Property report
8500 Essington Ave
678,227 sqftSPAIRbuilt 1950
City Of Phila & Dept Of Public Prop
13 violation rows marked OPEN in 2 active cases
The actual City titles, code sections, case posture, and latest recorded inspections are shown here instead of only an aggregate count.
Unapproved Alternative Materials
- Unapproved Alternative Materials
A-203.3/1
Notice Of Violation
- Food - Large Establishment License
6-301(4)(A)(.1) - Exit Doors
F-1104.28 - Fire Extinguishers
F-906.2 - Equipment Rooms
F-315.3.3 - Periodic Testing
F-901.6.4 - Halon Systems
F-904.9 - Commercial System Test
F-904.12.5.2 - High Rise Buildings
F-403.11.2 - Record Keeping
F-405.5 - High-Rise Building
F-105.6.3 - Rental License- Hotel (R1)
9-3902 (4) - Fire Extinguisher Hangers & Brackets
F-906.7
OPEN is the status in the fetched L&I file, not a new inspection by BlockReport. Read the notice for the cited condition and required correction, then verify the live case with L&I.
Assessment and City record timeline
The line tracks this property’s published City assessment. Markers show deeds, permits, inspections, licenses, violations, certifications, and appeals on their recorded dates. Select one to read the filing.
Assessments are tax-roll values, not sale prices or appraisals. OPA has published a 2027 assessment of $258,799,000. It is not yet the billed-year tax basis.
- OPA assessment · 2016$242M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2017$242M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2018$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2019$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2020$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2021$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2022$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2023$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2024$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2025$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2026$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- OPA assessment · 2027$259M assessed valueOPA’s value on the City tax roll for that year. It is not an appraisal, listing price, sale price, or live tax balance.How Philadelphia property assessments work ↗
- Permit · 2007-01-02UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-04MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-04MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-01-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-01-24Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-30UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-01-31Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-02-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-21PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-23PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-02-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-07UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-03-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-15Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-03-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-15SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-22AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-28Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-03-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-03-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-04-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-04-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-05-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-05-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-05-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-11Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-12OperationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-13Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-06-18New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-06-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-06DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-06New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-07-26Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-02UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-08-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-21PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-08-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-09-10Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-09-11PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-09-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2007-10-02Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Permit · 2007-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-10-10SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-15SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-18Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-18Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-24SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-10-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-10-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-10-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-12Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-11-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-27DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-28PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-29PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-11-29UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-04MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-14Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-20Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2007-12-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2007-12-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-04SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-07Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-07Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-07Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-07Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-07Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-22Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-01-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-02-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-12AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-14PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-22Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-02-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-02-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-03-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-03-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-03-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-03-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-03-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-03-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2008-03-25VIOL C&I MESSAGEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2008-03-25F+C LIQ-PROVIDE CLOS RPTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2008-03-25CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2008-03-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-04-08AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-10AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-16Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-04-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-30UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-04-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-05-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-05-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-13ZoningThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-05-16Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-20Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-22DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-05-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-06-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-06-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-06-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-19Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-06-27AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-06-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-07-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-03Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-03Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-03Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-03PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-08AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-24ZoningThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-24Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-07-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-01DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-08-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-08-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-08-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-08-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-18MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-08-18PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-21PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-27AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-08-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-04MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-11PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-15Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-23PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-25Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-09-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-09-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-06UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-09AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-09SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-14PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-16PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-10-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2008-10-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-10-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-03UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-11-20SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-16AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2008-12-19AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-06AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-12DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-14DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-01-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-01-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-10Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-02-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-03-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2009-03-03VIOL C&I MESSAGEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03HAZMAT-LIC REQ¿DA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03EGRESS EXIT SIGNS VISIBILITYA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03ANNUAL CERT FIRE ALARMA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03FIRE-ELECT OPEN JUNCTION BOXA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03ANNUAL CERT STANDBY/EMERG LITEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03FIRE SUPP-REPLACE SPRKLR HEADA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03HAZMAT ID STATIONARY CONTAINERA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03FIRE EXTING-INSTALL TYPE KA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03INT MATERIAL STORAGE EQUIP RMA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03FA-REP SYS SMOKE DETA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03EGRESS EXIT SIGNS REQA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03EGRESS-INT CLEAR OBSTRUCTIONA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03ELEVATORS POST EMERGENCY SIGNA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03EGRESS LANDING SIGN IN STAIRSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2009-03-03ANNUAL CERT FIRE SUPPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2009-03-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-17New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-19Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-03-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-03-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-04-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-04-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-04-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-24Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-04-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-05Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-05-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-05-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-05-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-05-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-03Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-06-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-06-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-06-26Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-15SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-16Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-23AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-07-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-07-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-07-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-03PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-08-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-08-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-08-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-27SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-27AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-08-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-01DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-02PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-02PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-24Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-25Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-09-25New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-09-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-10-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-10-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-10-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-16PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-16PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-20Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-10-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-28MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-28New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-10-28MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-02UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-05UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-10New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-10UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-16PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-11-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-19New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-19Fast form buildingThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-25SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-11-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-08AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-08AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-10SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-14MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-14PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-21Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-12-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-12-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-12-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2009-12-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2009-12-31SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-11New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-14DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-15AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-15UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-22AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-01-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-03AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-02-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-09Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-02-12AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-16Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-02-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-02-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-02-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-02-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-01Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-03-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-12AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-03-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-03-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-04-05AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-09Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-04-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-04-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-04UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-04SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-05-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-05-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-10AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-20SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-05-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-01SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-01SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-01SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-06-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-06-23PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-06-25PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-07-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-04PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-08-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-08-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-24PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-08-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-08-31New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-09-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-08SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-14MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-15Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-09-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-09-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-05UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-10-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-10-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-19AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-10-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-10-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2010-11-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-05New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-10SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-11-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-15SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-15UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2010-12-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2010-12-17CHANGE IN OCCUPANCYA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2010-12-17VIOL C&I MESSAGEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2010-12-17CI HAZMATA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2011-01-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-01-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-01-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-01-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-21UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-31PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-01-31Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-01-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-01SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-02-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-09Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-16UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-17Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-22PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-22PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-24AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-02-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-01ZoningThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2011-03-02CI HAZMATA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2011-03-03PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-03DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-03-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-03-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-18AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-03-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-03-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-24PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-03-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-21PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-04-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-06UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-06SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-24AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-24AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2011-05-25Zoning board appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Permit · 2011-05-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-05-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-06-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-06-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-27UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-06-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-06-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-07-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-07-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-07-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-07-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-08-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-04DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-05UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-08SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-08-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-08-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-09-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-19MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2011-09-21Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Permit · 2011-09-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-09-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-09-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-03PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-10-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-10-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-28Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-10-31UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-02PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-18SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-11-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-07AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-16Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-12-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2011-12-19ZoningThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-22AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-22AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2011-12-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-01-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-18PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-01-27AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-01-31Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-01-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2012-01-31PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2012-02-02UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-16PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-23PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-02-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-03-06SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-16Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-03-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-03-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-04-10UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-04-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-05-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-05-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-06-12SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-06-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-06-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-06-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-07-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-07-18PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-07-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-07-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-07-26Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-08-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-08-31PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-06SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-11ZoningThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-09-12Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-09-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-09-14Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-09-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-09-25New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2012-10-02BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2012-10-02BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2012-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-04SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-10-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-12PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-11-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-11-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-11-07AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-15SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-11-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-11-27Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2012-12-11CONTRACTOR UNLICENSED SUBA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-12-11SWO- CONTRARY TO GOOD PRACTICEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-12-11CONTRACTOR LIC NEEDEDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-12-11CVN-EMPLOYING UNLIC SUBCONTRA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2012-12-12SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2012-12-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2012-12-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-01-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-03UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-01-03SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2013-01-03STOP WORK ORDERA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-01-03PENALTY- NO BLDG PERM INFOA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-01-03PERMB- INSTALL FIRE SUPP SYSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2013-01-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-18MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-18PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-01-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-01UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-12UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-12UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-02-14MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-19AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-19MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-19AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-02-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-02-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-03-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-03-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-03-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-22AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-03-22UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-22UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-03-28UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-01Major signThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2013-04-24ARCHITECT/ENGINEER SERVICESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-04-24PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-04-24CO- WK NOT ENTIRELY DONE NO COA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-04-24PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-04-24ARCHITECT/ENGINEER SERVICESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2013-04-24CO- WK NOT ENTIRELY DONE NO COA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2013-04-24BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2013-04-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-26SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-04-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-29UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-04-30UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-05-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-07Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-07Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-07Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-07New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-05-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-09Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-05-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-13New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-16Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-21AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-05-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-04AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-04AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-04AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2013-06-04Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Permit · 2013-06-05UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-06-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-06-11PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-06-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-06-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-06-19AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-20UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-06-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2013-06-21BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2013-06-28Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-09New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-09New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-12UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-12UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-17New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-17New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-07-23New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2013-07-30CEASE INSP (likely: cease-operations compliance inspection)Legacy inspection shorthand; verify whether a cease-operations order existed and its current status.What Philadelphia inspections check ↗
- Inspection · 2013-07-30CEASE INSP (likely: cease-operations compliance inspection)Legacy inspection shorthand; verify whether a cease-operations order existed and its current status.What Philadelphia inspections check ↗
- Permit · 2013-07-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-07-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-14AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-14AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-08-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-08-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-28PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-28MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-08-29SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-08-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-09-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-10SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-17AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-09-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-09-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-04PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-04PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-10-21PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-22AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-11-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2013-12-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2013-12-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-02UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-01-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-13PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-01-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-28AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-01-31Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-02-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-06PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-02-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-02-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-02-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-19AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-02-28MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-06PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-03-25SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-26AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-28DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-03-28DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-01DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-04-14UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-04-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-25Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-04-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-04-25SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-07UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-05-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-22Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-05-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-06-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-06-13AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-16DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-06-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-07-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-07-15UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-07-15Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-07-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-07-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-07-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-08-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-08-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-08-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-08-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-09-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-09-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- L&I violation · 2014-10-08PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2014-10-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-10-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2014-10-20SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-30SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-10-31PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-11-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-11-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-11-14MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-11-19UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-03DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-16New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2014-12-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-06AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-01-26SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-02-17Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-02-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-02-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-03-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-03-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-04-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-04-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-28MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-04-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-08SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-05-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-06-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-07-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-07-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-07-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-07-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-08-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-25PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-08-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-09-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-09-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-09-21OperationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-09-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-10-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-18AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-11-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-12-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-02PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2015-12-24Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2015-12-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-01-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-01-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-01-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-01-14AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-02-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-02-24AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-02-25SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-09Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-03-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-29UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-03-30PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-04-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-04-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-04-29DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-05-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-05-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-05-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-05-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-06-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-13UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-06-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-16New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-21UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-21Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-06-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-06-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-11AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-26AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-07-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-08-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-09AdditionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-09-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-09-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-27DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-09-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-10-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-12SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-12PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-10-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-11-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-08UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-14Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-11-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-11-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-28PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-11-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-06UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-12-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-12-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-12-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2016-12-23MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-29PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2016-12-30SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-04AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-01-10Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-01-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-12MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-01-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-01-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-07AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-02-28PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-02-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-09MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-03-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-03-22Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-03-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-24Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-03-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-27MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-03-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-30AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-30UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-03-30Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-04-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-10AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-12SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-12SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-04-17UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-04-25PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-02PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-12Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-05-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-16SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-18UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-05-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-06-01Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-06-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-06-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-02AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-06Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-06-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-23PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-06-28SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2017-07-05PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2017-07-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-11UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-12PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-07-21SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-07-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-07-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-08-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-08-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-08-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-04AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-08-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-18MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-24New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-24UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-24SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-29Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-08-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-08-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-05UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-11PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-13SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-25ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-26Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-26New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-09-28Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-04PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-05Roof Covering ReplacementThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-05SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-25Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-25MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-10-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-27New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-10-31ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-03SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-06PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-11-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-14PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-22New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-22New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-29AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-29MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-30New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-11-30PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-06SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-07Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2017-12-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2017-12-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-08Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-08New constructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-11AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-12DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-01-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-25PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-25SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-01-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-01-30MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-02MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-05Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-02-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-13DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-02-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-02-28AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-09SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-16AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-22PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-03-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-10AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-04-18MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-04-23Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-15PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-15AdministrativeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-17Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-24ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-24Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-05-24MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-05-31MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-06-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-12PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-14SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-19Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-06-19MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-06-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-05ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-05DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-10SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-17SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-07-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-24Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-07-26ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-07-27New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-03Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-08-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-12PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-09-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-19MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-09-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-01Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-04Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-10Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-16MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-18Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-25Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-10-26DemolitionThis permit category usually covers partial or complete removal work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-26Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-10-29Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-06MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-06Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-11-07PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-16ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-11-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-11-26Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-11-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-11-30ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-05MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-06PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-07MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-10PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-10SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-17MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-12-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-18SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-19SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-20MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2018-12-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-12-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2018-12-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-04ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-08PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-09Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-01-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-15Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-01-15MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-17PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-22ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-01-31Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-02-04SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-02-11PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-21MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-26MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-27PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-02-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-02-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-02-27Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-03-08Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-03-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-13Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-03-14ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-21ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-25Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-03-28ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-01MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-02Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-04-04SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-04SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-05New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-09PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-09Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-11MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-15ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-16OperationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-23SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-26SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-04-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-01PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-01ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-02SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-03PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-08ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-09ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-13MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-20Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-05-20PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-23ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2019-05-23PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Permit · 2019-05-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-05-30AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-15Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-17Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-06-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-19ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-20ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-27ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-06-27SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-08AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-10ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-11ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-15AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-22MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-07-29ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-05PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-13ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-15Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-08-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2019-08-26AREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2019-08-30AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-06Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-10MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-18ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-09-19New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-03MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-03Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-10-07ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-08MechanicalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-11Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-11Major alterationA broad legacy permit work category for a substantial building alteration. It can include changed layouts, partitions, fixtures, finishes, structural work, or occupancy-related work, but only the approved scope and plans say what this permit actually authorized; separate trade permits may be required.What Philadelphia building permits can cover ↗
- Permit · 2019-10-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-21AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-22SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2019-10-22HG PHL RETAILERS, JV: Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2019-10-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-10-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-06ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-11SuppressionThis permit category usually covers fire-suppression systems or related life-safety work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-12ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-18PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-11-27New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-03AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-17ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-17New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-26Amend for conversionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2019-12-26PlumbingThis permit category usually covers water, drainage, fixtures, or other plumbing work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-02ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-17AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-01-31New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-03ElectricalThis permit category usually covers electrical installation, alteration, replacement, or repair. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-03New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-06New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-13AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-13New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-18New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-20New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-27New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-28Zoning/useThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-02-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-03AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-08Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-10Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-10Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-12Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-03-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-04-07New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-04-10New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-04-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-04-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-04-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-22New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-22New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-05-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-06-04New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-06-04New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-06-15New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-07-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-07-22Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-08-20Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-08Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-09-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-07AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-10-30Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-09Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-10Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-24Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-11-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-07Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Permit · 2020-12-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-08Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Permit · 2020-12-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-09Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Permit · 2020-12-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2020-12-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-01-22Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-04Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-11New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-02-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-17Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-03-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-04-13AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-05-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-10Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-06-29Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-07-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-07-09Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-07-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-07-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-07-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-08-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-08-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-09-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-10-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-10-21New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-18AntennaThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-11-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2021-12-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-11AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-14Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-14New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-24AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-03AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-14New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-21Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-23Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-02-24Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-09Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-09AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-16AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-03-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-06Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-06New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-12AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-22Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-04-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-19AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-24Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-26New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-05-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-06-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-07-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-08Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-12AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-08-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-08Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-09New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-09-09Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-17Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-21Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-21Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-10-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-01Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-01New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-02New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-11-15FoundationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-12-09Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-12-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-12-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-12-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2022-12-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-06FoundationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-01-28AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-10Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-02-28New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-02Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-14Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2023-03-20PHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2023-03-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-03-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-21AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-04-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-02Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-04AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-15AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-24Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-26Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-30New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-05-30Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-06-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-07-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-07-20Parking OnlyThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-07-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-07-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-03New Construction or AdditionsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Appeal · 2023-08-21BBS Permit DenialA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Permit · 2023-08-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-29AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-08-31Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-07Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-08New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-25New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-09-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-17AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-20SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-10-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-01AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-06Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-15Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-11-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-05New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-07Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-14AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-19AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-19Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2023-12-19NEW ELECTRICAL WIRINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-12-19NEW ELECTRICAL WIRINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2023-12-19NEW ELECTRICAL WIRINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2023-12-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2023-12-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2023-12-19L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2023-12-25Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-27Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2023-12-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-09Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-23Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2024-01-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-01-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-01-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2024-01-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-24AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-26AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-08Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-21New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-21Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-22Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-02-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-08Signs (Accessory / Non-Accessory)This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-11Sitework with Onsite Utility ServicesThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-03-23New ConstructionThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-18AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-04-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-23Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-05-29SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-06-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-06-10Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-06-14AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-06-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-07-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-07-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-21New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-08-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-04AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-09AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-10Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-13AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-17Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-09-27Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-10-02Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2024-10-02Jackmont of Philadelphia II, LLC (ELIXR COFFEE): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2024-10-09Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-10-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-10-17Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-11-04Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-11-06Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-11-13Tank Install/RemovalThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-11-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-11-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-12AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-13Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2024-12-17SSP America PHL, LLC (Bar Symon): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2024-12-26Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2024-12-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-07AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-15AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2025-01-15AD Partnership LLC (Chase Sapphire Lounge by The Club): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2025-01-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-23Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-01-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-04Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-19Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-21AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-21Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-02-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-26AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-26AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-26AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-03-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-04Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-07Parking OnlyThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- License · 2025-04-07Phl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2025-04-08AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-11General Earth Disturbance ONLYThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-23AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Certification · 2025-04-24Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-04-24Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Permit · 2025-04-25Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-28Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-28Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-04-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-05General Earth Disturbance ONLYThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-06AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-07Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-08Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2025-05-08FDC SIGNAGE REQUIREDA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08DISPOSAL OF OILY WASTEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08FIRE EXTINGUISHERSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08PERIODIC TESTINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08FOOD - LARGE ESTABLISHMENT LICENSEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08RENTAL LICENSE- HOTEL (R1)A dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08HIGH-RISE BUILDINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08SUPPRESSION SYSTEM TESTING & MAINTENANCEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08COMMERCIAL SYSTEM TESTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08UTILITY IDENTIFICATIONA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08EQUIPMENT ROOMSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08HANDRAILS & GUARDSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08EXIT DOORSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08CLEARANCE FROM IGNITION SOURCESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2025-05-08FIRE EXTINGUISHER HANGERS & BRACKETSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- License · 2025-05-08OTG Management PHL B, LLC (CIBO Bistro & Wine Bar): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Permit · 2025-05-13Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-22Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-05-29Site Clearing or Earth Disturbance ONLYThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-11Signs (Accessory / Non-Accessory)This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-20Roof Covering ReplacementThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-06-23Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-01Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-02Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-02Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-10Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-17Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-17Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2025-07-18L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2025-07-23Interior Non-Load-Bearing Wall Demo.This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-25Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-29Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-07-31Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-01Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-05Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-08AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-11Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-19Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-08-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-05Signs (Accessory / Non-Accessory)This permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-08General Earth Disturbance ONLYThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-10AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-12AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-19Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-22Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-23Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-24Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-09-29Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-07Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-07Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Inspection · 2025-10-08L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2025-10-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-14Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-16Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-20Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-20Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-20AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-21Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-22Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-27AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-10-30Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-11-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-11-11AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-11-13Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-11-19Roof Covering ReplacementThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-02Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-15AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-15Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2025-12-31Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-08Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-12Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-20Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-01-31AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-03Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-09Rough-InThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-09Change of UseThis permit category usually covers the property’s allowed use, dimensions, occupancy, or site configuration. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-10Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-12Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-13Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-18Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-02-27Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Certification · 2026-02-27Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Permit · 2026-03-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-03Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-04Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-06Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-11Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-12New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-18Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-19AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-20Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-03-25Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-06Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-06AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-15Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-15Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-21Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-21Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-04-30Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-05-05Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-05-06Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-05-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2026-05-08UNAPPROVED ALTERNATIVE MATERIALSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-05-08APPROVED PLANS ON -SITEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2026-05-08L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-05-08L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Permit · 2026-05-14Addition and/or AlterationsThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-05-15Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-02General Earth Disturbance ONLYThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-04SignThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-17New construction, addition, GFA changeThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-06-23Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-07-08Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- Permit · 2026-07-24Addition and/or AlterationThis permit category usually covers construction, repair, alteration, addition, or occupancy work. The approved scope—not the short category—defines what was authorized, and issuance alone does not prove completion.Philadelphia construction and repair permits ↗
- L&I violation · 2007-04-12F+C LIQ-PROVIDE CLOS RPTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2007-04-12VIOL C&I MESSAGEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2007-04-12CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2009-02-12VIOL C&I MESSAGEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2009-02-12CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2012-04-27PENALTY- NO BLDG PERM INFOA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-04-27PERME- ALTER ELEC INSTALLATIONA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-04-27STOP WORK ORDERA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2012-04-27PERMB- ALTER REPAIR INT PART (Building permit required for interior alteration or repair)Building permit required for interior alteration or repairHow L&I violations and orders work ↗
- L&I violation · 2012-04-27PENALTY- NO ELEC PERM INFOA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2012-04-27BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2013-05-29FOOD NON PERM LOC LOA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2013-05-29HCEU INSP (Housing Code Enforcement Unit inspection)A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended.What Philadelphia inspections check ↗
- L&I violation · 2013-06-25CAL LO (Commercial Activity License required)Philadelphia Code §19-2602(1) requires a Commercial Activity License before conducting business in the city.How L&I violations and orders work ↗
- L&I violation · 2013-06-25OBTAIN LIC INDICATED (Obtain the license identified in the notice)The shorthand does not identify the license type; open the case notice for that detail.How L&I violations and orders work ↗
- L&I violation · 2013-06-25OBTAIN LIC INDICATED (Obtain the license identified in the notice)The shorthand does not identify the license type; open the case notice for that detail.How L&I violations and orders work ↗
- L&I violation · 2013-06-25CAL LO (Commercial Activity License required)Philadelphia Code §19-2602(1) requires a Commercial Activity License before conducting business in the city.How L&I violations and orders work ↗
- Inspection · 2013-06-25BC INSP (likely: building-code inspection)Legacy inspection shorthand; confirm the inspection type and scope in the City case file.What Philadelphia inspections check ↗
- Inspection · 2013-06-25BC INSP (likely: building-code inspection)Legacy inspection shorthand; confirm the inspection type and scope in the City case file.What Philadelphia inspections check ↗
- Inspection · 2013-06-25BC INSP (likely: building-code inspection)Legacy inspection shorthand; confirm the inspection type and scope in the City case file.What Philadelphia inspections check ↗
- Inspection · 2013-06-25BC INSP (likely: building-code inspection)Legacy inspection shorthand; confirm the inspection type and scope in the City case file.What Philadelphia inspections check ↗
- L&I violation · 2017-11-13UNAPPROVED MAT'L ETCA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2017-11-13BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- L&I violation · 2026-07-22FOOD - LARGE ESTABLISHMENT LICENSEA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22EXIT DOORSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22FIRE EXTINGUISHERSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22EQUIPMENT ROOMSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22PERIODIC TESTINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22HALON SYSTEMSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22COMMERCIAL SYSTEM TESTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22HIGH RISE BUILDINGSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22RECORD KEEPINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22HIGH-RISE BUILDINGA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22RENTAL LICENSE- HOTEL (R1)A dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2026-07-22FIRE EXTINGUISHER HANGERS & BRACKETSA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2014-04-19INSURANCE - POST CERTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2014-04-19INSURANCE - POST CERTA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2016-04-14PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2018-03-28ARCHITECT/ENGINEER SERVICESA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2018-03-28PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2019-05-21PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- L&I violation · 2019-09-25PERMB- WK DONE W/O NOTIFY INSPA dated L&I enforcement row. Read the cited code, required correction, status, and later inspections together; the title alone does not establish the property’s current condition.How L&I violations and orders work ↗
- Inspection · 2006-07-28CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-08-22CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-08-23BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-09-13CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-10-02CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-10-02CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-10-23BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2006-12-12BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2007-05-07CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2008-04-09CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2008-11-04CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2010-10-08CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2010-10-08CI INSPA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2011-06-09CI HAZMATA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2012-05-04BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2012-06-01BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2012-07-13BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2013-06-07BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2014-02-24HCEU INSP (Housing Code Enforcement Unit inspection)A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended.What Philadelphia inspections check ↗
- Inspection · 2014-02-24BP_LICENSEA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2017-05-31PRECOURT (likely: pre-court compliance inspection)A follow-up before or during enforcement escalation; confirm the case sequence in the City file.What Philadelphia inspections check ↗
- Inspection · 2018-01-03BP_BLDGA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-08-10L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-08-10L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2024-08-12L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2025-05-09L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-06-15L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-07-20L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-07-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- Inspection · 2026-07-23L&I investigationA dated L&I visit or review. Its type describes the inspection program; the separate result and later rows show whether that visit passed, failed, or led to follow-up.What Philadelphia inspections check ↗
- License · 2026-07-16CPC Airport PHL LLC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-05-26MRG Philadelphia II LLC (Penn's Landing): Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-05-21The Grove/M2 JV, LLC (Dos Toros): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-05-07MRG Philadelphia II, LLC (Starbucks): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-04-22The Grove/M2 JV, LLC (Pretzels & Pints): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-03-09American Airlines, Inc.: Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2025-08-21Jackmont of Philadelphia, LLC (Middle Child): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2025-06-06Jackmont of Philadelphia, LLC (Federal Donuts & Chicken): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2025-05-28Jackmont of Philadelphia, LLC (Oyster House): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2024-08-07OTG MANAGEMENT PHL B, LLC ( LOVE GRILLE): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2024-07-30OTG MANAGEMENT PHL LLC: Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2024-04-02Airport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-05-31Airport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2023-10-03SSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2025-12-01SSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2023-10-02SSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2025-11-30SSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2023-09-01SLA Worldwide LLC: Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2023-08-11CPC Airport PHL LLCC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2026-05-18PHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2023-02-07Phl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2022-08-24HG PHL Retailers, JV (Hudson 2056): Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2022-03-17HG PHL Retailers, JV (Hudson ): Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2022-03-17HG PHL Retailers, JV (Hudson 2054): Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2021-06-08Seven Hills Inc (Burger King Term E (Space E-15)): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2022-10-24AREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license marked inactiveA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2019-08-07HG PHL RETAILERS, JV (Hudson News (STORE 1854)): Food Establishment, Retail Permanent Location business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2019-07-26The Grove, Inc. (Philly Pretzel Factory ): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2019-07-24OTG MANAGEMENT PHL B, LLC (INDEPENDENCE PRIME): Food Preparing and Serving (30+ SEATS) business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2019-06-05Sven Hills Inc (Jims South St Steaks and Hoagies (Terminal C24)): Food Preparing and Serving business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- License · 2012-12-27PHILADELPHIA PARKING AUTHORITY (ROCCO MORROTTO): Public Garage / Parking Lot business license initially issuedA City license record tied to an activity or property use. Its issue, expiration, inactive, and status fields—not the category alone—show what was recorded for this date.Philadelphia L&I licenses and property records ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-12Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-15Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-15Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2020-12-15Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2021-12-06Facade ReportA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2021-12-11Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2022-10-06Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2022-11-10Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-01-08Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2024-04-24Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-02-05Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-02-13Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-02-13Special Hazards CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-09-03Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2025-09-18Sprinkler CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Certification · 2026-06-18Fire Alarm CertificationA filed inspection or certification for a regulated building system or component. Check the result, expiration date, and latest filing before treating it as current.What Philadelphia inspections check ↗
- Appeal · 2009-01-26Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2010-03-24RB_LIRBA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2011-02-15Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2011-08-25RB_LIRBA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2015-11-25Building standards appealA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
- Appeal · 2024-05-07PAB Permit DenialA challenge or request reviewed through a City appeals process. Filing an appeal does not show who prevailed; read the decision, conditions, and related permit or violation.How Philadelphia L&I appeals work ↗
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
- PermitAddition and/or Alteration
- InspectionL&I investigation
- InspectionL&I investigation
- L&I violationFOOD - LARGE ESTABLISHMENT LICENSE
- L&I violationEXIT DOORS
- L&I violationFIRE EXTINGUISHERS
- L&I violationEQUIPMENT ROOMS
- L&I violationPERIODIC TESTING
- L&I violationHALON SYSTEMS
- L&I violationCOMMERCIAL SYSTEM TEST
- L&I violationHIGH RISE BUILDINGS
- L&I violationRECORD KEEPING
- L&I violationHIGH-RISE BUILDING
- L&I violationRENTAL LICENSE- HOTEL (R1)
- L&I violationFIRE EXTINGUISHER HANGERS & BRACKETS
- InspectionL&I investigation
- LicenseCPC Airport PHL LLC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- CertificationFire Alarm Certification
- PermitNew construction, addition, GFA change
- InspectionL&I investigation
- PermitSign
- PermitGeneral Earth Disturbance ONLY
- LicenseAirport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license marked inactive
- LicenseMRG Philadelphia II LLC (Penn's Landing): Food Establishment, Retail Permanent Location business license initially issued
- LicenseThe Grove/M2 JV, LLC (Dos Toros): Food Preparing and Serving business license initially issued
- LicensePHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license marked inactive
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- L&I violationUNAPPROVED ALTERNATIVE MATERIALS
- L&I violationAPPROVED PLANS ON -SITE
- InspectionL&I investigation
- InspectionL&I investigation
- LicenseMRG Philadelphia II, LLC (Starbucks): Food Preparing and Serving business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseThe Grove/M2 JV, LLC (Pretzels & Pints): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitNew construction, addition, GFA change
- PermitAddition and/or Alterations
- LicenseAmerican Airlines, Inc.: Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- CertificationSprinkler Certification
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitRough-In
- PermitChange of Use
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- LicenseSSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license marked inactive
- LicenseSSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license marked inactive
- PermitRoof Covering Replacement
- PermitRough-In
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- InspectionL&I investigation
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- CertificationSprinkler Certification
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitGeneral Earth Disturbance ONLY
- PermitAddition and/or Alteration
- PermitSigns (Accessory / Non-Accessory)
- CertificationFire Alarm Certification
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseJackmont of Philadelphia, LLC (Middle Child): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitChange of Use
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitAddition and/or Alteration
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- InspectionL&I investigation
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitRoof Covering Replacement
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitSigns (Accessory / Non-Accessory)
- PermitAddition and/or Alterations
- LicenseJackmont of Philadelphia, LLC (Federal Donuts & Chicken): Food Preparing and Serving business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitSite Clearing or Earth Disturbance ONLY
- LicenseJackmont of Philadelphia, LLC (Oyster House): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- InspectionL&I investigation
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- L&I violationFDC SIGNAGE REQUIRED
- L&I violationDISPOSAL OF OILY WASTE
- L&I violationFIRE EXTINGUISHERS
- L&I violationPERIODIC TESTING
- L&I violationFOOD - LARGE ESTABLISHMENT LICENSE
- L&I violationRENTAL LICENSE- HOTEL (R1)
- L&I violationHIGH-RISE BUILDING
- L&I violationSUPPRESSION SYSTEM TESTING & MAINTENANCE
- L&I violationCOMMERCIAL SYSTEM TEST
- L&I violationUTILITY IDENTIFICATION
- L&I violationEQUIPMENT ROOMS
- L&I violationHANDRAILS & GUARDS
- L&I violationEXIT DOORS
- L&I violationCLEARANCE FROM IGNITION SOURCES
- L&I violationFIRE EXTINGUISHER HANGERS & BRACKETS
- LicenseOTG Management PHL B, LLC (CIBO Bistro & Wine Bar): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitRough-In
- PermitAlterations
- PermitGeneral Earth Disturbance ONLY
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- CertificationFire Alarm Certification
- CertificationFire Alarm Certification
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitGeneral Earth Disturbance ONLY
- PermitAddition and/or Alterations
- PermitAlterations
- PermitParking Only
- LicensePhl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license marked inactive
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAlterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- CertificationFire Alarm Certification
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- CertificationSprinkler Certification
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitChange of Use
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- LicenseAD Partnership LLC (Chase Sapphire Lounge by The Club): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseSSP America PHL, LLC (Bar Symon): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitTank Install/Removal
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- LicenseJackmont of Philadelphia II, LLC (ELIXR COFFEE): Food Preparing and Serving business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew construction, addition, GFA change
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- LicenseOTG MANAGEMENT PHL B, LLC ( LOVE GRILLE): Food Preparing and Serving (30+ SEATS) business license initially issued
- LicenseOTG MANAGEMENT PHL LLC: Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitSign
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- AppealPAB Permit Denial
- CertificationFire Alarm Certification
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- LicenseAirport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitSitework with Onsite Utility Services
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitSigns (Accessory / Non-Accessory)
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitNew construction, addition, GFA change
- PermitAddition and/or Alteration
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alterations
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- CertificationFire Alarm Certification
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitRough-In
- PermitChange of Use
- PermitAlterations
- PermitAddition and/or Alterations
- L&I violationNEW ELECTRICAL WIRING
- L&I violationNEW ELECTRICAL WIRING
- L&I violationNEW ELECTRICAL WIRING
- InspectionL&I investigation
- InspectionL&I investigation
- InspectionL&I investigation
- PermitAddition and/or Alteration
- PermitAlterations
- PermitRough-In
- PermitNew construction, addition, GFA change
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitSign
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- LicenseSSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license initially issued
- LicenseSSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license initially issued
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitRough-In
- LicenseSLA Worldwide LLC: Food Preparing and Serving business license initially issued
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- AppealBBS Permit Denial
- PermitAddition and/or Alteration
- LicenseCPC Airport PHL LLCC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAddition and/or Alterations
- PermitNew Construction or Additions
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitParking Only
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicensePHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitChange of Use
- PermitRough-In
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicensePhl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitFoundation
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitFoundation
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alteration
- PermitNew Construction or Additions
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitAlterations
- LicenseAREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license marked inactive
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- CertificationSprinkler Certification
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseHG PHL Retailers, JV (Hudson 2056): Food Establishment, Retail Permanent Location business license initially issued
- PermitAddition and/or Alteration
- PermitAlterations
- PermitRough-In
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitSitework with Onsite Utility Services
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitRough-In
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew construction, addition, GFA change
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseHG PHL Retailers, JV (Hudson ): Food Establishment, Retail Permanent Location business license initially issued
- LicenseHG PHL Retailers, JV (Hudson 2054): Food Establishment, Retail Permanent Location business license initially issued
- PermitAlterations
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitTank Install/Removal
- PermitAddition and/or Alterations
- PermitRough-In
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitSitework with Onsite Utility Services
- PermitNew Construction or Additions
- PermitAlterations
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- CertificationFacade Report
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAntenna
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- LicenseSeven Hills Inc (Burger King Term E (Space E-15)): Food Preparing and Serving business license initially issued
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitChange of Use
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitRough-In
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alterations
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- PermitAddition and/or Alteration
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- CertificationSpecial Hazards Certification
- PermitAlterations
- PermitRough-In
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alterations
- PermitAlterations
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitRough-In
- PermitAddition and/or Alterations
- PermitAddition and/or Alterations
- PermitAddition and/or Alteration
- PermitRough-In
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitRough-In
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitRough-In
- PermitRough-In
- PermitRough-In
- PermitAlterations
- PermitZoning/use
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAlterations
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAlterations
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitElectrical
- PermitAmend for conversion
- PermitPlumbing
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitAlterations
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitPlumbing
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitPlumbing
- PermitElectrical
- PermitSuppression
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitElectrical
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitSuppression
- LicenseHG PHL RETAILERS, JV: Food Establishment, Retail Permanent Location business license initially issued
- PermitNew Construction
- PermitAlterations
- PermitNew Construction
- PermitTank Install/Removal
- PermitMajor alteration
- PermitNew Construction
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitNew Construction
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitAddition and/or Alteration
- PermitAlterations
- PermitNew Construction
- LicenseAREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitNew Construction
- PermitTank Install/Removal
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- LicenseHG PHL RETAILERS, JV (Hudson News (STORE 1854)): Food Establishment, Retail Permanent Location business license initially issued
- PermitPlumbing
- PermitElectrical
- LicenseThe Grove, Inc. (Philly Pretzel Factory ): Food Preparing and Serving business license initially issued
- LicenseOTG MANAGEMENT PHL B, LLC (INDEPENDENCE PRIME): Food Preparing and Serving (30+ SEATS) business license initially issued
- PermitMechanical
- PermitAlterations
- PermitElectrical
- PermitElectrical
- PermitAlterations
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitNew Construction
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitRough-In
- PermitElectrical
- PermitElectrical
- PermitNew Construction
- LicenseSven Hills Inc (Jims South St Steaks and Hoagies (Terminal C24)): Food Preparing and Serving business license initially issued
- PermitNew Construction
- PermitAlterations
- PermitElectrical
- PermitElectrical
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitElectrical
- PermitMajor alteration
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitNew Construction
- PermitSuppression
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitElectrical
- PermitSuppression
- PermitOperations
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitAddition and/or Alteration
- PermitNew Construction
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitMechanical
- PermitNew Construction
- PermitElectrical
- PermitTank Install/Removal
- PermitSuppression
- PermitElectrical
- PermitNew Construction
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitNew Construction
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitNew Construction
- PermitNew Construction
- PermitMechanical
- PermitNew Construction
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitPlumbing
- PermitMechanical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitNew Construction
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitZoning/use
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitDemolition
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitNew Construction
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitDemolition
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitElectrical
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitElectrical
- PermitAlterations
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitNew Construction
- PermitNew Construction
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitElectrical
- PermitNew Construction
- PermitElectrical
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitNew Construction
- PermitElectrical
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitNew Construction
- PermitSuppression
- PermitElectrical
- PermitDemolition
- PermitElectrical
- PermitElectrical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitPlumbing
- PermitAdministrative
- PermitElectrical
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- PermitNew Construction
- PermitElectrical
- PermitAlterations
- PermitNew Construction
- PermitAddition and/or Alteration
- L&I violationARCHITECT/ENGINEER SERVICES
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitElectrical
- PermitPlumbing
- PermitAdministrative
- PermitElectrical
- PermitSuppression
- PermitMechanical
- PermitAdministrative
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- PermitDemolition
- PermitMajor alteration
- PermitPlumbing
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitNew Construction
- PermitMajor alteration
- PermitPlumbing
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitNew Construction
- PermitSuppression
- PermitDemolition
- PermitAdministrative
- PermitElectrical
- PermitPlumbing
- PermitNew Construction
- PermitElectrical
- PermitZoning/use
- PermitNew construction
- InspectionBP_BLDG
- PermitElectrical
- PermitNew Construction
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitNew Construction or Additions
- PermitPlumbing
- PermitElectrical
- PermitAdministrative
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitNew Construction
- PermitNew Construction
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- L&I violationUNAPPROVED MAT'L ETC
- InspectionBP_BLDG
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitNew Construction
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitRoof Covering Replacement
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitAddition and/or Alteration
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitZoning/use
- PermitNew construction
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitUse
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitNew Construction
- PermitUse
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitAdministrative
- PermitMechanical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitNew Construction
- PermitMajor alteration
- PermitAlterations
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitPlumbing
- PermitUse
- PermitNew Construction
- PermitPlumbing
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitAddition and/or Alteration
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitNew Construction
- PermitNew Construction
- PermitZoning/use
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitAlterations
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- InspectionPRECOURT (likely: pre-court compliance inspection)
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitUse
- PermitElectrical
- PermitNew Construction
- PermitNew Construction
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitPlumbing
- PermitNew Construction
- PermitAddition and/or Alteration
- PermitElectrical
- PermitUse
- PermitMajor alteration
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitNew Construction
- PermitAlterations
- PermitMechanical
- PermitNew Construction
- PermitMechanical
- PermitMechanical
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitAlterations
- PermitUse
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitAddition and/or Alteration
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitAdministrative
- PermitElectrical
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitAlterations
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- PermitUse
- PermitUse
- PermitAddition and/or Alteration
- PermitUse
- PermitMajor alteration
- PermitAddition and/or Alteration
- PermitUse
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitAddition and/or Alteration
- PermitElectrical
- PermitPlumbing
- PermitUse
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitNew Construction
- PermitElectrical
- PermitUse
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitDemolition
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitAddition
- PermitElectrical
- PermitAddition and/or Alteration
- PermitUse
- PermitElectrical
- PermitAddition and/or Alteration
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitElectrical
- PermitMajor alteration
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitNew construction
- PermitSuppression
- PermitUse
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitAddition and/or Alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitDemolition
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitSuppression
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitAddition and/or Alteration
- PermitPlumbing
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitAdministrative
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitAddition
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitMajor alteration
- AppealBuilding standards appeal
- PermitElectrical
- PermitElectrical
- PermitAdministrative
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitOperations
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitInterior Non-Load-Bearing Wall Demo.
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitZoning/use
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitNew Construction
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitDemolition
- PermitUse
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitSign
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitUse
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitPlumbing
- PermitDemolition
- PermitAdministrative
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitZoning/use
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitUse
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMechanical
- PermitMechanical
- L&I violationINSURANCE - POST CERT
- L&I violationINSURANCE - POST CERT
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitMajor alteration
- PermitDemolition
- PermitDemolition
- PermitDemolition
- PermitAdministrative
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitPlumbing
- InspectionHCEU INSP (Housing Code Enforcement Unit inspection)
- InspectionBP_LICENSE
- PermitMechanical
- PermitSuppression
- PermitAlteration
- PermitMajor alteration
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitMajor alteration
- PermitAdministrative
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitSuppression
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitAlteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitAdministrative
- PermitUse
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitMechanical
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitMajor alteration
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitAdministrative
- PermitAdministrative
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- InspectionCEASE INSP (likely: cease-operations compliance inspection)
- InspectionCEASE INSP (likely: cease-operations compliance inspection)
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitNew construction
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitNew construction
- PermitNew construction
- PermitNew Construction
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitUse
- PermitMajor alteration
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitMajor alteration
- PermitSuppression
- PermitNew construction
- PermitNew construction
- PermitSuppression
- PermitMechanical
- PermitElectrical
- PermitZoning/use
- L&I violationCAL LO (Commercial Activity License required)
- L&I violationOBTAIN LIC INDICATED (Obtain the license identified in the notice)
- L&I violationOBTAIN LIC INDICATED (Obtain the license identified in the notice)
- L&I violationCAL LO (Commercial Activity License required)
- InspectionBC INSP (likely: building-code inspection)
- InspectionBC INSP (likely: building-code inspection)
- InspectionBC INSP (likely: building-code inspection)
- InspectionBC INSP (likely: building-code inspection)
- PermitElectrical
- InspectionBP_BLDG
- PermitUse
- PermitUse
- PermitUse
- PermitAdministrative
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitUse
- PermitMajor alteration
- PermitPlumbing
- InspectionBP_BLDG
- PermitUse
- PermitMechanical
- PermitMajor alteration
- PermitAdministrative
- PermitAdministrative
- PermitAdministrative
- AppealBuilding standards appeal
- PermitElectrical
- L&I violationFOOD NON PERM LOC LO
- InspectionHCEU INSP (Housing Code Enforcement Unit inspection)
- PermitMechanical
- PermitAdministrative
- PermitZoning/use
- PermitNew construction
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitZoning/use
- PermitZoning/use
- PermitZoning/use
- PermitNew construction
- PermitMajor alteration
- PermitSuppression
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitUse
- PermitMechanical
- PermitSuppression
- PermitMajor alteration
- PermitPlumbing
- PermitElectrical
- L&I violationARCHITECT/ENGINEER SERVICES
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- L&I violationCO- WK NOT ENTIRELY DONE NO CO
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- L&I violationARCHITECT/ENGINEER SERVICES
- L&I violationCO- WK NOT ENTIRELY DONE NO CO
- InspectionBP_BLDG
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitMajor sign
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitAdministrative
- PermitMajor alteration
- PermitUse
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitAddition
- PermitMechanical
- PermitAddition
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitUse
- PermitUse
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitUse
- PermitUse
- PermitMechanical
- PermitUse
- PermitElectrical
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitSign
- L&I violationSTOP WORK ORDER
- L&I violationPENALTY- NO BLDG PERM INFO
- L&I violationPERMB- INSTALL FIRE SUPP SYS
- PermitElectrical
- PermitMajor alteration
- LicensePHILADELPHIA PARKING AUTHORITY (ROCCO MORROTTO): Public Garage / Parking Lot business license initially issued
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- L&I violationCONTRACTOR UNLICENSED SUB
- L&I violationSWO- CONTRARY TO GOOD PRACTICE
- L&I violationCONTRACTOR LIC NEEDED
- L&I violationCVN-EMPLOYING UNLIC SUBCONTR
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitZoning/use
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitPlumbing
- PermitAdministrative
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitMechanical
- InspectionBP_BLDG
- InspectionBP_BLDG
- PermitPlumbing
- PermitNew construction
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitZoning/use
- PermitMajor alteration
- PermitZoning/use
- PermitMajor alteration
- PermitZoning
- PermitMajor alteration
- PermitSuppression
- PermitPlumbing
- PermitUse
- PermitUse
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitZoning/use
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- InspectionBP_BLDG
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitUse
- PermitSuppression
- PermitMajor alteration
- InspectionBP_BLDG
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitElectrical
- InspectionBP_BLDG
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- L&I violationPENALTY- NO BLDG PERM INFO
- L&I violationPERME- ALTER ELEC INSTALLATION
- L&I violationSTOP WORK ORDER
- L&I violationPERMB- ALTER REPAIR INT PART (Building permit required for interior alteration or repair)
- L&I violationPENALTY- NO ELEC PERM INFO
- InspectionBP_BLDG
- PermitPlumbing
- PermitUse
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitUse
- PermitPlumbing
- PermitMechanical
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitMechanical
- L&I violationPERMB- WK DONE W/O NOTIFY INSP
- PermitAddition
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitSuppression
- PermitUse
- PermitPlumbing
- PermitElectrical
- PermitMajor alteration
- PermitAlteration
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitMajor alteration
- PermitZoning
- PermitMechanical
- PermitMajor alteration
- PermitPlumbing
- PermitUse
- PermitElectrical
- PermitAlteration
- PermitSuppression
- PermitSign
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitElectrical
- PermitZoning/use
- PermitSuppression
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- PermitPlumbing
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- AppealBuilding standards appeal
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- AppealRB_LIRB
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitUse
- PermitElectrical
- PermitDemolition
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitUse
- PermitUse
- PermitMajor alteration
- PermitUse
- PermitUse
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- InspectionCI HAZMAT
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitUse
- PermitMechanical
- PermitElectrical
- PermitElectrical
- AppealZoning board appeal
- PermitAdministrative
- PermitAdministrative
- PermitElectrical
- PermitMechanical
- PermitUse
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitAddition
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitDemolition
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- InspectionCI HAZMAT
- PermitMechanical
- PermitZoning
- PermitUse
- PermitSuppression
- PermitMechanical
- PermitAddition
- PermitPlumbing
- PermitPlumbing
- PermitZoning/use
- PermitMechanical
- PermitUse
- AppealBuilding standards appeal
- PermitElectrical
- PermitZoning/use
- PermitElectrical
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitSuppression
- PermitPlumbing
- PermitMajor alteration
- PermitMechanical
- PermitUse
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- L&I violationCHANGE IN OCCUPANCY
- L&I violationVIOL C&I MESSAGE
- InspectionCI HAZMAT
- PermitSuppression
- PermitElectrical
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitSign
- PermitElectrical
- PermitNew construction
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitPlumbing
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- InspectionCI INSP
- InspectionCI INSP
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitNew Construction
- PermitMajor alteration
- PermitPlumbing
- PermitSuppression
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitAdministrative
- PermitMajor alteration
- PermitPlumbing
- PermitUse
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitUse
- PermitMajor alteration
- PermitMechanical
- PermitAdministrative
- PermitPlumbing
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- AppealRB_LIRB
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitZoning/use
- PermitUse
- PermitSuppression
- PermitSuppression
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitAdministrative
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitAlteration
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitAdministrative
- PermitMechanical
- PermitSuppression
- PermitAdministrative
- PermitUse
- PermitDemolition
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitNew construction
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitSuppression
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitZoning/use
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitUse
- PermitUse
- PermitMechanical
- PermitPlumbing
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitAdministrative
- PermitAlteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitNew construction
- PermitFast form building
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitPlumbing
- PermitElectrical
- PermitNew construction
- PermitUse
- PermitElectrical
- PermitUse
- PermitSuppression
- PermitUse
- PermitMechanical
- PermitNew construction
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitZoning/use
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitPlumbing
- PermitMajor alteration
- PermitSuppression
- PermitMajor alteration
- PermitNew construction
- PermitSuppression
- PermitSuppression
- PermitSuppression
- PermitRough-In
- PermitUse
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitPlumbing
- PermitPlumbing
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitDemolition
- PermitElectrical
- PermitSuppression
- PermitAdministrative
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitAddition
- PermitMajor alteration
- PermitZoning/use
- PermitSuppression
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitFast form building
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitUse
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitZoning/use
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitUse
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitFast form building
- PermitElectrical
- PermitFast form building
- PermitUse
- PermitMechanical
- PermitMajor alteration
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitNew Construction
- PermitPlumbing
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitUse
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitFast form building
- PermitNew construction
- PermitElectrical
- PermitMechanical
- L&I violationVIOL C&I MESSAGE
- L&I violationHAZMAT-LIC REQ¿D
- L&I violationEGRESS EXIT SIGNS VISIBILITY
- L&I violationANNUAL CERT FIRE ALARM
- L&I violationFIRE-ELECT OPEN JUNCTION BOX
- L&I violationANNUAL CERT STANDBY/EMERG LITE
- L&I violationFIRE SUPP-REPLACE SPRKLR HEAD
- L&I violationHAZMAT ID STATIONARY CONTAINER
- L&I violationFIRE EXTING-INSTALL TYPE K
- L&I violationINT MATERIAL STORAGE EQUIP RM
- L&I violationFA-REP SYS SMOKE DET
- L&I violationEGRESS EXIT SIGNS REQ
- L&I violationEGRESS-INT CLEAR OBSTRUCTION
- L&I violationELEVATORS POST EMERGENCY SIGN
- L&I violationEGRESS LANDING SIGN IN STAIRS
- L&I violationANNUAL CERT FIRE SUPP
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- PermitUse
- L&I violationVIOL C&I MESSAGE
- InspectionCI INSP
- PermitFast form building
- PermitSuppression
- PermitMajor alteration
- PermitElectrical
- PermitSuppression
- AppealBuilding standards appeal
- PermitMajor alteration
- PermitMajor alteration
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitDemolition
- PermitElectrical
- PermitDemolition
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitAlteration
- PermitAlteration
- PermitAdministrative
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitSuppression
- PermitUse
- PermitUse
- PermitSuppression
- PermitElectrical
- PermitElectrical
- InspectionCI INSP
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitAddition
- PermitSuppression
- PermitSign
- PermitUse
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitNew Construction
- PermitNew Construction
- PermitElectrical
- PermitMajor alteration
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitUse
- PermitSuppression
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitPlumbing
- PermitMechanical
- PermitMechanical
- PermitSuppression
- PermitSuppression
- PermitMechanical
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitSuppression
- PermitUse
- PermitAdministrative
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitPlumbing
- PermitMechanical
- PermitMajor alteration
- PermitPlumbing
- PermitMechanical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitDemolition
- PermitElectrical
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitZoning
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitMechanical
- PermitElectrical
- PermitAdministrative
- PermitPlumbing
- PermitFast form building
- PermitFast form building
- PermitZoning/use
- PermitPlumbing
- PermitSuppression
- PermitAddition
- PermitUse
- PermitMajor alteration
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMajor alteration
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitUse
- PermitFast form building
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitNew Construction
- PermitElectrical
- PermitDemolition
- PermitFast form building
- PermitUse
- PermitZoning/use
- PermitElectrical
- PermitZoning
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitUse
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- PermitPlumbing
- PermitAddition
- PermitPlumbing
- InspectionCI INSP
- PermitAdministrative
- PermitMajor alteration
- PermitElectrical
- L&I violationVIOL C&I MESSAGE
- L&I violationF+C LIQ-PROVIDE CLOS RPT
- InspectionCI INSP
- PermitElectrical
- PermitUse
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMajor alteration
- PermitMechanical
- PermitFast form building
- PermitSuppression
- PermitPlumbing
- PermitPlumbing
- PermitAdministrative
- PermitMajor alteration
- PermitMechanical
- PermitPlumbing
- PermitMechanical
- PermitMechanical
- PermitFast form building
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitFast form building
- PermitFast form building
- PermitFast form building
- PermitFast form building
- PermitFast form building
- PermitSign
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitMajor alteration
- PermitFast form building
- PermitFast form building
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitElectrical
- PermitPlumbing
- PermitUse
- PermitPlumbing
- PermitPlumbing
- PermitDemolition
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitSuppression
- PermitFast form building
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitUse
- PermitUse
- PermitMajor alteration
- PermitMajor alteration
- PermitSign
- PermitFast form building
- PermitFast form building
- PermitSuppression
- PermitSuppression
- PermitElectrical
- PermitSuppression
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- AppealBuilding standards appeal
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitFast form building
- PermitElectrical
- PermitPlumbing
- PermitMechanical
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitUse
- PermitUse
- PermitZoning/use
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMechanical
- PermitDemolition
- PermitNew construction
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitNew construction
- PermitPlumbing
- PermitElectrical
- PermitZoning/use
- PermitOperations
- PermitFast form building
- PermitElectrical
- InspectionCI INSP
- PermitMechanical
- PermitMajor alteration
- PermitElectrical
- PermitMajor alteration
- L&I violationF+C LIQ-PROVIDE CLOS RPT
- L&I violationVIOL C&I MESSAGE
- InspectionCI INSP
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMajor alteration
- PermitFast form building
- PermitMajor alteration
- PermitUse
- PermitElectrical
- PermitElectrical
- PermitAddition
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitSuppression
- PermitElectrical
- PermitElectrical
- PermitSuppression
- PermitMajor alteration
- PermitUse
- PermitSuppression
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitElectrical
- PermitElectrical
- PermitPlumbing
- PermitPlumbing
- PermitMajor alteration
- PermitElectrical
- PermitFast form building
- PermitUse
- PermitElectrical
- PermitFast form building
- PermitMajor alteration
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitMajor alteration
- PermitMechanical
- PermitMechanical
- PermitMechanical
- PermitElectrical
- PermitElectrical
- PermitElectrical
- PermitUse
- InspectionBP_BLDG
- InspectionBP_BLDG
- InspectionCI INSP
- InspectionCI INSP
- InspectionCI INSP
- InspectionBP_BLDG
- InspectionCI INSP
- InspectionCI INSP
Verify the public record
Property tax
$60,696/year estimated property tax
2026 taxable assessment $4,336,018 × 1.3998%. This is an estimate, not a bill or account balance. The City maintains payments, credits, interest, and the current amount due.
OPA has published a 2027 assessment of $258,799,000. It is not the 2026 billed-year value.
Payments, credits, interest, and the current amount due are maintained by the City.
OPA 7733000012026 OPA taxes $4,336,018 of $258,799,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.
See the assessment math →Historical delinquency sources No current conclusion
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Property report
Commercial property
Commercial, recorded in the City's commercial category. The public record and owner trail follow.
13 open violations
Recorded owner
Who's behind it
City Of Phila & Dept Of Public Prop · corporate / LLC owner
• Owns 3858 properties across Philadelphia under this name, assessed at $6.6B combined
• Tax bills mail to 1401 John F Kennedy Blvd, Philadelphia PA, 19102
Block context
8500 block of Essington Ave. Compare parcels, ownership, and public-record history.
See the whole block →L&I license dates · data through Jul 27, 2026
Business licenses at this address Latest pull
What L&I has registered at this OPA parcel, newest initial license date first.
Food Preparing and Serving (30+ SEATS) · Initial issue date Jul 16, 2026 · Filed expiration Jul 15, 2027
Food Establishment, Retail Permanent Location · Initial issue date May 26, 2026 · Filed expiration May 25, 2027
Food Preparing and Serving · Initial issue date May 21, 2026 · Filed expiration May 20, 2027
Food Preparing and Serving · Initial issue date May 7, 2026 · Filed expiration May 6, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Apr 22, 2026 · Filed expiration Apr 21, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Mar 9, 2026 · Filed expiration Mar 8, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Aug 21, 2025 · Filed expiration Aug 20, 2026
Food Preparing and Serving · Initial issue date Jun 6, 2025 · Filed expiration Jun 5, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date May 28, 2025 · Filed expiration May 27, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date May 8, 2025 · Filed expiration May 7, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Jan 15, 2025 · Filed expiration Jan 14, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Dec 17, 2024 · Filed expiration Dec 16, 2026
Food Preparing and Serving · Initial issue date Oct 2, 2024 · Filed expiration Oct 1, 2026
Food Preparing and Serving (30+ SEATS) · Initial issue date Aug 7, 2024 · Filed expiration Aug 6, 2026
Food Preparing and Serving (30+ SEATS) · Initial issue date Jul 30, 2024 · Filed expiration Jul 29, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Apr 2, 2024 · Terminal license date May 31, 2026
Food Preparing and Serving · Initial issue date Oct 3, 2023 · Terminal license date Dec 1, 2025
Food Preparing and Serving · Initial issue date Oct 2, 2023 · Terminal license date Nov 30, 2025
Food Preparing and Serving · Initial issue date Sep 1, 2023 · Filed expiration Aug 31, 2026
Food Preparing and Serving (30+ SEATS) · Initial issue date Aug 11, 2023 · Filed expiration Aug 10, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Mar 20, 2023 · Terminal license date May 18, 2026
Food Preparing and Serving (30+ SEATS) · Initial issue date Feb 7, 2023 · Terminal license date Apr 7, 2025
Food Establishment, Retail Permanent Location · Initial issue date Aug 24, 2022 · Filed expiration Aug 23, 2026
Food Establishment, Retail Permanent Location · Initial issue date Mar 17, 2022 · Filed expiration Apr 24, 2027
Food Establishment, Retail Permanent Location · Initial issue date Mar 17, 2022 · Filed expiration Mar 16, 2027
Food Preparing and Serving · Initial issue date Jun 8, 2021 · Filed expiration Jun 7, 2027
Food Establishment, Retail Permanent Location · Initial issue date Oct 22, 2019 · Filed expiration Oct 21, 2026
Food Preparing and Serving (30+ SEATS) · Initial issue date Aug 26, 2019 · Terminal license date Oct 24, 2022
Food Establishment, Retail Permanent Location · Initial issue date Aug 7, 2019 · Filed expiration Aug 6, 2026
Food Preparing and Serving · Initial issue date Jul 26, 2019 · Filed expiration Jul 25, 2027
Food Preparing and Serving (30+ SEATS) · Initial issue date Jul 24, 2019 · Filed expiration Jul 23, 2027
Food Preparing and Serving · Initial issue date Jun 5, 2019 · Filed expiration Jun 4, 2027
Public Garage / Parking Lot · Initial issue date Dec 27, 2012 · Filed expiration Dec 31, 2026
A license is an L&I registration, not proof that a business is open, operating today, or located at this storefront. Dates are license dates. Events are deduped by parcel, business identity, and license type, so a renewal is not shown as another opening. Other permit and filing types remain in the full source ledger.
Inferred from public records · 2025-07-29 through 2026-07-29
Food and drink at this property
7 possible-opening record signals in this 12-month window. These are classifications, not confirmed announcements.
Inference, not an opening announcement. Possible-opening classifications are inferences from public permit and license records, not confirmed opening announcements. A permit is authorization for a stated scope, not proof that work occurred or finished. A license is an L&I registration, not proof that a business is open or operating. Food and drink uses the seven exact L&I license types already used by BlockReport. The City record does not support a reliable restaurant, bar, and cafe split. License renewals do not create new events. The opening date is the earliest initial issue date for a deduped OPA parcel, normalized business identity, and license type. Sources: L&I building permits and L&I business licenses, data through Jul 29, 2026.
Open every source row 3,073 dated rows
- PermitAddition and/or Alteration
Permit CP-2026-001922 · Issued
FOR A ROOF STRUCTURE REPAIR TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- InvestigationL&I investigation
Case CF-2026-093068 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2025-033018 · PASSED
The cited inspection visit was marked passed.
- ViolationFOOD - LARGE ESTABLISHMENT LICENSE
Case CF-2026-093068 · Violation VI-2026-056472 · Code 6-301(4)(A)(.1) · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationEXIT DOORS
Case CF-2026-093068 · Violation VI-2026-056336 · Code F-1104.28 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationFIRE EXTINGUISHERS
Case CF-2026-093068 · Violation VI-2026-056337 · Code F-906.2 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationEQUIPMENT ROOMS
Case CF-2026-093068 · Violation VI-2026-056348 · Code F-315.3.3 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationPERIODIC TESTING
Case CF-2026-093068 · Violation VI-2026-056350 · Code F-901.6.4 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationHALON SYSTEMS
Case CF-2026-093068 · Violation VI-2026-056353 · Code F-904.9 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationCOMMERCIAL SYSTEM TEST
Case CF-2026-093068 · Violation VI-2026-056355 · Code F-904.12.5.2 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationHIGH RISE BUILDINGS
Case CF-2026-093068 · Violation VI-2026-056375 · Code F-403.11.2 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationRECORD KEEPING
Case CF-2026-093068 · Violation VI-2026-056377 · Code F-405.5 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationHIGH-RISE BUILDING
Case CF-2026-093068 · Violation VI-2026-056470 · Code F-105.6.3 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationRENTAL LICENSE- HOTEL (R1)
Case CF-2026-093068 · Violation VI-2026-056471 · Code 9-3902 (4) · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationFIRE EXTINGUISHER HANGERS & BRACKETS
Case CF-2026-093068 · Violation VI-2026-056333 · Code F-906.7 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- InvestigationL&I investigation
Case CF-2026-049214 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- License issue eventCPC Airport PHL LLC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issued
License 1012985 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit CP-2026-001729 · Issued
FOR THE REMOVAL OF EXISTING ROOF-MOUNTED LIGHTING AND INSTALLATION OF NEW LIGH POLES AT GROUND LEVEL. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2026-005200 · Issued
Install fire alarm devices on existing fire alarm system. PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- CertificationFire Alarm Certification
Certification BC-2026-017723 · Certified
Expires 2027-06-18
- PermitNew construction, addition, GFA change
Permit ZP-2026-003494 · Issued
FOR THE ERECTION OF TWENTY-SEVEN (27) LIGHT STRUCTURES. SIZE AND LOCATION AS SHOWN IN PLANS.
- InvestigationL&I investigation
Case CF-2026-049214 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitSign
Permit GP-2026-003665 · Issued
FOR THE REFACING OF EXISTING SIGNS; ONE(1) FLAT WALL SIGN AND ONE (1) PROJECTING SIGN **WORK TO BE COMPLETED PER APPROVED PLANS**
- PermitGeneral Earth Disturbance ONLY
Permit SP-2026-000379 · Issued
SITE WORK PERMIT FOR GENERAL EARTH DISTURBANCE ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- License terminal eventAirport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license marked inactive
License 948140 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventMRG Philadelphia II LLC (Penn's Landing): Food Establishment, Retail Permanent Location business license initially issued
License 1008457 · Active
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventThe Grove/M2 JV, LLC (Dos Toros): Food Preparing and Serving business license initially issued
License 1008245 · Active
License event. Registration does not prove present operation or storefront occupancy.
- License terminal eventPHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license marked inactive
License 919263 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2026-004394 · Issued
Demo Only of Electrical Cabinets/ Electrical Remotes, Conduit, and Wire of AW and F Parking Garage Cell Sites
- PermitAddition and/or Alterations
Permit FP-2026-000912 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (41) sprinklers in PHL RAE3
- PermitAddition and/or Alteration
Permit EP-2026-003193 · Issued
Install new conduit, explosion-proof fittings, and wiring to support the installation of a 12,000-gallon underground gasoline storage tank and two (2) fuel dispensers, in accordance with the approved drawings. Work includes all required raceways, conductors, seals, terminations, grounding, and bonding necessary for a complete and code-compliant installation in a hazardous (classified) location. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- ViolationUNAPPROVED ALTERNATIVE MATERIALS
Case CF-2026-049214 · Violation VI-2026-029841 · Code A-203.3/1 · OPEN
The individual violation row was marked open in the assembled City file; verify the live notice and any later inspection.
- ViolationAPPROVED PLANS ON -SITE
Case CF-2026-049233 · Violation VI-2026-029843 · Code A-302.5.1 · SVN ISSUED
Resolution: SVN ISSUED
- InvestigationL&I investigation
Case CF-2026-049214 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2026-049233
- License issue eventMRG Philadelphia II, LLC (Starbucks): Food Preparing and Serving business license initially issued
License 1006950 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2026-003534 · Issued
Install fire alarm devices and tie in to existing building fire alarm system.-2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2026-003508 · Issued
Replacement of existing BBC and EBBC Switchgear in same location as existing. New lighting, Grounding, and Security cameras in the switchgear yard as per 2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2026-001768 · Issued
FOR LOBBY RENOVATION TO A PORTION OF AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alteration
Permit EP-2026-000406 · Issued
Disconnect existing and re-feed (14) new RTU's @ E Concourse PHL. Upgrade Fire Alarm and wire new Duct Detectors and Shut Down Relays . all work per approved plans. MP-2025-001869
- License issue eventThe Grove/M2 JV, LLC (Pretzels & Pints): Food Preparing and Serving (30+ SEATS) business license initially issued
License 1005438 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit FP-2026-000705 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) sprinklers in PHL B-C Connector space BC/27-AB
- PermitAddition and/or Alteration
Permit EP-2026-001168 · Completed
Furnish and install fire alarm for new pretzel and pints space in Terminal A East at PHL Airport as per 2016 NFPA 72.
- PermitAddition and/or Alterations
Permit FP-2026-000674 · Completed
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 12 gallon kitchen fire suppression system, per UL 300
- PermitAddition and/or Alterations
Permit FP-2026-000673 · Completed
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 8 gallon kitchen fire suppression system, per UL 300
- PermitAddition and/or Alteration
Permit EP-2026-001435 · Amendment Application Incomplete
Electrical Permit for combo CP-2026-000245
- PermitAddition and/or Alterations
Permit MP-2026-001045 · Issued
Mechanical / Fuel Gas Permit for combo CP-2026-000245
- PermitAlterations
Permit PP-2026-002140 · Issued
Plumbing Permit (Interior) for combo CP-2026-000245
- PermitAddition and/or Alteration
Permit CP-2026-000245 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE (B-C Connector, Space BC/27-AB (Lafayette’s)) IN TERMINAL B OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS FOR PARTIAL DEMOLITION AND INTERIOR RENOVATIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS**. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**EXISTING BUILDING FULLY SPRINKLERED**IEBC 2018
- PermitAddition and/or Alterations
Permit FP-2026-000512 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (39) sprinkler heads for Escape Lounge tenant fit-out
- PermitAlterations
Permit PP-2026-001675 · Issued
Installation of one (1) dish table, one (1) 3 compartment sink, one (1) 1 compartment prep sink, two (2) hand sinks, six (6) floor sinks, one (1) dump sink, one (1) mop sink, one (1) water closet, one (1) lavatory and one (1) hot water heater with associated piping for all.
- PermitAddition and/or Alteration
Permit EP-2025-012043 · Issued
Disconnect & remove the existing disconnects and starters from the Mechanical and HVAC equipment. Install new Feeders to the mechanical-supplied disconnects, VFDs, and equipment. Disconnect existing Duct Detectors and install new Duct Detectors on the latest HVAC equipment. Remove existing Lighting fixtures & replace with new Lighting fixtures. All work in accordance with NEC & NFPA. All work Per approved plans
- PermitNew construction, addition, GFA change
Permit ZP-2026-001795 · Issued
FOR ADDITIONS TO TERMINALS (D) & (E) AND ASSOCIATED SITE WORK TO AN EXISTING STRUCTURE FOR USE AS PART OF THE PHILADELPHIA INTERNATIONAL AIRPORT; SIZE AND LOCATION AS PER APPLICATION/PLAN.
- PermitAddition and/or Alterations
Permit MP-2026-001181 · Issued
Mechanical / Fuel Gas Permit for combo CP-2026-000612
- License issue eventAmerican Airlines, Inc.: Food Preparing and Serving (30+ SEATS) business license initially issued
License 1001458 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2026-001049 · Issued
Install electrical panels and associated feeders to serve the space. Provide lighting fixtures, branch circuit wiring, and wiring devices including receptacles and switches. Install electrical connections for kitchen equipment and HVAC units. Furnish and install data cabling and communication jacks. All work shall be performed in accordance with the 2017 NEC and per approved plans. Amendment: Install Fire Alarm devices and associated conduit and wiring. Connect to existing building fire alarm system All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- PermitAddition and/or Alterations
Permit FP-2026-000421 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (7) sprinkler heads in space BC29B
- PermitAddition and/or Alteration
Permit CP-2026-000612 · Issued
FOR A LEVEL II INTERIOR ALTERATIONS TOINCLUDE A TENANT FIT-OUT TO A PORTION OF THE EXISTING AIRPORT TERMINAL. FOR A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-011725 · Amendment Application Incomplete
Fitout for new tenant (Sunglass Hut) to space-alteration to existing electrical system, including but not limited to new lighting fixtures to ceiling, display cases
- PermitAddition and/or Alteration
Permit EP-2026-001746 · Completed
Electrical Permit for combo CP-2026-001063
- PermitAddition and/or Alteration
Permit CP-2026-001063 · Issued
FOR AN ALTERATION TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alterations
Permit MP-2026-000934 · Issued
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK TO ACCOMMODATE A NEW TENANT AT THE AIRPORT . APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- CertificationSprinkler Certification
Certification BC-2026-006191 · Certified
Expires 2027-02-27
- PermitAddition and/or Alterations
Permit MP-2026-000674 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-005421
- PermitAddition and/or Alteration
Permit CP-2025-006204 · Issued
FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY CLASSIFICATION. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- PermitAddition and/or Alterations
Permit MP-2026-000196 · Issued
FOR TA MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- PermitAddition and/or Alterations
Permit FP-2026-000177 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (9) sprinkler heads to accommodate alterations to Space BC7
- PermitAddition and/or Alterations
Permit FP-2026-000164 · Issued
FOR ALTERATIONS TO AN EXISTING AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL HEADS THROUGHOUT RENOVATED BATHROOMS (RD5, RB2, RC1, and RF6) AS PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13. SEE CP-2023-002079 FOR ASSOCIATED BUILDING PERMIT.
- PermitRough-In
Permit FP-2026-000169 · Completed
Rough-In Permit for FP-2026-000164 Install (125) sprinklers to accommodate renovations to restrooms RD5, RB2, RC1, and RF6; new sprinklers will be tied into existing systems and backflow preventers
- PermitChange of Use
Permit ZP-2026-001199 · Issued
Eating and Drinking Establishments - Sit-Down Restaurant
- PermitAddition and/or Alterations
Permit MP-2026-000327 · Issued
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.* NO BUILDIGN ALTERATIONS/NO PARENT PERMIT ASSOCIATED WITH THIS PERMIT *
- PermitAddition and/or Alterations
Permit FP-2026-000158 · Completed
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install pre-engineered, wet chemical kitchen fire suppression system into kitchen hood at Paris Baguette. System type: CAS TANK 4/4 (8 gal system).
- PermitAlterations
Permit PP-2026-001338 · Completed
FOR THE INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING FOR CONVEYANCE AND SUPPLY FOR COMMERCIAL SPACE SHALL BE METALLIC TO ROOF EXTENSION. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2025-005421 · Issued
FOR A LEVEL II INERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR A NEW TENANT FIT-OUT AT THE AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**MECHANICAL WORK TO BE PROVIDED PER APPROVED PLANS ** ELLECTRICAL REVIEW TO INCLUDE INSTALLATION OF NEW WIRING, TELECOMMUNICATIONS WIRING, EMERGENCY LIGHTING, LIGHTING, JUNCTION BOX, RECEPTACLES AND OUTLETS.**PLUMBING WORK TO INCLUDE INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING FOR CONVEYANCE AND SUPPLY FOR COMMERCIAL SPACE SHALL BE METALLIC TO ROOF EXTENSION. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.**SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alteration
Permit EP-2026-000844 · Completed
FOR THE INSTALLATION OF NEW WIRING, TELECOMMUNICATIONS WIRING, EMERGENCY LIGHTING, LIGHTING, JUNCTION BOX, RECEPTACLES AND OUTLETS. Amended 3/13/26 Add Fire Alarm Devices to restaurant space. Wiring to connect to the existing airport system. ALL WORK PER APPROVED PLANS
- PermitAddition and/or Alterations
Permit MP-2025-005532 · Issued
TO REMOVE AND REPLACE 40 FT. RADIANT TUBE HEATER AND TIE IT INTO EXISTING GAS LINE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-009851 · Completed
RELOCATE POWER, DATA installation. Fire alarm Installation in accordance with NFPA 72 & The Philadelphia Fire code 2018
- PermitAddition and/or Alteration
Permit EP-2025-010738 · Issued
Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, AC ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disconnect and reconnect fire alarm pull stations.
- PermitAddition and/or Alteration
Permit EP-2025-011791 · Issued
Furnish & Install upgrade to PHL Video Security Surveillance System, network hardware and cable, CCTV cameras, power wire, CAT6, and fiber throughout Terminals D & E as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2025-012199 · Issued
Replace existing electrical distribution panel with new 225A, 120/208Y distribution panel. Disconnect and remove wiring to existing HVAC equipment and replace with new branch circuit wiring to replacement equipment. Install branch circuit wiring to new equipment. All branch circuit wiring rated 120V, 240V or 208V up to 60A maximum.
- PermitAddition and/or Alteration
Permit CP-2025-006202 · Issued
FOR LEVEL II INTERIOR ALTERATIONS TO EXISTING BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit FP-2026-000028 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (70) sprinklers to accommodate interior alterations
- PermitAddition and/or Alteration
Permit EP-2025-009556 · Completed
INSTALL A DAMAGE DETECTION CAMERA SYSTEM AT BOTH THE CUSTOMER EXIT AND CUSTOMER ENTRANCE. THE SYSTEM CONSISTS OF AN ARCH WITH CAMERAS AND LIGHTS TO DETECT THE PRESENCE OF DAMAGE AND RELAY THE IMAGES TO HERTZ PERSONNEL. INSTALL RECEPTACLES, ETHERNET WIRING, AND PROVIDE POWER TO UV EYES AS PER 2017 NEC. SERVICE IS EXISTING.
- PermitAddition and/or Alteration
Permit EP-2025-011751 · Completed
Electrical Permit for combo CP-2025-003902
- PermitAddition and/or Alterations
Permit FP-2025-002551 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (33) sprinklers to accommodate alterations to space AE-01
- PermitAddition and/or Alteration
Permit EP-2025-011321 · Completed
Provide new Electrical & Tele/Data Services to new Kiosk. All work to be done according to the 2017 NEC and per approved plans.
- PermitAddition and/or Alteration
Permit EP-2025-011712 · Completed
Fire Alarm modifications for a Paris Baguette store in Philadelphia International Airport terminal C space 8. PER APPROVED DRAWINGS.
- PermitAlterations
Permit PP-2025-015954 · Completed
Plumbing Permit (Interior) for combo CP-2025-003902
- PermitAddition and/or Alterations
Permit MP-2025-006336 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-003902
- PermitAddition and/or Alteration
Permit CP-2025-003860 · Issued
FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO EXISTING TSA STAFF AREA (GROUP B) LOCATED IN D/E CONNECTOR PRE-SECURITY AREA OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- PermitAddition and/or Alteration
Permit CP-2025-003902 · Completed
FOR A TENANT FIT-OUT TO AN EXISTING SPACE (SPACE AE-01) FOR A NEW VENDOR AT THE AIRPORT. ALTERATIONS TO INCLUDE THE SELECTIVE DEMOLITION OF EXISTING PARTITIONS AND THE NEW ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. MECHANICAL UPGRADE TO BE INCLUDED AS PART OF THE SCOPE OF WORK. PLUMBING WORK TO INCLUDE EXTENSION OF WATER SUPPLY PROVIDED BY AIRPORT, NEW WATER HEATER, AND ALL ASSOCIATED SUPPLY AND SANITARY WASTE ROUGH-INS FOR NEW FOOD SERVICE EQUIPMENT. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alterations
Permit MP-2025-004167 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-003812
- License terminal eventSSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license marked inactive
License 934792 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License terminal eventSSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license marked inactive
License 934668 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitRoof Covering Replacement
Permit GM-2025-010625 · Issued
EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Exiting Roofs as per attached standard. Deviations from these standards require submission of construction and site plans.
- PermitRough-In
Permit EP-2025-010782 · Completed
Rough-In Permit for EP-2025-010738 Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, AC ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disconnect and reconnect fire alarm pull stations.
- PermitAlterations
Permit PP-2025-012392 · Completed
domestic water piping with 1 water heater Sanitary piping with 2-grease traps,1-trench drain,19 floor sinks 9 floor drains and 1 hand sink
- PermitAddition and/or Alteration
Permit EP-2025-009824 · Completed
THE MODIFICATION OF THE FIRE ALARM SYSTEM IN THE TENANT SPACE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- PermitAddition and/or Alteration
Permit EP-2025-008182 · Completed
Electrical Permit for combo CP-2025-003811 amendment :Add fire alarm devices .
- PermitAddition and/or Alterations
Permit MP-2025-004893 · Completed
FOR THE INSTALLATION OF TWO (2) TYPE I COMMERCIAL KITCHEN HOODS AND NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION. AMENDMENT 4/25/26 TO INCLUDE GAS PIPING.
- PermitAddition and/or Alterations
Permit MP-2025-004396 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-003811
- PermitAlterations
Permit PP-2025-010887 · Completed
Installation of the following fixtures with associated piping:
- PermitAddition and/or Alterations
Permit FP-2025-002183 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) existing sprinkler heads for alterations to Starbucks, Terminal C, Space C-12-B
- PermitAddition and/or Alterations
Permit FP-2025-002184 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (27) sprinklers to accommodate interior alterations to BC Connector space BC-17 A/B
- PermitAddition and/or Alteration
Permit EP-2025-007684 · Completed
Installation of new 100 amp MLO panel, lighting and fixtures, outlets, receptacles, CCTV's, TV's, speakers, wireless access points, kiosks, and data rack with associated wiring and telecommunications wiring as per 2017 NEC. ***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM*** AMENDMENT: Install fire alarm devices on an existing fire alarm system as per 2016 NFPA 72.
- PermitAddition and/or Alteration
Permit EP-2025-010113 · Completed
Electrical Permit for combo CP-2025-003814
- PermitAddition and/or Alterations
Permit FP-2025-002155 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (18) sprinklers to accommodate interior alterations to space C08
- PermitAddition and/or Alteration
Permit EP-2025-009652 · Completed
Electric panels, general lighting, emergency lighting, lighting controls, receptacles, Kitchen and HVAC equipment power wiring. Fire alarm system (conduit pathways for security, data, audio, video. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2018 PHILA FIRE CODE.
- PermitAddition and/or Alteration
Permit CP-2025-003814 · Completed
FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP B EATING ESTABLISHMENT IN SPACE #C08 WITHIN PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL C. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- PermitAddition and/or Alteration
Permit CP-2025-003538 · Issued
FOR INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE CONCRETE REPAIR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2025-005332 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-003814 For the installation of fuel gas piping, GRDs and associated ductwork, and one (1) Type 1 commercial kitchen hood exhaust system as per approved plans and in accordance with 2018 IMC. Separate permits to be obtained for all other work.
- PermitAlterations
Permit PP-2025-013629 · Completed
Plumbing Permit (Interior) for combo CP-2025-003814
- PermitAddition and/or Alteration
Permit CP-2025-003811 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING COFFEE SHOP IN SPACE C-12-B OF TERMINAL C OF AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit CP-2025-003515 · Issued
FOR THE REPLACEMENT OF CURTAIN WALL AT TERMINAL D-E AND ASSOCIATED CONNECTOR BRIDGES AS PER APPROVED PLANS. SPEARATE PERMITS REQUIRED FOR OTHER WORK. *2018 IBC*
- PermitAddition and/or Alteration
Permit EP-2025-008236 · Issued
Upgrade and install electric lighting: recessed downlights, cylindrical downlight LED, linear direct/indirect LED as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2025-002532 · Issued
REPLACING THE MUFIDS MONITORS WITH NEW MONITORS AS PER 2017 NEC AND PER PLANS..
- InvestigationL&I investigation
Case CF-2023-127578 · PASSED
The cited inspection visit was marked passed.
- PermitAddition and/or Alteration
Permit EP-2025-009671 · Issued
Electrical Permit for combo CP-2025-003215
- PermitAddition and/or Alteration
Permit CP-2025-003215 · Issued
FOR A ROOF SYSTEM UPGRADE TO HOUSE NEW MECHANICAL EQUIPMENT PER APPROVED PLANS.**. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** ELECTRICAL WORK TO INCLUDE THE INSTALLATION OF WIRING FOR REPLACEMENT AND ADDITION OF HVAC UNITS IN 13 TELECOM ROOMS THROUGHOUT. **ELECTRICAL AMENDMENT :ELECTRICAL DRAWINGS HAVE BEEN UPDATED TO REFLECT ONLY ROOMS BT2050, AT2029, AC1085, ET1072, DT1072, AND CC1008 WHICH ARE LOCATED IN THE CITY OF PHILADELPHIA.**
- PermitAddition and/or Alterations
Permit MP-2025-005137 · Issued
Mechanical / Fuel Gas Permit for combo CP-2025-003215
- PermitAddition and/or Alterations
Permit MP-2025-002685 · Issued
FOR THE REMOVAL AND REPLACEMENT OF TWENTY-ONE (21) HVAC RTUs AT PHILADELPHIA INTERNATIONAL AIRPORT TERMINALS D AND E BAGGAGE CLAIM AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- PermitAddition and/or Alterations
Permit MP-2025-003254 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-001091
- PermitAddition and/or Alterations
Permit FP-2025-001978 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (46) sprinklers to accommodate alterations to Delta Sky Club
- PermitAddition and/or Alterations
Permit FP-2025-001976 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (15) sprinkler heads to accommodate alterations to space C-2, Insomnia Cookies
- PermitAddition and/or Alteration
Permit CP-2025-004663 · Issued
FOR CHANGE OF OCCUPANCY AT SPACE E9 AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- PermitAddition and/or Alteration
Permit EP-2025-007734 · Completed
Electrical panels, transformer & feeders, wiring devices, lights, HVAC & Kitchen equipment wiring, security system devices and wiring, communication devices & wiring. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC AMENDMENT: Install fire alarm.
