Multi-family report

419 W Cumberland St

8 bd7 ba3 stories4,933 sqftRM1built 2022

Property at a glanceMulti-family

Entity-held

2026 assessment
$1.3M OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this building against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$1.0M$2.0MZIP 19133 (Fairhill · West Kensington) median$1.1M200820122016202020242027
Property assessmentBlock median & rangeZIP 19133 (Fairhill · West Kensington) medianAssessmentLand buyL&I violationPermitLicense

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record17 events · exact dates, newest first
  1. LicenseGolden Rule LLC: Rental landlord or residential registration initially issued
  2. PermitNew Construction
  3. PermitRough-In
  4. PermitNew Construction
  5. PermitNew Construction or Additions
  6. PermitNew Construction
  7. PermitRough-In
  8. PermitNew Construction
  9. PermitNew Construction
  10. PermitNew construction, addition, GFA change
  11. L&I violationCLIP VIOLATION NOTICE
  12. L&I violationEXT A-VACANT LOT CLEAN/MAINTAI
  13. Land buyLand record $85K
  14. L&I violationVACANT LOT STANDARD
  15. L&I violationCLIP VIOLATION NOTICE
  16. PermitPlumbing
  17. PermitUse

Flags: material assessment exemption; legal basis and term unverified · active rental license. Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$3,617/year estimated property tax

2026 taxable assessment $258,400 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $1,060,500. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 192297100
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationPartial assessment exemption, basis unverified

2026 OPA taxes $258,400 of $1,292,400 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.

See the assessment math →
Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The assessment exemption gap

OPA's 2026 roll shows a partial assessment exemption. The annual difference is measurable; the reason for it and what happens after a sale are not established here.

Using OPA's taxable amount ~$3,617/year

$258,400 taxable basis

Difference to verify+$14,474/year
If the full assessment were taxable ~$18,091/year

$1,292,400 scenario basis

The assessment roll does not identify
  • Legal basis or program
  • Approval or expiration date
  • Treatment after a sale
  • Current Tax Center balance
Show the assessment math 2026: ($1,292,400 assessed − $1,034,000 exempt) × 1.3998% ≈ $3,617/year Full-assessment scenario: $1,292,400 × 1.3998% ≈ $18,091/year

Do not treat the full-assessment scenario as inevitable or assume the current relief transfers. Obtain the approval history and verify the live Tax Center account before relying on either number.

The property, on paper

OPA physical field record.

Bedrooms
8
Bathrooms
7
Stories
3
Interior
4,933 sqft livable area
Lot
1,665 sqft
Basement
Full, finished city code 1
Heat
Forced hot air city code A
Central air
Yes
Exterior condition
Newer construction city code 1
Newer construction
Interior condition
Newer construction city code 1
Newer construction
Zoning
RM1 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Recorded owner

Who's behind it

Golden Rule LLC · corporate / LLC owner

• Owns 34 properties across Philadelphia under this name, assessed at $21M combined
• Tax bills mail to 144 Buckwalter Rd, Royersford PA, 19468 — outside Philadelphia
• Holds an active rental license for this address

Block context

400 block of W Cumberland St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 417 W Cumberland St  ·  421 W Cumberland St

Business licenses at this address Latest pull

What L&I has registered at this OPA parcel, newest initial license date first.

Open the City record ↗

No L&I business license is on record at this address in data through Jul 29, 2026.

Landlord and residential filings

These are property registrations or landlord filings, not businesses operating at this address.

Golden Rule LLCActive

Rental · Initial issue date Sep 29, 2022 · Filed expiration Sep 28, 2026

A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.

Open every source row 17 dated rows
  1. License issue eventGolden Rule LLC: Rental landlord or residential registration initially issued

    License 907379 · Active

    License event. Registration does not prove present operation or storefront occupancy.

