Property report

4101 Market St

Property at a glanceVacant lot

University Place Associat

2026 assessment
$96M OPA value, not a listing price
2027 published assessment
$89M Future roll, not the current tax bill
Neighborhood area
University City · West Powelton Approximate · based on ZIP 19104
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar
Open L&I record

3 violation rows marked OPEN in 1 active case

The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.

Open City history ↗
Case CF-2026-027181

Notice Of Violation

IN VIOLATION

Opened Mar 24, 2026 · Latest inspection FAILED · Jun 2, 2026

  • Suppression System Testing & MaintenanceF-903.5
  • Periodic TestingF-901.6.4
  • Fdc Inspection, Testing & MaintenanceF-912.7
Open the City notice and correction details ↗

OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.

Assessment and City record timeline

The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.

Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $89,056,800. It is not yet the billed-year tax basis.

$0$50M$100M$89M2000200520102015202020252027
Property assessmentAssessmentL&I violationAppealPermitInspectionLicenseCertification

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record59 events · exact dates, newest first
  1. PermitAddition and/or Alterations
  2. PermitRough-In
  3. PermitRough-In
  4. PermitAddition and/or Alterations
  5. InspectionL&I investigation
  6. InspectionL&I investigation
  7. PermitAddition and/or Alteration
  8. PermitAlterations
  9. L&I violationSUPPRESSION SYSTEM TESTING & MAINTENANCE
  10. L&I violationPERIODIC TESTING
  11. L&I violationFDC INSPECTION, TESTING & MAINTENANCE
  12. InspectionL&I investigation
  13. PermitAddition and/or Alterations
  14. PermitAddition and/or Alteration
  15. CertificationSprinkler Certification
  16. PermitAddition and/or Alteration
  17. PermitChange of Use
  18. PermitAlterations
  19. PermitAddition and/or Alteration
  20. PermitAddition and/or Alteration
  21. PermitRough-In
  22. PermitAddition and/or Alterations
  23. PermitAddition and/or Alterations
  24. PermitAntenna
  25. PermitNew construction, addition, GFA change
  26. PermitAddition and/or Alteration
  27. PermitChange of Use
  28. CertificationSprinkler Certification
  29. PermitChange of Use
  30. AppealLIRB Violation Appeal
  31. PermitAddition and/or Alteration
  32. PermitSign
  33. PermitSigns (Accessory / Non-Accessory)
  34. PermitAddition and/or Alteration
  35. PermitAddition and/or Alterations
  36. PermitAlterations
  37. PermitAddition and/or Alterations
  38. PermitAddition and/or Alteration
  39. PermitChange of Use
  40. PermitNew Construction
  41. PermitNew Construction
  42. PermitNew Construction
  43. PermitNew Construction
  44. PermitNew Construction or Additions
  45. PermitRough-In
  46. PermitTower Crane
  47. PermitNew Construction or Additions
  48. PermitSitework with Onsite Utility Services
  49. PermitNew Construction (Shell Only)
  50. PermitFoundation
  51. PermitNew construction, addition, GFA change
  52. PermitCombined Lot Line Relocation and New Dev…
  53. LicenseTHE PEP BOYS - MANNY, MOE & MACK (ATTN ENVIRONMENTAL DEPT): Hazardous Materials L&I license filing marked inactive
  54. LicensePEP BOYS MANNY MOE AND JACK: Food Establishment, Retail Perm Location (Large) business license marked inactive
  55. LicenseTHE PEP BOYS: Motor Vehicle Repair / Fuel Dispensing business license marked inactive
  56. LicenseTHE PEP BOYS - MANNY, MOE & MACK (ATTN ENVIRONMENTAL DEPT): Hazardous Materials L&I license filing initially issued
  57. LicensePEP BOYS MANNY MOE AND JACK: Food Establishment, Retail Perm Location (Large) business license initially issued
  58. LicenseTHE PEP BOYS: Motor Vehicle Repair / Fuel Dispensing business license initially issued
  59. LicensePEP BOYS-MANY,MOE & JACK PEP BOYS PHILADELPHIA (ATTN: LEGAL DEPT.): Dumpster License - Private Property L&I license filing initially issued

Verify the public record

$0/year estimated property tax

2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $89,056,800. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 883054900
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationFull assessment exemption shown

2026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

Property report

Commercial property

Vacant lot, recorded in the City's offices category. The public record and owner trail follow.