- CertificationSprinkler Certification
Certification BC-2025-027828 · Certified
Expires 2026-09-18
- PermitAddition and/or Alteration
Permit EP-2025-005624 · Completed
Electrical Permit for combo CP-2025-001091
- PermitAlterations
Permit PP-2025-007665 · Completed
Plumbing Permit (Interior) for combo CP-2025-001091
- PermitAddition and/or Alterations
Permit FP-2025-001885 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (18) existing sprinkler heads to accommodate interior alterations to tenant space BC-3
- PermitAlterations
Permit PP-2025-009849 · Completed
Furnish and Install: Required Sanitary and Domestic Water Piping 5 Toilets 5 Lavatories 1 Floor Drain 1 Mop Receptor 1 Trap Primer 1 Domestic Recirc Pump 1 Electric Water Heater
- PermitGeneral Earth Disturbance ONLY
Permit SP-2025-001030 · Issued
FOR A EARTH DISTURBANCE PERMIT PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2025-001091 · Completed
FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING SPACE C-2 LOCATED IN TERMINAL C (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. FOR USE AS EATING AND DRINKING ESTABLISHMENTS-TAKE-OUT-RESTAURANT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitSigns (Accessory / Non-Accessory)
Permit ZP-2025-004324 · Issued
FOR THE INSTALLATION OF 123 DIRECTIONAL SIGNS. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- CertificationFire Alarm Certification
Certification BC-2025-030757 · Certified
Expires 2026-09-03
- PermitAddition and/or Alteration
Permit EP-2025-006382 · Issued
Replacement of existing substations with new electrical substations in various electrical substations at Philadelphia Airport. Utilizing existing service feeders to new transformers, switchboards, panelboards, disconnect switches, and circuit breakers as per 2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2025-003812 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL SPACE (SPACE BC-17 A/B) FOR NEW TENANT WITHIN EXISTING AIRPORT BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- License issue eventJackmont of Philadelphia, LLC (Middle Child): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0986889 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitChange of Use
Permit ZP-2025-007435 · Issued
Eating and Drinking Establishments - Take-Out Restaurant; Eating and Drinking Establishments - Sit-Down Restaurant
- PermitAddition and/or Alterations
Permit MP-2025-004031 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-006731 · Completed
Electrical Permit for combo CP-2025-003643
- PermitAddition and/or Alteration
Permit CP-2025-002330 · Completed
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS AN ASSEMBLY OCCUPANCY (A-2 RESTAURANT), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAlterations
Permit PP-2025-008988 · Completed
Plumbing Permit (Interior) for combo CP-2025-003643
- PermitAddition and/or Alterations
Permit MP-2025-003587 · Issued
FOR THE INSTALLATION OF DUCTWORK AND REGISTER/DIFFUSER AS PER APPROVED PLANS.
- PermitAddition and/or Alterations
Permit FP-2025-001606 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (2) sprinkler heads for interior alterations in Cibo wine bar
- PermitAddition and/or Alteration
Permit CP-2025-002486 · Issued
FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF MECHANICAL AND PLUMBING SYSTEMS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** ASBESTOS REMEDIATION REQUIRED **
- PermitAddition and/or Alteration
Permit CP-2025-003211 · Issued
Replacement of 21 existing rooftop air-handling units at D-Ticketing and C-D Connector bridge, D-Hammerhead, and E-F Connector bridge, and replacement of existing equipment support at PHL International Airport. Project includes hydronic piping, controls, and structural support.
- PermitAddition and/or Alteration
Permit EP-2025-000800 · Issued
Removal and replacement of twenty-six (26) rooftop air handling units (RTUs) on the roof of the B/C Baggage Claim Building as well as four (4) chilled water pumps, two (2) heat exchangers, two (2) fan coil units, two (2) hot water supply pumps, two (2) unit heaters, and two (2) glycol circulation pumps in Mechanical Room #11 serving the hydronic system for the RTUs, including associated ancillary devices, power, and controls in Mechanical Room #11; BAS for all equipment, related and required electrical work as per 2017 NEC. Install fire alarm devices as per 2016 NFPA 72.
- PermitAddition and/or Alteration
Permit CP-2025-003643 · Issued
FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF UTILITY WORK FOR PHL-TERMINAL AE, SPACE AE01. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-006427 · Completed
Electrical Permit for combo CP-2025-003466 - Installation of electrical and telecommunication wiring and devices with in a single tenant place not exceeding 2000 sqft.
- PermitAddition and/or Alteration
Permit EP-2025-005169 · Completed
INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- PermitChange of Use
Permit ZP-2025-007307 · Issued
Retail Sales - Food, Beverages, and Groceries; Retail Sales - Consumer Goods
- PermitAddition and/or Alteration
Permit EP-2025-006148 · Issued
Utilize existing core drills and provide a new floor box as shown on sheet E-003 Detail 5 "configuration B1". Provide (2) 1" conduits to the new floor box "A". Relocate existing power and date circuits shown. Provide a new floor box to match "configuration A" as shown on sheet E-003 Detail 4. Extend the existing power and data circuits to the new device. Provide new data cabling if the existing is short in length. Extend circuit "B-D/E-22A"-14,16 to the propsed L6-30R in configuration "A". Prepare existing L6-30R and extend circuit as shown. Installation shall comply with 2017 NEC.
- PermitInterior Non-Load-Bearing Wall Demo.
Permit GM-2025-006493 · Completed
EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. Separate Streets Department permit required for sidewalk and street closures. Interior demolition of non-bearing partitions.
- PermitAddition and/or Alteration
Permit EP-2025-005779 · Completed
INSTALL WIRING, LIGHTING, SWITCHES, EXIT SIGN, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS. AMENDMENT: Add fire alarm devices and connect to existing building system.(On Site Travel Essentials)
- PermitAddition and/or Alterations
Permit FP-2025-001491 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (31) sprinkler heads, to accommodate interior alterations to BC Connector-Space BC01
- InvestigationL&I investigation
Case CF-2025-033018 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alterations
Permit MP-2025-003324 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-003084
- PermitAddition and/or Alteration
Permit CP-2025-003466 · Issued
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- PermitAddition and/or Alteration
Permit CP-2025-003084 · Completed
FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE LOCATED AT THE AIRPORT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **NEW MECHANICAL WORK TO BE INCLUDED AS PART OF THE PERMIT**ELECTRICAL WORK TO INCLUDE INSTALLATION OF NEW WIRING, LIGHTING, SWITCHES, EXIT SIGN, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS.**SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-005991 · Completed
Remove and replace existing roof top units and associated fire alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- PermitChange of Use
Permit ZP-2025-006534 · Issued
Retail Sales - Consumer Goods
- PermitAddition and/or Alteration
Permit EP-2025-004494 · Issued
Equipment replacement 600V or less (Remove existing ticketing kiosks and install new kiosks), Installation of Low Voltage Wiring as per 2017 NEC.
- PermitAddition and/or Alterations
Permit MP-2025-001394 · Issued
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.*
- PermitAddition and/or Alterations
Permit FP-2025-001378 · Issued
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install kitchen fire suppression system #1 Tank FS (4.0/4.0 gallon) - Fire Cabinet Left - [covering 1 hood]
- PermitAddition and/or Alterations
Permit MP-2024-002350 · Issued
Mechanical / Fuel Gas Permit for combo CP-2024-001395
- PermitRoof Covering Replacement
Permit GM-2025-005085 · Completed
EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Existing Roofs as per attached standard. Deviations from these standards require submission of construction and site plans. Replacement of sheathing in excess of 10% of roof area shall not be applicable to the EZ permit process. Clean off existing roof of dirt, dust and debris then install new roof over existing roof.
- PermitAddition and/or Alteration
Permit EP-2025-004607 · Completed
Removal of old fleet charging station and installation of new EV chargers. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC .
- PermitAddition and/or Alteration
Permit EP-2025-003586 · Completed
Disconnect and make Electrical safe qty: (16) RTUs Furnish and install conduit, wiring as described for the new HVAC units. Disconnect and make the existing fire alarm devices safe. Install new fire alarm equipment for the Bridge and Terminal Roof top units. Includes and involves device and wiring upgrades in D Terminal/ Ticketing, D hammerhead and E-F Link .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- PermitAddition and/or Alterations
Permit MP-2025-002500 · Completed
FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTER/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- PermitAddition and/or Alteration
Permit EP-2025-003576 · Issued
Disconnect and make electrically safe qty (21) HVAC RTUs. Replace HVAC RTU(s) as per plans and 2017 NEC. Disconnect and Install new Fire Alarm Devices per drawings for the D/E baggage Claim RTUs as per 2016 NFPA 72.
- PermitSigns (Accessory / Non-Accessory)
Permit ZP-2024-007815 · Issued
For the erection of nine (9) freestanding directional signs [LI-36, LI-37, LI-38, LI-39, LI-42, LI-43, LI-45, LI-60, & LI-61] and the refacing of thirteen (13) existing directional signs [LI-40, LI-44, LI-46, LI-47, LI-48, LI-57, LI-58, LI-59, LI-62, LI-63, LI-66, LI-67, & LI-68]. Sizes and locations as shown on plans.
- PermitAddition and/or Alterations
Permit MP-2025-002853 · Issued
FOR ANEW MECHANICAL WORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**
- License issue eventJackmont of Philadelphia, LLC (Federal Donuts & Chicken): Food Preparing and Serving business license initially issued
License 0981022 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit CP-2025-002287 · Completed
FOR PARTIAL DEMOLITION AND FOR LEVEL II ALTERATION TO AN EXISTING STRUCTURE AT DELTA SKY CLUB. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOU, CONSTRUCTION OF FIVE (5) NEW SINGLE-OCCUPANCY RESTROOMS, INCLUDING TWO (2) FULLY ADA-COMPLIANT RESTROOMS WITH REQUIRED ACCESSIBILITY FEATURES AND ACCESSORIES. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS
- PermitAddition and/or Alteration
Permit EP-2025-004108 · Completed
The scope of work involved with this project encompasses removal, relocation, replacement of existing fire alarm devices, and installation of new and compatible fire alarm devices throughout the areas of work . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- PermitSite Clearing or Earth Disturbance ONLY
Permit ZP-2025-003666 · Issued
FOR THE SITE CLEARING WORK INCLUDING REMOVAL OF BUS SHUTTLE WAITING AREAS; REMOVAL OF LONG TERM PARKING ASSOCIATED WITH THE PHILADELPHIA INTERNATIONAL AIRPORT TO REPLACE WITH OPEN VEGETATED SPACE. SIZE AND LOCATION AS SHOWN ON PLANS.
- License issue eventJackmont of Philadelphia, LLC (Oyster House): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0980054 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit FP-2025-000986 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 40 sprinkler heads in ceiling from office space to Welcome Center
- PermitAddition and/or Alteration
Permit EP-2025-004715 · Completed
Install (6) duplex receptacles and (10 drive-thru lane light, fed from existing panel. Install low voltage wiring for (6) CCTV cameras and (2) Card Readers. All wiring to be in surface mounted conduit. No building permit involved.
- PermitAddition and/or Alteration
Permit EP-2025-004373 · Issued
Installation of conduit and wire throughout parking garage for Way-finding, Signage, and CCTV Cameras-2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2025-002107 · Issued
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE MODIFICATIONS TO THE EXISTING ROOF TO ACCOMMODATE THE REPLACEMENT ROOFTOP UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2025-001869 · Issued
FOR THE REPLACEMENT OF FOURTEEN (14) ROOFTOP UNITS. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- InvestigationL&I investigation
Case CF-2025-033018 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alteration
Permit EP-2025-004222 · Completed
Electrical Permit for combo CP-2025-000744
- PermitAddition and/or Alteration
Permit EP-2025-004171 · Completed
modification to electrical system and telecommunication work per drawings to existing restaurant. Note that Baba Bar is the current name on the EP contract (last location aka Tailgate)
- PermitAddition and/or Alterations
Permit MP-2025-002537 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-000744
- ViolationFDC SIGNAGE REQUIRED
Case CF-2025-033018 · Violation VI-2025-030725 · Code F-912.5 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationDISPOSAL OF OILY WASTE
Case CF-2025-033018 · Violation VI-2025-030721 · Code F-2311.2.3.2 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFIRE EXTINGUISHERS
Case CF-2025-033018 · Violation VI-2025-030719 · Code F-906.2 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPERIODIC TESTING
Case CF-2025-033018 · Violation VI-2025-030714 · Code F-901.6.4 · COMPLIED
Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFOOD - LARGE ESTABLISHMENT LICENSE
Case CF-2025-033018 · Violation VI-2025-030710 · Code 6-301(4)(A)(.1) · CLOSED
Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.
- ViolationRENTAL LICENSE- HOTEL (R1)
Case CF-2025-033018 · Violation VI-2025-030282 · Code 9-3902 (4) · CLOSED
Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.
- ViolationHIGH-RISE BUILDING
Case CF-2025-033018 · Violation VI-2025-030281 · Code F-105.6.3 · CLOSED
Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.
- ViolationSUPPRESSION SYSTEM TESTING & MAINTENANCE
Case CF-2025-033018 · Violation VI-2025-030715 · Code F-903.5 · COMPLIED
Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCOMMERCIAL SYSTEM TEST
Case CF-2025-033018 · Violation VI-2025-030760 · Code F-904.12.5.2 · COMPLIED
Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationUTILITY IDENTIFICATION
Case CF-2025-033018 · Violation VI-2025-030759 · Code F-509.1.1 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEQUIPMENT ROOMS
Case CF-2025-033018 · Violation VI-2025-030752 · Code F-315.3.3 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationHANDRAILS & GUARDS
Case CF-2025-033018 · Violation VI-2025-030750 · Code PM15-307 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEXIT DOORS
Case CF-2025-033018 · Violation VI-2025-030739 · Code F-1104.28 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCLEARANCE FROM IGNITION SOURCES
Case CF-2025-033018 · Violation VI-2025-030737 · Code F-305.1 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFIRE EXTINGUISHER HANGERS & BRACKETS
Case CF-2025-033018 · Violation VI-2025-030731 · Code F-906.7 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
- License issue eventOTG Management PHL B, LLC (CIBO Bistro & Wine Bar): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0978338 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitRough-In
Permit EP-2025-004375 · Completed
Rough-In Permit for EP-2025-004373 Installation of conduit and wire throughout parking garage for Way-finding, Signage, and Cameras
- PermitAlterations
Permit PP-2025-005818 · Completed
PP work includes removal of existing HWH and installation of new HWH-See drawing.
- PermitGeneral Earth Disturbance ONLY
Permit SP-2025-000416 · Completed
FOR THE REMOVAL OF EXISTING CONCRETE AND TRENCH ASPHALT, INSTALLATION OF NEW CONCRETE CURB & ISLAND, BACKFILL AND REPAVE ASPHALT FOR NEW ELECTRICAL VEHICLE CHARGING STATIONS PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2025-000744 · Issued
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- PermitAddition and/or Alteration
Permit EP-2025-004092 · Completed
Electrical Permit for combo CP-2025-002193
- PermitAddition and/or Alteration
Permit CP-2025-002193 · Completed
FOR LEVEL II ALTERATIONS TO INCLUDE NEW FLOORING, FIXTURES, EQUIPMENT, FURNISHINGS AS PER APPROVED PLANS. SEPARATE PERMITS FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- PermitAddition and/or Alteration
Permit EP-2024-008938 · Completed
Electrical Permit for combo CP-2024-004116
- PermitAddition and/or Alteration
Permit EP-2025-003767 · Completed
Electrical Permit for combo CP-2025-001537 AMENDMENT: INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- PermitAddition and/or Alterations
Permit FP-2025-000784 · Issued
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 2 tank fire suppression systems. FS #1 Tank (4 gallon) - Right Wall Utility Cabinet, covering 2 hoods. FS #2 Tank FS (4 gallon) - Left Wall Utility Cabinet, covering 1 hood
- PermitAddition and/or Alterations
Permit FP-2025-000875 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 8 sprinkler heads to accommodate interior alterations to space D9
- PermitAddition and/or Alterations
Permit MP-2025-002337 · Completed
Mechanical / Fuel Gas Permit for combo CP-2025-001537
- CertificationFire Alarm Certification
Certification BC-2025-014060 · Certified
Expires 2026-04-24
- CertificationFire Alarm Certification
Certification BC-2025-014056 · Certified
Expires 2026-04-24
- PermitAlterations
Permit PP-2025-005297 · Completed
Plumbing Permit (Interior) for combo CP-2025-001537
- PermitAddition and/or Alteration
Permit CP-2025-001537 · Completed
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. *******************SEPARATE PERMIT REQUIRED FOR FIRE-SUPPRESSION WORK. *********************
- PermitAddition and/or Alteration
Permit CP-2025-001109 · Issued
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE REPAIR OF THE EXISTING ROOF. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2025-000110 · Issued
FOR ROOF COVERING REMOVAL AND REPLACEMENT AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2025-001111 · Issued
FOR THE INSTALLATION OF NEW ROOF COVERING SYSTEM OVER EXISTING ONE LAYER EPDM ROOF SYSTEM. WORK WILL INCLUDE SELECTIVE DEMOLITION AND INSTALLATION OF NEW (2) PLY SBS MODIFIED BITUMEN ROOFING SYSTEM OVER EXISTING EPDM ROOF MEMBRANE. WORK ALSO TO INCLUDE (2) TIE-BACK ANCHORS PER APPROVED PLANS. ** EXTERIOR WORK ONLY**
- PermitGeneral Earth Disturbance ONLY
Permit SP-2025-000080 · Issued
FOR AN EARTH DISTURBANCE PERMIT. **WORK TO BE PERFORMED AS PER APPROVED PLANS** EARTH DISTURBANCE ONLY**
- PermitAddition and/or Alterations
Permit FP-2024-001925 · Issued
Fire Suppression System Permit for combo CP-2024-004116
- PermitAlterations
Permit PP-2025-001686 · Amendment Application Incomplete
INSTALL 7 FLOOR SINKS, 3 FLOOR DRAINS, 2 THREE COMPARTMENT SINKS, 3 HAND SINKS, 2 ICE MACHINE, 1 PREP SINK AND 1 GREASE INTERCEPTOR ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitParking Only
Permit ZP-2024-010528 · Completed
FOR THE INSTALLATION OF ELECTRIC VEHICLE CHARGING STATION AND ASSOCIATED PARKING PER APPROVED PLAN.
- License terminal eventPhl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license marked inactive
License 916072 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit FP-2025-000702 · Issued
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (500) sprinklers to accommodate changes in Terminal E and DE connector
- PermitAddition and/or Alteration
Permit EP-2025-001172 · Completed
Work in the Electrical Contract includes, but is not limited to, the following as per 2017 NEC: 1. Electrical service and distribution. 2. Interior lighting. 3. Communication and security. 4. Electrical connections to equipment furnished by the General Construction Contract. ***Application for fire alarm will be applied for when fire alarm drawings become available*** B. Temporary facilities and controls in the Electrical Contract include, but are not limited to, the following: 1. Electric power service and distribution. 2. Lighting. 3. Electrical connections to existing systems and temporary facilities and controls furnished by the General Construction Contract.
- PermitAddition and/or Alteration
Permit CP-2025-000463 · Issued
FOR LEVEL I ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) IN EXISTING BUILDING PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- PermitAddition and/or Alteration
Permit EP-2024-011684 · Completed
**ELECTRICAL WORK TO INCLUDE THE INSTALLATION OF A NEW RECEPTACLE FOR ESPRESSO MACHINE. REMOVE ALL POWER FROM DISCONNECTED DISPLAY CASE (BRANCH CIRCUIT, CONDUIT, WIRING, JUNCTION BOX AND RECEPTACLE). EXISTING RECEPTACLE FOR THE QUICK SERVE IPAD ORDER SYSTEM SHALL REMAIN. ALL WORK SHALL BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS
- PermitAlterations
Permit PP-2024-016587 · Completed
Plumbing Permit (Interior) for combo CP-2024-006304
- PermitAddition and/or Alterations
Permit MP-2024-005511 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-006225
- PermitAddition and/or Alteration
Permit CP-2024-006304 · Completed
FOR A LEVEL I INTERIOR ALTERATION TO AN EXISTING TENANT SPACE ( PHL-B11) LOCATED IN TERMINAL B (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**ELECTRICAL WORK TO INCLUDE THE INSTALLATION OF A NEW RECEPTACLE FOR ESPRESSO MACHINE. REMOVE ALL POWER FROM DISCONNECTED DISPLAY CASE (BRANCH CIRCUIT, CONDUIT, WIRING, JUNCTION BOX AND RECEPTACLE). EXISTING RECEPTACLE FOR THE QUICK SERVE IPAD ORDER SYSTEM SHALL REMAIN. ALL WORK SHALL BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.**SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alterations
Permit MP-2024-005559 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-006307 AMENDMENT: RELOCATE UNIT 10 FT BACK AS PER APPROVED PLANS.
- PermitAlterations
Permit PP-2024-016557 · Completed
Plumbing Permit (Interior) for combo CP-2024-006306
- PermitAlterations
Permit PP-2024-016428 · Completed
Plumbing Permit (Interior) for combo CP-2024-006225
- PermitAlterations
Permit PP-2024-016558 · Completed
Plumbing Permit (Interior) for combo CP-2024-006307
- PermitAddition and/or Alteration
Permit EP-2024-011646 · Completed
Electrical Permit for combo CP-2024-006306
- PermitAddition and/or Alteration
Permit EP-2024-011547 · Completed
REMOVE EXISTING EXHAUST FANS. INSTALL NEW CONDUIT AND RACEWAY SYSTEM FOR NEW EXHAUST FANS AND MECHANICAL EQUIPMENT. INSTALL NEW BRANCH CIRCUIT WIRING FOR NEW EQUIPMENT. THE EXHAUST FANS AND MECHANICAL EQUIPMENT ARE TO BE INTERCONNECTED. INSTALL NEW BRANCH CIRCUIT TO SUPPLY POWER TO HEAT TRACE FOR GREASE WASTE PIPING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- PermitAddition and/or Alteration
Permit EP-2024-012186 · Completed
Electrical Permit for combo CP-2024-006445
- PermitAddition and/or Alteration
Permit EP-2024-011648 · Completed
Electrical Permit for combo CP-2024-006307
- PermitAddition and/or Alterations
Permit MP-2025-001368 · Amendment Application Incomplete
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2025-001000 · Completed
FOR THE INSTALLATION OF REGISTERS / DIFFUSERS WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAlterations
Permit PP-2025-001461 · Completed
Plumbing Permit (Interior) for combo CP-2024-006565
- PermitAddition and/or Alterations
Permit MP-2025-000761 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-006565 FOR THE INSTALLATION OF HVAC APPLIANCE, THE RELOCATION OF GRDs, AND THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN EXHAUST HOOD WITH ASSOCIATED EXHAUST FAN, MAKEUP AIR SYSTEM, AND DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2025-001014 · Completed
Electrical Permit for combo CP-2024-006565
- PermitAddition and/or Alterations
Permit FP-2025-000281 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinklers to accommodate interior alterations to spaces BC29A & BC30
- PermitAddition and/or Alteration
Permit CP-2024-006583 · Issued
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO HOLDROOMS IN TERMINAL 'E' OF AN EXISTING AIRPORT BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit CP-2024-006565 · Completed
FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN OCCUPANCY TO AN EXISTING GROUP A-2 SIT-DOWN RESTAURANT IN SPACE D9 WITHIN TERMINAL D OF THE PHILADELPHIA INTERNATIONAL AIRPORT. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- CertificationFire Alarm Certification
Certification BC-2025-032488 · Certified
Expires 2026-02-13
- CertificationSpecial Hazards Certification
Certification BC-2025-019850 · Certified
Expires 2026-02-13
- PermitAddition and/or Alteration
Permit EP-2025-000688 · Issued
Install (16) Scan Guns and stanchion supports. Scan guns are USB connected to existing computer. Install (4) Fail-Safe and Stack-light devices on existing baggage conveyor. Install associated wiring to existing junction box with motor control center terminals. *No building construction or building permit involved.-2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2024-012113 · Completed
DEMO EXISTING POWER AND LIGHTING PER DRAWING- INSTALL POWER AND LIGHTING PER DRAWINGS FOR TEMP CORRIDORS AND EXIT LANES AS PER 2017 NEC. ***Fire alarm installation will be applied for under a separate application.***
- PermitAddition and/or Alteration
Permit EP-2025-000665 · Completed
Disconnect existing and re-feed (14) new RTU's @ E Concourse PHL. Upgrade Fire Alarm and wire new Duct Detectors and Shut Down Relays .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- PermitAddition and/or Alterations
Permit MP-2025-000854 · Expired
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace 2 existing RTU's only, in like & kind. No other work on this permit.
- CertificationSprinkler Certification
Certification BC-2025-009561 · Deficient
- PermitAddition and/or Alteration
Permit EP-2025-000718 · Issued
Install a new SCADA System for monitoring Island Ave and Main Terminal Substations at Philadelphia International Airport. All work in accordance with the 2017 NEC.
- PermitAddition and/or Alterations
Permit MP-2025-000257 · Issued
REPLACE (10) ROOF TOP UNITS OVER TERMINAL "A" EAST WITH ALL ASSOCATED DUCTWORK CONNECTIONS INTO EXISTING AND REPLACING AIR DIRT SEP, GLYCOL MAKE UP, PUMPS & HEAT EXCHANGERS AS PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit CP-2024-006306 · Completed
FOR A LEVEL I INTERIOR ALTERATION TO AN EXISTING SPACE B5 LOCATED IN TERMINAL B (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **
- PermitAddition and/or Alteration
Permit CP-2024-006225 · Completed
FOR A LEVEL I INTERIOR ALTERATION TO AN EXISTING TENANT SPACE ( PHL-B10) LOCATED IN TERMINAL B (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**MECHANICAL SYSTEM UPGRADE & PLUMBING WORK INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alteration
Permit CP-2024-006307 · Completed
FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING SPACE B12 LOCATED IN TERMINAL B (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2024-006445 · Completed
FOR LEVEL I INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE LOCATED IN TERMINAL B. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- PermitAddition and/or Alteration
Permit EP-2025-000011 · Issued
DISCONNECT & REMOVE THE FEEDERS, DISCONNECT SWITCHES & STARTERS FROM THE EXISTING MECHANICAL & HVAC EQUIPMENT. INSTALL NEW FEEDERS, DISCONNECTS & STARTERS FOR THE NEW MECHANICAL & HVAC EQUIPMENT. REMOVE THE EXISTING 1' X 4' LIGHT FIXTURES & REPLACE WITH NEW LIGHT FIXTURES USING THE EXISTING CIRCUITS & CONTROLS. INSTALL NEW DUCT DETECTORS USING THE EXISTING FIRE ALARM CIRCUITS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
- PermitAddition and/or Alterations
Permit MP-2024-006009 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-006106
- PermitChange of Use
Permit ZP-2025-000432 · Issued
Eating and Drinking Establishments - Take-Out Restaurant
- PermitAddition and/or Alteration
Permit EP-2024-012239 · Completed
Electrical Permit for combo CP-2024-006106
- PermitAddition and/or Alteration
Permit CP-2024-006106 · Completed
FOR LEVEL II ALTERATIONS TO CREATE ONE TENTANT SPACE (BC30) FROM TWO TENTANT SPACES (BC29A & BC30). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS RETAIL SALES FOR CONSUMER GOODS. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- PermitAddition and/or Alteration
Permit EP-2025-000252 · Completed
INSTALL A 50 AMP PANEL & FEEDER. INSTALL NEW LIGHTS NORMAL & EMERGENCY USING THE EXISITNG CIRCUITING. INSTALL SWITCHES, RECEPTACLES & DATA JACKS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. * NO FIRE ALARM WORK.
- PermitAlterations
Permit PP-2025-000270 · Issued
PHL Airport 1589.17 Sanitary Lift Station Upgrade - Plumbing Demo Pipe & pumps in 11 Lift Stations Replace Pipe and pumps in 11 Lift Stations. all piping must be metallic.
- License issue eventAD Partnership LLC (Chase Sapphire Lounge by The Club): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0969478 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit MP-2024-005354 · Completed
FOR THE REPLACEMENT OF ROOFTOP UNIT AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- PermitAlterations
Permit PP-2025-000087 · Completed
Furnish and install condensate drain line from Roof Top Unit to Existing Roof Drain
- PermitAddition and/or Alteration
Permit EP-2024-011829 · Completed
Fire Alarm Only: Install new fire alarm devices (FEDERAL DONUTS, OYSTER HOUSE)
- PermitAddition and/or Alteration
Permit EP-2024-011808 · Completed
Electrical Permit for combo CP-2024-006104
- PermitAddition and/or Alteration
Permit EP-2024-012112 · Completed
Disconnect power to (1) existing rooftop AHU unit and subsequently reconnect power to (1) new AHU unit in same location re-utilizing existing circuitry. Connected to Mech Permit MP-2024-005354 scope.
- PermitAddition and/or Alteration
Permit CP-2024-006104 · Completed
FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING SPACE C07 LOCATED IN TERMINAL C (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2024-011568 · Completed
installation of a 100amp sub panel, Furnish 2 temp 20AMP outlets/circuits. All work in this application is temporary, as they have future remodel in the space coming.
- License issue eventSSP America PHL, LLC (Bar Symon): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0967852 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit CP-2024-006055 · Completed
FOR LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, NEW PARTITIONS, DOORS, FLOORS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- PermitChange of Use
Permit ZP-2024-012005 · Completed
Retail Sales - Consumer Goods
- PermitAlterations
Permit PP-2024-011633 · Completed
Plumbing Permit (Interior) for combo CP-2024-002400 INSTALL 3 MOP SINKS, 3 EYEWASHERS, 3 HOT WATER HEATERS, 4 FLOOR DRAINS, 2 BACKFLOW PREVENTERS, 4 HOSE BIBBS AND 4 WATER HYRANTS ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitAddition and/or Alteration
Permit EP-2024-011550 · Issued
INSTALL A 400 AMP CIRCUIT BREAKER IN THE EXISTING SUBSTATION TV3-2. INSTALL A NEW 400 AMP PANEL & FEEDER DUB-1. RECONNECT THE EXISTING PANEL, TRANSFORMER, DISCONNECTS, PUMP CONTROL PANELS, AHU-1,EF-1 & VSD. PROVIDE FEEDERS TO THE NEW PUMPS & VFD'S. PROVIDE POWER TO THE HVAC & MECHANICAL EQUIPMENT FED FROM THE EXISTING PANELS. INSTALL (3) NEW 100 AMP TEMPORARY PANELS. INSTALL DUCT DETECTORS CONNECTING TO THE EXISTING FIRE ALARM SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2024-010882 · Issued
DEMO THE POWER WIRING TO THE (12) EXISTING LIFT STATION EJECTOR PUMPS & PUMP CONTROLLERS. INSTALL NEW CODUITS CONDUCTORS & CIRCUITING TO THE (12) NEW LIFT STATION EJECTOR PUMPS & PUMP CONTROLLERS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. * THE TELECOM EQUIPMENT & WIRING IS NOT INCLUDED ON THIS PERMIT.
- PermitAddition and/or Alteration
Permit EP-2024-009572 · Completed
Replace ceiling lights in restrooms. Install receptacle for new soup kettles. Wiring to be fished through existing accessible ceiling space. No building permit involved.
- PermitAddition and/or Alterations
Permit FP-2024-002444 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (66) sprinklers to accommodate interior alterations in tenant spaces BC-11 and BC-13
- PermitTank Install/Removal
Permit GP-2024-008574 · Completed
REMOVE (6) SIX UNDERGORUND TANKS. The removal must comply with the regulations of the Pennsylvania Department of Environmental Protection (PADEP). SEE PA ENGINEER REPORT THAT REMOVAL OF TANKS HAS NO IMPACTS ON THE EXISTING STRUCTURE AND NO SPECIAL PRECAUCTIONS REQUIRED.
- PermitAddition and/or Alteration
Permit EP-2024-009585 · Issued
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alterations
Permit MP-2024-004812 · Issued
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit FP-2024-002225 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinklers to accommodate interior alterations to Space DE01
- PermitAddition and/or Alteration
Permit EP-2024-005827 · Completed
Install lighting, receptacles, telecommunications wiring as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2024-008936 · Completed
Add outlet for cooler and replace ballast in cabinet lights. Wall fishing surface mount wire mold.
- PermitAddition and/or Alterations
Permit MP-2024-000954 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-000645
- License issue eventJackmont of Philadelphia II, LLC (ELIXR COFFEE): Food Preparing and Serving business license initially issued
License 0962507 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2024-008822 · Expired
Demo and replacement of variable message signs at PHL Airport terminal A through F Septa Platforms. Install new 120V power and fiber optic cable to each new sign in existing locations. ONLY ELECTRICAL AND FIBER WORK****
- PermitAddition and/or Alteration
Permit EP-2024-007389 · Completed
Replace (31) lights, (2) Exit signs, Install (10) wiring devices, (2) plug mold strips, (1) 60 amp panel, (11) data jacks. Utilize existing wiring, and fish new wiring through existing drop ceilings. *No new construction being done. No building permit applies.
- PermitAddition and/or Alterations
Permit MP-2024-002737 · Completed
FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM. ALL WORK TO BE DONE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK.
- PermitAddition and/or Alteration
Permit CP-2024-004116 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FORT MIFFLIN TUNNEL WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAlterations
Permit PP-2024-002869 · Completed
AMENDMENT DATED OCTOBER 7, 2024: Proposed amendment to reflect DOA approval and add'l 580sq'. Architect transmittal details changes to the plumbing system ORIGINAL: Plumbing Permit (Interior) for combo CP-2024-000645 INSTALL 13 FLOOR SINKS, 10 KITCHEN SINKS, 3 MOP SINKS, 2 HAND SINKS, 2 COMPARTMENT SINKS,3 GREASE INTERCEPTORS, 2 THREE COMPARTMENT SINKS, 2 HOT WATER HEATERS AND 2 TRENCH DRAINS ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitAddition and/or Alteration
Permit EP-2024-002004 · Completed
Electrical Permit for combo CP-2024-000645 ELECTRIC: INSTALL ALL WIRING ACCORDING TO APPROVED DRAWINGS-2017 NEC **NO FIRE ALARM WORK ON THIS PERMIT** AMENDMENT: additional 580sq' added, also, drawings reflect DOA approval-see architectural transmittal for specific changes to EP permit.
- PermitAddition and/or Alteration
Permit EP-2024-007826 · Issued
INSTALL (1) EQUIPMENT CABINET INSTALL (2) BATTERY CABINETS ON (1) PROPOSED 16'X11"X12'-4" EQUIPMENT PLATFORM INSTALL (1) H-FRAME WITH (1) 2OO AMP PPC, (2) HOFFMAN ENCLOSURES, (1) FIBER TROUGH, (1) GROUNFD BAR, (2) GPS ANTENNAS AND (1) DISCONNECT SWITCH INSTALL (1) PROPOSED 50KVA TRANSFORMER
- PermitAddition and/or Alteration
Permit CP-2024-000645 · Completed
For level II interior alterations without change of occupancy classification to PHL airport terminal retail space (tenant fitout of food establishments in existing food establishment spaces. Space BC-11 is Oyster House; Space BC-13 is Federal Donuts with the same operator as per approved plans. AMENDMENT TO CHANGE THE LAYOUT AND FINISHING DESIGN.
- PermitAlterations
Permit PP-2024-006237 · Expired
new dishwasher, hand sink, and mop sink hub drain and kitchen sink with disposal 4 FIXTURES DIRECT FIXTURE REPLACMENT WITHOUT PIPING.
- PermitAddition and/or Alteration
Permit EP-2024-007294 · Completed
Install (1) 200 amp panel, (1) 30 KVA transformer, (1) 100A panel and associated feeders. Install lights and wiring devices. Install wiring and terminations to HVAC equipment and motors. Install lightning protection system.
- PermitAddition and/or Alterations
Permit MP-2024-003648 · Issued
FOR UPGRADE TO THE EXISTING HVAC SYSTEM AS PER APPROVED PLANS.
- PermitAlterations
Permit PP-2024-012235 · Issued
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alteration
Permit CP-2024-003225 · Completed
FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- PermitAddition and/or Alteration
Permit CP-2024-002400 · Completed
FOR THE REMOVAL AND REPLACEMENT OF A DETACHED ONE (1) STORY WITH A PRE-ENGINEERED METAL BUILDING (PEMB) ON NEW REINFORCED CONCRETE FOUNDATIONS FOR USE AS LAVATORY DUMP SITE F ACCESSORY TO THE PHILADELPHIA INTERNATIONAL AIRPORT. BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- PermitNew construction, addition, GFA change
Permit ZP-2024-005857 · Completed
For the removal and replacement of one (1) detached structure (Lavatory Dump Site F) as part of the existing Philadelphia International Airport. Size and location as shown on plans.
- InvestigationL&I investigation
Case CF-2023-127454 · PASSED
The cited inspection visit was marked passed.
- InvestigationL&I investigation
Case CF-2023-127525 · PASSED
The cited inspection visit was marked passed.
- InvestigationL&I investigation
Case CF-2023-127578 · PASSED
The cited inspection visit was marked passed.
- License issue eventOTG MANAGEMENT PHL B, LLC ( LOVE GRILLE): Food Preparing and Serving (30+ SEATS) business license initially issued
License 0958210 · Active
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventOTG MANAGEMENT PHL LLC: Food Preparing and Serving (30+ SEATS) business license initially issued
License 0957570 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2024-004619 · Completed
Replacement of pole-mounted light fixtures and replacement of interior high hat fixtures throughout Philadelphia Airport. One for one replacement to newer LEDs
- PermitAddition and/or Alteration
Permit EP-2024-004177 · Completed
Furnish and install conduit and wire from panel LP to the chargers // Install (4) new chargers // Commissioning system as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2024-003753 · Completed
Install fire alarm devices and associated fire alarm wiring for HVAC units as per 2016 NFPA 72.
- PermitAlterations
Permit PP-2024-006235 · Completed
replace 3 wall hung toilets with piping
- PermitAddition and/or Alterations
Permit FP-2024-001205 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (9) sprinklers to accommodate renovations to Terminal D - Rooms 1012, 1019, & Gates D5 and D7
- PermitAddition and/or Alteration
Permit EP-2024-004959 · Completed
INSTALL CONDUIT DUCT BANKS FOR POWER & COMMUNICATIONS. INSTALL (1) NEW 800 AMP CIRCUIT BREAKER IN THE EXISTING SUBSTATION. INSTALL (3) 300 AMP CIRCUIT BREAKERS IN THE EXISTING SUBSTATION, INSTALL CONDUITS & FEEDERS TO (3) VFD"S & 150 HP PUMPS. INSTALL CONDUITS & FEEDERS TO (5) VFD'S & 25 HP COOLING TOWER PUMPS. PROVIDE POWER TO THE BASIN HEATERS & FLOW METER & CONTROLS. INSTALL LIGHTS, SWITCHES, RECEPTACLES & HEAT TRACE & GROUNDING ALL WORK IN ACCORDANCE WITH THE 2017 NEC. * PHASE ONE. * THE SWITCHBOARD & PANELS ARE EXISTING.
- PermitSign
Permit GP-2024-004105 · Completed
FOR THE ERECTION OF TWO (2) FREESTANDING SIGNS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL WORK.
- PermitAddition and/or Alterations
Permit FP-2024-001073 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (6) sprinkler heads for renovations to retail space M02, terminal BC connector
- PermitAddition and/or Alteration
Permit CP-2024-001395 · Issued
FOR SITEWORK AND INSTALLATION OF COOLING TOWERS, PUMPS AND CONTROL EQUIPMENT PER APPROVED PLANS.
- AppealPAB Permit Denial
Appeal PP-2023-001217 · Completed · Approved
INSTALLTION OF SANITARY AND DOMESTIC UNDERGROUND AND ABOVE GROUND PIPING.
- CertificationFire Alarm Certification
Certification BC-2024-011580 · Certified
Expires 2025-04-24
- PermitAddition and/or Alteration
Permit CP-2023-006646 · Issued
FOR THE REMOVAL OF TOWER B, FOR ROOF INFILL AND ASSOCIATED CONSTRUCTION, AND FOR ALRTERATIONS TO THE EXTERIOR WALL AS PER APPLICATION/PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE 2018 IEBC. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK* IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2024-003968 · Completed
Install new lighting and power distribution, conduit in slab, and tele/data wiring as per 2017 NEC. AMENDMENT: Install fire alarm devices as per 2016 NFPA.
- PermitAddition and/or Alterations
Permit MP-2024-001873 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-001787
- PermitAddition and/or Alteration
Permit CP-2024-001787 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO SUPPORT AREAS IN AIRPORT TERMINAL D (ROOMS 1012, 1019, & GATES D5 AND D7) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAlterations
Permit PP-2024-000182 · Completed
INSTALL 1 MOP SINK, 1 THREE COMPARTMENT SINK, 1 GREASE INTERCEPTOR, 2 HAND SINKS, 3 FLOOR SINKS, 1 BACKFLOW PREVENTER, 1 PREP SINK AND 1 HOT WATER HEATER ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitAddition and/or Alterations
Permit MP-2024-001003 · Completed
TO REMOVE AND REPLACE EXISTING ROOFTOP UNITS AND NEW DUCTWORK TO BE CONNECTED TO EXISTING DUCT RISERS AT TERMINAL E. ALL APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- License issue eventAirport Dining Inc (Sabrina's Cafe): Food Preparing and Serving (30+ SEATS) business license initially issued
License 948140 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitNew Construction
Permit EP-2024-002085 · Completed
Electrical Permit for combo SP-2023-001017
- PermitAddition and/or Alteration
Permit EP-2024-001743 · Completed
Install fire alarm. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE. **SEPARATE ELECTRICAL PERMITS REQ'D FOR INTERIOR WIRING**
- PermitAddition and/or Alteration
Permit EP-2024-002005 · Completed
Electrical Permit for combo CP-2024-000990
- PermitAddition and/or Alterations
Permit MP-2024-000990 · Completed
FOR THE INSTALLATION OF NEW COOLING TOWER, PIPING AND PUMPS PER APPROVED PLANS.
- PermitAddition and/or Alterations
Permit MP-2024-000956 · Completed
Mechanical / Fuel Gas Permit for combo CP-2024-000990
- PermitAddition and/or Alterations
Permit FP-2024-000480 · Issued
FOR THE ALTERATION OF AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 WITH AN EXSITING BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ** PHL RESTROOM LOCATIONS FOR THIS PERMIT: RAE2, RE1 & RE7,A S DESIGNATED ON THE APPROVED PLANS **
- PermitAddition and/or Alteration
Permit CP-2024-000990 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL SPACE M02 WITHIN AN EXISTING AIRPORT FACILITY (BC CONNECTOR) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitSitework with Onsite Utility Services
Permit SP-2023-001017 · Completed
FOR SITEWORK PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.
- PermitAddition and/or Alteration
Permit EP-2023-011240 · Completed
AMENDMENT: Install/ relocate new fire alarm devices as per 2016 NFPA 72. New light fixtures, security equipment installation, and sound system as per 2017 NEC. ***NO FIRE ALARM ON THIS PERMIT***
- PermitAddition and/or Alteration
Permit EP-2024-001271 · Issued
Install new conduits and electrical feeders for (15) GPU’s and (15) PC-Air Units being replaced between terminals D & E as per 2017 NEC. Install/replace electrical panels, disconnects, and meters as per 2017 NEC.
- PermitSigns (Accessory / Non-Accessory)
Permit ZP-2023-014047 · Completed
FOR THE ERECTION OF TWO SINGLE-FACED FREESTANDING SIGN. SIZE AND LOCATION AS SHOWN IN THE PLANS.
- PermitAddition and/or Alterations
Permit FP-2024-000445 · Expired
KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. INSTALL UL 300 SYSTEM PER CODE
- PermitAddition and/or Alteration
Permit CP-2023-005259 · Issued
FOR EXTERIOR AND LEVEL II INTERIOR ALTERATIONS TO UPGRADE PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL EMERGENCY ELECTRICAL SUBSTATIONS. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- PermitAddition and/or Alterations
Permit FP-2024-000361 · Completed
KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install UL 300 wet chemical commercial cooking fire suppression system
- PermitNew construction, addition, GFA change
Permit ZP-2024-001559 · Issued
For partial demolition of the existing structure. Size and location per plans.
- PermitAddition and/or Alteration
Permit EP-2023-012367 · Completed
Furnish and install new lighting, power, and tele-data for new coffee shop in airport as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- PermitRough-In
Permit EP-2024-001775 · Expired
Rough-In Permit for EP-2024-001743 Fire alarm system in tenant space per drawing
- PermitAddition and/or Alterations
Permit MP-2024-000090 · Completed
FOR A NEW MECHANICAL SYSTEM INSTALLATION TO ACCOMMODATE AN EXISTING SPACE ( BC-26AB). WORK TO INCLUDE, THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit FP-2024-000206 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (9) sprinkler heads to accommodate tenant fit-out
- PermitAddition and/or Alteration
Permit EP-2024-001345 · Completed
Replace (15) lights in Millwork. Replace 30 Track Head lamps. *No new wiring required. No building permit is applicable for this job.
- PermitAddition and/or Alteration
Permit EP-2023-012070 · Completed
INSTALL ELECTRICAL SERVICE, TWO 60 AMP CIRCUIT BREAKERS, 4 ELECTRICAL VEHICLE STATIONS AND CHARGERS ACCORDING TO THE 2017 NEC AND PER PLANS.
- PermitAddition and/or Alteration
Permit CP-2023-006840 · Completed
FOR INTERIOR LEVEL 2 ALTERATIONS FOR FIT-OUT OF A COFFEE SHOP AS PER PLANS. NO CHANGE IN OCCUPANCY CLASSIFICATION.
- PermitAlterations
Permit PP-2023-015846 · Completed
REPLACE 3/4" BACKFLOW DEVICE, WATER HEATER, LAUNDRY SINK AND WATER LINES.
- PermitAddition and/or Alterations
Permit FP-2024-000130 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinkler heads to accommodate interior alterations to existing tenant space, terminal B Space B1
- PermitAlterations
Permit PP-2024-001119 · Completed
Install 2 new 100 gallon hot water heaters, 1 recirculation pump and piping, and new PVC flue exhaust.
- PermitAddition and/or Alterations
Permit MP-2023-005050 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- InvestigationL&I investigation
Case CF-2023-127578 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-127525 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-127454 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alteration
Permit EP-2023-010700 · Completed
RELOCATE (2) EXISTING 120/208V/ 3 PHASE PANELS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, & LIGHTING CONTROL PANELS. INSTALL WIRING FOR THE RECEPTACLES, & DATA/ COM. PROVIDE POWER FOR THE MECHANICAL, HVAC, KITCHEN EQUIPMENT, & SHADES. INSTALL A NEW TENANT FIRE ALARM PANEL & DEVICES. PROVIDE POWER FOR THE SECURITY EQUIPMENT. INSTALL TELE/COM WIRING. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2023-008430 · Completed
Furnish and install power, lighting, telecommunications, and security for a new Airport Lounge space as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- PermitAddition and/or Alteration
Permit CP-2023-006392 · Completed
FOR LEVEL 2 ALTERATIONS TO EXISTING TENANT SPACE AS PER PLANS.
- PermitAddition and/or Alterations
Permit MP-2023-005557 · Issued
FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- CertificationFire Alarm Certification
Certification BC-2024-005138 · Certified
Expires 2025-01-08
- PermitAddition and/or Alterations
Permit MP-2023-005282 · Completed
FOR THE REPLACEMENT OF TWELVE (12) VENTILATION FANS AND EIGHT (8) DUCT HEATERS. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2023-005576 · Issued
FOR INTERIOR ACCESSIBILITY UPGRADES PER APPROVED PLANS AT AIRPORT TERMINALS A THROUGH F.
- PermitAddition and/or Alteration
Permit CP-2023-006668 · Completed
FOR THE ERECTION OF A CANOPY TO AN EXISTING STRUCTURE. WORK TO INCLUDE EXTERIOR IMPROVEMENT AS PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- PermitRough-In
Permit EP-2023-012368 · Expired
Rough-In Permit for EP-2023-012367 furnish and install demo new lighting power fire alarm and tele-data for new coffee shop in airport AS PER NEC 2017
- PermitChange of Use
Permit ZP-2023-013428 · Completed
Personal Services
- PermitAlterations
Permit PP-2023-016450 · Completed
Demo storm water pumps in AW, AE, BC East , BC West, CD, DE, E Concourses and Demo piping. Install new storm water pumps in AW, AE, BC East , BC West, CD, DE, E Concourses and new piping.
- PermitAddition and/or Alterations
Permit FP-2023-002836 · Completed
FOR THE INSTALLATION OF 323 NEW SPRINKLER HEADS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- ViolationNEW ELECTRICAL WIRING
Case CF-2023-127454 · Violation VI-2023-097248 · Code A-301.1/50 · COMPLIED
Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationNEW ELECTRICAL WIRING
Case CF-2023-127525 · Violation VI-2023-097301 · Code A-301.1/50 · COMPLIED
Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationNEW ELECTRICAL WIRING
Case CF-2023-127578 · Violation VI-2023-097359 · Code A-301.1/50 · COMPLIED
Resolution: COMPLIED - PERMIT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationL&I investigation
Case CF-2023-127454 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-127525 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationL&I investigation
Case CF-2023-127578 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitAddition and/or Alteration
Permit CP-2023-005936 · Expired
FOR CONSTRUCTION OF CONCRETE PAD ACCESSORY TO ELECTRICAL WORK.
- PermitAlterations
Permit PP-2023-015070 · Completed
INSTALL 1 THREE COMPARTMENT SINK, 1 GREASE INTERCEPTOR, 2 HAND SINKS, 2 PREP SINKS, 1 EJECTOR SUMP PUMP, 1 MOP SINK, 5 FLOOR SINKS AND 1 HOT WATER HEATER ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitRough-In
Permit FP-2023-002843 · Completed
Rough-In Permit for FP-2023-002836 Install (323) new sprinklers and piping tied to existing wet system and backflow preventer, in PHL DE Terminal Connector passenger lounge
- PermitNew construction, addition, GFA change
Permit ZP-2023-011958 · Completed
FOR THE ERECTION OF A CANOPY STRUCTURE ACCESSORY TO AN EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLAN
- PermitAddition and/or Alteration
Permit EP-2023-011166 · Completed
Furnish and install (6) outlets in the B/C food court for the fashion show Fishing wire down existing columns. AS PER NEC 2017
- PermitAddition and/or Alteration
Permit EP-2023-009620 · Completed
Fit-out of existing space. Coffee quick service to be replaced by coffee quick service. Eagle I electric will be removing and replacing existing electrical fixtures as well as adding new fixtures for lighting and upgrading some kitchen equipment. This is to facilitate the renovation and re-naming of an existing quick service coffee shop located in Terminal F space 14 at the Philadelphia airport. RENOVATION OF EXISTING RETAIL SPACE AT PHL AIRPORT, F TERMINAL HUB, SPACE FH14 AS PER NEC 2017
- PermitAddition and/or Alteration
Permit EP-2023-007207 · Completed
Renovations to existing baggage handling tug tunnels to include replacement of luminaires, telecommunications wiring, exhaust fans and sump pumps to include associated 120V and 480V branch circuiting as per 2017 NEC. All wiring replaces existing circuits in new or modified pathways.
- PermitAddition and/or Alteration
Permit EP-2023-010124 · Completed
DISCONNECT POWER TO THE EXISTING HVAC EQUIPMENT TO BE REMOVED. PROVIDE POWER TO THE (7) NEW HVAC UNITS USING NEW & EXISTING CONDUITS & EXISTING PANELS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
- PermitAddition and/or Alterations
Permit MP-2023-004826 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED PIPING AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitAddition and/or Alterations
Permit MP-2023-003590 · Expired
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNIT, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitAddition and/or Alterations
Permit FP-2023-002680 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (5) sprinklers to accommodate retail space renovation
- PermitAddition and/or Alterations
Permit FP-2023-002649 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (40) sprinkler heads to accommodate interior alterations, PHL Airport Terminal C, spaces C5 and C6
- PermitRough-In
Permit EP-2023-010701 · Expired
Rough-In Permit for EP-2023-010700 Electrical Fit out of existing airport commercial space.
- PermitAddition and/or Alterations
Permit MP-2023-004692 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING REGISTERS, AND DIFFUSERS WITH ASSOCIATED APPLIANCES AND DUCTWORK AS PER PLANS. FOR THE INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOOD AS PER PLANS.
- PermitAddition and/or Alterations
Permit FP-2023-002458 · Issued
FOR THE INSTALLATION OF 113 NEW CONCEALED PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS
- PermitAddition and/or Alteration
Permit CP-2023-005380 · Completed
RENOVATION OF EXISTING RETAIL SPACE AT PHL AIRPORT, F TERMINAL HUB, SPACE FH14 AS PER APPROVED PLANS.
- PermitAlterations
Permit PP-2023-014405 · Completed
INSTALL 12 FLOOR SINKS, 2 GREASE INTERCEPTORS, 1 THREE COMPARTMENT SINK, 2 HAND SINKS, 1 MOP SINK, 1 HOT WATER HEATER AND 1 PREP SINK ACCORDING TO THE 2018 PPC AND PER PLANS.
- PermitAddition and/or Alteration
Permit CP-2023-004980 · Expired
LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO AN EXISTING ADMINISTRATIVE BUILDING (PPA BUILDING) FOR ROOF REPLACEMENT AND GLAZING REPAIR (NOT SUBSTANTIAL IMPROVEMENT) AS PER APPROVED PLANS. NO INTERIOR WORK ON THIS PERMIT. *2018 IEBC REVIEW*
- PermitAddition and/or Alteration
Permit CP-2023-000642 · Expired
FOR THE INSTALLATION OF FOUR (4) EV VEHICLE CHARGING STATIONS AND SIGNS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.
- PermitSign
Permit GP-2023-008780 · Issued
FOR THE ERECTION OF TWO (2) STATICALLY ILLUMINATED SIGNS. SIZE AND LOCATION AS SHOWN IN APPLICATION / PLANS. SEPARATE PERMIT REQURIED FOR ELECTRICAL WORK.
- PermitAddition and/or Alteration
Permit EP-2023-009994 · Completed
Install 20A/1P branch power and telecommunications circuits to additional lane of security screening equipment. AS PER NEC 2017
- PermitAlterations
Permit PP-2023-012439 · Completed
F&I New Domestic Water - Sanitary/Vent Piping F&I New Fixtures (12) Water closets (2) Urinals (12) Lavs (1) Kitchen Sink (1) Mop Sink (2) Showers (20) floor Drains (14) Floor sinks (2) Trench Drains (5) Trap Primers (2) Hose Bibbs (4) Water Heaters (4) Pumps (4) Grease Interceptors
- PermitAddition and/or Alteration
Permit CP-2023-005475 · Completed
FOR LEVEL II INTERIOR ALTERATIONS WITH A PARTIAL CHANGE IN OCCUPANCY TO CREATE A GROUP A-2 SIT-DOWN RESTAURANT IN TERMINAL C SPACES C5 & C6 OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. BUILDING IS FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- PermitAddition and/or Alterations
Permit FP-2023-002370 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13) - For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (173) sprinkler heads to accommodate interior alterations in passenger lounge, PHL DE Terminal connector
- PermitAddition and/or Alteration
Permit EP-2023-009513 · Completed
Upgrade conduit and feeders between existing switchgear and existing disconnects at face of building serving (3) Passenger Boarding Bridges. Install new LSIG breakers at existing panels and demand meters at existing disconnects (meters FBO). Demo old conduit and feeders AS PER NEC 2017
- License issue eventSSP America PHL, LLC (Earl of Sandwich): Food Preparing and Serving business license initially issued
License 934792 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventSSP America PHL, LLC (Mo Burger): Food Preparing and Serving business license initially issued
License 934668 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2023-006980 · Issued
INSTALL FLOOR OUTLET POKE THROUGHS AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2023-008627 · Completed
PROVIDE 120V POWER TO TWO NEW SIGNS. ALL WORK IN ACCORDNCE WITH THE 2017 NEC.
- PermitNew Construction
Permit EP-2023-008367 · Completed
Electrical Permit for combo CP-2023-002294
- PermitAddition and/or Alteration
Permit EP-2023-008321 · Completed
New lights and wiring devices fed from existing panel. Install communication jacks. Fire alarm modifications.. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- PermitAddition and/or Alterations
Permit MP-2023-003807 · Completed
REMOVE AND REPLACE EXISTING GAS-FIRED INFRARED TUBE HEATERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- PermitAddition and/or Alterations
Permit MP-2023-003920 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK AS PER PLANS. FOR THE INSTALLATION OF A TYPE 2 COMMERCIAL KITCHEN EXHAUST HOOD AS PER PLANS.
- PermitNew Construction
Permit CP-2023-002294 · Completed
MODULAR CONSTRUCTION OF A TEMPORARY (MORE THAN 180 DAYS CUSTOMER SERVICE BOOTH ACCESSORY TO AN EXISTING CUSTOMER SERVICE AND CAR RENTAL BUILDING AS PER APPROVED PLANS AND BBS VARIANCE NO. MI-2023-004002. BBS PROVISO: APPLICANT IS ALLOWED TO BUILD SMALL ATTENDANT BOOTH WITH SLIDING DOORS, WITH A FLOOR ELEVATION BELOW THE FLOODPLAIN LEVEL. BOOTH IS ALLOWED FOR A PERIOD OF UP TO 5 YEARS. BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IB REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- PermitRough-In
Permit EP-2023-008431 · Expired
Rough-In Permit for EP-2023-008430 Furnish and install power, lighting, fire alarm, telecommunications, and security for a new Airport Lounge space. AS PER NEC 2017
- License issue eventSLA Worldwide LLC: Food Preparing and Serving business license initially issued
License 932280 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit MP-2023-003456 · Completed
FOR A NEW MECHANICAL WORK TO INCLUDE COIL CLEANING, FILTER REPLACEMENT AND THERMOSTAT RELOCATION. ** WORK TO BE PERFORMED PER APPROVED WORK. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK**
- PermitAlterations
Permit PP-2023-012169 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alteration
Permit EP-2023-008125 · Completed
Furnish and install fiber data cable, raceways and associated equipment to ticket counters in E-Terminal. Conduit and cable will be run in existing exposed areas or fished. * No other trades or building permit required for this project. AS PER NEC 2017
- PermitAddition and/or Alteration
Permit EP-2023-007307 · Completed
Furnish and install demo, power, tele/data, and lighting to renovate an airport store.ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. ** THE ELECTRIC PANELS ARE EXISTING. ** NO FIRE ALARM WORK ON THIS PERMIT**
- PermitAddition and/or Alteration
Permit EP-2023-004786 · Completed
INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, & TIME CLOCK. INSTALL RECEPTACLES, FLOOR BOXES, & DATA/COM WIRING, & DEVICES. INSTALL FIRE ALARM DEVICES CONNECTING TO THE EXISTING BUILDING SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC & 2016 NFPA-72. * THE 100 AMP 120 / 208V / 3 PHASE PANEL IS EXISTING.
- PermitAddition and/or Alteration
Permit EP-2023-007084 · Completed
*Install feeders to the new replacement equipment (2) reclaim pump controllers, (2) brush system controllers, (4) sump pumps, new RO pump controller, (1) new GFCI, (8) new light fixtures, and (2) three- way switches as per 2017 nec. ** The car wash is existing and the replacement lighting & equipment is like for like replacements. *** The service & panels are existing.
- AppealBBS Permit Denial
Appeal CP-2023-002294 · Completed · Approved
Scope of Application: Application for proposed modular construction of temporary (more than 180 days) customer service booth accessory to existing customer service and car rental building in on-site car ready area.
- PermitAddition and/or Alteration
Permit EP-2023-007039 · Completed
Install fire alarm devices as per 2016 NFPA 72. Relocate fire alarm devices.
- License issue eventCPC Airport PHL LLCC (Chickie's & Pete's (Terminal E)): Food Preparing and Serving (30+ SEATS) business license initially issued
License 930693 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit MP-2023-003158 · Completed
FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.
- PermitNew Construction or Additions
Permit PP-2023-001217 · Completed
Amend permit per PBA Proviso Approval on hearing date 5/2/2024 - A) Existing PVC piping can remain in place until May 02, 2027. (3 years) B) After May 02, 2027, all existing non-metallic piping must be removed to and including the underground sanitary piping connecting to the manhole. C) If the trailer remains in place and in use after May 02, 2027, all existing non-metallic piping both sanitary & domestic must be removed and replaced with code compliant metallic materials including the interior of the trailer, the exterior of the trailer and the underground piping to the manhole. D) No additional connections to the existing non-metallic piping shall be permitted. E) If the use or occupancy of the trailer changes, code compliant materials must be installed including the interior of the trailer, the exterior of the trailer and the underground piping to the manhole. F) All sanitary & domestic piping must be properly protected from freezing. above ground sanitary and domestic water piping connections along with interior connections to existing for temp trailer.
- PermitAddition and/or Alteration
Permit CP-2023-003699 · Completed
For level II alteration to passenger lounge to be located in DE Terminal Connector of the Philadelphia International Airport. Building is fully sprinklered. Separate permits required for MEP & FP work. Amendment to the second and third floor of the lounge space. Revised partition layout on the second floor concourse level of the project.
- PermitAddition and/or Alterations
Permit FP-2023-001774 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Modify (6) sprinkler heads to accommodate interior alterations
- PermitParking Only
Permit ZP-2023-005808 · Issued
For the addition of four(4) electrical vehicle charging station to an existing parking lot.
- PermitAddition and/or Alteration
Permit CP-2023-002639 · Completed
LEVEL I ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING CAR WASH BUILDING TO INCLUDE UPDATING/REPLACING EQUIPMENT AND ROOF RE-COVERING AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- PermitAddition and/or Alteration
Permit EP-2023-005132 · Completed
INSTALL ELECTRICAL EQUIPMENT TO TRAILER-TRANSFORMER, DISCONNECT SWITCH AS PER 2017 NEC
- PermitNew Construction
Permit CP-2023-001971 · Completed
FOR THE ERECTION OF A DETACHED BUILDING (ONE STORY TRAILER) AS A PART OF PHILADELPHIA INTERNATIONAL AIRPORT AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. BUILDING IS NOT SPRINKLERED.
- PermitAddition and/or Alterations
Permit FP-2023-000537 · Completed
Fire Suppression System Permit for combo CP-2022-004301
- PermitAddition and/or Alterations
Permit FP-2023-001188 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (8) sprinkler heads to accommodate interior alterations to Space FH-3, Terminal F
- PermitAddition and/or Alteration
Permit CP-2023-002848 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL TENANT SPACE BC-15 FOR A NEW TENANT WITHIN AN EXISTING AIRPORT FACILITY (BC CONNECTOR) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit CP-2023-002452 · Completed
FOR LEVEL II INTERIOR ALTERATIONS (NEW TENANT FIT-OUT) TO RETAIL TENANT SPACE # FH-2 IN TERMINAL "F" OF THE PHILADELPHIA INTERNATIONAL AIRPORT WITHOUT A CHANGE IN EXISTING GROUP M USE & OCCUPANCY CLASSIFICATION. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. NO SIGNS THIS PERMIT.
- PermitRough-In
Permit EP-2023-004787 · Expired
Rough-In Permit for EP-2023-004786 New lights, wiring devices, power to lighted millwork; Wiring to connect to existing panel. Data cabling and jacks. Install fire alarm devices and connect to existing local zone. As per 2017 nec
- PermitAddition and/or Alterations
Permit MP-2023-002088 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating (4) Diffusers
- PermitAddition and/or Alterations
Permit MP-2023-002194 · Completed
Mechanical / Fuel Gas Permit for combo CP-2023-001611
- PermitAddition and/or Alteration
Permit EP-2023-004489 · Completed
Electrical Permit for combo CP-2023-001611
- PermitAddition and/or Alteration
Permit EP-2023-004183 · Completed
Electrical Permit for combo CP-2023-001530
- PermitAddition and/or Alteration
Permit CP-2023-001611 · Completed
FOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 1ST FLOOR LEVEL OF AN EXISTING STRUCTURE(AIRPORT). FOR USEAS A BUSINESS OCCUPANCY . ALTERATIONS TO INCLUDE FINISHES UPGRADE AND PROVIDE FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK NOT APPROVED ON THIS PERMIT**.
- PermitAlterations
Permit PP-2022-012723 · Expired
Plumbing alterations for new tenant in space per drawings. New hand sink, dump sink, dishwasher, and floor drains 3 FIXTURES
- PermitAddition and/or Alterations
Permit MP-2023-002082 · Completed
Mechanical / Fuel Gas Permit for combo CP-2023-001530
- PermitAddition and/or Alteration
Permit CP-2023-001530 · Completed
FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE 2ND AND 3RD FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. **STRUCTURE IS FULLY SPRINKLERED**ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHANICAL ELECTRICAL AND PLUMBING WORK INCLUDED AS PART OF THE REVIEW**
- PermitAddition and/or Alterations
Permit MP-2023-001710 · Issued
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK FOR AREAS THROUGHOUT AN EXISTING AIRPORT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2023-003456 · Issued
Renovations to 22Public Restrooms within the Philadelphia Airport, inclusive of required renovations to ancillary spaces associated with the support and maintenance of the public restrooms, at Terminals AE, B, C, D, E and F. Renovations and modifications shall be made to existing systems in place, in addition to new system installations. as per APPROVED DRAWINGS-2017 NEC. AMENDMENT: Install fire alarm . Phase 5 & 6.
- PermitAddition and/or Alteration
Permit CP-2023-002451 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE (Space #FH-3) IN TERMINAL F OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS TO INCLUDE PARTIAL DEMO AND INTERIOR RENOVATIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. **ALL WORK TO BE DONE PER APPROVED PLANS**. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**EXISTING BUILDING FULLY SPRINKLERED**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK*
- PermitAlterations
Permit PP-2023-005077 · Issued
Renovations to 22Public Restrooms within the Philadelphia Airport, inclusive of required renovations to ancillary spaces associated with the support and maintenance of the public restrooms, at Terminals AE, B, C, D, E and F. Renovations and modifications shall be made to existing systems in place, in addition to new system installations. The City of Philadelphia requires: Plumbing alterations/ additions in an existing building connecting to an existing plumbing system must be designed, sized and installed to the 2018 Philadelphia Plumbing Code section 919(Philadelphia Single Stack/venting System
- PermitAddition and/or Alterations
Permit MP-2023-001137 · Completed
Mechanical / Fuel Gas Permit for combo CP-2022-004301
- PermitAddition and/or Alteration
Permit EP-2023-003568 · Completed
Furnish and install (6) GFCI-protected circuits in the B/C Foodcourt as per 2017 nec. We will be running wires in the existing drop ceiling and fishing down existing columns, there is not any new building construction
- PermitAddition and/or Alterations
Permit MP-2023-001979 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2023-002909 · Completed
REUSE ABANDONED 200 AMP SERVICE FROM NEXTEL AND INSTALL NEW 200 AMP SERVICE, GROUNDING, FIBER AND TELECOMMUNICATION CABINETS FOR DISH NETWORK AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit CP-2023-002079 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO RESTROOMS WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2023-002230 · Completed
Electrical Permit for combo CP-2022-004301
- PermitAlterations
Permit PP-2023-003151 · Completed
Plumbing Permit (Interior) for combo CP-2022-004301
- PermitAddition and/or Alteration
Permit EP-2023-002324 · Completed
Installing (1) 225A 120/208V 3 phase outdoor panel for new vacuum addition as per print. includes (2) 3 phase 208V-60A VAC circuits, (1) 3 phase 208V-30A compressor circuit and miscellaneous power to shed as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2023-001428 · Completed
EXTEND EXISTING CIRCUITRY FOR NEW TICKET KOISK LOCATIONS BY FISHING NEW WIRES AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2023-002301 · Completed
Demo existing chiller and pumps. Provide new circuit breakers and feeders for the new chiller and pumps. Low voltage control wiring by others -per 2017 nec
- PermitAddition and/or Alteration
Permit CP-2022-004301 · Completed
FOR LEVEL II INTERIOR ALTERATIONS TO TERMINAL E OF THE PHILADELPHIA INTERNATIONAL AIRPORT AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. NO CHANGE TO EXISTING USE & OCCUPANCY CLASSIFICATIONS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. [AMENDMENT 9/20/2023 FOR REVISIONS TO WALL ASSEMBLY CONSTRUCTION DETAILS.]
- PermitAddition and/or Alteration
Permit EP-2023-001873 · Completed
INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS,LIGHT CONTROLS & RECEPTACLES. PROVIDE POWER FOR THE KITCHEN EQUIPMENT. RELOCATE THE EXISTING 200 AMP LV2 PANEL. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. ** THE ELECTRIC PANELS ARE EXISTING. ** NO FIRE ALARM WORK ON THIS PERMIT.
- PermitAddition and/or Alteration
Permit EP-2023-001845 · Completed
Electrical line voltage, electrical low voltage, and lightning protection work associated with a roof replacement project as per 2017 nec
- License issue eventPHL Connector Venture: Food Preparing and Serving (30+ SEATS) business license initially issued
License 919263 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitChange of Use
Permit ZP-2023-002185 · Issued
Personal Services; Office - Business and Professional; Eating and Drinking Establishments - Sit-Down Restaurant
- PermitRough-In
Permit EP-2023-001972 · Completed
Rough-In Permit for EP-2023-001873 Furnish and install new lighting and power for the renovation of a juice store in the Airport as per 2017 nec
- PermitNew Construction
Permit EP-2022-010640 · Completed
Install fire alarm system as per APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 Phila Fire Code.
- PermitAddition and/or Alterations
Permit FP-2023-000455 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2023-000018) Relocate (4) Sprinkler Heads (Terminal F-Space FH06)
- PermitAddition and/or Alteration
Permit CP-2023-000018 · Completed
FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR USE AS A EATING AND DRINKING ESTABLISHMENT OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**AMENDED AS OF 3/14/2023 FOR FINISHES UPGRADE**
- PermitAddition and/or Alteration
Permit CP-2022-004755 · Completed
FOR A LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE REPLACEMENT OF THE ROOF STRUCTURE AND RAMP TOWER. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- License issue eventPhl Connector Venture LLC (Bud and Marilyns): Food Preparing and Serving (30+ SEATS) business license initially issued
License 916072 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitAlterations
Permit PP-2022-016255 · Completed
Install the following fixtures 4 toilets,4 lavs,1 mop sink,1 drinking fountain 6 floor drains and 4 shower drains 2- electric hot water heaters and 1-2" backflow preventer Domestic water piping and Cast Iron sanitary and vent piping Rough in permit for 2022-016255
- PermitAddition and/or Alterations
Permit FP-2023-000164 · Completed
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. RELOCATE ANSUL SYSTEM IN HOOD
- PermitAlterations
Permit PP-2023-000631 · Expired
Removing (2) Water Coolers in Terminal D and replacing with (1) New Beverage Dispenser Removing (2) Water Coolers in Terminal E and replacing with (1) New Beverage dispenser
- PermitAddition and/or Alterations
Permit FP-2023-000074 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (23) sprinkler heads
- PermitAddition and/or Alterations
Permit MP-2022-006348 · Completed
FOR THE REPLACEMENT OF HVAC SYSTEM (WATER COOLED CHILLER), ASSOCIATED DUCT WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitAddition and/or Alterations
Permit MP-2022-006487 · Completed
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW FITNESS CENTER IN SPACE FH01 WITHIN TERMINAL F OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. *2018 IMC REVIEW*
- PermitFoundation
Permit SP-2022-000479 · Completed
FOR THE ERECTION OF 14 AUGER CAST PILES. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ALL FUTURE BEAMS, GIRDERS, POSTS, AND CONNECTIONS TO THE FUTURE PREFABRICATED TRAILER REQUIRE A SEPARATE BUILDING PERMIT. AMENDMENT APPROVED AS OF 8/11/23: TO DOCUMENT THE CHANGE IN AUGER CAST PILES. SIZE AND LOCATION AS SHOWN IN AMENDENT PLANS.
- PermitAddition and/or Alteration
Permit EP-2021-015312 · Completed
Provide electrical assistance in providing power to conveyor systems at airport as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2022-010681 · Completed
Furnish and install power, lighting, data, and fire alarm for renovation of airport store.
- PermitAddition and/or Alteration
Permit EP-2022-012810 · Completed
New lights, wiring devices fed from existing panel. Communication cable and jacks. Clean/replace fire alarm devices as needed per plans as per 2017 nec and nfpa 72
- PermitAddition and/or Alteration
Permit CP-2022-006422 · Completed
FOR LEVEL 2 ALTERATIONS TO SPACE FOR TENENT FIT-OUT FOR FITNESS CENTER WITHIN AIRPORT AS PER PLANS.
- PermitAddition and/or Alteration
Permit EP-2022-012160 · Completed
Electrical Distribution modifications associated with the PC Air & GPU Replacements at selected terminal gates as per 2017 nec
- PermitChange of Use
Permit ZP-2022-012710 · Completed
Retail Sales - Wearing Apparel and Accessories; Personal Services
- PermitFoundation
Permit SP-2022-000533 · Completed
FOR THE ERECTION OF FOUNDATION FOR LIGHT POLES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2022-010599 · Expired
INSTALL ELECTRIC FOR NEW HVAC UNIT AS PER 2017 NEC DATA CLOSET -F&I Conduit
- CertificationSpecial Hazards Certification
Certification BC-2022-016833 · Certified
Expires 2023-11-10
- PermitAddition and/or Alteration
Permit EP-2022-010019 · Completed
INSTALL A 70 AMP CIRCUIT BREAKER, 45 KVA TRANSFORMER, 200 AMP/175AMP FUSED DISCONNECT SWITCH, 175 AMP PANEL & FEEDER, 60 AMP UPS SYSTEM. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES ,CONTROLS, RECEPTACLES, CONDUITS & STRINGS, PATHWAYS FOR LOW VOLTAGE WIRING. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. ** NO FIRE ALARM WORK.
- PermitNew Construction or Additions
Permit PP-2022-011197 · Completed
Install new water lines, sanitary lines, fixtures and hot water heaters. all piping will be metallic.
- PermitAddition and/or Alterations
Permit MP-2022-004776 · Completed
Install of hvac system in IT room. 60,000 btu , 5 ton , 13 seer, 200 cfms. Replacement of unit only, in-like and kind. If other work is performed, a building permit will be required.
- PermitNew Construction
Permit EP-2022-008892 · Completed
Install new 100-amp electric feeder and panel. Install new lighting. Install duplex receptacles. Install data and speakers outlets As per 2017 nec
- PermitAddition and/or Alteration
Permit CP-2022-004612 · Completed
FOR ALTERATIONS TO EXISTING SPACES D12 AND D13, TO INCLUDE NEW INTERIOR PARTIIONS, RATED SHAFT ENCLOSURE INSTALLATIONS, RATED FLOOR/CEILING ASSEMBLIES, AND WALL/FLOOR/CEILING FINISHING. (IEBC 2018, WORK-AREA METHOD, LVL III ALTERATIONS) **SEPARATE PERMITS TO BE REQUIRED FOR ANY PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE SUPPRESSION SYSTEM INSTALLATIONS. **
- PermitAlterations
Permit PP-2022-015011 · Completed
Install floor drains and sinks for new restaurant tenant.
- License terminal eventAREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license marked inactive
License 821973 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitRough-In
Permit EP-2022-010683 · Completed
Rough-In Permit for EP-2022-010681
- PermitAddition and/or Alterations
Permit MP-2022-005368 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND THE RELOCATION OF EXISTING GREASE DUCT HOOD WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2022-010488 · Completed
Furnish and install two temporary power circuits for temporary kiosks as per 2017 nec
- PermitAddition and/or Alterations
Permit MP-2022-004713 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit FP-2022-002767 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (CP-2022-005537) Relocate (24) Sprinkler Heads - Concourse level E (Space E12)
- CertificationSprinkler Certification
Certification BC-2022-014052 · Certified
Expires 2023-10-06
- PermitAddition and/or Alteration
Permit CP-2022-005537 · Completed
LEVEL II INTERIOR ALTERATIONS FOR FIT-OUT OF NEW RESTAURANT TENANT IN SPACE E12 OF AN EXISTING AIRPORT FACILITY (CONCOURSE E) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitNew Construction
Permit MP-2022-004040 · Completed
FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AND FOR THE INSTALLATION OF A FUEL GAS PIPING SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK. SEE CP-2021-000825 FOR ASSOCIATED BUILDING PERMIT. [AMENDMENT 3/15/2024 FOR CHANGES TO MECHANICAL VENTILATION CALCULATIONS, DISTRIBUTION DUCTWORK, AND GRDs AS PER APPROVED AMENDED PLANS TO ADDRESS LAYOUT CHANGES.]
- PermitAddition and/or Alterations
Permit MP-2022-001802 · Expired
Mechanical / Fuel Gas Permit for combo CP-2021-009016
- PermitRough-In
Permit EP-2022-009132 · Completed
Rough-In Permit for EP-2022-008892 Install new 100-amp electric feeder and panel. Install new lighting. Install duplex receptacles. Install data and speakers outlets As per 2017 nec
- PermitAddition and/or Alterations
Permit FP-2022-002448 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Modifying (7) sprinklers
- PermitAddition and/or Alterations
Permit MP-2022-004652 · Expired
ALTERATIONS TO EXISTING HVAC TO ACCOMODATE NEW TENANT LAYOUT IN SPACE B1b IN AN EXISTING AIRPORT FACILITY (TERMINAL B) AS PER APPROVED PLANS. *2018 IMC REVIEW*
- PermitAddition and/or Alteration
Permit CP-2022-004852 · Completed
FOR LEVEL II ALTERATIONS AND RENOVATIONS TO THE 1ST FLOOR OF AN EXISTING BUILDING. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. *********SEPARATE PERMITS REQUIRED FOR MECHANICAL & ELECTRICAL WORK*********
- PermitAddition and/or Alteration
Permit EP-2022-007337 · Completed
Furnish & Install upgrade to PHL Video Surveillance System, network hardware and cable, CCTV cameras, 120VAC to CCTV camera boxes in Terminals AEast, C and F as per 2017 nec
- License issue eventHG PHL Retailers, JV (Hudson 2056): Food Establishment, Retail Permanent Location business license initially issued
License 904110 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alteration
Permit EP-2022-008282 · Expired
Relocation of 12 Strand fiber due to the closing of Starbucks Space as per 2017 NEC
- PermitAlterations
Permit PP-2022-005911 · Expired
Replace hand washing sinks and drains WITHOUT PIPING
- PermitRough-In
Permit EP-2022-007423 · Completed
Rough-In Permit for EP-2022-007337 Furnish & Install upgrade to PHL Video Surveillance System, network hardware and cable, CCTV cameras, 120VAC to CCTV camera boxes in Terminals AEast, C and F as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2022-007477 · Completed
**Please note there is no associated building permit** Install the following surface-mounted fixtures via surface-mounted conduit - no walls will be opened. (Mechanic Area) 1-new exterior wall light 2-new exterior spotlight 2-new surface mounted switches for exterior spotlights (Cleaning Area) 10-new exterior spotlights (Dollar Thrifty area) 6-new emergency light fixtures (surface mounted) 4-new outdoor emergency lights As per 2017 NEC
- PermitAddition and/or Alteration
Permit CP-2022-002619 · Expired
FOR RENOVATIONS OF EXISTING SEPTA PLATFORMS AT THE PHILADELPHIA INTERNATIONAL AIRPORT. SEPARATE PERMTS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.
- PermitAddition and/or Alteration
Permit EP-2022-005721 · Completed
IN CUSTOMER WAITING AREA DISCONNECT ELECTRIC DEVICES FOR LED BACKWALL DISPLAYS AND REMOVE CIRCUITS. PROVIDE/INSTALL NEW ELECTRICAL CIRCUITS AND DEVICES FOR NEW DISPLAYS. ALSO PROVIDE CONDUIT DROPS DOWN WALL FOR LOW VOLTAGE VENDOR AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2022-006099 · Completed
Demolition of existing electrical lighting and replace with new as per 2017 nec
- PermitAddition and/or Alterations
Permit FP-2022-001809 · Expired
KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. INSTALL KITCHEN FIRE SUPPRESSION
- PermitAddition and/or Alteration
Permit EP-2022-005651 · Completed
Disconnect/remove electric and data in existing Gold Board TV Display. Installation of new circuits using existing conduit and breakers, and connect to new Gold Board as per 2017 nec
- PermitAddition and/or Alterations
Permit FP-2022-001707 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of (1) Sprinkler Head as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitAddition and/or Alteration
Permit EP-2022-005623 · Completed
GOLD MEMBERS WAITING AREA DISCONNECT ELECTRIC DEVICES FOR LED BACKWALL DISPLAYS AND REMOVE CIRCUITS. PROVIDE/INSTALL NEW ELECTRICAL CIRCUITS AND DEVICES FOR NEW DISPLAYS. ALSO PROVIDE CONDUIT DROPS DOWN WALL FOR LOW VOLTAGE VENDOR AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2022-006043 · Completed
Furnish and install conduit, wire, and equipment for tracking system of vehicle maintenance as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2022-004999 · Completed
Remove and replace 3 pendent fixtures on existing track and install 3 new pendent fixtures and tie into existing lighting circuit and control. Provide new power for digital display and connect new store front signage to existing power as per 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2022-005024 · Completed
Disconnect electric and data wiring in existing cash wrap. Reconnect existing electric and data to new cash wrap after installation. Disconnect existing electric from floor fixtures. Reconnect to existing electric to new floor fixtures after installation. Disconnect existing wall feature power and reconnect to new wall feature device. Replace existing pendant light with new pendant light. As per 2017 nec
- PermitNew Construction
Permit EP-2022-005282 · Completed
Electrical Permit for combo SP-2022-000216
- PermitSitework with Onsite Utility Services
Permit SP-2022-000216 · Expired
FOR THE INSTALLATION OF ELECTRIC VEHICLE CHARGERS AS PER APPROVED PLANS.
- PermitAlterations
Permit PP-2022-007805 · Completed
Install one sink and associated piping AS PER PPC 2018
- PermitAddition and/or Alteration
Permit CP-2022-001502 · Expired
FOR THE REPAIR OF EXISTING COLUMN ON THE SECOND FLOOR LEVEL ACCESSORY TO EXISTING AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit CP-2022-001415 · Completed
For level 2 alterations for interior fit-out of tenant space in PHL space BC-3 for merchantile store "1920 Merch Co" per drawings.
- PermitAddition and/or Alteration
Permit CP-2022-000825 · Completed
FOR LEVEL II INTERIOR ALTERATIONS TO THE SPACE BC-14 AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORKS.
- PermitAddition and/or Alteration
Permit EP-2022-003422 · Completed
Furnish and install new lights, power, data and fire alarm for an airport news store ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- PermitAddition and/or Alteration
Permit EP-2022-000654 · Completed
Furnish & Install LED apron lighting system for Concourses B,C, D including electrical power distribution infrastructure with the concourse and substations, boarding bridge-mounted LED task lighting, LED flood lighting, high mast light poles, lighting controls, pole foundations. Work also includes the demolition of existing floodlighting system as per 2017 NEC
- PermitRough-In
Permit EP-2022-004053 · Completed
Rough-In Permit for EP-2022-003422 Furnish and install new lights, power, data and fire alarm for an airport news store as per 2017 nec and nfpa 72
- PermitAlterations
Permit PP-2022-003869 · Completed
Install 1 hub drain water piping for fixture
- PermitAddition and/or Alteration
Permit EP-2022-001169 · Completed
Install (3) 200 amp panels, (1) 200 amp sub-meter, (1) 112.5 KVA transformer, new lighting, switches, receptacles, Kitchen & Mechanical Equipment connections, communication outlets and security cameras as per 2017 NEC. Install fire alarm devices and connection to main airport fire alarm system as per 2016 NFPA 72.
