House report

436 E Westmoreland St

3 bd1 ba2 stories1,216 sqftRSA5built 1935

Property at a glanceHouse

Owner-occupancy signal

2026 assessment
$82K OPA value, not a listing price
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar

Assessment and City record timeline

Published City assessments for this house against its block and ZIP. Dated City filings are marked on the same line. Select one to read it. Assessments are tax-roll values, not sale prices or appraisals.

$0$100K$200KZIP 19134 (Port Richmond · Kensington) median$101K201220152018202120242027
Property assessmentBlock median & rangeZIP 19134 (Port Richmond · Kensington) medianAssessmentDeed / saleL&I violationPermitInspection

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record8 events · exact dates, newest first
  1. PermitAddition and/or Alteration
  2. InspectionL&I investigation
  3. L&I violationEXTERIOR STRUCT UNSAFE COND 8
  4. L&I violationEXTERIOR STRUCT UNSAFE COND 4
  5. L&I violationUNSAFE STRUCTURE
  6. InspectionCSUINITIAL
  7. PermitElectrical
  8. Deed / saleDeed / sale $52K

Informational only. Not investment advice or a consumer report (FCRA).

Verify the public record

$0/year estimated property tax

2026 taxable assessment $0 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.

OPA has published a 2027 assessment of $101,400. It is not the 2026 billed-year value.

Current City balanceCheck Tax Center

Payments, credits, interest, and the current amount due are maintained by the City.

OPA 073231500
Open Philadelphia Tax Center →Use “View period balance” to inspect each tax year.
Exemption classificationHomestead exemption

2026 OPA removes $82,300 from the taxable assessment through the owner-occupant exemption. The exclusion reduces this assessment-based estimate to $0.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

The property, on paper

OPA physical field record.

Bedrooms
3
Bathrooms
1
Stories
2
Interior
1,216 sqft livable area
Lot
880 sqft
Heat
Undetermined city code H
Exterior condition
Average city code 4
Interior condition
Average city code 4
Quality grade
C assessor's grade
Zoning
RSA5 city zoning code

OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.

Block context

400 block of E Westmoreland St. Compare parcels, ownership, and public-record history.

See the whole block →

Next door: 438 E Westmoreland St  ·  440 E Westmoreland St

No business or residential license records

No business license or residential registration matched this OPA parcel in the latest City data.

Verify with the City ↗
Open every source row 8 dated rows
  1. PermitAddition and/or Alteration

    Permit RP-2023-005676 · Completed

    EZ PERMIT STANDARDS ALTERATIONS For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc. *No basement alterations of any kind were proposed or approved for this permit* *No structural alterations of any kind were proposed or approved for this permit* BSRP PHDC WORK ORDER 176988 REPLACE EXISTING MAIN STAIRS *IN EXISTING OPENING*

  2. InvestigationL&I investigation

    Case 696867 · PASSED

    The cited inspection visit was marked passed.

  3. ViolationEXTERIOR STRUCT UNSAFE COND 8

    Case 696867 · Violation 211968078 · Code PM15-304.1H · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  4. ViolationEXTERIOR STRUCT UNSAFE COND 4

    Case 696867 · Violation 211968118 · Code PM15-304.1D · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  5. ViolationUNSAFE STRUCTURE

    Case 696867 · Violation 211968075 · Code PM15-108.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  6. InvestigationCSUINITIAL

    Case 696867 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  7. PermitElectrical

    Permit 762540 · COMPLETED

    REPLACE 100A PANEL.. IN ACCORDANCE WITH 2008 NEC FOR A ONE FAMILY BUILDING

  8. Recorded transfer$52K transfer

    2012

Where this comes from

Methodology & freshness

This report was assembled Jul 25, 2026, 9:23 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)