3 open violations

What it is
Vacant lot Vacant Land Commer < Acre
Owner
University Place Associat
Corridor
40th Street and vicinity city commercial corridor
Zoning
CMX4

Recorded owner

Who's behind it

University Place Associat · corporate / LLC owner

• Tax bills mail to 30 N 41st St, Philadelphia PA, 19104

Block context

4100 block of Market St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 4100-36 Market St  ·  4138-52 Market St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗
PEP BOYS MANNY MOE AND JACKInactive

Food Establishment, Retail Perm Location (Large) · Initial issue date May 20, 2004 · Terminal license date Jun 29, 2015

THE PEP BOYSInactive

Motor Vehicle Repair / Fuel Dispensing · Initial issue date Mar 2, 2004 · Terminal license date Mar 1, 2015

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 59 dated rows
  1. PermitAddition and/or Alterations

    Permit FP-2026-001314 · Issued

    FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE SEVENTH FLOOR LEVEL WITH EXISTING 6” FIRE SERVICE AND 6" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  2. PermitRough-In

    Permit FP-2026-001337 · Completed

    Rough-In Permit for FP-2026-001314 Install (376) sprinklers on 7th floor

  3. PermitRough-In

    Permit FP-2026-001126 · Completed

    Rough-In Permit for FP-2026-001115 Install (360) sprinklers on 6th floor, wet and pre-action. Other floors will be submitted separately.

  4. PermitAddition and/or Alterations

    Permit FP-2026-001115 · Issued

    FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE SIXTH FLOOR LEVEL WITH EXISTING 6” FIRE SERVICE AND 6" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  5. InvestigationL&I investigation

    Case CF-2026-027181 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  6. InvestigationL&I investigation

    Case CF-2026-027181 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. PermitAddition and/or Alteration

    Permit EP-2026-003469 · Issued

    Perform tenant fit-out of a space to accommodate the installation of a fire alarm system. Work includes furnishing and installing fire alarm control equipment (as required), initiating devices, notification appliances, wiring, terminations, programming, and testing. All devices shall be properly interconnected to provide required detection and occupant notification. All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC and per approved plans.

  8. PermitAlterations

    Permit PP-2026-002039 · Issued

    ALTERATIONS TO EXISTING LAB. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  9. ViolationSUPPRESSION SYSTEM TESTING & MAINTENANCE

    Case CF-2026-027181 · Violation VI-2026-016872 · Code F-903.5 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  10. ViolationPERIODIC TESTING

    Case CF-2026-027181 · Violation VI-2026-016871 · Code F-901.6.4 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  11. ViolationFDC INSPECTION, TESTING & MAINTENANCE

    Case CF-2026-027181 · Violation VI-2026-016873 · Code F-912.7 · OPEN

    The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.

  12. InvestigationL&I investigation

    Case CF-2026-027181 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  13. PermitAddition and/or Alterations

    Permit MP-2026-001009 · Issued

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  14. PermitAddition and/or Alteration

    Permit EP-2026-001592 · Issued

    Install panels, receptacles, poke-thru(s), lights, & lighting controls as per drawings and 2017 NEC. Fire alarm permit to be submitted separately.

  15. CertificationSprinkler Certification

    Certification BC-2026-006838 · Deficient

  16. PermitAddition and/or Alteration

    Permit CP-2025-004978 · Issued

    FOR LEVEL II INTERIOR ALTERATIONS FOR PARTIAL RENOVATIONS TO UNOCCUPIED BASEMENT LEVEL TO HOUSE UTILITY SPACE (S1 OCCUPANCY) AND PARTIAL FIRST FLOOR SPACE FOR BUSINESS OCCUPANCY (ACCESSORY A-3/ S-1/ S-2 OCCUPANCY) AND FOR THE FIT OUT OF UNOCCUPIED SHELL SPACE TO BE BUSINESS (B) OCCUPANCY ON THE SIXTH, SEVENTH AND EIGHTH FLOORS. ALL WORK TO BE DONE PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  17. PermitChange of Use

    Permit ZP-2025-009180 · Issued

    Office - Government

  18. PermitAlterations

    Permit PP-2025-004311 · Completed

    INSTALLLATION OF NEW LABRATORY FIXTURES AND EQUIPMENT AS LISTED. ALL ASSOCIATED PIPING INSULATION AND CONNECTIONS TO EXISTING PIPING MADE IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.