- PermitAddition and/or Alteration
Permit EP-2022-002997 · Completed
Remove, relocate, install new poke thru devices with 120V branch power and telecommunication cabling at airport terminal security screening checkpoints as per 2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2022-001436 · Expired
FOR CONCRETE REPAIRS WITHIN EXISTING PARKING GARAGE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK.
- PermitNew construction, addition, GFA change
Permit ZP-2021-016018 · Completed
FOR THE ERECTION OF A DETACHED BUILDING (ONE STORY TRAILER) AS A PART OF PHILADELPHIA INTERNATIONAL AIRPORT (SIZE AND LOCATION AS SHOWN ON PLANS).
- PermitAddition and/or Alteration
Permit EP-2022-003381 · Completed
Install 13 receptacles in existing space. New wiring to terminate in existing panel. Wiring to be run through existing conduits. No new building construction, cutting or patching will be necessary. Project is just electrical. As per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2022-002798 · Completed
Disconnect existing 120V branch power, telecommunication and low voltage control wiring from parking area access control equipment. Remove and replace equipment, reconnect 120V branch power, telecommunication and low voltage controls as per 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2022-002958 · Completed
Disconnect and remove (2) existing floor Receptacles. Plate existing holes on bottom of floor and patch with Non-Shrink Grout. Core (4) new holes for floor receptacles at new location. Provide (2) new floor receptacles and install (4) total floor receptacles. Existing (2) floor receptacles will be re-used. Rework conduit and wiring below floor to new floor receptacles. Disconnect existing receptacles behind wall fixtures and remove wiring back to source. As per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2022-002168 · Expired
INSTALL NEW POWER AND DATA TO TICKETING KIOSKS AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit CP-2021-009016 · Expired
For Level II Alterations (w/o a change of occupancy) to an existing Group B space (Airport Operations Center) within an existing Group A-3 (Airport) occupancy, as per plans; see sub-permits for associated mechanical and electrical work; building is fully sprinklered in accordance with NFPA 13; work entirely outside of the flood plain as per submitted FIRMette.
- PermitAddition and/or Alteration
Permit CP-2022-001219 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL SPACE IN DE08 IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE TO BE OBTAINED FOR ALL OTHER WORK.
- License issue eventHG PHL Retailers, JV (Hudson ): Food Establishment, Retail Permanent Location business license initially issued
License 892828 · Active
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventHG PHL Retailers, JV (Hudson 2054): Food Establishment, Retail Permanent Location business license initially issued
License 890002 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAlterations
Permit PP-2022-001178 · Completed
INSTALL 2 FLOOR DRAINS, 1 HOT WATER HEATER, 1 HUD DRAIN, 1 WASHING MACHINE BOX, 2 SHOWER/TUB AND 1 WATER CLOSET ACCORDING TO THE 2018 PPC.
- PermitRough-In
Permit EP-2022-002433 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitAddition and/or Alterations
Permit MP-2022-000582 · Completed
FOR ALTERATIONS TO FUEL GAS PIPPONG AS PER PLANS.
- PermitAlterations
Permit PP-2022-002796 · Completed
INSTALL 1 KITCHEN SINK, 1 EJECTOR PUMP AND 1 ELECTRIC WATER HEATER ACCORDING TO THE 2018 PPC.
- PermitAddition and/or Alterations
Permit MP-2022-000347 · Completed
FOR ALTERATIONS TO AN EXISTING MECHANICAL SYSTEM TO INCLUDE NEW MAKEUP AIR UNITS, GAS PIPING, AND ASSOCIATED DUCTWORK, AND FOR THE INSTALLATION OF TWO (2) (16' & 20') TYPE I KITCHEN HOODS FOR A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK, ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT A DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2022-001176 · Completed
Install (12) lights, (3) switches, (27) receptacles, connection to (5) mechanical equipment, (1) 30 KVA transformer, (1) 100 amp panel, (11) Tele/Data jacks as per 2017 NEC. Relocate (2) horn/strobes as per NFPA 72 with no additional wiring.
- PermitTank Install/Removal
Permit GP-2022-000621 · Expired
**TANK CLOSURE PERMIT** FOR THE CLOSURE IN PLACE OF ONE (1) 6,000 GALLON UNDERGROUND STORAGE FUEL OIL TANK (UST) TANK #3. REMOVE ANY PETROLEUM PRODUCT / WATER FROM TANK. CONDUCT A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTINGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED. FILL IN PLACE WITH FLOWABLE FILL CONCRETE MIXTURE. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH PA DEP UST REMOVAL GUIDELINES. PROVIDE THE CITY OF PHILADELPHIA WITH A TANK CLOSURE REPORT.
- PermitAddition and/or Alterations
Permit MP-2022-000805 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (Install 1 ductless heat pump with 2 indoor units. Replace 2 ceiling diffusers and 2 ceiling return air grills).
- PermitRough-In
Permit EP-2022-001664 · Completed
Rough-In Permit for EP-2022-001176 Install (12) lights, (3) switches, (27) receptacles, connection to (5) mechanical equipment, (1) 30 KVA transformer, (1) 100 amp panel, (11) Tele/Data jacks. Relocate (2) horn/strobes as per 2017 nec and nfpa 72
- PermitNew Construction
Permit FP-2022-000460 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 6" MAIN FIRE SERVICE LINE WITH A 6" AMES 2000SS BACKFLOW PREVENTION ASSEMBLY. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitAddition and/or Alterations
Permit MP-2022-000590 · Completed
FOR INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTOWORK FOR SPACE ACCESSORY TO AIRPORT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2022-000501 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTUERER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit FP-2022-000472 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (5) Sprinkler Heads Space # AB-6 (CP-2021-009459)
- PermitAddition and/or Alterations
Permit FP-2022-000417 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (14) Sprinkler Heads Terminal E8c (CP-2021-008867)
- PermitAddition and/or Alterations
Permit FP-2022-000418 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) Sprinkler Heads Suite C12-A
- PermitAddition and/or Alteration
Permit CP-2021-008867 · Completed
FOR ALTERATIONS TO INCLUDE THE INSTALLATION OF AN ACCESSIBLE SERVICE COUNTER, INSULATED WALK-IN COOLER, INTERIOR PARTITIONS, AND WALL/FLOOR/CEILING FINISHING. (IEBC 2018, WORK-AREA METHOD, LVL II ALTERATIONS; NON-SUBSTANTIAL IMPROVEMENT) **SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, AND KITCHEN EXHAUST HOOD INSTALLATIONS.**
- PermitAlterations
Permit PP-2022-000714 · Completed
Installation of all interior supply and Drain/Waste/Vent pipe to the listed fixtures per the 2018 Philadelphia Plumbing Code. Sizes and locations per plans.
- PermitAddition and/or Alteration
Permit EP-2022-000941 · Completed
Replace existing lights with new. Replace existing switches and receptacles with new. Add new wiring devices. Wiring to new HVAC unit. Replace ceiling speakers. Install (1) tele/data jack. Relocate (2) speaker/strobes to adjacent wall. New wiring to connect to existing panel as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2022-000333 · Expired
FURNISH & INSTALL (3) 120V CIRCUITS, FIBER CABLE FROM E-TERMINAL OPS DATA CABINET TO GATE E-13, AND (10) CAT 5 DATA CABLES TO PODIUMS. All work in accordance with the 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2021-015170 · Completed
Alterations for renovations to restaurant in space FH-08 in an existing airport facility as per 2017 NEC. Re-wire new luminaires to existing lighting circuit. Installation of new power and equipment as per 2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2021-009535 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EMPLOYEE AREA ON THE LOWER LEVEL OF TERMINAL E WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit CP-2021-009459 · Completed
FOR INTERRIOR LEVEL 2 ALTERATIONS AS PER PLANS.
- PermitAlterations
Permit PP-2021-024962 · Completed
For the removal and re-installation of existing grease trap. Replacement of any damaged sanitary waste pipe only. Separate fuel gas permit required.
- PermitAddition and/or Alteration
Permit CP-2021-009352 · Completed
For level II alteration without change of occupancy classification of existing retail space within Philadelphia International Airport as per approved plans.
- PermitAddition and/or Alteration
Permit EP-2021-002920 · Completed
THE INFRASTRUCTURE AND BAGGAGE HANDLING SYSTEM WORK ASSOCIATED WITH THE REPLACEMENT OF EIGHT EXISTING EXPLOSIVE DETECTION CTX 9400 UNITS WITH SIX NEW GOVERNMENT FURNISHED CTX 9800 UNITS. THIS RECAPITALIZATION PROJECT WILL INCLUDE CHANGES TO THE EXISTING BAG MATRIX CONVEYOR SYSTEM AND WORKSTATION REPLACEMENTS IN THE ON SCREEN RESOLUTION (OSR) AND CHECKED BAGGAGE RECONCILIATION AREA (CBRA) ROOMS. THERE WILL BE SUPPORTING ELECTRICAL FEED CHANGES, ADDITIONAL HVAC FAN INSTALLATIONS FOR INCREASED AIR CIRCULATION, NEW COMMUNICATIONS CABLING FOR CONTROL SYSTEMS. New conduits and Feeds for the above items New conduits and communications. As per 2017 NEC
- PermitSitework with Onsite Utility Services
Permit SP-2021-000905 · Completed
3" Domestic Water Service Tie-in to existing PWD 20" water main
- PermitNew Construction or Additions
Permit PP-2022-000617 · Completed
Plumbing Permit for combo SP-2021-000905
- PermitAlterations
Permit PP-2022-000248 · Completed
Fixture replacement WITHOUT PIPING for existing bathrooms
- PermitAddition and/or Alteration
Permit EP-2021-014685 · Completed
Remodel of the existing Operations Center Workstations, Install New Power, New Lighting Communications, audio/visual, a new Power Panel and UPS as per 2017 NEC.
- PermitNew Construction
Permit EP-2021-008342 · Completed
New construction including 13.2kV service from existing customer-managed medium voltage distribution to the existing customer-provided outdoor 13.2kV primary/480V secondary electrical distribution equipment, 480/277V and 208/120V branch power, lighting, lightning protection, audio paging, security, video surveillance, and telecommunications systems as per 2017 NEC. Install fire alarm as per 2016 NFPA 72. Amendment: Reconfigured office space in proposed building in accordance with Bulletin 4. Electrical drawings affected by this change have been uploaded.
- PermitAddition and/or Alteration
Permit EP-2021-012556 · Completed
Running conduit and wire from an existing electrical panels within Philadelphia International Airport to antennas in areas throughout airport as per APPROVED DRAWINGS-2017 nec. Work is under GP-2021-012388.
- CertificationSpecial Hazards Certification
Certification BC-2022-000063 · Certified
Expires 2022-12-11
- CertificationFacade Report
Certification BC-2022-001201 · Safe with Repair
Expires 2026-12-06
- PermitAddition and/or Alteration
Permit CP-2021-008761 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO RESTAURANT IN SPACE FH-08 IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2021-013408 · Expired
Install cat-6 cable through accessible ceiling to (1) ceiling mount people counter sensors. No cutting of building finishes necessary to install wiring as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2021-013412 · Expired
Install cat-6 cable through accessible ceiling to (1) ceiling mount people counter sensors. No cutting of building finishes necessary to install wiring as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2021-013414 · Expired
Install cat-6 cables through accessible ceiling to (2) ceiling mount people counter sensors. No cutting of building finishes necessary to install wiring as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2021-013397 · Expired
Install cat-6 cables through accessible ceiling to (2) ceiling mount people counter sensors. No cutting of building finishes necessary to install wiring as per 2017 NEC
- PermitAntenna
Permit GP-2021-012388 · Expired
FOR THE INSTALLATION OF ANTENNAS AND ASSOCIATED EQUIPMENT APART OF EXISTING TELECOMMUNICATION EQUIPMENT ASSOCIATED WITH EXISTING AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS SEALED BY STRUCTURAL ENGINEER. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2021-012721 · Completed
Install new conduits and electrical feeders for (11) new PC Air units pm jet bridges. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS.-2017 NEC.
- PermitNew Construction
Permit FP-2021-002214 · Completed
FOR THE INSTALLATION OF NEW SPRINKLERS TYING TO THE EXISTING FOUR (4) INCH CROSS MAIN SIZE. AUTOMATIC FIRE SUPPRESSION SYSTEM TO BE AS PER NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. SEPARATE PERMIT REQUIRED FOR ANY OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2021-010051 · Completed
furnish & install conduit, cabling, monitor mounts & supports; terminate, test & label all cabling; install owner supplied equipment; install 24x24 access panels as per APPROVED DRAWINGS- 2017 NEC.
- PermitAddition and/or Alterations
Permit MP-2021-005059 · Expired
FOR THE INSTALLATION OF HVAC APPLIANCE, REGISTERS, DIFFUSERS AND DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTUER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.
- PermitAddition and/or Alteration
Permit CP-2021-005226 · Expired
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A RESTAURANT IN SPACE BC13 IN THE BC CONNECTOR OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alterations
Permit MP-2021-003800 · Expired
FOR MECHANICAL ALTERATIONS IN EXISTING BATHROOMS, TO INCLDE THE INSTALLATION OF THREE (3) ERU'S, REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS.
- PermitNew Construction
Permit CP-2021-000825 · Completed
FOR THE ERECTION OF A ONE (1) STORY DETACHED STRUCTURE (BUILDING "A") OF CONSTRUCTION TYPE IIB FOR USE AS AN AIRPORT-RELATED FACILITY (GROUPS B & A-3 USE & OCCUPANCY CLASSIFICATIONS) BY THE PHILADELPHIA INTERNATIONAL AIRPORT PAVEMENT & GROUNDS (P & G) UNIT. BUILDING IS TO BE FULLY SPRINKLERED THROUGHOUT WITH A NFPA 13 AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. [AMENDMENT 9/14/2023 TO INCLUDE REVISIONS TO EXTERIOR WALLS DETAILS AND TO INTERIOR LAYOUT AS PER APPROVED AMENDED PLANS.]
- PermitAddition and/or Alteration
Permit EP-2021-005730 · Expired
Removing and reinstalling in-pavement centerline lights. Part of this project is in Tinicum Township (Delaware County). As per 2017 NEC
- PermitAddition and/or Alteration
Permit CP-2020-000130 · Completed
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO ENTRANCE DOORS DEPARTING TERMINALS D AND E WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2021-006067 · Completed
Demolish and furnish and install new power, lighting, and fire alarm for (4) new vestibule doors for Terminal E and Terminal D as per APPROVED DRAWINGS 2017 NEC and 2018 PHILA FIRE CODE.
- PermitAddition and/or Alteration
Permit EP-2021-003900 · Completed
Install new lights, and power to electrically operated sliding doors and electric heaters and air curtains for renovated vestibules as per 2017 NEC. Install wiring for fire alarm tamper & flow switches as per 2016 NFPA 72.
- PermitAddition and/or Alterations
Permit MP-2021-002616 · Expired
FOR ALTERATIONS TO AN EXISTING MECHANICAL SYSTEM TO INCLUDE NEW AIR HANDLING UNITS AND CONDENSING UNITS, REFRIGERANT PIPING, AND ASSOCIATED DUCTWORK.
- PermitAddition and/or Alteration
Permit EP-2021-005133 · Completed
Furnish and install new power and data for cash wrap, new floor receptacles, and extend existing lighting circuits for owner furnished lighting as per NEC 2017
- PermitAddition and/or Alteration
Permit EP-2021-002684 · Completed
Install panels, transformers, feeders, lighting, wiring devices, HVAC wiring, low voltage communication and fire alarm devices and wiring for restrooms renovations as per 2017 nec and nfpa 72
- License issue eventSeven Hills Inc (Burger King Term E (Space E-15)): Food Preparing and Serving business license initially issued
License 870354 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitAddition and/or Alterations
Permit FP-2021-001299 · Completed
FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEM INCLUDING PIPING AND SRINKLER HEADS PER APPROVED PLANS, HYDRAULIC CALCULAITON AND NFPA 13.
- PermitAddition and/or Alteration
Permit CP-2021-001514 · Completed
FOR LEVEL 2 ALTERATIONS FOR FITOUT OF EXISTING COMMERCIAL TENANT SPACE (FOR A NEW KIEHL'S LOCATION) IN SPACE DE-3 OF CONCOURSE CONNECTOR DE AT PHILADELPHIA INTERNATIONAL AIRPORT AS PER PLANS. NO ADDITIONS. NO CHANGE IN GFA. NO EXTERIOR WALL PENETRATION. NO STRUCTURAL WORK.
- PermitAddition and/or Alteration
Permit CP-2021-001413 · Completed
Replace 4 revolving doors with new entrance vestibules, Replace 1 sliding door with new entrance vestibule, replace 2 sliding doors with new glazing system at grade level/ first floor as per approved plans.
- PermitAddition and/or Alteration
Permit EP-2021-004391 · Completed
NO ALELECTRICAL: New VFDs and disconnect switches ,with new 3-pole breakers in MCC bucket all new conduit & wire for cooling tower fans, heat trace, and basin heaters. ALL WORK TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC.
- PermitAddition and/or Alteration
Permit CP-2021-001792 · Completed
NO ALTERATIONS ASSOCIATED WITH SCOPE OF WORK, REPLACEMENT OF COOLING TOWER, PLEASE SEE ASSOCIATED MECHANICAL PERMIT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACATURER'S SPECIFICIATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2021-002827 · Completed
FOR THE REPLACMENT OF COOL TOWER AS SHOWN PER APPROVED PLANS. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACATURER'S SPECIFICIATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAlterations
Permit PP-2021-001177 · Completed
New rough in for fixtures ,Water piping , new fixtures
- PermitAddition and/or Alteration
Permit EP-2021-002692 · Completed
Retrofit (8) existing signs to LED as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2021-001355 · Completed
Disconnect power to motorized gate and storefront lights to allow for gate replacement. Reconnect gate and lights when new gate is replaced as per 2017 nec
- PermitChange of Use
Permit ZP-2021-002649 · Completed
Retail Sales - Sundries, Pharmaceuticals, and Convenience Sales
- PermitAddition and/or Alteration
Permit EP-2020-001236 · Expired
Provide 100a service to temporary trailer as per 2017 nec
- PermitAddition and/or Alteration
Permit CP-2020-004755 · Completed
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO RESTROOMS IN TERMINALS B, B/C & C WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit EP-2020-011435 · Completed
Install floor receptacle. Install GFI receptacle. Install (2) receptacles. Install Tel/Data cables. As per APPROVED DRAWINGS-2017 nec
- PermitNew Construction
Permit 1037606 · Expired
FOR INSTALLATION OF A NEW HVAC SYSTEM INCLUDING BLACK IRON DUCT WORK WITH FIRE WRAP FOR TYPE II KITCHEN EXHAUST HOOD AS PER PLANS.
- PermitAddition and/or Alterations
Permit FP-2021-000299 · Completed
Install (1) Ansul R-102 Wet Chemical Commercial Kitchen Fire Suppression System for protection of cooking equipment and Type 1 kitchen exhaust hood- See Mechanical Kitchen Hood Permit #MP-2020-000527 Issued 12/9/2020
- PermitAddition and/or Alteration
Permit EP-2021-000671 · Completed
Install new power for vending machines as per 2017 NEC
- PermitRough-In
Permit EP-2021-000672 · Completed
Rough-In Permit for EP-2021-000671 Install new power for vending machines as per 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2020-010738 · Expired
LED lighting retrofits, new LED fixtures, & occupancy controls as per APPROVED DRAWINGS-2017 nec.
- PermitAddition and/or Alterations
Permit FP-2020-001900 · Completed
Installation of a sprinkler system per NFPA 13. Convert pendents to uprights. Reinstall sprinkler heads to protect new layout.
- PermitAddition and/or Alterations
Permit MP-2020-004565 · Completed
FOR THE REPLACEMENT OF PIPING AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAddition and/or Alterations
Permit MP-2020-003991 · Completed
FOR THE INSTALLATION OF APPLIANCES AND UPGRADE OF EXISTING CONVEYOR SYSTEM WITHIN AN EXISTING AIRPORT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAddition and/or Alteration
Permit EP-2020-009016 · Expired
1) Safe-off and disconnect power to (4) Baggage Dimensioner Devices and reconnect once new BDD’s are F&I by others. 2) Remove Communication cables to (4) Baggage Dimensioner Devices and reconnect once new BDD’s are F&I by others. 3) All existing Power and Communications to remain in place as this is a one for one replacement of the BDD’s. No Changes to existing wiring. 4) BDD’s are just getting upgraded to newer version. As per 2017 nec
- CertificationSpecial Hazards Certification
Certification BC-2021-001394 · Certified
Expires 2021-12-15
- CertificationSpecial Hazards Certification
Certification BC-2021-001395 · Certified
Expires 2021-12-15
- CertificationSpecial Hazards Certification
Certification BC-2021-001396 · Certified
Expires 2021-12-15
- PermitAddition and/or Alterations
Permit FP-2020-002489 · Completed
We will be relocating (18) sprinklers at The PHiladelphia Airport Terminal E, Burger King, Space# E-15. See CP-630
- PermitAddition and/or Alteration
Permit CP-2020-006897 · Completed
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR THE USE AS A RETAIL SPACE, ALTERATIONS TO INCLUDE THE CHANGE IN LAYOUT OF THE EXISTING SPACE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- CertificationSpecial Hazards Certification
Certification BC-2021-001392 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001388 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001368 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001384 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001386 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001397 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001356 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001366 · Certified
Expires 2021-12-12
- CertificationSpecial Hazards Certification
Certification BC-2021-001326 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001348 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001360 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001327 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001354 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001369 · Certified
Expires 2021-12-10
- CertificationSpecial Hazards Certification
Certification BC-2021-001362 · Certified
Expires 2021-12-10
- PermitAddition and/or Alterations
Permit MP-2020-000527 · Completed
For the new HVAC system and Kitchen hood within existing tenant space #15 at Philadelphia Airport Concourse E a take out restaurant as per approved plan.
- CertificationSpecial Hazards Certification
Certification BC-2021-001379 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001374 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001383 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001380 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001364 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001358 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001363 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001329 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001377 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001371 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001370 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001373 · Certified
Expires 2021-12-09
- CertificationSpecial Hazards Certification
Certification BC-2021-001375 · Certified
Expires 2021-12-09
- PermitAddition and/or Alteration
Permit EP-2020-010479 · Completed
Provide new lighting, power, fire alarm for a Burger King in Terminal E as per APPROVED DRAWINGS-NEC 2017 and 2016 NFPA 72.
- CertificationSpecial Hazards Certification
Certification BC-2021-001349 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001340 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001389 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001376 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001352 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001350 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001391 · Certified
Expires 2021-12-08
- CertificationSpecial Hazards Certification
Certification BC-2021-001338 · Certified
Expires 2021-12-08
- PermitAddition and/or Alteration
Permit EP-2020-010049 · Completed
Furnish and install power for (2) Powerservers, (12) Powerstations at Terminal E as per 2017 NEC
- CertificationSpecial Hazards Certification
Certification BC-2021-001341 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001336 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001328 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001331 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001344 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001342 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001334 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001343 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001353 · Certified
Expires 2021-12-07
- CertificationSpecial Hazards Certification
Certification BC-2021-001345 · Certified
Expires 2021-12-07
- PermitAlterations
Permit PP-2020-001300 · Completed
For level II interior alteration within existing tenant space #15 at Philadelphia Airport Concourse E without change of occupancy classification to create a take out restaurant. Building is fully sprinklered.
- PermitRough-In
Permit EP-2020-010481 · Completed
Rough-In Permit for EP-2020-010479 Provide new lighting, power, fire alarm for a Burger King in Terminal E as per NEC 2017 and NFPA 72
- PermitAddition and/or Alteration
Permit EP-2020-009820 · Expired
Add (5) GFCI outlets as per 2017 nec
- PermitAddition and/or Alteration
Permit CP-2020-000630 · Completed
For level II interior alteration within existing tenant space #15 at Philadelphia Airport Concourse E without change of occupancy classification to create a take out restaurant. Building is fully sprinklered.
- PermitAddition and/or Alteration
Permit EP-2020-009638 · Completed
FOR INSTALLATION OF LOW VOLTAGE CABLING AND ANTENNAS FOR RADIO TRANSMISSION NETWORK AS PER 2017 NEC.
- PermitAddition and/or Alterations
Permit FP-2020-000161 · Issued
Upgrading Existing 3 water wash Kitchen Hood Suppression Systems to Piranha Kitchen Hood Suppression Systems, (Buffet Hood, Main Hood and Kettle Hood) UL300 listed Mech#1042048
- PermitAddition and/or Alteration
Permit EP-2020-006686 · Completed
Electrical modifications to existing 120/208V and 480/277V branch power circuits, one new 120/208V 225A panel, replacement of existing lighting and associated branch power, relocation of existing fire alarm devices, relocation of existing telecom, and removal of existing CCTV devices as per 2017 nec and nfpa72
- PermitAddition and/or Alterations
Permit MP-2020-004176 · Completed
For alterations to an existing mechanical/HVAC system (including ductwork, registers, diffusers, and appliance replacements-in-kind) within the Baggage Handling Area in Terminal B at Philadelphia International Airport, as per plans; no other work on this permit; see AP#1033685 for building permit.
- PermitAlterations
Permit PP-2020-009690 · Completed
For the removal and replacement of storm and sanitary drainage per 2018 Philadelphia Plumbing Code. Mechanical Permit required for installation of fuel gas piping.
- PermitAddition and/or Alteration
Permit EP-2020-008305 · Completed
Install floor outlet as per 2017 nec
- PermitAddition and/or Alteration
Permit EP-2020-008316 · Completed
INSTALL FLOOR OUTLET AS PER 2017 NEC.
- PermitAddition and/or Alteration
Permit EP-2020-008139 · Completed
DISCONNECT AND REPLACE PC AIR AC UNITS ON JET BRIDGES FOR GATES E1, E3, AND E5 AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit EP-2020-007848 · Completed
DISCONNECT (2) EXISTING BRANCH CIRCUIT DEVICES. PROVIDE AND INSTALL NEW BRANCH WIRING IN EXISTING CONDUIT FOR NEW DEVICES. RELAMP EXISTING LIGHT FIXTURES AS PER 2017 NEC Permit Amended 10-30-20 to identify accurate location
- PermitAddition and/or Alteration
Permit CP-2020-004810 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING TENANT SPACE(SPACE #FH4) LOCATED IN TERMINAL F OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT THE DESIGNATED FLOORS. **ALL WORK TO BE DONE PER APPROVED PLANS**. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**EXISTING BUILDING FULLY SPRINKLERED**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- PermitAddition and/or Alteration
Permit CP-2020-004398 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING ASSEMBLY OCCUPANCY(SPACE #D) IN TERMINAL E OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT THE DESIGNATED FLOORS. **ALL WORK TO BE DONE PER APPROVED PLANS**. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**EXISTING BUILDING FULLY SPRINKLERED**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**AMENDED AS OF 10/10/2020 TO SPECIFY THE LOCATION OF WORK "B-C CONNECTOR, SPACE BC11".
- PermitAddition and/or Alteration
Permit CP-2020-004806 · Completed
For level 2 alterations of existing Hudson News Space at Philadelphia International Airport. Space FH15, Terminal F as per plans.
- PermitAddition and/or Alteration
Permit EP-2020-006897 · Completed
Install 42 feet of fiber and 74 spider clip on devices on existing wireless access points as per NEC 2017
- PermitRough-In
Permit EP-2020-006898 · Completed
Rough-In Permit for EP-2020-006897 Install one power receptacle, 42 feet of fiber and 74 spider clip on devices on existing wireless access points as per NEC 2017
- PermitAddition and/or Alterations
Permit FP-2020-001384 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating (1) sprinkler at Gadget Express #BSR1, Philadelphia Airport.
- PermitAddition and/or Alterations
Permit FP-2020-001018 · Completed
EZ STANDARDS KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. INSTALL ANSUL R102 SYSTEM
- PermitAddition and/or Alteration
Permit EP-2020-004839 · Completed
Install 50 Amp panel and feeder, (3) Track lights, (9) Receptacles and Sign circuit. Install outlet box and conduit stub for tele/data jacks.
- PermitRough-In
Permit EP-2020-004846 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
- PermitNew Construction
Permit 1047489 · Expired
ALTERATION TO AN EXISTING MECHANICAL SYSTEM FOR THE A/B & F RAMP TOWER LOCATED AT THE AIRPORT. ALTERATION TO INCLUDE A NEW HVAC SYSTEM, AIR HANDLERS , REGISTERS AND DIFFUSERS,EXHAUST FANS,CHILLED WATER PUMPS AND ALL ASSOCIATED DUCTWORK AS PER APPROVED PLANS.APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**SEPARATE PERMITS REQUIRED FOR ANY OTHER ELECTRICAL PLUMBING AND FIRE SUPPRESSION WORK**
- PermitNew Construction
Permit 1050547 · Completed
PROVIDE POWER, GROUNDING, CONDUIT FOR FIBER FOR T-MOBILE EQUIPMENT PER 2017 NEC (WEST DIST)
- PermitNew Construction
Permit 1056518 · Completed
PASSENGER BOARDING BRIDGES (PBB) POWER AND CONTROL CONNECTIONS AT GATES B1, B4, B5, C17 AND C25. OUR SCOPE STARTS AT THE OUTDOOR JUNCTION BOXES WHERE WE SPLICE EXTEND FEEDERS. DEMOLITION, CIRCUIT BREAKERS, FUSES, GROUNDING, SAFETY SWITCHES, JUNCTION
- PermitNew Construction
Permit 1056511 · Completed
DEMOLITION, FEEDERS, CIRCUIT BREAKERS, FUSES, GROUNDING, SAFETY SWITCHES, JUNCTION BOXES, SPLICES PER 2017 NEC (WEST DIST)
- PermitNew Construction
Permit 1057222 · Completed
TERMINALS B&C-BHS UPDATES. PROVIDE POWER TO PLC CABINET SERVER RACK AND CONSOLE UPGRADE WIRING TO EXISTING ATR'S REMOVE AND REPLACE MANUAL ENCODE STATIONS REPLACE 37 SHAFT ENCODERS AND UPGRADE WIRING SELECT DEMOLITION
- PermitNew Construction
Permit EP-2020-000542 · Completed
1) Provide power feeds to new MCP-PDP's. 2) Provide new power and control wiring to field devices. 3) Select Demolition of existing controls and wiring. 4) Start-up and Testing of new System
- PermitNew Construction
Permit EP-2020-000537 · Completed
Terminals B & C, 1) Safe off and Disconnect existing power feeds and controls to existing Makeup Units 1,2,3,4 from existing MCP's so Makeup units can be replaced by others.2) Mount all new field devices to new MU and provide new Power and Control wiring from existing MCP's. 3) Provide support for testing and startup as per 2017 NEC.
- PermitNew Construction
Permit 1050711 · Completed
DEMOLITION OF HVAC EQUIPMENT CIRCUITRY AND INSTALLATION OF NEW PANEL, TRANFORMER AND CIRCUITS--RELOCATION OF FIRE ALARM DEVICES DEMOLITION OF HVAC EQUIPMENT CIRCUITRY AND INSTALLATION OF NEW PANEL, TRANFORMER AND CIRCUITS--RELOCATION OF FIRE ALARM DEVICES
- PermitAddition and/or Alteration
Permit CP-2020-000164 · Completed
FOR LEVEL II ALTERATION TO CREATE AN RETAIL SALE STALL WITHIN THE EXISTING COMMERCIAL RETAIL AREA AT AIRPORT TERMINAL B NORTH AS PER APPROVED PLAN. SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL AND FIRE SUPPRESSION WORK.
- PermitNew Construction
Permit 1050548 · Completed
PROVIDE POWER, GROUNDING, CONDUIT FOR FIBER FOR TMOBILE EQUIPMENT PER 2017 NEC (WEST DIST)
- PermitNew Construction
Permit 1052873 · Expired
ALTERATIONS TO EXISTING HVAC SYSTEM IN SECTOR 23 & A EAST OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitNew Construction
Permit 1052434 · Completed
REPLACEMENT OF EXISITNG 208/120 AND 480/277 BRANCH POWER CIRCUITS FOR PROPOSED HVAC EQUIPMENT BEING REPLACED IN TELCOM ROOMS
- PermitRough-In
Permit 1057222-RI · Completed
TERMINALS B&C-BHS UPDATES. PROVIDE POWER TO PLC CABINET SERVER RACK AND CONSOLE UPGRADE WIRING TO EXISTING ATR'S REMOVE AND REPLACE MANUAL ENCODE STATIONS REPLACE 37 SHAFT ENCODERS AND UPGRADE WIRING SELECT DEMOLITION
- PermitAddition and/or Alteration
Permit 1047744 · Expired
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXPAND EXISTING BAGGAGE HANDLING SYSTEM FOR TERMINAL A EAST IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERD. *2018* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit 1049700 · Expired
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO UPGRADE EXISTING BAGGAGE MAKEUPS FOR TERMINAL B/C IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERD. *2018* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitNew Construction
Permit 1046760 · Completed
DISCONNECT & RECONNECT ELECTRICAL EQUIPMEMT ,AS NEEDED, FOR ROOF REPLACEMENT PER NEC 2017 WEST DISTRICT
- PermitNew Construction
Permit 1055558 · Completed
INSTALL ONE TEMP CORD 240V 40A FOR GRINDER AS PER 2017 NEC
- PermitRough-In
Permit 1056511-RI · Completed
DEMOLITION, FEEDERS, CIRCUIT BREAKERS, FUSES, GROUNDING, SAFETY SWITCHES, JUNCTION BOXES, SPLICES PER 2017 NEC (WEST DIST)
- PermitRough-In
Permit 1056518-RI · Completed
PASSENGER BOARDING BRIDGES (PBB) POWER AND CONTROL CONNECTIONS AT GATES B1, B4, B5, C17 AND C25. OUR SCOPE STARTS AT THE OUTDOOR JUNCTION BOXES WHERE WE SPLICE EXTEND FEEDERS. DEMOLITION, CIRCUIT BREAKERS, FUSES, GROUNDING, SAFETY SWITCHES, JUNCTION
- PermitRough-In
Permit 1047643-RI · Expired
ELECTRICAL: INSTALL NEW LIGHTING AND LIGHTING CONTROLS FOR GREEN ROOF AS PER NEC 2017 (WEST DIST)
- PermitAlterations
Permit 1047703 · Completed
REPLACING RAIN LEADERS FROM 4TH LEVEL TO BASE LEVEL PIPE REPAIRS ONLYPER 2018 PHILA PLUMBING CODE
- PermitZoning/use
Permit 1029658 · COMPLETED
FOR NEW CONSTRUCTION OF A VEHICLE EXIT LANE, DETACHED STRUCTURE (PREFABRICATED GUARD BOOTH), CONCRETE ISLAND AND CURBING, ASPHALT PAVING, LINE STRIPPING, UTILITY TRENCHING AND RELOCATION OF ADA PARKING ON THE HERTZ LOT AT THE PHILADELPHIA AIRPORT. SIZE AND LOCATION AS SHOWN ON PLANS. FOR USE AS PERSONAL VEHICLE SALES AND RENTAL AT THE AIRPORT FACILITY. NO SIGNS ON THIS PERMIT.
- PermitAddition and/or Alteration
Permit 1028041 · Completed
TO AMEND BUILDING PERMIT 1028041 PER APPROVED PLANS. FOR NEW CONSTRUCTION OF A VEHICLE EXIT LANE, DETACHED STRUCTURE (PREFABRICATED GUARD BOOTH), CONCRETE ISLAND AND CURBING, ASPHALT PAVING, LINE STRIPPING, UTILITY TRENCHING AND RELOCATION OF ADA PARKING ON THE HERTZ LOT AT THE PHILADELPHIA AIRPORT. SIZE AND LOCATION AS SHOWN ON PLANS. FOR USE AS PERSONAL VEHICLE SALES AND RENTAL AT THE AIRPORT FACILITY. NO SIGNS ON THIS PERMIT. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.
- PermitNew Construction
Permit 1053817 · Completed
RUNNING POWER TO THE GUARDS BOOTH HEATER HVAC PLATE BARRIER SWITCH 5 SIGNS RECEPTACLES TRAFFIC LIGHT GATE ARM INSTALL VEHICLE TRANSPONDER FOR EXISTING EXIT BARRIER AND 2 LOOP SENSORS AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit 1043704 · Completed
PARKING GARAGE CONCRETE REPAIRS AND REPLACEMENT OF EXPANSION JOINTS AS PER APPROVED PLANS.
- PermitNew Construction
Permit 1053220 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of 100 Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. (BLDG PERMIT #1033685)
- PermitNew Construction
Permit 1051668 · Completed
INSTALL 1-240V,40AMP SINGLE PHASE CIRCUIT FOR BATTERY CHARGER ONLY AS PER 2017 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 1042966 · Completed
INSTALL 45KVA TRANSFORMER, 120/208V 125AMP PANEL, CONDUIT & BRANCH WIRING FOR RECEPTACLES, LIGHTING & DATA AS PER NEC 2017 FIRE ALARM INSTALL FACP, 3-STROBE, 1-PULL STATION, 2-MONITOR MODULES & 1-SMOKE DETECTOR AS PER NFPA 72
- PermitNew Construction
Permit 1045623 · Issued
INSTALL NEW 100AMP 210/208V ELECTRICAL PANEL. INSTALL BRANCH WIRING FOR ALL RECEPTACLES, LIGHTING, DATA, AND SECURITY AS PER 2008 NEC. INSTALL (1) SPEAKER/STROBE,(2) STROBES, AND REPLACE TAMPER SWITCH AND FLOW SWITCH MODULES AS PER NFPA 72.
- PermitNew Construction
Permit 1051329 · Completed
REPLACE 60 LIGHT FIXTURES WITH LED FIXTURES IN SIGN CANOPY AS PER 2017 NEC
- PermitNew Construction
Permit 1040473 · Completed
RELOCATE AND RESTORE UTILITIES FOR HVAC EQUIPMENT REPLACEMENT. FURNISH AND INSTALL NEW CIRCUITRY AS NEEDED FOR HVAC UNITS. FURNISH AND INSTALL NEW DUCT DETECTORS ON NEW HVAC UNITS PER NFPA 72 AND 2017 NEC (WEST DIST) RELOCATE AND RESTORE UTILITIES FOR HVAC EQUIPMENT REPLACEMENT. FURNISH AND INSTALL NEW CIRCUITRY AS NEEDED FOR HVAC UNITS. FURNISH AND INSTALL NEW DUCT DETECTORS ON NEW HVAC UNITS PER NFPA 72 AND 2017 NEC (WEST DIST)
- PermitAlterations
Permit 1040341 · Completed
INSTALLING (1) 3-COMP SINK, (1) MOP SINK, (1) ICE MACHINE, (2) ICE BINS, (1) PREP-SINK, (1) HAND SINK, (2) FLOOR SINK, (1) WATER HEATER 50 GAL, (1) GREASE INCEPTOR **BUILDING PERMIT# 1024776**
- PermitNew Construction
Permit 1042048 · Completed
FOR THE INSTALLATION OF ONE (1) KITCHEN HOOD, EXHAUST FAN AND MAKEUP AIR FAN, IN SPACE E1, WITHIN AN EXISTING AIRPORT, AS PER APPROVED PLANS.
- PermitNew Construction
Permit 1049428 · Completed
FOR MECHANICAL ALTERATIONS TO SPACE E1 IN TERMINAL E OF AN EXISTING AIRPORT, TO INCLUDE NEW REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS. SEE APP# 1042048 FOR APPROVED PLANS.
- PermitNew Construction
Permit 1038599 · Completed
EXPANSION OF EXISTING BAGGAGE SCREENING FACILITIS TO INCLUDE BRANCH POWER, LIGHTING, ACCESS CONTROL, TELECOM, FIRE ALARM AND VIDEO SURVEILLANCE PER 2017 NEC AND NFPA 72 (WEST DIST) EXPANSION OF EXISTING BAGGAGE SCREENING FACILITIS TO INCLUDE BRANCH POWER, LIGHTING, ACCESS CONTROL, TELECOM, FIRE ALARM AND VIDEO SURVEILLANCE PER 2017 NEC AND NFPA 72 (WEST DIST)
- PermitNew Construction
Permit 1047563 · Completed
FURNISH AND INSTALL 1-20AMP DEDICATED OUTLET FOR CELLPHONE CHARGING OUTSIDE IN CELLPHONE WAITING LOT OFF OF AIRPORT RECIRCULATION ROAD BY THE PHILADELPHIA INTERNATIONAL AIRPORT AS PER 2017 NEC (WEST DISTRICT)
- PermitElectrical
Permit 1046047 · COMPLETED
FURNISH AND INSTALL 2-NEW 20AMP DEDICATED OUTLETS FOR FREEZER FOR PHILABUNDANCE ROOM IN TERMINAL F AS PER 2017 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 1046657 · Completed
REPLACE 2CIRCUITS FOR DRYERS IN CAR WASH:3PHASE 90AMP 480V BREAKER AND 100AMP DISCONNECT ONLY AS PER 2017 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 1033821 · Issued
FURNISH AND INSTALL (20) NEW CONDUIT/FIBER CABLES TO INTERCONNECT THE HUDSON STORE LOCATIONS THROUGHOUT MAS RUN 500FT.'17 NEC.
- PermitNew Construction
Permit 1035385 · Expired
FOR IMPROVEMENTS TO MECHANICAL SYSTEMS INCLUDING REPLACEMENT OF AIR HANDLER UNITS, OTHER APPLIANCES AND ASSOCIATED DUCTWORK AS PER PLANS.
- PermitNew Construction
Permit 1038424 · Issued
EXTENDING BRANCH CIRCUITS TO ACCOMMODATE ROOF REPLCEMENT; RELOCATE LIGHT FIXTURES, RECEPTACLES, GROUNDING, DEMO, DISCONNECT AND RECONNECT SAFETY SWITCHES DISCONNECT AND RECONNECT SATELLITE DISHES, MECHANICAL EQUIPMENT, ANTENNAS, CCTV TO ACCOMMODATE R
- PermitNew Construction
Permit 1037689 · Issued
INSTALL (3) 200AMP PANELS, (1) 200 AMP SUB-METER, (1) 112.5 KVA TRANSFORMER, NEW LIGHTING, SWITCHES, RECEPTACLES, KITCHEN AND MECANICAL EQUIPMENT CONNECTIONS, COMMUNITION OUTLETS AND SECURITY CAMERAS. INSTALL FIRE ALARM DEVICES AND CONNECTION TO MAIN INSTALL (3) 200AMP PANELS, (1) 200 AMP SUB-METER, (1) 112.5 KVA TRANSFORMER, NEW LIGHTING, SWITCHES, RECEPTACLES, KITCHEN AND MECANICAL EQUIPMENT CONNECTIONS, COMMUNITION OUTLETS AND SECURITY CAMERAS. INSTALL FIRE ALARM DEVICES AND CONNECTION TO MAIN
- PermitAlterations
Permit 1028779 · Expired
INSTALLING 1 KITCHEN SINK 1-4GAL WATER HEATER
- PermitAddition and/or Alteration
Permit 1033685 · Completed
FOR LELEL II INTERIOR ALTERATION WITHIN THE EXISTING BAGGAGE INSPECTION AREA OF AIRPORT COMPLEX INCLUDING DEMOLITION OF EXISTING DOORS, CEILINGS, WALL, & FLOORS AND RECONSTRUCTION OF NEW WALLS, EXIT ACCESS STAIRWAY, CEILINGS, & FLOORING. NEW FINISHES SUCH AS PAINTING FLOORING & CEILINGS. NEW DOORS& FRAMES AS PER APPROVED PLAN. BUILDING IS FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEPS WORK. AMEND PERMIT AP#1033685 TO INCLUDE ADDITONAL MODIFICATION AND NEW BAGGAGE CONVEYOR AS PER APPROVED PLANS.
- PermitNew Construction
Permit 1040676 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitNew Construction
Permit 1027031 · Completed
ELECTRICAL: INSTALL NEW POWER PANEL. INSTALL NEW LIGHTING AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008. COMMUNICATION: 8 PLENUM RATED CAT6 LINES AVERAGE RUN 50 FT; LONGEST RUN 75 FT. FIRE ALARM: FURNISH AND INSTALL NEW FIRE ALARM PANEL, 2 NEW HORN ELECTRICAL: INSTALL NEW POWER PANEL. INSTALL NEW LIGHTING AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008. COMMUNICATION: 8 PLENUM RATED CAT6 LINES AVERAGE RUN 50 FT; LONGEST RUN 75 FT. FIRE ALARM: FURNISH AND INSTALL NEW FIRE ALARM PANEL, 2 NEW HORN
- PermitNew Construction
Permit 1039611 · Completed
INSTALL 1 120V/20A BRANCH CIRCUIT FROM EXISTING PANEL BOARD TREE 2 AND SIX CAT6 DATA CIRCUITS TO COMPUTER EQUIPMENT IN TICKETING KIOSK LOCATED IN TERMINAL E TICKETING AS PER 2017 NEC
- PermitAddition and/or Alteration
Permit 1029531 · Completed
FOR PRESCRIPTIVE ALTERATIONS TO THE ROOF & ROOF ACCESS STAIRS OF TERMINAL E AT PHILADELPHIA INT'L AIRPORT AND FOR ISOLATED STRUCTURAL ALTERATIONS TO THE ROOF FRAMING, AS PER PLANS; SEPARATE PERMITS REQUIRED FOR ALL MEP/FSP WORK; NO CHANGE TO OVERALL HEIGHT OR AREA OF TERMINAL E.
- PermitElectrical
Permit 1021427 · COMPLETED
ELECTRICAL: MAINTAIN SWITCHGEAR, CIRCUITS AND JUNCTION BOXES FOR REUSE, INSTALL NEW LIGHTING AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008--COMMUNICATION: 8 PLENUM RATED CAT6 LINES (AVG. RUN 50FT LONG-LONGEST RUN 75FT LONG)--FIRE ALARM: FURNISH AND INSTALL (1) NEW HORN/STROBES AND RELOCATE (1) FIRE ALARM DEVICE AND TIE INTO EXISTING AIRPORT SYSTEM AS PER 2017 NEC. (WEST DISTRICT)
- PermitAmend for conversion
Permit 1037553 · Issued
TO AMEND BUILDING PERMIT AP#1020515 TO CORRECT PLAN SET TO REFLECT CORRECT TERMINAL/SPACE E5B.
- PermitPlumbing
Permit 1037591 · COMPLETED
REPLACE 1-EXISTING DRINKING FOUNTAIN & DRAIN & WATER PIPING THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitNew Construction
Permit 1020940 · Completed
INSTALL NEW 100AMP PANEL 30KVA TRANSFORMER AND CONNECT O EXISTING FEEDER INSTALL NEW LIGHTS SWITCHES LIGHTING CONTROLS RECEPS AND JBOXES FOR SIGNS INSTALL DATA JACKS AND LOW VOLTAGE CABLE TO CAMERAS AND SPEAKERS. '17 NEC INSTALL FIRE ALARM DEVICES PER ENGINEER SEALED DRAWINGS.
- PermitNew Construction
Permit 1026509 · Completed
BRANCH CIRCUIT 12X12 DUCTBANKS; ACS & CCTV EQUIPMENT AND WIRING; VEHICLE DETECTION LOOPS PER 2017 NEC (WEST DIST)
- PermitElectrical
Permit 1026503 · COMPLETED
PROVIDE 20/2 CB AND BRANCH CIRCUITRY TO SEED NEW FAN COIL; PROVIDE NEW 30/2 CB AND BRANCH CIRCUITRY TO FEED NEW CONDENSER UNIT PER 2017 NEC (WEST DIST)
- PermitNew Construction
Permit 995239 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 TO BE TIED INTO AN EXISTING SYSTEM TO ACCOMMODATE SPACE C-17 AT THE AIRPORT. EXISTING BACFLOW PREVENTION SYSTEM TO REMAIN AS PER APPROVED PLANS AND CU-100 FORMS.ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- PermitAddition and/or Alteration
Permit 998886 · Expired
FOR THE REMOVAL OF TWO EXISTING ROOF ASSEMBLIES AND REPLACECEMENT WITH TWO EXTENSIVE VEGETATED ROOF SYSTEMS. REPLACEMENT TO INCLUDE THE INSTALLATION OF ROOF LEVEL GUARD RAIL ASSEMBLIES;INSTALLATION OF ROOF ACCESS LADDERS WITH FALL PROTECTION CAGES. SELECTIVE MODIFICATION OF EXISTING MEP EQUIPMENT TO ACCOMMODATE EXTENSIVE VEGETATED ROOF SYSTEMS**IBC 2018**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING WORK**
- PermitNew Construction
Permit 1025817 · Issued
LOW VOLTAGE CONTROL ROOM WIRING AS PER NEC 2017 GUIDLINES
- PermitNew Construction
Permit 1025812 · Issued
LOW VOLTAGE CONTROL WIRING AS PER 2017 NEC GUIDLINES
- PermitAlterations
Permit 1026390 · Expired
INSTALLING (1) 3-COMP SINK, (1) PREP SINK, (2) GREASE INTERCEPTORS, (1) WATER HEATER 60 GAL, (1) CUP DRAIN
- PermitNew Construction
Permit 1021837 · Expired
FOR THE INSTALLATION OF HVAC EQUIPMENT INCLUDING DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.
- PermitAddition and/or Alteration
Permit 993766 · Completed
FOR PRESCRIPTIVE ALTERATIONS FOR PARTIAL REPLACEMENT OF THE ROOF ON TERMINALS B & C AT THE PHILADELPHIA INTERNATIONAL AIRPORT, AS PER PLANS; SEPARATE PERMITS REQUIRED FOR ALL MEP/FSP WORK.
- PermitNew Construction
Permit 1021884 · Completed
INSTALLATION OF 8 SITE LIGHTS, 120/240 VOLT AND 1 PANEL, 120/240/50A, NEMA 3R AS PER 2017 NEC (WEST DIST)
- PermitPlumbing
Permit 1015846 · COMPLETED
INSTALLING FLOOR SINK, HAND SINK, 3 COMP SINK, GREASE TRAP, ICE BIN, MOP RECEPTOR, AND WATER HEATER
- PermitNew Construction
Permit 1028301 · Expired
FOR THE INSTALLATION OF WALL UNIT AND ROOFTOP UNIT AND ASSOCIATED PIPING AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitAddition and/or Alteration
Permit 1027463 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR THE INSTALLATION OF MOUNTING HARDWARE TO SUPPORT NEW TELEVISION MONITOR INSTALLATIONS THROUGHOUT AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018* **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- PermitNew Construction
Permit 1028929 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitPlumbing
Permit 1019126 · COMPLETED
INSTALL DRAIN PIPING FOR NEW KITCHEN SINK DOMESTIC WATER PIPING EMMAX ELECTRIC WATER HEATER PER 2004 PHILA PLUMB CODE
- PermitElectrical
Permit 1017968 · COMPLETED
INSTALL 18 LIGHTS, 13 RECEPTACLES ,7 HVAC UNIT CONNECTIONS, 8 COMMUNICATION OUTLETS. NEW CIRCUITS TO BE TERMINATED IN EXISTING PANELS AS PER 2017 NEC (WEST DIST)
- PermitSuppression
Permit 1025583 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitAddition and/or Alteration
Permit 1024776 · Completed
LEVEL II INTERIOR ALTERATION TO AN EXISTING TENANT SPACE (SPACE E1) IN THE AIRPORT. ALTERATIONS TO INCLUDE THE INSTALLATION OF FINISHES, FURNISHINGS AND MINOR ACCESSIBILITY IMPROVEMENTS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING IS FULLY SPRINKLERED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK**IEBC 2018**NO SIGN APPROVED ON THIS PERMIT**
- PermitNew Construction
Permit 1025584 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitElectrical
Permit 1021424 · COMPLETED
ELECTRICAL: REPLACE 13 LAY IN FIXTURES WITH LED LAY IN FIXTURES EXISTING WIRING TO REMAIN INSTALL BRANCH WIRING FOR RECEPS INSTALL CAT 6 CABLE FOR DATA LOCATIONS INSTALL AS PER NEC
- PermitNew Construction
Permit 1024106 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitAddition and/or Alteration
Permit 1020515 · Expired
INTERIOR ALTERATIONS TO SPACE E5B AS PER PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING. IEBC 2018
- PermitNew Construction
Permit 1013577 · Completed
INSTALLATION OF 1" CONDUIT FO CONNECTING NEW EQUIPMENT IN B/C EAST BAGGAGE SCREENING AREA B/C CENTRAL OVERSIZED BAGGAGE SCREENING AREA, F LOBBY CHECKED BAGGAGE SCREENING AREA, AND D/E CHECKED BAGGAGE SCREENING ROOM. RELOCATION OF TWO EXISTING POWER P
- PermitSuppression
Permit 1021366 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13) - FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- License issue eventHG PHL RETAILERS, JV: Food Establishment, Retail Permanent Location business license initially issued
License 827129 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitNew Construction
Permit 1020736 · Completed
TEMP HOOK UP FOR TRAILER WITH 120/208V 50AMP AS PER 2017 NEC
- PermitAlterations
Permit 1020739 · Completed
REPLACE KITCHEN SINK NEW DRAIN PIPING AS PER 2004 PPC
- PermitNew Construction
Permit 1012330 · Completed
FURNISH AND INSTALL FIBER,CAT6 CABLE WITH 190 RUNS AND LONGEST RUN OF ABOUT 220FT,FURNISH AND INSTALL 120V BRANCH CIRCUITS FOR NEW EQUIPMENT FROM LOCAL PANELS,INSTALL VIDEO AND MOUNT DISPLAYS THROUGHOUT ALL THE TERMINALS AS PER 2017 NEC (WEST DISTRIC
- PermitTank Install/Removal
Permit 1018369 · Expired
REMOVAL OF ONE 1,000 GALLON USED OIL TANK, RESTORATION OF AREA DISTRIBUTED
- PermitMajor alteration
Permit 1009942 · COMPLETED
FOR INTERIOR RENOVATION TO AN EXISTING TENANT SPACE( SPACE # D-10) FOR USE AS MERCANTILE IN THE AIRPORT. ALTERATIONS TO INCLUDE THE INSTALLATION OF FINISHES, NEW PARTITIONS,FURNISHINGS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING IS FULLY SPRINKLERED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. **IEBC 2018**NO SIGNS APPROVED ON THIS PERMIT**
- PermitNew Construction
Permit 1010004 · Expired
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMMODATE NEW TENANT LAYOUT IN SPACE BC17 OF AN EXISTING AIRPORT FACILITY TO INCLUDE DUCTWORK AS PER APPROVED PLANS.
- PermitMechanical
Permit 1013476 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW TENANT LAYOUT IN SPACE D10 OF AN EXISTING AIRPORT FACILITY TO INCLUDE DUCTWORK AS PER APPROVED PLANS.
- PermitElectrical
Permit 1010025 · COMPLETED
RENO TO HVAC SYSTEM SERVING TSA SEARCH ROOM AS PER 2017 NEC (WEST DIST)
- PermitElectrical
Permit 1015960 · COMPLETED
REPLACE 5-PENDANT LIGHTS WITH NO ADD'L WIRING AND ADD 2-RECESSED LIGHTS & INSTALL 2-OUTLETS AS PER NEC 2017 WEST DISTRICT
- PermitMechanical
Permit 1009875 · COMPLETED
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AHU'S AND EIGHT (8) REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- PermitMajor alteration
Permit 1008612 · COMPLETED
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, MILLWORK, FURNISHING, AND FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. **IEBC 2018**
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 893207 · Violation 5209422 · Code A-302.11/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- PermitNew Construction
Permit 986922 · Completed
INSTALLING NEW LIGTHING, POWER IN RENOVATED BATHROOMS IN TERMINALS D/E/F; BAGGAGE CLAIMS AND CONCOURSE AREA RESTROOMS AS PER 2017 NEC (WEST DIST) INSTALL FIRE ALARM PER CITY APPROVED DRAWINGS.
- PermitElectrical
Permit 1011498 · COMPLETED
REPLACE BRANCH WIRING, CONDUIT & DISCONNECT AND REPLACE WITH NEW DISWASHER AS PER NEC 2017 WEST DISTRICT
- PermitElectrical
Permit 1011504 · COMPLETED
REPLACE OF EQUIPMENT IN KIND WITH NO ADDITIONAL WIRING REPLACE 8 2X4 FLORESCENT TROFFERS WITH 2X4 LED FIXTURES, EXISTING WIRING TO REMAIN AS PER NEC 2017 WEST DISTRICT
- PermitElectrical
Permit 1011635 · COMPLETED
INSTALL 20-208V,SINGLE PHASE,30AMP OUTLETS ONLY IN THE BC CLUB AS PER 2017 NEC (WEST DISTRICT)
- PermitMechanical
Permit 1005488 · COMPLETED
MECHANICAL DEMOLITION WORK AND FOR THE INSTALLATION OF DUCTWORK, REGISTERS/DIFFUSERS, AND ALL OTHER WORK AS PER APPROVED PLANS. (2018 IMC). SEPARATE PERMIT REQUIRED FOR ELECTRICAL AND PLUMBING WORK.
- PermitAddition and/or Alteration
Permit 1001128 · Expired
FOR INTERIOR RENOVATIONS TO AN EXISTING TENANT SPACE FOR USE AS MERCANTILE IN THE AIRPORT. ALTERATIONS TO INCLUDE THE INSTALLATION OF FINISES, FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING IS FULLY SPRINKLERED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- PermitAlterations
Permit 992281 · Completed
FURNISH PIPE VALVES, FITTINGS AND INSTALLATION FOR NEW POTABLE WATER CABINETS. CABINETS SUPPLIED BY AMERICAN AIRLINES. 2" WATER MAINS WITH 1" BRANCH TO EACH CABINET.
- PermitNew Construction
Permit 992597 · Expired
FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE ENERGY RECOVERY UNITS, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- License issue eventAREAS G2G PHL JV LLC: Food Preparing and Serving (30+ SEATS) business license initially issued
License 821973 · Inactive
License event. Registration does not prove present operation or storefront occupancy.
- PermitNew Construction
Permit 1003276 · Completed
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 183 sprinkler heads in restrooms within Terminal D,E and F.
- PermitTank Install/Removal
Permit 1002480 · Expired
EXCAVATION, CLEANING, REMOVAL AND DISPOSAL OF FIVE (5) 10,000 GALLON UNDERGROUND STORAGE TANKS (USTS); FOUR OF WHICH CONTAINED GASOLINE AND ONE (1) OF WHICH CONTAINED DIESEL FUEL. EXCAVATIONS WILL BE BACKFILLED, COMPACTED AND RESTORED WITH ASPHALT UPON COMPLETION OF THE REMOVAL OF THE USTS AND ASSOCIATED PIPING. ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH PHILADELPHIA INTERNATIONAL AIRPORT (PHL) PERMIT #T18117, AS REFERENCED IN ATTACHED PHL CORRESPONDENCE.**Change of Contractor, see AP # 960372 for siteplan**
- PermitAddition and/or Alteration
Permit 993805 · Expired
LEVEL II INTERIOR ALTERATION (NO CHANGE OF OCCUPANCY). FOR RENOVATIONS TO TENANT SPACE# E 8C IN AN EXISTING STRUCTURE[AIRPORT)AS PER APPROVED PLANS.**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK**IEBC2018**
- PermitNew Construction
Permit 1000092 · Expired
ALTERATIONS TO AN EXISTING MECHANICAL SYSTEM TO ACCOMMODATE SPACE # E8C. ALTERATIONS TO INCLUDE REGISTERS/DIFFUSERS, DUCTWORK, ROOFTOP UNIT, AND ALL OTHER WORK AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR KITCHENHOODS, ELECTRICAL, AND PLUMBING WORK.**
- PermitNew Construction
Permit 1000694 · Issued
INSTALL 1" CONDUIT WITH 4 COAX CABLES FROM AMERICAN AIRLINES TO ROOF FOR USE WITH DIRECT TV DISH AS PER 2017 NEC
- PermitElectrical
Permit 991841 · COMPLETED
PROVIDE WIRING FOR THIRTY ONE POTABLE WATER CABINETS AS PER 2017 NEC (WEST DIST)
- License issue eventHG PHL RETAILERS, JV (Hudson News (STORE 1854)): Food Establishment, Retail Permanent Location business license initially issued
License 820294 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitPlumbing
Permit 935561 · COMPLETED
INSTALL DOMESTIC WATER PIPING AND CAST FROM SANITARY AND VENT PIPING 1- WATER HEATER, 2 GREASE TRAPS, 1 MOP SINK, 4 HAND SINKS, 1 PREP SINK, 1 POT SINK, 4 FLOOR SINKS AND 3 FLOOR DRAINS. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004.
- PermitElectrical
Permit 996679 · COMPLETED
INSTALL 1-CAT6 CABLE FROM THE OPS CABINET TO ROOFTOP DISH ONLY AS PER 2017 NEC (WEST DISTRICT)
- License issue eventThe Grove, Inc. (Philly Pretzel Factory ): Food Preparing and Serving business license initially issued
License 819217 · Active
License event. Registration does not prove present operation or storefront occupancy.
- License issue eventOTG MANAGEMENT PHL B, LLC (INDEPENDENCE PRIME): Food Preparing and Serving (30+ SEATS) business license initially issued
License 818992 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitMechanical
Permit 993431 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR A SPA IN SPACE C2 OF TERMINAL C IN AN EXISTING AIRPORT FACILITY TO INCLUDE REMOVAL AND REPLACEMENT OF AN EXISTING ROOFTOP UNIT WITH ALL ASSOCIATED DUCTWORK AS PER APPROVED PLANS.
- PermitAlterations
Permit 985948 · Completed
BATHROOMS RENOVATION NEW SANITARY WATER PIPING AND FIXTURES
- PermitElectrical
Permit 990181 · COMPLETED
REPLACE 2-480V/30AMP EXISTING DISCONNECTS FOR HVAC UNIT ONLY ON AN EXISTING SERVICE AS PER 2017 NEC (WEST DISTRICT)
- PermitElectrical
Permit 992215 · COMPLETED
REPLACE 30 LAY-IN FIXTURES WITH LED LAY-IN FIXTURES, EXISTING WIRING TO REMAIN, INSTALL 2 USB OUTLETS, INSTALL AS PER 2017 NEC
- PermitAlterations
Permit 974321 · Completed
EZ-PLUMBING PERMIT SECTION C-17 OF THE PHL AIRPORT RENOVATION TO EXISTING PUTTING TWO BATHROOMS AND A SHOWER FOR EMPLOYEE USE.
- PermitElectrical
Permit 980360 · COMPLETED
FURNISH & INSTALL 1-NEW DEDICATED QUAD OUTLETS & 6-NEW CAT6 LINES TO NEW RADIO CABINET LONGEST RUN 228 FEEYT AS PER NEC 2017 WEST DISTRICT
- PermitElectrical
Permit 970606 · COMPLETED
ELECTRICAL: INSTALL NEW POWER PANEL LIGHTING EQUIPMENT POWER AND POWER RECEPS FOR OFFICE SPACE AS PER NEC 2008 COMMUNICATION: 87CAT6 LINES AVERAGE RUN 75FT LONGEST RUN 150FT FIRE ALARM: INSTALL NEW 8 HORN/STROBS 1 SMOKE 1CARBON MONOXIDE 2PULL STATIONS 1STROBE 3CONTROL RELAYS 7MONITOR RELAYS
- PermitSuppression
Permit 989343 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitElectrical
Permit 984014 · COMPLETED
REPLACE EXISTING FIRE ALARM PANEL WITH NEW, REPLACE EXISTING FIRE ALARM DEVICES WITH NEW, ATTACHED ARE (3) FULL SETS OF FIRE ALARM SHOP DRAWINGS (EQUIPMENT, DEVICES,SINGLE LINE DIAGRAM) BUILDING PERMIT #952878 AS PER NFPA 72
- PermitNew Construction
Permit 985424 · Expired
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIT TO BE OBTAINED FOR ALL OTHER WORK.
- PermitElectrical
Permit 986925 · COMPLETED
INSTALL NEW 3 OUTLETS FOR REF FROM EXISTING PANEL, PER 2017 NEC
- PermitElectrical
Permit 986927 · COMPLETED
INSTALL NEW OUTLET FOR REFRIGERATOR IN DISH ROOM FROM EXISTING PANEL, PER 2017 NEC
- PermitElectrical
Permit 986933 · COMPLETED
INSTALL 1 NEW OUTLET FOR REF FROM EXISTING PANEL, PER 2017 NEC
- PermitElectrical
Permit 979268 · COMPLETED
ELECTRICAL: RELOCATE FLIGHT INFORMATION DISPLAYS TO NEW LOCATIONS. RECIRCUIT TO EXISTING TO EXISTING PANLE AS PER NEC 2008. COMMUNICATION: 8 CAT6 PLENUM RATED RUNS; AVERAGE RUN= 100 FEET; LONGEST RUN 125 FEET AS PER 2017 NEC (WEST DIST)
- PermitAddition and/or Alteration
Permit 932184 · Completed
FOR PRESCRIPTIVE ALTERATIONS TO RENOVATE FIVE (5) PUBLIC RESTROOMS ACROSS TERMINALS D, E, AND F OF THE PHILADELPHIA INTERNATIONAL AIRPORT, AS PER PLANS; NO OTHER WORK ON THIS PERMIT; NO OTHER WORK ON THIS PERMIT.
- PermitAddition and/or Alteration
Permit 978245 · Completed
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO ERECT SUPPORT STRUCTURE FOR RELOCATED FLIGHT INFORMATION DISPLAYS IN TERMINAL B OF AN EXISTING AIRPORT FACILITY. BUILDING FULLY SPRINKLERED. *2018* **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- PermitMajor alteration
Permit 985316 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO RENOVATE EXISTING EMPLOYEE BREAKROOMS (AMERICAN AIRLINES) IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERED. *2018* **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- PermitRough-In
Permit 982988-RI · Expired
INSTALL KITCHEN SINK FOR BREAK ROOM & 1-4 GALLON WATER HEATER THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004 ***SEE LOG***
- PermitElectrical
Permit 983679 · COMPLETED
INSTALL 2-CAT6 CABLES TO A FLOOR OUTLET FROM EXISTING DATA SWITCH AS PER 2017 NEC (WEST DISTRICT)
- PermitElectrical
Permit 965217 · COMPLETED
FURNISH AND INSTALL 1 NEW TRANSFORMER/PANEL, 12 NEW POKETHRU DEVICES, 3 POWER POLES, AND 32 CAT 6 RUNS. AVERAGE RUN 200FT LONGEST 317 FT AS PER 2008 NEC (WEST DIST)
- PermitNew Construction
Permit 954868 · Expired
FOR THE REPLACEMENT AND INSTALLATION OF MECHANCIAL EQUIPMENT IN AN EXISTING AIRPORT. APPLIANCES AND EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICIATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- License issue eventSven Hills Inc (Jims South St Steaks and Hoagies (Terminal C24)): Food Preparing and Serving business license initially issued
License 814607 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitNew Construction
Permit 980817 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitAlterations
Permit 972106 · Expired
RUNNING NEW 4" PIPING FOR FUTURE ROOF DRAIN
- PermitElectrical
Permit 979272 · COMPLETED
RE-WIRE COMMERCIAL (IBC BUILDINGS) AS PER 2017 NEC
- PermitElectrical
Permit 972282 · COMPLETED
FIRE ALARM: FURNISH AND INSTALL 1 HORN STROBE, 1 CEILING SMOKE ALARM, 2 NEW WALL STROBES AND TIE INTO EXISTING AIRPORT SYSTEM AS PER NFPA 72(WEST DIST)
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 917518 · Violation 5049553 · Code A-302.11/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 917519 · Violation 5047080 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitElectrical
Permit 935084 · COMPLETED
INSTALLATION OF (2)NEW 20K GAL UNDERGROUND FUEL STORAGE TANKS. INSTALLATION OF NEW ENVIRONMENTAL SENSORS, OVERFILL ALARM, NEW FUEL PANEL, REWIRE EXISTING DISPENSES AND EMERGENCY STOP BUTTONS AS PER APPROVED PLANS.AS PER 2008 NEC
- PermitMajor alteration
Permit 976529 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING TERMINAL C INTERSECTION IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitPlumbing
Permit 933050 · COMPLETED
4HAND SINKS 8FLOOR SINKS 2GREASE TRAPS 1MOP SINK 1-3COMPARTMENT SINK 1PREP SINK 1-100GAL GAS WATER HEATER GAS PIPING.
- PermitMechanical
Permit 973302 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM, INCLUDING DUCTWORK AND INSTALLATION OF NEW EXHAUST FAN, FOR SPACE DK-1 IN TERMINAL D OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitElectrical
Permit 974641 · COMPLETED
INSTALL 3-TRACK LIGHT STRIPS, 6-MILLWORK LIGHTS, 10-RECEPTACLES, 2-SWITCHES, 1-SIGN J-BOX & 4-DATA JACKS USING EXISTING PANEL AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 970600 · COMPLETED
FIRE ALARM: RELOCATE AND REINSTALL 2 HORN/STROBES AND INSTALL 2 NEW STROBES AND TIE INTO EXISTING AIRPORT SYSTEM. PER NFPA 72 (WEST DIST)
- PermitPlumbing
Permit 973031 · COMPLETED
INSTALL 2 SINKS WITH WATER HEATERS AS PER 2004 PPC
- PermitSuppression
Permit 972485 · COMPLETED
EZ STANDARS KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. INSTALL (1) ANSUL R - 102 9.0 GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM.
- PermitSuppression
Permit 972486 · COMPLETED
EZ STANDARS KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.INSTALL (1) ANSUL R-102 6.0- GALLON WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitElectrical
Permit 971480 · COMPLETED
INSTALL ONE LED STOP SIGN USING EXISTING 120V LIGHTING CIRCUIT AS PER NEC 2014 WEST DISTRICT
- PermitElectrical
Permit 962998 · COMPLETED
FURNISH AND INSTALL NEW SECURITY EQUIPMENT AND ONE NW SUB PANEL FOR EXIT BREACH CONTROL AS PER 2008 NEC.(WEST DIST)
- PermitPlumbing
Permit 969868 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING;AIRPORT FACILITY-THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004 REMOVING 1 ELECTRIC HOT WATER HEATER AND ADDING 3 NEW ONES
- PermitElectrical
Permit 966978 · COMPLETED
ELECTRICAL:RELOCATE POWER PANEL INSTALL NEW LIGHTING LIGHTING CONTROLS AND POWER RECEPS FOR SPACE AS PER NEC 2008 COMMUNICATION: 8-CAT6 LINES AVERAGE RUN 50FEET LONGEST RUN 75 FEET FIRE ALARM: WILL BE INCLUDED UNDER SEPARATE PERMIT
- PermitNew Construction
Permit 962444 · Completed
INSTALL 10 NEW INTERIOR LIGHTS, REPLACE 6 ROOF OBSTRUCTION LIGHTS, INSTALL 3 60AMP 480 VOLT MOTORIZED CORD REELS. INSTALL 1 NEW 60AMP 480 VOLT FEEDER TO ONE OF THE CORD REELS AS PER 2008 NEC.(WEST DIST)
- PermitSuppression
Permit 970917 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitAddition and/or Alteration
Permit 907996 · Completed
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. LEVEL II INTERIOR ALTERATIONS AND STRUCTURAL WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO COMMENCEMENT OF WORK*
- PermitNew Construction
Permit 940026 · Completed
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. LEVEL II INTERIOR ALTERATIONS AND STRUCTURAL WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO COMMENCEMENT OF WORK*
- PermitElectrical
Permit 939778 · COMPLETED
INSTALL FIRE ALARM CONTROL PANEL. INSTALL MANUEL PULL STATION. INSTALL HEAT DETECTOR. INSTALL (3) CEILING STROBES. PER NFPA 72
- PermitSuppression
Permit 969635 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitOperations
Permit 26180 · COMPLETED
HOTWORKS: WELDING/CUTTING/SOLDERING/TORCH WORK - PERMIT EXPIRES 4/16/2020
- PermitElectrical
Permit 957540 · COMPLETED
ELETRICAL MAINTAIN SWITCHGEAR CIRCUITS JUNCTION BOXES FOR REUSE INSTALL NEW LIGHTING AND POWER RECEPS FOR SPACE AS PER NEC 2008 COMMUNICATION: (160 CAT76 LINES AVERAGE RUN 50 FT LONGEST RUN 90FT FIRE ALARM FURNISH AND INSTALL 4 NEW HORN/STROBES AND TIE INTO EXISTING AIRPORT SYSTEM
- PermitElectrical
Permit 957925 · COMPLETED
FURNISH AND INSTALL 17 WIRELESS ACCESS POINTS (WAPS) AS PER 2008 NEC (WEST DIST)
- PermitMechanical
Permit 962970 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM INCLUDING DUCTWORK FOR RETAIL SPACE DE9 IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitMechanical
Permit 962976 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM INCLUDING DUCTWORK FOR RETAIL SPACE DE4 IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitElectrical
Permit 962749 · COMPLETED
NEW LIGHTING, LIGHTING CONTROL, RECEPTACLES, BAR EQUIPMENT POWER WIRING, EXISTING SUB PANEL WITH NEW BREAKERS. VOICE DATA POS SECURITY CCTV TV CONDUITS BOXES WIRES JACKS PULL STRINGS. PER 'O8 NEC.
- PermitElectrical
Permit 961567 · COMPLETED
ELECTRICAL: REMOVAL OF EISTING POWER RECEPTACLES, LIGHTIG FIXTURES AND SWITCHES. MAINTAIN CIRCUITS AND JUNCTION BOXES FOR REUSE. INSTALL NEW LIGHTING AND POWR RECEPTACLES FOR SPACE AS PER NEC 2008. FIRE ALARM: FURNISH AND INSTALL NEW FIRE ALARM EQUIPMENT AND TIE INTO EXISTING AIRPORT SYSTEM AS PER NFPA 72. COMMUNICATION: 4 CAT6 LINES: AVERAGE RUN 35 FEET; LONGEST RUN 55 FEET.
- PermitElectrical
Permit 961575 · COMPLETED
ELECTRICAL: REMOVAL OF EISTING POWER RECEPTACLES, LIGHTIG FIXTURES AND SWITCHES. MAINTAIN CIRCUITS AND JUNCTION BOXES FOR REUSE. INSTALL NEW LIGHTING AND POWR RECEPTACLES FOR SPACE AS PER NEC 2008. FIRE ALARM: FURNISH AND INSTALL NEW FIRE ALARM EQUIPMENT AND TIE INTO EXISTING AIRPORT SYSTEM AS PER NFPA 72. COMMUNICATION: 4 CAT6 LINES: AVERAGE RUN 35 FEET; LONGEST RUN 55 FEET.
- PermitPlumbing
Permit 957339 · COMPLETED
REFURBISH EXISTING RESTAURANT REPLACING HWH, 3 BAY SINK, PREP SINK, HAND SINK AND GARBAGE DISPOSAL.
- PermitAddition and/or Alteration
Permit 963970 · Completed
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- PermitNew Construction
Permit 964467 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitSuppression
Permit 963874 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitSuppression
Permit 963877 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitMajor alteration
Permit 945555 · COMPLETED
LEVEL II ALTERATION TO TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMechanical
Permit 959570 · COMPLETED
INTERIOR MECHANICAL DEMOLITION WORK AND MECHANICAL WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL AND PLUMBING WORK.
- PermitNew Construction
Permit 958951 · Completed
FURNISH AND INSTALL 5 NEW LIGHT FIXTURES AND 4 EXIT SIGNS, REPLACING WITH LED LIGHTS, PER 2008 NEC
- PermitElectrical
Permit 952843 · COMPLETED
FIRE ALARM: RELOCATE (1) HORN/STROBE, FURNISH & INTALL (1) NEW CEILING ALARM (1) NEW CEILING STROBE AND TIE INTO EXISTING AIRPORT SYSTEM. PER NFPA 72
- PermitTank Install/Removal
Permit 960372 · Expired
EXCAVATION, CLEANING, REMOVAL AND DISPOSAL OF FIVE (5) 10,000 GALLON UNDERGROUND STORAGE TANKS (USTS); FOUR OF WHICH CONTAINED GASOLINE AND ONE (1) OF WHICH CONTAINED DIESEL FUEL. EXCAVATIONS WILL BE BACKFILLED, COMPACTED AND RESTORED WITH ASPHALT UPON COMPLETION OF THE REMOVAL OF THE USTS AND ASSOCIATED PIPING. ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH PHILADELPHIA INTERNATIONAL AIRPORT (PHL) PERMIT #T18117, AS REFERENCED IN ATTACHED PHL CORRESPONDENCE.
- PermitSuppression
Permit 959859 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitElectrical
Permit 957810 · COMPLETED
REMOVE 12-2'X2' LAY IN FIXTURES AND REPLACE WITH 12 2'X2' LAY IN LED FIXTURES
- PermitNew Construction
Permit 950595 · Completed
INSTALL (2)200A 208V PANELS (2)100A 208V PANELS AND ASSOCIATED FEEDERS, (33) LIGHTS, (41) RECEPTACLES, (4) SWITCHES WIRING AND CONNECTIONS TO MECHANICAL EQUIPMENT UNITS, REPLACE EXISTING DUCT SMOKE DETECTORS WITH NEW DUCT SMOKE DETECTORS PER NFPA 72 INSTALL (2)200A 208V PANELS (2)100A 208V PANELS AND ASSOCIATED FEEDERS, (33) LIGHTS, (41) RECEPTACLES, (4) SWITCHES WIRING AND CONNECTIONS TO MECHANICAL EQUIPMENT UNITS, REPLACE EXISTING DUCT SMOKE DETECTORS WITH NEW DUCT SMOKE DETECTORS PER NFPA 72
- PermitElectrical
Permit 943389 · COMPLETED
INSTALL 1 400AMP PANEL, 1 150AMP PANEL, 1 100AMP PANEL AND ASSOCIATED FEEDERS, NEW LIGHTING, 1 LIGHTING CONTROL PANEL, SWITCHES, RECEPTACLES, KITCHEN & MECHANICAL EQUIPMENT CONNECTIONS, COMMUNICATION OUTLETS AS PER 2008 NEC. INSTALL FIRE ALARM DEVICES AND CONNECTION TO MAIN AIRPORT FIRE ALARM SYSTEM AS PER NFPA 72.(WEST DIST)
- PermitElectrical
Permit 949381 · COMPLETED
ELECTRICAL: RELOCATE POWER PANEL AND TRANSFORMER. INSTALL NEW LIGHTING, LIGHTING CONTROLS AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008. COMMUNICATION: (18) CAT6 LINES; AVERAGE RUN 50 FEET; LONGEST RUN 75 FEET. FIRE ALARM WILL BE INCLUDED UNDER SEPARATE PERMIT.(WEST DIST)
- PermitMajor alteration
Permit 955149 · COMPLETED
LEVEL II ALTERATION FOR TENANT FITOUT AS PER PLAN **SEPARATE PERMIT IS REQUIRED FOR MECHANICAL AND ELECTRICAL WORK**
- PermitElectrical
Permit 955543 · COMPLETED
FURNISH AND INSTALL (21) LED FIXTURES IN WINDOW WELL. ALL WORK AS PER 2008 NEC **FISH ONLY NO ACTIVE BUILDING PERMIT IN PLACE**
- PermitMajor alteration
Permit 952878 · COMPLETED
FOR INTERIOR ALTERATIONS TO TENANT SPACE E6 IN AN EXISTING STRUCTURE. ALTERATION TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS. NO CHANGE IN OCCUPANCY. **SEPARATE PERMITS REQUIRED FOR ANY MEP**
- PermitElectrical
Permit 943344 · COMPLETED
ELECTRICAL: INSTALL NEW POWER PANEL AND TRANSFORMER. INSTALL NEW LIGHTING, LIGHTING CONTROLS, AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008. FIRE ALARM: FURNISH AND INSTALL NEW FIRE ALARM EQUIPMENT AND TIE INTO EXISTING AIRPORT SYSTEM. (1) NEW SMOKE, (2) NEW STROBES, (2) RELOCATED HORN/STROBES. COMMUNICATION: (16) CAT LINES; AVERAGE RUN 50 FEET; LONGEST RUN 75 FEET AS PER NFPA 72. (WEST DIST)
- PermitPlumbing
Permit 934712 · COMPLETED
FLOORS SINKS, MOP RECEPTOR, HAND SINKS, 3- COMP SINK, GREASE TRAP, (HOT WATER HEATRER 50 GAL). THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004.
- PermitMajor alteration
Permit 948474 · COMPLETED
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A MERCANTILE OCCUPANCY. NO CHANGE IN MEANS OF EGRESS CATEGORY. ALTERATIONS TO INCLUDE THE ERECTION OF NEW FIXTURES, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING. *IEBC 2009*
- PermitMajor alteration
Permit 948479 · COMPLETED
LEVEL II INTERIOR ALTERATIONS(NO CHANGE OF OCCUPANCY). FOR RENOVATIONS TO TENANT SPACE DE-9 IN AN EXISTING STRUCTURE[ AIRPORT(WITH OTHER APPROVED USES)] AS PER APPROVED PLANS. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMajor alteration
Permit 948469 · COMPLETED
LEVEL II INTERIOR ALTERATIONS(NO CHANGE OF OCCUPANCY). FOR RENOVATIONS TO TENANT SPACE DE-4 IN AN EXISTING STRUCTURE(WITH OTHER APPROVED USES) AS PER APPROVED PLANS. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitNew Construction
Permit 950423 · Expired
FOR MECHANICAL ALTERATIONS TO TERMINAL "E"/ SPACE E-14 SPACE OF PHL AIRPORT, TO INCLUDE NEW REGISTERS/DIFFUERS, EXHAUST FAN WITH ASSOCIATED DUCTWORK, AS PER APPROVED PLANS.
- PermitMechanical
Permit 950414 · COMPLETED
FOR MECHANICAL ALTERATIONS TO TERMINAL "E"/ SPACE E-14 SPACE OF PHL AIRPORT, TO INCLUDE NEW REGISTERS/DIFFUERS, EXHAUST FAN WITH ASSOCIATED DUCTWORK, AS PER APPROVED PLANS.
- PermitElectrical
Permit 941577 · COMPLETED
INSTALLATION OF HEATERS AS PER 2008 NEC. (WEST DIST)
- PermitElectrical
Permit 933680 · COMPLETED
REUSE EXISTING ELECTRICAL PANEL. INSTALL RECEPTACLES AND RECESSED LIGHTING. POWER WIRING TO HOOD, MAKE-UP AIR UNIT AND AC UNIT. INSTALL TEL/DATA AND CAMERA CABLING AS PER 2008 NEC (WEST DIST)
- PermitMechanical
Permit 948614 · COMPLETED
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK IN TERMINAL D OF THE PHILADELPHIA AIRPORT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitPlumbing
Permit 945008 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; TENANT FITOUT; 9 FLOOR SINKS, 3 HAND SINKS, 1 MOP SINK, 3 GREASE TRAPS, 1 DISPOSAL, 1 PRE RINSE SINK, 1 COMMERCIAL DISHWASHER, 1- 3 COMPARTMENT POT SINK, 1- 3 COMPARTMENT BAR SINK, 1 WATER HEATER GAS PIPING ACCORDING TO PLAN. THE INSTALLATION WILL COMPLY WITH THE 2004 PHILA PLUMBING CODE.