  2. PermitNew Construction

    Permit EP-2021-011391 · Completed

    INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT AS PER THE 2017 NEC & 2016 NFPA-72. ** FIRE ALARM WORK ONLY**

  3. PermitRough-In

    Permit EP-2021-011408 · Expired

    Rough-In Permit for EP-2021-011391 Install fire alarm system throughout. Install fire panel, horns, strobes, low freq mini horns, pull stations, smokes as per plans and 2017 NEC. Install all wiring throughout as per NFPA72.

  4. PermitNew Construction

    Permit MP-2021-005869 · Completed

    EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Install Four (4)- 90% Eff. 60,000 BTU Gas furnaces Exhausted via direct vent to the exterior (Side) install ductwork, grilles, registers and diffusers, installing (Four) 3-Ton Coil & One 3-Ton 13 SEER A/C condenser located on a pad at the rear of the building and 3 -Ton 13 Seer A/C condensers on pad n the roof. (MFD) 1047787).

  5. PermitNew Construction or Additions

    Permit PP-2021-015105 · Completed

    Water Distribution, inlet, curb drain hot water, kitchen, laundry, lavs, water closets, shower

  6. PermitNew Construction

    Permit FP-2021-001570 · Completed

    For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using a new, two (2) inch fire service line as per PWD Utility Plan dated 03/05/2020, two (2) inch backflow within the basement, and two (2), four (4) inch standpipes within the exit stairways installed as per NFPA 14), throughout a new three (3) story attached structure to be used as Group R-2, as per plans and hydraulic calculations; see AP#1047787 for building permit.

  7. PermitRough-In

    Permit FP-2021-002120 · Completed

    Rough-In Permit for FP-2021-001570 Install auto wet sprinkler system throughout per NFPA 13R Install manual wet standpipes per NFPA 14 (1047787)

  8. PermitNew Construction

    Permit EP-2021-003207 · Completed

    Provide a 400 amp service with a 5 gang meter enclosure with circuit breaker disconnects. One common area panel. Four corresponding unit panels. Install all wiring for each unit as well as the common areas. Provide all arc-fault and gfi circuit protection, 120v battery back up smoke detectors, all receptacles as switches as per 2017 NEC

  9. PermitNew Construction

    Permit 1047787 · Completed

    FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE VA CONSTRUCTION CONTAINING (4) RESIDENTIAL UNITS, BASEMENT, ROOF DECK AND PILOT HOUSE AS SHOWN ON THE ENCLOSED PLANS. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. AMENDMENT (10/13/2021) TO CHANGE SPECIAL INSPECTION AGENCY AS PER DOCUMENTS PROVIDED.

  10. PermitNew construction, addition, GFA change

    Permit 1047786 · Completed

    FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A CELLAR AND A ROOF DECK WITH A ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.

  11. ViolationCLIP VIOLATION NOTICE

    Case 720533 · Violation 5281786 · Code CP-01 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  12. ViolationEXT A-VACANT LOT CLEAN/MAINTAI

    Case 720533 · Violation 5281787 · Code PM-302.2/4 · COMPLIED

    City marked this violation complied with; check the resolution date and live case for what was accepted.

  13. Land recordLand record

    2019

  14. ViolationVACANT LOT STANDARD

    Case 239433 · Violation 1718784 · Code PM-306.0/2 · CLOSEDCASE

    City marked the case closed; that does not mean the original condition never existed.

  15. ViolationCLIP VIOLATION NOTICE

    Case 239433 · Violation 1718783 · Code CP-01 · CLOSEDCASE

    City marked the case closed; that does not mean the original condition never existed.

  16. PermitPlumbing

    Permit 273824 · COMPLETED

    REPAIR WATER DISTRIBUTION PIPE IN FRONT OF PROPERTY AND REPAIR CURB TRAP ALSO

  17. PermitUse

    Permit 186851 · COMPLETED

    USE TO SECOND HAND FURNITURE

Where this comes from

Methodology & freshness

This report was assembled Jul 30, 2026, 7:49 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)