  19. PermitAddition and/or Alteration

    Permit EP-2025-005191 · Completed

    FOR BUILDING MODIFICATIONS ASSOCIATED WITH ELECTRICAL WORK (ELECTRICAL WORK TO INCLUDE INSTALLATION OF ONE (1) 120V/20A RECEPTACLE AND #6 GROUNDING/BONDING OF SMALL REPEATER CELL TOWER ON ROOFTOP; REFERENCE GP-2025-001257 & ZP-2024-006863).

  20. PermitAddition and/or Alteration

    Permit EP-2025-003809 · Completed

    Fitout of existing space to include: new panels, step down transformers, panel feeders, mechanical equipment lines/connections, lighting fixture supply/wiring/installation, lighting controls, receptacles, furniture/hood connections, fire alarm devices connected to existing, tele/data outlets/equipment, card access devices, temporary power/light .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.

  21. PermitRough-In

    Permit EP-2025-003826 · Completed

    Rough-In Permit for EP-2025-003809 Fitout of existing space to include: new panels, step down transformers, panel feeders, mechanical equipment lines/connections, lighting fixture supply/wiring/installation, lighting controls, receptacles, furniture/hood connections, fire alarm devices connected to existing, tele/data outlets/equipment, card access devices, temporary power/light

  22. PermitAddition and/or Alterations

    Permit MP-2025-001913 · Completed

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  23. PermitAddition and/or Alterations

    Permit FP-2025-000550 · Completed

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (186) sprinkler heads to accommodate interior alterations

  24. PermitAntenna

    Permit GP-2025-001257 · Completed

    FOR THE ERECTION OF ROOF MOUNTED ANTENNAS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  25. PermitNew construction, addition, GFA change

    Permit ZP-2024-006863 · Completed

    FOR THE INSTALLATION OF TWO TOWER MOUNTED ANTENNAS AS PER PLANS. ** WORK TO BE IN ACCORDANCE WITH SECTION 14-603. (17) OF THE PHILADELPHIA ZONING CODE.

  26. PermitAddition and/or Alteration

    Permit CP-2024-005016 · Completed

    FOR LEVEL II ALTERATIONS AND CHANGE IN OCCUPANCY AT THIRD FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.

  27. PermitChange of Use

    Permit ZP-2024-009494 · Issued

    Office - Business and Professional; Research and Development

  28. CertificationSprinkler Certification

    Certification BC-2024-017935 · Certified

    Expires 2025-04-24

  29. PermitChange of Use

    Permit ZP-2024-002489 · Issued

    Eating and Drinking Establishments - Sit-Down Restaurant

  30. AppealLIRB Violation Appeal

    Appeal HA-2023-002248 · Closed · Complete

    See Attached

  31. PermitAddition and/or Alteration

    Permit EP-2023-002797 · Completed

    Install Card Access at (3) doors, install (17) cameras, install intrusion alarm system with wireless hold up buttons (7), (6) wireless traps, (4) motion detectors, (2) alarm strobes, (1) keypad and (2) monitoring points ATM and Safe as per 2017 nec

  32. PermitSign

    Permit GP-2023-002009 · Issued

    For the installation of one (1) accessory, statically (externally) illuminated marquee sign, and two (2) accessory, statically illuminated, double-faced projection signs, for a new Group B Financial Services use ("Fulton Bank"), as per plans; separate permit required for electrical work see ZP-2023-002805 for zoning/use approval of signs; no other work on this permit.

  33. PermitSigns (Accessory / Non-Accessory)

    Permit ZP-2023-002805 · Issued

    FOR THE ERECTION OF ONE (1) STATICALLY ILLUMINATED (EXTERNAL) MARQUEE SIGN AND TWO (2) STATICALLY ILLUMINATED WALL SIGNS. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.

  34. PermitAddition and/or Alteration

    Permit EP-2023-004993 · Completed

    Tenant fit-out for bank: electrical panels, transformers with feeders, mechanical equipment feeders, lighting, lighting controls, receptacles, 120 volt power, and telecom wiring/jacks/equipment as per 2017 NEC. Add fire alarm devices to the existing system as per 2016 NFPA 72.