- PermitMajor alteration
Permit 944787 · COMPLETED
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A MERCANTILE OCCUPANCY. NO CHANGE IN MEANS OF EGRESS CATEGORY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION. *IEBC 2009*
- PermitElectrical
Permit 947789 · COMPLETED
INSTALL 3-20AMP CIRCUITS 1-30AMP CIRCUIT PER NEC 2008
- PermitSuppression
Permit 946521 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF 45 SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitMajor alteration
Permit 944246 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL PRETZEL STORE IN SPACE FH05 IN TERMINAL F OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitElectrical
Permit 943436 · COMPLETED
INSTALL 18" TRACK & 9-TRACK HEADS, RELOCATE 3-RECEPTACLES, DISCONNECT & RECONNECT POWER TO 4-PCS NEW KIT EQUIP, INSTALL 1-NEW DATA JACK, RAISE FIRE ALARM STROBE TO HIGHER ELEVATION, PER 2008 NEC
- PermitPlumbing
Permit 942296 · COMPLETED
RELOCATE 1/2" WATER SUPPLY LINE FOR COFFEE MAKER, REPAIR DRAIN PIPE FOR SODA FOUNTAIN
- PermitMajor alteration
Permit 933472 · COMPLETED
LEVEL II ALTERATIONS FOR TENANT FITOUT AS PER PLAN. SEPARATED PERMIT REQUIRED FOR ELECTRICAL AND PLUMBING WORK.
- PermitMechanical
Permit 935415 · COMPLETED
HVAC INSTALLATION FOR TENANT FITOUT AS PER PLAN.WORK TO INCLUDE THE INSTALLATION OF TYPE 1 COMMERCAIL COOKING EXHAUST HOOD SYSTEM AND A TYPE 2 HOOD.
- PermitElectrical
Permit 940909 · COMPLETED
FIRE ALARM RELOCATE 1 EXISTING HORN/STROBE
- PermitMajor alteration
Permit 938303 · COMPLETED
ALTERATION TO RESTAURANT SPACE AS PER PLAN.
- PermitMechanical
Permit 935590 · COMPLETED
INSTALL BLACK IRON DUCT FOR COMMERCIAL COOKING EXHAUST HOOD SYSTEMS. TYPE 1 AND TYPE 2 HOOD.INSTALLATION AS PER MANUFACTURES SPECIFICATIONS AND PLAN.
- PermitPlumbing
Permit 933046 · COMPLETED
INSTALL NEW WALL HUNG SINK INSTALL NEW 4 GAL ELECTRIC HOT WATER HEATER.
- PermitElectrical
Permit 931911 · COMPLETED
NEW LIGHTING, LIGHTING CONTROL, RECEPTACLES, BAR EQUIPMENT POWER WIRING, EXISTING SUB-PANEL WITH NEW BREAKERS. VOICE, DATA, POS, SECURITY, CCTV, TV (CONDUITS, BOXES, WIRES, PULL STRINGS). BUILDING PERMIT-916900 AS PER 2008 NEC (WEST DIST)
- PermitElectrical
Permit 929240 · COMPLETED
INSTALL(4) NEW 125AMP PANELS, RELOCATE (2) 45KVA TRANSFORMER, NEW LIGHTING,(1)LIGHTING CONTROL PANEL,SWITCHES,RECEPTACLES,FLOOR BOXES,KITCHEN & MECHANICAL EQUIPMENT CONNECTIONS,COMMUNICATIONS OUTLETS AS PER 2008 NEC (WEST DISTRICT) INSTALL FIRE ALARM DEVICES AND CONNECTION TO MAIN AIRPORT EXISTING FIRE ALARM SYSTEM AS PER NFPA72
- PermitElectrical
Permit 924296 · COMPLETED
MAINTAIN CKTS & JUNCTION BOXES FOR REUSE, INSTALL NEW LIGHTING & POWER RECEPTACLES & 15-CAT6 PLENUM LINES AVERAGE RUN 50' LONGEST RUN 75' AS PER NEC 2008 & FURNISH & INSTALL FIRE ALARM EQUIPMENT & TIE INTO EXISTING AIRPORT SYSTEM, 1-SMOKE, 1-HORN STROBE AS PER NFPA 72
- PermitElectrical
Permit 922668 · COMPLETED
MAINTAIN CIRCUITS AND JUNCTION BOXES FOR REUSE,INSTALL NEW LIGHTS,LIGHTING CONTROLS,POWER RECEPTS AND 10-CAT6 PLENUM RATED CABLES WITH LONGEST RUN OF 75FT AS PER 2008 NEC (WEST DISTRICT) FURNISH AND INSTALL 1-NEW SMOKES AND 1-HORN/STROBES ON TO AN EXISTING FIRE ALARM SYSTEM AS PER NFPA72
- PermitElectrical
Permit 924334 · COMPLETED
ELECTRICAL EXTEND FEEDER TO RELOCATE PANEL LOCATION INSTALL NEW LIGHTING CONTROLS AND POWER RECEPTACLES FOR SPACE AS PER NEC 2008. FIRE ALARM FURNISH AND INSTALL NEW FIRE ALARM EQUIPMENT AND TIE INTO EXISTING AIRPORT SYSTEM: (1) STROBE AND (1) HORN/STROBE AS PER NFPA 72. COMMUNICATION: 12 CAT6 LINES AVERAGE RUN 50' LONGEST RUN 75'
- PermitMajor alteration
Permit 922388 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 922380 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitNew Construction
Permit 937015 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitNew Construction
Permit 937011 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitMechanical
Permit 927757 · COMPLETED
FOR MECHANICAL ALTERATIONS TO SPACE D5A, TO INCLUDE THE INSTALLATION OF AN EXHAUST FAN, REGISTERS/DIFFSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS.
- PermitNew Construction
Permit 927760 · Expired
FOR MECHANICAL ALTERATIONS TO SPACE F06, TO INCLUDE NEW REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK, AS PER APPROVED PLANS.
- PermitSuppression
Permit 936317 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 935749 · COMPLETED
REPLACE 12 LAY-IN FIXTURES, 1 SWITCH AND 1 RECEPTACLE WITH NO ADDITIONAL WIRING PER 2008 NEC
- PermitSuppression
Permit 935846 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 935847 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 935848 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 935879 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 935880 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 935881 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)-FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitMechanical
Permit 933280 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR SPACE DE-10 IN DE CONNECTOR OF AN EXISTING AIRPORT FACILITY INCLUDING DUCTWORK AS PER APPROVED PLANS.
- PermitMechanical
Permit 933279 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR SPACE EK-2 IN TERMINAL E OF AN EXISTING AIRPORT FACILITY INCLUDING DUCTWORK AS PER APPROVED PLANS.
- PermitMechanical
Permit 929787 · COMPLETED
MECHANICAL WORK INCLIDES HVAC INSTALLATION AND TWO (2) COMMERCIAL EXHAUST HOODS AS PER PLAN.
- PermitMajor alteration
Permit 929236 · COMPLETED
LEVEL II ALTERATIONS INCLUDES COMPLETE ALTERATION OF INTERIOR SPACE AS PER PLAN. ** BUILDING IS FULLY SPRINKLERED ** DOCUMENTS. MECHANICAL PERMIT IS INCLUDED IN THIS APPLICATION. COST OF MECHANICAL WORK IS 75,990.
- PermitElectrical
Permit 923431 · COMPLETED
INSTALL NEW LIGHTS SWITCHES RECEPTACLES TO EXISTING 50AMP PANEL INSTALL POWER AND CONNECTION TO MOTORIZED GATE AND SIGN INSTALL DATA JACKS AND LOW VOLTAGE CABLE TO CAMERAS AND SPEAKERS INSTALL NEW FIRE ALARM DEVICES
- PermitMechanical
Permit 933157 · COMPLETED
INSTALLATION OF ONE NEW ROOF MOUNTED CONDENSING AND EVAPORATOR UNIT TO SERVE DISPLAY CASE FOR SPACE BC-18A IN AN EXISTING AIRPORT AS PER APPROVED PLANS.
- PermitPlumbing
Permit 932086 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; PREPARATION AND SERVING OF FOOD FOR TAKE-OUT IN SPACE DS 3LL WITHIN AN EXISTING AIRPORT COMPLEX; WATER LINE FOR PROOFER OVEN, OVEN & CONDENSATE PUMP DRAIN-THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitElectrical
Permit 930429 · COMPLETED
RELOCATE FLIGHT INFORMATION DISPLAYS TO NEW LOCATIONS & RE CIRCUIT TO EXISTING PANEL AND 8-CAT6 PLENUM RATED AVERAGE RUN 100' & LONGEST 125' AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 931632 · COMPLETED
INSTALL NEW 150AMP ELECTRICAL PANEL FED FROM NEW 150AMP 3 POLE CIRCUIT BREAKER IN EXISTING MAIN DISTRIBUTION PANEL AND INSTALL 18-NEW GFCI RECEPTACLES FOR CONVENIENCE POWER AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 924297 · COMPLETED
EXTEND FEEDER TO RELOCATED PANEL LOCATION & INSTALL NEW LIGHTING, LIGHTING CONTROLS & POWER RECEPTACLES & 9-CAT6 PLENUM LINES AVERAGE RUN 50' LONGEST RUN 75' AS PER NEC 2008 & FURNISH & INSTALL FIRE ALARM EQUIPMENT & TIE INTO EXISTING AIRPORT SYSTEM, 1-SMOKE, 1-STROBES & 2-HORN/ STROBE AS PER NFPA 72
- PermitSuppression
Permit 933429 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. RELOCATE THREE (3) SPRINKLER HEADS
- PermitMechanical
Permit 924310 · COMPLETED
FOR THE INSTALLATION OF AN HVAC MECHANICAL CONFIGURATION TO INCLUDE GRILLES/REGISTERS/DIFFUSERS AND ASSOCIATED DUCTWORK CONNECTING TO THE EXISTING SUPPLY SYSTEM
- PermitPlumbing
Permit 933056 · COMPLETED
***FIXTURES REPLACEMENT ONLY WITH NO ADD'L OR REPLACEMENT OF PIPING*** - REPLACE 1-KITCHEN SINK & 1-4-GAL ELECTRIC WATER HEATER THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitPlumbing
Permit 925819 · COMPLETED
REPLACEMENT OF EXISTING FIXTURES INCLUDING HWH GREASE RAPS SANITARY TRAPS AND ALL SINKS
- PermitMechanical
Permit 919293 · COMPLETED
HVAC INSTALLATION INCLUDES DEMO OF EXISTING DUCT AND REPLACE WITH NEW SLOT DIFFUSSERS,LAY IN DIFFUSERS AND AIR BALANCING.
- PermitAddition and/or Alteration
Permit 922811 · Expired
ALTERATIONS AS PER PLAN INCLUDES NEW FLOORING AND CEILINGS.** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 922667 · COMPLETED
INSTALL NEW 150AMP POWER PANEL,TRANSFORMER,LIGHTS,LIGHTING CONTROLS,POWER RECEPTS AND 10-CAT6 PLENUM RATED CABLES WITH LONGEST RUN OF 75FT AS PER 2008 NEC (WEST DISTRICT) FURNISH AND INSTALL 1-NEW SMOKES AND 2-HORN/STROBES ON TO AN EXISTING FIRE ALARM SYSTEM AS PER NFPA72
- PermitMajor alteration
Permit 926258 · COMPLETED
ALTERATION TO EISTING SPACE AS PER PLAN.
- PermitMechanical
Permit 924304 · COMPLETED
HVAC,INSTALLATION INCLUDING DUCTWORK, AS PER PLANS (12) REGISTERS/DIFFUSERS
- PermitMajor alteration
Permit 925396 · COMPLETED
INFORMATION PANEL RELOCATED TO TERMINAL C AS PER DRAWING
- PermitMechanical
Permit 905341 · EXPIRED
ALTERATIONS TO AN EXISTING MECHANICAL SYSTEM TO INCLUDE REGISTERS/DIFFUSERS, DUCTWORK, ROOFTOP UNIT, AND ALL OTHER WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR KITCHENHOODS, ELECTRICAL, AND PLUMBING WORK.
- PermitMajor alteration
Permit 903310 · EXPIRED
INTERIOR ALTERATIONS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP, KITCHENHOODS, AND FIRE SUPPRESSION WORK.
- PermitElectrical
Permit 919094 · COMPLETED
INSTALL NEW FEEDER TO NEW PANEL IN SPACE INSTALL NEW LIGHTING LIGHTING CONTROL POWER RECEPTACLES FOR SPACE AS PER NEC 2008
- PermitElectrical
Permit 910086 · COMPLETED
REMOVAL OF EXISTING POWER RECEPTS,LIGHTING FIXTURES AND SWITCHES,MAINTAIN CIRCUITS AND JUNCTION BOXES FOR REUSE,INSTALL NEW LIGHTING AND POWER RECEPTS FOR SPACE AND INSTALL 14-PLENUM CAT6 CABLES W/LONGEST RUN OF 75FT AS PER 2008 NEC (WEST DISTRICT) FURNISH AND INSTALL NEW FIRE ALARM EQUIPMENT AND TIE INTO EXISTING AIRPORT SYSTEM AS PER NFPA72
- PermitElectrical
Permit 917860 · COMPLETED
INSTALL & WIRE BASEBOARD HEATERS AS PER NEC 2008 WEST DISTRICT - SEE LOG
- PermitElectrical
Permit 918975 · COMPLETED
DEMO ALL UNUSED CONDUITS,WIRING AND DEVICES,INSTALL LIGHTS,SWITCHES,WIRING AND CONDUIT FOR RECEPTACLES AND EQUIPMENT,INSTALL CONDUIT AND CABLE FOR POS AND CAMERAS FOR TENANT FITOUT AS PER 2008 NEC (WEST DISTRICT)
- PermitPlumbing
Permit 912353 · COMPLETED
INSTALL 3-WATER HEATERS,1-GREASE TRAP,4-FLOOR SINKS,1-ICE MAKER,1-DISHWASHER,1-HAND SINK,1-COFFEE BREWER,1-RINSE TRAY AND 1-ICE BIN.THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitSuppression
Permit 925553 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 906052 · COMPLETED
POWER FOR TV MENU BOARDS, MAINTAIN CIRCUIT & JUNCTION BOXES FOR REUSE, F& I NEW DRUM LIGHTS, REMOVE & REPLACE POWER FOR REFRIGERATOR AS PER NEC 2008 WEST DISTRICT
- PermitSuppression
Permit 925549 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 925548 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 925550 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 925551 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitNew Construction
Permit 925552 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.
- PermitMechanical
Permit 897245 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW RESTAURANT TENANT IN SPACE E12 OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitMajor alteration
Permit 894889 · COMPLETED
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A RESTAURANT WITH SEATING IN SPACE E12 IN TERMINAL 'E' OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitElectrical
Permit 924281 · COMPLETED
REPLACE EXISTING LIGHT FIXTURES WITH NEW LED FIXTURES **REPLACE IN KIND WITH NO ADDITIONAL WIRING** 64- HIGH BAY LIGHTS & 50-LAYIN FIXTURES AS PER NEC 2008 WEST DISTRICT **NO ADDITIONAL WIRING**
- PermitZoning/use
Permit 883197 · COMPLETED
FOR THE ERECTION OF THREE (3) DETACHED STRUCTURES (BUILDING A, CANOPY B AND BUILDING C) AND ONE (1) ACCESSORY STRUCTURE (GUARD BOOTH). SIZE AND LOCATION AS SHOWN ON PLANS AND APPLICATION. FOR USE AS AIRPORT RELATED FACILITY. FOR THE CREATION OF THIRTY-SEVEN (37) ACCESSORY, SURFACE PARKING SPACES,INCLUDING TWO (2) ACCESSIBLE SPACES. NO SIGNS ON THIS APPLICATION.
- PermitMajor alteration
Permit 917520 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 917514 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 917522 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 917519 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 917518 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitMajor alteration
Permit 917521 · COMPLETED
INTERIOR RENOVATION OF TENANT SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitDemolition
Permit 922375 · COMPLETED
EZ DEMO OF INTERIOR FINISHES - SPACE #DK1
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 922440 · Expired
EZ DEMO INTERIOR FINISHES TERMINAL E 13/14
- PermitMajor alteration
Permit 916900 · COMPLETED
LEVEL II ALTERATION TO EXISTING SPACE AS PER PLANS.** SEPARATE PERMIT REQUIRED FOR M.E.P.**
- PermitElectrical
Permit 910113 · COMPLETED
REMOVAL EXISTING POWER PANEL, POWER RECEPTACLES, LIGHTING FIXTURES & SWITCHES, INSTALL POWER PANEL, LIGHTING & POWER RECEPTACLES AND 4-CAT6 LINES RUN 50' LONGEST RUN 75' AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 910084 · COMPLETED
FURNISH AND INSTALL NEW 200AMP NEMA 3R PANEL ON ROOFTOP FED FROM SUBSTATION BELOW,INSTALL NEW FIBER CONNECTION FROM LOCAL COMMUNICATION ROOM TO T-MOBILE ANTENNAS ON ROOF,FURNISH AND INSTALL GROUNDING CONDUCTOR FROM GROUND ROD TO ROOFTOP AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 910085 · COMPLETED
FURNISH AND INSTALL NEW 200AMP NEMA 3R PANEL ON ROOFTOP FED FROM SUBSTATION BELOW,INSTALL NEW FIBER CONNECTION FROM LOCAL COMMUNICATION ROOM TO T-MOBILE ANTENNAS ON ROOF,FURNISH AND INSTALL GROUNDING CONDUCTOR FROM GROUND ROD TO ROOFTOP AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 919275 · COMPLETED
INSTALL 6- OUTLETS AND DATA CABLE FOR NEW KIOSKS... (AIRPORT TERMINAL)
- PermitMajor alteration
Permit 916669 · COMPLETED
THE CONSTRUCTION OF A TEMPORARY SECURITY CHECKPOINT ENTRANCE PARTITION WITH SWINGING DOORS TO REPLACE THE EXISTING CHECKPOINT SLIDING DOORS AT TERMINAL "C". THE GOAL OF THE PROJECT IS TO SECURE THE TERMINAL "C" SECURITY CHECKPOINT WITHOUT THE USE OF THE EXISTING SLIDING DOORS. THIS EFFORT INCLUDES THE DESIGN OF THE AFOREMENTIONED TEMPORARY SECURITY CHECKPOINT ENTRANCE PARTITION TO BE CONSTRUCTRED OF ALUMINUM FRAMING WITH INFILL GLAZING WHICH WILL INCORPORATE A SERIES OF SWINGING DOORS WHICH WILL BE ON HELD OPENS DURING HOURS OF OPERATION AND CLOSED AND LOCKED AFTER HOURS. THE WORK UNDER THIS APPLICATION INCLUDES ONLY THE STRUTURAL AND GENERAL CONSTRUCTION REQUIRED TO ACCOMMODATE THE NEW SECURITY ENTRANCE PARTITION. THE NEW SECURITY ENTRANCE PARTITION IS TO BE PROVIDED BY A SEPARATE VENDOR HIRED BY THE OWNER (PHL) AND IS ONLY SHOWN ON THE ENCLOSED DRAWINGS FOR REFERENCE PURPOSES.
- PermitNew Construction
Permit 919579 · Expired
PHL ON CALL SPACE #M3T-024 ATO CORRIDOR EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitMechanical
Permit 914458 · COMPLETED
HVAC INSTALLATION INCLUDES 8 SLOT DIFFUSERS AIR BALANCING AS PER PLAN.
- PermitElectrical
Permit 918626 · COMPLETED
TRMINAL B SPACE B8 ELECTRICAL: ADDING(1) NEW ADDITIONAL RECEPTACLE FOR MASSAGE CHAIR.
- PermitElectrical
Permit 906954 · COMPLETED
INSTALL NEW ELECTRICAL PANEL, INSTALL RECEPTACLES AND RECESSED LIGHTING AND TEL/DATA AND CAMERA CABLING AS PER NEC 2008 WEST DISTRICT
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 917623 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. INTERIOR FINISHES TERMINAL D-5A
- PermitDemolition
Permit 917627 · COMPLETED
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. INTERIOR FINISHES TERMNIAL E-3
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 917628 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. INTERIOR FINISHES TERMINAL DE-10
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 917632 · Expired
EZ DEMO INTERIOR FINISHES TERMNIAL E EK-2
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 917635 · Expired
EZ DEMO INTERIOR FINISHES TERMINAL F (F-06)
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 917639 · Expired
EZ DEMO INTERIOR FINISHES TERMINAL F (FH-23)
- PermitNew Construction
Permit 916852 · Issued
TERMINAL C-REPLACE 198 LIGHT FIXTURES/ELETRICAL DEVICES IN KIND THORUGHOUT C CONCOURSE. NO ADDITIONAL WIRING WILL BE NEEDED.
- PermitNew Construction
Permit 912021 · Expired
HVAC INSTALLATION INCLUDING DUCTWORK AS PER PLANS.
- PermitElectrical
Permit 906026 · COMPLETED
REMOVAL OF EXISTING POWER RECEPTACLES, LIGHTING FIXTURES & SWITCHES, MAINTAIN CIRCUITING AND JUNCTION BOXES FOR REUSE. FURNISH & INSTALL NEW LIGHTING AND POWER RECEPTACLES, FOR VARIOUS EMPLOYEE BREAK ROOMS, KITCHEN AND BATHROOMS AS PER NEC 2008 WEST DISTRICT
- PermitAddition and/or Alteration
Permit 910064 · Issued
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A MERCANTILE OCCUPANCY. NO CHANGE IN MEANS OF EGRESS CATEGORY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION AND SIGNAGE WORK.
- PermitMajor alteration
Permit 911963 · COMPLETED
TENANT FIT OUT OF AN EXISTING RETAIL SPACE AS PER PLAN.
- PermitElectrical
Permit 915980 · COMPLETED
INSTALL 13 CAT6 CABLES FOR NEW WIRELESS ACCESS POINTS MAX LENGTH OF CABLE 125'
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 914801 · Expired
INTERIOR DEMO OF NON LOAD BEARING PARTITIONS ONLY. (COMMERCIAL)
- PermitElectrical
Permit 911708 · COMPLETED
RELOCATE ONE WALL SWITCH, ONE DUPLEX RECEPTACLE AND ONE DATA DROP TO ADJACENT WALL... PER 2008 NEC (OFFICE)
- PermitAlterations
Permit 886746 · Expired
ALTERATIONS: INTERIOR/EXTERIOR PLUMBING; CONCOURSE E, FIRST FLOOR GATE E4; REMOVE & REINSTALL A POTABLE WATER CABINET FOR A PASSENGER BOARDING BRIDGE THAT IS BEING REPLACED INCLUDING INSTALLATION OF NEW DOMESTIC WATER PIPING TO THE POTABLE WATER CABINET - THE INSTALLATION WILLL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitElectrical
Permit 911650 · COMPLETED
FISHING ALL WIRE ADD 1-20AMP BREAKER, RUN 1 20AMP GFCI RECEPTACLE, ADD 1 30AMP BREAKER, RUN 1-30AMP DISCONNECT FOR RUN OFF SYSTEM AS PER NEC 2008 WEST DISTRICT
- PermitMechanical
Permit 907273 · COMPLETED
HVAC ALTERATIONS FOR RELOCATED DIFFUSORS & ALL ASSOCIATED TERMINAL DEVICES PER APPROVED PLANS. SEPARATE PERMIT REQ'D FOR ANY ELECTRICAL WORK.
- PermitMajor alteration
Permit 905967 · COMPLETED
ALTERATION TO EXISTING KIOSK AS PER PLAN.** SEPARATE PERMIT IS REQUIRED FOR ELECTRICAL AND PLUMBING WORK **
- PermitNew Construction
Permit 910467 · Expired
RELOCATING 8 SPRINKLER IN PHILADELPHIA INTERNATIONAL AIRPORT XPRESSA EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitNew Construction
Permit 910469 · Expired
RELOCATING 6 SPRINKLER IN PHILADELPHIA INTERNATIONAL AIRPORT,EARL OF SANDWICH EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitPlumbing
Permit 905745 · COMPLETED
INSTALL 1 KITCHEN SINK AND 1-4 GAL WATER HEATER AND RELATED PIPING - THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitElectrical
Permit 898462 · COMPLETED
REPLACE PARKING LOT KLIGHTING FIXTURES & BRANCH WIRING AS PER NEC 2008 WEST DISTRICT ***SEE LOG***
- PermitElectrical
Permit 904075 · COMPLETED
INSTALL 4- 120V, 20A CIRCUITS FOR 4- BASEBOARD HEATERS.... PER 2008 NEC (AIRPORT TERMINAL)
- PermitElectrical
Permit 894623 · COMPLETED
RENOVATE EXISTING LIGHTING PER 2008 NEC (AIRPORT)ALTERNATION TO EXISTING SYSTEM AND OR REPLACE OF FA DEVICES PER NFPA 72
- PermitAddition and/or Alteration
Permit 899772 · Issued
ALTERATION INCLUDES REPLACE FLOOR FINISHES AND CEILING TILES. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 902073 · COMPLETED
NEW 12 STRAND FIBER TELECOMMUNICATIONS CABLE FROM AIRPORT DEMARC TO CHICKIE & PETES SPACE PER 2008 NEC (RESTAURANT)FINAL TERMINATIONS BY THE AIRPORT
- PermitElectrical
Permit 902071 · COMPLETED
NEW 6 STRAND FIBER TELECOMMUNICATIONS CABLE FROM AIRPORT DEMARC TO CHICKIE & PETES SPACE PER 2008 NEC (RESTAURANT)FINAL TERMINATIONS BY THE AIRPORT
- PermitNew Construction
Permit 902072 · Expired
NEW 6 STRAND FIBER TELECOMMUNICATIONS CABLE FROM AIRPORT DEMARC TO CHICKIE & PETES SPACE PER 2008 NEC (RESTAURANT)FINAL TERMINATIONS BY THE AIRPORT
- PermitElectrical
Permit 901037 · COMPLETED
RELOCATE 2- POWER OUTLETS AND 1- DATA OUTLET TO ADJACENT WALL... PER 2008 NEC (AIRPORT TERMINAL)
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 899309 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans.
- PermitNew Construction
Permit 822187 · Completed
GROUNDING,BRANCH CIRCUITS,FEEDERS,SAFETY SWS,INTEGRATED POWER CENTERS,POWER CONNECTIONS TO MECH EQUIPMENT,POWER CONNECTIONS TO PASSENGER BOARDING BRIDGES,ACCESS CONTROL SYSTEM AND CABLING,CCTV SYSTEM AND CABLING PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 882435 · COMPLETED
INSTALL NEW BRANCH CIRCUIT 200AMP FEEDERS ONLY TO PRE-FAB PASSENGER BOARDING BRIDGES AS PER 2008 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 883519 · Expired
HVAC INSTALLATION FOR TENANT FIT-OUT INCLUDES DUCTWORK AND REGISTERS/DIFFUSERS.
- PermitAddition and/or Alteration
Permit 881687 · Expired
TENANT FIT-OUT OF AIRPORT TERMINAL SPACE (TERMINAL B -SPACE B1) FOR EXPRESS SPA AS PER PLAN.
- PermitMajor alteration
Permit 893207 · COMPLETED
LEVEL II ALTERATION TO EXISTING SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 879828 · COMPLETED
FURNISH & INSTALL 6-HEATERS & THERMOSTATS AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 886751 · COMPLETED
DISCONNECT AND SAFE OFF ALL POWER FEEDING, REMOVE ALL LIGHTS, CONDUITS, CABLES, WIRES AND INSTALOL JUNCTION BOXES & SAFE OFF WIRES, INSTALL LIGHTING & POWER FROM EXISTING PANELBOARD INSTALL NEW DATA CAMERAS & LOW VOLTAGE SPEAKER TO A/V DATA RACK AS PER NEC 2008 WEST DISTRICT & FIRE ALARM - REMOVE RELOCATE & REINSTALL 1-SPEAKER STROBE, CONFIRM EXISTING TAMPER & FLOW SWITCHES ARE CONNECTED TO FIRE ALARM AS PER NFPA 72
- PermitMajor alteration
Permit 872402 · COMPLETED
FOR INTERIOR ALTERATIONS TO EXISTING SPACE AS PART OF PHILADELPHIA INTERIONATIONAL AIRPORT, TO INCLUDE NEW INTERIOR FINISHES, COUNTERS, AS PER APPROVED PLANS.
- PermitSuppression
Permit 848179 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitNew Construction
Permit 893493 · Expired
EZ STANDARDS KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. INSTALL 1 HOOD SYSTEM CONSISTING OF 4 SECTIONS
- PermitSuppression
Permit 892264 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATING (17) SPRINKLERS IN HERITAGE BOOKS, 2ND FLOOR, SPACE #BC5
- PermitElectrical
Permit 882592 · COMPLETED
DEMO OF EXISTING FLOOR OUTLETS INSTALL 65 NEW POKE THRU FLOOR OUTLETS
- PermitDemolition
Permit 891309 · COMPLETED
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 866086 · COMPLETED
INSTALL 1 NEW ELECTRICAL PANEL,BRANCH WIRING FOR OUTLETS,LIGHTING AND SWITCHES.INSTALL LOW VOLTAGE CABLES FOR DATA PER 2008 NEC (AIRPORT)INSTALL 1 PULL STATION,2 STROBES AND 1 SPEAKER PER NFPA 72
- PermitElectrical
Permit 886954 · COMPLETED
6 GENERAL USE RECEPTACLES, 15 READER BOARDS EACH WITH 1 DATA AND 1 RECEPTACLE.2 FLOOR BOXES,4 OCCUPANCY SENSORS,14 MIRROR POWER RECEPTACLES PER 2008 NE (HOTEL)
- PermitAddition and/or Alteration
Permit 878985 · Issued
LEVEL II ALTERATION FOR THE SEPARATION OF AN EXISTING AIRLINE TICKET OFFICE ("ATO") WITH B OCCUPANCY INTO TWO OFFICES BY PROVIDING A NEW TENANT WALL. THIS WALL CREATES A NEW CORRIDOR BETWEEN THE EXISTING ATO OFFICE AND A FUTURE FIT-OUT SHELL SPACE AS PER PLAN.** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 881760 · COMPLETED
INSTALL LIGHTS SWITCHES RECEPTACLES TELE/DATA CABLE AND DEVICES INSTALL FIRE ALARM WIRING AND DEVICES PER THE 2008 NEC
- PermitElectrical
Permit 890224 · COMPLETED
REPALCE (4) 2X2 LIGHTS WITH LED 2X2 LIGHTS. REPLACE OUTLETS AS NEEDED 1 FOR 1 REPLACEMENT IN KIND WITH NO ADDITIONAL WIRING AS PER 2008 (WEST DISTRICT) NO BUILDING PERMIT ON FILE
- PermitMechanical
Permit 883590 · COMPLETED
HVAC INSTALLATION INCLUDES DUCTWORK, VAV BOX, GRILLES, DIFFUSERS
- PermitMechanical
Permit 877103 · COMPLETED
INSTALL 1 TYPE I KITCHEN HOOD WITH BLACK IRON DUCT AND FIRE WRAP INSULATION. INSTALL 1 TYPE II KITCHEN HOOD WITH GALVINIZED DUCT. INSTALL 1 MAKE UP AIR UNIT WITH GALVANIZED DUCT AND FIRBERGLASS DUCT WRAP AS PER PLAN.
- PermitMajor alteration
Permit 883719 · COMPLETED
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A BOOK STORE IN SPACE BC5 OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMechanical
Permit 885523 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM WITHIN SPACE BC5 OF AN EXISTING AIRPORT FACILITY TO ACCOMODATE NEW BOOK STORE TENANT AS PER APPROVED PLANS.
- PermitSuppression
Permit 886896 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 885687 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitPlumbing
Permit 884841 · COMPLETED
REMOVE EXSITING FIXTURES URINALS 6 WATER CLOSETS 18 SINKS 14 2 WATER FOUNTAIN COOLERS INSTALL NEW
- PermitElectrical
Permit 874374 · COMPLETED
INSTALL DOOR ACCESS CONTROL HARDWARE ON 5 MAN DOORS AND 3 OVERHEAD GARAGE DOORS.INSTALL ACCESS DOOR PANEL AND NETWORK RACK (AIRPORT)
- PermitSuppression
Permit 883684 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. RELOCATE SEVEN (7) SPRINKLER HEADS
- PermitElectrical
Permit 873437 · COMPLETED
REPLACE EXISTING LIMINAIRES, INSTALL 480V/3P/20A BRANCH POWER TO 3-TEMPORARY COOLING UNITS FROM EXISTING PANEL AS PER NEC 2008 WEST DISTRICT**NO FIRE ALARM ON THIS PERMIT**
- PermitMajor alteration
Permit 879003 · COMPLETED
INTERIOR ALTERATIONS TO MAIN BALL ROOM PRE FUNCTION LOBBY RESTROOMS 2ND FLOOR MEETING ROOMS 2ND FLOOR BOARD ROOM MEETING CORRIDOR 2ND FLOOR RESTROOMS AND 2ND FLOOR CORRIDOR LEADING FROM AIRPORT HOTEL CORRIDOR. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 882133 · COMPLETED
RETROFIT 3- T-8 LIGHT FIXTURES TO LED... PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 881759 · COMPLETED
EZ ELECTRIC PERMIT - REPLACE TRACK LIGHTING WITH 52 TRACK HEADS REPLACE 7 RECESSED LIGHTS 2 EMERGENCY/EXIT LIGHTS INSTALL 7 NEW RECEPTACLES PER THE 2008 NEC.
- PermitElectrical
Permit 870700 · COMPLETED
INSTALL 2-200AMP PANELS,LIGHTS,SWITCHES,RECEPTACLES AND TELE/DATA DEVICES,INSTALL WIRING AND CONNECTIONS TO HVAC AND KITCHEN EQUIPMENT AS PER 2008 NEC (WEST DISTRICT) INSTALL A NEW FIRE ALARM SYSTEM WITH PULLS,HORNS,STROBES,LIGHTS AND PANEL AS PER NFPA72
- PermitMechanical
Permit 874757 · COMPLETED
INSTALL 4 DUCTLESS SPLIT SYSTEMS. INSTALL 2 CONDENSING UNITS. INSTALL 1 DIFFUSER AS PER PLAN.
- PermitMechanical
Permit 874760 · COMPLETED
INSTALL 3 TEMPORARY COOLING UNITS. INSTALL 2 FAN COIL UNITS, AND ASSOCIATED DUCTWORK AS PER PLAN.
- PermitElectrical
Permit 876010 · COMPLETED
AIRPORT INTERNET TECHNOLOGY HVAC IMPROVEMENTS AIR CONDITIONING UNITS PER PLANS
- PermitAddition and/or Alteration
Permit 872959 · Completed
LEVEL I ALTERATIONS (NO CHANGE OF OCCUPACY) TO REMOVE AND REPLACE DAMAGED CMU WALL AT TRANSFORMER ROOM LOCATED IN BREEZEWAY BETWEEN TERMINALS 'C' AND 'D' WITHIN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK**
- PermitElectrical
Permit 870241 · COMPLETED
INSTALL NEW POWER FOR 8 NEW AIRLINE CHECK-IN KIOSKS IN EXISTING TERMINAL D TICKETING AREA (SOUTHWEST AIRLINES)COMMUNICATION -INSTALLATION OF 26 CAT 6 DROPS LONGEST RUN 50FT PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 865909 · COMPLETED
INTERIOR FITOUT OF SPACE C7 FOR "IN MOTION" STORE (RETAIL SALES OF CONSUMER GOODS) PER DRAWING.
- PermitMechanical
Permit 867706 · COMPLETED
HVAC INSTALLATION FOR RETAIL SPACE. SEE A/P 865909 FOR PLAN.
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 877776 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.
- PermitPlumbing
Permit 877111 · COMPLETED
TERMINAL B FOOD COURT (BC10) INSTALL (1) 3 COMPARTMENT SINK WITH GREASE TRAP AND DISPOSAL. 1 PREP SINK, 1 FLOOR SINK, 1 MOP SINK AND 2 HAND SINKS. 1 AO SMITH GAS WATER HEATER.
- PermitAdministrative
Permit 868707 · COMPLETED
AMEND MECHANICAL PERMIT NO. 852727 TO INCLUDE INSTALLATION OF UL LISTED CAPTIVE AIRE HOOD WITH ROOF EXHAUST FANS AS IDENTIFIED IN ORIGINAL PERMIT AND AS PER APPROVED PLANS.
- PermitElectrical
Permit 871963 · COMPLETED
REPLACE EXISTING FIRE ALARM PANEL WITH NEW REPLACE EXISTING FIRE ALARM DEVICES WITH NEW BLDG PERMIT #845752
- PermitNew Construction
Permit 874208 · Expired
HVAC INSTALLATION INCLUDES DUCTWORK,REGISTERS/ DIFFUSERS AS PER PLAN.
- PermitAddition and/or Alteration
Permit 872041 · Issued
LEVEL II ALTERATION FOR FITOUT OF RETAIL SHOP AS PER PLAN.**SEPARATE PERMIT REQUIRED FOR M.E.P.S**
- PermitElectrical
Permit 872507 · COMPLETED
INSTALL 2- 120V DUPLEX OUTLETS IN ONE OFFICE, AND 4- OUTLETS AND 4- DATA DROPS IN ADJACENT OFFICE... IN ACCORDANCE WITH 2008 NEC (AIRPORT TERMINAL)
- PermitElectrical
Permit 873740 · COMPLETED
REMOVAL OF EXISTING CONDUIT AND 1- JUNCTION BOX FROM 2ND FLOOR TO 1ST FLOOR... IN ACCORDANCE WITH 2008 NEC (AIRPORT TERMINAL)
- PermitSuppression
Permit 873062 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitMajor alteration
Permit 867296 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING TERMINAL D TICKETING AREA (SOUTHWEST AIRLINES) TO INSTALL SELF TICKETING KIOSKS AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERD. **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- PermitMajor alteration
Permit 866060 · COMPLETED
LEVEL II ALTERATIONS FOR FITOUT OF NEW TENANT IN BC CONNECTOR BC-10 SPACE FOR GACHI HOUSE OF SUSHI.
- PermitMechanical
Permit 868441 · COMPLETED
HVAC INSTALLATION FOR FOR FITOUT OF NEW TENANT IN BC CONNECTOR BC-10 SPACE FOR GACHI HOUSE OF SUSHI.** SEE A/P 866060 FOR PLAN ** * SEPARATE PERMIT IS REQUIRED FOR COMMERCIAL HOOD EXHAUST SYSTEM AND FIRE SUPPRESSION SYSTEM *
- PermitNew Construction
Permit 867570 · Expired
For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitElectrical
Permit 855861 · COMPLETED
INSTALL 2 PANELS, (1) 45KVA TRANSFORMER, LIGHTS, SWITCHES, RECEPTACLES AND TELE/DATA DEVICES AS PER NEC 2008 WEST DISTRICT & INSTALL FIRE ALARM DEVICES AS PER NFPA 72
- PermitAlterations
Permit 866296 · Expired
REPLACE BREAKROOM SINK AMD INJECTOR PUMP - THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitNew Construction
Permit 866292 · Expired
VA TECH OPS BREAKROOM EZ PERMIT INSTALL MINI-SPLIT For the installation of Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
- PermitAddition and/or Alteration
Permit 851745 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING UNITED AIRLINES TECH OPS BREAK ROOM IN TERMINAL 'D' OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- ViolationARCHITECT/ENGINEER SERVICES
Case 774192 · Violation 4623916 · Code A-304.1/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 774192 · Violation 4623915 · Code A-302.11/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- PermitElectrical
Permit 850523 · COMPLETED
INSTALL NEW DEVICES TWO SPEAKER STROBES AND TIE INTO AIRPORT SYSTEM PER NFPA 72
- PermitPlumbing
Permit 858256 · COMPLETED
ALTERATION: INTERIOR PLUMBING; FIT OUT; TERMINAL E (SPACE E8B);FOOD SERVICE; 2-HAND SINKS,1-3COMP SINK,1-1COMP SINK,1-MOP SINK,1-ICE MACHINE,1-DISH WASHER,1-WATER HEATER,2-FLOOR SINKS,1-COFFEE BREWER AND 2-WATER FILTERS-THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitAdministrative
Permit 859921 · COMPLETED
TEMPORARY CERTIFICATE OF OCCUPANCY FOR PERMIT NUMBER 816888
- PermitElectrical
Permit 850721 · COMPLETED
NEW LIGHTING LIGHTING CONTROL PADDLE FANS RECEPTACLES BAR EQUIPMENT POWER WIRING EXISTING SUB PANEL WITH NEW BREAKERS VOICE DATA POS SECURITY CCTV TV CONDUITS BOXES WIRES PULL STRINGS PER 2008 NEC (RESTAURANT)
- PermitSuppression
Permit 857968 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitMechanical
Permit 852727 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW RESTAURANT TENANT IN SPACE 8B IN TERMINAL 'E' OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.
- PermitAdministrative
Permit 855580 · COMPLETED
TCO FOR TERMINAL D & E BAGGAGE CLAIM AREA
- PermitMechanical
Permit 852160 · COMPLETED
FOR THE INSTALLATION OF MECHANICAL WORK TO INCLUDE REGISTERS/DIFFUSERS, DUCTWORK, AND ALL OTHER WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL AND PLUMBING WORK.
- PermitPlumbing
Permit 851474 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; RESTAURANT; AIRPORT, TERMINAL C (SPACE C-11); 1-3COMP,2-HAND AND 1-PREP SINKS,HOT WATER HEATER AND GREASE TRAP;GREASE INTERCEPTOR SHALL BE COMPLIANT WITH THE REQUIREMENTS OF THE INDUSTRIAL WASTE UNIT OF THE PHILADELPHIA WATER DEPARTMENT AND THE DEVICE MUST BE AUTOMATIC OR SEMI-AUTOMATIC TYPE (MANUAL TYPE GREASE TRAPS REQUIRING THAT THE LID BE REMOVED FOR CLEANING ARE PROHIBITED) -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitElectrical
Permit 847140 · COMPLETED
INSTALL NEW LIGHTING, FURNISH AND INSTALL NEW BRANCH CIRCUITRY & POWER FOR TENANT SPACE, 6 CAT6 DATA DROPS LONGEST RUN 40FT AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 853620 · COMPLETED
REDO CIRCUITRY FOR LIGHTING IN TWO OFFICES. DEMOLISH POWER AND DATA FROM EXISTING WALL.... WORK IN ACCORDANCE WITH 2008 NEC (AIRPORT TERMINAL)
- PermitSuppression
Permit 854181 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 851109 · COMPLETED
PROVIDE DATA OUTLETS PER 2008 NEC (AIRPORT)
- PermitPlumbing
Permit 847658 · COMPLETED
INSTALL NEW FLOOR SINKS, SINKS, GREASE TRAP, WATER HEATER, COFFEE BREWER, DIPPER WELL AND PRE RINSE.THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitDemolition
Permit 851740 · COMPLETED
EZ INTERIOR DEMOLITION-DRYWALL COLUMN COVERS AS PER PHL-AD1-01-01 FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. TERMINAL D 8500 ESSINGTON AVE UNITED TECH OPS BREAK ROOM
- PermitMajor alteration
Permit 849985 · COMPLETED
LEVEL II ALTERATION FOR FIT OUT OF SPACE E8B FOR NEW TENANT PURSUANT TO DRAWINGS ATTACHED. ** SEPARATE PERMITS REQUIRED FOR M.E.P.S.**
- PermitPlumbing
Permit 827221 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; SPACE C12B; RESTAURANT (STARBUCKS); 3-FLOOR SINKS, 1-MOP SINK, GREASE TRAP, 1-RINSE SINK, 2-HAND SINKS AND 1-WATER HEATER -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitMajor alteration
Permit 845752 · COMPLETED
INTERIOR RENOVATIONS TO EXISTING SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING AND MECHANICAL WORK.**
- PermitMechanical
Permit 847590 · COMPLETED
HVAC INSTALLATION INCLUDING DUCTWORK AS PER PLANS.
- PermitElectrical
Permit 847139 · COMPLETED
INSTALL 1 NEW 150AMP PANEL, FURNISH & INSTALL NEW BRANCH CIRCUITRY & LIGHTING FOR TENANT SPACE, INSTALL & PROVIDE POWER TO NEW KITCHEN & MISC EQUIPMENT,9 CAT6 DATA LONGEST DROPS 30' AS PER 2008 NEC (WEST DISTRICT) ROUGH IN EXCLUDES ANSEL SYSTEM NO SUPPRESSION OR MECHANICAL PERMIT ON FILE
- PermitElectrical
Permit 842938 · COMPLETED
PHL AIRPORT-TERMINAL E CONCOURSE SPACE FIRE ALARM FIT OUT,RELOCATE EXISTING AND INSTALL NEW FIRE ALARM EQUIPMENT,RECONNECT TO EXISTING FIRE ALARM AIRPORT SYSTEM AS PER NFPA72
- PermitElectrical
Permit 840813 · COMPLETED
INSTALL CONDUIT AND WIRE FOR INSTALLATION OF FIRE ALARM SYSTEM EXPANSION BY ADDING HORNS AND STROBES TO AN EXISTING SYSTEM AS PER NFPA72
- PermitMechanical
Permit 847588 · COMPLETED
HVAC INSTALLATION INCLUDEING DUCTWORK PER PLANS.
- PermitNew Construction
Permit 848130 · Expired
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.
- PermitMajor alteration
Permit 842360 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING UNITED AIRLINES CLUB IN TERMINAL 'D' OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitPlumbing
Permit 828254 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; AIRPORT; RESTAURANT LOUNGE; FLOOR DRAINS, FLOOR SINKS, WATER HEATERS, GREASE TRAP, CLEAN OUTS, SINKS, SHOWER, DISHWASHER, RANGE, BACKFLOW PREVENTER-THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitSuppression
Permit 847852 · COMPLETED
INSTALL ONE ANSUL R102 PER UL 300. FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitElectrical
Permit 846644 · COMPLETED
INSTALL 4- NEW BATTERY CHARGERS ON JET BRIDGES... PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 846171 · COMPLETED
INSTALL 12- 2 X 2 LED FIXTURES TO REPLACE EXISTING. INSTALL 6- OCCUPANCY SENSOR SWITCHES TO REPLACE EXISTING TOGGLE SWITCHES.... IN ACCORDANCE WITH 2008 NEC (AIRPORT OFFICE)
- PermitElectrical
Permit 831221 · COMPLETED
RESTAURANT FIT OUT INSTALL NEW PANEL, LIGHTING CIRCUITRY, GENERAL PURPOSE CIRCUITRY AND KITCHEN EQUIPMENT POWER, 32 CAT6 DROPS AVERAGE RUN 125' AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 845200 · COMPLETED
RESTORE POWER TO EXISTING LIGHTS AND RETROFIT TO LED (7- LIGHTS)... PER 2008 NEC (CATERING BUSINESS IN AIRPORT)
- PermitMajor alteration
Permit 844262 · COMPLETED
LEVEL II ALTERATION FOR INTERIOR FITOUT OF EXISTING RETAIL SPACE ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.**
- PermitElectrical
Permit 846120 · COMPLETED
REPLACE (6)2X2 LAYIN FIXTURES WITH NEW 2X2 LED FIXTURES,RELAMP (4)6" RECESSED FIXTURES AND INSTALL (5)NEW PENDANT FIXTURES IN EXISTING CEILING,NEW WIRING TO BE INSTALLED BY FISHING MC CABLE IN CEILING,ALL BRANCH WIRING TO BE AS PER 2008 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 832328 · Completed
FIT OUT - INSTALL NEW 150 AMP PANEL, NEW 200AMP PANEL, LIGHTING CIRCUITY, GENERAL PURPOSE CIRCUITY, KITCHEN EQUIPMENT POWER & COMMUNICATION DATA 14 CAT6 DROPS AVERAGE RUN 125' AS PER NEC 2008 WEST DISTRICT
- PermitSuppression
Permit 845764 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATING (6) SPRINKLERS IN THE PHILADELPHIA INTERNATIONAL AIRPORT, LA COLUMBE-2ND FLOOR SPACE B4C.FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitDemolition
Permit 845155 · COMPLETED
EZ INTERIOR DEMOLITION-INTERIOR DEMOLITION OFFICE SPACE FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitAdministrative
Permit 833932 · COMPLETED
AMEND PERMIT #612907. INCLUDE ALTERATION OF SPACE FOR RSERVICE ANIMAL RELIEF AREA. FINISHES OF TILE, ARTIFICIAL TURF. INSTALLATION OF CEILING, WALLS, TOILET ACCESSORIES AS PER PLAN.
- PermitElectrical
Permit 826273 · COMPLETED
INSTALL LIGHTS SWITCHES WIRING AND CONDUITS FOR RECEPTACLES AND EQUIPMENT INSTALL CONDUIT AND CABLE FOR POS AND CAMERAS INSTALL NEW 100A SUB PANEL AS PER NEC 2008 & FIRE ALARM INSTALL 1 FIRE ALARM PANEL 1 AMBER STROBE, PULL STATION, CEILING STROBE & WALL STROBE AS PER NFPA 72
- PermitPlumbing
Permit 830086 · COMPLETED
INSTALL 1 3COMPARTMENT SINK WITH GREASE TRAP, 2 HAND SINKS, 1 PREP SINK, 1 MOP SINK, 4 FLOOR SINKS AND 1 50 GAL WATER HEATER
- PermitNew Construction
Permit 840525 · Expired
FOR THE INSTALLATION OF ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD AS PER PLANS. SEPARATE PERMIT REQUIRED FOR FIRE SUPPRESSION SYSTEM.
- PermitElectrical
Permit 835957 · COMPLETED
INSTALL PANEL AND CONNECTION TO EXISTING FEEDER, LIGHTS, SWITCHES, RECEPTACLES, TELE/DATA DEVICES AND SPEAKERS.AS PER 2008 NEC. INSTALL FIRE ALARM DEVICES AS PER NFPA 72.
- PermitZoning/use
Permit 842682 · COMPLETED
FOR THE INSTALLATION OF TWO (2) UNDERGROUND FUEL STORAGE TANKS (WITHIN THE SPECIAL HAZARD FLOOD AREA), ON THE HERTZ RENTAL LOT AT PHILADELPHIA INTERNATIONAL AIRPORT, SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION. TANKS ACCESSORY TO PERSONAL VEHICLE SALES AND RENTAL AND AIRPORT FACILITIES.
- PermitNew construction
Permit 814575 · EXPIRED
FOR THE INSTALLATION OF TWO (2) NEW 20,000 GALLON UNDERGROUND FUEL STORAGE TANKS (WITHIN THE FLOOD PLAIN), ON THE HERTZ RENTAL LOT AT PHILADELPHIA INTERNATIONAL AIRPORT, AS PER PLANS; ALL WORK TO BE IN ACCORDANCE WITH PADEP REGULATIONS AND NFPA 30/31; SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL/PLUMBING WORK; CERTIFICATE OF COMPLETION FROM THE LICENSED CONTRACTOR MUST BE SUBMITTED UPON COMPLETE OF THE INSTALLATION INDICATING FULL COMPLIANCE WITH APPLICABLE CODES, STANDARDS AND MANUFACTURER'S INSTRUCTIONS TO PADEP.
- InvestigationBP_BLDG
Case 611800 · PASSED
The cited inspection visit was marked passed.
- PermitElectrical
Permit 826271 · COMPLETED
INSTALL LIGHTS SWITCHES WIRING AND CONDUITS FOR RECEPTACLES AND EQUIPMENT INSTALL CONDUIT AND CABLE FOR POS AND CAMERAS INSTALL NEW 80A ELECTRICAL PANEL EXTEND EXISITING FEEDERS TO NEW PANEL LOCATION AS PER NEC 2008 & FIRE ALARM INSTALL 1 STROBE 1 AMBER STROBE AND 1 SPEAKER AS PER NFPA 72
- PermitNew Construction
Permit 837529 · Issued
INSTALLATION OF SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13. INSTALLING (108) SPRINKLERS IN THE TERMINAL B WALKTHROUGH AND FOOD COURT AS PER THE SUBMITTED DRAWINGS AND CALCS.
- PermitSuppression
Permit 839383 · COMPLETED
WE WILL BE RELOCATING 8 SPRINKLERS IN 2ND FLOOR TERMINAL E CONCOURSE - EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 831222 · COMPLETED
RESTAURANT FIT OUT INSTALL NEW PANEL, LIGHTING CIRCUITRY, GENERAL PURPOSE CIRCUITRY AND KITCHEN EQUIPMENT POWER, 16 CAT6 DROPS AVERAGE RUN 125' AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 793058 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL SPACE BC31 IN THE B/C CONNECTOR OF AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitSuppression
Permit 834430 · COMPLETED
INSTALLATION OF FIRE SPRINKLER SYSTEM FROM EXISTING 4-INCH FEED IN ACCORDANCE WITH NFPA 13.(51) SPRINKLERS
- PermitElectrical
Permit 826005 · COMPLETED
ELECTRICAL INSTALL 1 NEW PANEL, F & I NEW BRANCH CIRCUITRY POWER AND LIGHT FOR TENANT SPACE, INSTALL 8-CAT6 DATA DROPS LONGEST RUN 55' AS PER NEC 2008 WEST DISTRICT & FIRE ALARM EXISTING CONTROL PANEL AS PER NFPA72
- PermitElectrical
Permit 835406 · COMPLETED
CHANGE APPROXIMATELY 30- EXISTING 2X4 FLUORESCENT LIGHTS TO LED LIGHTS... PER 2008 NEC (AIRPORT)
- PermitNew Construction or Additions
Permit 814348 · Issued
ALTERATIONS;INTERIOR PLUMBING;RESTAURANT AT SPACE # BC09 AS PART OF EXISTING AIRPORT; WATER HEATER - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitPlumbing
Permit 808821 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; AIRPORT;SPACE E6B - LA COLUMBE; 2 FLOOR SINKS, 2 HARD SINKS, 1 HUB DRAIN, 1 GREASE TRAP, 1 WATER HEATER - THE INSTALLATION WILL COMPY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitElectrical
Permit 826994 · COMPLETED
INSTALL CONDUIT ABD WIRE FOR NEW LIGHT FIXTURES WIRING DEVICES AND INSTALL CONDUIT AND WIRE FOR CCTV SYSTEM AND ROUGH IN ACCESS CONTROL SYSTEM RELOCATE EXISTING PANEL BOARDS AND INSTALL NEW PANEL BOARDS AND TRANSFORMER AS PER NEC 2008 WEST DISTRICT
- PermitAdministrative
Permit 833096 · COMPLETED
TO AMEND PLUMBING PERMIT#827092 TO INCLUDE PLANS TO SHOW NEW WHY CONNECTION FOR THE SPRUNG FACILITY AT AMERICAN AIRLINES.
- PermitMechanical
Permit 827094 · COMPLETED
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. WORK TO BE COMPLETE IN BUSINESS OCCUPANCY WITH AIRPORT FACILITY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESGIN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR PLUMBING AND ELECTRICAL WORK.
- PermitElectrical
Permit 834669 · COMPLETED
INSTALL 2- FLOOR OUTLETS.... IN ACCORDANCE WITH 2008 NEC (AIRPORT)
- PermitElectrical
Permit 826272 · COMPLETED
INSTALL LIGHTS SWITCHES WIRING AND CONDUITS FOR RECEPTACLES AND EQUIPMENT INSTALL CONDUIT AND CABLE FOR POS AND CAMERAS INSTALL NEW 100A ELECTRICAL PANEL EXTEND EXISITING FEEDERS TO NEW PANEL LOCATION AS PER NEC 2008 & FIRE ALARM INSTALL 1 STROBE 1 AMBER STROBE AND 1 SPEAKER AS PER NFPA 72
- PermitElectrical
Permit 824922 · COMPLETED
DISCONNECT WIRING FOR SIGNS, LIGHTS, ANTIENNAS AND HVAC EQUIPMENT, RE CONNECT AFTER COMPLETION OF NEW ROOF AS PER 2008 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 831055 · Completed
HVAC INSTALLATION INCLUDES MECHANICAL AND DUCTWORK. ** SEPARATE PERMIT IS REQUIRED FOR PLUMBING, COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM AND ELECTRICAL WORK.**
- PermitNew Construction
Permit 831062 · Completed
INSTALL TWO (2) COMMERCIAL EXHAUST HOODS SYSTEM PER PLANS.
- PermitSuppression
Permit 832999 · COMPLETED
FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitSuppression
Permit 829641 · COMPLETED
INSTALLATION OF SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13. (18) SPRINKLERS IN PHILADELPHIA INTERNATIONAL AIRPORT, GSE SHOP EXPANSION, E SPRUNG STRUCTURE AS PER PLAN.
- PermitSuppression
Permit 828360 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 832348 · COMPLETED
FIBER INTERCONNECTION CONNECTING SPACE BC 26AB AND C12B WITH 6 STRAND SINGLE MODE FIBER, 1-CABLE 100' AS PER NEC 2008 WEST DISTRICT
- PermitPlumbing
Permit 829610 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; AIRPOR, TERMINAL D; SERVICE ANIMALS RELIEF STATION (SARA) RESTROOM; HOSE BIBBS, FLOOR DRAINS & LAVATORY; PLASTIC PIPING PROHIBITED IN THIS OCCUPANY PER SECTIONS P902.5, P1005.5 & P1102.3 PPC; CODE BULLETIN 901 R3 -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- ViolationUNAPPROVED MAT'L ETC
Case 611800 · Violation 4505855 · Code A-203.1/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- InvestigationBP_BLDG
Case 611800 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitElectrical
Permit 813335 · COMPLETED
INSTALL WIRE GATE INFORMATION DISPLAYS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 827797 · COMPLETED
FURNISH AND INSTALL ELECTRICAL AND DATA FOR AVTEC UPGRADES AND RAMP TOWERS
- PermitPlumbing
Permit 823767 · COMPLETED
RESTUARANT FIT OUT WITH 31 PLUMBING FIXTURES WITH PIPING IN TERMINAL B . THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUMBING CODE 2004
- PermitMajor alteration
Permit 824711 · COMPLETED
RENOVATION OF EXISTING SHOP, INCLUDING NEW FLOORING, MILLWORK, CEILING TILES AS PER PLAN.
- PermitPlumbing
Permit 827092 · COMPLETED
INSTALL 10 PLUMBING FIXTURES WITH PIPING FOR THE SPRUNG FACILITY AT AMERICAN AIRLINES - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitElectrical
Permit 821291 · COMPLETED
INSTALL 1 PANEL 9 TRACK LIGHT HEADS 1 TIME CLOCK 6 RECEPTACLES 1 TELE DATA JACK AND 3 CCTV DATA CAMERAS
- PermitElectrical
Permit 828357 · COMPLETED
INSTALL NEW 40A PANEL AND CONNECT TO EXISTING FEEDER, 15- LED SHELF LIGHT CONNECTIONS, 5- RECEPTACLES, 1- SIGN CIRCUIT, 1- TELE/DATA OUTLET... IN ACCORDANCE WITH 2008 NEC (AIRPORT-CNBC KIOSK)
- PermitSuppression
Permit 829568 · COMPLETED
INSTALL ONE ANSUL R 102 UL 300-EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 824282 · COMPLETED
RELOCATING 1-FIRE ALARM PULL STATION AND 1-STROBE,PROVIDE 1-NEW FIRE ALARM STROBE LIGHT DEVICE AND 1-CEILING SPEAKER,VOICE,DATA,POS,SECURITY,CCTV,TV CONDUITS,BOXES,WIRES,PULL STRINGS AS PER NFPA72
- PermitMechanical
Permit 819503 · COMPLETED
FOR ALTERATIONS TO AN EXISTING STRUCTURE TO INCLUDE NEW DIFFUSER/GRILL/REGISTER INSTALLATIONS AND ASSOCIATED DUCTWORK.
- PermitMechanical
Permit 819506 · COMPLETED
FOR ALTERATIONS TO AN EXISTING STRUCTURE TO INCLUDE NEW DIFFUSER/GRILL/REGISTER INSTALLATIONS AND ASSOCIATED DUCTWORK.
- PermitNew Construction
Permit 823903 · Issued
HVAC INSTALLATION INCLUDES DUCTWORK AS PER PLAN.
- PermitMajor alteration
Permit 823408 · COMPLETED
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR RENOVATIONS TO AN EXISTING LOUNGE AREA AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- PermitMechanical
Permit 824071 · COMPLETED
INTERIOR MEHCANICAL DEMOLITION WORK. MECHANICAL WORK TO INCLUDE REGISTERS/DIFFUSURES, DUCTWORK, KITCHENHOOD, EXHAUST FAN, AND ALL OTHER WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL AND PLUMBING WORK.
- PermitMechanical
Permit 823908 · COMPLETED
INSTALLATION OF TWO (2) UL 710 LISTED COMMERCIAL KITCHEN EXHAUST HOODS IN SPACE B10 OF AN EXISTING AIRPORT FACILITY WITH DUCTWORK TIE IN TO TWO (2) EXHAUST FANS AND ONE (1) MAKE UP AIR FAN AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR HOOD SUPPRESSION SYSTEM INSTALLATION**
- PermitMajor alteration
Permit 822896 · COMPLETED
LEVEL II ALTERATIONS FOR TENATN FIT-OUT INTERIOR ALTERATIONS AS PER BUILDING PLANS. RETAIL SALE OF CONSUMER GOODS (REMODEL EXISTING, NO CHANGE IN USE.
- PermitMechanical
Permit 825888 · COMPLETED
HVAC INSTALLATION FOR TENANT FIT-OUT. ** SEE A/P 822896 FOR PLAN **
- PermitElectrical
Permit 825726 · COMPLETED
INSTALL 8- CAT6 CABLES TO WI-FI ACESS POINTS... IN ACCORDANCE WITH 2008 NEC (AIRPORT)
- PermitMechanical
Permit 825183 · COMPLETED
HVAC INSTALLATION FOR TENANT FITOUT AS PER PLAN.
- PermitMajor alteration
Permit 820840 · COMPLETED
FITOUT FOR NEW TENANT (SUBWAY) AS PER PLANS. ** SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND PLUMBING WORK **.
- PermitMajor alteration
Permit 816888 · COMPLETED
RENOVATION OF AN EXISTING SPRUNG STRUCTURE TO PROVIDE FACILITY FOR LIGHT MAINTENACE OF VEHICHLES. THIS PROJECT WILL RENOVATE THE STRUCTURE FOR AMERICAN AIRLINES TO PROVIDE VEHICLE MATIENCE FACILITES ALONG WITH ASSICATED PERSONAL AND PARTS STORAGE SPACE. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S. AND EXTERIOR SIGNS **
- PermitElectrical
Permit 824262 · COMPLETED
INSTALL 4- 1X4 SURFACE MOUNTED LED LIGHT FIXTURES.... IN ACCORDANCE WITH 2008 NEC (AIRPORT)
- PermitElectrical
Permit 817216 · COMPLETED
REPLACE EXISTING FIRE ALARM CONTROL PANELS,EXTEND NEW 120V BRANCH POWER TO FACP PANELS AND REPLACE EXISTING CO/NOX GAS MONITORING SYSTEM AS PER NFPA72
- PermitElectrical
Permit 822671 · COMPLETED
INSTALL 6-LED 4" VAPOR TIGHT CHANNEL FIXTURE AND INSTALL 1-GFI RECEPTACLES AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 813977 · COMPLETED
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION IN EXISTING SPACE SPACE C12B. INTERIOR ALTERATIONS TO CREATE A TAKE RESTAURANT (STARBUCKS) AS PER APPROVED PLANS. SEPERATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- PermitMechanical
Permit 815921 · COMPLETED
FOR THE INSTALLLATIN OF A MECHANICAL SYSTEM TO INCLUDE REGISTERS/DIFFUSERS, DUCTWORK, EXHAUST FAN. SEPARATE PERMIT REQUIRED FOR HITCHEN HOOD AND KITCHEN HOOD EXHAUST DUCT TO TIE INTO EXHAUST FAN.
- PermitRoof Covering Replacement
Permit 813249 · Completed
EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Exiting Roofs as per attached standard. Deviations from these standards require submission of construction and site plans.
- PermitSuppression
Permit 819969 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 821838 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATING (6) SPRINKLER HEADS IN PHILADELPHIA INTERNATIONAL AIRPORT, PGA TOUR SPACE #BC28B
- PermitMechanical
Permit 814416 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM INCLUDING REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK AS PER APPROVED PLANS.
- PermitPlumbing
Permit 820497 · COMPLETED
INSTALL 5" HOUSE DRAIN WITH TRAP
- PermitAddition and/or Alteration
Permit 815695 · Expired
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) TO REPLACE PASSENGER BOARDING BRIDGES (ON EXISTING FOUNDATIONS) FOR GATES B1, B4, B5, C17, C21, C25, D9 & E4 WITHIN AN EXISTING AIRPORT FACILITY TO INCLUDE REPLACEMENT OF EXISTING ACCESS DOORS TO THE JETWAY BRIDGES AS PER APPROVED PLANS. EXISTING AIRPORT FACILITY FULLY SPRINKLERED. **SEPARATE PERMIT REQUIRED FOR ANY MEP WORK**
- PermitMajor alteration
Permit 818189 · COMPLETED
REPAIR WINDOW & WALL IN TERMINAL B - GATE 13 AS PER PLANS.
- PermitAddition and/or Alteration
Permit 812956 · Completed
LEVEL II ALTERATION INCLUDES DEMOLISH EXISTING FACILITIES AND CONVERT THE SPACE INTO A WALKTHROUGH RETAIL MARKET, COFFEE SHOP, QUICK SERVE FOOD SERVICE AND CANDY DISPENSORY.** SEPARATE PERMIT IS REQUIRED FOR M.E.PS.S **
- PermitAddition and/or Alteration
Permit 812961 · Issued
DEMOLISH EXISTING FACILITIES AND CONVERT THE SPACE INTO A FULL RESTAURANT. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S **
- PermitMajor alteration
Permit 808955 · COMPLETED
LEVEL II ALTERATIONS FOR RENOVATIONS OF AN EXISTING AIRPORT STORAGE SPACE TO ACCOMODATE PROPOSED AIRPORT MEDITATION ROOM. LOCATED ON 2ND FLOOR CONCORSE BETWEEN TERMINAL D AND E.** SEPARATE PERMITS REQUIRED FOR M.E.P.S.**
- PermitZoning/use
Permit 774191 · COMPLETED
FOR THE ERECTION OF A DETACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION; NO CHANGE IN HEIGHT OR AREA OF OTHER DETACHED STRUCTURE WITHIN LEASE AREA. FOR USE AS TWO (2) NON-ACCESSORY CARPORT PARKING SPACES WITH NO CHANGES TO EXISTING USE AS AIRPORT FACILITIES (RENTAL CAR AGENCY) OR OTHER NON-ACCESSORY SURFACE PARKING SPACES.
- PermitNew construction
Permit 774192 · COMPLETED
FOR THE ERECTION OF A NEW CARPORT WITH ROOM FOR TWO (2) NON-ACCESSORY PARKING SPACES LOCATED WITHIN THE AVIS BUDGET GROUP LEASE AREA, AS PER PLANS; NO OTHER WORK ON THIS PERMIT; NO SIGNS ON THIS PERMIT.
- PermitNew Construction
Permit 814340 · Issued
INSTALLATION OF TWO (2) UL 710 LISTED CAPTIVE AIRE KITCHEN EXHAUST HOODS IN SPACE BC09 OF AN EXISTING AIRPORT FACILITY WITH TIE IN TO ONE (1) EXHAUST FAN AND ONE (1) MAKE UP AIR FAN LOCATED ON THE ROOF AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR KITCHEN HOOD EXTINGUISHING SYSTEM**
- PermitNew Construction
Permit 814326 · Issued
ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW TAKE OUT RESTAURANT TENANT IN SPACE BC09 IN AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS. *SEE PERMIT 814340 FOR KITCHEN EXHAUST HOOD INSTALLATION*
- PermitElectrical
Permit 819000 · COMPLETED
FURNISH AND INSTALL 3 NEW DEDICATED QUAD OUTLETS AND 1 NEW PLUG MOLD CHARGE STATION VIA EXISTING PANEL PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 811183 · COMPLETED
REPLACE 7 PARKING LOT POLE FIXTURES WITH 8 NEW LED FIXTURES RUN NEW WIRING TO FIXTURES AS PER PLANS
- PermitElectrical
Permit 810940 · COMPLETED
INSTALL PANELS, LIGHTS,SWITCHES, RECEPTS, HVAC EQUIPMENT WIRING, TELE/DATA DEVICES AS PER 2008 NEC (WEST DISTRICT) INSTALL FIRE ALARM SYSTEM & DPEAKERS AS PER 2 NFPA72
- PermitElectrical
Permit 809845 · COMPLETED
DEMO EXISTING LIGHTING PER ATTACHED PLANS. FURNISH AND INSTALL NEW LIGHTING AND BASEBOARD HEAT UNITS. RELOCATE 1 EXISTING SMOKE DETECTOE FURNISH AND INSTALL 1 UDIBLE VISUAL DEVICE.
- PermitPlumbing
Permit 807475 · COMPLETED
TIE IN NEW 3" WASTE LINE INTO A EXISTING 6" WASTE LINE FOR A NEW MOP SINK (AIRPORT)THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitMechanical
Permit 807474 · COMPLETED
HVAC AND DUCTWORK
- PermitElectrical
Permit 813092 · COMPLETED
RELOCATE EXISTING ELECTRICAL PANEL,INSTALL NEW OUTLETS AND LIGHTS IN SPACE AS PER 2008 NEC (WEST DISTRICT) REPLACE OR REUSE EXISTING FIRE ALARM DEVICES,TEST AND CERTIFY THE SYSTEM AS PER NFPA 72
- PermitSuppression
Permit 815805 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitPlumbing
Permit 811442 · COMPLETED
DIRECT REPLACEMENTS 11 WC 14 LAVS 10 URINALS 10 SHOWERS 3 CLEANOUT 6 FLOORS DRAINS ONLY 2 LAVS NEEDS WATER AND WASTE AS PER PLAN PER PHILADELPHIA 2004 PLUMBING CODE.
- PermitElectrical
Permit 805189 · COMPLETED
RENOVATION OF BREAKROOMS IN TERMINAL B AND TERMINAL C TO INCLUDE WIRING OF VARIOUS ELECTRICAL DEVICES AS PER 2008 NEC (WEST DISTRICT)
- PermitUse
Permit 811815 · COMPLETED
FOR A TAKE-OUT RESTAURANT AT SPACE # BC09 AS PART OF EXISTING AIRPORT ON THE SAME LOT WITH ALL OTHER USES AS PREVIOUSLY APPROVED.NO SIGN ON THIS APPLICATION.
- PermitElectrical
Permit 808758 · COMPLETED
NEW LIGHTING CONTROL PADDLE FANS RECEPTACLES BAR EQUIPMENT WIRING EXISTING SUB PANEL WITH NEW BREAKERS VOICE DATA POS SECURITY CCTV TV CONDUITS BOXES WIRES PULL STRINGS AS PER PLANS PER 2008 NEC.
- PermitMajor alteration
Permit 807041 · COMPLETED
LEVEL II ALTERATION TO SPACE BC 14 AS PER PLANS.** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S **
- PermitElectrical
Permit 805188 · COMPLETED
FURNISH AND INSTALL NEW FIRE ALARM DEVICES LIKE HORNS,STROBES,SMOKES,LIGHTS AND PULLSTATIONS IN RENOVATED AREA AS PER NFPA 72
- PermitSuppression
Permit 806622 · COMPLETED
INSTALLATION OF 19 SPRINKLERS IN NOOBAR CONCESSION SPACE B8 AS PER PLAN.
- PermitNew Construction
Permit 806586 · Issued
FOR INSTALLATION OF A COMMERCIAL KITCHEN EXHAUST HOOD AS PER PLANS.
- PermitUse
Permit 811184 · COMPLETED
PROPOSED USE;MERCHANTILE RETAIL SALES IN AIRPORT TERMINAL
- PermitSuppression
Permit 811195 · COMPLETED
INSTALL UL 300 3 GALLON ANSUL SYSTEM.FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
- PermitSuppression
Permit 810841 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.RELOCATE 9 SPRINKLERS IN MAC SPACE 14B
- PermitMechanical
Permit 796200 · COMPLETED
FABRICATE AND INSTALL ALL BARE GALVANIZED DUCT WORK. FURNISH LABOR TO INSTALLL DISPLAY CASE AND CONDENSER. FINISH AND INSTALL ALL REFRIDGERANT PIPING.
- PermitAddition and/or Alteration
Permit 806680 · Issued
LEVEL II ALTERATION TO VACANT TENANT SPACE WITHIN AN AIRPORT COMPLEX AS PER PLAN. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 798647 · COMPLETED
NEW LIGHTING LIGHTING CONTROL PADDLE FANS RECEPTACLES BAR EQUIPMENT POWER WIRING NEW SUB PANEL BREAKERS 60A FEEDER VOICE DATA POS SECURITY CCTV TV CONDUITS BOXES WIRES PULL STRINGS AS PER PLANS PER 2008 NEC
- PermitElectrical
Permit 781469 · COMPLETED
INSTALL FIRE ALARM DEVICERS AS PER NFPA 72 & INSTALL LIGHTS FIXTURES, WIRING DEVICES, AUDIO AND SECURITY WIRING AS PER NEC 2008 WEST DISTRICT
- PermitMajor alteration
Permit 805309 · COMPLETED
LEVEL II ALTERATION FOR FITOUT OF SPACE D12 IN TERMINAL D FOR DUTY FREE SHOP AS PER PLAN.
- PermitAdministrative
Permit 805556 · COMPLETED
TCO FOR TERMINAL D & E & BAGGAGE CLAIM AREA
- PermitMechanical
Permit 802567 · COMPLETED
ADD 3/4" TEE,NIPPLE AND SHUT VALVE FOR SECOND FRYER IN SPACE C9-B - TERMINAL 'C' - PHIL - FUEL GAS PIPING ONLY. THE INSTALLATION SHALL COMPLY WITH THE INTERNATIONAL MECHAINCAL CODE, 2009 AND THE INTERNATIONAL FUEL GAS CODE, 2009.
- PermitElectrical
Permit 796396 · COMPLETED
RENOVATION OF CLASSROOM, INCLUDING LIGHTING, RECEPTS, AND TELECOM WIRING AS PER 2008 NEC (WEST DISTRICT) NO FIRE ALARM ON THIS PERMIT
- PermitMajor alteration
Permit 775743 · COMPLETED
LEVEL II ALTERATION FOR TENANT FIT-OUT AS PER BUILDING PLANS.
- PermitMajor alteration
Permit 775741 · COMPLETED
LEVEL II ALTERATION FOR TENANT FIT-OUT AS PER BUILDING PLANS.
- PermitNew Construction
Permit 799205 · Issued
INSTALLING AN AUTOMATIC CLEAN AGENT FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 2001 AND PLANS.*SEPARATE ELECTRICAL PERMIT IS REQUIRED*
- PermitMajor alteration
Permit 775689 · EXPIRED
FOR LEVEL II ALTERATIONS TO REPLACE EXISTING KIOSK FOR THE RETAIL SALE OF CONSUMER GOODS IN AN EXISTING AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitAlterations
Permit 804164 · Issued
RELOCATE EXISTING VENT PIPING 4' 4" NO HUB PIPE AND INSTALL ONE FIXTURE AS PER PHILADELPHIA PLUMBING CODE.
- PermitElectrical
Permit 791143 · COMPLETED
INSTALL NEW FIRE ALARM SYSTEM INCLUDING 1FACP 1 SMOKE DETECTOR 1 PULL STATION 2 STROBES CONNECTION TO ANSUL SYSTEM FOR MONITORING AND DEMO OF OLD FIRE ALARM SYSTEM AS PER NFPA 72
- PermitElectrical
Permit 803436 · COMPLETED
ELECTRICAL DISCONNECT EXISTING 120VOLT POWER FROM BOARDING PASS KIOSK.USE EXISTING FEED TO POWER NEW RECEPTACLES ON NEW COUNTERTOP THAT IS REPLACING THE BOARDING PASS KIOSK PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 789886 · COMPLETED
LEVEL II ALTERATION INCLUDE RENOVATIONS TO SPACE C31 TO EXPAND SEATING AREA IN EXISTING RESTAURANT
- PermitMechanical
Permit 799210 · COMPLETED
INSTALLATION OF NEW GAS LINES TO THREE (3) TENANT SPACES WITHIN AN EXISTING AIRPORT FACILITY WITH TIE INTO EXISTING 3" GAS MAIN AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR PLUMBING WORK**
- PermitSuppression
Permit 801823 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WIL BE RELOCATING (6) SPRINKLERS IN CHICKIE & PETE'S SPACE E5C
- PermitMajor alteration
Permit 797588 · COMPLETED
INTERIOR ALTERATION INCLUDES REPLACEMENT OF FLOOR TILE AND WALL BASES. REPLACEMENT OF SELECTIVE AREAS OF WALL TILE FOR WORK PERMFORMED WITHIN PHILADELPHIA COUNTY.
- PermitElectrical
Permit 799953 · COMPLETED
DEMOLISH 10- T12 LIGHT FIXTURES, INSTALL 10- LED LIGHT FIXTURES... IN ACCORDANCE WITH 2008 NEC (AIRPORT)
- PermitSuppression
Permit 799472 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.(ADD 3 GALLON TANK TO EXISTING. 3 GALLON SYTEM MAKING IT A 6 GALLON ANSUL SYSTEM)
- PermitPlumbing
Permit 799019 · COMPLETED
REPLACING 6 FIXTURES ONLY, 2 WATER CLOSETS, 2 LAVATORIES, 2 DRINKING FOUNTAIN AND 1 KITCHEN SINK WITH NO ADDITIONAL PIPING.THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitUse
Permit 798662 · COMPLETED
FOR THE EXPENSION OF SPACE# C31 ( SIT-DOWN RESTAURANT) FROM SPACE # C30 ( 479 SF )(FLIGHT WAITING AREA) (TOTAL GFA 2,062 SF ) FOR AN EXISTING EATING AND DRINKING ESTABLISHMENTS AT SPACE# C31 ON THE SAME LOT WITH ALL OTHER USES AS PREVIOUSLY APPROVED. NO SIGN ON THIS APPLICATION.
- PermitNew Construction
Permit 790732 · Completed
EXISTING PANEL BOARDS TO REMAIN, FURNISH AND INSTALL NEW BRANCH CIRCUITRY, AND PENDANT LIGHTING FOR NEW GATEROOM SEATING B1 TO B8, INSTALL CAT6 TO EACH NEW TABLE AND ACCESS POINT (65 - DROPS WITH AN AVERAGE RUN OF 155 FT AS PER 2008 NEC (WEST DISTRIC
- PermitPlumbing
Permit 793634 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; AIRPORT; TERMINAL B SPACE B8; RESTAURANT - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 779913 · Violation 4550458 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitElectrical
Permit 793780 · COMPLETED
RESTAURANT FIT OUT INSTALL NEW PANEL LIGHTING CIRCUITRY GENERAL PURPOSE CIRCUITRY AND KITCHEN EQUIPMENT POWER 28 CAT 6 DROPS AVERAGE RUN APPRX 125' FOR COMMUNICATIONS PER 2008 NEC (RESTAURANT)INSTALL FA DEVICES PER NFPA 72
- PermitElectrical
Permit 796862 · COMPLETED
REPLACEMENT OF KIND WITH NO ADDITIONAL WIRING 215-LIGHTS THROUGHOUT CONCOURSE B - ONE FOR ONE REPLACEMENTS AS PER NEC 2008 WEST DISTRICT
- PermitSuppression
Permit 795625 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitAddition and/or Alteration
Permit 791645 · Issued
LEVEL II ALTERATION INCLUDES REMOVAL OF EXISTING COUNTER TOPS, DOOR PANELS, WALL PARTITIONS. INSTALLATION OF NEW PARTITIONS, FLOORS. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S.***
- PermitPlumbing
Permit 755184 · COMPLETED
ALTERATION: INTERIOR PLUMBING; SIT DOWN RESTAURANT SPACE IN TERMINAL D SPACE 11 -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitElectrical
Permit 788759 · COMPLETED
ELECTRICAL: EXISTING PANELBOARDS TO REMAIN,FURNISH AND INSTALL NEW BRANCH CIRCUITRY,POWER AND PENDANT LIGHT FOR NEW GATE ROOM SEATING B9,B10,B11 AND B13 PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 770095 · COMPLETED
DEMO ALL EXISTING CONDUITS AND DEVICES. RELOCATE EXISTING ELECTRICAL PANEL. INSTALL ALL LIGHT FIXTURES. INSTALL ALL POWER FOR RECEPTACLES AND EQUIPMENT. INSTALL LIGHTING CONTRACTOR. INSTALL CONDUIT AND CABLE FOR CAMERAS AND POS EQUIPMENT AS PER 2008 NEC. PROVIDE AND INSTALL FIRE ALARM AND TIE INTO EXISTING SYSTEM AS PER NFPA 72.
- PermitMechanical
Permit 785559 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM WITHIN AIRPORT CONCOURSES D & E TO INCLUDE ASSOCIATED DUCTWORK, HOT WATER PIPING AND REFRIGERANT PIPING AS PER APPROVED PLANS.
- PermitElectrical
Permit 773368 · COMPLETED
RUN POWER TO 111 LED SIGNS AS PER SEALED ELECTRICAL DRAWINGS AND NEC 2008 (WEST DISTRICT)
- PermitSuppression
Permit 774750 · COMPLETED
FOR ALTERATIONS OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 2007, STANDARD 13 TO A ELEVATOR MACHINE ROOM CONNECTED TO A PREACTION SERVICE SYSTEM WITH PRIVATE SERVICE LINES
- PermitSuppression
Permit 786754 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 779421 · COMPLETED
INSTALL POWER FOR RECEPTACLES AND EQUIPMENT, INSTALL LIGHT LIGHT FIXTURES, INSTALL CONDUIT AND CAT6 CABLES FOR CAMERAS AND POS EQUIPMENT AS PER NEC 2008 & FIRE ALARM: INSTALL ONE STROBE AS PER NFPA72 WEST DISTRICT
- PermitElectrical
Permit 778425 · COMPLETED
ELECTRICAL EXISTING PANELBOARDS TO REMAIN,FURNISH AND INSTALL NEW BRANCH CIRCUITY,POWER AND LIGHTING FOR TENAT SPACE.CAT 6 FOR NEW POS SYSTEM 4 TOAL WIRE MAX RUN 43 FEET PER 2008 NEC (AIRPORT)FIRE ALARM RELOCATE AS NEEDED AND TEST DEVICES PER NFPA 72
- PermitElectrical
Permit 768201 · COMPLETED
ELECTRICAL INSTALL 1 NEW PANEL FURNISH AND INSTALL NEW BRANCH CIRCUITY POWER AND LIGHTING FOR TENANT SPACE. FIRE ALARM EXISTING CONTROL PANEL INSTALL NEW DEVICES TIE INTO AIRPORT SYSTEM COMMUNICATION. INSTALL 8 CAT6 DATA DROPS LONGEST RUN 55FT. AS PER 2008 NEC AND NFPA72
- PermitMajor alteration
Permit 784858 · COMPLETED
LEVEL II ALTERATION FOR EXPANSION TO SEATING AREA IN EXISTING RESTAURANT (CHICKIE & PETES), WITH BAR AREA AS PER PLAN.
