Land report
4245 Sansom St
Individual owner on record
6 violation rows marked OPEN in 3 active cases
The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.
Architect/Engineer Services
- Architect/Engineer Services
A-304.1/1
Unsafe structure case
- Structural Repair
A-301.1/38 - Id Structure
PM15-110.1 - Exterior Walls
PM15-304.1(G) - Architect/Engineer Services
A-304.1/1
Walkway Not Provided
- Walkway Not Provided
IBC 3306.2
OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.
Assessment and City record timeline
The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $710,700. It is not yet the billed-year tax basis.
- OPA assessment · 2025$711K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2026$711K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$711K assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Permit · 2022-08-24New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2024-08-15ARCHITECT/ENGINEER SERVICESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2024-08-15L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2024-11-19STRUCTURAL REPAIRA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2024-11-19ID STRUCTUREA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2024-11-19EXTERIOR WALLSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2024-11-19ARCHITECT/ENGINEER SERVICESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2024-11-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2025-05-21WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-21POSTING OF PERMITSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2025-05-21L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-05-21L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2025-06-05POSTING OF PERMITSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-06-05WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2025-06-05L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-06-05L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2025-09-02WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2025-09-02L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-09-02L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2025-08-28POSTING OF PERMITSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-09-08POSTING OF PERMITSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-09-08WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-09-29WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2025-09-29L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2025-10-07WALKWAY NOT PROVIDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2025-10-07L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-09-24L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-10-28L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-12-02L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-01-10L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-02-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-03-26L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-03-29L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-05-22L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-05-22L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-09-09L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-09-09L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Appeal · 2022-09-09ZBA Permit Denial - VarianceA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2024-12-16BBS IDA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2025-01-27BBS IDA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- L&I violationWALKWAY NOT PROVIDED
- InspectionL&I investigation
- L&I violationWALKWAY NOT PROVIDED
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationPOSTING OF PERMITS
- L&I violationWALKWAY NOT PROVIDED
- L&I violationWALKWAY NOT PROVIDED
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationPOSTING OF PERMITS
- L&I violationPOSTING OF PERMITS
- L&I violationWALKWAY NOT PROVIDED
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationWALKWAY NOT PROVIDED
- L&I violationPOSTING OF PERMITS
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- AppealBBS ID
- InspectionL&I investigation
- AppealBBS ID
- InspectionL&I investigation
- L&I violationSTRUCTURAL REPAIR
- L&I violationID STRUCTURE
- L&I violationEXTERIOR WALLS
- L&I violationARCHITECT/ENGINEER SERVICES
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationARCHITECT/ENGINEER SERVICES
- InspectionL&I investigation
- PermitNew Construction
- PermitNew Construction
- AppealZBA Permit Denial - Variance
- PermitNew construction, addition, GFA change
Verify the public record
Property tax
$9,948/year estimated property tax
2026 taxable assessment $710,700 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $710,700. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 8810004272026 taxable assessment equals the full assessed value.
Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Land report
Vacant land
Vacant land. Deeds, ownership, zoning, and the public-source record follow.
1 open violation
Block context
4200 block of Sansom St. Compare parcels, ownership, and public-record history.
See the whole block →Next door: 4243 Sansom St · 4241 Sansom St
L&I licenses checked through Jul 10, 2026
No business or residential license records
No business license or residential registration matched this OPA parcel in the latest City data.
Open every source row 42 dated rows
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-110975 · Violation VI-2025-079844 · Code B-3306.2 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2025-110975
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-107298 · Violation VI-2025-076793 · Code IBC 3306.2 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2025-107298 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2025-097977
- InvestigationL&I investigation
Case CF-2025-097979
- ViolationPOSTING OF PERMITS
Case CF-2025-097977 · Violation VI-2025-070187 · Code A-302.8 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-097979 · Violation VI-2025-070188 · Code B-3306.2 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-093824 · Violation VI-2025-067785 · Code B-3306.2 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2025-093824
- InvestigationL&I investigation
Case CF-2025-093826
- ViolationPOSTING OF PERMITS
Case CF-2025-093826 · Violation VI-2025-067168 · Code A-302.8 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationPOSTING OF PERMITS
Case CF-2025-053941 · Violation VI-2025-040421 · Code A-302.8 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-053942 · Violation VI-2025-040415 · Code B-3306.2 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2025-053942
- InvestigationL&I investigation
Case CF-2025-053941
- InvestigationL&I investigation
Case CF-2025-046706
- InvestigationL&I investigation
Case CF-2025-046708
- ViolationWALKWAY NOT PROVIDED
Case CF-2025-046706 · Violation VI-2025-034962 · Code B-3306.2 · SVN ISSUED
Resolution: SVN ISSUED
- ViolationPOSTING OF PERMITS
Case CF-2025-046708 · Violation VI-2025-034963 · Code A-302.8 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2025-046706 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2025-046708 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- AppealBBS ID
Appeal HA-2024-005219 · Closed · Request Review
First, the subject violation was not received by Responsible Party (Franjo Construction Corporation) until December 12. Owner received a violation on the same facts and property and filed an appeal for which a BBS hearing was held December
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- AppealBBS ID
Appeal HA-2024-004954 · Closed · Request Review
See attached
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- ViolationSTRUCTURAL REPAIR
Case CF-2024-121162 · Violation VI-2024-093444 · Code A-301.1/38 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationID STRUCTURE
Case CF-2024-121162 · Violation VI-2024-093441 · Code PM15-110.1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationEXTERIOR WALLS
Case CF-2024-121162 · Violation VI-2024-093442 · Code PM15-304.1(G) · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationARCHITECT/ENGINEER SERVICES
Case CF-2024-121162 · Violation VI-2024-093443 · Code A-304.1/1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2024-121162 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- ViolationARCHITECT/ENGINEER SERVICES
Case CF-2024-089526 · Violation VI-2024-069029 · Code A-304.1/1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2024-089526 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitNew Construction
Permit FP-2024-000640 · Stop Work
Installation of new NFPA 13 wet fire sprinkler system to the building at the sansom address. The system is fed from 6" fire service and fire pump on adjacent building at 4240 Chestnut which is permit FP-2023-001126.
- PermitNew Construction
Permit CP-2022-005771 · Issued
FOR THE ERECTION OF A THREE-STORY, ATTACHED STRUCTURE OF TYPE IIIB CONSTRUCTION AS PER PLANS. FOR TWELVE (12) DWELLING UNITS WITH LAYOUT AS SHOWN.
- AppealZBA Permit Denial - Variance
Appeal ZP-2022-004014 · Completed · Granted
Related permit ZP-2022-004014 · PERMIT FOR THE ERECTION OF AN ATTACHED STRUCTURE (NTE 38’ HIGH) FOR A MULTI-FAMILY HOUSEHOLD LIVING (TWELVE (12) DWELING UNITS). WITH FOUR (4) 1A CLASS BICYCLE SPACES IN AN ACCESSIBLE ROUTE SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
- PermitNew construction, addition, GFA change
Permit ZP-2022-004014 · Issued
FOR THE ERECTION OF AN ATTACHED STRUCTURE (NTE 38’ HIGH) WITH FOUR (4) 1A CLASS BICYCLE SPACES IN AN ACCESSIBLE ROUTE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Neighborhood income & rents: US Census ACS 5-year estimates
- Historical mortgage rates: Freddie Mac Primary Mortgage Market Survey, annual averages
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 18, 2026, 3:56 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)