  35. PermitAddition and/or Alterations

    Permit MP-2023-002325 · Completed

    INSTALLATION OF NEW HVAC SYSTEM TO INCLUDE PIPING FOR NEW BANK FIT-OUT ON THE GROUND FLOOR OF A BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*

  36. PermitAlterations

    Permit PP-2023-006445 · Completed

    Fit Out for Fulton Bank. Add (2) bathrooms and break area sink. (1) Hot Water Heater (1) Kitchen Sink (2) Lavs (2) WC Rough-In of Aboveground Piping (1) Mop Sink (OTHER)

  37. PermitAddition and/or Alterations

    Permit FP-2023-000858 · Completed

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (33) sprinkler heads from existing branch line outlets to accommodate new wall & ceiling layout.

  38. PermitAddition and/or Alteration

    Permit CP-2023-000814 · Completed

    FOR LEVEL II INTERIOR ALTERATIONS (TENANT FIT-OUT) AT THE GROUND FLOOR LEVEL OF AN EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.

  39. PermitChange of Use

    Permit ZP-2023-001828 · Issued

    Financial Services

  40. PermitNew Construction

    Permit CP-2021-004109 · Completed

    AMENDMENT: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT CP-2021-004109 TO DOCUMENT CHANGE IN LAYOUT IN PENTHOUSE AND REMOVAL OF PARTITIONS FROM FLOORS 4-8 AS SHOWN PER PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ORIGINAL: FOR THE INSTALLATION OF FIRE COMMAND CENTER AND FINISHES THROUGHOUT. SEPARATE PERMITS TO BE OBTAINED FOR THE INTERIOR FITOUT OF EACH FLOOR LEVEL AND CERTIFICATE OF OCCUPANCY. STRUCTURE FOR USE AS A BUSINESS USE AND LABORTORY SPACE THAT FALLS WITHIN THE PROVISIONS OF GROUP B OCCUPANCY. ORIGINAL CORE AND SHELL APPROVED UNDER THE FOLLOWING: CP-2020-003948. BUILDING TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 WITH STANDPIPES IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 38 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.

  41. PermitNew Construction

    Permit FP-2021-003787 · Completed

    FOR THE INSTALLATION OF A FIRE PUMP IN ACCORDANCE WITH NFPA 2016, STANDARD 13, 14 & 20, TO INCLUDE A SIX (6)-INCH DIAMETER SERVCE LINE, BACKFLOW PREVENTION ASSEMBLY, DRY SPRINKLER SYSTEM, LISTED FIRE PUMP INSTALLATION, AND TWO (2) STANDPIPE RISER INSTALLATIONS.

  42. PermitNew Construction

    Permit EP-2022-000570 · Completed

    Dual Electrical Service, medium voltage gear, sub-stations, distribution equipment, sub panels, transformers, bus duct with feeders. Emergency generator, UPS system, fire pump service/line, mechanical equipment lines, elevator feeders, lightning protection, lighting, controls, 120 volt power, receptacles, fire alarm system, telecom wiring/devices, Rescue assistance system, security system, temporary service/power/light . Temp power to Crane. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.

  43. PermitNew Construction

    Permit MP-2021-006467 · Completed

    FOR THE INSTALLATION OF HVAC APPLIANCES, REGISTERS / DIFFUSERS / GRILLES, AND ASSOCIATED DUCTWORK, HYDRONIC PIPING SYSTEMS, AND FUEL GAS PIPING SYSTEMS THROUGHOUT AN EIGHT (8) STORY HIGH-RISE CORE & SHELL. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE CP-2021-004109 FOR ASSOCIATED BUILDING PERMIT.