- PermitElectrical
Permit 780737 · COMPLETED
TERMINAL RECEPTACLES AND TELECOM RELOCATIONS PER 2008 NEC (AIRPORT)
- PermitNew Construction
Permit 789527 · Issued
INSTALL ANSUL FIRE SUPPRESSION SYSTEM
- PermitNew Construction
Permit 789528 · Issued
INSTALL ANSUL FIRE SUPPRESSION SYSTEM
- PermitZoning/use
Permit 777379 · COMPLETED
FOR ERECTION OF ONE FLAT WALL SIGN AND RE-FACE EXISTING SIGNS AS PREVIOUSLY APPROVED (NO CHANGE IN SIZE OR AREA). SIZE AND LOCATION AS SHOWN ON THE APPLICATION. USES FOR SIGN ACCESSORY TO CAR RENTAL FACILITY AS PREVIOUSLY APPROVED.
- PermitMajor alteration
Permit 782801 · COMPLETED
LEVEL II ALTERATION TO INCLUDE DEMOLISHING THE EXISTING FACILITES AND CONVERTING THE SPACE INTO A FULL RESTUARANT AS PER PLAN.** SEPARATE PERMIT REQUIRED FOR M.E.P.S.**
- PermitElectrical
Permit 783162 · COMPLETED
INSTALL LIGHT FIXTURES,10 DIMMERS,48 RECEPTACLES,BRANCH CIRCUIT WIRNG FOR MECH EQUIP,21 IPADS,2 SPEAKERS,3 TV'S,2 CCTC DAMERS,3 MOTION SENSORS,1 KEY PAD,10,000' OF TELE CABLING PER 2008 NEC (AIRPORT)INSTALL FIRE ALARM PER NFPA 72
- PermitElectrical
Permit 783163 · COMPLETED
INSTALL 20 RECEPTACLES,INSTALL BRANCH CIRCUIT WIRING TO MECH EQUIPMENT.INSTALL LIGHT FIXTURES,INSTALL 8 DIMMER SWITCHES,INSTALL 4000' TELE CABLING,INSTALL 1 SPEAKER,3 MOTION SENSORS,1 CCTV CAMERAS,3 DIGITAL DISPLAYS AND 3 IPADS (AIRPORT)
- PermitAlterations
Permit 779089 · Issued
ALTERATION: INTERIOR PLUMBING;REPLACE ROOF DRAINS-37, REPLACE DECK ROOF DRAINS ON LEVEL 2-26, REPLACE DECK DRAINS ON LEVEL 3-27, REPLACE DECK DRAINS ON LEVEL 4-32 - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitMajor alteration
Permit 782794 · COMPLETED
LEVEL I ALTERATION FOR REPLACING ALL FURNITURE IN EXISTING GATEHOLDS WITH LIVING ROOM BAR STYLE TABLES AND CHAIRS AS PER PLAN.** SEPARATE ELECTRICAL PERMIT IS REQUIRED **
- PermitMajor alteration
Permit 782783 · COMPLETED
LEVEL I ALTERATION FOR REPLACING ALL FURNITURE IN EXISTING GATEHOLDS WITH LIVING ROOM BAR STYLE TABLES AND CHAIRS AS PER PLAN.** SEPARATE ELECTRICAL PERMIT IS REQUIRED **
- PermitMechanical
Permit 785925 · COMPLETED
HVAC INSTALLATION TO INCLUDE DUCTWORK. SEE A/P 782801 FOR PLAN. ** SEPARATE PERMIT IS REQUIRED FOR COMMERCIAL HOOD AND FANS **
- InvestigationPRECOURT (likely: pre-court compliance inspection)
Case 325627 · PASSED
A follow-up before or during enforcement escalation; confirm the case sequence in the City file. The cited inspection visit was marked passed.
- PermitElectrical
Permit 773356 · COMPLETED
REST ROOM REVISION AS PER PLANS AS PER 2008 NEC.
- PermitElectrical
Permit 782370 · COMPLETED
INSTALL NEW PANEL,LIGHTING CIRCUITRY,GENERAL PURPOSE CIRCUITRY,AND KITCHEN EQUIPMENT POWER.26 CAT 6 DROPS AVERAGE RUN IN APPROX 125FT FOR COMMUNICATIONS PER 2008 NEC (RESTURANT)
- PermitSuppression
Permit 785595 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 785602 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitUse
Permit 784775 · COMPLETED
FOR USE AS AN EATING AND DRINKING ESTABLISHMENT (SIT DOWN RESTAURANT) IN SPACE C-5 OF TERMINAL E OF AN EXISTING AIRPORT FACILITY WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitElectrical
Permit 773355 · COMPLETED
INSTALL ADDITIONAL HEAT DETECTORS AS PER PLANS AS PER NFPA 72
- PermitNew Construction
Permit 774756 · Issued
FOR THE INSTALLATION OF AN AUTOMATIC SPRINKLER SYSTEM WITHIN THE BAGGAGE CLAIM AREA OF TERMINAL D, IN ACCORDANCE WITH NFPA 13, AS PER PLANS; USING EXISTING SYSTEM WITH 6" FIRE SERVICE LINE.
- PermitNew Construction
Permit 780988 · Issued
FOR THE INSTALLATION OF AN AUTOMATIC SPRINKLER SYSTEM WITHIN THE BAGGAGE CLAIM AREA OF TERMINAL E, IN ACCORDANCE WITH NFPA 13, AS PER PLANS; USING EXISTING SYSTEM WITH 6" FIRE SERVICE LINE; SEE AP#774756 FOR PLANS.
- PermitSuppression
Permit 780771 · COMPLETED
INSTALLATION OF NEW BRANCH LINES AND SPRINKLERS FOR FIT OUT OF RESTAURANT TENANT SPACE B5 (LOVE GRILLE) WITHIN EXISTING AIRPORT FACILITY IN ACCORDANCE WITH THE NFPA 13 STANDARD AND AS PER APPROVED PLANS.
- PermitSuppression
Permit 784077 · COMPLETED
RELOCATE 12 SPRINKLERS EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitPlumbing
Permit 772426 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR A FIT-OUT OF A TAKE-OUT RESTAURANT (SPACE B6-PHIL) (AUNTIE ANNE'S). THE INSTALLATION SHALL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitMechanical
Permit 772422 · COMPLETED
INSTALL NEW LG HEAT PUMP WITH AIR HANDLER AND ASSOCIATED DUCTWORK. INSTALL PRICE VAV BOX WITH ASSOCIATES DUCT WORK INSTALL GREEN HECK EXHAUST FAN WITH ASSOCIATED DUCT WORK AIR BALANCING.
- PermitMajor alteration
Permit 779913 · COMPLETED
LEVEL II ALTYERATION FOR REMODELING CONCOURSE D TICKETING AND ATO OFFICE AND CONCOURSE E RAMP, GATE E3 AND GATE E5. NEW WALLS, CEILINGS AS PER PLAN. **ADDITIONAL PERMITS ARE REQUIRED FOR M.E.P.S **
- PermitElectrical
Permit 783164 · COMPLETED
INSTALL 10-2MC CABLE FROM EXISTING JUNCTION BOX TO NEW TABLES FOR 120V POWER TO RECEPTACLES TYPICAL FOR TWO TABLES WITH TOTAL OF 8 RECEPTACLES.INSTALL GFCI MODULE FOR PROTECTION OF EACH CIRCUIT PER 2008 NEC (AIRPORT)
- PermitPlumbing
Permit 770722 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING; NEW TENANT; GRAB AND GO FOOD SERVICE - THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004.
- PermitElectrical
Permit 782369 · COMPLETED
INSTALL DEDICATED 120V OUTLETS & CAT6 CABLE FROM LOCAL ELECTRICAL CLOSET TO NEW ATM MACHINE TERMINAL D.CATE 6 DROPS AVERAGE RUN IS APPROX 125FT PER 2008 NEC (AIRPORT)
- PermitSuppression
Permit 780242 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 780252 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 780253 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 780278 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 780279 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitPlumbing
Permit 746918 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING;PHILA., INTERNATIONAL AIRPORT; SIT-DOWN RESTAURANT IN SPACE B13 OF TERMINAL B; TAPPING INTO EXISTING WATER AND SANITARY AND EXTENDED TO LEASE LINE -THE INSTALLATION WILL COMPY WITH THE PHILADELPHIA PLUMBING CODE 2004.
- PermitPlumbing
Permit 770723 · COMPLETED
ALTERATIONS: INTERIOR PLUMBING;PHASE 2 OF A PROJECT CURRENT UNDER CONSTRUCTION UNDER PERMIT #739973; KITCHEN TO SERVICE BAR/RESTAURANT - THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004.
- PermitNew Construction
Permit 775842 · Issued
HVAC INSTALLATION INCLUDING DUCTWORK. SEE A/P 773177 FOR PLAN.
- PermitAddition and/or Alteration
Permit 773177 · Issued
TENANT FIT OUT OF RETAIL SPACE AS PER PLAN.
- PermitElectrical
Permit 773960 · COMPLETED
INSTALL 10-2 MC CABLE FROM EXISTING JUNCTION BOX TO NEW TABLES FOR 120V POWER TO RECEPTACLES TYPICAL FOR TWO TABLES WITH A TOTAL OF 8 RECEPTACLES. INSTALL GFCI MODULE FOR PROTECTION OF EACH CIRCUIT PER 2008 NEC (AIRPORT)
- PermitUse
Permit 775693 · COMPLETED
FOR THE CREATION OF TWO (2) TENANT SPACES #BC-28A &BC-28B FROM THE EXISTING TENANT SPACE #BC-28. FOR RETAIL SALE OF CONSUMER GOODS IN TENANT SPACE #BC-28A. FOR RETAIL SALE OF CONSUMER GOODS IN TENANT SPACE #BC-28B
- PermitMajor alteration
Permit 769608 · COMPLETED
LEVEL II ALTERATIONS INCLUDES INSTALLING NEW WALLS, CEILINGS, FINISHES AS PERM PLAN.
- PermitSuppression
Permit 774742 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 774744 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 765046 · COMPLETED
REPLACE 120/208 BRANCH POWER CIRCUIT AND FIRE ALARM DUCT DETECTORS TO 28-AIR HANDLERS, INSTALL NEW 208-80/277V STEP-UP TRANSFORMER & NEW 600A PANEL FOR NEW PUMPS & REPLACE ELECTRICAL BRANCH CKTS TO REPLACEMENT PUMP EQUIPMENT WEST DISTRICT
- PermitMechanical
Permit 773341 · COMPLETED
INSTALLATION OF ONE (1) UL LISTED CAPTIVE AIRE COMMERCIAL KITCHEN EXHAUST HOOD WITH SUPPLY/EXHAUST TIE-IN TO ONE (1) RETURN AIR FAN, ONE (1) EXHAUST FAN & ALL ASSOCIATED RETURN/EXHAUST DUCTWORK.***SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM*** **SEE A/P 752393 FOR PLANS**
- PermitNew Construction
Permit 767872 · Completed
HVAC INSTALLATION TO COMPLETE WORK UNDER PERMIT NUMBER 229301. TO ALSO INCLUDE REVISIONS TO RESTROOMS WITHIN EXISTING AIPRORT TERMINAL E TICKETING LEVEL 1 AS PER PLANS
- PermitAlterations
Permit 767873 · Issued
ALTERATIONS: INTERIOR PLUMBING; AIRPORT FACILITY - THE INSTALLATION WILLL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitMechanical
Permit 769998 · COMPLETED
HVAC INSTALLATION TO INCLUDE, DUCTWORK, AND MECHANICAL EQUIPMENT, AS PER PLANS.(28) REGISTERS/DIFFUSERS.
- PermitNew Construction
Permit 772832 · Issued
INSTALLATION OF COMMERCIAL COOKING EXHAUST SYSTEM (TYPE I HOOD). ** SEPARATE PERMIT IS REQUIRED FOR COMMERCIAL COOKING EXTINGUISHING SYSTEM ** SEE A/P 769998 FOR PLAN.
- PermitMechanical
Permit 770000 · COMPLETED
HVAC INSTALLATION TO INCLUDE, DUCTWOKR, AND MECHANICAL EQUIPMENT, AS PER PLANS. (7) REGISTERS/ DIFFUSERS
- PermitMechanical
Permit 772825 · COMPLETED
INSTALLATION OF COMMERCIAL COOKING EXHAUST SYSTEM (TYPE I HOOD). ** SEPARATE PERMIT IS REQUIRED FOR COMMERCIAL COOKING EXTINGUISHING SYSTEM ** SEE A/P 770000 FOR PLAN.
- PermitPlumbing
Permit 751617 · COMPLETED
INSTALL THE FOLLOWING PLUMBING FIXTURES, 2 FLOOR SINKS, 1 GREASE TRAP, 1 - 3 COMPARTMENT SINK, 2 HAND SINKS, 1 PREPSINK AND 1 MOP SINK - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitMechanical
Permit 733693 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM FOR TENANT SPACE C-08 WITHIN AIRPORT TO INCLUDE INSTALLATION OF (5) TON ROOF TOP UNIT AND ASSOCIATED SUPPLY & RETURN DUCTWORK AND INSTALLATION OF (1) TYPE II EXHAUST HOOD WITH ROOF TOP FAN AS PER APPROVED PLANS.
- PermitElectrical
Permit 771946 · COMPLETED
INSTALL 2-120V CIRCUITS & CAT6 CABLE FROM LOCAL DOA CLOSETS IN D/E CHECK POINT AREA AT NEW ATM LONGEST RUN CABLE 145' AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 769244 · COMPLETED
INSTALL 1 CEILING FIRE ALARM SPEAKER AND STROBE, CONNECT TO EXISTING SYSTEM AS PER NFPA72 (WEST DISTRICT)
- PermitAlterations
Permit 759430 · Issued
ALTERATION: INTERIOR PLUMBING FOR THE FIT-OUT OF A SIT-DOWN RESTAURANT IN SPACE B-14,TERMINAL 'B', PHIL. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitUse
Permit 769965 · COMPLETED
FOR USE AS A TAKE-OUT RESTAURANT IN SPACE B-6 IN TERMINAL B OF AN EXISTING AIRPORT FACILITY WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitMajor alteration
Permit 767253 · COMPLETED
LEVEL II INTERIOR ALTERATIONS TO CREATE A TAKE OUT RESTAURANT IN SPACE B-6 AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- PermitMechanical
Permit 764192 · COMPLETED
HVAC INSTALLATION AS PER PLAN. **SEPARATE PERMIT IS REQUIRED FOR FIRE SUPPRESSION WORK**
- PermitMajor alteration
Permit 761675 · COMPLETED
LEVEL II ALTERATION FOR FITOUT OF RETAIL SHOP AS PER PLAN.**SEPARATE ELECTRICAL PERMIT IS REQUIRED**
- PermitElectrical
Permit 746297 · COMPLETED
ELECTRICAL DEMOLITION. INSTALL 7 NEW LIGHT FIXTURES, INSTALL 3 OCCUPANCY SENSORS, ELECTRICAL CONNECTIONS TO WALK IN COOLER AND FREEZER UNITS, ELECTRICAL CONNECTION TO HEAT TRACE, INSTALL WEATHER PROOF GFCI RECEPTACLE INSTALL NEW 60A 3 PHASE PANEL AND METER PER 2008 NEC (AIRPORT) INSTALL 1 SMOKE DETECTOR AND 1 HORN STROBE FIRE ALARM DEVICE OFF OF EXISTING FIRE ALARM PER NFPA 72
- PermitElectrical
Permit 753133 · COMPLETED
INSTALL PANEL,LIGHTS,SWITCHES,RECEPTACLES,HVAC AND KITCHEN EQUIPMENT WIRING,TELE/DATA SERVICES AND SPEAKERS PER 2008 NEC (AIRPORT)INSTALL FIRE ALARM PER NFPA 72
- PermitMajor alteration
Permit 766433 · COMPLETED
ALTERATIONS TO TERMINAL E FRONTIER AIRLINE OFFICE SPACE AS PER PLAN. ** SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK **
- PermitMechanical
Permit 768835 · COMPLETED
HVAC INSTALLATION.INCLUDES RELOCATION OF DIFFUSERS ** SEE A/P 766433 FOR PLAN **
- PermitSuppression
Permit 769437 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 769449 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitMajor alteration
Permit 763395 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXISTING RESTAURANT SPACE B7 IN EXISTING AIRPORT TERMINAL B AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMechanical
Permit 766647 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR RESTAURANT SPACE B7 WITHIN TERMINAL B OF AN EXISTING AIRPORT AS PER APPROVED PLANS.
- PermitMajor alteration
Permit 762199 · COMPLETED
LEVEL II ALTERATION AS PER PLAN. THIS IS CURRENTLY TWO GRAB AND GO FOOD SERVICE TENANTS. A NEW TENANT (OTG) IS TAKING OVER THE SPACE AND WILL BE DEMOLISHING THE EXISTING FACILITIES.** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S. **
- PermitMajor alteration
Permit 762211 · COMPLETED
THIS IS PHASE 2 OF A PROJECT CURRENT UNDER CONSTRUCTION UNDER PERMIT #739973. THIS IS THE KITCHEN TO SERVICE THE BAR/RESTAURANT AREA BUILT UNDER PHASE 1. ** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S. **
- PermitElectrical
Permit 763119 · COMPLETED
INSTALL 225A 120/208V 3 PHASE 4 WIRE PANEL; EMON METER IN EXISTING MMU UNIT; CONDUTI AND BRANCH CIRCUIT WIRING FROM PANEL TO NEW JUNCTION BOX IN CEILING; 1-2X4 LAY IN LIGHT FIXTURES AND 1 EXIT SIGN; 1 TOGGLE SWITCH; 2 GFCI RECEPTACLES; 3 DROPS OF CAT6 NON-PLENUM 2" CONDUIT ABOUT 500FT FOR TELECOMMUNICATIONS AS PER 2008 NEC(WEST DISTRICT) INSTALL ONE SMOKE DETECTOR AND ONE HORN STROBE FIRE ALARM DEVICE AS PER NFPA72
- PermitElectrical
Permit 767453 · COMPLETED
INSTALL PATHWAYS & LOW VOLTAGE COAXIAL ANTENNA CABLING & RELATED ANTENNA EQUIPMENT FOR CELLULAR SERVICE EXPANSION, TO INCLUDE 1-20A 120V BRANCH POWER CKT AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 765370 · COMPLETED
INSTALL 2 NEW LIGHTS, 1 NEW EXIT LIGHT, 2 NEW SWITCHES AND RELOCATE 4 EXISTING LLIGHTS AS PER 2008 NEC (WEST DISTRICT)
- PermitMechanical
Permit 752402 · COMPLETED
ALTERATIONS TO EXISTING HVAC FOR RESTAURNT IN SPACE D-11 TO INCLUDE INSTALLATION OF NEW (20) TON ROOF TOP UNIT, FABRICATION AND INSTALLATION OF NEW DUCTWORK FROM ROOFTOP AND INSTALLATION OF NEW NSF LISTED KITCHEN EXHAUST HOODS WITH BLACK IRON WELDED DUCTWORK AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR KITCHEN HOOD SUPPRESSION SYSTEM**
- PermitAddition and/or Alteration
Permit 761615 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO COMPLETE WORK PREVIOUSLY PERMITTED UNDER A/P 121262 TO ALSO INCLUDE REVISIONS TO RESTROOMS WITHIN EXISTING AIRPORT TERMINAL E TICKETING LEVEL 1 AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK**
- PermitElectrical
Permit 763016 · COMPLETED
INSTALL CAT6 CABLE TO THREE WI-FI ACCESS POINTS... IN ACCORDANCE WITH 2008 NEC FOR AIRPORT CLUB
- PermitElectrical
Permit 756244 · COMPLETED
PHL AIRPORT- TERM D INSTALL CONDUIT AND CAT6 CABLE FROM NITED AIRLINES LOCAL IDF CABINET TO 69 WIRELESS ACCESS POINTS THROUGHOUT TERMINAL D TICKETING, BAGGAGE, CONCOURSE, OFFICES, AND JETWAYS. (69) CAT 6 DROPS AVERAGE RUN IS APPROX 175FT.
- PermitElectrical
Permit 753159 · COMPLETED
ADD 6 FIRE ALARM DEVICES TO EXISTING FIRE ALARM SYSTEM IN THIS SPACE FOR NEW CONFIGURATION PER NFPA 72 (AIRPORT)
- PermitPlumbing
Permit 755185 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR AN EXISTING TAKE-OUT RESTAURANT (PHIL - SPACE DE06- DUNKIN DONUTS).THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUMBING CODE, 2004.
- PermitSuppression
Permit 758788 · COMPLETED
INSTALLING THIRTEEN (13) SPRINKLERS IN THE BABA BAR; CONCESSION SPACE B-14 IN TERMINAL "B" IN ACCORDANCE WITH NFPA 13 AS PER PLANS.
- PermitElectrical
Permit 759418 · COMPLETED
TERMINAL B/C,B4,B5,C25,C26,C30 TSA BAG SHUTE BREAKROOMS - REPLACE LIGHT FIXTURES AND INSTALL RECEPTS, FIXTURES AND RECEPTS BE INSTALL AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 754145 · COMPLETED
INSTALL NEW MILLWORK AND REFRIGERATOR FOR SNACK KIOSK AS PER PLAN.
- PermitUse
Permit 757873 · COMPLETED
FOR RETAIL SALE OF FOOD, BEVERAGES AND GROCERIES IN SPACE D6-K, TERMINAL D AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitElectrical
Permit 753158 · COMPLETED
INSTALL 300A 120/208V 3 PHASE 4 WIRE PNL; INSTALL EMON METER IN EXIST MMU UNIT; INSTALL 60 REC,BRANCH CIRCUIT WIRING TO MECH EQUIP, INSTALL FIXTURES,12 DIMMER SWITCHES,14,000' OF TELE CABLING, INSTALL 2 SPEAKERS,4 MOTION SENSORS,2 CCTV CAMERAS,5 TV'S,39IPADS PER 2008 NEC (AIRPORT)INSTALL 2 HORN STROBES OFF OF THE EXITING FA SYSTEM PER NFPA 72
- PermitElectrical
Permit 753145 · COMPLETED
INSTALL 400A 120/208V 3 PHASE 4 WIRE PNL; INSTALL EMON METER IN EXIST MMU UNIT; INSTALL 68 REC,BRANCH CIRCUIT WIRING TO MECH EQUIP, INSTALL FIXTURES,10 DIMMER SWITCHES,18,000' OF TELE CABLING, INSTALL 2 SPEAKERS,4 MOTION SENSORS,2 CCTV CAMERAS,5 TV'S,39IPADS PER 2008 NEC (AIRPORT)INSTALL FA SPEAKER STROBE DEVICE OFF OF THE EXITING FA SYSTEM PER NFPA 72
- PermitElectrical
Permit 743724 · COMPLETED
TERMINAL "B" UPGRADES. INSTALL MDP'S AND POWER FOR TENNANT SPACES PER NEC 2008.
- PermitElectrical
Permit 749787 · COMPLETED
INSTALL PANEL, LIGHTS, SWITCHES, RECEPTACLES, HVAC EQUIPMENT WIRING, FIRE ALARM DEVICES, TELE/DATA DEVICES AND SPEAKERS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 760333 · COMPLETED
DISCONNECT AND RECONNECT VARIOUS CAR WAS EQUIPMENT THAT IS BEING REPLACE WITH EXISTING WIRING AS PER NEC 2008 WEST DISTRICT
- PermitMechanical
Permit 755965 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM FOR SPACE DE06 WITHIN AN EXISTING AIRPORT TO INCLUDE (1) VAV UNIT WITH DUCT WORK AND AIR BALANCING AS PER APPROVED PLANS. *SEPARATE PERMIT REQUIRED FOR COMMERCIAL KITCHEN EXHAUST HOOD INSTALLATION*
- PermitMechanical
Permit 755958 · COMPLETED
INSTALLATION OF ONE (1) TYPE 2, CAPTIVE AIRE KITCHEN HOOD AND (1) EXHAUST FAN LOCATED ON ROOF SERVING SPACE DE06 AS PER APPROVED PLANS.
- PermitElectrical
Permit 758219 · COMPLETED
REPLACE 6- 2X4 FLUORESCENT LAY-IN FIXTURES WITH 6- LED FIXTURES... IN ACCORDANCE WITH 2008 NEC
- PermitMechanical
Permit 757111 · COMPLETED
HVAC INSTALLATION AS PER PLAN.
- PermitAddition and/or Alteration
Permit 745669 · Issued
ALTERATION TO A PASSENGER HOLD ROOM. WORK TO INCLUDE DEMOLISHING THE EXISITNG FINISHES AND CONVERTING THE SPACE INTO A RESTAURANT.
- PermitElectrical
Permit 757662 · COMPLETED
REPLACE (13) 2X4 LAY IN FIXTURES, RELOCATE, 3 EXISTING RECEPTS AND INSTALL 3 NEW RECEPTS USING SURFACE MOUNTED CONDUIT OF BY FISHING WALLS AS PER 2008 NEC (WEST DISTRICT)
- PermitPlumbing
Permit 748440 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR A SIT-DOWN RESTAURANT IN TERMINAL B, SPACE B-13 OF THE PHILADELPHIA INTERNATIONAL AIRPORT. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitPlumbing
Permit 748441 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR A SIT-DOWN RESTAURANT IN TERMINAL B, SPACE B-11 (BOULE CAFE) OF THE PHILADELPHIA INTERNATIONAL AIRPORT. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitPlumbing
Permit 748443 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR A SIT-DOWN RESTAURANT IN TERMINAL B, SPACE B-12.1 (MEZZOGIORNO) OF THE PHILADELPHIA INTERNATIONAL AIRPORT. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitElectrical
Permit 753146 · COMPLETED
INSTALL 225A 120/208V 3 PHASE 4 WIRE PNL; INSTALL EMON METER IN EXIST MMU UNIT; INSTALL 61 REC,BRANCH CIRCUIT WIRING TO MECH EQUIP, INSTALL FIXTURES,13 DIMMER SWITCHES,134000' OF TELE CABLING, INSTALL 3 SPEAKERS,5 MOTION SENSORS,2 CCTV CAMERAS,5 TV'S,29IPADS PER 2008 NEC (AIRPORT)INSTALL (1)FA SPEAKER STROBE DEVICE OFF OF THE EXITING FA SYSTEM PER NFPA 72
- PermitAdministrative
Permit 757291 · COMPLETED
TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE D/E CONNECTOR AND BAGGAGE CLAIM AREA. ASSOCIATED WITH PERMIT 638697.
- PermitElectrical
Permit 756212 · COMPLETED
REPLACE 11 2X4 LAY IN FIXTURES AND RELOCATE 5 EXISTING RECEPTACLES USING SURFACE MOUNTED CONDUIT OR BY FISHING WALLS.
- PermitMechanical
Permit 752393 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR RESTAURANT IN SPACE D6-A TO INCLUDE INSTALLATION OF NEW GREASE FAN AND MAKEUP AIR UNIT ON ROOF, FABRICATION AND INSTALLATION OF BLACK IRON DUCTOWRK TO NEW HOOD (TO BE INSTALLED BY OTHERS) AND RECONFIGURATION OF SUPPLY AND RETURN DUCTWORK AS PER APPROVED PLANS. *SEPARATE PERMIT REQUIRED FOR INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOOD*
- PermitSuppression
Permit 756325 · COMPLETED
RELOCATE 51 SPRINKLERS IN PHL BAR SYMON SPACE D11
- PermitSuppression
Permit 752927 · COMPLETED
INSTALLING (10) SPRINKLLERS IN (SPACE B13) IN ACCORDANCE WITH NFPA 13 AS PER PLAN.
- PermitSuppression
Permit 753053 · COMPLETED
INSTALLING (20) SPRINKLERS IN MEZZOGIANO (SPACE B12.1) IN ACCORDANCE WITH NFPA 13 AS PER PLAN.
- PermitSuppression
Permit 753049 · COMPLETED
INSTALLING (19) SPRINKLLERS IN THE BOULE CAFE (SPACE B11) IN ACCORDANCE WITH NFPA 13 AS PER PLAN.
- PermitSuppression
Permit 756508 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 754535 · COMPLETED
RELOCATE 4 RECEPTACLES AND 2 TELECOMMUNICATIONS OUTLETS
- PermitElectrical
Permit 753539 · COMPLETED
PHL TERMINAL D:INSTALL 3/4" EMT CONDUIT AND 750FT,12-STRAND FIBER OPTIC CABLE CONNECTING UNITED BAGGAGE TO UNITED TICKETING COUNTER,INSTALL 1" CONDUIT AND 48-STRAND SINGLE MODE FIBER FROM MDF 2/UA TICKET COUNTER TO MDF 1/LL GATE D1 AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 754179 · COMPLETED
INSTALL NEW PANELBOARD AND FEEDER WIRES IN EXITING CONDUIT FOR GOOD TO GO KIOSK SPACE D-8 & INSTALL 1-CAT 6 LINE APPROX 345 FT IN EXISTING CONDUIT FOR CASH WRAP AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 740703 · COMPLETED
SUPPLY & INSTALL ELECTRONIC SUB-METERING AT VARIOUS ELECTRIC PANELS AS PER NEC 2008 WEST DISTRICT
- PermitMajor alteration
Permit 748571 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATION OF EMPLOYEE BREAK ROOMS IN TERMINAL D OF AN EXISTING AIRPORT TO INCLUDE NEW FLOORING, MILLWORK, CEILING TILES, PAINT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMechanical
Permit 746868 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM FOR A SIT-DOWN RESTAURANT IN SPACE B-11 OF AN EXISTING AIRPORT AS PER APPROVED PLANS. WORK TO INCLUDE INSTALLATION OF EXAUST FOR DISHWASHER.
- PermitMechanical
Permit 746869 · COMPLETED
FOR THE INSTALLATION OF DUCTWORK, REGISTERS/DIFFUSERS, REFRIDGERENT PIPING, AND ROOF TOP UNITS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR DUNNAGE. SEPARATE PERMIT REQUIRED FOR ANY PLUMBING AND ELECTRICAL WORK.*ANY CHANGES TO LOCATION OF ROOF TOP UNIT WILL REQUIRE AN AMENDED PERMIT*
- PermitMechanical
Permit 746861 · COMPLETED
INSTALLATION OF HVAC INCLUDES DUCTWORK, DIFFUSERS AND EXHAUST FAN AS PER PLAN.
- PermitMechanical
Permit 746884 · COMPLETED
HVAC ALTERATIONS INCLUDES INSTALLATION OF DUCTWORK, DIFFUSER AND REFRIGERATION PIPING AS PER PLAN.
- PermitElectrical
Permit 732933 · COMPLETED
ELECTRIC AND FIRE ALARM WORK FOR RETAIL SPACE REMODEL.
- PermitMechanical
Permit 738924 · COMPLETED
FOR THE REMOVAL AND INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK IN A BUSINESS AREA APART OF AN EXISTING AIRPORT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- PermitMajor alteration
Permit 717606 · COMPLETED
LEVEL II ALTERATION INCLUDE REMODEL SIT DOWN RESTAURANT SPACE IN TERMINAL D SPACE 11 AS PER PLANS. **SEPARATE PERMIT IS REQUIRED FOR M.E.P.S**
- PermitMajor alteration
Permit 747583 · COMPLETED
LEVVEL II ALTERATION AS PER PLAN. **SEPARATE PERMITS IS REQUIRED FOR ELELCTRICAL AND MECHANICAL WORK**
- PermitElectrical
Permit 749033 · COMPLETED
REPLACE 45 EXISTING 2X4 LAY IN LIGHTS WITH NEW LED LAY IN LIGHTS, CLEAN EXISTING WIRING DEVICES AND PLATES. INSTALL CONDUIT AND CAT 6 CABLE FROM TELECOM ROOM TO BREAKROOM FOR FUTURE USE AS PER 2008 NEC
- PermitPlumbing
Permit 741354 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR A 2ND FLOOR OFFICE FIT-OUT IN THE PHILADELPHIA INTERNATIONAL AIRPORT (TERMINAL A).THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUMBING CODE, 2004.
- PermitElectrical
Permit 748306 · COMPLETED
PHL TERM B INSTALL 3/4" EMT CONDUIT AND 750FT 4 STRAND FIBER OPTIC CABLE CONNECTING SPACE C-08 TO SPACE BC-26AB.INSTALL CAT 6 WIRE 8 DRIPS ALL APPROX 75FT LONG IN SPACE C-08,MOUNT COMM BOX AND INSTALL 1-120V OUTLET PER 2008 NEC (AIRPORT)
- PermitAlterations
Permit 747056 · Expired
TERMINALS B & C - EMPLOYEE BREAKROOMS - PLUMBING FIXTURE REPLACEMENT OF (8)KITCHEN SINKS, (29)LAVATORIES/FAUCETS/TRIM, (22)WATER CLOSETS/FLUSHOMETERS, (16)URINALS/FLUSHOMETERS AND (4)SHOWER PANS - FIXTURES/TRIM WILL COMPLY WITH THE AIRPORT BREAKROOM FIXTURE SCHEDULE ATTACHED
- PermitElectrical
Permit 746719 · COMPLETED
REPLACE IN KIND: 26- 2X4 FLOURESCENT LAY-IN FIXTURES WITH 2X4 LED LAY-IN FIXTURES (AMERICAN AIRLINES "B" TERMINAL BREAKROOM... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 746740 · COMPLETED
REPLACE IN KIND: 35- 2X4 FLOURESCENT LAY-IN FIXTURES WITH 2X4 LED LAY-IN FIXTURES (AMERICAN AIRLINES TERMINAL BREAKROOM- C30... IN ACCORDANCE WITH 2008 NEC
- PermitSuppression
Permit 739064 · COMPLETED
ALTERATIONS TO EXISTING SPRINKLER SYSTEM WITHIN AN AIRPORT TO INCLUDE INSTALLATION OF (6) NEW CONTROL VALVES AND FLOW SWITCHES AND A NEW 3" MAIN IN TERMINAL B AS PER APPROVED PLANS.
- PermitSuppression
Permit 739065 · COMPLETED
INSTALLATION OF (36) NEW SPRINKLER HEADS IN THE OUTSOURCE CLINIC IN TERMINAL A EAST OF AN EXISTING AIRPORT PER APPROVED PLANS.
- PermitElectrical
Permit 746830 · COMPLETED
REPLACE 6 LIGHT FIXTURES IN B3 LOCKER ROOM AS PER 2008 NEC (WEST DISTRICT)
- PermitPlumbing
Permit 746911 · COMPLETED
PIPE CONDENSATE OVER TO KNEW STAND PIPE FROM EXISTING FLOOR DRAIN.
- PermitUse
Permit 745647 · COMPLETED
SPACE B14 (TERMINAL B) USE TO RESTAURANT
- PermitUse
Permit 739952 · COMPLETED
FOR USE AS AN EATING AND DRINKING ESTABLISHMENT (SIT DOWN RESTAURANT) IN SPACE B-11 OF TERMINAL B OF AN EXISTING AIRPORT FACILITY WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitAddition and/or Alteration
Permit 739988 · Issued
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A SIT-DOWN RESTAURANT IN SPACE B11 OF TERMINAL B OF AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitUse
Permit 739961 · COMPLETED
ZONING IS SP-AIR, AIRPORT RELATED FACILITIES. LOCATION IS INSIDE AN APPROVED AIRPORT TERMINAL. THIS SPACE IS BEING TRANSFERRED FROM A PREVIOUS TENANT TO AN NEW TENANT. THE NEW TENANT DEMOLISHING AND REMOVING THE INTERIOR OF THE ENTIRE SPACE.
- PermitMajor alteration
Permit 739973 · COMPLETED
THIS IS CURRENTLY AN EXISTING RESTAURANT. A NEW TENATN (OTG) IS TAKIN OVER THE SPACE AND WILL BE DEMOLISHING AND RENOVATING THE INTERIOR OF THE ENTIRE SPACE. **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit 739968 · Issued
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A SIT-DOWN RESTAURANT IN SPACE B13 OF TERMINAL B OF AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitUse
Permit 739956 · COMPLETED
FOR USE AS AN EATING AND DRINKING ESTABLISHMENT (SIT DOWN RESTAURANT) IN SPACE B-13 OF TERMINAL B OF AN EXISTING AIRPORT FACILITY WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitMajor alteration
Permit 739967 · COMPLETED
LEVEL 11 ALTERATION TO SPACE WHICH WILL BE CONVERTED TO A DRY/COLD/FROZEN STORAGE AREA FOR PRODUCT/MERCHANDISE. THIS PROJECT INCLUDES THE INSTALLATION OF COLD AND FREEZER WALK-IN-BOXES, FENCED AREAS AND OPEN AREAS FOR THE STORAGE OF PRODUCT.** SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRICAL AND SPRINKLER WORK **
- PermitMechanical
Permit 742733 · COMPLETED
HVAC INSTALLATION INCLUDES DUCTWORK,REGISTERS/DIFFUSERS AND RTU AS PER PLAN. ** SEE A/P 739967 FOR PLAN.**
- PermitElectrical
Permit 736199 · COMPLETED
FITOUT INSTALL NEW POWER RECEPTACLES 20AMP 120/277 & LIGHTING AS PER NEC 2008 & FIRE ALARM SYSTEM AS PER NFPA 72 WEST DISTRICT
- PermitElectrical
Permit 745139 · COMPLETED
INSTALLATION OF SEPTA FARE EQUIPMENT. TERMINATE TO EXISTING 120V CIRCUITS. 10 FARE VENDING MACHINES. 26 FARE KIOSKS CARD READERS PER NEC 2008 - POWER WIRING TO THE EQUIPMENT WAS PREVIOUSLY "BY OTHERS"
- PermitElectrical
Permit 737500 · COMPLETED
DEMOLITION OF ELECTRICAL SYSTEM IN THIS SPACE. FURNISH AND INSTALL NEW BRANCH CIRCUIT WIRING FOR NEW SPACE CONFIGURATION. FURNISH AND INSTALL 63 RECEPTACLES, 14 GFCI RECEPTACLES, 36 TELECOMMUNICATIONS OUTLETS, 4 NURSE CALL STATIONS, 120 LIGHT FIXTURES, 100A 3 PHASE 4 WIRE 120/208V 42 CIRCUIT PANEL BOARD. 30KVA TRANSFORMER, TELECOMMUNICATIONS CABLING AND GROUNDING.
- PermitMajor alteration
Permit 742661 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING TAKE OUT RESTAURANT IN SPACE DE06 OF AN AIRPORT TERMINAL AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMajor alteration
Permit 739500 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RADIO ROOM (MU5) WITHIN AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitAddition and/or Alteration
Permit 733375 · Issued
LEVEL II ALTERATIONS INCLUDE NEW WALLS NEW FINISHES AS PER PLAN.** SEPARATE PERMIT IS REQUIRED FOR M.E.P.S **
- PermitElectrical
Permit 741821 · COMPLETED
PROVIDE SINGLE 120V CIRCUIT TO SERVER RACK FROM EXISTING ELECTRICAL PANEL @ PPA OFFICE @ SHORT TERM PARKING AREA: NORTH END OF AIRPORT... IN ACCORDANCE WITH 2008 NEC
- PermitPlumbing
Permit 733684 · COMPLETED
ALTERATION: INTERIOR PLUMBING FOR THE FIT-OUT OF BALDUCCI'S FOOD LOVER'S MARKET(RESTAURANT), SPACE C-08 PHL AIRPORT. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitUse
Permit 741388 · COMPLETED
FOR A AIRPORT RELATED FACILITY AT SPACE B-ST-2-LL LOWER LEVEL (CONCOURSE B) AS PART OF EXISTING AIRPORT COMPLEX.
- PermitElectrical
Permit 739690 · COMPLETED
REMOVAL OF CURB SIDE COUNTERS,DISCONNECT ELECTRIC AND TELE DATA AND SAFE END IN PREP FOR REMOVAL OF COUNTERS BY OTHERS (AIRPORT)WEST DISTRICT
- PermitPlumbing
Permit 718896 · COMPLETED
ALTERATION: INTERIOR PLUMBING FIT-OUT OF A TAKE-OUT RESTAURANT IN TERMINAL D, SPACE 8 OF THE PHILADELPHIA INTERNATIONAL AIRPORT. THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE, 2004.
- PermitSuppression
Permit 738987 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION, WE WILL BE RELOCATING 7 SPRINKLERS IN PHL MO BURGER ON THE SECOND FLOOR IN SPACE DBA
- PermitSuppression
Permit 738989 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATING 13 SPRINKLERS IN PHL BALDUCCIS ON THE SECOND FLOOR IN SPACE C-08
- PermitSuppression
Permit 738991 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATING 6 SPRINKLERS IN PHL LOWER LEVEL STORAGE ROOM IN SPACE B-ST-2-LL
- PermitElectrical
Permit 732397 · COMPLETED
INSTALLING 2 NEW VFR-40 CONTROL PANELS WITH A TOTAL OF 7 HEAT DETECTORS PER NFPA 72 (AIRPORT)WEST DISTRICT
- PermitMajor alteration
Permit 726607 · COMPLETED
INSTALLATION OF STORAGE CAGES
- PermitMajor alteration
Permit 726825 · COMPLETED
LEVEL II ALTERATIONS INCLUDE DEMOLITION OF EXISTITGN FLOORS [CARPET, STONE & TILE], REMOVAL OF EXISTING COUNTERTOPS, WAL PARTITIONS, CEILINGS. ** SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL AND FIRE SUPPRESSION SYSTEM.**
- PermitElectrical
Permit 733243 · COMPLETED
INSTALL 1- 120V, 20A CIRCUIT FOR A STRIP PLUG IN BREAKROOMS B3, B7, B8 AND C26.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 727343 · COMPLETED
INSTALL VIDEO MONITORING SYSTEM AS PER 2008 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 713583 · Issued
INSTALL LIGHT FIXTURES,REMOVE AND REPLACE RECEPTACLES IN MILLWORK ADD RECEPTACLES,INSTALL COMMUNICATION OUTLETS AND SPEAKER OUTLETS. ALL WIRING TO BE FROM EXISTING PANEL PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 735312 · COMPLETED
INSTALLATION OF 8 NEW 20AMP CIRCUIT BREAKERS, LUTRON CONTROL PANEL AND RECEPTACLES. LUTRON PANEL TO BE SURFACE MOUNT AND ALL WIRING IN EXPOSED CONDUIT PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitUse
Permit 728197 · COMPLETED
FOR THE CREATION OF SEVEN (7) UNITS FROM FOUR (4) UNITS FOR USE AS AIRPORT RELATED FACILITIES IN TERMINAL E, SPACE EST4 AS PART OF AN AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitElectrical
Permit 734525 · COMPLETED
DISCONNECT POWER TO EXIT BOOTH & RECONNECT TO NEW BOOTH & DISCONNECT ELECTRIC TO CRASH BARRIER & RECONNECT TO NEW CRASH BARRIER & RECONNECT ELECTRIC AS PER NEC 2008 WEST DISTRICT
- PermitMajor alteration
Permit 731297 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO CREATE A NEW OPENING IN AN EXISTING WALL WITHIN AN AIRPORT BETWEEN TERMINALS A & B AS PER APPROVED PLANS. EXISTING BUILDING IS FULLY SPRINKLERED.
- PermitElectrical
Permit 731044 · COMPLETED
RELOCATE EXISTING POWER AND DATA LINE TO NEW CASH EQUIPMENT LOCATED 12' AWAY... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 727496 · COMPLETED
INSTALL 5 RECEPTACLES. INSTALL TELECOMMUNICATION OUTLETS AND CABLES NON PLENUM RATED CAT6 APPROX 200' AS PER 2008 NEC
- PermitElectrical
Permit 726385 · COMPLETED
INSTALL 100A 120/208V 3 PHASE 4 WIRE PANEL;INSTALL 5 LIGHT FIXTURES; INSTALL 9 RECEPTS;CONNECT AC UNIT AND CONDENSER UNIT, CONNECT ERV UNIT, INSTALL CONDUIT FOR ROUTING OF FIBER OPTIC CABLE AS PER 2008 NEC (WEST DISTRICT) INSTALL WATER FLOW SWITCH, TAMPER SWITCH, PULL STATION AND HORN STROBE AS PER NFPA72
- PermitSuppression
Permit 732491 · COMPLETED
RELOCATE 2 SPRINKLES IN THE LOWER LEVEL MDF ROOM TERMINAL B
- PermitElectrical
Permit 730361 · COMPLETED
INSTALL 2- 120V, 20A CIRCUITS FOR ADDITIONAL OUTLETS IN BREAKROOM... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 727499 · COMPLETED
INSTALL 2 RECEPTACLES AND SPEAKERS; CONNECT NEW KICTHEN EQUIPMENT. INSALL TELECOMMUNICATIONS OUTLETS AND CABLE NON PLENUM RATED CAT6 APPROX 200' AS PER 2008 NEC
- PermitElectrical
Permit 727489 · COMPLETED
INSTALL 70A 120/208V 1 PHASE PANEL; INSTALL 5 L14-20 RECEPTACLES, INSTALL TELECOM OUTLETS AND CABLE NON PLENUM RATED CAT6 APPROX 200'REPLACE EXISTING TRACK LIGHT HEADS AS PER 2008 NEC
- PermitElectrical
Permit 727415 · COMPLETED
INSTALL 4-RECEPTACLES, SPEAKER & INSTALL TELECOMMUNICATION OUTLETS & CABLE CAT6 NON PLENUM CABLE IN CONDUIT APPROX 100' AS PER NEC 2008
- PermitElectrical
Permit 727412 · COMPLETED
INSTALL 13 RECEPTACLES, SPEAKERS AND CAMERA INSTALL TELECOMMUNICATION OUTLETS AND CABLE PER 2008 NEC
- PermitElectrical
Permit 729170 · COMPLETED
INSTALL COAX CABLE FROM DISH NETWORK SATELLITE TO TICKETING BREAK ROOM... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 729828 · COMPLETED
INSTALL TWO 120V, 20A CIRCUITS FOR ADDITIONAL OUTLETS IN C30 BREAK ROOM... IN ACCORDANCE WITH 2008 NEC FOR A ONE FAMILY BUILDING
- PermitMajor alteration
Permit 728821 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO REMOVE EXISTING SWINGING DOOR AND INSTALL NEW SLIDING DOOR TO UNITED AIRLINES CLUB IN TERMINAL B/C AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL WORK**
- PermitSuppression
Permit 728546 · COMPLETED
RELOCATING TWO,(2), SPRINKLER HEADS. IN SPACE B-IT-LL OF THE B CONCOURSE
- PermitPlumbing
Permit 728374 · COMPLETED
RELOCATE FLOOR DRAIN AND PIPE IN CONDENSATE (AIRPORT)THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitMechanical
Permit 727276 · COMPLETED
INSTALL HVAC SYSTEM FOR NEW OTG MDF ROOM TO INCLUDE DUCTLESS SPLIT SYSTEM, GALVANIZED DUCTWORK, ENERGY RECOVERY UNIT, 2 DIFFUSERS AND 3 ZONE CONTROLLERS AS PER APPROVED PLANS.
- PermitElectrical
Permit 727763 · COMPLETED
POWER FOR 10- RADIO COMMUNICATION CHARGING STATIONS- 120V, 20A CIRCUITS (SHELVING UNITS WITH A CIRCUIT TO EACH)... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 713582 · COMPLETED
INSTALL LIGHT FIXTURES,REMOVE AND REPLACE RECEPTACLES IN MILLWORK ADD RECEPTACLES,INSTALL COMMUNICATION OUTLETS AND SPEAKER OUTLETS. ALL WIRING TO BE FROM EXISTING PANEL 100A 120/208V PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitMajor alteration
Permit 724861 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO CONVERT AN EXISTING BATHROOM INTO AN IT ROOM WITHIN AN EXISTING AIRPORT (TERMINAL B - SPACE B-IT-LL) AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitSuppression
Permit 711821 · COMPLETED
INSTALLATION OF TWO (2) NEW PREACTION SYSTEMS AND ONE (1) DRY SYSTEM IN ACCORDANCE WITH NFPA 13 IN THE BASEMENT OF TERMINAL A ALONG WITH ASSOCIATED SUPPLY PIPING AS PER APPROVED PLANS.
- PermitElectrical
Permit 726779 · COMPLETED
FURNISH AND INSTALL 1 NEW EXIT SIGN. RELOCATE 1 EXIST SIGN DUE TO CHANGE IN LAYOUT PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 725905 · COMPLETED
DEMOLISH DEAD CIRCUIT AND RAISE JUNCTION BOX AND OUTLET BOXES FOR ROOF WORK... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 724982 · COMPLETED
RELOCATE EXISTING SWITCH AND ONE OUTLET... IN ACCORDANCE WITH 2008 NEC
- PermitDemolition
Permit 724863 · COMPLETED
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 706187 · COMPLETED
TEMP LIGHTING, FUSES,CIRCUIT BREAKERS, GROUNDING, MV FEEDERS INDOORS, DUCT SEALING. REPLACING MV FEEDERS IN EXISTING DUCTBANKS, SWITCHGEAR, SWITCHES, LIGHTING CONTROLS, CONCRETE PADS, MV MATS, BRANCH CIRCUITS AND DEMOLITION AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 708804 · EXPIRED
LEVEL II INTERIOR ALTERATIONS AS PER PLAN. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitMajor alteration
Permit 717603 · COMPLETED
ALTERATIONS TO FIT OUT SPACE FOR BALDUCCI'S FOOD LOVER'S MARKET AS PER PLANS
- PermitMechanical
Permit 722043 · COMPLETED
HVAC INSTALLATION INCLUDES, 11 NEW GRILLES, REGISTERS AND DIFFUSERS, 1 NEW EXHAUST FAN AND 1 RTU. SEE A/P 717603 FOR PLAN.
- PermitElectrical
Permit 720553 · COMPLETED
INSTALLATION OF 1- 120V, 20A CIRCUIT FOR NEW SLIDING GLASS DOOR... IN ACCORDANCE WITH 2008 NEC
- PermitAddition
Permit 638697 · COMPLETED
PERMIT TO COMPLETE WORK APPROVED UNDER BUILDING PERMIT APPLICATION # 178697(7/23/2009) TO INCLUDE REMEDIATION OF EXISTING, NON COMPLIANT, SPRAY-APPLIED FIRE RESISTIVE MATERIAL (SFRM) AND ALTERNATIVE MEANS OF FIRE RATING COMPLIANCE. PERMIT TO CHANGE THE CONSTRUCTION TYPE FROM 1B TO IIA AS PER PLAN.**SEPARATE PERMIT IS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION SYSTEMS**
- PermitElectrical
Permit 705376 · COMPLETED
INSTALL NEW PRE-ACTION CONTROL PANEL AND ASSOCIATED DETECTION DEVICES ON THE 2ND FLOOR AS PER NFPA 72 WEST DISTRICT
- PermitAddition and/or Alteration
Permit 708814 · Issued
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXISTING RETAIL ELECTRONICS STORE IN BC CONNECTER SPACE BC30 WITHIN AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitUse
Permit 717258 · COMPLETED
RETAIL SALES OF CONSUMER GOODS
- PermitElectrical
Permit 714504 · COMPLETED
REMOVE EXISTING BREAKER AND REPLACE WITH NEW 100 AMP BREAKER AS PER 2008 NEC. (WEST)
- PermitAddition and/or Alteration
Permit 702377 · Issued
REPAIR OF DETERIORATED CONCRETE THROUGHOUT GARAGE D. WORK TO INCLUDE STRUCTURAL REPAIR, WATERPROOFING,GUARDRAIL UPDATING, PIPE GUARD INSTALLATION AND EXPANSION JOINT REPLACEMENT AS PER PLAN.
- PermitMechanical
Permit 700239 · COMPLETED
FOR HVAC MECHANICAL ALTERATIONS TO INCLUDE THE INSTALLATION OF ASSOCIATED DUCTWORK, SUPPLY/RETURN REGISTERS, EXHAUST FANS, AND A TYPE II KITCHEN EXHAUST HOOD TO SERVICE A LIGHT-DUTY COOKING APPLIANCE (PRODUCING NO SMOKE OR GREASE).
- PermitSuppression
Permit 715371 · COMPLETED
RELOCATE 10 SPRINKLERS IN SPACE D8 ON THE 2ND FLOOR
- PermitElectrical
Permit 698531 · COMPLETED
INSTALL PANEL, LIGHTS, SWITCHES, RECEPTACLES,HVAC EQUIPMENT WIRING,COMMUNICATION JACKS AND SPEAKERS AS PER 2008 NEC (WEST DISTRICT) NEW FIRE ALARM DEVICES INCLUDING SPEAKER/STROBES AND MODULES AS PER NFPA72
- PermitMechanical
Permit 704402 · COMPLETED
INSTALLING BUILDING OWNER SUPPLIED DATA ROOM HVAC COOLING EQUIPMENT TO SUPPORT ADJACENT PROCESSING EQUIPMENT. INSTALL OUTDOOR CONDESING CAPACITY AND RELATED REFRIGERANT PIPING. REMOVAL OF EXISTING AIR HANDLER CONDENSER.
- PermitElectrical
Permit 710247 · COMPLETED
PROVIDE AND 208 VOLT POWER FOR TSA X RAY MACHINES IN TERMINAL D/E BAGGAE AND TERMIAL F PER 2008 NEC (AIRPORT) WEST DISTRICT
- PermitSuppression
Permit 699421 · COMPLETED
INSTALLATION OF (1) SPRINKLER ON THE FIRST FLOOR OF TERMINAL F FED BY A NEW DOUBLE INTERLOCK PRE-ACTION SYSTEM AS PER THE SUBMITTED DRAWINGS.
- PermitElectrical
Permit 711227 · COMPLETED
UPGRADE EXISTING PASSENGER BOARDING BRIDGES TO LED LIGHTING BRIDGES WITH ABOUT 700 LIGHTS IN TERMINALS C AND F AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 709980 · COMPLETED
INSTALL 2- DATA DROPS AND A 12- STRAND FIBER.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 702308 · COMPLETED
PHILADELPHIA PARKING AUTHORITY OFFICE BUILDING AT PHILADELPHIA INTERNATIONAL AIRPORT. REPLACE 125A FUSES WITH 150A FUSES IN EXISTING 200A SWITCH. PROVIDE ANDINSTALL NEW CIRCUIT BREAKERS, CONDUIT, WIRE AND DISCONNECT SWITCHES FOR NEW HVAC EQUIPMENT AND OWNER SUPPLIED UPS AND RACK AIR CONDITIONERS. ASSEMBLE OWNER SUPPLIED UPS, TERMINATE ALL WIRING, TEST AND COMMISSION SYSTEMS ALONG SIDE FACTORY EQUIPMENT TECHNICIANS.
- PermitAlteration
Permit 710303 · COMPLETED
EZ PERMIT RE-ROOFING- FOR THE INSTALLATION OF NEW ROOF COVERINGS ON EXITING ROOFS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 702000 · COMPLETED
INSTALL 120V BRANCH POWER CIRCUITS FROM EXISTING PANELS TO PROPOSED FLOOR MOUNTED RECEPTACLES FOR PASSENGER SEATING PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitMajor alteration
Permit 703405 · COMPLETED
INSTALL OF FINISHING AND DECORATION PACKAGE AS PER PLAN.**SEPARATE ELECTRICAL PERMIT IS REQUIRED**
- PermitPlumbing
Permit 683426 · COMPLETED
ALTERATION TO EXISTING SPACE,REPLACE SANITARY AND WATER LINES TO MAIN,INSTALL 3-SINKS,2-GREASE TRAPS AND 6-FLOOR SINKS. THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004
- PermitElectrical
Permit 699198 · COMPLETED
FURNISH AND INSTALL NEW BRANCH CIRCUITRY POWER FOR LIGHTING FOR NEW TENANT. EXISTING PANEL BOARD TO BE RELOCATED IN SPACE. INSTALL PLENUM RATED CAT6 (6 DROPS) FOR DATA OUTLETS. MAX RUN 55FT. PER 2008 NEC (AIRPORT)FIRE ALARM-EXISTING PANEL TO REMANIN AND REPLACE EXISTING DEVICES AND TEST PER NFPA 72
- PermitElectrical
Permit 703004 · COMPLETED
PROVIDE CONDUIT & WIRE FOR FUTURE PARKING LOT EQUIPMENT AS PER NEC 2008 WEST DISTRICT
- PermitAlteration
Permit 687116 · COMPLETED
LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) AT EXISTING AIRPORT TERMINALS C & D TO INCLUDE REPLACEMENT OF EXISTING ROOF, FLASHING, AND ACCESSORY MATERIALS, INSTALLATION OF NEW ROOF DRAIN LOCATION, REPLACEMENT OF STAIR TOWER ROOF ACCESS DOOR, PAINTING AND RELOCATION OF EXISTING HVAC EQUIPMENT AND DUNNAGE AS PER APPROVED PLANS. **SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL WORK**
- PermitMechanical
Permit 700224 · COMPLETED
FOR THE INSTALLATION OF A NEW HVAC SYSTEM WITH ASSOCIATED DUCT WORK AND REGISTERS/DIFFUSERS (SPACE BC-22/23), PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION
- PermitElectrical
Permit 695331 · COMPLETED
COMMUNICATIONS-INSTALL CONDUIT AND FIBER CABLE/PLENUM RATED CAT6 FROM LOCAL TERMINALCOMMUNICATIONS ROOM TO NEW WIRELESS ANTENNAS,(5)6 STRAND SINGLE MODE FIBER RUNS-325FT AND (8)CAT6 RUNS-85FT EACH AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 701402 · COMPLETED
FURNISH AND INSTALL NEW 60AMP SUB PANEL, INSTALL CONDUIT AND WIRE FOR NEW 20AMP RECEPTS IN B/C FOOD COURT COLUMNS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 699507 · COMPLETED
1 FOR 1 REPLACEMENT OF 423 CANOPY LIGHTING FIXTURES AT LOWER LEVEL OF PHILADELPHIA INTERNATIONAL AIRPORT PARKING GARAGE (AIRPORT)
- PermitMechanical
Permit 696853 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR AIRPORT CONCOURSES 'B' & 'C' TO INCLUDE INSTALLATION OF THIRTY-ONE (31) NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS.
- PermitUse
Permit 695091 · COMPLETED
FOR USE AS A TAKE OUT RESTAURANT IN TERMINAL D SPACE #8 WITHIN AN EXISTING AIRPORT FACILITY WITH OTHER PREVIOUSLY APPROVED USES. **SEE A/P 695081 FOR PLANS**
- PermitMajor alteration
Permit 695081 · COMPLETED
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A TAKE OUT RESTAURANT IN SPACE #8 WITHIN TERMINAL D OF AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- PermitElectrical
Permit 699996 · COMPLETED
INSTALL (4) DATA LINES AND (2) SWITCHES FOR EXISTING LIGHTING PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitSuppression
Permit 700463 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitNew construction
Permit 682719 · COMPLETED
SITE WORK FOR AVIS BUDGET GROUP (AABG) TO INCLUDE RECONFIGURING THE CUSTOMER CAR RETUR ENTRANCE, DEMOLITION WORK TO INCLUDE THE DEMOLITION OF AN EXISTING LANDSCAPE ISLAND, CURBING, GUARDRAIL, AND PAVING, NEW WORK TO INCLUDE THE INSTALLATION OF A NEW LANDSCAPE ISLAND, CURBING, GUARDRAIL, PAVING, STRIPING, SECURITY EQUIPMENT AND TWO (2) NEW DIRECTIONAL SIGNS AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK**
- PermitSuppression
Permit 699682 · COMPLETED
EZ STANDARD KITCHEN FIRE SUPPRESSION- FOR THE INSTALLATION OF NEW WET CHEMICAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. INSTALL ONE ANSUL UL300 WET CHEMICAL SYSTEM.
- PermitUse
Permit 698892 · COMPLETED
RETAIL SALE OF WEARING APPAREL AND ACCESSORIES IN B/C CONNECTOR SPACE# 22/23 IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.
- PermitMajor alteration
Permit 694943 · COMPLETED
LEVEL II ALTERATION FOR TENANT FITOUT AS PER PLAN **SEPARATE PERMIT IS REQUIRED FOR MECHANICAL AND ELECTRICAL WORK**
- PermitElectrical
Permit 698464 · COMPLETED
REPAIR WIRING TO B3 TRASH COMPACTOR... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 687602 · COMPLETED
INSTALL NEW OR EXTEND EXISTING 120V/20A BRANCH POWER CIRCUITS FROM EXISTING PANELBOARDS TO NEW OR RELOCATED LOADS,MODIFY EXISTING LIGHTING AND ASSOCIATED 277V BRANCH LIGHTING CIRCUITS FOR RELOCATED AND/OR REMOVED LIGHTING FIXTURES,INSTALL NEW LIGHTING AND CONTROLS AND ASSOCIATED 277V BRANCH LIGHTING AND LOW VOLTAGE CONTROL CIRCUITS AS PER 2008 NEC(WEST DISTRICT)
- PermitMajor alteration
Permit 681601 · COMPLETED
EXTERIOR LOT IMPROVEMENTS, NEW EXISTING SECURITY EQUIPMENT, HYDRAULIC BARRIERS, NEW ELECTRICAL, SPIKE SYSTEM UPGRADES AND REPLACEMENT, INSTALLATIONS AS PER PLANS
- PermitElectrical
Permit 695846 · COMPLETED
INSTALL 200' COAX CABLE FOR CABLE TV... IN ACCORDANCE WITH 2008 NEC
- PermitAddition and/or Alteration
Permit 682434 · Issued
LEVEL II ALTERATION INCLUDES RENOVATION OF EMPLOYEE BREAKROOMS, NEW FLOORING, CEILINGS TILES & MILLWORK AS PER PLAN.
- PermitMajor alteration
Permit 688100 · COMPLETED
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR REMODEL OF TERMINAL F SECURE EXIT PORTAL WITHIN EXISTING AIRPORT FACILITY TO INCLUDE INTERIOR SIGNAGE AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- PermitElectrical
Permit 689979 · COMPLETED
INSTALL CONDUIT FOR SECURITY WIRING DONE BY ANOTHER.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 680764 · COMPLETED
ELECTRICAL-EXISTING PANELBOARDS TO REMAIN, FURNISH AND INSTALL NEW BRANCH CIRCUITRY, POWER, AND LIGHTING FOR TENNT SPACE AS PER 2008 NEC (WEST DISTRICT) FIRE ALARM- REPLACE EXISTING CONTROL PANEL, TIE INTO NEW ID NET SYSTEM, INSTALL NEW DEVICES AS PER NFPA72
- PermitElectrical
Permit 687089 · COMPLETED
INSTALL (1)120VOLT,20 AMP OUTLET IN SCREENING ROOM PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 687078 · COMPLETED
INSTALL TWO CATERGORY 6 CABLES TO GATE AGENCY PODIUM FOR NEW MICROPHONES PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitDemolition
Permit 688084 · COMPLETED
INTERIOR DEMOLITION EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 684616 · COMPLETED
RESTORE POWER TO B-11 COMPACTOR/DUMPSTER, WITH ASSOCIATED WIRING.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 682995 · COMPLETED
RELOCATE TWO KIOSKS FROM WINDOW LOCATION TO COLUMN IN FRONT OF TICKET COUNTER. RELOCATE POWER AND DATA FROM KIOSKS TO NEW LOCATION... IN ACCORDANCE WITH 2008 NEC
- PermitMechanical
Permit 681354 · COMPLETED
INSTALLATION OF NEW SUPPLEMENTAL DUCTLESS AIR CONDITIONING UNIT FOR TSA HAMMERHEAD 'D' WITHIN EXISTING AIRPORT AS PER APPROVED PLANS.
- PermitElectrical
Permit 677596 · COMPLETED
INSTALL A 225KVA TRANSFORMER,800AMP DISCONNECT,200HP,60HP,40HP FD'S,INSTALL CIRCUIT BREAKERS IN EXISTING PANELBOARDS,DISCONNECTION AND RECONNECTION OF ROOFTOP AIR HANDLERS,NEW FEEDERS,REMOVAL AND REINSTALLATION AS PER 2008 NEC (WEST DISTRICT) ADDITIONAL FIRE ALARM DUCT DETECTORS AS PER NFPA72
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 670233 · Violation 3908692 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitSuppression
Permit 683759 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION WE WILL BE RELOCATING 9 SPRINKLERS IN CONCESSION SPACE BC6 EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitMajor alteration
Permit 678053 · EXPIRED
INSTALLATION OF A PRE-FABRICATED ACCESSORY SECURITY BOOTH ON AN EXISTING TRAIN PLATFORM WITHIN AN EXISTING AIRPORT COMPLEX AS PER APPROVED PLANS. NOT REQUIRED TO BE SPRINKLERED. **SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL WORK**
- PermitMechanical
Permit 682303 · COMPLETED
HVAC INSTALLATION FOR TENANT FIT-OUT. **SEE A/P 679782 FOR PLAN**
- PermitMajor alteration
Permit 679782 · COMPLETED
LEVEL II ALTERATION FOR TENANT FIT OUT AS PER PLAN.
- PermitMechanical
Permit 682629 · COMPLETED
INSTALLATION OF COMMERCIAL EXHAUST HOOD SYSTEM INCLUDING DUCTWORK AND FANS **SEE A/P 679782 FOR PLAN**
- PermitElectrical
Permit 681897 · ABANDONED
POWER FOR 10 RADIO COMMUNICATION CHARGING STATIONS (10- SHELVING UNITS WITH A CIRCUIT TO EACH)... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 674455 · COMPLETED
INSTALL CONDUITS FOR FIBER OPTIC CABLE INSTALLATION BY COMCAST AS PER NEC 2008 WEST DISTRICT
- PermitAddition and/or Alteration
Permit 681716 · Completed
REPLACE 12 CANOPY LIGHTS OF KIND WITH NO ADDITIONAL WIRING AS PER NEC 2008 WEST DISTRICT
- PermitPlumbing
Permit 680115 · COMPLETED
REPAIR/REPLACE AN APPROXIMATELY 10'-0" SECTION OF 2" WATER DISTRIBUTION PIPING AT THE PHILADELPHIA INTERNATIONAL AIRPORT AKA 4770 ISLAND AVENUE (FLEET MAINTENANCE BUILDING PIA) - LAWN AREA
- PermitUse
Permit 679761 · COMPLETED
USE REGISTERATIONS FOR EAT IN/ TAKE RESTAURANT IN SPACE B/C 06 IN TERMINAL B/C
- PermitElectrical
Permit 678845 · COMPLETED
FURNISH AND INSTALL 3 NEW DEDICATED 120V CIRCUITS FOR 3 NEW CLEAR CHANNEL INFORMATION SIGNS AS PER 2008 (WEST DISTRICT)
- PermitElectrical
Permit 670227 · COMPLETED
REPLACE MMC, PANEL,2 DISTRIBUTION PANELS ON CONTROL UTILITY BLDG PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 674227 · COMPLETED
INSTALL DONDUIT AND WIRE FOR 120V BRANCH CIRCUITS TO NEW CHARGING TABLES TYPICAL FOR 14 CHARGING TABLES AS PER NEC 2008 (WEST DISTRICT)
- PermitElectrical
Permit 675440 · COMPLETED
REPLACE EXISTING FLIGHT INTO MONITORS, INSTALL 5 NEW CAT 5E DATA DROPS. REUSE EXISTING CIRCUITRY PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 675438 · COMPLETED
REPLACE 3 EXISTING SOUTHWEST PODIUMS, REPLACE 12 EXISTING CAT 5 DATA DROPS WITH NEW CAT 6. REUSE EXISTING CIRCUITRY FOR GFCI PROTECTED OUTLETS PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 668733 · COMPLETED
REPLACEMENT OF EXISTING ACCESS CONTROL EQUIPMENT FOR 343 SECURITY CONTROLLED DOORS, INCLUDING EXPANSION OF FIBER OPTIC DISTRIBUTION NETWORK, PROVISION OF NEW NETWORK SWITCHES AND ASSOCIATED RACK MOUNTED MODULAR UPS EQUIPMENT AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 670233 · COMPLETED
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) TO INCLUDE REPLACEMENT OF ROOFING AND NEW PARAPET ERECTION FOR EXISTING FUEL CANOPY FOR AUTO RENTALS CENTER AS PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- PermitElectrical
Permit 674496 · COMPLETED
EXTEND (2)20A/120V CIRCUITS FOR SIN SHADE MOTORS FROM EXISTING 150A-208/120V PANEL PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 671294 · COMPLETED
INSTALL 120V POWER AND DATA TO BAGGAGE BELTS FOR NEW NETWORK EQUIPMENT AS PER 2008 NEC (WEST DISTRICT)
- PermitSuppression
Permit 672244 · COMPLETED
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION OF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitAdministrative
Permit 671943 · COMPLETED
TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE D/E CONNECTOR AND BAGGAGE CLAIM AREA
- PermitMajor alteration
Permit 665495 · COMPLETED
LEVEL I INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXISTING AIRPORT TERMINAL 'D' TO INCLUDE REMOVAL AND REPLACEMENT OF EXISTING SECURITY GLASS RAILING IN GATES D3 & D7 AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED.
- PermitElectrical
Permit 667157 · COMPLETED
INSTALL TWO NEW FLUORESCENT LUMINAIRES AND CONNECT TO EXISTING LIGHTING CIRCUIT.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 668747 · COMPLETED
DEMO POWER AND DATA FROM CHECK-IN COUNTERS AND INSTALL 2- QUAD OUTLETS AND 2- CAT6 CABLES...IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 668685 · COMPLETED
FURNISH AND INSTALL ONE 120V CIRCUIT FOR NEW SIGN OUTSIDE GATE C22 AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 654007 · COMPLETED
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXISTING AIRPORT TERMINAL 'D' TO INCLUDE INSTALLATION OF BAGGAGE COUNTER INSERTS AT NEW COUNTER, INSTALLATION OF INTERIOR SIGNAGE BEHIND TICKET COUNTER AND REMOVAL OF EXISTING UNITED CURBSIDE BAGGAGE COUNTERS AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. **SEPARATE PERMIT REUQIRED FOR ELECTRICAL WORK**
- PermitElectrical
Permit 666421 · COMPLETED
INSTALL 1- 120V, 20A DEDICATED RECEPTACLE IN EXISTING POWER POLE..IN ACCORDANCE WITH 2008 NEC
- PermitAddition
Permit 649158 · CLOSED
FOUNDATION AND SITE WORK FOR REPLACEMENT OF PASSENGER BOARDING BRIDGES INCLUDING CONCOURSE 'B' GATES AND CONCOURSE 'C' GATES AS PART OF EXISTING AIRPORT AS PER APPROVED PLANS. *PART OF WORK FALLS INTO JURISDICTION OF SEPARATE COUNTY, SEE SITE PLANS FOR COUNTY BOARDER*
- PermitSuppression
Permit 663363 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitElectrical
Permit 660021 · COMPLETED
INSTALL 120/208V POWER TO NEW TRAILER FROM ADJACENT SUB-STATION PANEL... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 657976 · COMPLETED
INSTALL CONDUIT AND WIRE TO TRASH COMPACTORS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 655104 · COMPLETED
FURNISH AND INSTALL FIBER BACKBONE, COAXIAL CABLING, COAXIAL SPLITTERS, CONDUIT PATHWAYS, ANTENNAS AND REMOTE JUNCTION FOR A COMPLETE AND FUNCTIONING DISTRIBUTED ANTENNA SYSTEM. FURNISH AND INSTALL 480 VOLT POWER FEEDER, TRANSFORMER, GROUNDING AND 120/208V PANEL AT THE HEADEND EQUIPMENT ROOM ALONG WITH MISC ELECTRICAL BRANCH CIRCUITY
- PermitMajor alteration
Permit 656824 · COMPLETED
INTERIOR FIT OUT FOR EXISTING SPACE FOR USE AS AN AIRLINE EMPLOYEE BREAKROOM. THE WORK INCLUDES NEW FINISHES, ACT CEILING WITH GRID, AND NEW CASEWORK WITH SINK. ALSO THERE IS MINOR ELECTRICAL AND HVAC WORK, INCLUDING NEW LIGHTS. THE SPRINKLER SYSTEM WILL BE ADJUSTED TO SERVE THE SPACE.
- PermitElectrical
Permit 652988 · COMPLETED
REPLACEMENT OF EXISTING PASSENGER BOARDING BRIDGES: PROVIDE POWER TO SLIDEOUTS ON NEW PASSENGER BOARDING BRIDES PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitMechanical
Permit 655395 · COMPLETED
ALTERATIONS TO EXISTING HVAC SYSTEM FOR NEW BREAKROOM TO INCLUDE INSTALLATION OF (3) LAY IN CEILING DIFFUSERS AND (1) RETURN GRILL TO INCLUDE PRE AND POST AIR BALANCING AS PER APPROVED PLANS.
- PermitMechanical
Permit 648170 · COMPLETED
MECHANICAL WORK TO INCLUDE REPLACEMENT OF THREE (3) EXISTING ROOF TOP COOLING UNITS WITH THREE (3) NEW, YORK 5-TON SINGLE PACKAGES ROOF TOP UNITS FOR PPA TERMINAL B PEDESTRIAN BRIDGE AT PHILADELPHIA INTERNATIONAL AIRPORT AS PER APPROVED PLANS.
- PermitSuppression
Permit 651810 · COMPLETED
INSTALLING (4) ADDITIONAL SPRINKLERS IN THE BATHROOM SHAFT IN TERMINAL F BAGGAGE CLAIM AT AIRPORT IN ACCORDANCE WITH NFPA 13
- PermitElectrical
Permit 658632 · COMPLETED
EXTEND AND CONNECT EXISTING POWER TO 3 NEW DISPLAY SIGNS AND INSTALL ONE 120V DEDICATED OUTLET IN COMMUNICATION CABINET. PULL DATA 2 CAT5E CABLES APPROX 125FT THRU EXISTING CONDUITS FOR NEW CAROUSEL SIGNAGE AND CONNECT PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 658331 · COMPLETED
TERMINAL F BAGGAGE: INSTALL 1 - 6 SINGLE STRAND MODE FIBER, APPROX 925FT CONNECTING CLEAR CHANNEL IDF'S IN E BAGGAGE TO F BAGGAGE AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 651303 · COMPLETED
AT&T WIFI EXPANSION TO NEW TERMINAL F BAGGAGE,NON-PLENUM RATED CAT 6 CABLE WITH A RUN OF 250FT DROP AND 120V FEEDER TO AT&T IDF ENCLOSURE,REMOTE WIFI ANTENNAS, FIBER OPTIC CONNECTION TO EXISTING WIFI SYSTEM AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 653832 · COMPLETED
INSTALL RECESSED FIXTURES, RECEPTACLES, REFRIGERATOR OUTLET, TELECOM OUTLETS PER 2008 NEC (AIRPORT) RELOCATE 2 FIRE ALARM DEVICES PER NFPA 72
- PermitPlumbing
Permit 655359 · COMPLETED
INSTALL NEW KITCHEN SINK (AIRPORT)
- PermitElectrical
Permit 652651 · COMPLETED
GATE D1:INSTALL 1-20AMP RECEPT AND 2-CAT6 NON-PLENUM DATA CABLES,APPROX 124FT,FOR PRTABLE KIOSK.GATE D7:INSTALL 2-20AMP RECEPTS AND 4-CAT6 NON-PLENUM DATA CABLES,APPROX 210 FT,FOR NEW CHECK IN COUNTER.GATE D13: INSTALL 2-CAT6 NON-PLENUM DATA CABLES,APPROX 130FT,FOR NEW CHECK IN COUNTER AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 651666 · COMPLETED
MODIFY TICKET COUNTERS AT THREE GATES IN TERMINAL D. WORK INCLUDES, COUNTER DEMOLITION. *SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK*
- AppealBuilding standards appeal
Appeal 26355 · CLOSED · APPROVED
Related permit 638697 · ON 10/30/2015, THE DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED A NOTICE OF REFUSAL FOR APPLICATION #638697.
- PermitElectrical
Permit 650175 · COMPLETED
INSTALL RECEPTACLES AT VARIOUS AIRPORT LOCATIONS.AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 647460 · COMPLETED
INSTALL LOW VOLTAGE TEMPERATURE CONTROL WIRING PER 2008 NEC (AIRPORT)
- PermitAdministrative
Permit 651707 · COMPLETED
TCO FOR AP# 355096 FOR NEW BAGGAGE CLAIM BLDG, CONVEYOR BRIDGE AND THE PEDESTRIAN BRIDGE
- PermitElectrical
Permit 644726 · COMPLETED
DEMOLISH EXISTING AND INSTALL NEW COMMUNICATION EQUIPMENT FOR FLIGHT INFORMATION DISPLAY SYSTEMS PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 642831 · COMPLETED
INSTALL CABLE,KIOSKS,DATA RACK AND OUTLETS PER 2008 NEC (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 648369 · COMPLETED
REPLACE PARKING LOT POLE AND LIGHTS WITH NEW POLE AND LED LIGHT ON EXISTING BASE AT HERTZ CAR RENTAL AT THE AIRPORT AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 645559 · COMPLETED
INSTALL 1- 20A CIRCUIT FOR NEW RADIO BASE STATION...IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 636915 · COMPLETED
INSTALL WIRING FOR CONVEYOR SYSTEM INCLUDING SERVICES TO CONVEYORS MOTOR AND MOTOR CONTROLS WEST DISTRICT
- PermitElectrical
Permit 644114 · COMPLETED
INSTALL ONE GFI RECEPTACLE CIRCUIT AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 642148 · COMPLETED
INSTALL SECURITY CABLE INSIDE THE EXISTING CONDUIT RACEWAY AND MOUNT (4) SECURITY CAMERA'S. THE EMPTY CONDUIT RACEWAY SYSTEM IS PART OF PERMIT #615968 (AIRPORT)
- PermitElectrical
Permit 634315 · COMPLETED
DISCONNECT POWER CIRCUITS FROM THIRTEEN (13) AIR HANDLING UNITS AND THREE (3) PUMPS. RUN NEW CIRCUITS INEXISTING CONDUIT AND NEW CONDUIT TO THIRTEEN (13) NEW AIR HANDLING UNITS AND THREE (3) NEW PUMPS. REMOVE FIVE (5) PANEL INTERIORS AND INSTALL FIVE (5) NEW PANELS/TERMINATE EXISTING AND NEW CIRCUITS. REPLACE DEVICES FOR THE EXISTING FIRE ALARM SYSTEM.
- PermitElectrical
Permit 640870 · COMPLETED
INSTALL 2 DEDICATED CIRCUITS TO FEED 2 OUTLETS FOR NATIONAL CAR RENTAL EXHIBIT PER 2008 NEC (AIRPORT)
- PermitOperations
Permit 23743 · COMPLETED
09/24/2015 ERECT ASSEMBLY TENT (40'X 80'), TO BE USED AS A PRODUCTION TENT FOR ATLANTIC AVIATION AT PHILADELPHIA INTERNATIONAL AIRPORT. (10% CHAIRS ONLY, 90% STANDING)
- PermitElectrical
Permit 639442 · COMPLETED
WIRE 1" EMT CONDUIT FOR POWER WIRING TO A NEW OVEN.PROVIDE NEW CIRCUT BREAKER FOR AN EXISTING BUSINESS. NOT FIR OUT WIRIING ON THIS PERMIT
- PermitElectrical
Permit 635403 · COMPLETED
TO INSTALL 120V, 20A CIRCUIT FOR COFFEE MACHINE AND 208V, 30A CIRCUIT FOR A COFFEE MACHINE.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 623877 · COMPLETED
INSTALL NEW POWER CIRCUITS TO FEED NEW CAR CHARGER IN TERMINALS C, D & ECONOMY LOT & INSTALL NEW CAR CHARGER EQUIPMENT AS PER NEC 2008 WEST DISTRICT
- PermitPlumbing
Permit 616149 · COMPLETED
PLUMBING DEMO AND ALTERATION WORK FOR RESTROOM RENOVATIONS IN TERMINALS D, E & F (PHASE 2) - THE WORK WILL COMPLY WITH THE APPROVED PLANS AND THE PHILADELPHIA PLUMBING CODE 2004
- PermitElectrical
Permit 633470 · COMPLETED
REPLACE 17- FLUORESCENT LAY IN FIXTURES WITH 17- LED FIXTURES..... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 633460 · COMPLETED
REPLACE: 12- 1X4 FLUORESCENT PENDANT FIXTURES WITH 12- LED PENDANT FIXTURES, 5- 2X4 FLUORESCENT LAY IN FIXTURES WITH 5- 2X4 LED -LAY IN FIXTURES..... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 633131 · COMPLETED
INSTALLATOIN OF CONDUIT AND CAT 6 FROM SPACE BC-32 TO B-07 IN TERMINAL B (LONGEST CABLE 300FT)PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 612907 · COMPLETED
COMPLETE REMOVAL AND REPLACEMENT OF ALL PARTITIONS, FINISHES, CASEWORK, BATHROOM ACCESSORIES WITHIN THE FOOTPRINT OF SIX RESTROOM LOCATIONS ON TERMINAL D, E, AND F. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL , PLUMBING AND MECHANICAL WORK ALSO TO INCLUDE AN AMENDED PERMIT FOR THE APPROVAL OF SPECIAL INSPECTORS**
- PermitElectrical
Permit 626908 · COMPLETED
FURNISH AND INSTALL 200 AMP NEMA 3R PANEL FEED FROM NEW TRANSFORMER SUBSTATION BELOW VIA 3" RGS. FURNISH AND INSTALL FIBER OPTIC CABLE FROM E BAGGAGE VIA 2" RGS. FURNISH AND INSTALL 2/0 GROUND VIA 1 1/2" RGS PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 614581 · COMPLETED
RENOVATION OF EXISTING PUBLIC RESTROOMS TO INCLUDE DEMOLITION & REMOVAL OF BRANCH POWER DEVICES & LIGHTS, INSTALL NEW 208/120V PANELS, BRANCH CKT WIRING, DEVICES, LIGHTS & PUBLIC ANNOUNCEMENT SPEAKERS AS PER 2008 NEC (WEST DISTRICT) REPLACEMENT OF EXISTING FIRE ALARM DEVICES AS PER NFPA72
- PermitElectrical
Permit 627314 · COMPLETED
REPLACE 8- EXISTING RECESSED LIGHT FIXTURES WITH 8- NEW RECESSED LIGHT FIXTURES... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 627301 · COMPLETED
DISCONNECT POWER THEN REINSTALL TO A NEW TSA X-RAY MACHINE, 208V... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 628368 · COMPLETED
INSTALL 1 DEDICAED CIRCUIT TO FFED 1 OUTLET ON A POEWR POLE IN LANE #4 (AIRPORT)WEST DISTRICT
- PermitElectrical
Permit 620585 · COMPLETED
DISCONNECT EXIST ELEC BRANCH CKTS FROM CASEWORK FOR INST CASEWORK, INSTA CONDUIT FOR BRANCH CKTS TO CASEWORK WORK, KIOSKS & MONITORS, INST CONDUIT & TELECOMM CABLE TO NEW CASEWORK, KIOSKS & MONITORS AS PER NEC 2008 ****NEED A BUILDING PERMIT ATTACHED*****
- PermitMechanical
Permit 615041 · COMPLETED
INSTALL 4 ROOFTOP UNITS, INSTALL 3 EXHAUST FANS. DUCTWORK
- PermitMajor alteration
Permit 614799 · COMPLETED
INSTALLATION OF WIRELESS SERVICES ON STAIRWELL ROOF TERMINAL E/F PARKING GARAGE. INSTALL ONE EQUIPMENT PLATFORM ON STAIRWELL ROOF. INSTALL ONE EQUIPMENT CABINET ON PLATFORM. INSTALL THREE PANEL ANTENNAS ATTACHED TO RAILING OF EQUIPMENT PLATFORM. INSTALL GPS ANTENNA, SIX RRHS, AND ONE FIBER DISTRIBUTION BOX.**SEPARATE ELECTRICAL PERMIT IS REQUIRED**
- PermitSuppression
Permit 621246 · COMPLETED
RELOCATE 236 SPRINKLERS IN THE BATHROOM OF TERMINALS D,E,F ON THE GROUND AND 2ND FLOOR.
