEW PLATFORM AND NEW FIBERGLASS TANK, AS PER APPROVED PLANS. **ABATEMENT OF ASBESTOS REQUIRED PRIOR TO START OF WORK**
- License issue eventHEATHLAND HOSPITALITY GROUP: Food Preparing and Serving business license initially issued
License 713399 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitNew Construction
Permit 507791 · Expired
INSTALLATION OF CONTROL SYSTEM INCLUDING 3 PNL,7 MONITOR MODULES,6 VENT CONTROLLERS,3 CURTAIN CONTROLLERS,1 WEATHER STATION,(16) 18/2 DRY CONTACT CONNECTIONS INSTALLATION OF 18/2 AND 18/3 LOW VOLTAGE CABLE ONLY PER 2008 NEC (GREENHOUSE)*ALL POWER BY
- License terminal eventBROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license marked inactive
License 209458 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License terminal eventDUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing marked inactive
License 281217 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License terminal eventCANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license marked inactive
License 199654 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventCANTEEN CORPORATION: Food Establishment, Retail Permanent Location business license initially issued
License 199654 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventBROCK & COMPANY INC: Food Preparing and Serving (30+ SEATS) business license initially issued
License 209458 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventDUPONT E I DENEMOURS & CO: Dumpster License - Private Property L&I license filing initially issued
License 281217 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 30, 2026, 1:29 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)