  44. PermitNew Construction or Additions

    Permit PP-2021-013336 · Completed

    PLUMBING SYSTEMS FOR EIGHT STORY BUILDING (SHELL) DOMESTIC WATER SYSTEM GRAY WATER SYSTEM ACID PIPE & TANK FOR FUTURE LABS SUMP PUMPS, FLOOR DRAINS, ROOF DRAINS STORM WATER BOOSTER PUMP, DOMESTIC WATER BOOSTER PUMP PLUMBING FIXTURES FOR GANG BATHROOMS ON EACH LEVEL WATER HEATERS & PUMPS IN PENTHOUSE

  45. PermitRough-In

    Permit FP-2021-003796 · Completed

    Rough-In Permit for FP-2021-003787 (CP-2020-003948)

  46. PermitTower Crane

    Permit GP-2021-006189 · Expired

    For the erection of one (1) tower crane and foundation as per approved plans and supplemental documentation. All work shall be in accordance with streets dept. approval

  47. PermitNew Construction or Additions

    Permit PP-2021-013796 · Completed

    Three sewer connections with Fresh Air Inlets (FAI). One new sanitary 10-inch sewer with FAI connected to new 18-inch sewer. Two new storm sewers. One 18-inch with FAI, and a second is 16-inch with FAI.

  48. PermitSitework with Onsite Utility Services

    Permit SP-2021-000403 · Completed

    FOR EARTHWORK TO INSTALL DETENTION BASINS AND PROVIDE UTILITY CONNECTIONS. **SEPARATE PERMIT TO BE REQUIRED FOR PLUMBING APPROVALS ASSOCIATED WITH INTERIOR INSTALLATION WORK WITHIN THE PROPERTY LINES.**

  49. PermitNew Construction (Shell Only)

    Permit CP-2020-003948 · Completed

    FOR THE ERECTION OF A EIGHT STORY DETACHED STRUCTURE FOR CORE AND SHELL ONLY, ONLY WORK PROPOSED IS FOUNDATION AND CORE.SHELL OF THE STRUCTURE. SEPARATE PERMITS TO BE OBTAINED FOR THE INTERIOR FITOUT OF THE STRUCTURE AND CERTIFICATE OF OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 WITH STANDPIPES IN EXIT STAIRWAYS IN ACCORDANCE WITH NFPA 14. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 38 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.

  50. PermitFoundation

    Permit SP-2020-000359 · Completed

    FOR FOUNDATION AND SITE WORK ONLY, SEPARATE PERMIT TO BE OBTAINED FOR STRUCTURE ABOVE GRADE, INTERIOR FITOUT AND CERTIFICATE OF OCCUPANCY FOR THE ENTIRE STRUCTURE. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  51. PermitNew construction, addition, GFA change

    Permit ZP-2020-006397 · Completed

    FOR THE ERECTION OF A DETACHED STRUCTURE WITH GREEN ROOF AT THIRD FLOOR, ROOF-TOP MECHANICAL PENTHOUSE AND ROOF MOUNTED SOLAR COLLECTORS. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.

  52. PermitCombined Lot Line Relocation and New Dev…

    Permit ZP-2020-000190 · Completed

    FOR THE RELOCATION OF LOT LINES (CONSOLIDATION) TO CREATE ONE (1) LOT [PARCEL 'O'] FROM FOURTEEN (14) DEEDED LOTS AND ONE (1) OPA ACCOUNT [4101-23 MARKET ST]. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.

  53. License terminal eventTHE PEP BOYS - MANNY, MOE & MACK (ATTN ENVIRONMENTAL DEPT): Hazardous Materials L&I license filing marked inactive

    License 285351 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  54. License terminal eventPEP BOYS MANNY MOE AND JACK: Food Establishment, Retail Perm Location (Large) business license marked inactive

    License 201350 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  55. License terminal eventTHE PEP BOYS: Motor Vehicle Repair / Fuel Dispensing business license marked inactive

    License 283598 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  56. License issue eventTHE PEP BOYS - MANNY, MOE & MACK (ATTN ENVIRONMENTAL DEPT): Hazardous Materials L&I license filing initially issued

    License 285351 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  57. License issue eventPEP BOYS MANNY MOE AND JACK: Food Establishment, Retail Perm Location (Large) business license initially issued

    License 201350 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  58. License issue eventTHE PEP BOYS: Motor Vehicle Repair / Fuel Dispensing business license initially issued

    License 283598 · Inactive

    License event. Registration does not prove present operation or storefront occupancy.

  59. License issue eventPEP BOYS-MANY,MOE & JACK PEP BOYS PHILADELPHIA (ATTN: LEGAL DEPT.): Dumpster License - Private Property L&I license filing initially issued

    License 281051 · Active

    License event. Registration does not prove present operation or storefront occupancy.

Where this comes from

Methodology & freshness

This report was assembled Jul 30, 2026, 2:36 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)