- PermitElectrical
Permit 619528 · COMPLETED
TEMPORARY POWER (200A) FOR FLOOR GRINDING EQUIPMENT- (APPROXIMATELY 60 DAYS)... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 618838 · COMPLETED
INSTALL 60' OF ET CONDUIT WITH COAX CABLE..... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 611881 · COMPLETED
ACCESS CONTROL SYSTEM UPGRADES AS PER NEC 2008 (WEST DISTRICT)
- PermitElectrical
Permit 620001 · COMPLETED
INSTALL 110 FEET OF 1"EMT CONDUIT WITH 6 STRAND FIBER OPTIC CABLE FROM AB1004 TO AB1001.
- PermitElectrical
Permit 611612 · COMPLETED
REPLACE FEEDERS FOR POWER TO PASSENGER BOARDING BRIDGES, GROUND POWER, AND PC AIR UNITS, BRANCH CIRCUITS,PULLBOXES, CLOSED-CIRCUIT TELEVISION, ACCESS CONTROL, LOW VOLTAGE CABLING, CCTV RACKS, ACCESS CONTROL PANELS.
- PermitElectrical
Permit 601576 · COMPLETED
REMOVE AND REPLACE ELECTRICAL CONDUITS TO A DISPENSERS AND 1 DIESEL TANK AND PULL NEW WIRE (AIRPORT)
- PermitElectrical
Permit 616356 · COMPLETED
PROVIDE 120V POWER TO SIGNE LOCATED A F-30 FED FROM CLOSET JUNCTION BOX AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 615968 · COMPLETED
PROVIDE EMPTY CONDUIT RACEWAYS AND JUNCTION BOXES FOR FUTURE CCTV SECURITY CAMERA SYSTEM AS PER 2008 NEC. ALL CABLE INSTALLATION AND TERMINATIONS WILL BE COMPLETED BY ANOTHER CONTRACTOR (NIC) (WEST DISTRICT)
- PermitElectrical
Permit 613060 · COMPLETED
REPLACE IN KIND: 62- 2X4 FLUORESCENT LIGHT FIXTURES WITH 62- 2X4 LED LIGHT FIXTURES... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 615062 · COMPLETED
INSTALLATION OF 70KW GENERATOR WITH 100AMP 3 PHASE POWER DISTRIBUTION OFR TEMPORARY SOUND SYSTEM AND FANS FOR A ONE DAY EVENT AND IONSPECTION ON JUNE 9, 2015 AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 609751 · COMPLETED
REPLACE 750 EXISTING FIXTURES (CANOPY LIGHTING) ADD 150 NEW FIXTURES (CANOPY LIGHTING) - THE INSTALLATION WILL COMPLY WITH THE APPROVED PLANS AND THE 2008 NEC
- PermitElectrical
Permit 606649 · COMPLETED
NEW LIGHTING IN BREEZEWAY AREAS & NEW TRAFFIC CONTROLS FOR INNER SERVICE ROAD AS PER NEC 2008 (AIRPORT) WEST DISTRICT
- PermitSuppression
Permit 607155 · COMPLETED
RELOCATING A DRY SYSTEM WITH (16) SPRINKLERS IN THE TERMINAL F TICKETING AREA AT PHILA AIRPORT
- PermitElectrical
Permit 609764 · COMPLETED
WIRE AND INSTALL 3 NEW OUTLETS FOR CHARGING TABLES VIA EXSISTING CIRCUITS AND WIREMOLD
- PermitSuppression
Permit 609071 · COMPLETED
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
- PermitSuppression
Permit 608794 · COMPLETED
INSTALL1-ANSUL R-1-2 9.0 GAL WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitElectrical
Permit 608469 · COMPLETED
REPAIR OF DAMAGE ROOF TOP MAKE UP AIR UNIT AND EXHAUST FAN WHICH WILL REQ THE REPLACEMENT OF THE EXISTING 15A 3 PHASE 208 VOLT BRANCH CIRCUITS FOR EACH UNIT (2) PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 598551 · COMPLETED
INSTALL 2-PANEL, 1-FEEDER, LIGHT FIXTURES, WIRING DEVICES, HVAC & KITCHEN EQUIPMENT WIRING, TELE/DATA JACKS & WIRING FOR SECURITY CCTV AS PER NEC 2008 & FIRE ALARM SYSTEM AS PER NFPA 72 (AIRPORT) WEST DISTRICT
- PermitElectrical
Permit 605829 · COMPLETED
REMOVE 38 EXISTING LIGHT FIXTURES & INSTALL 38 LED TYPE LIGHT FIXTURES ON THE EXISTING WIRING. NO NEW WIRING OR PANELS ON THIS PERMIT.PER 2008 NEC (AIRPORT)
- PermitMechanical
Permit 598560 · COMPLETED
INSTALLATION OF TWO (2) UL 710 LISTED CAPTIVE AIRE COMMERCIAL KITCHEN EXHAUST HOODS WITH SUPPLY/EXHAUST TIE-IN TO ONE (1) MAKE UP AIR FAN, ONE (1) EXHAUST FAN & ALL ASSOCIATED RETURN/EXHAUST DUCTWORK.***SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM***
- PermitMajor alteration
Permit 603053 · COMPLETED
DEMO & REINSTALL NEW TICKET COUNTERS & TICKET KIOSK AS PER PLAN FOR ** A- EAST TICKET COUNTER, A - EAST BRIDGE, B - BRIDGE, C - BRIDGE, B/C - TICKET COUNTER AND F- TICKECT COUNTER **
- PermitElectrical
Permit 602847 · COMPLETED
INSTALL POWER & DATA COMMUNICATION AMERICAN AIRLINES KIOSKS ACAVATION STATION & TICKET COUNTERS & POWER & DATA TIE INTO EXISTING PANELS AS PER NEC 2008 (AIRPORT) WEST DISTRICT
- PermitElectrical
Permit 602054 · COMPLETED
DISCONNECT POWER CKTS FROM 4-0LD EXISTING PBB & RECONNECT TO 3 OF 4 PBB, INSTALL POWER CKT TO FEED PBB AT GATE D8, BRANCH CKT & COMMUNICATION CABLE FOR SECURITY EQIPMENT AT GATE D8 AS PER NEC 2008 (AIRPORT)
- PermitElectrical
Permit 604409 · COMPLETED
DISCONNECT 3-WIRES FROM EXISTING JUNCTION BOX & REMOVE 2-LIGHTS AS PER NEC 2008 (AIRPORT) WEST DISTRICT
- PermitElectrical
Permit 604411 · COMPLETED
REPLACE 16-2X4 LIGHTING FIXTURES WITH LED LIGHT FIXTURES AS PER NEC 2008 WEST DISTRICT
- PermitElectrical
Permit 601652 · COMPLETED
INSTALL 30A/208V THHN CIRCUIT IN EMT/RGS CONDUIT FROM EXISTING PANEL TSA-PP, LOCATED IN ELECTRICAL CLOSET TERMINAL D HAMMERHEAD BUILDING, FIRSTFLOOR CONCORSE, TSA CONTROL OFFICE TO OUTDOOR MOUNTED CONDENSING UNIT LOCATED AT ELEVATED RAMP AREA.
- PermitSuppression
Permit 594510 · COMPLETED
FOR ALTERATION TO EXIST. FIRE SUPPRESSION SYSTEM W. EXIST. BACKFLOW PREVENTION (BFP) ASSEMBLY SERVING PEDESTRIAN BRIDGE AREA OF EXIST. PLANE TERMINAL FACILITY TO CONVERT EXISTING DRY TYPE SYSTEM INTO WET PIPE SYSTEM WITH ONSITE PRIVATE WATER SUPPLY. FIRE SUPPRESSION SYSTEM ALTERATION IN ACCORDANCE WITH NFPA 13.
- PermitPlumbing
Permit 597105 · COMPLETED
INSTALL GREASE TRAP, MOP SINK, 2-HAND SINKS, 1-PREP SINK & 5-FLOOR SINKS NOTE: THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitElectrical
Permit 599549 · COMPLETED
ADD THREE DUPLEX RECEPTACLES AND THREE CAT 5 PLENUM RATED DATA DROPS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 599849 · COMPLETED
CORE DRILL (1)-6" HOLE AND INSTALL POWER AND (1) NEW POKE TROUGH DEVICE FOR THE INSTALLATION OF A GROUND FLOOR MOUNTED RECEPTACLE PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 597093 · COMPLETED
FOR LEVEL II ALTERATIONS TO AN EXISTING TAKEOUT RESTAURANT, ALTERATIONS TO INCLUDE THE INSTALLATION OF EQUIPMENT, FINISHES AND FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- PermitElectrical
Permit 598148 · COMPLETED
INSTALL ALL NEW CONDUIT AND WIRE TO TRAILER 1 DISCONNECT POWER FROM TRAILER 2 AND RECONNECT POWER TO TRAILER 2 AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 598475 · COMPLETED
INSTALL NEW 120V AND 20A RECEPTACLE AND TWO CAT 6 CABLES FOR NEW MONITOR
- PermitElectrical
Permit 598128 · COMPLETED
DEMOLITION OF TEMPORARY POWER RELOCATE GATE POWER INSTALL ONE NEW QUAD OUTLET AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 556113 · COMPLETED
REPLACEMENT OF EXISTING LOW SLOPE ROOF, FLASHINGS, AND ACCESSORY MATERIALS, REMOVAL OF EXISTING SKYLIGHTS, REFURBISHMENT OF EXISTING SKYLIGHTS, INFILL OF EXISTING OPENINGS.EXISTING SKYLIGHTS TO BE INFILL TO NEW ELEVATION COMPATIBLE WITH NEW ROOF INFILL. **SEPARATE PERMIT IS REQUIRED FOR SPRINKLER RELOCATION**
- PermitElectrical
Permit 598752 · COMPLETED
WIRE & INSTALL NEW 100AMP SUB PANEL & 4-DEDICATED OUTLETS IN AB STORAGE CAGE FOR STARBUCK EQUIPMENT AS PER NEC 2008 (AIRPORT)
- PermitElectrical
Permit 593811 · COMPLETED
DEMOLITION OF QUAD RECEPTACLE AND DATA LINES TO GATE E3 AND BAGGAGE CLAIM OFFICE.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 593831 · COMPLETED
RETROFIT 30 LIGHT FIXTURES TO LED (NO NEW WIRING)... IN ACCORDANCE WITH 2008 NEC
- PermitInterior Non-Load-Bearing Wall Demo.
Permit 594970 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.
- PermitElectrical
Permit 587433 · COMPLETED
INSTALL FIRE ALARM 2-HEAT DETECTORS TO NEW RP-2001 PRE-ACTION CONTROL PANEL IN TERMINAL BAGGAGE CLAIM AS PER NFPA 72
- PermitElectrical
Permit 587430 · COMPLETED
INSTALL FIRE ALARM 2-HEAT DETECTORS TO NEW RP-2001 PRE-ACTION CONTROL PANEL IN TERMINAL TICKETING AREA AS PER NFPA 72
- PermitElectrical
Permit 594213 · COMPLETED
INSTALL CONDUIT, WIRE & 1-20AM RECEPT TO MCO CABINET FED FROM PNL R2-3 & CONDUIT & 1-6 STRAND SINGLE MODEFIBER TO MCO CABINET FED FROM DEMARC CT2032 AS PER NEC 2008 (AIRPORT)
- PermitElectrical
Permit 593382 · COMPLETED
WIRE AND INSTALL 2 NEW 120V OUTLETS FOR NEW COFFEE MACHINES PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 593387 · COMPLETED
WIRE AND INSTALL 2 NEW 120V OUTLETS FOR NEW COFFEE MACHINES PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 593388 · COMPLETED
WIRE AND INSTALL 2 NEW 120V OUTLETS FOR NEW COFFEE MACHINES PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 591436 · COMPLETED
INSTALL NEW QUAD RECEPTACLE AND DATA LINE TO GATE PODIUM, AND 120V POWER AND 1 EACH DATA LINES TO (5)TICKET KIOSKS (CAT 6 CABLE, #10 SOLID COPPER WIRING)... IN ACCORDANCE WITH 2008 NEC
- PermitSuppression
Permit 583613 · COMPLETED
INSTALLING NEW PREACTION, WET AND DRY SYSTEMS WITH (324) SPRINKLERS IN THE TERMINAL F BAGGAGE CLAIM AT PHILADELPHIA AIRPORT.
- PermitZoning/use
Permit 588114 · COMPLETED
INSTALL ONE EQUIPMENT PLATFORM ON EXISTING STAIRWELL ROOF OF TERMINAL GARAGE. INSTALL ONE EQUIPMENT CABINET ON PLATFORM. INSTALL THREE PANEL ANTENNAS ATTCHED TO RAILING OF EQUIPMENT PLATFORM. INSTALL ONE GPS ANTENNA SIX RRHS OND ONE FIBER DISTRIBUTIONBOX. INSTALL ONE GPS ANTENNA SIX RRHS ANDONE FIBER DISTRIBUTION BOX.
- PermitSuppression
Permit 586446 · COMPLETED
INSTALLATION OF 18 SPRINKLERS ABOVE BAGGAGE CONVEYER SYSTEM. ORIGINAL WORK SCOPE ON PERMIT # 530269. INSTALLATION IN ACCORDANCE WITH NFPA 13.
- PermitElectrical
Permit 585786 · COMPLETED
RELOCATE 2 POKE THRU OUTLETS (POWER AND DATA)AND ADJUST/RELOCATE 6 POWER POLES(POWER AND DATA TO FIT NEW EQUIPMENT)PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 585790 · COMPLETED
RELOCATE 5 POKE THRU OUTLETS IN QUEUE AREA (POWER AND CAT 6 DATA)AND ADJUST/RELOCATE 6 POWER POLES (POWER AND CAT 6 DATA TO FIT NEW EQUIPMENT) PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 579931 · COMPLETED
INSTALL VIDEO SURVEILLANCE SYSTEM UPGRADES AS PER NEC 2008. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 725 OF THE 2008 NEC.
- PermitElectrical
Permit 579933 · COMPLETED
INSTALL VIDEO SURVEILLANCE SYSTEM UPGRADES INCLUDING NEW HEAD END AS PER NEC 2008. INSTALLATION TO COMPLY WITH ARTICLES 300.21, 300.22 & 725 OF THE 2008 NEC.
- PermitElectrical
Permit 584254 · COMPLETED
INSTALL 30 L.F. OF 3/4"EMT CONDUIT ABOVE EXISTING CEILING FOR LOW VOLTAGE COMMUNICATIONS CABLING FROM TENANT SPACE TO ROOF AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 584114 · COMPLETED
POWER WIRING FOR 1 EVAPORATOR UNIT, 1 CONDENSING UNIT AND 1 CONDENSATE PUMP, ALL DEDICATED EQUIPMENT CIRCUITS ARE FED FROM AN EXISTING POWER PANEL AS PER 2008 (WEST DISTRICT)
- PermitAlteration
Permit 581073 · COMPLETED
RE-ROOFING OF HERTZ RENTAL CAR BLDG TO INCLUDE REMOVAL DOWN TO ROOF DECK-EXISING BUILT UP GRAVEL SURFACED ROOF FROM MAIN AREA AND 2 CANOPIES. OVER ROOF DECK LOOSE LAY 2 LAYERS OF 2" ISCOCYANURATE AND A 1/2" LAYER OF DENSDECK. INSULATION AND DENSDECK WILL BE MECHANICALLY FASTENED WITH SCREWS AND PLATES. MECHANICALLY FASTEN A 50 MIL DUROLAST WHITE ROOF OVER THE NEW INSULATION. FLASH PERIMETER RISING WALLS AND ROOF PENETRATIONS PER DUROLAST DETAILS, FABRICATE AND INSTALL 24 GA KYNAR COPINGS AS PER APPROVED PLANS.
- PermitElectrical
Permit 581918 · COMPLETED
TYING INTO EXISTING POWER FOR NEW RECEPTACLE PER 2008 NEC (AIRPORT)
- PermitSuppression
Permit 582112 · COMPLETED
WE WILL BE RELOCATING 3 SPRINKLERS IN THE TERMINAL F BAGGAGE CLAIM AT PHILA AIRPORT
- PermitElectrical
Permit 579612 · COMPLETED
HOOK-UP COUNTER TOP TOSTER WITH 280V, 20A CIRCUIT TO EXISTING ELECTRIC
- PermitNew Construction
Permit 579562 · Completed
DEMOLITION OF TWO TEMPORARY TRANSFORMERS AND PANELS, HOOK UP 85 FOOT DATA LINE AND CIRCUIT TO EXISTING ELECTRIC RECEPTACLE
- PermitElectrical
Permit 570334 · COMPLETED
INSTALL CONDUIT, WIRE, PHOTOEYES,ENCODERS, DISCONNECT SW & OTHER ACESSORIES FOR DTC-A INCLULDING TERMINATION MCP, INSTALL COAX CABLE FOR CNET CABLE FOR INTERCOMM BETWEEN MCPS (AIRPORT) AS PER NEC 2008
- PermitSuppression
Permit 579182 · COMPLETED
RELOCATE 13 EXISTING SPRINKLER HEADS (COMMERCIAL)
- PermitElectrical
Permit 577682 · COMPLETED
PROVIDE TEMP.LIGHTING(3 FIXTURES) AND POWER(1 QUAD OUTLET)FROM MARKET PLACE PANEL,RELOCATE/REMOVE FIRE ALARM/POWER AS NEEDED AS SPACES B AND C ARE NOW COMBINED AS PER 2008 NEC(WEST DISTRICT)
- PermitDemolition
Permit 577534 · COMPLETED
INTERIOR DEMO OF NON BEARING WALLS
- PermitUse
Permit 575229 · COMPLETED
USE OF COMMERCIAL SPACE #09 IN AIRPORT AS RETAIL SALES OF FOOD, BEVERAGES AND GROCERIES
- PermitMechanical
Permit 572213 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLANS. 7 REGISTERS/DIFFUSERS
- PermitElectrical
Permit 574003 · COMPLETED
DEMO OF EXISTING DATA AND POWER FROM PODIUM.RELOCATE PODIUM NEXT TO EXISTING PODIUM AND HOOK UP POWER TO EXISTING ELECTRIC (AIRPORT)
- PermitElectrical
Permit 569348 · COMPLETED
PROVIDE BRANCH CIRCUIT WIRING FOR GENERAL LIGHTING FIXTURES,RECEPTACLES 7 SWS,FIRE ALARM,PHONE,DATA,SPEAKER AND SECURITY LOW VOLT WRING AND EXISTING ELECTRICAL PNL,DISTRIBUTION AND FEEDERS PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitMechanical
Permit 567327 · COMPLETED
HVAC INCLUDING DUCTWORK AND MECHANICAL EQUIPMENT WITH ASSOCIATED PIPING AS PER PLANS.
- PermitPlumbing
Permit 559674 · COMPLETED
REPLACEMENT OF EXISTING FIXTURES INSTALL 3 COMPARTMENT SINK,HAND SINK,MOP SINK,GREASE TRAP AND HOT WATER HEATER (AIRPORT)
- PermitSign
Permit 564450 · COMPLETED
INSTALLATION OF ONE (1) WALL SIGN AT STOREFRONT WITH THREADED RODS, ONE (1) ILLUMINATED BAND WITH TEK SCREWS AND ONE (1) WALL SIGN AT REGISTER WITH PIN MOUNTS IN SILICONE PER PLANS. FOR DOCUMENTATION OF THE REPLACEMENT OF A TOTAL OF FOUR (4) FACES ON TWO (2) DOUBLE-FACED "BLADE" SIGNS (EXISTING SUPPORT TO REMAIN UNCHANGED). SEPARATE ELECTRICAL PERMIT REQUIRED FOR ANY ILLUMINATION.
- PermitSuppression
Permit 570074 · COMPLETED
RELOCATING 8 SPRINKLERS IN THE TUMI DE2 SPACE AT THE D/E CONNECTOR AT PHILADELPHIA AIRPORT
- PermitSuppression
Permit 568862 · COMPLETED
RELOCATE 5 EXISTING SPRINKLER HEADS (COMMERCIAL)
- PermitMajor alteration
Permit 567390 · COMPLETED
CONSTRUCTION OF NEW INFORMATION DESK AND SIGNAGE AS PER PLAN.
- PermitMajor alteration
Permit 559870 · COMPLETED
CONVERSION OF TENANT SPACE INTO AIRPORT CONCOURSE. REMOVAL OF EXISTING TENANT WALL AND FINISHES. CONSTRUCTION OF NEW DEMISING WALL, LIGHTING AND FINISHES AS PER PLAN.**SEPARATE PERMIT REQUIRED FOR MECHANICAL AND ELECTRICAL WORK**
- PermitMajor alteration
Permit 565286 · COMPLETED
LEVEL II ALTERATION AS PER PLANS-TENANT FIT OUT. **SEPARATE PERMIT REQUIRED FOR MECHANICAL & ELECTRICAL WORK**
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 521959 · Violation 3353421 · Code A-302.11/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- PermitElectrical
Permit 566582 · COMPLETED
WIRE AND INSTALL 12 NEW LIGHTING FIXTURES,3 RECEPTACLES,1 DATA JACK,RELOCATE EXISTING TRACK LIGHT AND EXIT SIGN AS NEEDED PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 566586 · COMPLETED
RELOCATE EXISTING PANEL BOARD,WIRE AND INSTALL NEW RECEPTACLES,SWITCHES,AND TIME CLOCK.RELOCATE EXISTING RACEWAYS FOR TELE/DATA OUTLETS AS REQUIRED PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 556348 · COMPLETED
DEMO EXIST LIGHTS & RECEPTS, RELABEL EXIST PANELBOARD, WIRE & INSTALL LGT FIXTURES & SW/TIME CLOCK & POWER RECEPTS, INSTALL RACEWAYS TELE/DATA AUDIO/SECURITY AS REQUIRED, RETEST & RECERT F/A AS PER NEC2008 & NFPA 72
- PermitElectrical
Permit 558295 · COMPLETED
DEMO LIGHT & RECEP,RE-LABEL EXIST PNL BOARD,WIRE & INSTALL FIXTURES,WIRE INTO EXIST LIGHTING CONTROL PNL,WIRE & INSTALL POWER RECEP,PROVIDE POWER FOR HWH/HEAT TRACE, RACEWAYS FOR TELE/DATA/AUDIO/SECURITY RETEST & RECERFITY FA PER 2008 NEC & NFPA 72(AIRPORT)
- PermitElectrical
Permit 558301 · COMPLETED
DEMO LIGHTS & REC,RELOCATE EXIST PNL BOARD,WIRE & INSTALL FIXTURES,WIRE INTO EXIST LIGHTING CONTROL PNL,WIRE & INSTALL NEW POWER REC,PROVIDE POWER FOR HWH/HEAT TRACE INSTALL RACEWAYS FOR TELE/DATA AS REQ & RETEST & RECERTIFY FA PER 2008 NEC & NFPA 72(AIRPORT)
- PermitMechanical
Permit 559865 · COMPLETED
INSTALL NEW HVAC SYSTEM FOR COMMERCIAL SPACE AS PER PLAN
- PermitMechanical
Permit 558023 · COMPLETED
FOR PART. DEMO. OF EXIST. MECH SYSTEM & FOR ALTERATION OF HVAC SYSTEM SERVING A MERCANTILE TENANT SPACE W/IN AN AIRPORT FACILITY TO INCLUDE INSTALLATION OF (18) TERMINAL GRILLS, REGISTERS, & DIFFUSERS (GRDS) & ALL ASSOCIATED SUPPLY, RETURN, & EXHAUST AIR DUCTWORK.
- PermitUse
Permit 559866 · COMPLETED
USE TO AIRPORT CONCOURSE-CONCOURSE B-SPACE #B1
- PermitSuppression
Permit 562457 · COMPLETED
RELOCATE 11 SPRINKLER HEADS SPACE DE9 (COMMERCIAL)
- PermitSuppression
Permit 562458 · COMPLETED
RELOCATE 10 SPRINKLER HEADS (COMMERCIAL)
- PermitMechanical
Permit 559853 · COMPLETED
INSTALL NEW HVAC SYSTEM FOR COMMERECIAL SPACE AS PER PLAN
- PermitSuppression
Permit 562403 · COMPLETED
RELOCATION OF 6 SPRINKLER HEADS (COMMERCIAL)
- PermitElectrical
Permit 559760 · COMPLETED
(3)DUPLEX RECEPTACLES, (2)GFI RECEPTACLES, (3)TELEDATA OUTLETS, RELOCATE (1)THERMOSTAT, PULL COAX CABLE FOR SATELLITE DISH (CABLE FURNISHED BY OTHERS; SATELLITE DISH FURNISHED AND INSTALLED BY OTHERS) - ALL WORK WILL BE IN COMPLIANCE WITH THE 2008 NEC
- PermitMajor alteration
Permit 556960 · COMPLETED
OFFICE FIT OUT TO INCLUDE ADDING LOCKERS, TO INCLUDE INSTALLATION OF TICKET KIOSKS AND BACK WALL SIGNAGE.
- PermitMajor alteration
Permit 547745 · COMPLETED
LEVEL II ALTERATIONS AND TENANT FITOUT FOR FOR NEW BOUTIQUE WOMEN'S ACCESSORY STORE. **SEPARATE PERMIT REQUIRED FOR ELECTRICAL AND MECHANICAL WORK**
- PermitMajor alteration
Permit 556589 · COMPLETED
DEMOLITION & LEVEL II INTERIOR ALTERATIONS OF EXISTING SPACE AS PER PLAN.
- PermitMajor alteration
Permit 547737 · COMPLETED
LEVEL II ALTERATIONS AND TENANT FITOUT FOR FOR NEW BOUTIQUE CANDY STORE. **SEPARATE PERMIT REQUIRED FOR MECHANICAL AND ELECTRICAL WORK**
- PermitElectrical
Permit 555993 · COMPLETED
INSTALL 8-CAT 6 DATA JACKS W/CONDUIT SLEEVES TO EXISTING CABLE TRAY AS PER NEC 2008 (AIRPORT)
- PermitUse
Permit 551408 · COMPLETED
USE CHANGE FROM RETAIL SALE OF HANDBAGS, PENS, BRIEFCASES AND ACCESSORIES TO RETAIL SALE OF CONSUMER GOODS AND RETAIL SALE OF WEARING APPAREL AND ACCESSORIES IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.- SPACE DE-4
- PermitUse
Permit 551409 · COMPLETED
USE CHANGE FROM RETAIL SALE OF JEWELRY AND ACCESSORIES TO RETAIL SALE OF CONSUMER GOODS AND RETAIL SALES OF FOOD, BEVERAGES AND GROCERIES AND RELATED ITEMS IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.- SPACE DE-9
- PermitUse
Permit 551410 · COMPLETED
USE CHANGE FROM RETAIL SALE OF ELECTRONICS AND ACCESSORIES TO RETAIL SALE OF CONSUMER GOODS SELLING LUGGAGE, HANDBAGS, BRIEFCASES AND ACCESSORIES IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.- SPACE DE-2
- PermitUse
Permit 554939 · COMPLETED
ADDITION OF TAKE-OUT RESTAURANT TO ESTABLISHED EATING AND DRINKING ESTABLISHMENT
- PermitElectrical
Permit 552004 · COMPLETED
WIRE & INSTALL 1-DEDICATED OUTLET FOR NEW COFFEE MAKER FED FROM EXISTING PANEL RP-1 AS PER NEC 2008 (AIRPORT)
- PermitElectrical
Permit 550031 · COMPLETED
INSTALL NEW PULL STATION, SMOKE DETECTOR & SPEAKER/STROBE AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 544249 · COMPLETED
FURNISH AND INSTALL P1 & P2 INCLUDING FEEDER AND CONDUIT FROM EXISTING PANEL PAV. ALL DEVICE LIGHT FIXTURES,FA,AND TELECOM/SECURITY WIRING PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitMechanical
Permit 546277 · COMPLETED
RENOVATE EXISTING SPACE FOR US AIRWAYS. FURNISH & INSTLL 4 VAV BOXED AND ASSOCIATED DUCT WORK AND GRD'S. DEMO EXISTING DUCTWORK & COMPONENTS. PROVIDE NEW CONTROLS FOR NEW VAV BOXES.
- PermitUse
Permit 548944 · COMPLETED
PROJECT INCLUDES THE DEMOLITION OF EXISTING BUILD OUT AND CONSTRUCTION OF NEW UNACCOPANIED MINOR SPACE(1356 SF) AND AMERICAN AIRLINE CREDIT UNION (896 SF).
- PermitMajor alteration
Permit 542914 · COMPLETED
DEMO OF EXISTING PARTITIONS,FLOORS AND CEILINGS AND CONSTRUCTION OF NEW DRYWLL PARTITIONS, CEILINGS AND FLOOR FINISHES, NEW MILLWORK, DOOR FRAMESN **SEPARATE ELECTRICAL, PLUMBING,MECHANICAL SPRINKLERS IS REQUIRED**
- PermitSuppression
Permit 546386 · COMPLETED
RELOCATION OF (26) FIRE SPRINKLER HEADS.
- PermitPlumbing
Permit 545983 · COMPLETED
ROUGH IN FOR NEW HAND SINK AND REINSTALL OF EXSITING FIXTURES THAT WERE REMOVED DUE TO DEMO (AIRPORT)
- PermitElectrical
Permit 538406 · COMPLETED
REMOVE EXIST LGT FIX & REC, F&I 120/280V 50A ELEC PNL & FEED, F&I 12-REC, CONNECT TO 1-VAV UNIT & 1-STORE, WIRE & INST OWNER SUPP LGT FIX, EXTEND, RESET & TEST 2-EX F/A CONNECT TO PHL FIRE SYS AS PER NEC & NFPA 72
- PermitPlumbing
Permit 543669 · COMPLETED
30 GAL WATER HEATER
- PermitDemolition
Permit 542919 · COMPLETED
2500 SQUARE FEET, INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS ONLY. NO OTHER WORK ALLOWED UNDER THIS PERMIT. SEPARATE PERMITS REQUIRED FOR RENOVATION. NO STRUCTURAL CHANGES. MUST MAINTAIN ALL CODE REQUIRED FIRE RATING ON WALL AND FLOOR/CEILING ASSEMBLIES. THREE SETS OF PLANS DRAWN TO PROFESSIONAL QUALITY ARE TO BE SUBMITTED FOR REVIEW AND APPROVAL BY THE DEPARTMENT BEFORE WORK ON RENOVATION STARTS. CONTACT STREETS DEPARTMENT FOR DUMPSTER PERMIT AND FOOTWAY CLOSURE PERMITS.
- PermitAdministrative
Permit 520221 · COMPLETED
AMEND PERMIT# 355096 TO REFLECT THE NEW CHANGES AS PER PLANS.
- PermitElectrical
Permit 540848 · COMPLETED
AKA ESSINGTON AVENUE - ELECTRICAL TEMPORARY EVENT PERMIT - 85KW GENERATOR W/100AMP 3-PHASE DISTRIBUTION FOR TEMPORARY SOUND SYSTEM AND FANS - ONE DAY EVENT INSPECTION 06/05/2014
- PermitMajor alteration
Permit 521959 · COMPLETED
REMODELING OF EXISTING TENANT SPACE AS PER PLANS - COMMERCIAL
- PermitElectrical
Permit 540133 · COMPLETED
RELOCATE 14 DOWNLIGHT,10 ADJUSTABLE 3 HEAD LIGHT AND TIE INTO EXISTING CIRCUITS PER 2008 NEC (AIRPORT)
- PermitSuppression
Permit 540138 · COMPLETED
RELOCATION OF (8) FIRE SPRINKLER HEADS.
- PermitElectrical
Permit 540158 · COMPLETED
CONCOURSE F, SPACE FH1 - DEMO CONDUIT AND WIRE BACK TO PANEL FROM EXISTING INSTA-HOT TANKLESS DOMESTIC WATER HEATER - FURNISH AND INSTALL CONDUIT, WIRE, DISCONNECT AND CONNECTIONS FOR A NEW 30GAL ELECTRIC DOMESTIC HOT WATER HEATER - NOTE: ALL WORK WILL BE IN COMPLIANCE WITH THE 2008 NEC
- PermitMajor alteration
Permit 532120 · COMPLETED
FOR INTERIOR ALTERATIONS TO INCLUDE DISCONNECT AND REMOVE PODIUM CUSTOMER COUNTER DECK, MOUNT RECONNECT PODIUM AND CUSTOMER COUNTER TO NEW LOCATION, REMOVE AND REPLACE GLAZING SYSTEM AND ALL OTHER ALTERATIONS AS PER APPROVED PLANS. ** SEPARATE PERMIT REQUIRED FOR ELECTRICLA WORK.**
- PermitElectrical
Permit 539057 · COMPLETED
DISCONNECT 3 EXISTING BATTERY CABINETS & REPLACE WITH NEW BATTERY CABINETS IN KIND AND RE-CONNECT TO EXISTING WIRING VERIZON CELL TOWER SITE LOCATED ON ELEVATOR PENTHOUSE ROOFTOP OF TERMINAL A PARKING GARAGE AT AIRPORT PER 2008 NEC(AIRPORT)
- PermitZoning/use
Permit 535598 · COMPLETED
CONSTRUCTION OF NEWW BAGGAGE TERMINAL F
- PermitSuppression
Permit 530269 · COMPLETED
INSTALLATION OF MAINS, LINES, AND (193) SPRINKLERS IN AIRPORT.
- PermitElectrical
Permit 536896 · COMPLETED
INSTALL 3/4" EMT CONDUIT IN INTERNATIONAL SHOPPES IS BEAUTY STORE LOCATED IN TERMINAL D/E CONNECTOR FOR 5 NEW WALL MOUNTED SECURITY CAMERAS AND NEW MAGNETIC CONTACT FOR GATE BACK TO SECURITY EQUIPMENT PANEL AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 517907 · COMPLETED
TENANT FIT-OUT AS PER PLANS
- PermitMechanical
Permit 517925 · COMPLETED
MECHANICAL PERMIT: MECHANICAL WORK TO INCLUDE LINEAR DIFFUSERS, 3 SERVE AS SUPPLY, 2 AS RETURN- 2 WILL BE BLANKED OFF ALL AS PER PLANS.
- PermitMechanical
Permit 535693 · COMPLETED
INSTALL A SPLIT TYPE DUCT-LESS UNIT IN KITCHEN
- PermitUse
Permit 531485 · COMPLETED
CHANGE IN REGISTRATION FROM RETAIL SALE OF GOLD APPAREL AND EQUIPMENT TO RETAIL SALE OF CONSUMER GOODS SELLING SNEAKERS, APPAREL AND ACCESSORIES IN EXISTING AIRPORT COMPLEX.
- PermitElectrical
Permit 529616 · COMPLETED
F & I NEW PANEL MP & SB INCLUDE FEEDER CONDUIT & WIRE, ALL DEVICES, LIGHT FIXTURES, F/A & EQUIPMENT POWER E-1-0, E-1-1 & FA-1.0 AS PER NEC 2008 & NFPA 72
- PermitMechanical
Permit 531437 · COMPLETED
HVAC, TO INCLUDE DUCTWORK, AS PER PLANS. (9) REGISTERS/DIFFUSERS.
- PermitMechanical
Permit 533277 · COMPLETED
INSTALLATION OF TYPE II COMMERCIAL HOOD EXHAUST SYSTEM WITH DUCTWORK AND FANS. SEE A/P 531437 FOR PLAN.
- PermitSuppression
Permit 531036 · COMPLETED
INSTALL 55 NEW SPRINKLERS BENEATH NEW AND RECONFIGURED BAGGAGE CONVEYOR AND SERVICE CATWALK.
- PermitElectrical
Permit 530299 · COMPLETED
FURNISH AND INSTALL NEW PANEL L AND LA INCLUDING FEEDER CONDUIT WIRE.FURNISH AND INSTALL ALL DEVICES,LIGHT FIXTURES,FIRE ALARM EQUIPMENT AND POWER PER 2008 NEC & NFPA 72(AIRPORT)
- PermitPlumbing
Permit 529778 · COMPLETED
COMMERICAL KITCHEN 3-COMPARTMENT SINK W/GREASE TRAP, PREP SINK, HANK SINKS, MOP SINK 4-FLOOR SINKS & 50 GAL WATER HEATER (COMM) - NOTE: HEALTH DEPARTMENT APPROVAL AND GREASE TRAP SUBMITTAL ARE BOTH ATTACHED AS "OLE" FILES IN THE DATABASE
- PermitPlumbing
Permit 529779 · COMPLETED
COMMERICAL KITCHEN 3-COMPARTMENT SINK W/GREASE TRAP, PREP SINK, HAND SINKS, MOP SINK 4-FLOOR SINKS & 50 GAL WATER HEATER (COMM) - NOTE: HEALTH DEPARTMENT APPROVAL AND GREASE TRAP SUBMITTAL ARE BOTH ATTACHED AS "OLE" FILES IN THE DATABASE
- PermitMajor alteration
Permit 522374 · COMPLETED
INTERIOR ALTERATIONS- REMODEL OF EXISTING RETAIL TENANT SPACE. NO CHANGE IN USE.
- PermitElectrical
Permit 527812 · COMPLETED
F & I 45KVA 480-120/280VAC INDOOR TRANSFORMER , 100A FUSED DIS SW, 150A 120/208VAC ELEC PNL TRANSFORMER & PNL FEEDER EXIST SOURCE, REROUTE 120VAC CKTS FROM 3-EXIST CTS MACHINES TO NEW ELEC AS PER NEC 2008 (AIRPORT)
- PermitElectrical
Permit 532752 · COMPLETED
INSTALL 3,300 WIRE MOLD IN SEATING AREA,INSTALL 5 POWER AND USB PORTS.CHANGE EXISTING CIRCUIT TO GFI BREAKERS.INSTALL NEW WALL SWITCHES PER 2008 NEC (AIRPORT)
- PermitSuppression
Permit 532694 · COMPLETED
THIS IS AN OVER THE COUNTER PERMIT APPLICATION. WE WILL BE RELOCATION 18 SPRINKLERS IN THE TERMINAL F EXTERIOR CANOPY
- PermitMechanical
Permit 522938 · COMPLETED
HVAC DUCT WORK INSTALLATION AS PER PLAN.
- PermitMechanical
Permit 531950 · COMPLETED
RELOCATING EXISTING DIFFUSERS
- ViolationINSURANCE - POST CERT
Case 507439 · Violation 3150221 · Code A-302.8/32 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- ViolationINSURANCE - POST CERT
Case 510871 · Violation 3196560 · Code A-302.8/32 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitSuppression
Permit 526397 · COMPLETED
DEMOLITION (40) SPRINKLERS AND 60" OF 4" SPRINKLER PIPE IN TERMINAL F CATERING HAL, TICKETING & BAGGAGE AREA.FIRE DEPARTMENT MUST BE NOTIFIED PRIOR TO COMMENCEMENT OF WORK.
- PermitSuppression
Permit 530939 · COMPLETED
RELOCATE (15) SPRINKLER HEADS
- PermitSuppression
Permit 530953 · COMPLETED
RELOCATE (15) SPRINKLER HEADS
- PermitMechanical
Permit 528945 · COMPLETED
HVAC INSTALLATION AS PER PLAN.
- PermitUse
Permit 526410 · COMPLETED
RETAIL STORE FOR USE AS A CLOTHING AND ACCESSORY IN SPACE BC02 AS PART OF AN EXISTING AIRPORT COMPLEX.
- PermitMajor alteration
Permit 527267 · COMPLETED
TENANT FIT OUT AS PER PLAN.
- PermitMajor alteration
Permit 513567 · COMPLETED
LEVEL II ALTERATION AS PER PLANS.**SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING AND HVAC**
- PermitDemolition
Permit 527956 · COMPLETED
INTERIOR DEMOLITION.
- PermitDemolition
Permit 527132 · COMPLETED
DEMO OF INT SPACE
- PermitDemolition
Permit 527134 · COMPLETED
DEMO INT SPACE
- PermitAdministrative
Permit 520896 · COMPLETED
ELECTRICAL ONLY: THIS PROJECT IS FOR THE MODIFICATION OF EXISTING TAXIWAY H AND THE CREATION OF TAXIWAY EE (NORTH) AT PHL. WE ARE REQUESTING AN ELECTRICAL PRELIMINARY PLAN REVIEW ON THE ELECTRICAL DESIGN ASSOCIATED WITH THIS PROJECT
- PermitSuppression
Permit 526274 · COMPLETED
RELOCATE 40 SPRINKLERS
- PermitElectrical
Permit 519485 · COMPLETED
F&I NEW 120/208V 60A ELECTRICAL PANEL & FEED, F&I 19-RECPTS, CONNECT TO 1-VAV UNIT & 1-STORE FRONT SIGN, INSTALL 24-OWNER FURN LIGHT LED FIX, F&I 1-VISUAL F/A DEVICE CONNECTED TO PHL FIRE SYS AS PER NEC 2008 & NFPA 72
- PermitMajor alteration
Permit 509731 · COMPLETED
REPLACE AN EXISTING 256 SQ.FT. ROOF AND WOOD ROOF STRUCTURAL MEMBERS AT THE EXISTING PHL AVIS STORAGE SHED WITH A NEW SBS HEAT WELDABLE ROOFING SYSTEM AND NEW COLD FORMED FRAMING ROOF STRUCTURAL MEMBERS. IN, ADDITION, THE EXISTING STEEL OVERHEAD GARAGE DOOR SYSTEM WILL BE REPLACED WITH A NEW, STEEL OVERHEAD GARAGE DOOR SYSTEM.
- PermitMechanical
Permit 516819 · COMPLETED
HVAC RENOVATION AS PER PLAN.
- PermitSuppression
Permit 523156 · COMPLETED
RELOCATING 10 SPRINKLERS IN THE TERMINAL F CATERING AREA AT PHILADELPHIA AIRPORT.
- PermitMechanical
Permit 522688 · COMPLETED
FOR THE RELOCATION OF SIX (6) DIFFUSER WITH ALL SUPPLEMENTAL DUCTWORK, FANS AND EXHAUST.
- PermitPlumbing
Permit 517738 · COMPLETED
MOVING SINK & ICE MAKER TO NEW LOCATION (AIRPORT)
- PermitElectrical
Permit 522608 · COMPLETED
REMOVE EXISTING POWER CONNECTIONS FROM EXISTING CNBC KIOSK UNIT AND RECONNECT ALL MILLWORK LIGHTING IN NEW CNBC KIOSKS TO EXISTING POWER CONNECTIONS AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 522609 · COMPLETED
CLEAN EXISTING FIXTURES THROUGH OUT STORE, RELAMP AND REPLACE BALLASTS, IF NECESSARY, CLEAN EXISTING SPEAKER GRILLS, REMOVE AND INSTALL OWNER FURNISHED TRACK LIGHTING HEADS AND LAMPS, PROVIDE CONDUIT, WIRE AND DATA TO TEMPORARY KIOSK, FURNISH AND INSTALL ONE CONVERIENCE OUTLET FOR COLLER TO TEMPORARY KIOSK AS PER 2008 NEC (WEST DISTRICT)
- PermitMechanical
Permit 520422 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLANS.
- PermitMechanical
Permit 515746 · COMPLETED
FOR THE RELOCATION OF ONE (1) RETURN AIR FLEX DUCT/GRILLE AND FOR THE INSTALLATION OF ONE (1) DIFFUSER WITH ALL SUPPLEMENTAL DUCTWORK, FANS AND EXHAUST.
- PermitPlumbing
Permit 521507 · COMPLETED
TERMINAL "F" RENOVATIONS NORTH/SOUTH AND NEW BAGGAGE AREA RESTROOMS - INSTALL NEW SANITARY DRAINAGE PIPING FOR (36)NEW RESTROOM FIXTURES IN THE BAGGAGE AREA - REPLACE SECTION(S) OF UNDERGROUND STORM PIPING AS NEEDED (NORTH & SOUTH) - DEMO EXISTING LAVATORIES IN THE RESTROOMS TERMINAL "F" NORTH
- InvestigationBP_LICENSE
Case 383298 · CLOSED
City marked the record closed; open the case for the closing reason.
- PermitMechanical
Permit 520401 · COMPLETED
FOR LEVEL II ALTERATION TO HVAC SYSTEM, ALTERATION TO INCLUDE THE RELOCATION OF TEN (10) REGISTERS/DIFFUSERS.SEPARATE PERMIT REQUIRED FOR ALL OTHER WORK.
- PermitSuppression
Permit 520177 · COMPLETED
RELOCATE (6) EXISTING SPRINKLER HEADS IN SPACE BC29A
- PermitAlteration
Permit 520183 · COMPLETED
ROOF RECOVERING (EPDM).
- PermitMajor alteration
Permit 515336 · COMPLETED
INTERIOR ALTERATIONS- REMODEL OF EXISTING RETAIL TENANT SPACE
- PermitSuppression
Permit 519807 · COMPLETED
RELOCATE 7 SPRINKLERS
- PermitMajor alteration
Permit 515337 · COMPLETED
INTERIOR ALTERATIONS: REMODEL OF EXISTING RETAIL TENANT SPACE.(CNBC NEWS STAND) AS PER PLAN.
- PermitMajor alteration
Permit 515333 · COMPLETED
INTERIOR ALTERATIONS; REMODEL OF EXISTING RETAIL TENANT SPACE AS PER PLAN.
- PermitElectrical
Permit 515749 · COMPLETED
INSTALL 120V BRANCH POWER & CAT 6 DATA CABLING TO NEW FLIGHT INFORMATION MONITORS LOCATED AT EACH TERMINAL GATE (AIRPORT TERMINAL)
- PermitPlumbing
Permit 518532 · COMPLETED
TERMINAL "F" BAG CLAIM ADDITION SANITARY SITEWORK DRAINAGE - INSTALLATION OF AN 8" UNDERGROUND SANITARY HOUSE DRAIN (PRIVATE SEWER) - NOTE: ALSO SEE PLUMBING PERMIT #502211 FOR THE APPROVED STORM HOUSE DRAINAGE PIPING
- PermitElectrical
Permit 518584 · COMPLETED
REMOVE EXISTING LIGHTING FIXTURES, RETAIN CKTS, INSTALL NEW LIGHTING FIXTURES IN SAME LOCATION & RECONNECT EXISTING CKTS AS PER NEC 2008 (AIRPORT)
- PermitPlumbing
Permit 514597 · COMPLETED
INSTALL NEW FLOOR DRAIN AND OPEN DRAIN/SAFE WASTER RECEPTOR FOR NEW ICE MACHINE - CONNECT NEW HAND SINK TO EXISTING PIPING (AIRPORT)
- PermitElectrical
Permit 516068 · COMPLETED
DISCONNECT FOR REMOVAL- 1-AUTO TIC MACH & 1-TIC COUNTER INSERT IN TERMINAL E & REINST IN TERM D, POWER,VOICE/DATA FEED BY OTHER, F&I 120VAC POWER TO 2-COMM RACKS, F& I ROOF ANTENNA,LV COMM TO AA GATE COUNTER D6
- PermitMajor alteration
Permit 507439 · COMPLETED
REFURBISH EXISTING FOOD COURT SPACE WITH NEW FLOORING AND NEW CEILING. **SEPARATE PERMIT ELECTRICAL AND MECHANICAL PERMIT REQUIRED**
- PermitAdministrative
Permit 516618 · COMPLETED
AMEND FIRE SUPPRESSION PERMIT#509671 - FROM: INSTALL (1) ONE ANSUL R-102 3.0-GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM, TO: INSTALL (1) ONE ANSUL R-102 6.0-GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM FOR PROTECTION OF (2) TWO VENTILATION HOODS (SEE ATTACHED DATA SHEET)
- PermitElectrical
Permit 516731 · COMPLETED
INSTALL 3 RECEPTACLES IN STORAGE AREA (D-ST-1D) PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 508243 · COMPLETED
CONVERSION OF SINGLE RETAIL TENANT SPACE INTO 2 SEPARATE RETAIL TENANT SPACES. NEW DEMISING WALL TO BE CONSTRUCTED.LANDLORD WORK INCLUDES DEMOLITION OF EXISTING MATERIALS,FIXTURES, FINISHES, FURNITURE, ETC. AS REQUIRED TO INSTALL THE NEW DEMISING WALL. SEPARATE PERMITS REQUIRED FOR FUTURE TENANT TO FOLLOW WITH COMPLETE RENOVATION.
- PermitElectrical
Permit 516770 · COMPLETED
F & I 1-6' LOF LIGHTING TRACK, CONNECT TO EXISTING ADJACENT 120AC CKT & F&I 6-LED TRACK HEADS AS PER NEC 2008 (AIRPORT)
- PermitSuppression
Permit 515233 · COMPLETED
RELOCATE (6) EXISTING SPRINKLER HEADS - SOUTHWEST AIR ICE ROOM
- PermitSuppression
Permit 515236 · COMPLETED
RELOCATE (3) EXISTING SPRINKLER HEADS - SPACE BC13-LEGAL SEAFOOD
- PermitPlumbing
Permit 515044 · COMPLETED
INSTALL DOMESTIC COLDWATER SUPPLY FROM EXISTING MAIN PIPING LOADING DOCK AREA TO TEMP OFFICE TRAILER AJACENT TO DOCK --SEE BLDG PERMIT #480873 FOR TEMP TRAILER (TRAILER)
- PermitSuppression
Permit 514604 · COMPLETED
RELOCATING (7) SPRINKLERS IN THE TERMINAL F TEMPORARY VESTIBULE AND TRASH ROOM AT PHILADELPHIA AIRPORT.
- PermitMajor alteration
Permit 510871 · COMPLETED
ALTERATIONS AS PER PLAN INCLUDES LABOR AND MATERIALS TO PERFORM DEMO PER PLANS, SAWCUT TRENCH AND REPLACE AN OUTSIDE RAMP, PERFORM FRAMING, GWB AND TILE BACKER AND ACT, INSTALL WALL TILE AND FLOORING
- PermitUse
Permit 511662 · COMPLETED
CHANGE IN USE REGISTRATION FROM RETAIL SALE OF WEARING APPAREL AND ACC. TO RETAIL SALE OF FOOD AND BEVERAGES WITH SEATING (PREPARED FOOD SHOP) IN SPACE BC-26AB IN AN EXISITING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.
- PermitElectrical
Permit 509088 · COMPLETED
EXTENSION OF EXISTING 277V LIGHTING CIRCUITS TO NEW WAY FINDING SIGNAGE AS PER NEC 2008 (AIRPORT TERMINALS)
- PermitElectrical
Permit 513255 · COMPLETED
CLEAN EXISTING FIXTURES THROUGH OUT THE STOR, RELAMP AND REPLACE BALLASTS, IF NECESSARY, CLEAN EXISTING SPEAKER GRILLS, REMOVE AND INSTALL OWNRE FURNISHED TRACK LIGHTING HEADS AND LAMPS, FURNISH AND INSTALL 1 CONVENIENCE OUTLETS FOR COLLER TO EXISTING D10 ELECTRICAL PANEL AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 510889 · COMPLETED
INTERIOR ALTERAIONS OF EXISTING RETAIL TENANT SPACE (CNBC NEWS STAND)AS PER PLAN.
- PermitMechanical
Permit 512542 · COMPLETED
RELOCATE (7) DIFFUSERS
- PermitMechanical
Permit 512543 · COMPLETED
RELOCATE (8) DIFFUSERS
- PermitSuppression
Permit 509671 · COMPLETED
INSTALL ONE ANSUL WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitElectrical
Permit 509469 · COMPLETED
NEW TEREMINAL F BAG CLAIM BUILDING AND TICKETING RENOVATION TO INCLUDE DUCTBANK RELOCATION, WITH RELOCAITON OF EXISTING MEDIUM VOLTAGE CIRCUITS, NEW 480V ELECTRICAL POWER DISTIBUTION, BRANCH POWER, LIGHTING AND TELE DATA SYSTEMS AS PER 2008 NEC (WEST DISTRICT) INSTALL FIRE ALARM SYSTEM AS PER NFPA72
- PermitElectrical
Permit 510960 · COMPLETED
INSTALL POWER AND DATA WIRING TO KIOSK PER THE 2008 NEC
- PermitElectrical
Permit 510961 · COMPLETED
TERMINAL E, RAMP LEVEL E-6 - REPLACE LIGHT FIXTURES, INSTALL CONDUIT AND WIRE, RELOCATE DEVICE - INSTALLATION WILL COMPLY WITH THE 2008 NEC
- PermitElectrical
Permit 509862 · COMPLETED
REMOVE AND REPLACE 25 EXISTING LIGHTING FIXTURES IN SAME LOCATION AND RECONNECT EXISTING WIRING PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 500399 · COMPLETED
REPLACE MOTOR CONTROL CENTER THREE ALONG WITH PUMP FEEDERS, PANEL DCU AND ADD PARALLEL FEEDER, 5KV FEEDER TO CHILLER CH-4, ALL OTHER MISC ELECTRICAL WORK AS PER 2008 NEC & NFPA 72 (POWER CONTROL ROOM)
- PermitElectrical
Permit 503908 · COMPLETED
INSTALL FIRE ALARM PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitPlumbing
Permit 508183 · COMPLETED
SPACE BC13 (PLUMBING ALTERATIONS) - REPLACEMENT OF EXISTING PLUMBING FIXTURES TO COMPLY WITH CODE BULLETIN P-9701 DATED 10/07/1997 - ADD ADDITIONAL (4)FOUR FLOOR DRAINS IN THE KITCHEN - WORK WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004
- PermitPlumbing
Permit 502211 · COMPLETED
INSTALL 30" STORM LINE & CONNECT TO 54" PRIVATE SEWER W/1-CATCH BASIN & 2-RAIN CONDUCTORS, RELOCATE EXISTING 16" WATER MAIN FROM UNDER NEW BUILDING (SITE) PA20132951590-PA20132951659-PA20132951711
- PermitAlteration
Permit 502680 · COMPLETED
LEVEL ! ALTERATIONS TO INCLUDE:VINYL FLOOR TILES (GATE D8 LOCKER ROOM) VINYL FLOOR TILE (GATE D5 BREAK ROOM). WALL TILE,FLOOR TILE AND BASE (GATE D8 REST ROOM
- PermitElectrical
Permit 505354 · COMPLETED
RELOCATE EXISTING UNDERGROUND 277V SITE LGT CKT, REMOVE ABANDONED LGT CKT, REM EXIST & INACTIVE 112.5KVA OUTDOOR TRANS & RELATED UNDERGROUND DUCTBANK TO LIMIT PROPOSED BLDG DEMO ONLY NOT NEW CONST AS PER NEC 2008
- PermitElectrical
Permit 501315 · COMPLETED
(2)1400 600V 3 POLE DISCONNECTS FOR PBB (1)100A DISCONNECT FOR PC AIR (1) 100A DISCONNECT FOR GPU, 150A DISCONNECT FOR JET BRIDGE POWER,POWER BEING DERIVED FROM EXISTING 480V 3 PHASE POWER PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 500183 · COMPLETED
INSTALL LGT FIXTURES, RECPTS, BRANCH CKTS WIRING, ALL ELEC PNL, CKTS BREAKERS KITCHEN EQUIPMENT BRANCH CKT WIRING CONDUIT & CABLE CCTV SYSTEM & POS SYSTEM FIRE ALARM AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 498827 · COMPLETED
AT&T WI-FI COMMUNICATIONS SYSTEM INCLUDING MDF EXPANSION, REMOTE IDF ENCLOSURES, 120VAC WIRING TO ENCLOSURES, REMOTE ANTENNAS, FIBER OPTIC & CAT 6 INTERCONNECTION CABLING PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 501678 · COMPLETED
RELOCATE 1 STROBE AND 1 SPEAKER IN CEILING PER 2008 NEC & NFPA 72(AIRPORT)
- PermitPlumbing
Permit 501473 · COMPLETED
REMOVE AND REPLACE 2 EXISITING GREASE TRAPS (AIRPORT)
- PermitMajor alteration
Permit 491864 · COMPLETED
INSTALLATION OF PRECAST CONCRETE COLLAR EXTENSION WITH HELICAL PIER FOUNDATIONS AS PART OF AN EXISTING TELECOMMUNICATIONS CONTROLLED ENVIRONMENT VAULT. SPECIAL INSPECTION REPORTS SHALL BE FURNISHED TO FIELD INSPECTOR. SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL OR PLUMBING WORK.
- PermitMechanical
Permit 493987 · COMPLETED
MECHANICAL WORK TO INCLUDE REPLACEMENT OF FANS, KITCHEN HOODS, WELDED KITCHEN GREASE DUCTWORK AND MECHANICAL EQUIPMENT WITH DUCT (9) REGISTERS/DIFFUSERS
- PermitSuppression
Permit 494946 · COMPLETED
EXTEND EXISTING SPRINKLER SYSTEM INTO SEATING AREA.
- PermitPlumbing
Permit 493115 · COMPLETED
REMOVE ALL EXISTING SANITARY PIPING AND INSTALL ALL NEW PIPING TO FIXTURES 4 FLOOR SINKS,(1) 3 COMPARTMENT SINK WITH GREASE TAP,1 MOP SINK AND 2 HAND SINKS (RESTAURANT)
- PermitElectrical
Permit 493000 · COMPLETED
INSTALL & WIRE LGTS FIXTURES, RECPTS & POWER TO MECH EQUIP, PROVIDE JUCTION BOX & CONDUIT FOR CAMERA, CAT 5E FOR TELE/DATA, PLASMA DISPLAY & DVD PLAYER F&I 1-NEW STROBE F/A AS PER NEC 2008 & NFPA 72 (RETAIL STORE)
- PermitPlumbing
Permit 484281 · COMPLETED
TERMINAL F, SPACE #FH13 CHIPOTLE MEXICAN GRILL - CONVERT EXISTING VACANT SPACE INTO A THEME RESTAURANT (AIRPORT) 4 FL SINKS, MOP SINK, 4 KITCHEN SINKS
- PermitPlumbing
Permit 478015 · COMPLETED
COMMERCIAL KITCHEN;INSTALL THE FOLLOWING FIXTURES:1-3 COMP SINK W/GREASE TRAP,1 MS,4 FS,2 HS,1 GS (COMMERCIAL)SPACE FH-10
- PermitMechanical
Permit 491825 · COMPLETED
RELOCATE NINE (9) EXISITING REGISTERS/DIFFUSERS. INSTALL SIX (6) NEW REGISTERS/DIFFUSERS
- PermitElectrical
Permit 498193 · COMPLETED
REPOCATE EXISTING 100AMP PANEL, SUPPLY & INSTALL 12 RECESSED LIGHTS, 5 TRAC FEEDS, 5 DATA PHONE OUTLETS 'ONLY' AS PER 2008 NEC(AIRPORT/RETAIL)**NO OTHER WORK TO BE DONE UNDER THIS PERMIT***
- PermitElectrical
Permit 491541 · COMPLETED
FIRE ALARM AS PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 491532 · COMPLETED
EXISTING POWER AND PANEL TO REMAIN, REMOVE EXISTING CEILING FIXTURES, REPLACE WITH LED FIXTURES, EXISTING LIGHTING, POWER, DATA AND TELEPHONE TO BE REMOVED AND RELOCATED TO NEW LOCATION AS PER 2008 NEC(AIRPORT)EMERGENCY LIGHTING PER ARTICLE 700.12(F).
- PermitElectrical
Permit 490052 · COMPLETED
F/A DRAWING ONLY AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 490069 · COMPLETED
F/A DRAWING ONLY AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitMechanical
Permit 492410 · COMPLETED
FOR THE INSTALLATION OF TEN (10) DIFFUSERS/REGISTERS FOR THE EXTENSION OF AN EXISTING HVAC SYSTEM AND THE RELOCATION OF EXISTING THERMOSTATS.
- PermitMajor alteration
Permit 491310 · COMPLETED
DEMO COMPLETE INTERIOR SPACE AND PROVIDE NEW INTERIOR FIT OUT AS PER PLAN
- PermitMechanical
Permit 493986 · COMPLETED
HVAC, INCLUDING DUCTWORK AND VAV BOXES (7) REGISTERS/DIFFUSERS
- PermitSuppression
Permit 491996 · COMPLETED
INSTALL ONE ANSUL R-102 6.0 GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitAdministrative
Permit 494541 · COMPLETED
AMEND PERMIT 486796 TO CHANGE THE LOCATION FROM FH-17 TO FH-7.
- PermitUse
Permit 493277 · COMPLETED
CHANGE IN USE REGISTRATION FROM FOOD, BEVERAGES AND GROCERIES TO EATING AND DRINKING ESTABLISHMENT/TAKEOUT RESTAURANT IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.
- PermitSuppression
Permit 494920 · COMPLETED
RELOCATE (25) EXISTING SPRINKLER HEADS (BC16)
- PermitSuppression
Permit 494927 · COMPLETED
RELOCATE (7) EXISTING SPRINKLER HEADS (BC21)
- PermitSuppression
Permit 494930 · COMPLETED
RELOCATE (10) EXISTING SPRINKLER HEADS (C9C)
- PermitMechanical
Permit 489783 · COMPLETED
INSTALL TWO (2) COMMERCIAL COOKING EXHAUST SYSTEM.
- PermitElectrical
Permit 487852 · COMPLETED
PROVIDE 1-45A 3PH 480V BREAKER TO EXISTING PANEL TDFHC, INSTALL POWER, LIGHTING, TRANSFORMER & EQUIPMENT AS PER PLANS.
- PermitElectrical
Permit 488463 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (NEWSTAND)
- PermitElectrical
Permit 488462 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (FOOD STORE)
- PermitElectrical
Permit 488461 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (FOOD STORE)
- PermitElectrical
Permit 488460 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (NEWSTAND)
- PermitElectrical
Permit 488459 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (FOOD STORE)
- PermitElectrical
Permit 488464 · COMPLETED
FIRE ALARM SYSTEM AS PER 2008 NEC & NFPA 72 (EYEGLASS STORE)
- PermitElectrical
Permit 490070 · COMPLETED
F/A DRAWING ONLY AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 490068 · COMPLETED
F/A DRAWING ONLY AS PER NEC 2008 & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 487679 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH WIRING.INSTALL 1 CEILING MOUNTED FA STROBE AND 1 CEILING MOUNTED FA SPEAKER TO EXSITING SYSTEM CONDUIT ONLY FOR POS SYSTEM POWER WIRING TO 1 VAV BOX AND 1 INLINE FAN PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitSuppression
Permit 488200 · COMPLETED
FOR THE INSTALLATION OF A KITCHEN HOOD FIRE SUPPRESSION SYSTEM.
- PermitElectrical
Permit 493523 · COMPLETED
INSTALL TEMP POWER TO A TRAILER AT AIRPORT POWER FROM PNL 'DTFH' USING 100A/3P CB VIA#1 SER TYPE CABLE TO OUTDOOR 45LVA TRANSFORMER TO OUTDOOR N3R 150A FUSED SAFETY SWS TO FEED TRAILER PNL USING #2/0 SER TYPE CABLE PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 493541 · COMPLETED
INSTALL CONDUIT/NONN FROM MARKET PLACE PNL TO D12 LOC, INCLUDE EMON-DEMON METER, FIRE RATED SLEEVES BETWEEN WALLS AS NECESSARY, INSTALL 1-NEW FIRE RATED FLOOR BOX AS PER NEC 2008 (KIOSK)
- PermitMajor alteration
Permit 489364 · COMPLETED
TENANT FIT OUT. WORK TO INCLUDE NEW FINISHED WALLS, FLOOR AND CEILING, CABINETRY, LIGHTING, SIGNAGE AND FLOOR FIXTURES.
- PermitMajor alteration
Permit 490116 · COMPLETED
GUT EXISTING TENANT SPACE COMPLETE, REMOVAL OF ALL EXISTING FINISHES AND UTILITIES TO BASE BUILDING SOURCE INSTALL NEW PARTITIONS, FINISHES, MILLWORK, EQUIPMENT AND ALL OTHER ITEMS INDICATED - ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HVAC AND SUPPRESSION
- PermitSuppression
Permit 486796 · COMPLETED
INSTALL ONE ANSUL R-102 4.5 GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitMechanical
Permit 487784 · COMPLETED
INSTALL NEW 1600 CFM VAV WITH ASSOCIATED DUCTWORK AND 8 NEW DIFFUSERS
- PermitPlumbing
Permit 482247 · COMPLETED
RELOCATE 6 EXISTING FIXTURES AND INSTALL 1 NEW FIXTURE AND WATER HTR. INSTALL 1 NEW FLOOR DRAIN AND TRENCH DRAIN (RENTAL CAR FACILITY)
- PermitMechanical
Permit 482276 · COMPLETED
RELOCATE EXISTING REGISTERS/DIFFUSERS. INSTALL NEW REGISTERS/DIFFUSERS.
- PermitPlumbing
Permit 491507 · COMPLETED
REPLACEMENT OF EXISTING DOMESTIC WATER HEATERS (HOTEL)
- PermitPlumbing
Permit 483374 · COMPLETED
NEW PLUMBING FIT OUT FOR RESTAURANT AT TERMINAL F
- PermitPlumbing
Permit 483379 · COMPLETED
NEW PLUMBING FIT OUT FOR CAFE
- PermitPlumbing
Permit 484482 · COMPLETED
PLUMBING FIT OUT FOR TAKE OUT PRETZEL STORE/BAKERY (RESTAURANT)
- PermitMajor alteration
Permit 484226 · COMPLETED
FOR THE INSTALLATION OF A WALL WITH GRAPHICS AND FLOOR FOR THE PROPOSED USE OF PERSONAL SERVICES AND RETAIL SALE OF SUNDRIES, PHARMACEUTICALS AND CONVENIENCE SALES IN SPACE D-12 AS PART OF AN EXISTING AIRPORT COMPLEX.ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.
- PermitMajor alteration
Permit 480873 · COMPLETED
INTERIOR RENOVATIONS AND ALTERATIONS OF EXISTING TERMINAL F TICKETING BUILDING ** ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HVAC AND SUPPRESSION **
- PermitPlumbing
Permit 486159 · COMPLETED
1-WC, 1-LAV, 2-HAIR SINKS, 2-KIT SINKS, 1-SHOWER & 1-WASHER BOX (SALON)
- PermitElectrical
Permit 485105 · COMPLETED
INSTALL NEW 150AMP NEMA 3R PANEL FED BY A 45KVA TRANS W/2 DISCONNECT (PRIMARY & SECONDARY 2 LOCATIONS TERMINAL C & D AS ATTACHED PLANS AS PER NEC 2008 (PARKING GARAGE)
- PermitElectrical
Permit 489815 · COMPLETED
PROVIDE CONDUIT FOR FIBER,DATA AND POWER.FIBER AND DATA WIRE TO EXISTING AFDE-2040 AND POWER TO EXISTING RTA-3 PANEL PER 2008 NEC (AIRPORT)
- PermitAdministrative
Permit 479085 · COMPLETED
AMEND PERMIT #473748 TO INCLUDE HVAC MAKE UP AIR UNITS, ADDITIONAL DUCTWORK, AND AIR DIFFUSERS.
- PermitAdministrative
Permit 479084 · COMPLETED
AMEND PERMIT #471784 TO INCLUDE HVAC MAKE UP AIR UNITS, ADDITIONAL DUCTWORK, AND AIR DIFFUSERS.
- PermitElectrical
Permit 485014 · COMPLETED
PROVIDE & INSTALL (1)480/277 3PH BREAKER IN EXISTING MDP PNL (1) 277/480 3PH PNL 30 CIRCUIT (1)30KVA TRANSFORMER (1)100AMP 3 PH 30 CIRCUIT PNL 21 FIXTURES 1 POWER OUTLETS 3 EXIT/EMERGENCY FIXTURES PER 2008 NEC. HEAT TRACE PER ARTICLE 427.22.
- PermitElectrical
Permit 481832 · COMPLETED
INSTALL PARKING LOT LIGHTING & TEMPORARY TRANSFORMER, 400A SERVICE & 4 125A FEEDERS TO TRAILERS.
- PermitMechanical
Permit 486179 · COMPLETED
INSTALL ONE VAV, GRILLES, REGISTERS AND DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 486180 · COMPLETED
INSTALL ONE VAV, GRILLES, REGISTERS AND DUCTWORK AS PER PLAN. ** SEPARATE PERMIT IS REQUIRED FOR KITCHEN HOOD AND FANS **
- PermitElectrical
Permit 487295 · COMPLETED
INSTALL DISH ANTENNAS & CABLES, 50' OF 1/2 COAX CABLE ETHERNET AS PER NEC 2008 (HOTEL CELL SITE)
- PermitPlumbing
Permit 485763 · COMPLETED
FIT OUT NEW CONCESSION STAND IN AIRPORT ADDITION 3-FLOOR SINKS, 1-MOP RECEPTOR, 1-TRIPLE BOWL SINK, 1-TWO BOWL SINK 2-ONE BOWL SINKS (CONCESSION STAND)
- PermitElectrical
Permit 484247 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH CIRCUIT WIRING INSTALL ALL ELECTRIC PANEL,CIRCUIT BREAKERS,TRANSFORMER,EMON DEMON METER EMPTY CONDUIT SYSTEM FOR FUTURE SPEAKERS AND CAMERA SYSTEM POWER WIRING TO 1 VAV BOX CONDUIT AND CABLE FOR POS SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 478429 · COMPLETED
PROVIDE PWR GROUNDING,SITE PWR,PWR DUCT BANKS,COMMUNICATIONS SPARE CONDUITS*EXCLUDES F/A ALL EXISTING TO REMAIN * AS PER 2008 NEC (RENTAL CAR FACILITY)
- PermitElectrical
Permit 484235 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH CIRCUIT WIRING INSTALL ALL ELECTRICAL PANEL,CIRCUIT BREAKERS,TRANSFORMERS,EMON DEMON METER FIRE ALARM SYSTEM POWER WIRING TO ONE VAV BOX CONDUIT AND CABLE FOR A POS SYSTEM PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitMechanical
Permit 484764 · COMPLETED
HVAC, INCLUDING DUCTWORK AS PER PLANS. 8 REGISTERS/DIFFUSERS
- PermitMechanical
Permit 484767 · COMPLETED
HVAC, INCLUDING DUCTWORK AS PER PLANS. 7 REGISTERS/DIFFUSERS
- PermitMechanical
Permit 484765 · COMPLETED
INSTALLATION OF COMMERCIAL KITCHEN WELDED GREASE EXHAUST DUCTWORK AS PER PLANS.
- PermitMechanical
Permit 484757 · COMPLETED
INSTALL HVAC, INCLUDING DUCTWORK AS PER PLANS. 8 REGISTERS/DIFFUSERS
- PermitMechanical
Permit 484766 · COMPLETED
FOR THE INSTALLATION OF AN HVAC SYSTEM TO INCLUDE DUCTWORK AND REGISTERS AND DIFFUSERS. ALL WORK SHALL BE IN ACCORDANCE WITH APPROVED PLANS.
- PermitElectrical
Permit 482379 · COMPLETED
PROVIDE (1) 45KVA TRANSFORMER, 480/3 TO 208/120Y, (1)150AMP 54 CIRCUIT DOUBLE PANEL & WIRE POWER & LIGHTING AS PER PLANS.
- InvestigationCEASE INSP (likely: cease-operations compliance inspection)
Case 388293 · PASSED
Legacy inspection shorthand; verify whether a cease-operations order existed and its current status. The cited inspection visit was marked passed.
- InvestigationCEASE INSP (likely: cease-operations compliance inspection)
Case 388307 · PASSED
Legacy inspection shorthand; verify whether a cease-operations order existed and its current status. The cited inspection visit was marked passed.
- PermitMechanical
Permit 478348 · COMPLETED
HVAC INCLUDING DUCTWORK, EXHAUST FAN AND MECHANICAL EQUIPMENT 16 REGISTERS/DIFFUSERS.
- PermitMechanical
Permit 484458 · COMPLETED
INSTALLATION OF COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM, DUCTWORK AND FANS. SEE A/P 483073 FOR PLAN.
- PermitMechanical
Permit 483073 · COMPLETED
HVAC INSTALLATION AS PER PLAN.
- PermitElectrical
Permit 485639 · COMPLETED
INSTALL FEED FOR 3 SMART CAR PARKING SPACES PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 484242 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH CIRCUIT WIRING INSTALL ALL ELECTRICAL PANELS,CIRCUIT BREAKERS,TRANSFORMER,EMON DEMON METER KITCHEN EQUIPMENT BRANCH CIRCUIT WIRING POWER WIRING TO 1 VAV BOX CONDUIT AND CABLE FOR A POS SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 484238 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH CIRCUIT WIRING INSTALL ALL ELECTRICAL PANELS, CIRCUIT BREAKERS, TRANSFORMER,EMON DEMON METER KITCHEN EQUIPMENT BRANCH CIRCUIT WIRING POWER WIRING ON 1 VAV BOX CONDUIT AND CABLE FOR POS SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 484239 · COMPLETED
INSTALL LIGHTING FIXTURES,RECEPTACLES,BRANCH CIRCUIT WIRING.INSTALL ALL ELECTRICAL PANELS,CIRCUIT BREAKERS,TRANSFORMER, EMON DEMON METER KITCHEN EQUIPMENT BRANCH CIRCUIT WIRING POWER WIRING TO 1 VAV BOX CONDUIT AND CABLE FOR A POS SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 484315 · COMPLETED
INSTALL NEW 175A/480V FEDER TO NEW PANEL "H" AZND NEW 45KVA TRANSFORMER WITH NEW 280V FEED TO PANEL "A" 175A/3P/4W - INSTALL NEW 20A CKTS - 2 30A 3PH CKYS FOR KITCHEN EQUIPMENT - 1 30A CKT FOR CCU - INSTALL 8 NEW DOWNLIGHTS - 6 2X4 LIGHTS - 6 2X2 LIGTS - 2 UNDER CABINET LIGTS - 2 EM LTS - 2 EXIT SIGNS - AND WALK-IN COOLER LIGHTING - INSTALL NEW 3 WAY SWITCH - 1 P SWITCH GFDI RECEPTACLES AND KITCHEN RECEPTACLES - FIRE ALARM INCLUDED - AS PER NFPA72 AND NEC 2008
- PermitElectrical
Permit 484319 · COMPLETED
INSTALL 175A/480V FEEDER,45KVA,XFORMER,208V FEED TO PANEL A 175A,2 30A CTS FOR KIT EQUIP,30A CKT FOR CCU,8 DOWNLIGHTS,6 2X4 LTS,6 2X2 LTS,2 UNDER CABINET LTS,2 EM LTS,2 EXIT SIGNS,COOLER LTNG,3 WAY SW,1 SW,GFCI RCPS AND KITCHEN RCPS,F/A INCLUDED.
- PermitNew construction
Permit 475816 · COMPLETED
TENANT FIT OUT AS PER PLAN.
- PermitElectrical
Permit 480929 · COMPLETED
PROVIDE NEW 45A 3PH 480 BREAKER, INSTALL 30KVA TRANSFORMER, LIGHTING, RECEPTACLES & EQUIPMENT FEEDS AS PER PLANS.
- PermitElectrical
Permit 480928 · COMPLETED
PROVIDE NEW 120/280 3PH 30 CIRCUIT PANEL, 15 KVA TRANSFORMER, LIGHTING, RECEPTACLES & EQUIPMENT FEEDS AS PER PLANS.
- PermitMajor alteration
Permit 463707 · COMPLETED
INTERIOR ALTERATIONS, FIT OUT, NEW PARTITIONS, FURNISHINGS, EQUIPMENT INSTALLATION, FINISHES FOR RESTAURANT SPACE FH10. STRUCTURAL MODIFICATIONS FOR FRAMING, SUPPORTS FOR TRANSFORMER AND MECHANICAL EQUIPMENT.
- PermitMajor alteration
Permit 478656 · COMPLETED
ALTERATIONS FOR TENANT FIT OUT IN EXISTING RETAIL SPACE IN AIRPORT COMPLEX, INCLUDES ALTERATION TO DIFFUSER AND VAV BOX REPLACEMENT. NO CHANGE IN OCCUPANCY CLASSIFICATION. CO IS FOR RECORD PURPOSES.
- PermitMajor alteration
Permit 480936 · COMPLETED
INSTALLATION OF SUPPORT STEEL/ EQUIPMENT PLATFORM FOR HVAC EQUIPMENT.
- PermitSuppression
Permit 482351 · COMPLETED
INSTALL AN ANSUL R-102 6 GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM.
- PermitSuppression
Permit 482350 · COMPLETED
INSTALL AN ANSUL R-102 3.0 GALLON WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM.
- PermitPlumbing
Permit 474046 · COMPLETED
STORE FIT OUT AT NEW FOOD COURT F TERMINAL, INSTALL FIXTURES (AIRPORT TERMINAL
- PermitPlumbing
Permit 474047 · COMPLETED
STORE FIT OUT AT NEW FOOD COURT F TERMINAL, INSTALL FIXTURES (AIRPORT TERMINAL
- PermitPlumbing
Permit 478016 · COMPLETED
COMMERCIAL KITCHEN;INSTALL THE FOLLOWING FIXTURES:1-3 COMP SINK W/GREASE TRAP,1 PREP SINK,1 MS,2 HS,5 FS (COMMERCIAL)
- PermitNew construction
Permit 475819 · COMPLETED
TENANT FIT OUT AS PER PLAN.
- PermitNew construction
Permit 475813 · COMPLETED
TENANT FIT-OUT FOR STORE AS PER PLAN.
- PermitNew Construction
Permit 477474 · Completed
INSTALL FEED CABLE TO 2 PNLS, 75KVA XFM 480/277 TO 208Y/120 66 LTS, 21 LTS,4 SWS, 9 RECP 7 QUAD 4 POKE THROUH REC, 4 SPEAKERS 5 DATA, 2 DUCT HEATER, 3 AV BOX,1 DIS,2 HEAT TRACE, 1-200 3/P BREAKER (MAIN FEEDERS) PER (AIRPORT)
- PermitElectrical
Permit 477470 · COMPLETED
INSTALL 1-125A,3P 480V CIRCUIT BREAKER IN EXISTING DOA TDFHA TO FEED 1-FH-14 LOW VOLTAGE 480V/277 3/P 18 CIRCUIT PANEL 1-45VA TRANSFORMER 480V/208Y/120 TO FH-14 LOW VOLTAGE 1-54 CIR PANEL WITH 175AMP MAIN 61 FIXTURES 6 EMER FIXTURES 2 SINGLE POLE SWITCH 1 TIME CLOCK 1 LIGHT CONTACTOR 6 GFI REC 12 QUAD 15 SINGLE REC 11 EQUIP CONNECTION 1 ROOF TO P UNIT 1 VAV BOX 6 DATA OUTLETS 4 CAMERA CONN RELOCATE EXIST FA PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitElectrical
Permit 482814 · COMPLETED
INSTALL LIGHT FIXTURES, RECEPTACLES & BRANCH CIRCUIT WIRING. PANELS & BREAKERS EXISTING TO REMAIN.
- PermitElectrical
Permit 482909 · COMPLETED
RELOCATE 2 20A RECEPTACLES & INSTALL 2 CAT6 DATA JACKS.
- PermitElectrical
Permit 477041 · COMPLETED
PROVIDE POWER, PANEL BOARDS, DATA OUTLETS, PHONE LINES, GROUNDING, SITE POWER - PER PLANS - AS PER 2008 NEC
- PermitElectrical
Permit 482756 · COMPLETED
PROVIDE AND INSTALL (1) 60AMP 480V DISCONNECT SWITCH (1) 30KVA 480V 208/120V 3PHASE 4 WIRE TRANSFORMER (1)208/120V 3PHASE 4 WIRE 30 CIRCUIT WITH 100AMP MCB PANEL PER 2008 NEC (AIRPORT)
- PermitUse
Permit 480950 · COMPLETED
PERSONAL SERVICES AND RETAIL SALE OF SUNDRIES, PHARMACEUTICALS, CONVIENCE GOODS AND SPA SERVICE, INCLUDING MASSAGE (NOT AS DEFINED IN 14-601 (7) (A) (.5) IN SPACE D-12 AS PART OF AN EXISTING AIRPORT COMPLEX.
- PermitUse
Permit 480951 · COMPLETED
PERSONAL SERVICES AND RETAIL SALE OF SUNDRIES, PHARMACEUTICALS, CONVIENCE GOODS AND SPA SERVICE, INCLUDING MASSAGE (NOT AS DEFINED IN 14-601 (7) (A) (.5) IN SPACE FH-1 AS PART OF AN EXISTING AIRPORT COMPLEX.
- PermitMajor alteration
Permit 462082 · COMPLETED
INTERIOR ALTERATIONS, DEMO AND TENANT FIT-OUT FOR RESTAURANT IN FOOD COURT AND FOR MECHANICAL WORK. STRUCTURAL WORK AND FRAMING FOR EQUIPMENT SUPPORTS. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, SPRINKLERS, ANSUL SUPPRESSION SYSTEM. SEE AP# 463587 FOR MECHANICALS- HOOD, APPLIANCES.
- PermitMechanical
Permit 463587 · COMPLETED
TENANT FIT-OUT FOR RESTAURANT IN FOOD COURT UNDER AP462082 AND FOR MECHANICAL WORK. INSTALLATION OF A TYPE 1 AND TYPE 2 KITCHEN HOODS AND ASSOCIATED DUCTWORK, DIFFUSERS, EXHAUST FANS AND MAKE UP AIR, CONDENSING UNITS, ACCESSORY MECHANICALS AS PER PLANS AND SCHEDULES. ADD'L PERMITS REQ: ELECTRICAL, PLUMBING, ANSUL SUPPRESSION SYSTEM.
- PermitUse
Permit 475660 · COMPLETED
USE CHANGE FROM RETAIL SALE OF THEMED MERCHANDISE TO SALE OF DRY GOODS IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES TO REMAIN
- PermitMajor alteration
Permit 471818 · COMPLETED
RENOVATIONS TO EXISTING ADMIN BLDGS. UPDATES TO HVAC. ADDITION OF 4 CANOPIES AND 3 NEW BOOTHS. SITE RENO INCLUDING NEW SIGNAGE AND PAVEMENT REPAIRS-RENTAL CAR FACILITY
- PermitMajor alteration
Permit 480072 · COMPLETED
INTERIOR FIT-OUT OF FH-05 SPACE. WORK TO INCLUDE; NEW STOREFRONT, INTERIOR PARTITIONS, EQUIPMENT, CASEWORK, CEILING, AND FINISHES.
- PermitSuppression
Permit 478478 · COMPLETED
INSTALLATION OF SPRINKLER SYSTEM AS PER PLAN.
- PermitNew construction
Permit 474753 · COMPLETED
TENANT FIT-OUT AS PER PLAN.
- PermitNew construction
Permit 465522 · COMPLETED
TENANT FIT-OUT AS PER PLAN TO CREATE NEW ICE CREAM/SMOOTHIE SHOP
- PermitSuppression
Permit 478094 · COMPLETED
INSTALL ONE ANSUL R WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM. **SEE A/P 478091 FOR PLAN AND DATA SHEET **
- PermitMechanical
Permit 478091 · COMPLETED
INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOODS ONLY
- PermitElectrical
Permit 475910 · COMPLETED
PROVIDE EMT CONDUIT FOR 12 QUAD OUTLETS W #12THNN WIRE FROM NEW NEW 3PHASE,4 WIRE 208/120,4 WIRE F-NW-MPR 30 CIRCUIT PANEL.PROVIDE AND INSTALL 125/3 PHASE BREAKER IN EXISTING TDFHD PANEL AS PER 2008 NEC(PIA TERMINAL F)
- PermitZoning/use
Permit 471802 · COMPLETED
REPLACEMENT OF 5 SIGNS, ADDITION OF 15 SIGNS, NEW PAVEMENT CONFIGURATION
- ViolationCAL LO (Commercial Activity License required)
Case 388293 · Violation 2842028 · Code 19-2602.1/1 · COMPLIED
Philadelphia Code §19-2602(1) requires a Commercial Activity License before conducting business in the city. City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationOBTAIN LIC INDICATED (Obtain the license identified in the notice)
Case 388293 · Violation 2842029 · Code LO-1 · COMPLIED
The shorthand does not identify the license type; open the case notice for that detail. City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationOBTAIN LIC INDICATED (Obtain the license identified in the notice)
Case 388307 · Violation 2842114 · Code LO-1 · COMPLIED
The shorthand does not identify the license type; open the case notice for that detail. City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCAL LO (Commercial Activity License required)
Case 388307 · Violation 2842113 · Code 19-2602.1/1 · COMPLIED
Philadelphia Code §19-2602(1) requires a Commercial Activity License before conducting business in the city. City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationBC INSP (likely: building-code inspection)
Case 388293 · CLOSED
Legacy inspection shorthand; confirm the inspection type and scope in the City case file. City marked the record closed; open the case for the closing reason.
- InvestigationBC INSP (likely: building-code inspection)
Case 388307 · CLOSED
Legacy inspection shorthand; confirm the inspection type and scope in the City case file. City marked the record closed; open the case for the closing reason.
- InvestigationBC INSP (likely: building-code inspection)
Case 388293 · FAILED
Legacy inspection shorthand; confirm the inspection type and scope in the City case file. The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationBC INSP (likely: building-code inspection)
Case 388307 · FAILED
Legacy inspection shorthand; confirm the inspection type and scope in the City case file. The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitElectrical
Permit 473388 · COMPLETED
REMOVE 2 MONITOR MODULES,ADD 1 CEILING SPEAKER AND 1 CEILING STROBE FOR EXISTING FIRE ALARM SYSTEM AS PER 2008 NEC AND NFPA72 (COMMERCIAL)
- InvestigationBP_BLDG
Case 377450 · PASSED
The cited inspection visit was marked passed.
- PermitUse
Permit 476911 · COMPLETED
CHANGE OF USE REGISTRATION FROM EATING AND DRINKING TO EATING AND DRINKING TAKEOUT RESTAURANT
- PermitUse
Permit 476912 · COMPLETED
RETAIL SALE OF JEWELRY (CONSUMER GOODS)(NO ITEMS AS DEFINED IN SECTION 14-603 (13) AND NO DRUG PARAPHERNALIA STORE AND GUN SHOP)
- PermitUse
Permit 476908 · COMPLETED
FOR THE CREATION OF TWO (2) TENANT SPACES (BC29A AND BC29B) FROM ONE (1) TENANT SPACE BC-29AB. BC29B FOR RETAIL SALE OF CLOTHING AND ACCESSORIES (WEARING APPAREL AND ACCESSORIES). SEE A/P 476912
- PermitAdministrative
Permit 477200 · COMPLETED
AMEND PERMIT # 472071 TO INCLUDE THE INSTALLATION OF BLACK IRON DUCTWORK FOR COMMERCIAL COOKING EXHAUST SYSTEM.
- PermitMechanical
Permit 476299 · COMPLETED
FOR THE REPLACEMENT OF 12 REGISTERS & DIFFUSERS IN AN EXISTING STRUCTURE (AIRPORT, TERMINAL 'F'). MECHANICAL WORK ALSO TO INCLUDE ALL REQUIRED EHAUSTS, FANS AND DUCTWORK REQUIRED TO COMPLETE RECONFIGURED SYSTEM. HVAC SYSTEM TO BE BALANCED PRIOR TO CONTINUING SERVICE.
- PermitMajor alteration
Permit 473398 · COMPLETED
ALTERATIONS INCLUDE GWB PARTITIONS AND FLOORING. ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HVAC AND SUPPRESSION
- PermitMajor alteration
Permit 468929 · COMPLETED
INTERIOR TENANT FIT OUT OF COMMERCIAL SPACE FH-9 IN TERMINAL F HUB AS PER PLANS. MECHANICAL HVAC AND KITCHEN HOOD PERMIT ISSUED UNDER AP#471784.
- PermitMechanical
Permit 471784 · COMPLETED
HVAC DUCTWORK AND NEW DIFFUSERS/REGISTERS; TO INCLUDE TWO KITCHEN HOODS (TYPE I AND TYPE II) WITH RELATED DUCTWORK AS PER PLANS. PLANS ARE UNDER PERMIT AP#468929. SEPARATE FIRE SUPPRESSION PERMIT REQUIRED.
- PermitMechanical
Permit 473748 · COMPLETED
INTERIOR FIT OUT, INSTALL KITCHEN HOOD, ASSOCIATED DUCT WORK, FANS DIFFUSERS INCLUDED FOR NEW TENANT SPACE. ADDITIONAL PERMIT FOR ANSUL SUPPRESSION SYSTEM REQUIRED.
- PermitMajor alteration
Permit 468930 · COMPLETED
INTERIOR FIT OUT OF TAKE OUT RESTAURANT SPACE, INCLUDES MECHANICAL FOR HOOD & DIFFUSERS : SEE AP # 473748. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING, SPRINKLERS, ANSUL SYSTEM.
- PermitUse
Permit 474142 · COMPLETED
USE CHANGE TO TAKE OUT RESTAURANT TO SALE OF PREPARED AND PREPACKAGED FOODS (FOOD BEVERAGES AND GROCERIES) IN CONCOURSE C - SPACE C -9C IN AN EXISTING AIRPORT COMPLEX
- PermitMajor alteration
Permit 420058 · COMPLETED
INTERIOR ALTERATIONS TO EXISTING FOOD COURT BUSINESS IN TERMINAL BC CONNECTOR SPACE, AS PER PLANS. ADDITONAL PERMITS REQUIRED: ELECTRICAL, PLUMBING, HVAC, SPRINKLERS
- PermitPlumbing
Permit 473684 · COMPLETED
PLUMBING INSTALL FOR RESTAURANT AT THE AIRPORT
- InvestigationBP_BLDG
Case 377450 · PASSED
The cited inspection visit was marked passed.
- PermitUse
Permit 472567 · COMPLETED
CHANGE IN USE REGISTRATION FROM AIRPORT CONCOURSE TO RETAIL SALE OF DRY GOODS (RETAIL SALE OF CONSUMER GOODS) IN SPACE D-12 IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPPROVED.
- PermitMechanical
Permit 468592 · COMPLETED
HVAC INSTALLATION FOR NEW FOOD SERVICE SPACE IN TERMINAL F. SEE A/P 462055 FOR PLAN.
- PermitMajor alteration
Permit 462055 · COMPLETED
TENANT FIT OUT OF NEW FOOD SERVICE SPACE IN TERMINAL F AT THE FOOD COURT
- PermitAdministrative
Permit 475401 · COMPLETED
AMEND EXISTING TEMPORARY CERTIFICATE OF OCCUPANCY PERMIT #460381 FOR AN ADDITIONAL(180)DAYS - CONCOURSE 1 & 2/COLUMN LINES FB.3 TO FB.6 - CONCOURSE 3/COLUMN LINES E3 TO E4 - F TERMINAL MAIN HUB/INFORMATION DESK AREA/COLUMN LINES F1 TO F7.9 & FB TO TWENTY FEET (20'-0") SOUTH OF COLUMN LINE FC.3/MEZZANINE BALCONY & MONUMENTAL STAIRS
- PermitAdministrative
Permit 475420 · COMPLETED
TEMPORARY CERTIFICATE OF OCCUPANCY (180)DAYS - SOUTHEAST/SOUTHWEST 1ST FLOOR FHUB (COLUMN LINES FC TO FG - FO.1 TO F8) INCLUDING INBOUND & OUTBOUND BUS VESTIBULES
- PermitAdministrative
Permit 475385 · COMPLETED
AMEND PERMIT# 318838 TO TERMINAL F HUB EXPANSION TO INDICATE 4 EXIT DOORS TO BE LOCKED.
- AppealBuilding standards appeal
Appeal 20446 · OPEN · Withdrawn
Related permit 467397 · DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED NOTICE OF REFUSAL FOR APPLICATION #467397.
- PermitElectrical
Permit 472443 · COMPLETED
INSTALL 480/277V 3 PHASE PNL TRANSFORMERS 120/208 3 PHASE PNL LIGHTING CONTROL SYS LIGHT FIXTURES WIRING DEVICES FA TELECOMMUNICATION CABLING SECURITY SYS CCTV CAMERAS POS SYS MECHANICAL CONNECTIONS TO KITCHEN EQUIP & HVAC EQUIP PER 2008 NEC & NFPA 72(AIRPORT)
- ViolationFOOD NON PERM LOC LO
Case 383298 · Violation 3093381 · Code 06-301.2/13 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationHCEU INSP (Housing Code Enforcement Unit inspection)
Case 383298 · FAILED
A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended. The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitMechanical
Permit 472071 · COMPLETED
HVAC INSTALLATION AS PER PLAN. SEPARATE PERMIT REQUIRED FOR COMMERCIAL EXHAUST HOOD SYSTEM.
- PermitAdministrative
Permit 472687 · COMPLETED
"TEMPORARY CERTIFICATE OF OCCUPANCY" 180 DAYS - MEZANINE; SOUTHEAST: OFFICES, LOCKER ROOM, BREAKROOM, VENDING AREA & RESTROOMS - MEZZANINE; SOUTHWEST: PILOT OFFICES, CREW ROOM/PILOT LOUNGE, VENDING AREA, LUGGAGE STORAGE, RECEPTION, COMPUTER ROOM & BREAKROOM
- PermitZoning/use
Permit 462587 · COMPLETED
THREE NEW PARKING ATTENDANT BOOTHS, FIVE NEW CANOPIES.
- PermitNew construction
Permit 414848 · COMPLETED
SITE WORK FOR A PARKING LOT. ADDITIONAL ONSITE WORK INCLUDES THE CONSTRUCTION OF FENCE AND GUIDE RAIL ALONG THE PERIMETER OF EACH LOT.
- PermitElectrical
Permit 464029 · COMPLETED
INSTALL 2 PANELS - RECEPTACLES AND LIGHTS AS PER DRAWINGS - INSTALLATIONS OF TELECOMMUNICATIONS AND RELOCATION OF 3 EXISTING FIRE ALARM NOTIFICATION SERVICES AS PER PLANS - AS PER 2008 NEC
- PermitMajor alteration
Permit 463230 · COMPLETED
TENANT FIT OUT FOR NEWSTAND STORE-TERMINAL F, SPACE F7
- PermitMechanical
Permit 469846 · COMPLETED
HVAC INSTALLATION FOR TENANT SPACE. SEE A/P 463230 FOR PLAN.
- PermitElectrical
Permit 469893 · COMPLETED
INSTALL TWO 120V/20A BRANCH CIRCUITS FOR QUAD RECEPTACLE DEVICES PER 2008 NEC (AIRPORT)
- PermitZoning/use
Permit 444743 · COMPLETED
FOR THE CONSTRUCTION OF GUARD BOOTHS AND MINOR RESTRIPING.
- PermitZoning/use
Permit 459127 · COMPLETED
SIGNAGE ACCESSORY TO RENTAL CAR FACILITY. SEE AP#444743 FOR PLAN.
- PermitZoning/use
Permit 432273 · COMPLETED
INSTALLATION OF PROPRIETORY IMPROVEMENTS CONSISTING OF NEW CONCRETE FOUNDATIONS AND PREFABRICATED BOOTHS AND CANOPIES. DEMOLITION OF EXISTING CONCRETE SLAB AND BOOTHS ON AVIS AND BUDGET SITE. SIGNS NOT INCLUDED IN THIS PERMIT.
- PermitNew construction
Permit 430057 · COMPLETED
INSTALLATION OF CONCRETE FOUNDATIONS AND PREFABRICATED BOOTHS AND CANOPIES.
- PermitMajor alteration
Permit 444755 · COMPLETED
CONSTRUCTION OF NEW CANOPY, PREFAB EXIT BOOTHS, CANOPY, NEW PARKING LOT & STALLS- CIVIL SITE WORK LANDSCAPING, SIGNAGE INSTALLATIONS FOR EXISTING AIRPORT CAR RENTAL LOT. ADDITIONAL PERMITS REQ: ELECTRICAL, PLUMBING
- PermitSuppression
Permit 469160 · COMPLETED
RELOCATE 16 HEADS
- PermitMechanical
Permit 466965 · COMPLETED
HVAC MODIFICATION. SEE A/P 460631 FOR PLAN.
- PermitMajor alteration
Permit 460631 · COMPLETED
TENANT IMPROVEMENT FOR RETAIL STORE AS PER PLAN.
- PermitMechanical
Permit 468080 · COMPLETED
HVAC INSTALLATION. SEE A/P 466922 FOR PLAN. *SEPARATE COMMERCIAL COOKING EXHAUST SYSTEM IS REQUIRED*
- PermitMajor alteration
Permit 466922 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN. *SEPARATE PLUMBING AND ELECTRICAL PERMIT IS REQUIRED*
- PermitUse
Permit 458935 · COMPLETED
CHANGE IN USE FROM VACANT COMMERCIAL SPACE (FH-17) TO TAKE OUT FAST FOOD RESTAURANT
- PermitElectrical
Permit 466052 · COMPLETED
ELECTRICAL WORK ASSOCIATED WITH RENOVATION TO NEWSTAND INCLUDING WIRING, LIGHT FIXTURES, EQUIPMENT AND PANELS. ALL WORK DONE IN ACCORDANCE WITH 2008 NEC(AIRPORT NEWSTAND)
- PermitUse
Permit 465933 · COMPLETED
CHANGE USE FROM VACANT COMMERCIAL SPACE TO RETAIL SALES OF PREPARED FOOD AND BEVERAGES IN AN EATING AND DRINKING ESTABLISHMENT
- PermitMechanical
Permit 467580 · COMPLETED
RELOCATE 4 DIFFUSERS
- PermitSuppression
Permit 447612 · COMPLETED
RELOCATION OF 10 FIRE SPRINKLER HEADS. - NOTE: THIS PERMIT WAS ROLLED BACK ON FRIDAY, 04/26/2013 TO SHOW THE CORRECT LOCATION
- PermitMajor alteration
Permit 463621 · COMPLETED
INTERIOR ALTERATIONS, DEMO AND INTERIOR FIT OUT, UPGRADES TO FINISHES, NEW FURNISHINGS, PARTITIONS IN SPACE FH17 FOR SIT DOWN RESTAURANT IN THE F TERMINAL HUB. INTERIOR /EXTERIOR STRUCTURAL MODIFICATIONS FOR HVAC FRAMING /SUPPORTS, ADDITIONAL PERMITS ARE REQUIRED FOR MECHANICAL, KITCHEN HOODS(TYPE 1 & TYPE 2) & ANSUL SYSTEM, ELECTRICAL, PLUMBING, SPRINKLERS.
- PermitPlumbing
Permit 467716 · COMPLETED
INSTALL KITCHEN SINK (AIRPORT BREAK ROOM)
- PermitElectrical
Permit 465712 · COMPLETED
INSTALL LGT FIXTURES, SW, RECPTS, COMM JACKS, CONDUIT & PULL STRING FOR CCTV CAMERAS & CIRCUIT BREAKERS IN EXISTING PANEL FOR RETAIL STORE IN PHL AIRPORT TENANT SPACE AS PER NEC 2008(AIRPORT TERMINAL)
- ViolationARCHITECT/ENGINEER SERVICES
Case 377450 · Violation 2820515 · Code A-304.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 377450 · Violation 2820514 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCO- WK NOT ENTIRELY DONE NO CO
Case 377450 · Violation 2820516 · Code A-701.5/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 450441 · Violation 2773327 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationARCHITECT/ENGINEER SERVICES
Case 450441 · Violation 2773328 · Code A-304.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCO- WK NOT ENTIRELY DONE NO CO
Case 450441 · Violation 2773329 · Code A-701.5/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationBP_BLDG
Case 377450 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitSuppression
Permit 466809 · COMPLETED
RELOCATE 4 SPRINKLER HEADS (SPACE F7 - HUDSON NEWS)
- PermitSuppression
Permit 466810 · COMPLETED
RELOCATE (12) EXISTING SPRINKLER HEADS IN SPACE F6.
- PermitMechanical
Permit 465295 · COMPLETED
RELOCATE 2 DIFFUSERS
- PermitMechanical
Permit 464895 · COMPLETED
REPLACE 4 DIFFUSERS, REMOVE OLD CONDENCING UNIT
- PermitMechanical
Permit 463885 · COMPLETED
DUCT WORK & 16 DIFFUSERS ONLY-AIRLINE TICKET AREA-TERMINAL E
- PermitSuppression
Permit 463451 · COMPLETED
RELOCATE (2) EXISTING SPRINKLER HEADS (SPACE BC 25)
- PermitElectrical
Permit 462394 · COMPLETED
INSTALL NEW CONDUIT PATHWAYS WITH CAT5 CABLE, AND 1 NEW 120V 20A BRANCH POWER CIRCUIT, FOR TELECOMMUNICATION EQUIPMENT CABINET IN THE MAINTENANCE AREA OF REPUBLIC AIRWAYS TERMINAL C FIRST FLOOR CONCOURSE PER 2008 NEC (AIRPORT)
- PermitMajor sign
Permit 458540 · COMPLETED
INTERIOR ALTERATIONS, REPLACEMENT AND INSTALLATION OF NEW CABINETS & EQUIPMENT - NEW INTERIOR TO CREATE ADVERTISING DISPLAYS AND VARIOUS VIDEO WALLS, TOUCHSCREEN KIOSKS, STRUCTURAL WORK AND CONNECTIONS/ MODIFICATIONS FOR LCD WALL MOUNT AND KIOSK INSTALLATIONS, UPGRADES TO FINISHES, ALTERATIONS-UPGRADES TO EXISTING ELECTRICAL PANELS AND ELECTRICAL INSTALLATIONS, SPECIAL SYSTEMS TELECOMMUNICATIONS. ADDITIONAL PERMITS REQUIRED : ELECTRICAL.
- PermitUse
Permit 460620 · COMPLETED
RETAIL SALE OF PREPARED BEVERAGES
- PermitUse
Permit 460598 · COMPLETED
CHANGE OF USE FROM VAVCANT TO RETAIL SALES OF PREPARED AND PREPACKAGES FOOD AND BEVERAGES IN AN EATING AND DRINKING ESTABLISHMENT
- PermitUse
Permit 460622 · COMPLETED
EATING AND DRINKING ESTABLISHMENT
- PermitUse
Permit 460600 · COMPLETED
CHANGE OF USE FROM VACANT TO RETAIL SALES OF PREPARED AND PREPARED FOOD AND BEVERAGES IN AN EATING AND DRINKING ESTABLISHMENT
- PermitUse
Permit 460619 · COMPLETED
RETAIL SALE OF PREPARED FOOD AND BEVERAGES IN AN EATING AND DRINKING EST
- PermitUse
Permit 460596 · COMPLETED
USE CHANGE FORM VACANT TO RETAIL SALE OF PREPARED AND PREPACKAGED FOOD AND BEVERAGES IN AN EATING AND DRINKING ESTABLISHMENT IN AN EXITING AIRPORT
- PermitUse
Permit 460621 · COMPLETED
RETAIL SALE OF GOODS FOR PERSONAL GROOMING AND FOR THE DAY TO DAY MAINTENANCE OF PERSONAL HEALTH AND WELL BEING
- PermitAdministrative
Permit 460381 · COMPLETED
TEMPORARY CERTIFICATE OF OCCUPANCY (180)DAYS - CONCOURSE 1 & 2/COLUMN LINES FB.3 TO FB.6 - CONCOURSE 3/COLUMN LINES E3 TO E4 - F TERMINAL MAIN HUB/INFORMATION DESK AREA/COLUMN LINES F1 TO F7.9 & FB TO TWENTY FEET (20'-0") SOUTH OF COLUMN LINE FC.3/MEZZANINE BALCONY & MONUMENTAL STAIRS
- PermitMajor alteration
Permit 450441 · COMPLETED
REMODEL OF THE EXISTING BOSE STORE - LOCATED AT THE PIA B/C CONNECTOR RETAIL SPACE BC#25
- PermitUse
Permit 458933 · COMPLETED
CHANGE IN USE FROM VACANT COMMERCIAL SPACE (FH-7) TO TAKE OUT FAST FOOD RESTAURANT
- PermitUse
Permit 458934 · COMPLETED
CHANGE IN USE FROM VACANT COMMERCIAL SPACE (FH-13) TO TAKE OUT FAST FOOD RESTAURANT
- PermitElectrical
Permit 460644 · COMPLETED
REMOVAL OF EXISTING WIRING DEVICES AND REINSTALLATION TO ALLOW FOR NEW CASEWORK TO BE INSTALLED(8 RECEPTACLES TO BE REMOVED & REINSTALLED) AS PER 2008 NEC (AIRPORT) ***NO ADDITIONAL WIRING AND NO OTHER WORK TO BE DONE ON THIS PERMIT***
- PermitElectrical
Permit 460321 · COMPLETED
INSTALL 11-2X4 FIXTURES 1 EXIT SIGN 6-120V RECEPTACLE 2-120V 20AMP SWS 1" EMIT WITH 3-20 BRANCH CRIB W/#10THNN WIRE TO EXIST MP-TD-P1 PNL UPGRADE EXST FEEDER TO (4)#2 & (1)#8 FROM PNL MP-TD-DP2 TO MP-TD-P1 INSTALL 100AMP BREAKER PER 2008 NEC (AIRPORT)
- PermitMajor alteration
Permit 452304 · COMPLETED
INSTALLING POWER POLES IN VARIOUS LOCATION AS PER PLAN. SEPARATE ELECTRICAL PERMIT IS REQUIRED.
- PermitMajor alteration
Permit 457015 · COMPLETED
RENOVAYION OF EXISTING RETAIL SPACE FOR RETAIL SPACE - NOTE: THIS PERMIT WAS "REVISED" TO SHOW A CHANGE OF CONTRACTOR ON 04/04/2013
- PermitElectrical
Permit 452782 · COMPLETED
PROVIDE MILLWORK FIXTURES REC,& BRANCH CIR WIRING POWER WIRING POWER WIRING FOR NEW BAR EQUIP RELOCATE 1 FA HORN STROBE PROVIDE CONDUIT RACEWAYS JUNCTION BOXES & WIRING FOR COMMUNICATION PROVIDE 1-60A/3P SUB ELECTRIC PNL INCLUDE CONDUIT RACEWAY FEEDERS PNL & BREAKERS PER 2008 NEC & NFPA 72 (COMMERCIAL)
- PermitMajor alteration
Permit 453165 · COMPLETED
TENANT FIT OUT AS PER PLANS
- PermitElectrical
Permit 451320 · COMPLETED
INSTALL NEW CONDUIT PATHWAY W/CAT5 CABLE AND NEW 120V 20A BRANCH POWER CIRCUIT FOR PASSENGER TICKETING EQUIPTMENT LOCATED IN TERMINAL A EAST TICKETING.TELCOM CABINET AND ELECTRICAL PANEL ARE BOTH EXISTING AS PER 2008 NEC (AIRPORT TERMINAL)
- PermitMajor alteration
Permit 442940 · COMPLETED
COMPLETE CONSTRUCTION OF EXISTING RATED WALLS AND SMOKE BARIER IN EXISTING STORGAE ROOM. SEPARATE PERMIT REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK.
- PermitSuppression
Permit 456163 · COMPLETED
RELOCATE 9 SPRINKLERS
- PermitMechanical
Permit 436299 · COMPLETED
FOR THE ALTERATION OF AN EXISTING HVAC SYSTEM TO INCLUDE THE INSTALLATION OF NEW DUCTWORK, GRD'S, EQUIPMENT AND THE RELOCATION OF ONE (1) EXISTING COMMERCIAL KITCHEN EXHAUST HOOD AS PER APPROVED PLANS.
- PermitElectrical
Permit 454625 · COMPLETED
ADD ONE STROBE LIGHT TO EXISTING CIRCUIT RELOCATE EXISTING 1 SPEAKER AND 1 STROBE *PERMIT ALREADY PROCURED FOR THE PROJECT 447433 FOR ELECTRICAL* PER 2008 NEC & NFPA 72 (COMMERCIAL)
- PermitElectrical
Permit 449616 · COMPLETED
INST GENERAL & EMERGENCY LIGHTING, REC, SWS, DEMO, PHONE, DATA, POS & ASSOCIATED LOW VOLT WIRING INCLUDES RELOCATIN OF HORN STROBES FROM OLD WALL TO NEW WALL IN SAME LOC EXCLUDES ALL SECURITY, CCTV, SOUND, PAGING IN ITS ENTIREY (BY OTHERS) PER 2008 NEC & NFPA 72 (AIRPORT)
- PermitUse
Permit 453164 · COMPLETED
USE REGISTRATION FOR RESTAURANT/BAR SEATING AND SERVING AREA (NO PREPARING FOOD IN THIS AREA IN TERMINAL C APCE C-31)
- PermitAddition
Permit 452471 · COMPLETED
FIT OUT OF A SHELL SPACE AS PER PLAN.
- PermitMechanical
Permit 453400 · COMPLETED
NEW HVAC INSTALLATION AS PER PLAN.
- PermitAddition
Permit 452467 · COMPLETED
TENANT FIT-OUT AS PER PLAN.
- PermitMajor alteration
Permit 450228 · COMPLETED
REMODELILNG TO A RETAIL STORE AS PER PLAN.
- PermitMechanical
Permit 451551 · COMPLETED
HVAC INSTALLATION TO A RETAIL STORE AS PER PLAN.
- PermitElectrical
Permit 452561 · COMPLETED
FURNISH & INSTALL 120VAC ELECTRIC POWER POLES FOR CUSTOMER ELECTRIC DEVICES, INCLUDING CORE DRILLING, CONDUIT & WIRING PER NEC (AIRPORT)
- PermitUse
Permit 451426 · COMPLETED
FOR RETAIL SALE OF CONSUMER GOODS AND FOOD, BEVERAGES AND GROCERIES IN SPACE FH-15 IN TERMINAL F AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitUse
Permit 451427 · COMPLETED
FOR RETAIL SALE OF CONSUMER GOODS AND FOOD, BEVERAGES AND GROCERIES IN SPACE FH-4 IN TERMINAL F AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitElectrical
Permit 442416 · COMPLETED
REPLACE EXISTING UNITS IN PLACE TO ALLOW FOR WALL PAPERING;RELOCATE EXISTING UNITS TO NEW LOCATION DUE TO WALL RELOCATION;INSTALL NEW UNITS AND FIRE ALARM WORK PARTIAL 1ST & 8TH FL AS PER 2008 NEC AND NFPA72(COMMERCIAL)
- PermitSuppression
Permit 448443 · COMPLETED
INSTALL SPRINKLER SYSTEM IN STORAGE SPACE AB5, STARTING A NEW CONNECTION TO EXISTING SPRINKLER MAIN IN SPACE.
- PermitElectrical
Permit 447829 · COMPLETED
INSTALL ADVERTISING DISPLAYS COMPLETE W/120 VAC POWER & ETHERNET COMMUNICATIONS CABLES AS PER NEC 2008 (COMM)
- PermitElectrical
Permit 446308 · COMPLETED
INSTALL CKT BREAKERS IN EXISTING PANELS,NEW PANELS, CONDUIT AND BRANCH CKTS FOR NEW WIRING DEVS AND LT FIX,TELE/COMM CABLES,CABLE TRAY AND OUTLETS AND FA CONDUIT. ALL WORK DONE IN ACCORDANCE WITH 2008 NEC(AIRPORT)(WEST DIST)
- PermitUse
Permit 450421 · COMPLETED
CHANGE USE FROM VACANT COMMERCIAL TO RETAIL SALE OF CONSUMER GOODS IN SPACE FH-19 TERMINAL F HUB AS PART OF AN EXISTING AIRPORT COMPLEX.
- PermitUse
Permit 450422 · COMPLETED
CHANGE OF USE FROM VACANT COMMERCIAL SPACE TO EATING AND DRINKING ESTABLISHMENT IN EXISTING AIRPORT COMPLEX.
- PermitUse
Permit 450425 · COMPLETED
USE CHANGE FROM VACANT COMMERCIAL TO RETAIL SALE OF WEARING APPAREL AND ACCESSORIES IN EXISTING AIRPORT COMPLEX.
- PermitMechanical
Permit 443823 · COMPLETED
REMOVE EXISTING VAV REPLACE WITH DUCTWORK ONLY NO NEW MECHANICAL EQUIPMENT TO BE INSTALLED. REPLACE AND RELOCATE EXISTING DIFFUSERS AND RETURN GRILLS WITH NEW. SOME NEW ADDITIONAL DUCTWORK AND PARTCAL REMOVALS OF EXISTING REQUIRED.
- PermitUse
Permit 446990 · COMPLETED
AB LINK SPACE AB-5 USE TO STORAGE OF DRY GOODS
- PermitElectrical
Permit 447433 · COMPLETED
INSTALL GENERAL & EMER LITS,REC,SWS,DEMO NEW 150A PNL & FEEDER EQUIP POWER WIRING,METERING & GROUNDING INCLUDES PHONE,DATA,POS & ASSOCIATED LOW VOLT WIRING NO FA,SECURITY,CCTV,SOUND,PAGING & LOW VOLT WIRNG IN ITS ENTIRETY PER 2008 NEC & NFPA 72
- PermitSuppression
Permit 443772 · COMPLETED
MODIFICATION OF SPRINKLER SYSTEM AS PER PLAN.
- PermitMechanical
Permit 444457 · COMPLETED
RE-WORK EXISTING DUCTWORK AND INSTALL NEW TO FIT OUT SPACE AND RELOCATE EXISTING THERMOSTATS.
- PermitPlumbing
Permit 448944 · COMPLETED
REPLACING ONE FOR ONE 3-COMPARTMENT SINK W/GREASE TRAP, PREP SINK, HAND SINK & MOP SINK (STORE)
- PermitElectrical
Permit 443683 · COMPLETED
INSTALL POWER, WIRING DEVICES LIGHTING PANEL, FEEDERS, TELE/DATA WIRING & JACKS, CEILING SPERAKERS & FIRE ALARM SYSTEM FOR RETAIL FOOD CONCESSION SPACE (45 RECPT & SWITCHES) (STORE)AS PER NEC 2008 & NFPA 72
- PermitSuppression
Permit 447587 · COMPLETED
RELOCATE 5 SPRINKLER HEADS IN AE BAGGAGE CLAIM - AVI-3
- PermitElectrical
Permit 445870 · COMPLETED
INSTALLATION OF UNDERGROUND AND INTERIOR PATHWAYS FOR ACCESS CONTROL SYSTEM INCLUDING WIRING AND DEVICES INSTALL 120V BRACH POWER CIRCUITS FOR NEW ACCESS CONTROL PANEL AND NEW TELECOMMUNICATION CABINET PER 2008 NEC (AIRPORT)
- PermitMechanical
Permit 441918 · COMPLETED
HVAC INCLUDING DUCKTWORK AND MECHANICAL EQUIPMENT, AS PER PLAN.
- PermitPlumbing
Permit 447164 · COMPLETED
INSTALL 2 HWH AND 2 SINKS(AIRPORT)
- PermitUse
Permit 438485 · COMPLETED
FOR PERSONAL CARE AND BEAUTY PRODUCTS (SUNDRIES, PHARMACEUTICALS AND CONVENIENCE SALES) IN SPACE BC-03 AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitUse
Permit 438489 · COMPLETED
CHANGE IN USE REGISTRATION FROM TAKE OUT RESTAURANT TO EATING AND DRINKING ESTABLISHMENT IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED
- PermitUse
Permit 438483 · COMPLETED
CHANGE IN USE REGISTRATION FROM TAKE OUT RESTAURANT TO EATING AND DRINKING ESTABLISHMENT IN AN EXISTING AIRPORT COMPLEX WITH ALL OTHER PREVIOUSLY USES PREVIOUSLY APPROVED.
- PermitUse
Permit 439962 · COMPLETED
CONCOURSE F SPACE F-06. RETAIL SALES OF CONSUMER GOODS WITH ACCESSORY USE OF FOOD, BEVERAGES AND GROCERIES. PREPACKAGED
- PermitUse
Permit 439961 · COMPLETED
FOR RETAIL SALE OF CONSUMER GOODS WITH ACCESSORY SALE OF PRE-PACKAGED FOOD, BEVERAGES AND GROCERIES IN SPACE F-07 AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES AS PREVIOUSLY APPROVED.
- PermitUse
Permit 439958 · COMPLETED
TERMINAL F HUB-SPACE FHA. PERSONAL SERVICES WITH ACCESSORY USE OF RETAIL SALE SUNDRIES, PHARMACEUTICAL AND CONVENIENCE PRODUCTS
- PermitMechanical
Permit 445847 · COMPLETED
HVAC ALTERATIONS IN AN EXISTING BUILDING AS PER THE SEALED SUBMITTED PLAN. CALL THE INSPECTOR PRIOR TO STARTING WORK.
- PermitMajor alteration
Permit 439337 · COMPLETED
DEMOLITION AND ALTERATIONS TO TENANT SPACE WITHIN PHL AIRPORT
- PermitMechanical
Permit 445011 · COMPLETED
HVAC INSTALLATION FOR TENANT FIT-OUT FOR AIRPORT. SEE A/P 443771 FOR PLAN.
- PermitUse
Permit 445002 · COMPLETED
TO CREATE CEP PMO OFFICE SPACE CONSISTING OF CONFERENCE ROOMS, BREAK ROOMS.
- PermitMajor alteration
Permit 443771 · COMPLETED
TENANT FIT-OUT FOR AIRPORT AS PER PLAN
- PermitSign
Permit 441564 · COMPLETED
INSTALLING ONE ILLUMINATED CHANNEL LETTERS ADHERED TO AN EXISTING GLASS SURFACE, VINYL DIGITAL PRINTS DISPLAYED IN WINDOWS AS PER PLANS.
- ViolationSTOP WORK ORDER
Case 433008 · Violation 2680001 · Code A-504.1/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- ViolationPENALTY- NO BLDG PERM INFO
Case 433008 · Violation 2680003 · Code A-901.13/1 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- ViolationPERMB- INSTALL FIRE SUPP SYS
Case 433008 · Violation 2679999 · Code A-301.1/27 · CLOSEDCASE
City marked the case closed; that does not mean the original condition never existed.
- PermitElectrical
Permit 444579 · COMPLETED
RENOVATION OF EXISTING OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING LIGHTING FIXTURES & BRANCH CIRCUIT DEVICES, INSTALLATION OF NEW LIGHTING & BRANCH CIRCUIT DEVICES. AS PER NEC 2008 (COMM)
- PermitMajor alteration
Permit 443560 · COMPLETED
GUT EXISTING TENANT SPACE COMPLETE, PREVIOUSLY "BASSET'S CAFE" INCLUDING REMOVAL OF ALL EXISTING FINISHES AND UTILITIES TO BASE BUILDING SOURCE. INSTALL NEW PARTITIONS, FINISHES, WALK IN COOLER, MILLWORK, EQUIPMENT AND ALL OTHER ITEMS INDICATED IN CONSTRUCTION DOCUMENTS REQUIRED FOR PINKBERRY OPERATION. ADDITIONAL PERMITS REQUIRED FOR ELECTRICAL AND PLUMBING
- License issue eventPHILADELPHIA PARKING AUTHORITY (ROCCO MORROTTO): Public Garage / Parking Lot business license initially issued
License 556157 · Active
License event. Registration does not prove present operation or storefront occupancy.
- PermitSuppression
Permit 442497 · COMPLETED
INSTALL NEW SPRINKLER SYSTEM IN CONCESSION SPACE C9A STARTING AT EXISTING MAIN THAT RUNS THROUGH SPACE.
- PermitElectrical
Permit 444106 · COMPLETED
TRAVELEX CURRENCY--INSTALLING BURGLAR ALARM SYSTEM
- PermitMajor alteration
Permit 443300 · COMPLETED
GROUND TRANSPORTATION CUSTOMER CARE RENOVATION TO CREATE TWO ROOM AS PER PLAN.
- PermitSuppression
Permit 435844 · COMPLETED
INSTALL (1) ANSUL R-102 6-GALLON WET CHEMICAL COOKING EXTINGUISHING SYSTEM FOR RESTAURANT AS PART OF AIRPORT.
- PermitElectrical
Permit 440981 · COMPLETED
ADD DISPLAY SCREEN TO EXISTING BROADBAND SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 440980 · COMPLETED
ADD DISPLAY SCREEN TO EXISTING BROADBAND SYSTEM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 440991 · COMPLETED
ADD DISPLAY SCREEN TO EXISTING BROADBAND SYSTEM PER 2008 NEC (AIRPORT)
- ViolationCONTRACTOR UNLICENSED SUB
Case 432991 · Violation 2693891 · Code 9-1004.2/3 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationSWO- CONTRARY TO GOOD PRACTICE
Case 432991 · Violation 2693893 · Code A-504.1/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCONTRACTOR LIC NEEDED
Case 432991 · Violation 2693889 · Code 9-1004.2/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationCVN-EMPLOYING UNLIC SUBCONTR
Case 432991 · Violation 2693887 · Code 9-1004(6E) · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitPlumbing
Permit 442625 · COMPLETED
REPLACING EXISTING COMPARTMENT SINK W/GREASE TRAP, HAND SINK, PREP SINK & MOP SINK (STORE)
- PermitPlumbing
Permit 440621 · COMPLETED
RENOVATION OF 4 TOILETS ROOMS INCLUDING REPLACEMENT OF WATER DRAINAGE AND VENT PIPING AND FIXTURES AND TIRED INTO EXISTING MAINS (COMMERCIAL)
- PermitElectrical
Permit 439810 · COMPLETED
NEW BACKBONE W/WALL JACKS AS PER NEC 2008 (HOTEL)
- PermitZoning/use
Permit 419250 · COMPLETED
INSTALLATION OF DIRECTIONAL/EXT SIGNAGE AT EXISTING CANOPY
- PermitMajor alteration
Permit 420653 · COMPLETED
EXTENSION OF RAMP AND THE ERECTION OF A CANOPY ABOVE THE RAMP AS PER PLAN.
- PermitSuppression
Permit 439252 · COMPLETED
RELOCATE 12 SPRINKLER HEADS IN SPACE C12A
- PermitElectrical
Permit 393195 · COMPLETED
INSTALL LIGHTING - WIRING DEVICES - PANELS - FEEDERS - COMMUNICATIONS CONDUIT AND FIRE ALARM DEVICES IN RETAIL SPACE AT AIRPORT AS PER 2008 NEC
- PermitMechanical
Permit 438542 · COMPLETED
INSTALL EXHAUST COMMERCIAL HOOD AS PER PLAN. SEE A/P 435362 FOR MAKE UP AIR AND EXHAUST FANS.
- PermitMechanical
Permit 435362 · COMPLETED
INSTALLING NEW HVAC SYSTEM FOR SPACE. WORK INCLUDES (1) ROOF TOP UNIT AND EXHAUST AND MAKE-UP AIR FANS AS PER PLAN. SEPARATE PERMIT IS REQUIRED FOR COMMERCIAL EXHAUST HOOD.
- PermitElectrical
Permit 436578 · COMPLETED
FIT OUT GUEST ROOMS WITH NEW DEVICES (SWITCHES, OUTLETS, LIGHTS FITOUT CORRIDORS WITH NEW DEVICES (SWITCHES, OUTLETS, LIGHTS) PER 2008 NEC (HOTEL)
- PermitSuppression
Permit 438170 · COMPLETED
RELOCATING 10 SPRINKLERS ON THE 2ND FLOOR IN 'THE BODY SHOP' AREA
- PermitElectrical
Permit 434851 · COMPLETED
INST LITS RECEPT SWS DEMOLITION NEW 400A PNL & FEEDER, POS WIRING TELE-DATA WIRING EXHAUST FAN WIRING MECHANCIAL EQUIP WIRING INST 1 DUCT DETECT 1 ANSYL SYS MONITORING 1 AIRPORT MONITOR MODUCLES 1 FA PNL 1 PULL STAT 1 SMOKE & 1 HORN/STROBE DEV PER 2008 NEC & NFPA 72 COMMERCIAL
- PermitElectrical
Permit 437578 · COMPLETED
PROVIDE & REWORK THE EXISTING WORK STATIONS IN THE LOUNGE ADDING 1-ADDITIONAL CIRCUIT FOR LAP TOP COMPUTER CHARGING STATION. DEMO EXISTING TELE DATA STATION AS PER NEC 2008
- PermitElectrical
Permit 437579 · COMPLETED
SUPPLY & INSTALL 4-20AMP CIRCUITS WHEEL CHAIR BATTERY CHARGERS IN TERMINAL B & 4-TERMINAL C FOR US AIRWAYS UTILIZE 2-CIR FOR EACH TERMINAL 2-OUT OF P2L 2-OUT OF P3L IN TERMINAL C AS PER NEC 2008 (AIRPORT)
- PermitMechanical
Permit 430136 · COMPLETED
INSTALL SUPPLY & RETURN DUCT SYSTEM
- PermitElectrical
Permit 436576 · COMPLETED
FIT OUT OF RESTAURANT/LOUNGE & LOBBY AREAS PER 2008 NEC (HOTEL)
- PermitPlumbing
Permit 435228 · COMPLETED
INSTALLING NEW FIXTURES IN RETAIL SPACE DRAINS, SINKS, MOP RECEPTOR AND HOT WATER HEATERS
- PermitAdministrative
Permit 436600 · COMPLETED
PHILADELPHIA AIRPORT - TERMINAL "F" - NORTHEAST SECTOR 41 - TEMPORARY CERTIFICATE OF OCCUPANCY (180 DAYS) - COLUMN LINES F6 TO E4/EM.7 TO FA - ROOMS: FH-124 "REPORTING", FH-125 "POC", FH-126 "FILE ROOM", FH-129 "EQUIPMENT ROOM" & FH-128 "CORRIDOR"
- PermitMajor alteration
Permit 432991 · COMPLETED
RENOVATIONS AND UPDATE AND REFRESH 419 GUESTROOMS AND CORRIDORS - ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HVAC AND SUPPRESSION
- PermitMajor alteration
Permit 434695 · COMPLETED
PERMIT TO CORRECT WORK VIOLATION # 325627. PENETRATING FLOOR ASSEMBLIES INSTALL CONDUIT OR SLEEVES INSULATION WITH FIRE STOP AS PER MANUFACTURERS INSTRUCTIONS. SEE A/P 432991 FOR PLAN DRAWINGS # DV-000 THRU DV-905 FOR DETAIL.SEPARATE PERMIT IS REQUIRED FOR ELECTRICAL WORK
- PermitMajor alteration
Permit 433008 · COMPLETED
RENOVATIONS AND UPDATE LOBBBY AND RESTAURANT AS PER PLAN. ADDITIONAL PERMITS ARE REQUIRED FOR ELECTRICAL SYSTEMS.
- PermitElectrical
Permit 433867 · COMPLETED
CONDUIT FOR FUTURE TELE/DATA WIRING CONDUIT STUBS FROM DEVICE TO ACCESSIBLE CEILINGS CONDUIT FROM DEVICES TO TELE/DATA ROOM PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 429626 · COMPLETED
INSTALLING OF SECURITY CABLING & CAMERAS PER 2008 NEC (AIRPORT)
- PermitElectrical
Permit 432775 · COMPLETED
REPLACE EXISTING QUARTZ LAMPS IN CEILING LIGHTS WITH LED LAMPS, REPLACE EXISTING CORD & PLUG ILLUMINATOR BOXES FOR DISPLAY CASES WITH LED TYPE, INSTALL CONDUIT SLEEVES FOR EXPOSED COMMUNICATION CABLE IN OFFICE OF RETAIL STORE AS PER 2008 NEC(AIRPORT)
- PermitElectrical
Permit 427496 · COMPLETED
INSTALL PANEL, TRANSFORMER, SWITCHES, RECEPTACLES, LIGHT FIXTURES, CONDUIT & PULL STRING FOR COMMUNICATION DEVICES, FIRE ALARM DEVICES FOR RETAIL STORE IN AIRPORT AS PER 2008 NEC & NFPA 72(AIRPORT)
- PermitPlumbing
Permit 431285 · COMPLETED
TENANT FITOUT OF EXISTING BAR. INSTALL SINKS, FD, AND MOP RECEPT(AIRPORT-BAR)
- PermitElectrical
Permit 425925 · COMPLETED
INSTALL NEW LIGHTING,RECEPTS. INSTALL CONDUIT AND PULL STRING FOR COMMUNICATION OUTLETS.NEW WORK IS FOR RETAIL AREA OF RESTAURANT AS PER 2008 NEC. ADDITIONAL FIRE ALARM DEVICES AND ASSOCIATED CONDUIT & WIRING AS PER 2008 NEC AND NFPA72. (RESTUARANT IN PIA)
- PermitMechanical
Permit 425998 · COMPLETED
HVAC DUCTWORK RENOVATION AND ALTERATION AS PER PLAN.
- PermitElectrical
Permit 431586 · COMPLETED
INSTALL 12 RECEPTACLES, 22 LIGHTING FIXTURES, 4 SWITCHES & 2 DATA OUTLETS
- PermitMechanical
Permit 431225 · COMPLETED
REMOVE 4 DIFFUSERS AND INSTALL 7 NEW DIFFUSERS WITH MINOR DUCT MODIFICATION. RELOCATE 1 BASE BOARD HEATER
- PermitMajor alteration
Permit 429982 · COMPLETED
DEMOLITION OF EXISTIG 900SF FOOD SERVICE AREA AND INSTALLATION OF NEW FOOD SERVICE AREA AS PER PLAN.
- PermitSuppression
Permit 421427 · COMPLETED
EXTEND EXISTING TERMINAL "F" HUB FIRE PROTECTION SPRINKLER SYSTEM IN CONCESSION SPACES FH-21, FH22 & FH23 STARTING AT EXISTING VALUE OUTLETS SUPPLIED BY OTHERS AS SHOWN ON PLANS.
- PermitElectrical
Permit 429300 · COMPLETED
INSTALL 200A 3 PHASE 208/120V SECTION PANEL,75KVA TRANS,METERING,COND AND WIRE FOR BRANCH CKT,RECEPTS AND EQUIP CONN,TIME CLOCK,EX FAN CONN,COND AND WIRE FOR LOW VOLT SYS,FA NOTIFICATION APPS VIA EXISTING SYS PER 2008 NEC(AIRPORT)(WES DIST)
- PermitMechanical
Permit 430390 · COMPLETED
NEW DUCT WORK IN TERMINAL F SPACE FH21. 1200 SF 1600 CFM NO PENETRATIONS 12 REGISTERS
- InvestigationBP_BLDG
Case 325627 · CLOSED
City marked the record closed; open the case for the closing reason.
- PermitPlumbing
Permit 428639 · COMPLETED
DEMO EXISTING BATHROOMS, INSTALL NEW DRAINS & WATER FOR NEW LAYOUT (AIRPORT)
- PermitNew construction
Permit 427663 · COMPLETED
TENANT FIT OUT EXISTING AIRPORT SPACE. CONSTRUCTION OF A BAR WITH SEATING, LIMITED FOOD MENU AND PRE- PACKAGED FOOD SALES
- PermitElectrical
Permit 426020 · COMPLETED
RELOCATE CIRCUITS & DATA LINES FOR TSA PASSENGER CHECKPOINT EQUIPMENT AS PER NEC 2008 (AIRPORT)
- PermitMajor alteration
Permit 425809 · COMPLETED
TENANT FIT-OUT FOR RETAIL SALE OF FOOD, BEVERAGE, AND GROCERIES AS PER PLANS (SPACE FH-22). SEPERATE PERMIT REQUIRED FOR MECHANICAL AND ELECTRICAL.
- PermitElectrical
Permit 427863 · COMPLETED
CHANGING 95 LIGHTING FIXTURES EXPECTED DECREASE IN LOAD (ONE FOR ONE ONLY) NO ADDITIONAL WIRING (COMM) AS PER NEC 2008
- PermitPlumbing
Permit 425123 · COMPLETED
REMOVE EXISTING SINK AND REPLACE WITH NEW(AIRPORT-AU BON PAIN- SPACE#C1
- PermitZoning/use
Permit 427307 · COMPLETED
ERECTION OF A 6' HIGH FENCE ON RELOCATED AIRPORT LOT.
- PermitMajor alteration
Permit 424296 · COMPLETED
DEMOLITION OF FREESTANDING PARTITIONS RELOCATION OF ELECTRONICS REMODELING REPAIRS (FLOORS & CEILINGS) WITHIN TERMINAL D/E AS PER PLANS.
- PermitZoning/use
Permit 425037 · COMPLETED
SECURITY UPGRADE, CRASH BARRIES, PRECAST CONCRETE BARRIER AND GUIDE RAIL
- PermitMajor alteration
Permit 425040 · COMPLETED
SECURITY UPGRADE - INSTALL CRASH BARRIES, PRECAST CONCRETE BARRIER GUIDE RAIL WITHIN THE PHILADELPHIA AIRPROT PROPERTY LINES WITHIN THE PHILADELPHIA COUNTY.
- PermitZoning
Permit 426137 · COMPLETED
RELOCATION OF LOT LINES FROM TWO LOTS TO ONE LOT. INCORPORATE ABOVE REFERENCED PARCEL INTO PHILADELPHIA AIRPORTS BOUNDARIES. PARCEL TO BE USED FOR AIRPORT EXPANSION PURPOSES.
- PermitMajor alteration
Permit 424964 · COMPLETED
FIT-OUT OF EXISITING RETAIL SPACE.
- PermitSuppression
Permit 425806 · COMPLETED
RELOCATE 20 SPRINKLER HEADS (SPACE C1 - AU BON PAIN)
- PermitPlumbing
Permit 425107 · REVOKED
REMOVE EXISTING SINK AND REPLACE WITH NEW (AIRPORT-AU BON PAIN)
- PermitUse
Permit 424528 · COMPLETED
USE TO EAT IN RESTUARANT AND BAR-TERMINAL F HUB-SPACE FH-21
- PermitUse
Permit 424529 · COMPLETED
USE TO RETAIL SALES PF PREPACKAGED FOODS AND BEVERAGES-TERMINAL F HUB-SPACE FH 22
- PermitUse
Permit 424533 · COMPLETED
USE TO RETAIL SALES OF DRY GOODS, PERIODICALS AND PACKAGED FOODS AND BEVERAGES IN SPACE FH23 AS PART OF AN EXISTING AIRPORT COMPLEX
- PermitElectrical
Permit 422371 · COMPLETED
INSTALL 3/4 CONDUIT TO 3 SIGN LOCATION ON EXISTING BEAM AS PER NEC 2008 (COMM)
- PermitElectrical
Permit 422368 · COMPLETED
PROVIDE & INST 1-1X4 FIX, 1-20AMP DUP RECPT RELOCATE 1 EXIST 20AMP OUT 3-SW FOR LGT CONTROL 20AMP TOG SW PROV & INST SUPPORT WIRES FOR EXIST 2X4 LAYIN FIX INST IN 3/4 EMT COND & 12RHNN WIRE AS PER NEC 2008 (COMM)
- PermitElectrical
Permit 420167 · COMPLETED
DEMO OF EXIST ELECTRICAL LITS FIXTURES & DEVICES IN REST ROOMS INST OF LITS FIXTURES WIRING DEVICES AND CONNECTION TO NEW HWH. INST OF JUNCTION BOX FOR HAND DRYER RELOCATION OF DOOR BELL PER 2008 NEC
- PermitMajor alteration
Permit 419847 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN. WORK TO INCLUDE EXISTING DIFFUSERS REPLACEMENT.
- PermitMechanical
Permit 418207 · COMPLETED
FURNISH AND INSTALL ONE VAV BOX INCLUDING (3) DIFFUSERS AS PER PLAN. CERTIFICATE OF OCCUPANCY IS REQUIRED PRIOR TO OCCUPANCY.
- PermitElectrical
Permit 420276 · COMPLETED
REPLACE LAMPS IN EXISTING LIGHT FIXTURES, RELOCATE, INSTALL RECEPTACLES AND INSTALL DATA LINES PER 2008 NEC
- PermitElectrical
Permit 410723 · COMPLETED
INSTALL 6 SINGLE 20A RECEPTACLES FROM EXISTING PANEL.AS PER NEC 2008 (BLDG)
- PermitElectrical
Permit 417895 · COMPLETED
1-30KVA TRANSFORMER 3-P-480 TO 120/208-4W,1 480V NON FUSE 3P=60AMP DISCONNECT 60AMP BREAKER INSTALL IN EXIST PANEL, TDFHB 1 NEW E-MON METER IN EXIST MMU8 METER PNL,6 2X2 LAYIN FIX TYPE A,1 EXIT LT,1 WALL SWITCH, 1 TIME CLOCK, 4 JUNC BXS W/PULL STRING AS PER 2008 NEC(AIRPORT)
- PermitZoning/use
Permit 407264 · COMPLETED
ERECTION OF A PREFAB SECURITY BOOTH AND A CONCRETE SUPPORT SLAB
- PermitElectrical
Permit 417140 · COMPLETED
DISCONNECT 1 LED LIGHTING CIRC. DISCONNECT AND RECONNECT 2 FLOOR DISPLAYS AND CASH/WRAP THAT ARE BEING PLACE IN SAME SPACE AS PER 2008 NEC(AIRPORT TERMINAL C SPACE C7)(WEST DIST)
- PermitElectrical
Permit 410119 · COMPLETED
INSTALL 1 SMOKE/DUCT DET, 1 REMOT TEST STATION AND 1 STROBE TO EXISTING FA SYSTEM AS PER NFPA-72(AIRPORT-TERMINAL E HAMMERHEAD 2ND FLOOR)(WEST DIST)
- PermitPlumbing
Permit 336014 · COMPLETED
TO INSTALL ADDITIONAL PIPING FOR RAIN WATER CONDUCTORS (12) MULTIPLE SIZES 6", 18" AND 10" PIPING, RELOCATE 8" WATER MAIN
- InvestigationBP_BLDG
Case 325627 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitElectrical
Permit 414369 · COMPLETED
REPAIR EXIST LITS FIXTURE 15-2X2 LAY IN REM & REINST EXIST POWER OUTLETS & DATA OUTLETS IN EXIST CASH WRAP & REINST EXIST DEVICES IN NEW CASH WRAP REM & RPL POWER OUTLETS & SWIT PROV NEW BATTERIES IN ALL EMER EXITS & WALL PACKS PROV NEW PNL DIRECTORIES NO NEW WIRING PER 2008 NEC
- PermitMajor alteration
Permit 412473 · COMPLETED
INTERIOR RENOVATION INCLUDES RESTROOMS AS PER PLAN
- PermitMajor alteration
Permit 412472 · COMPLETED
ITERIOR RENAVATIONS AS PER PLANS
- PermitMajor alteration
Permit 409896 · COMPLETED
CONSTRUCTION OF INTERIOR PARTITIONS, DEMISING PIERS, AND INSTALLATION OS SIGN BRACKETS FOR FUTURE CONCESSION TENNANTS. NINETEEN (19) VACANT COMMERCIAL SPACE, TWO (2) SEATING SPACES, TWO (2) STORAGE ROOMS AND ONE (1) STORAGE ROOM WITH EIGHT (8) CAGES IN SPACES FH1-FH26 - NOTE: CONTRACTOR CHANGED ON THE PERMIT EFFECTIVE 04/09/2013
- PermitElectrical
Permit 410347 · COMPLETED
INST POWER & CONTROL WIRE 3 NEW ADD'L CONTROL & POWR INST 1 45KVA TRANS 480/208 3P 1-42 CIR PAN BREAKER POWR POLES OUTLETS RECPT FEEDER GROUND WIRE ALL POWR & CONTROL WIRING WILL BE IN CONDUIT AS PER NEC 2008(AIRPORT B/C BAGGAGE)
- PermitElectrical
Permit 411555 · COMPLETED
INSTALL AND HOOK UP 200KW GENERATOR WIRING TO THE 2-25 TON AC UNITS, 6-20A CIRCS FOR LIGHTING AND EXTENSIN CORDS TO 12-575 WATTS LIGHTS AS PER 2008 NEC(AIRPORT PARKING LOT)(WEST DIST)
- PermitUse
Permit 411612 · COMPLETED
USE TO EXPAND RESTURANT
- PermitUse
Permit 411616 · COMPLETED
FOR THE CREATION OF 19 VACANT COMMERCIAL SPACES (FH1-FH26) WITH 2 SEATING AREAS, 2 STORAGE ROOMS AND A STORAGE ROOM 8 CAGES WITH PRIOR USES.
- PermitSuppression
Permit 400347 · COMPLETED
INSTALLATION OF (3) CLEAN AGENT FIRE SUPPRESSION SYSTEMS INCLUDING PANELS, NOVEC 1230 CYLINDERS, NOZZLES, AUDIBLES, DETECTORS, AND MANUAL ABORT STATIONS, IN COMMUNICATION AND IT ROOMS. ALSO MONITORING AND ACTIVATION OF THREE (3) PRE ACTION SYSTEMS CONTROL AND DETECTION ONLY, SPRINKLER SYSTEM TO BE PERFORMED BY OTHER. SEPARATE ELECTRICAL PERMIT IS REQUIRED.
- PermitMajor alteration
Permit 405062 · COMPLETED
REMOVE OLD STONE FIXTURES, NEW PAINT, CEILING TILES AND NEW STORE CHECK OUT COUNTER AS PART OF AIRPORT.
- InvestigationBP_BLDG
Case 325627 · PASSED
The cited inspection visit was marked passed.
- PermitSuppression
Permit 378406 · COMPLETED
INSTALL NEW FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE NEWLY RENOVATED TERMINAL "F"
- PermitSuppression
Permit 405073 · COMPLETED
REPLACE EXISTING PIPING AND HEADS, RELOCATION, IN KIND FOR ALTERATIONS, RECONFIGURATION OF SPACES. NO INCREASES/CHANGES IN DEMAND PER DESIGNER.
- PermitElectrical
Permit 405154 · COMPLETED
REMOVE AND REPLACE CAT5E CABS,OUTLETS,CIRCS,CAB TRAYS AS PER 2008 NEC(AIRPORT)(TERMINAL E AND D TICKETING, BAGGAGE, LOWER AND UPPER CONCOURSE)INSTALLATION TO COMPLY WITH ARTICLES 300.21 & 800 OF THE 2008 NEC.
- PermitElectrical
Permit 398529 · COMPLETED
NEW LIGHTS,SW,RECEPTS,POWER & LIGHTING PANELS AS PER 2008 NEC. FIRE ALARM: NEW DEVICES CONNECTED TO SYSTEM AS PER 2008 NEC AND NFPA72
- PermitUse
Permit 404708 · COMPLETED
LEGALIZE USE (TERMINAL C) SPACE #C9-B
- PermitUse
Permit 404710 · COMPLETED
LEGALIZE USE SPACE E8-A - TERMINAL E
- PermitUse
Permit 404714 · COMPLETED
LEGALIZE USE SPACE #BC6 - TERMINAL B/C
- PermitUse
Permit 404712 · COMPLETED
LEGALIZE USE SPACE L12B - TERMINAL B
- PermitUse
Permit 404713 · COMPLETED
LEGALIZE USE SPACE M12-A - TERMINAL B/C
- PermitUse
Permit 404711 · COMPLETED
LEGALIZE USE - SPACE # L16 - TERMINAL C
- PermitElectrical
Permit 403463 · COMPLETED
REMOVAL OF 6 EXISTING EXIT SIGNAGE AND REPLACE WITH ENERGY EFFICIENT LIGHTING SIGNS AS PER 2008 NEC (WEST DIST) CAR RENTAL FACILITY IN AIRPORT
- InvestigationBP_BLDG
Case 325627 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitSuppression
Permit 402719 · COMPLETED
RELOCATE 1 SPRINKLER HEAD (CD-ST1-LL6)
- PermitMajor alteration
Permit 286700 · ABANDONED
CONSTRUCTION OF PARTITIONS FOR THREE (3) STORAGE CAGES AS PER PLAN.
- PermitElectrical
Permit 402562 · COMPLETED
INSTALL 3-15' PWRR POLES,NEW 3/4 EMT & 12 THNN WIRE TO EACH LOCATION, RELOCATE EXIST PWR CIRC TO NEW PWR POLES,RELOCATE 1 EXIST OUTLET TO NEW LOCATION INTO BREAK RM,REPAIR 12 EXIST FIXT W/ NEW LAMPS, BALLAST & LENSES AS PER 2008 NEC- PASSENGER OPERATION CENTER-AIRPORT
- ViolationPENALTY- NO BLDG PERM INFO
Case 325627 · Violation 2596134 · Code A-901.13/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPERME- ALTER ELEC INSTALLATION
Case 325627 · Violation 2596132 · Code A-301.1/53 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationSTOP WORK ORDER
Case 325627 · Violation 2596133 · Code A-504.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPERMB- ALTER REPAIR INT PART (Building permit required for interior alteration or repair)
Case 325627 · Violation 2596131 · Code A-301.1/4 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationPENALTY- NO ELEC PERM INFO
Case 325627 · Violation 2596135 · Code A-901.13/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationBP_BLDG
Case 325627 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitPlumbing
Permit 400490 · COMPLETED
RELOCATE WATER AND WASTE LINES, NEW LAVS, WC, WASHER BOX, AND SINKS(AIRPORT)
- PermitUse
Permit 398264 · COMPLETED
CHANGE IN USE FORM RETAIL SALE OF DRY GOODS (GREETING CARDS AND GIFTS) TO RETAIL SALES OF DRY DOODS (CLOTHING AND ACCESSORIES INCLUDING SPORTS MEMORABILIA) EXISTING AIRPORT COMPLEX
- PermitMechanical
Permit 389532 · COMPLETED
INSTALL NEW DUCTWORK, 9 REGISTERS
- PermitElectrical
Permit 395729 · COMPLETED
TERMINAL- REMOVE 2 EXISTING POWER OUTLETS AND INSTALL 1 NEW POWER OUTLET IN CENTER OF NEW COOLER TO BE INSTALLED FLUSH AGAINST WALL AS PER 2008 NEC
- PermitElectrical
Permit 395733 · COMPLETED
TERMINAL-INSTALL 3/4 EMT AND #12THHN WIRE FOR NEW 120V POWER OUTLET TO BE INSTALLED AT CENTER OF NEW COOLER TO ALLOW TO BE INSTALLED FLUSH AGAINST WALL AS PER 2008 NEC
- PermitElectrical
Permit 395737 · COMPLETED
TERMINAL-INSTALL 3/4 EMT AND #12THHN WIRE FOR NEW 120V POWER OUTLET TO BE INSTALLED AT CENTER OF NEW COOLER TO ALLOW TO BE INSTALLED FLUSH AGAINST WALL AS PER 2008 NEC
- PermitMechanical
Permit 388588 · COMPLETED
HVAC INSTALLATION INCLUDES FOUR (4) ROOFTOP UNITS
- PermitElectrical
Permit 374263 · COMPLETED
HOTEL-REMOVE REPLACE FIRE ALARM EQUIPTMENT.MISC REWIRE AS PER 2008 NEC (WEST DISTRICT)
- PermitSuppression
Permit 392817 · COMPLETED
INSTALL AND TEST CORE FIRE PROTECTION SYSTEM
- PermitMajor alteration
Permit 388182 · COMPLETED
INTERIOR ATLERATIONS AS PER PLAN.
- PermitMechanical
Permit 393500 · COMPLETED
HVAC INSTALLATION AS PER PLAN.
- PermitElectrical
Permit 391549 · COMPLETED
INSTALL (3)RECEPTACLES, CONVERT EXISTING DUPLEX RECEPTACLE TO DOUBLE DUPLEX RECEPTACLE.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 391805 · COMPLETED
REMOVE AND RE-INSTALL (3)TRACK LIGHT SECTIONS, INSTALL (7)RECEPTACLES.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 389352 · COMPLETED
TENANT FITOUT USING EXISTING CIRCS. NEW TELECOM. RELOCATE FA WITH EXISTING DEVS. NEW LT AND POWER DEVICES PER 2008 NEC(AIRPORT-TERMINAL E)(WEST DIST)
- PermitElectrical
Permit 390101 · COMPLETED
FURNISH AND INSTALL PANELS, TRANSFORMER, METERING, DISCONNECT SW, WIRING DEVICES, LT FIX, FA SYSTEM, TELECOM OUTLETS, BRANCH CIRCUIT CONDUIT AND WIRING, TIME CLOCK, AND OCCUPANCY SENSORS AS PER 2008 NEC AND NFPA-72(AIRPORT)(TERMINAL E SPACE E-14)(WEST DIST)
- PermitSuppression
Permit 391682 · COMPLETED
RELOCATE (17) HEADS BASED ON NEW LAYOUT AT VIRGIN AIRLINES IN TERMINAL E.
- PermitMajor alteration
Permit 389455 · COMPLETED
RENO/UPGRADE OF EXISTING RETAIL SPACE. REMOVAL OF EXISTING CASEWORK AND INSTALLATION OF NEW CASEWORK LAYOUT. EXISTING CASEWORK TO BE PAINTED. INSTALLATION OF NEW SIGNAGE.
- PermitUse
Permit 389879 · COMPLETED
CHANGE USE TO RETAIL SALE OF DRY GOODS TO INCLUDE WATCHES AND WATCH ACCESSORIES AS PART OF AIRPORT.
- PermitPlumbing
Permit 389559 · COMPLETED
COMMERCIAL SPACE-INSTALL HAND SINK,MOP SINK AND FLOOR SINK
- PermitMechanical
Permit 384974 · EXPIRED
HVAC INSTALLATION INCLUDES 4 NEW AIR HANDLING UNITS, CABINUET UNIT HEATERS, FAN COIL UNIT, EXHAUST FANS, GRAVITY VENTILATORS,VAV BOXES-AIRPORT BAGGAGE CLAIM
- PermitPlumbing
Permit 384847 · COMPLETED
WATER MAIN PIPING, SEWAGE PIPING ND RAIN WATER PIPING. INSTALL BACKFLOW PREVENTOR, STACK, WH, AND AREA DRAIN(AIRPORT TERMINAL F)
- PermitPlumbing
Permit 387683 · COMPLETED
PHILADELPHIA INTERNATIONAL AIRPORT - HAMMERHEAD "C" - PLUMBING CONSTRUCTION - REPLACE THE EXISTING WATER CLOSETS, LAVATORIES, URINALS, MOP SINK AND FLOOR DRAINS - REPLACE THE SOIL, WASTE AND WATER SUPPLY PIPING FROM THE FIXTURES TO THE EXISTING PIPING
- PermitPlumbing
Permit 387702 · COMPLETED
PHILADELPHIA INTERNATIONAL AIRPORT - CONCOURSE "C" - PLUMBING CONSTRUCTION - REPLACE THE EXISTING WATER CLOSETS, LAVATORIES, URINALS, MOP SINK AND FLOOR DRAINS - REPLACE THE SOIL, WASTE AND WATER SUPPLY PIPING FROM THE FIXTURES TO THE EXISTING PIPING
- PermitPlumbing
Permit 387703 · COMPLETED
PHILADELPHIA INTERNATIONAL AIRPORT - HAMMERHEAD "B" - PLUMBING CONSTRUCTION - REPLACE THE EXISTING WATER CLOSETS, LAVATORIES, URINALS, MOP SINK AND FLOOR DRAINS - REPLACE THE SOIL, WASTE AND WATER SUPPLY PIPING FROM THE FIXTURES TO THE EXISTING PIPING
- PermitPlumbing
Permit 387704 · COMPLETED
PHILADELPHIA INTERNATIONAL AIRPORT - CONCOURSE "B" - PLUMBING CONSTRUCTION - REPLACE THE EXISTING WATER CLOSETS, LAVATORIES, URINALS, MOP SINK AND FLOOR DRAINS - REPLACE THE SOIL, WASTE AND WATER SUPPLY PIPING FROM THE FIXTURES TO THE EXISTING PIPING
- PermitElectrical
Permit 380313 · COMPLETED
INSTALL 120V BRANCH POWER TO 3 EQUIPMENT ENCLOSURES, FIBER OPTIC CABLE, COAXIAL ANTENNA CABLE, AND ANTENNAS FOR AUTOMATIC VEHICHLE IDENTIFICATION SYSTEM AS PER 2008 NEC (WEST DIST)AIRPORT
- PermitElectrical
Permit 380318 · COMPLETED
MODIFY EXIST ELECTRICAL DISTRIB SYSTEM FOR REPLACEMENT OF COOLING TOWERS LOCATED IN SATELLITE THERMAL PLANT, AND FOR MECHANICAL EQPMT BEING REPLACED IN TERMINAL D BASEMENT MECHANICAL ROOM 14 AS PER 2008 NEC (WEST DIST) AIRPORT
- PermitElectrical
Permit 381645 · COMPLETED
INSTALL LIGHTS, WIRIND DEVICES, 2 PANELS, COMMUNCATION OUTLET ROUGH IN AND FIRE ALARM FOR RESTAURANT(AIRPORT RESTAURANT)(TERMINAL C SPACE C6 BURRITO ELITO)(WEST DIST)
- PermitElectrical
Permit 381646 · COMPLETED
INSTALL LIGHTING, WIRING DEVICES, 1 PANEL, COMMUNICATION OUTLETS AND FIRE ALARM FOR RETAIL STORE(AIRPOT RETAIL STORE)(WEST DIST)(B-C CONNECTOR SPACE BC20 TURNI)
- PermitSuppression
Permit 387404 · COMPLETED
RELOCATE 6 SPRINKLER HEADS.
- PermitElectrical
Permit 386641 · COMPLETED
CAMERA'S MOVE FROM WALL TO CEILING IN HERTZ CAR RETURN ROAD - PHILLY AIRPORT
- PermitMechanical
Permit 381616 · COMPLETED
INSTALLATION OF HVAC, INCLUDING DUCTWORK, EXHAUST FAN AND RTU MECHANICAL UNIT, TYPE 1 KITCHEN HOOD WITH EXHAUST FAN AND GREASE EXHAUST DUCT WORK. SEPARATE PERMIT REQUIRED FOR ANSUL SUPPRESSION SYSTEM.
- PermitMechanical
Permit 381612 · COMPLETED
HVAC, INCLUDING DUCTWORK, AS PER PLANS WITH (3) REGISTERS.
- PermitUse
Permit 386234 · COMPLETED
COMBINATION OF SPACE C2 & C3. USE TO BEAUTY SALON WITH ACCESSORY RETAIL SALES OF BEAUTY SUPPLIES. ALL OTHER USE AS PREVIOUSLY APPROVED.
- PermitMajor alteration
Permit 384138 · COMPLETED
INTERIOR ALTERATION OF ROW SPACE AS PER PLAN.
- PermitMechanical
Permit 384139 · COMPLETED
INSTALL KITCHEN EXHAUST SYSTEM AS PER PLAN.
- ViolationPERMB- WK DONE W/O NOTIFY INSP
Case 364144 · Violation 2348087 · Code A-302.11/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitAddition
Permit 355096 · COMPLETED
CONSTRUCTION OF NEW BAGGAGE CLAIM BLDG FOR TERMINAL F AT AIRPORT.
- PermitMajor alteration
Permit 379308 · COMPLETED
INTERIOR RENOVATIONS TO INCLUDE THE COMPLETE REMOVAL AND REPLACEMENT OF ALL PARTITIONS, FINISHES AND CASEWORK WITHIN FOUR RESTROOMS IN TERMINAL B AND C AS PER PLANS.
- PermitElectrical
Permit 383963 · COMPLETED
PROVIDE AND INSTALL1-18 CIRC 208Y/120V 3 PHASE 4 WIRE PANLE. 2-60A POWER OUTLET FOR 2 OVENS. NEW 200A FEED NEW K4 PANEL. RELOCATE EXISTING WH CIRC . 1 EM-MON METER. ALL WORK IS EMT COND. FEEDS FOR OVENS WILL BE#8 AND FEED TO K4 4-3/0 AND 6 GROUND AS PER 2008 NEC(COMMERCIAL)
- PermitPlumbing
Permit 383628 · COMPLETED
INSTALL 3/4 COPPER CONDENSATE LINE TO EXISTING FLOOR SINK (AIRPORT- SPACE C-1)
- PermitSuppression
Permit 383750 · COMPLETED
RELOCATION OF 9 SPRINKLER HEADS.
- PermitSuppression
Permit 383751 · COMPLETED
RELOCATE 20 SRINKLER HEADS (SPACE C2 - EXPRESS).
- PermitUse
Permit 383414 · COMPLETED
SPACE E14 USE TO RETAIL SALES OF PREPARED AND PREPACKAGED FOODS AND BEVERAGES
- PermitPlumbing
Permit 383110 · COMPLETED
RENOVATE SPACE FOR INSTALLATION OF 4 NEW SINKS TO FACILITATE NEW FOOD SERVICE TENANT(AIRPORT-RESTAURANT)
- PermitElectrical
Permit 376496 · COMPLETED
INSTALL 14 RECEPTACLES, 13 VOICE/DATA OUTLETS & 3 FLOOR OUTLETS WITH DATA. RELOCATE 30 CIRCUIT PANEL. PROVIDE 3/4" COMDUIT FOR SECURITY/CAMERAS & TIME CLOCK. INSTALL 6 8' LENGHTS OF TRACK LIGHTING, 17 LED FIXTURES & 3 LAY-IN FIXTURES.
- PermitMajor alteration
Permit 378225 · COMPLETED
TENANT FIT OUT AS PER PLANS BC CONNECTOR-SPACE BC 20
- PermitAlteration
Permit 380043 · COMPLETED
REPAIR OF CMU WALL, ALUMINUM AND GLASS WINDOWS AND GWB/METAL STUDS AND DOOR FRAME FOR CAR RENTAL PLACE AS PART OF AIRPORT. ALL REPAIRS TO MATCH ORIGINAL IN SIZE AND LOCATION. SAFETY GLAZING REQUIRED.
- PermitElectrical
Permit 379734 · COMPLETED
INSTALL 2 CEILING LIGHTS ABOVE EXTERIOR SIDEWALK AS PER 2008 NEC, AIRPORT TERMINAL D HAMMERHEAD GROUND FLOOR
- PermitElectrical
Permit 371416 · COMPLETED
INSTALL (6) RECEPTACLE OUTLETS, (1)SWITCH, POWER AND DATA WIRING TO (8)LED POWER SUPPLIES IN SIGNS AND DATA OUTLET BOX AND CONDUIT STUB IN HERTZ RENTAL....IN ACCORDANCE WITH 2008 NEC
- PermitAlteration
Permit 379579 · COMPLETED
ROOF COVERING REPLACEMENT. PHILADELPHIA INTERNATIONAL AIRPORT, B/C CONNECTOR AND C/D LINK. 70,000 SQUARE FEET INSTALL NEW ROOF COVERING AS PER MANUFACTURER'S SPECIFICATIONS. NEW ROOF COVERINGS SHALL NOT BE INSTALLED WITHOUT FIRST REMOVING ALL EXISTING LAYERS WHEN THE ROOF HAS TWO OR MORE APPLICATIONS OF ANY TYPE OF ROOF COVERING. SUBMIT ROOF CERTIFICATION TO INSPECTOR FOR FINAL INSPECTION.
- PermitMajor alteration
Permit 377866 · COMPLETED
INTERIOR FIT OUT OF EXISTING SPACE AS PER PLAN
- PermitZoning
Permit 379478 · COMPLETED
ERECTION OF AWNING
- PermitMechanical
Permit 378422 · COMPLETED
INSTALLATION OF HVAC, DUCT WORK, DIFFUSERS,ACCESSORY MECHANICALS AS INDICATED
- PermitMajor alteration
Permit 378589 · COMPLETED
EXTEND RAMP FOR AIRPORT AS PER SUBMITTED PLAN.CANOPY EXTENSION REQUIRES ZONING APPROVAL AND AN ADDITIONAL AMENDED BUILDING PERMIT FOR THIS APPLICATION #378589. PLUMBING AND ELECTRICAL WORK ALSO REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK.
- PermitPlumbing
Permit 378469 · COMPLETED
COMMERCIAL-WATER LINE TO EXISTING FIXTURE
- PermitUse
Permit 377768 · COMPLETED
TAKE-OUT RESTAURANT
- PermitElectrical
Permit 371657 · COMPLETED
PROVIDE AND INSTALL NEW SQUARE D I-LINE PANEL 800AMP, 3 PHASE 4 WIRE AND PROVIDE A MMU-8 E-MON METER PANEL, INSTALL (2) 3 1/2" EMT FROM TERMINAL D 4A AIRPORT MDP SUBSTATION USING EXISTING 800AMP BREAKER, INSTALL 2 SETS OF 4-500 MCM IN EACH CONDUIT AS PER 2008 NEC (WEST DISTRICT) DRAWINGS ATTACHED E-1 TO E-5
- PermitAlteration
Permit 377360 · COMPLETED
FOR U S AIRWAYS HANGAR F, BARREL ROOF. GAF TPO WITH/INSUL IN ADHESIVE (MECH ATTACHED INSULATION).
- PermitSuppression
Permit 376003 · COMPLETED
RELOCATE 10 SPRINKLER HEADS (TECH INTERACTION - C7)
- PermitSign
Permit 369839 · COMPLETED
REMOVE EXISTING SIGN & INSTALL NEW 'HERTZ' SIGN BOX AND A TOTAL OF SIX (6) MONITORS FOR HERTZ RENTAL CAR AS PER PLANS.
- PermitSuppression
Permit 364646 · COMPLETED
EXTEND EXISTING FIRE PROTECTION SPRINKLER SYSTEM TO CONCESSION SPACE B4 STARTING AT EXISTING 3" OUTLET FOR AIRPORT.
- PermitElectrical
Permit 373388 · COMPLETED
PROVIDE AND INSTALL 3/4" CONDUIT WITH 12 THIN WIRES FOR 3 GFI DUPLEX OUTLETS ON EXISTING 3 COLUMNS. ALSO PROVIDE POWER CONNECTION FOR 12FT LONG LIGHTING FIXTURES TO EXISTING TIME CLOCK AS PER 2008 NEC(PHL AIRPORT TERMINAL D/E CONNECTOR)(WEST DIST)
- PermitSuppression
Permit 366316 · COMPLETED
INSTALL NEW SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 TO ACCOMODATE NEW TENANT.
- PermitElectrical
Permit 366250 · COMPLETED
INSTALL NEW FIRE ALARM SYSTEM IN TENANT SPACE C5 INCLUDING CONDUIT, WIRE, FIRE ALARM PANEL, FIRE ALARM NOTIFICATION APPLIANCES AND FIRE ALARM INITIATING DEVICES AS PER NFPA 72 AND NEC 2008
- PermitPlumbing
Permit 371884 · COMPLETED
INSTALL COMPARTMENT SINK, HAND SINK, PREP SINK, GREASE TRAP AND MOP SINK (AIRPORT SPACE D-ST3LL)
- PermitElectrical
Permit 356397 · COMPLETED
ALTERATION TO EXISTING FIRE ALARM SYSTEM IN TERMINAL F CONSISTING OF REPLACEMENT RELOCATION AND ALTERATIONS TO THE EXISTING FIRE ALARM SYSTEM, THIS PERMIT APPLICATION IS IN ADDITION TOTHE EXISTING ELECTRICAL PERMIT #334587 AS PER 2008 NEC,NFPA-72
- PermitUse
Permit 369982 · COMPLETED
SPACE D9 USE TO RESTAURANT
- PermitUse
Permit 371411 · COMPLETED
USE TO RETAIL SALES OF DRY GOODS
- PermitUse
Permit 371410 · COMPLETED
USE TO RETAIL SALE OF DRY GOODS
- PermitUse
Permit 371407 · COMPLETED
USE TO SIT DOWN RESTAURANT WITH BAR AND TAKE OUT
- PermitElectrical
Permit 369114 · COMPLETED
FURNISH AND INSTALL NEW LIGHT FIXTURES ND WIRING DEVICES, CONDUIT AND WIRE TO NEW FOOD SERVICE EQUIPMENT, NEW 200A 3P 4W 42KAIC PANEL INCLUDING FEEDER AND BRANCH CIRCUITS AS PER 2008 NEC(WEST DIST), RELOCATION OF EXISTING FIRE ALARM NOTIFICATION AND INITIATING DEVICES AS PER NFPA 72
- PermitZoning/use
Permit 355558 · COMPLETED
CONSTRUCT NEW BAGGAGE CLAIM BUILDING FOR TERMINAL F AT PHILA INTL AIRPORT
- PermitSuppression
Permit 363755 · COMPLETED
INSTALL ANSUL SYSTEM FOR 6 GALLON COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM.
- PermitMechanical
Permit 362865 · COMPLETED
INSTALL DUCTLESS SPLIT SYSYTEM. INSTALL REFRIDGERATION TO COOLER FREEZER
- PermitElectrical
Permit 344514 · COMPLETED
INSTALL NEW LIGHTING POWER CONNECTIONS AND BREAKER NEEDED FOR NEW EQUIPMENT AS PER 2008 NEC
- PermitSuppression
Permit 368502 · COMPLETED
RELOCATE 11 SPRINKLER HEADS - PHILA AIRPORT TERMINAL D - LOWER LEVEL
- PermitElectrical
Permit 367937 · COMPLETED
INSTALL 8 BRANCH CIRCUITS- 120 VOLTS, 20 AMP RECEPTACLES FOR EQUIPMENT, LIGTHING & CASH REGISTER AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 367936 · COMPLETED
INSTALL 8 BRANCH CIRCUITS- 120 VOLTS, 20 AMP RECEPTACLES FOR EQUIPMENT, LIGTHING & CASH REGISTER AS PER 2008 NEC (WEST DISTRICT)
- PermitSuppression
Permit 367966 · COMPLETED
RELOCATE 2 SPRINKLER HEADS (AU BON PAIN - TERMINAL C)
- PermitMajor alteration
Permit 364727 · COMPLETED
INTERIOR ALTERATIONS FOR TENANT FIT OUT FOR SALE OF CELL PHONES.
- PermitMajor alteration
Permit 364724 · EXPIRED
INTERIOR ALTERATIONS FOR TENANT FIT OUT FOR SALE OF CELL PHONES.
- PermitPlumbing
Permit 364373 · COMPLETED
DEMO EXISTING SANITARY AND WATER PIPING,FURNISH AND INSTALL NEW SANITARY AND WATER,INSTALL OWNER SUPPIED EQUIPMENT AND FIXTURES
- PermitSuppression
Permit 364678 · COMPLETED
EXTEND EXISTING FIRE SUPPRESSION SPRINKLER SYSTEM FOR CONCESSION SPACE.
- PermitMajor alteration
Permit 364144 · COMPLETED
REMOVE AND REPLACE SEVEN BAR JOIST IN CARWASH A & B AREA WITH SAME
- PermitElectrical
Permit 362952 · COMPLETED
INSTALL 600AMP 480/277VOLT MLO PANEL,FEEDER AND SUB METERING IN AIRPORT ELETRIC ROOM AS PER 2008 NEC
- PermitMechanical
Permit 364077 · COMPLETED
NEW DUCTWORK AS PER PLANS WITH KITCHEN EXHAUST ADDED FOR RESTAURANT
- PermitElectrical
Permit 364818 · COMPLETED
REMOVE 3 20 AMP BRANCH CIRCUIT CONDUITS TO ALLOW NEW BAR JOIST TO BE INSTALLED AND REPLACE CONDUITS AFTER BAR JOISTS ARE INSTALLED AS PER 2008 NEC (WEST DIST)
- PermitSuppression
Permit 358980 · COMPLETED
FOR THE INSTALLATION OF ONE (1) ANSUL R-102 3.0 GALLON WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM IN TERMINAL D, SPACE D9.
- AppealBuilding standards appeal
Appeal 16080 · OPEN · APPROVED
Related permit 355096 · ON 8/18/2011, THE DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED A NOTICE OF REFUSAL FOR APPLICATION #355096.
- PermitMechanical
Permit 362542 · COMPLETED
INSTALLATION OF NEW HOOD, DUCTWORK AND ROOF TOP FAN FOR RESTAURANT. C.O REQUIRED PRIOR TO OCCUPANCY.
- PermitElectrical
Permit 362061 · COMPLETED
INSTALLATION OF 400AMP 3 PHASE CIRCUIT BREAKER FOR FEEDER TO 400AMP 3 PHASE 208/120 PANEL A AND EMON METER,INSTALLATION OF FEEDER TO 225AMP 3 PHASE 208/120VOLT PANEL B,INSTALLATION OF CONDUIT AND WIRE FOR BRANCH CIRCUIT TO WIRING DEVICES, KITCHEN EQUIPTMENT AND MECHANICAL EQUIPTMENT, INSTALLATION OF CONDUIT AND WIRE FOR TELECOMMINICATION DEVICES AS PER 2008NEC
- PermitSuppression
Permit 362236 · COMPLETED
RELOCATE 7 SPRINKLER HEADS (SUNGLASS HUT - SPACE BC-21)
- PermitSuppression
Permit 362238 · COMPLETED
RELOCATE 8 SPRINKLER HEADS (POPEYE'S - SPACE C12A)
- PermitSuppression
Permit 08500 · REVOKED
RELOCATE 14 SPRINKLER HEADS (SPACES C6 AND C7)
- PermitSuppression
Permit 362239 · COMPLETED
RELOCATE 14 SPRINKLER HEADS (SPACES C6 AND C7)
- PermitMajor alteration
Permit 358091 · COMPLETED
INTERIOR DEMO AND RENOVATIONS, FIT OUT OF EXISTING RESTAURANT SPACE FOR NEW TENANT. INSTALL NEW EQUIPMENT, FURNISHINGS, STRUCTURAL MODIFICATIONS AND REINFORCING OF FRAMING, UPGRADES TO FINISHES, AS PER PLANS. ADD'L PERMITS REQ: ELECTRICAL, PLUMBING, HVAC, HOOD & ANSUL, SPRINKLERS.
- AppealRB_LIRB
Appeal 14903 · OPEN · SUSTAINED
Related permit 262309 · THE PROVISIONS OF THE CODE DO NOT FULLY APPLY; THE STRUCTURE IS CURRENTLY BEING USED AS A SUPPLY AND EQUIPMENT CENTER, USE APPROVED BY L & I ON 4/11/08.
- PermitMajor alteration
Permit 347810 · COMPLETED
INTERIOR RENOVATION OF EXISTING SPACE EPOXY FLOORS, FRP WALLS, WALK IN BOXES AND NEW CEILINGS.
- PermitElectrical
Permit 357704 · COMPLETED
INSTALL 1 - 120/20A DUPLEX RECEPT AND 1 COMM OUTLET WITH CAT5 PLENUM RATED CABLE TO COMPUT STAND IN EXISTING AMER AIR LOST BAG OFFICE, 1 - 120/20A DUPLEX RECEPT AND RELOC 1 COMM OUTLET WITH CAT5 PLENUM TO RELOC PRINTER AT AMER AIR TICKET COUNTER AS PER 2008 NEC (WEST DISTRICT)
- PermitSuppression
Permit 354220 · COMPLETED
INSTALL ANSUL R-102.3.0/3.0/1.5 GALLON COMMERCIAL FIRE SUPPRESSION SYSTEM.
- PermitSuppression
Permit 357081 · COMPLETED
GREEN LEAFS - SPACE D9 - RELOCATION OF (4)SPRINKLER HEADS
- PermitUse
Permit 356894 · COMPLETED
ADDING SMALL CART(PORTABLE) IN TERMINAL AS PART OF AIRPORT.
- PermitElectrical
Permit 356402 · COMPLETED
2 VOICE DATA OUTLETS WITH CAT 5E CABLES TO AN IDF,1 SPLICE AND EXTEND EXISTING FFIBER OPTIC CABLE, 10 RECEPTACLE AND 20AMP 120VOLT CIRCUITS AS PER 2008 NEC
- PermitDemolition
Permit 356633 · COMPLETED
INTERIOR DEMOLITION OF NO LOAD BEARING ASSEMBLIES.
- PermitElectrical
Permit 344510 · COMPLETED
INSTALL NEW LIGHTING INSTALL POWER CONNECTION AND BREAKS AS NEEDED FOR NEW EQUIPMENT AS PER 2008 NEC
- PermitMajor alteration
Permit 349806 · COMPLETED
RENOVATION TO HOLD ROOMS AND OPERATING AREA AS PER PLAN. SEPARATE PERMIT IS REQUIRED FOR ELECTRICAL WORK.
- PermitElectrical
Permit 329802 · COMPLETED
ADD RECEPTS AND NEW LIGHTING AS PER 2008 NEC (WEST DISTRICT)
- PermitMechanical
Permit 351782 · COMPLETED
DEMO EXISTING DUCT WORK INCLUDING BLACK IRON, DIFFUSERS AND MAKE UP AIR DUCT. INSTALL NEW HVAC / DUCTWORK AND COMMERCIAL KITCHEN EXHAUST PER PLAN
- PermitMechanical
Permit 352904 · COMPLETED
INSTALLATION OF TWO EXHAUST HOODS AND FANS IN SPACE D-1 AS PER PLANS.
- PermitElectrical
Permit 352701 · COMPLETED
INSTALL (1) DEDICATED 120V, 20 AMP RECEPTACLE CIRCUIT UTILIZING EXISTING CONDUIT.... IN ACCORDANCE WITH 2008 NEC
- PermitElectrical
Permit 350920 · COMPLETED
INSTALL PATHWAYS AND CAT5 CABELING FOR TICKET DATA OUTLETS AS PER 2008 NEC (WEST DISTRICT)
- PermitPlumbing
Permit 353092 · COMPLETED
FURNISH AND INSTALL SANITARY, GAS AND DOMESTIC WATER FOR ALL KITCHEN AND BAR EQUIPMENT, FOOD PREP
- PermitElectrical
Permit 353028 · COMPLETED
PROVIDE GEN'L LTG FIX'S,EMERG/EXIT LTG,RECPTS,SWS/BR CIRCUIT WIRING,PWR WIRING FOR HVAC/KIT EQUIP,COMP FA SYS,INCL EQUIP,PNL,DEV/WIRING,COND RACEWAYS,JUNC BOXES/WIRING FOR SOUND,TV,SEC,CCTV/PHONE/DATA SYS,COMP DISTR SYS,FDRS,PNLS,BKRS/TRANS
- PermitUse
Permit 353615 · COMPLETED
USE CHANGE
- PermitUse
Permit 353616 · COMPLETED
USE CHANGE
- PermitUse
Permit 353617 · COMPLETED
USE CHANGE
- PermitUse
Permit 353393 · COMPLETED
ZONING USE CHANGE
- PermitUse
Permit 353398 · COMPLETED
ZONING USE CHANGE
- PermitUse
Permit 353400 · COMPLETED
ZONING USE CHANGE
- PermitElectrical
Permit 352459 · COMPLETED
PROVIDE POWER, LIGHTING & SWITCHING PER PLANS.
- PermitPlumbing
Permit 353202 · COMPLETED
DEMO OF EXISTING DRAINS AND WATER PIPING, NEW DRAINS AND FLOOR SINKS, WATER LINES
- PermitElectrical
Permit 353301 · COMPLETED
PROVIDE (1) 120V POWER CONNECTOR OFF OF EXISTING OUTLET AND INSTALL CAT #6 DATA IN 3/4 CONDUIT TO EXISTING CASE WRAP LOCATION FOR DATA CONNECTION FOR NEW BOARDER'S KIOSK UNIT (EAST DIST)
- PermitElectrical
Permit 353304 · COMPLETED
PROVIDE (1) 120V POWER CONNECTOR OFF OF EXISTING OUTLET AND INSTALL CAT #6 DATA IN 3/4 CONDUIT TO EXISTING CASH WRAP LOCATION FOR DATA CONNECTION FOR NEW BOARDER'S KIOSK UNIT (EAST DIST)
- PermitPlumbing
Permit 352720 · COMPLETED
TERMINAL D - SPACE 9 - REPLACE 20'-0" OF 4" CAST IRON PIPE AND ADD (2)FLOOR SINKS WITH 3" TRAPS
- PermitMajor alteration
Permit 347945 · COMPLETED
CONSTRUCTION OF A NEW COFFEE KIOSK IN EXISTING AIRPORT RETAIL SPACE.
- PermitMajor alteration
Permit 349638 · COMPLETED
TENANT FITOUT TO INCLUDE HVAC-SPCAE D-1
- PermitMechanical
Permit 350964 · COMPLETED
INSTALL HVAC AS PER PLAN. ESTIMATED CONSTRUCTION COST IS $13,000.
- PermitMajor alteration
Permit 350264 · COMPLETED
INFILL EXISTING DOOR OPENING TO INSTALL WIDE DOOR AND HARDWARE. INFILL TO BE DRYWALL AND METAL STUDS.
- PermitElectrical
Permit 351251 · COMPLETED
INSTALL 6 VARIABLE MESSAGES SIGNS AT 6 CASHIERS BOOTH RE USE EXISTING 120VOLT POWER CIRCUIT FROM OLD LIGHT INDICATORS,INSTALL 3/4" CONDUIT FROM NEW VARIABLE MESSAGE SIGNS TO THIER RESPECTIVE CASHIER BOOTH AND INSTALL 1 CONTROL CABLE FOR CONTROL, INSTALL 2" PANDUIT INSIDE CASHIER BOOTH TO HOUSE NEW CONTROL CABLE, INSTALL 6 NEW LOW VOLTAGE PATRON INTERFACE HOUSING AND REOATE EXISTING SWITCH IF THEY INTERFACE WITH INSTALLATION AS PER 2008 NEC
- PermitSuppression
Permit 350430 · COMPLETED
RELOCATE 30 EXISTING SPRINKLER HEADS(COMMERCIAL)
- PermitUse
Permit 349979 · COMPLETED
SPACE BC18 USE TO RETAIL SALE OF BREWED AND SPECIALTY COFFEE, PREPACKAGED BAKED GOODS, SANDWICHES AND ASSORTED BEVERAGES.
- PermitUse
Permit 349981 · COMPLETED
AB3A USE TO OFFICE SPACE ACCESSORY TO THE AIRPORT
- PermitMajor alteration
Permit 346495 · COMPLETED
ALTERATIONS TO EXISTING FOOD PREPRATION AND SALES STATION.
- PermitUse
Permit 349620 · COMPLETED
SPACE D-1 USE TO PROPOSED RESTAURANT
- PermitUse
Permit 349150 · COMPLETED
ZONING USE
- PermitElectrical
Permit 349042 · COMPLETED
RELOCATE EXISTING INFORMATION BOOTH TO NEW LOCATION ABOUT 30' AT TERMINAL C CONCCOURSE, EXISTINT 60AMP 3 PHASE SERVIC AND EXISTING DATA LINE, WIIL PROVIDE CONDUIT FROM EXISTING SERVIVCE JUNCTION BOX AND DATA JUNTION BOX AND RECONNECT ALL EXISING ALL EXISTING POWER OUTLETS AND DATA OUTLETS AT NEW LOCATION AS PER 2008 NEC
- PermitPlumbing
Permit 348534 · COMPLETED
SEAL STORM AND SANITARY LATERAL
- PermitElectrical
Permit 347211 · COMPLETED
RELOCATE EXISTING EQUIPMENT AND POWER CIRCUIT TO NEW LOCATION, CIRCUIT PANEL #K-2-13-15-17-19, ALSO CIRCUIT PANEL #K2 2-6 ARE TO BE EXTENDED TO THE NEWE LOCATION EXISTING EQUIPMENT, ALL INSTALLATION WILL BE IN EMT CONDUIT AND #12 THNN WIRE AS PER 2008
- PermitElectrical
Permit 342640 · COMPLETED
INSTALL 1 LIGHT POLE WITH 1 400W HPS LIGHT FIXTURE.
- PermitElectrical
Permit 347017 · COMPLETED
INSTALL APPROXIMATELY 6 RECEPTACLES FOR EQUIPMENT.
- InvestigationCI HAZMAT
Case 262309 · PASSED
The cited inspection visit was marked passed.
- PermitMajor alteration
Permit 337630 · COMPLETED
REPLACEMENT OF EXISTING LOW SLOPE ROOFS AND FLASHINGS.
- PermitElectrical
Permit 340369 · COMPLETED
INSTALL CAT5E CABLING WITH 108 RJ45 JACKS,INSTALL 15 ENCODERS,INSTALL 12 EQUIPMENT RACKS AND PATCH PANELS,INSTALL 328 PATCH CABLES AS PER 2008 NEC
- PermitMajor alteration
Permit 338210 · COMPLETED
CONSTRUCT MURAL DISPLAY WALL ENCLOSURE FOR AUDIO VISUAL EQUIPMENT AT PERIMETER WALL.
- PermitElectrical
Permit 343870 · COMPLETED
INSTALL 3 PANELS, DEVICES, TELE/DATA & CEILING FANS PER PLANS.
- PermitUse
Permit 334849 · COMPLETED
ZONING USE/CHANGE
- PermitMechanical
Permit 342645 · COMPLETED
FOR THE PARTIAL DEMOLITION OF EXISTING MECHANICAL SYSTEM AND FOR THE RELOCATION OF TWENTY-ONE (21) DIFFUSERS AND THREE (3) NEW VAV BOXES AS PER PLANS WITHIN LOCKER AREA OF EXISTING AIRPORT FACILITY (TERMINAL 'D').
- PermitElectrical
Permit 343415 · COMPLETED
REPLACING (7) EXIT SIGNS WITH NEW AND ADDING IN (5) EMERGENCY PACKS IN STAIRWAY AS PER 2008 NEC
- PermitElectrical
Permit 341867 · COMPLETED
(2)RECEPTACLES,RELOCATE EXISTING T-STAT, INSTALL SPEAKER, SPEAKER POWER PACK, MEDIA PLAYER...NO FIRE ALARM OR VOICE DATA.... IN ACCORDANCE WITH 2008 NEC
- AppealZoning board appeal
Appeal 15146 · CLOSED · Granted
Related permit 334849 · PERMIT FOR USE AS A HEALTH SPA TO INCLUDE MASSAGE IN THE SAME SPACE AS PART OF THE EXISTING BEAUTY SALON WITH ACCESSORY RETAIL SALE OF HEALTH AND BEAUTY SUPPLIES AND RETAIL SALE OF VARIETY STORE PREVIOUSLY APPROVED IN PHILADELPHIA AIRPORT,
- PermitAdministrative
Permit 341597 · COMPLETED
AMENDING BLDG PERMIT#311337 TO ADD NEW EXHAUST SYSTEM.
- PermitAdministrative
Permit 341599 · COMPLETED
AMENDING BLDG PERMIT#310083 TO INCLUDE NEW EXHAUST SYSTEM FOR RESTAURANT
- PermitElectrical
Permit 334843 · COMPLETED
INSTALL DISTRIBUTION, BRANCH CIRCUITS, LIGHTING, FIRE ALARM, SECURITY, CCTV, DISPLAY SYSTEM & TELECOMM.
- PermitMechanical
Permit 333675 · COMPLETED
INSTALL (11) NEW AIR HANDLING ROOFTOP UNITS, (8) NEW FAN COIL UNITS, INSTALL (11) NEW EXHAUST FANS AND INSTALL (5) NEW VENTING FANS. INSTALL REPLACE DUCTWORK AS PER PLAN.
- PermitUse
Permit 339552 · COMPLETED
HOTDOG MOBILE PUSH CART
- PermitSuppression
Permit 339549 · COMPLETED
RELOCATE 20 SPRINKLER HEADS IN AIRPORT
- PermitSuppression
Permit 338802 · COMPLETED
RELOCATE 2 SPRINKLER HEADS (TERMINAL D- DELTA IN-FLIGHT OFFICE)
- PermitSuppression
Permit 334437 · COMPLETED
INSTALLATION OF ANSUL R-102 COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM FOR RESTAURANT.
- PermitSuppression
Permit 334454 · COMPLETED
ANSUL R-102 COMMERCIAL FIRE SUPPRESSION SYSTEM FOR RESTAURANT
- PermitElectrical
Permit 338177 · COMPLETED
FURNISH AND INSTALL 1 30AMP 120VOLT DEDICATED SERVICE AND 1 20AMP 120VOLT DEDICATED SERVICE FOR NEW GATE AS PER 2008 NEC
- PermitElectrical
Permit 337739 · COMPLETED
NEW KIOSK UNIT AT TERMINAL "E", E-3 HOLD ROOM, PROVIDE/INSTALL (1) 3/4" EMT W/(4) 20A CIRCUITS AND (1) 3/4" EMT CONDUIT FOR DATA CABLE. POWER/DATA FROM EXISTING PANELS IN 2ND FLOOR INFULL, PANEL #RPE-4 120/208 AND DATA PANEL AS PER 2008 NEC
- PermitElectrical
Permit 337741 · COMPLETED
NEW DELTA OFFICE IN TERMINAL "D" UPPER CONCOURSE AREA ACROSS FROM D-10 HOLD ROOM, MOVE (1) FIRE ALARM STROBE TO NEW LOCATION AND RELOCATE (2) EXISTING DATA OUTLETS, CLEAN AND REPLACE EXISTING LAMPS WITH NEW AS PER 2008 NEC
- PermitElectrical
Permit 334587 · COMPLETED
ELEC CONSTR,PUB ADD SYS,SEC SYS/SPEC SYS FOR THE TERMINAL "F' EXPANSION/RENOVATION PROJECT. FIRE ALARM ON FUTURE PERMIT.INSTALLATION TO COMPLY WITH ARTICLES 110.26(C)(3),250.30,300.21 OF THE 2008 NEC.
- PermitPlumbing
Permit 332759 · COMPLETED
TERMINAL HUB RENOVATIN AND EXSPANSION TO ACCOMODATE FOOD COURT AND RETAIL SHOP ON 1ST FLOOR
- PermitElectrical
Permit 336521 · COMPLETED
RELOCATE CCTV CAMERAS, CCTV MONITORS & SECURITY CARD READERS.
- PermitElectrical
Permit 333123 · COMPLETED
INSTALL GENERATOR, GROUNDING, POWER CABLES, 25 400W HID FIXTURES TO TEMPORARY HANGAR. POWER SERVICE TO 2 OFFICE TRAILERS & 1 SANITARY TRAILER. ALL WORK PER ARTICLES 513 & 590 OF THE 2008 NEC.
- PermitElectrical
Permit 327514 · COMPLETED
INSTALL 45KVA TRANSFORMER,150AMP PANEL,INSTALL DUPLEX RECEPTACLES,DRYER RECEPTACLES AND FLOOR RECEPTACLE,INSTALL LIGHT FIXTURES,AND LIGHT SWITCHES,POWER WIRING TO WATER HEATER AND VAV UNIT,INSTALL TELEPHONE OUTLETS AS PER 2008 NEC
- PermitSuppression
Permit 325850 · COMPLETED
EXTEND EXISTING FIRE PROTECTION SPRINKLER SYSTEM INTO CONCESSION SPACE CB9 STARTING AT EXISTING 4" OUTLET.
- PermitSuppression
Permit 325859 · COMPLETED
EXTEND FIRE PROTECTION SPRINKLER SYSTEM IN TO CONCESSION SPACE B12 STARTING AT EXISTING 4" OUTLET.
- PermitPlumbing
Permit 331607 · COMPLETED
SOME DEMO, ADDING TWO NEW SINKS, WATER AND DRAIN
- PermitMajor alteration
Permit 329365 · COMPLETED
INTERIOR FIT-OUT OF EXISTING DELTA AIRLINES SPACE ON APRON LEVEL
- PermitElectrical
Permit 330584 · COMPLETED
NEW TELEPHONE CONDUIT FROM VERIZON DAMARC TO AT & T ROOM AS PER 2008 NEC (WEST DIST)
- PermitAddition
Permit 318838 · COMPLETED
TERMINAL F HUB EXPANSION. CONSTRUCTION OF BLDG ADDITIONS AT THE HUB OF EXISTING TERMINAL BLDG. RECONFIGURATION AND RENOVATION OF ADJACENT EXISTING SPACE. EXPAND HUB WILL ACCOMMODATE FOOD COURT AND RETAIL SHOPS ON THE 1ST FL, AIRLINE OPERATIONS SPACE ON MEZZANINE LEVEL, AIRPORT CONCOURSE
- PermitMajor alteration
Permit 328473 · COMPLETED
RECONFIGURATION AND RENOVATION OF ADJACENT EXISTING SPACE. EXPAND HUB WILL ACCOMMODATE FOOD COURT AND RETAIL SHOPS ON THE 1ST FL, AIRLINE OPERATIONS SPACE ON MEZZANINE LEVEL, AIRPORT CONCOURSE. SEE A/P 318838 FOR PLANS.
- PermitElectrical
Permit 329803 · COMPLETED
EVALUATE FIRE STOPPING FOR CONDUITS & TRANSFORMER. TEST FIRE ALARM. LABEL CONDUITS. REPLACE LAMPS/BALLASTS FOR 29 LIGHT FIXTURES. INSTALL WIREMOLD TO CONCEAL POWER CORD FOR MENUBOARD.
- PermitMajor alteration
Permit 323738 · COMPLETED
CONSTRUCTION OF A MILLWORK KIOSK IN THE CONCOURSE OF D TERMINAL. KIOSK IS 6' X 13'6"
- PermitMajor alteration
Permit 323741 · COMPLETED
COSMETIC RENOVATIONS OF EXIST STORE. REPLACE CEILING TILE, CLEAN CARPETS, REPAINTING, NEW WALL COVERINGS, REPLACE COUNTERTOPS
- PermitElectrical
Permit 328543 · COMPLETED
RELOCATE 34 LIGHT FIXTURES, 2 DISPOSALS, INSTALL LIGHT FIXTURES, 32 RECEPTACLES, 8 VOICE/DATA OUTLETS & MODIFY 1 FIRE ALARM DEVICE LOCATION.
- PermitPlumbing
Permit 326968 · COMPLETED
ADD 2 SINKS,ADD 1 WASHER BOX
- PermitDemolition
Permit 327240 · COMPLETED
DEMOLITION OF EXISTING RESTROOM. BUILDING FOOTPRINT WILL BE FILLED AND PAVED OVER WITH PAVING FOR USE AS A RENT-A-CAR OVERFLOW LOT.
- PermitMechanical
Permit 323286 · COMPLETED
INSTALL NEW SUPPLY DUCTWORK, VAV BOX, NEW ROOF EXHAUST FAN AND ASSOCIATED DUCTWORK AS PER PLAN.
- PermitElectrical
Permit 326893 · COMPLETED
DEMO LIGHTING AND RECEPTACLES,REINSTALL NEW LIGHTING AND RECPTACLES AND RECONNECT NEW KITCHEN EQUIPMENT AS PER 2008 NEC
- PermitElectrical
Permit 323204 · COMPLETED
INSTALL NEW E-MON METER FOR TENNANT, SELECTIVE DEMO, SUPPLY AND INSTALL NEW FISTURES AND RECEPTS FOR FIT OUT NEW TELECOM DROPS FOR SPACE AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 325556 · COMPLETED
INSTALL NEW PANEL,NEW RECEPTACLES AND INSTALL NEW LIGHTING AS PER 2008 NEC
- PermitElectrical
Permit 327684 · COMPLETED
REMOVE ALL PWR CONN/PWR POLE FROM EXISTING L3 EXAM(X-RAY)UNIT/RECONNECT TO NEW CT-80DR EXAM(X-RAY)UNIT,DISC RECEPT,OUTLET OF EXAMINER TABLE/RECONNEC,PROVIDE (1)NEW NEMA L6-30R RECEPT,AND (1)NEW NEMA 5-20R RECEPT,TO REPLACE EXTG UNIT(X-RAY BAGGAGE AREA)
- InvestigationCI HAZMAT
Case 262309 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitMechanical
Permit 327195 · COMPLETED
RELOCATE (4) REGISTERS
- PermitZoning
Permit 325075 · COMPLETED
DEMOLITION OF EXISTING RESTROOM. BUILDING FOOTPRINT WILL BE FILLED AND PAVED OVER WITH PAVING FOR USE AS A RENT-A-CAR OVERFLOW LOT.
- PermitUse
Permit 326426 · COMPLETED
DEMOLITION OF EXISTING RESTROOM. BUILDING FOOTPRINT WILL BE FILLED AND PAVED OVER WITH PAVING FOR USE AS A RENT-A-CAR OVERFLOW LOT.
- PermitSuppression
Permit 326986 · COMPLETED
RELOCATE 39 EXISTING SPRINKLER HEADS(COMMERCIAL)
- PermitMechanical
Permit 321907 · COMPLETED
HVAC, INCLUDING DUCTWORK, AS PER PLANS.
- PermitAddition
Permit 323222 · COMPLETED
CONSTRUCTION OF A TEMPORARY STEEL & NON FLAMMABLE FABRIC SHEATHING HANGER FACILITY STRUCTURE FOR AIRPLANE REPAIR FOR LESS THAN 180 DAYS, CONNECTED/SUPPORTED ON EXISTING CONCRETE APRON FOUNDATION, TEMPORARY ELECTRICAL GENERATORS AND HEATING, AS PER SUBMITTED PLANS AND PER CODE SECTION 3103. FINAL SAFETY PLAN FOR MATERIALS STORED TO BE SUBMITTED TO FIRE DEPARTMENT FOR REVIEW AND APPROVAL. 3RD PARTY MANUFACTURERS INSPECTION.
- PermitPlumbing
Permit 323382 · COMPLETED
DEMO SOME FIXTURES ADD NEW HAVE SINK AND MOP SINK USE EXISTING GREASE TRAP FOR NEW 3 BOWL SINK
- PermitPlumbing
Permit 323387 · COMPLETED
DEMO EXISITING 3 BOWL SINKS AND RE PIPE USING EXISTING GREASE TRAP AGAIN ADD ONE MOP SINK
- PermitZoning/use
Permit 322665 · COMPLETED
ERECTION OF AN ACCESSORY STRUCTURE FOR AIRCRAFT REPAIR.
- PermitMechanical
Permit 311337 · COMPLETED
ALTERATION FOR HVAC DUCTWORK AS PER PLAN. WORK TO NCLUDE THE REPLACEMENT OF KITCHEN HOOD FANS AND CONTROLS.
- PermitUse
Permit 325399 · COMPLETED
USE TERMINAL D IN SPACE D-13 AS CURRENCY EXCHANGE IN EXISTING AIRPORT COMPLEX.
- AppealBuilding standards appeal
Appeal 14387 · CLOSED · APPROVED
Related permit 318838 · ON 1/24/2011, THE DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED A NOTICE OF REFUSAL FOR APPLICATION #318838.
- PermitElectrical
Permit 317694 · COMPLETED
PROVIDE NEW RECEPTACLES, SWITCHES, LIGHTING FIXTURES, EMERGENCY/EXIT LIGHTING, FA DEVICES/EQUIPMENT SOUND MASKING SYSTEM DEVICES AND EQUIPMENT, HVAC EQUIPMENT POWER WIRING, AS PER 2008 NEC AND NFPA-72 (WEST DIST)
- PermitZoning/use
Permit 318845 · COMPLETED
TERMINAL F HUB EXPANSION. CONSTRUCTION OF BLDG ADDITIONS AT THE HUB OF EXISTING TERMINAL BLDG. RECONFIGURATION AND RENOVATION OF ADJACENT EXISTING SPACE. EXPAND HUB WILL ACCOMMODATE FOOD COURT AND RETAIL SHOPS ON THE 1ST FL, AIRLINE OPERATIONS SPACE ON MEZZANINE LEVEL, AIRPORT CONCOURSE
- PermitElectrical
Permit 324296 · COMPLETED
INSTALL 1 30KVA TRANFORMER,1 100AMP PANEL,1 60AMP 480VOLT DISCONNECT SWITCH,1 SUB METER,4 RECEPTACLES,4 JUNCTION BOXES FOR VENDING MACHINE CONNECTION AND 1 TELE/DATA OUTLET AS PER 2008 NEC
- PermitMechanical
Permit 323287 · EXPIRED
NEW RETURN DUCTWORK TO RENOVATED BURGER KING. INSTALLATION OF 11 NEW REGISTERS AND DIFFUSERS AND NEW EXHAUST FANS AND BLACK IRON DUCTWORK FOR 2 EXISTING KITCHEN HOODS.
- PermitMechanical
Permit 323001 · COMPLETED
HVAC INSTALLATION FOR LEASED SPACE AS PER PLAN.
- PermitMajor alteration
Permit 319880 · COMPLETED
TENANT FIT-OUT FOR LEASED SPACE AS PER PLAN.
- PermitElectrical
Permit 323139 · COMPLETED
PROVIDE 1" & 3/4" EMT TO EA (8) MONITOR LOCS (2) TOTAL OF (4) MONITORS IN UPPER CONC D-5/7 GATES/(4) IN HAMMERHEAD AT UNITED (4) GATES LOC,ALL MONITORS ARE TO BE MOUNTED ON EXT STEEL BEAM,ALL PWR CONDUIT WILL BE TO EXIST UNITED ELEC PANELS/DATA CONDUIT WILL BE TO EXIST UNITED TELE-DATA RM IN LWR CONCOURSE
- PermitPlumbing
Permit 320245 · COMPLETED
SOUTHWEST AIRLINES (APRON LEVEL) - REPLACE KITCHEN SINK WHERE EXISTING PLUMBING REMAINS - INSTALL NEW KITCHEN SINK AND SHOWER - DOMESTIC HOT WATER HEATER INSTALLATION
- PermitSuppression
Permit 322959 · COMPLETED
RELOCATE 48 EXISTING SPRINKLER HEADS(COMMERCIAL)
- PermitPlumbing
Permit 322746 · EXPIRED
REPLACING 3 GREASE INTERCEPTORS,INSTALLING 1 FLOOR SINK AND 1 HAND SINK,ALSO INSTALLING A HOT WATER HEATER AND REPLACING MOP RECPTOR
- PermitMajor alteration
Permit 310570 · COMPLETED
LEVEL II ALTERATION AS PER PLAN.
- PermitMechanical
Permit 310083 · COMPLETED
INSTALL HVAC DUCT WORK AS PER PLAN.
- PermitUse
Permit 321764 · COMPLETED
FOR A BEAUTY SALON (NO ACTIVITIES AS DEFINED IN SECTION 14-1605 OF PHILADELPHIA ZONING CODE) WITH ACCESSORY RETAIL SALE OF BEAUTY SUPPLIES IN THE SAME SPACE WITH EXISTING RETAIL SALE OF VARIETY STORE ITEMS IN SPACE D-4 AS PART OF AN EXISTING AIRPORT COMPLEX WITH ALL OTHER USES PREVIOUSLY APPROVED.
- PermitPlumbing
Permit 320315 · COMPLETED
ROUGHING IN WATER/WASTE TO PICK UP THE FOLLOWING FIXTURES, ALSO INSTALLING A HOT WATER HEATER. FIXTURES: 2 FLOOR SINKS, 1 MOP RECEPTOR, 2 HAND SINKS AND (1) 3-COMPARTMENT SINK
- PermitMajor alteration
Permit 310822 · COMPLETED
INTERIOR RENOVATIONS AS PER PLAN.
- PermitElectrical
Permit 315300 · COMPLETED
PROVIDE NEW 100 AMP 120/208 VOLT 3 PHASE PANEL, 11 LIGHT FIXTURES, 20 RECEPTACLES, AND 2 LIGHT SWITCHES, CONNECT 1 WATER HEATER,1 EXHAUST FAN,1 VAV PROSVIDED BY OTHERS AS PER 2008 NEC (WEST DIST)
- PermitMajor alteration
Permit 316036 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN.
- PermitElectrical
Permit 313244 · COMPLETED
MCDONALDS WILL INSTALL CONDUIT FOR DATA WIRES FOR WIRELESS ACESS SYSTEM AS PER 2008 NEC
- PermitMajor alteration
Permit 315667 · COMPLETED
BUILD WALLS FOR CUBICALS AND INSTALLING NEW CARPET, TILE, WALL COVERING AND MILLWORK
- PermitElectrical
Permit 311674 · COMPLETED
DISCONNECT AND REMOVE 16 LT FIXTURES/17 RECEPTACLES,ADD 17 RECEPTACLES FOR NEW EQUIPMENT,ADD 22 NEW LIGHT FIXTURES,DISCONNECT AND RECONNECT AND MONITOR FIRE ALARM DURING RENOVATION AS PER 2008 NEC (WEST DIST)
- PermitMechanical
Permit 316184 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM TO BUSINESS SERVICES SPACE.
- ViolationCHANGE IN OCCUPANCY
Case 262309 · Violation 1995973 · Code A-102.9/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationVIOL C&I MESSAGE
Case 262309 · Violation 1995972 · Code A-000.0/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationCI HAZMAT
Case 262309 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitSuppression
Permit 316588 · COMPLETED
RELOCATE 28 EXISTING SPRINKLER HEADS(COMMERCIAL)
- PermitElectrical
Permit 310907 · COMPLETED
INSTALL RECEPTACLES,SWITCHES,LIGHT FIXTURES,PANELS AND TRANFORMER,COMMUNICATION JACKS AND FIRE ALARM DEVICE MODIFICATION FOR OFFICE AND LOCKER ROOM AREA RENOVATION AS PER 2008 NEC
- PermitUse
Permit 304604 · COMPLETED
CHANGE IN USE FROM CONCESSION AREA FOR RETAIL SALES OF INTERNET ACCESS TO CONCESSION AREA FOR RENTAL OF CUBICALS THAT CAN BE USED BY AIR TRAVELERS TO MAP, RELAX OR WORK. NO CHANGE IN SQUARE FOOTAGE, WITHIN THE "A' - "B" CORRODOR.
- PermitElectrical
Permit 312777 · COMPLETED
POWER FOR GROUND POWER UNITS AND CONNECTIONOF CABLE HOIST AS PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 262059 · COMPLETED
FIRE ALARM VISUAL NOTIFICATION APPLIANCE UPGRADE AS PER NFPA-72 (WEST DIST)
- PermitSuppression
Permit 312388 · COMPLETED
RELOCATE 27 SPRINKLER HEADS (AB CONVECTOR, SPACE AB6)
- PermitSuppression
Permit 312393 · COMPLETED
RELOCATE 9 SPRINKLER HEADS (SPACE D4)
- PermitSuppression
Permit 307732 · COMPLETED
INSTALL NEW FIRE SUPPRESSION SYSTEM FOR KITCHEN.
- PermitElectrical
Permit 310759 · COMPLETED
INSTALL POWER, CONTROLS & MOTORS FOR BAGGAGE BELT SYSTEM AS PER PLANS.
- PermitElectrical
Permit 311344 · ABANDONED
INSTALL 1 120 POWER CONNECTOR OFF EXISTING RECEPTACLE & 1 CAT6 DATA CABLE.
- PermitElectrical
Permit 311345 · ABANDONED
INSTALL 1 120 POWER CONNECTOR OFF EXISTING RECEPTACLE & 1 CAT6 DATA CABLE.
- PermitPlumbing
Permit 300366 · COMPLETED
RELOCATING SOME EXISTING FIXTURES,ADDING SOME NEW FLOOR SINKS, REUSING THE EXISTING GREASE TRAP, WATER METER AND BACKFLOW PREVENTOR
- PermitPlumbing
Permit 310995 · COMPLETED
REPLACE EXISTING MOP SINK AND 2 HAND SINKS, REPLACE EXISTING WATER HEATER
- PermitSign
Permit 309198 · COMPLETED
INSTALLAING NON ILLUMINATED SIGN ON TOP IF THE FRONT OF THE STORE 1'4" X 10'3", ALSO INSTALLING 2 LED LIGHT BOXES IN FRONT OF THE COUNTER 6" X 1' 8" & 6" X 7'7"
- PermitElectrical
Permit 304968 · COMPLETED
REPLACE 28 LIGHT FIXTURES, 2 EXIT SIGNS, 2 EMERGENCY LIGHTS, 9 RECEPTACLES & 4 SWITCHES.RECONNECT RELOCATED EQUIPMENT.
- PermitNew construction
Permit 310238 · COMPLETED
PERMIT IS FOR THE TEMPORARY INSTALLATION OF ONE (1) DOUBLE WALL 3,000 GALLON AST (ABOVEGROUND STORAGE TANK) LOCATED IN ACCORDANCE WITH THE ATTACHED PLAN AND APPROVAL BY THE PHILADELPHIA FIRE DEPARTMENT. THIS APPROVAL EXPIRES MAY 1ST 2011.
- PermitElectrical
Permit 300488 · COMPLETED
ADDITION OF 3RD EMERGENCY GENERATOR & MODIFICATION OF CONTROL SYSTEM. ASSOCIATED WIRING TO COMPLETE.
- PermitElectrical
Permit 309728 · COMPLETED
INSTALLATIO OF 1 ADDITIONAL NODE AND BATTERY CABINET TO THE EXISING VERIZON WIRELESS CELL SITE ON THE ROOFTOP OF PARKING GARAGE A, INSTALL 1 50AMP SINGLE PHASE 240V CIRCUIT FROM EXISTING PANEL AT CELL SITE TO NEW NODE AND BATTERY CABINET AS PER 2008 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 304568 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN.
- PermitMechanical
Permit 304047 · COMPLETED
INSTALL HVAC AND DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 294441 · COMPLETED
INSTALL HVAC AS PER PLAN.
- PermitMajor alteration
Permit 306916 · COMPLETED
ALTERATIONS AS PER PLAN INCLUDES CONSTRUCTION OF STORE FRONT FASCIA, INSTALLATION OF FLOOR TILE AT LEASE LINE, INSTALLATION OF SIGN BRACKETS. CONSTRUCTION OF STORE FRONT BARACADE.
- PermitPlumbing
Permit 308346 · EXPIRED
REPLACE (3) GREASE INTERCEPTORS, REPLACE 4" MAIN DRAIN, 1 HAND SINK
- PermitSuppression
Permit 301726 · COMPLETED
EXTEND EXISTING FIRE PROTECTION SPRINKLER SYSTEM IN CONCESSION SPACE
- PermitElectrical
Permit 307336 · COMPLETED
INSTALL 6 RECEPTACLE ON TWO 120VOLT 20 AMP DEDICATED CIRCUITS IN B-C CONNECTOR CONCOURSE,INSTALL 4 120VOLT 20 AMP DEDICATED CIRCUIT TO A PRE-WIRED RECEPTACLE STATION, 1 LOCATED IN EACH O THE CONCOURSE LEVELS OF TERMINAL,B,C,D&F AS PER 2008 NEC
- PermitElectrical
Permit 307157 · COMPLETED
INSTALL 3/4 EMT CONDUIT WITH 4 #12 THWN FOR TWO (2) DUPLEX RECEPTACLES FOR CLEAR CHANNEL KIOSK UNIT AS PER 2008 NEC (WEST DIST)
- PermitElectrical
Permit 303532 · COMPLETED
WIRE (4) DISPENSERS AND EQUIPMENT, WIRE (2) SUBMERGABLE PUMPS AND EQUIPMENT, REWIRE (1) TAK MONITOR AND EQUIPMENT AS PER 2008 NEC (WEST DIST)
- PermitAlteration
Permit 306749 · COMPLETED
RE-ROOF TO CARLISLE IS YR EPDM SPEC.
- PermitElectrical
Permit 307278 · COMPLETED
RELOCATE EXISTING 60 AMP COMPACTOR CIRCUIT FROM EXISTING PANEL MPR-EPC-D2 TO ADJACENT EXISTING PANEL MDP-S4A IN AIRPORT ELECTRIC ROOM AS PER 2008 NEC (WEST DIST)
- PermitElectrical
Permit 306180 · COMPLETED
INSTALL NEW POKE THROUGH DEVICES FOR SECURITY CHECK POINT EQUIPMENT,INSTALL BRANCH WIRING AND VOICE/DATA CABLING AS NEEDED PER PLAN AND SPECIFICATIONS AS PER 2008 NEC
- PermitMechanical
Permit 304355 · COMPLETED
KITCHEN HOOD, TO INLCUDE BLACK IRON DUCT FOR KITCHEN EXHAUST, AS PER PLANS
- PermitMajor alteration
Permit 297922 · COMPLETED
ALTERATIONS TO A FAST FOOD/JAMBA JUICE INSIDE AIRPORT AT SPACE D6-D PER PLAN.
- InvestigationCI INSP
Case 193078 · CLOSED
City marked the record closed; open the case for the closing reason.
- PermitMajor alteration
Permit 303059 · COMPLETED
REMOVE (3) 10,000 GASOLINE TANKS, INCLUDING PIPING AND EQUIPMENT. INSTALL (2) 12,000 DOUBLE WALL TANKS WITYH (4) FUEL DISPENSERS INCLUDING PIPING. FOR CAR RENTAL FACILITY BY A CERTIFIED INSTALLER ONLY PER PLAN.
- PermitUse
Permit 304602 · COMPLETED
CHANGE IN USE FROM EXISTING CONCOURSE AREA TO CONCESSION SPACE SELLING TAKE-AWAY FOOD & DRINK
- PermitElectrical
Permit 299522 · COMPLETED
PROVIDE AND INSTALL 1 1/4" EMT 1" EMT 3/4" EMT AND POWER WIRE FOR 7HS MACHINES PROVIDE (7) 208 3/W 30AMP TWIST-LOCK RECEPTACLES AND 7 30 AMP 240V 2/P BREAKERS TO BE INSTALLED IN EXISTING TEO PANEL LOCATION PER 2008 NEC CODE
- PermitSuppression
Permit 303435 · COMPLETED
RELOCATE 1 SPRINKLER HEAD(COMMERCIAL)
- PermitSuppression
Permit 303448 · COMPLETED
RELOCATE 1 SPRINKLER HEAD(COMMERCIAL)
- PermitMechanical
Permit 298265 · COMPLETED
OVERALL PROJECT WORK SCOPE IS TO INSTALL A NEW 2000KW GENERATOR IN CENTRAL UTILITIES BLDG @ PHL AIRPORT. INSTALLATION OF CONCRETE FOUNDATION PADS FOR GENERATOR & ELECTRICAL EQUIPMENT AND FOUNDATION CAISONS FOR OUTDOOR MECHANICAL EQUIPMENT. INSTALLATION OF STRUCTURAL SUPPORT HANGERS FOR ELECTRICAL & MECHANICAL EQUIPMENT, ASSOCIATED/ACCESSORY MECHANICAL PIPING, AS PER SUBMITTED PLANS AND SPECIFICATIONS.
- PermitMechanical
Permit 301437 · COMPLETED
HVAC, INCLUDING DUCTWORK AND VAV BOXES FOR AIRPORT.
- PermitSuppression
Permit 300432 · COMPLETED
EXTENSION TO EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitSuppression
Permit 300430 · COMPLETED
EXTENSION TO EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitMajor alteration
Permit 300106 · COMPLETED
TENANT FIT OUT FOR RETAIL CLOTHING STORE IN AIRPORT
- PermitElectrical
Permit 301322 · COMPLETED
INSTALL POWER FOR NEW BAGGAGE LIFT UNIT IN B_C CENTRAL BAGGAGE CLAIM AREA INSTALL 3/4 EMT CONDUIT FROM EXISTING PANEL WITH 4 #10 FOR POWER CONNECTION FOR BAGGAGE LIFTING UNIT ALSO INSTALL NEW 2/P 30 AMP BREAKER INTO EXISTING PANEL PER 2008 NEC CODE(EAST DIS)
- PermitMechanical
Permit 298914 · COMPLETED
INSTALL KITCHEN HOOD W/ EXHAUST DUCTWORK FOR A RESTAURANT AS PER PLANS
- PermitSuppression
Permit 300686 · COMPLETED
RELOCATE 13 SPRINKLER HEADS(COMMERCIAL)
- PermitElectrical
Permit 300536 · COMPLETED
PROVIDE POWER, LIGHTING, SWITCHING & LOW VOLTAGE PER PLANS. NO FIRE ALARM WORK.
- PermitElectrical
Permit 300537 · COMPLETED
PROVIDE POWER, LIGHTING, SWITCHING & LOW VOLTAGE PER PLANS. NO FIRE ALARM WORK.
- PermitPlumbing
Permit 300360 · COMPLETED
RELOCATING EXISTING FIXTURES, ADDING SOME NEW FIXTURES, REUSING THE EXISTING GREASE TRAP,WATER METER AND BACKFLOW PREVENTOR
- PermitElectrical
Permit 300474 · COMPLETED
INSTALL 1 SWITCH, 1 TIME CLOCK, 6 RECEPTACLES, 10 LIGHT FIXTURES, 2 EXIT LIGHTS & 2 BOXES FOR SPEAKERS. RELOCATE 1 SPEAKER/STROBE.
- PermitSuppression
Permit 298462 · COMPLETED
INSTALLATION OF ANSUL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEMS
- PermitElectrical
Permit 299992 · COMPLETED
INSTALL 1 FLOOR RECEPTACLE 1 TIME CLOCK 27 LIGHT FIXTURES 2 EXIT LIGHTS 2 OUTLET BOX ROUGHIN FOR CCTV CAMERA FOR EXISTING STORE SPACE (PER 2008 NEC CODE)WEST DIS
- PermitElectrical
Permit 299997 · COMPLETED
INSTALL 2 DEDICATED 20 AMP 120 VOLT RECEPTACLES FOR MEDIA DISPLAY IN D- TERMINAL (WEST DIS)
- PermitElectrical
Permit 293737 · COMPLETED
INSTALL BRANCH CIRCUITS, LIGHT FIXTURES, FIRE ALARM SYSTEM & EMPTY CONDUITS FOR SOUND SYSTEM/POS PER PLANS.
- PermitElectrical
Permit 293738 · COMPLETED
INSTALL BRANCH CIRCUITS, 200A FEEDER, 208V 3-PHASE PANEL, 100A 208V 3-PHASE PANEL, LIGHT FIXTURES, FIRE ALARM SYSTEM & EMPTY CONDUITS FOR SOUND SYSTEM/POS PER PLANS.
- PermitMajor alteration
Permit 297693 · COMPLETED
INTERIOR FIT-OUT TO A RETAIL SPACE IN AIRPORT AS PER SUBMITTED PLANS.
- PermitElectrical
Permit 299189 · COMPLETED
INSTALL CONDUIT & WIRE FOR 1 1X4 LIGHT FIXTURE, 1 SWITCH & 1 EMERGENCY LIGHT.
- PermitElectrical
Permit 299190 · COMPLETED
REMOVE FOR 5 JET BRIDGES IN TERMINAL E CONCOURSE FOR REMOVAL OF OLDER BRIDGES.
- PermitElectrical
Permit 299191 · COMPLETED
INSTALL 2 POWER POLES FOR 2 DESK LOCATIONS, 2 BREAKERS IN EXISTING PANEL WITH 1 CIRCUIT FOR EACH POWER POLE.
- PermitNew Construction
Permit 299016 · Expired
REMOVAL OF EXISTING MICROWAVE COMMUNICATIONS SYSTEM IN TERMINALS D,E & F, REMOVE CONDUIT TO SOURCE, REMOVE 110 VOLT POWER TO BREAKER AND REMOVE 4 PR VTP TO SOURCE, REMOVE TELECOM CABINETS AS NOTED AS PER 2008 (WEST DIST)
- PermitMajor alteration
Permit 291102 · COMPLETED
TENANT IMPROVEMENT WORK FOR NEW BURRITO SHOP AS PER PLAN.
- PermitPlumbing
Permit 292422 · COMPLETED
REPLACE SANITARY WATER AND FIXTURES
- PermitSuppression
Permit 297139 · COMPLETED
RELOCATE 59 SPRINKLER HEADS (DELTA CLUB - TERMINAL D)
- PermitMechanical
Permit 293178 · COMPLETED
NEW DUCTWORK AND EXHAUST SYSTEM AS PER PLANS.
- PermitMechanical
Permit 293661 · COMPLETED
HVAC & DUCTWORK PER PLANS 51 GRILLS/REGISTERS
- PermitMajor alteration
Permit 290870 · COMPLETED
UPGRADING BAGGAGE SCREENING SYSTEM, MISCELLANEOUS MODIFICATIONS IN THE TERMINAL A-EAST BAG MAKE UP ROOM. MODIFICATION TO INCLUDE REMOVING ROLL UP DOORS AND REPLAICNG WITH CONCRETE MASONRY UNITS; REMOVAL OF CONCRETE MASORNY UNITS IN THE WATER METER ROOM. REMOVAL OF PORTTION OF AIRLINE TICKETING OFFICE IN ORDER TO EXPAND AND BUILD NEW WALLS WITHIN AIRLINE TICKETING OFFICE.REPLACEMENT OF THE WALL IN A NEW ALIGNMENT IN THE ELECTRIC ROOM.
- PermitMajor alteration
Permit 294070 · COMPLETED
DEMOLITION AND INTERIOR ALTERATIONS AS PER PLAN.
- PermitElectrical
Permit 293201 · COMPLETED
RENOVATION OF THE DELTA SKY CLUB LOCATED ON THE SECOND FLOOR "TERMINAL D" NEW TRANSFORMER/PANELS, LIGHTING AND RECEPTACLES, AS PER 2008 NEC. NEW FIRE ALARM AND TELECOMMUNICATIONS SYSTEM, AS PER NFPA-72 (WEST DIST)
- PermitPlumbing
Permit 286442 · COMPLETED
RPZ BACKFLOW PREVENTOR
- PermitPlumbing
Permit 294497 · COMPLETED
INSTALLATION OF DRAIN WASTE AND VENT PIPING FOR THE FOLLOWING: 3 WATER CLOSETS, 3 LAV'S, 2 URINALS, 1 MOP RECEPTOR, 2 FLOOR DRAINS, 6 FLOOR SINKS,3 INDIRECT WASTES, 1 ELECTRIC WATER HEATER, INSTALLAITON OF DOMESTIC HOT AND COLD WATER PIPING,
- PermitElectrical
Permit 293354 · COMPLETED
REMOVE EXISTING POWER FOR BAGGAGE LIFTING UNIT, PROVIDE POWER TO NEW UNIT TO EXISTING PANEL AND PROVIDE NEW #10 THHN WIRE USING EXISTING CONDUIT AND PROVIDE NEW 2/P, 30AMP BREAKER AS PER 2008 NEC (WEST DISTRICT)
- PermitMechanical
Permit 293086 · COMPLETED
HVAC, DUCTWORK ONLY. (4) REGISTERS
- PermitSuppression
Permit 290531 · COMPLETED
RELOCATION OF 6 SPRINKLER HEADS.
- PermitSuppression
Permit 290552 · COMPLETED
RELOCATION OF 1 SPRINKLER HEAD.
- PermitMechanical
Permit 283089 · COMPLETED
INSTALL HVAC, INCLUDING DUCTWORK AND (28) REGISTERS
- PermitPlumbing
Permit 288749 · COMPLETED
3" ADDITION OF WATER PRESSURE REDUCING VALVE
- PermitElectrical
Permit 281769 · COMPLETED
PHILA INTL AIRPORT-TERMINAL ANNOUNCEMENT CONTROL SYSTEM (TACS) UPGRADE PER 2008 NEC
- PermitElectrical
Permit 288853 · COMPLETED
PROVIDE 3/4" EMT CONDUIT W/3 #12 THNN WIRE FOR POWER FROM EXISTING ELEC PANEL V CIRCUIT 26 TO ANTENNA CONTROL CABINET. PROVIDE 1" EMT CONDUIT UP TO EXISTING SHAFT TO ROOFTOP EXISTING ANTENNA MASS AND INSTALL ANTENNA WIRE SUPPLIED BY OWNER AS PER 2008 NEC (WEST DIST)
- PermitPlumbing
Permit 287641 · COMPLETED
HOUSE DRAIN,HOUSE TRAP,FAI
- PermitPlumbing
Permit 282556 · COMPLETED
3 WATER CLOSETS, 2 URINALS, 3 LAVS, 1 EWC , 1 MOP RECEPTOR
- PermitMajor alteration
Permit 281038 · COMPLETED
INTERIOR ALTERATION INCLUDES THE RELOCATION OF AIRLINE CARRIERS, BUILDING A CLUB THAT INCLUDES; RECEPTION, OFFICE, BATHROOM AND SELF SERVE BAR, NEW FLOORING, TILES CONCRETE TILES, NEW CEILINGS, NEW WALL PARTITIONS AND WALL FINISHES.
- PermitSuppression
Permit 280184 · COMPLETED
INSTALLATION OF FIRE SPRINKLER SYSTEM AS PER PLANS.
- PermitSuppression
Permit 281214 · COMPLETED
INSTALL A NEW FIRE SUPPRESSION SYSTEM.
- PermitElectrical
Permit 285926 · COMPLETED
REMOVE EXISTING CEILING FIXTURES 40 FEET TRACK LT'S & RECESS LT'S (18), AFTER GC REPLACES CEILING TILE,REINSTALL W/NEW. REMOVE 4 POWER OUTLETS & 2 DATA OUTLETS FROM EXISTING CASEWORK & REINSTALL IN NEW CASEWORK. REUSE EXISTING FLOOR PENETRATION AS PER 2008 NEC
- PermitElectrical
Permit 269041 · COMPLETED
REMOVE CONDUIT/CONDUCTORS/SIGNS/INPAVEMENT FIXTURES SO THAT THE HYDRANT FUEL PIPE CAN BE INSTALLED,AFTER BACKFILLED AND COMPACTED;ALL CONDUIT CONDUCTORS/SIGNS/FIXTURES WILL BE PUT BACK IN PLACE ON TAXIWAY "N" (TAXIWAY K3 IS TINICUM TWP) PER 2008 NEC (WEST DISTRICT)
- PermitElectrical
Permit 269043 · COMPLETED
INSTALL INPAVEMENT FIXTURES,SIGN PANELS, PULL OUT OLD CONDUCTORS AND PULL IN NEW CONDUCTORS IN THEIR PLACE. WORK AT FIELD LIGHTING VAULT #4. ALL WORK IN AIRFIELDS. REMAINDER WORK IN TINNICUM TWNSHP. SEE PLANS AS PER 2008 NEC (WEST DISTRICT)
- PermitUse
Permit 278015 · COMPLETED
DELTA SKY CLUB-PRIVATE WAITING AREA FOR DELTA SKY CLUB MEMBERS
- PermitMechanical
Permit 283870 · COMPLETED
RELOCATE 6 DIFFUSERS
- PermitMajor alteration
Permit 283291 · COMPLETED
INTERIOR RENOVATION AS PER PLAN
- PermitElectrical
Permit 281799 · COMPLETED
PHILA INTL AIRPORT-ELECTRICAL DEMO,INSTALL NEW LIGHTING,RECEPTACLES,FIRE ALARM,CCTV,TELEDATA & MECHANICAL EQUIP BRANCH WIRING, RELOCATION OF 2ND FL GATE AREA STATIONS INCLUDING RECEPT & TELEDATA PER 2008 NEC
- PermitMechanical
Permit 279525 · COMPLETED
VAV UPGRADE TO INCLUDE CONTROLS MODIFICATIONS INSTALL A VAN TERMINAL UNIT IN DUCT TO US AIR OFFICE. LOCATION OF WORK AS PER PLAN.
- PermitSuppression
Permit 276140 · EXPIRED
EXTEND EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitSuppression
Permit 276137 · COMPLETED
EXTEND EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitSuppression
Permit 276141 · COMPLETED
EXTEND EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitSuppression
Permit 282014 · COMPLETED
OFFICES - RELOCATE 42 SPRINKLER HEADS.
- PermitElectrical
Permit 281762 · COMPLETED
RELOCATE CONDUIT & EXISTING FEEDER TO NEW VFD, INSTALL POWER FOR VAV UNIT & THERMOSTAT IN LARGE OFFICE AREA. INSTALL 3/4" EMT CONDUIT & #10 WIRE LOCATED IN TERMINAL B CONCOURSE OFFICE. PER 2008 NEC
- PermitMechanical
Permit 278194 · COMPLETED
RELOCATE 6 DIFFUSERS
- PermitPlumbing
Permit 280352 · COMPLETED
INSTALLATION OF NEW FLOOR SINK
- PermitSuppression
Permit 264222 · COMPLETED
ADD/RELOCATE FIRE SPRINKLERS HEADS AS PER PLAN.
- PermitElectrical
Permit 274067 · COMPLETED
INSTALL LIGHT FIXTURES, SWITCHES, RECEPTACLES, PANELS, TRANSFORMER, TELE/DATA, CEILING SPEAKERS & FIRE ALARM SPEAKER STROBES.
- PermitElectrical
Permit 274066 · COMPLETED
INSTALL LIGHT FIXTURES, SWITCHES, RECEPTACLES, PANELS, TRANSFORMER, TELE/DATA, CEILING SPEAKERS & FIRE ALARM SPEAKER STROBES.
- PermitSuppression
Permit 279964 · COMPLETED
RELOCATE 4 SPRINKLER HEADS (BC-ST-1)
- PermitSuppression
Permit 262971 · COMPLETED
INSTALL NEW ANSUL FIRE SUPPRESSION SYSTEM.
- PermitMajor alteration
Permit 274914 · COMPLETED
RELOCATION OF AIRLINE CARRIERS AND CREATION OF AND ADDIDIONAL GATE FOR THE SAME USE. WORK INCLUDES RENOVATION OF AN AREA IN THE RAMP LEVEL OF TERMINAL E CONCOURSE BETWEEN EXISTING GATES E2 AND E6 FOR AIRTRAN'S RAMP OPERATIONS AREA. CONSTRUCTION OF NEW PASSENGER BOARDING BRIDGE FOR NEW GATE E6. CONSTRUCTION OF FOUNDATION FOR ADDITIONAL GATE E4. RENAVOTION AS PER PLAN.
- PermitMechanical
Permit 275660 · COMPLETED
INSTALL HVAC AND DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 275483 · COMPLETED
NEW VAV BOX WITH DUCTWORK AND GRD'S FOR AIRPORT.
- PermitAdministrative
Permit 271115 · COMPLETED
AMENDING BUILDING PERMIT #266071 TO INSTALL NEW VAV WITH DUCTWORK. SEE A/P 266089 FOR APPROVED PLAN.
- PermitMajor alteration
Permit 274736 · COMPLETED
INTERIOR RENOVATIONS AS PER PLANS
- PermitPlumbing
Permit 277013 · COMPLETED
7 FIXTURES WITH PIPING FOR COFFEE SHOP.3 FLOOR SINKS,1 GREASE TRAP,3 SINKS,1 MOP SINK
- PermitUse
Permit 276995 · COMPLETED
REGISTER USE
- PermitSuppression
Permit 277045 · COMPLETED
RELOCATE 43 SPRINKLER HEADS.
- PermitElectrical
Permit 275948 · COMPLETED
RELOCATE POWER, LIGHTING & DATA OUTLETS, INSTALL 12 POWER OUTLETS & 14 DATA OUTLETS.
- PermitElectrical
Permit 268597 · COMPLETED
INSTALL SWS,RECEPTS,LT FIXS,PANELS,EQUIP CONNECTIONS/ASSOC FEEDERS AND BRANCH CKS.INSTALL TELE/DATA JACKS/ASSOCIATED CONDUIT/ CABLE,INSTALL TENANT PROVIDED FA SYS,INSTALL TENANT PROVIDED CCTV CAMERAS,CEILING SPEAKERS/ASSOC WIRING AS PER 2008 NEC(WEST DIST)
- PermitMechanical
Permit 266089 · COMPLETED
INSTALL BLACK IRON KITCHEN HOOD 1 & 2 ( CAPTIVE ARC HOODS ) & MUA SYSTEM AS PER PLANS.
- PermitElectrical
Permit 272033 · COMPLETED
INSTALL 225A 208/120V PANEL, 200 FEEDER, 45 LIGHT FIXTURES, 4 SWITCHES, 1 TIME CLOCK, 10 RECEPTACLES, 2 EQUIPMENT CONNECTIONS, 2 DISCONNECTS, 2 GFCI RECEPTACLES, 1 HOT WATER HEATER & 1 A/C UNIT.
- PermitUse
Permit 272655 · COMPLETED
SPACE IN LINK AB CHANGING USE FROM DR'S OFFICES TO THE EXPANSION OF DR'S OFFICES IN 1193 SQFT IN SPACE AB3A
- PermitMajor alteration
Permit 271011 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN FOR WORK PERMFORMED WITHIN PHILADELPHIA COUNTY.
- PermitMechanical
Permit 271670 · COMPLETED
INSTALL HVAC AS PER PLAN.
- PermitAdministrative
Permit 268603 · COMPLETED
AMEND BLDG. PERMIT#249051 AND 252952 KITCHEN EXHAUST FAN CHANGED TO SIDE DISCHARGE FAN
- PermitPlumbing
Permit 265598 · COMPLETED
ROUGH IN 2 GT MAIN DRAIN SYSTEM, WATER SUPPLY TO 2 COMP SINK, 3 COMP SINK, FLOOR DRAIN, HOT WATER HEATER INSTALLATION
- PermitSuppression
Permit 269367 · COMPLETED
RELOCATE 8 SPRINKLER HEADS (SPACE #BC29AB)
- PermitMajor alteration
Permit 263313 · COMPLETED
INTERIOR FIT-OUT AS PER PLAN.
- PermitMajor alteration
Permit 263330 · COMPLETED
INTERIOR FIT OUT OF EXISTING TENANT SPACE AS PER PLANS
- AppealRB_LIRB
Appeal 10311 · OPEN · City affirmed
WE HAVE A PRETZEL STAND AT THE AIRPORT. THE INSPECTOR INSPECTED OUR PREMISES AND FOUND EVERYTHING SATISFACTORY. IN AN INTERVIEW WITH THE PRESENT EMPLOYEE, SHE ASKED WHAT IS OUR POLICY IF AN EMPLOYEE IS SICK WITH HEPATITIS A . HE SAID THE
- PermitElectrical
Permit 268137 · COMPLETED
REMOVE ALL POWER & DATA WIRING FROM FROM DESKS TO SOURCE.
- PermitElectrical
Permit 262370 · COMPLETED
INSTALL NEW LIGHTING, SWITCHES, RECEPTACLES, CIRCUIT BREAKER PANELS AND FEEDERS, INSTALL WIRING AND CONNECTIONS TO HVAC AND KITCHEN EQUIPMENT, INSTALL CONDUIT AND PULL STRINGS FOR COMMUNICATION ONLY AS PER 2005 NEC. INSTALL FIRE ALARM SYSTEM AS PER NFPA-72 (WEST DIST)
- PermitElectrical
Permit 266958 · COMPLETED
REMOVAL OF DATA, POWER CONDUIT FROM READER PODIUM. REMOVAL OF VGA CABLES FROM T-POST PYLONS. REMOVAL OF 2 ROOF MOUNTED LIGHTING DETECTORS.
- PermitElectrical
Permit 266959 · COMPLETED
REPAIR EXISTING 2X2 LIGHT FIXTURES. REMOVE TRACK LIGHTING & INSTALL 5 2X2 LIGHT FIXTURES USING EXISTING CIRCUITS.
- PermitAlteration
Permit 266478 · COMPLETED
INSTALLATION OF CEILINGS, MILLWORK REPAIR, TILE WORK.
- PermitMechanical
Permit 266071 · COMPLETED
INSTALL NEW VAV WITH DUCTWORK UNDER 2000CFM. ALL WORK WITHIN A SINGLE SPACE
- PermitMechanical
Permit 266075 · COMPLETED
RELOCATIION OF DIFFUSERS (6) WITHIN A SINGLE RETAIL SPACE.
- PermitMechanical
Permit 261051 · COMPLETED
HVAC, INCLUDING DUCTWORK AS PER PLAN
- PermitMechanical
Permit 261056 · COMPLETED
HVAC, INCLUDING DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 261055 · COMPLETED
HVAC, INCLUDING DUCTWORK AND VAV FOR AIRPORT AS PER PLAN
- PermitMechanical
Permit 261053 · COMPLETED
HVAC, INCLUDING DUCTWORK AND VAV BOX AS PER PLAN.
- PermitSuppression
Permit 258296 · COMPLETED
EXTEND EXISTING SPRINKLER SYSTEM TO COVER SPACE C8B AS PER PLANS
- PermitMajor alteration
Permit 263597 · COMPLETED
TENANT FIT-OUT AS PER PLAN
- PermitElectrical
Permit 264778 · COMPLETED
INSTALL SWS,RECEPTS & LIGHT FIXTURES. INSTALL CONDUIT AND WIRING FROM EXISTING PANEL.INSTALL TELEPHONE AND DATA JACKS AND ASSOCIATED CONDUIT AND CABLE, RELOCATE EXISTING FIRE ALARM DEVICES,NO CHANGES IN LOAD OR WIRING,AS PER 2005 NEC(WEST DIST)
- PermitElectrical
Permit 264249 · ABANDONED
RENOVATIONS TO BURGER KING: DISCONNECT AND RE-CONNECT POWER TO EQUIPMENT. INSTALL NEW LIGHT FIXTURES.... IN ACCORDANCE WITH 2005 CODE
- PermitElectrical
Permit 259756 · COMPLETED
SUPPLY AND INSTALL ALL POWER REQUIREMENTS FOR EGSE CHARGER UNIT INSTALLATION THROUGHOUT FACILITY.
- PermitZoning/use
Permit 261718 · COMPLETED
RELOCATION OF EXISTING MOBILE TRAILER.
- PermitUse
Permit 263596 · COMPLETED
USE REGISTRATION FOR RETAIL SALES OF TELEPHONES ITEMS IN AIRPORT.
- PermitSuppression
Permit 263416 · COMPLETED
RELOCATE 54 SPRINKLER HEADS (SPACE #BC 13)
- PermitSuppression
Permit 263420 · COMPLETED
RELOCATE 4 SPRINKLER HEADS (SPACE #D6D)
- PermitMajor alteration
Permit 260318 · COMPLETED
TENANT FITOUT FOR RESTAURANT STORAGE.
- PermitMajor alteration
Permit 260314 · COMPLETED
ALTERATIONS FOR RESTAURANT AS PER PLAN
- PermitMajor alteration
Permit 253716 · EXPIRED
RENOVATION OF AN EXISTING BURGER KING REST. AS PER PLANS
- PermitAdministrative
Permit 261732 · COMPLETED
TCO FOR TERMINAL D/E BAGGAGE CLAIM.
- PermitMajor alteration
Permit 260281 · COMPLETED
INTERIOR ALTERATIONS AS PER PLANS
- PermitElectrical
Permit 261303 · COMPLETED
INSTALL 4 CAT 5E CABLES TO POS LOCATION.
- PermitElectrical
Permit 257547 · COMPLETED
INSTALL CONDUIT AND WIRE FOR 2 NEW PANELS 208/120V 3 PHASE 4 WIRE, 18 CIRCUITS W/50AMP MAIN. 2-60AMP, 3 PHASE DISCONNECT SWITCH, 2-15KVA, 2 EXIT SIGNS. 3 POWER JUNCTION BOX FOR SIGNAGE AS PER 2005 NEC. (WEST DISTRICT)
- PermitElectrical
Permit 257548 · COMPLETED
AS PER PLANS PROVIDED, NO FIRE ALARM OR SECURITY WORK AS PER 2005 NEC. (WEST DISTRICT)
- PermitElectrical
Permit 257549 · COMPLETED
INSTALL CONDUIT AND WIRE FOR 2 NEW FIXTURES, 8 RECEPTACLE OUTLETS, 1-45KVA, 2 NEW PANELS 208/120, 3 PHASE, 4 WIRE WITH 150 AMP MAIN.18 CIRCUITS AND 100 AMP MAIN WITH 25 CIRCUITS. 5 POWER JUNCTION BOX FOR SIGNAGE AS PER 2005 NEC. (WEST DISTRICT)
- PermitAlteration
Permit 256546 · COMPLETED
REPLACING ROOF NOT TO EXCEED 10% INSULATION REPLACEMENT. SEE A/P 247819 FOR PLAN.
- PermitMajor alteration
Permit 247819 · COMPLETED
REPLACING ROOF AS PER PLAN.
- PermitSuppression
Permit 256607 · COMPLETED
INSTALL ANSUL SYSTEM FOR RESTAURANT IN AIRPORT.
- PermitElectrical
Permit 252920 · COMPLETED
THROUGHOUT TERMINAL E MCDONALDS INSTALL NEW FIRE ALARM SYSTEM
- PermitPlumbing
Permit 259607 · COMPLETED
INSTALL DRAIN, WASTE/VENT,INSTALL DOMESTIC HOT/COLD WTR PIPE, W/THE FOLL:1 HD SINK,1 EX HOOD,1 ICE MKR,1 MOP SINK,1 DIPPER WELL,1 3-COMP SINK,1 DISHWR,1 SODA TOWER,1 WTR FILTER,1 OYSTER DISP,3 WAITRESS STAT, 7 STORAGE BINS,1 BAR DRAIN,2 COOLERS,1 DUMP SINK,1 GLASSWR,4 BAR SINKS,1 TANK SINK,1EXPR MACH,4 ICE CHESTS,6 FL SINKS,3 GREASE TRAPS,2 WTR HTRS
- PermitElectrical
Permit 259109 · COMPLETED
PROVIDE & INSTALL 24 PATCH PANEL IN NEW DATA CABINET, 2 120V CIRCUITS FROM EXISTING PANEL, 6 DATA OUTLETS, 2 RECEPTACLES & 1 SWITCH.
- PermitAdministrative
Permit 257531 · COMPLETED
AMEND PERMIT #244720 TO INSTALL HVAC AND DUTWORK AS PER PLAN TO INCLUDE BLACK IRON METAL DUTCTOWK AS PER PLAN FOR THE CONVEYANCE OF GREASE-LADEN AIR.
- PermitMechanical
Permit 258494 · COMPLETED
INSTALL COMMERCIAL COOKING EXHAUST STSTEMS AND RELATED COMPONENTS PER PLAN TO INCLUDE BLACK IRON DUCTWORK FOR THE CONVEYANCE OF GREASE-LADEN AIR.
- PermitSuppression
Permit 257460 · COMPLETED
INSTALL FIRE SUPPRESSION SYSTEM ANSUL R-102 6 GALLON. SEPARATE PERMIT REQUIRED FOR KITCHEN HOOD.
- PermitAdministrative
Permit 255059 · COMPLETED
TEMP C.O. TO THE EXISTING CONCOURSE "E" BLDG PROVIDING SEVEN PASSENGER BOARDING GATES. TCO IS REQUESTED FOR BOTH STORIES AND ROOF AREAS WITHIN THE PROJECT AREA. SEE BLDG PERMIT 161992 FOR APPROVED PLANS.
- PermitUse
Permit 257614 · COMPLETED
LEGALIZING DUNKIN DONUTS WITH RETAIL SALES OF DONUTS, MUFFINS, BAGELS.
- PermitDemolition
Permit 257293 · COMPLETED
INTERIOR DEMOLITION OF KIOSK LOCATED IN B-C CONNECTOR.
- PermitSuppression
Permit 253177 · COMPLETED
EXTEND FIRE PROTECTION SPRINKLER SYSTEM TO SPACE E14. CERTIFICATE OF OCCUPANCY REQUIRED PRIOR TO OCCUPANCY,
- PermitElectrical
Permit 254091 · COMPLETED
INSTALL (60) DUPLEX RECEPTACLES, (7) PAGING SPEAKERS, (3) LIGHTING NOTIFICATION PANELS AND ASSOCIATED CONDUIT AND WIRE AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 250353 · COMPLETED
INSTALL LTS, DEVICES & ASSOCIATED WIRING, PANELS XFORMERS & FEEDERS. INSTALL WIRING & CONNECTIONS TO HVAC EQPT. INSTALL TELEPHONE,DATA & CATV JACKS & WIRING, CCTV CAMERA AND ASSOCIATED WIRING, CEILING SPEAKERS AND WIRING AS PER 2005 NEC INSTALL FASYS AS PER NFPA 72 (WEST DISTRICT)
- PermitNew construction
Permit 253383 · COMPLETED
CONSTRUCTION OF ELECTRICAL SUBSTATIONS, CANOPIES, DISTRIBUTION FACILITIES AND VEHICLE CHARGING STATIONS.
- PermitMechanical
Permit 253010 · COMPLETED
THE IMPROVEMENTS INCLUDE INSTALLATION OF NEW PRE-CONDITIONED AIR UNITS AND OTHER MECHANICAL UNITS TO SERVE 24 GATES AT TERMINAL F.
- PermitMechanical
Permit 255996 · COMPLETED
INSTALL NEW KITCHEN HOODS AND DUCT WORK AS PER PLAN. SEE A/P 250886 FOR PLANS.
- PermitMechanical
Permit 250886 · COMPLETED
INSTALL NEW HVAC SYSTEM AS PER PLANS.
- PermitElectrical
Permit 255386 · COMPLETED
INSTALL ELECTRICAL POWER,LIGHTING,SECURITY,AND VOICE/DATA WIRING PER DRAWINGS AS PER 2005 NEC (WEST DISTRICT) FIRE ALARM AS PER NFPA 72
- PermitSuppression
Permit 240427 · COMPLETED
ADD SPRINKLERS TO SWITCH VAULTS TO ACCOMODATE NEW EQUIPMENT AS PER PLAN.
- PermitElectrical
Permit 255299 · COMPLETED
DISCONNECT 120V POWER CIRCUIT EXISTING SIGNS. CIRCUIT IS TO BE SAFED OFF FOR FUTURE USE AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 243838 · COMPLETED
CONSTRUCTION OF DEMISING WALLS, GLASS STOREFRONT, OVERHEAD GRILLES, CEILING.
- PermitMajor alteration
Permit 243839 · COMPLETED
CONSTRUCTION OF DEMISING WALLS, DEMISING PIERS AND INSTALLATION OF SIGNAGE BRACKETS FOR FUTURE CONCESSION TENANTS. CERTIFICATE OF OCCUPANCY REQUIRED PRIOR TO OCCUPANCY.
- PermitMajor alteration
Permit 243391 · COMPLETED
CONSTRUCTION OF DEMISING WALLS, DEMISING PIERS AND INSTALLATION OF SIGNAGE BRACKETS FOR FUTURE CONCESSION TENANTS. CERTIFICATE OF OCCUPANCY IS REQUIRED PRIOR TO OCCUPANCY.
- PermitElectrical
Permit 254376 · COMPLETED
INSTALL 60 AMP SUB-PANEL , SUB-METER,CONDUIT, WIRE AND CONNECTION TO PRE-WIRED KIOSK. MOUNT AND CONNECT TRACK LIGHT AS PER 2005 NEC (WEST DISTRICT)
- PermitZoning/use
Permit 246780 · COMPLETED
ADDING THE USES OF ELECTRICAL SUBSTATION EQUIPMENT AT FX1 AND TBF-2, 2 VEHICLE CHARGING STATION CANOPIES AND HVAC EQIP
- PermitMechanical
Permit 249051 · COMPLETED
INSTALL KITCHEN HOOD AND DUCTWORK AS PER PLAN.
- PermitMajor alteration
Permit 247892 · COMPLETED
ALTERATIONS TO AN EXISTING RESTAURANT AS PER PLAN.
- PermitMechanical
Permit 252952 · COMPLETED
INSTALL HVAC TO EXISTING RESTAURANT AS PER PLAN.
- PermitUse
Permit 254181 · COMPLETED
KIOSK TO INCLUDE PREPARING AND SERVING SNACKS AND RETAIL SERVICE OF WINE WITH SEATING
- PermitUse
Permit 254173 · COMPLETED
THE SALES OF FOOD, COFFEE AND SNACKS
- PermitMechanical
Permit 247075 · COMPLETED
INSTALL HVAC AS PER PLAN.
- PermitPlumbing
Permit 252818 · COMPLETED
12 FIXTURES WITH PIPING AS PER PLANS
- PermitSuppression
Permit 247217 · COMPLETED
EXTEND EXISTING FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitSuppression
Permit 247703 · COMPLETED
EXTEND FIRE SUPPRESSION SYSTEM TO CONCESSION SPACE E-12 AS PER PLANS.
- PermitSuppression
Permit 247176 · COMPLETED
EXTEND EXISTING FIRE PROTECTION SPRINKLER SYSTEM INTO CONCESSION SPACE E-13 AS PER PLANS.
- PermitSuppression
Permit 248021 · COMPLETED
INSTALL FIRE SPRINKLERS FOR AIRPORT TERMINAL A LOWER LEVEL TICKETING, CATWALK/CONVEYORS, UNIT HEATERS AND LOBBIES. PERMIT FOR WORK ONLY IN THE CITY OF PHILADELPHIA. SEPARATE PERMIT REQUIRED BEYOND COUNTY LINE.
- PermitAdministrative
Permit 245286 · COMPLETED
AMENDING BLDG. PERMIT # 220280 DUE TO A CHANGE IN DESIGN OF THE FOOTING FOR THE TEMP. CANOPY.
- PermitAlteration
Permit 252285 · COMPLETED
ROOF REPLACEMENT, E.P.D.M.(COMMERCIAL)
- PermitElectrical
Permit 247088 · COMPLETED
RELOCATE (1) LIGHT FIXTURE, INSTALL WIRING TO (1) EXHAUST FAN, INSTALL (1) RECEPTACLE,AS PER 2005 NEC, AND PROVIDE MODIFICATIONS TO FIRE ALARM SYSTEM AS PER NFPA-72 (WEST DIST)
- PermitElectrical
Permit 247717 · COMPLETED
INSTALL PARKING LOT LIGHT FIXTURES, POWER, DISPLAY SCREENS & EMERGENCY PHONES.
- PermitElectrical
Permit 251358 · COMPLETED
INSTALL 3-PHASE 4 WIRE 50A FEEDER TO KIOSK, 1 TELE/DATA CABLE TO KIOSK & CONDUIT/WIRE FOR LIGHT & POWER.
- PermitElectrical
Permit 250562 · COMPLETED
7 LOCATIONS - HAMMERHEAD, TERMINAL E INSTALL ALL FACTORY INTERCONNECTIONS FOR ALL JET BRIDGES AT ALL JUNCTION BOX LOCATIONS AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 250563 · COMPLETED
7 LOCATIONS - HAMMERHEAD, TERMINAL E EXTEND AIRPORT POWER TO NEW 7 JET BRIDGES. POWER AND CABLE CONNECTION FROM JET BRIDGES RECONNECTORS SWITCH AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 250026 · COMPLETED
INSTALL POWER & DATA AT 4 CURBSIDE LOCATIONS.
- PermitElectrical
Permit 247110 · COMPLETED
INSTALL OF PANELS,TRANS/METERING FOR NEW SPACE,INSTALL OF CONDUIT/WIRING FOR LIGHTING/POWER,INSTALL OF CONDUIT FOR SPEAKERS,INSTALLATION OF CONDUIT/DATA WIRING FOR CASH WRAP SYSTEM INSTALL OF CONDUIT/WIRING FOR MECH EQUIPMENT,PER 2005 NEC(WEST DIST)
- PermitElectrical
Permit 247113 · COMPLETED
INSTALL OF CONDUIT/WIRING FOR WIRING DEVICES,LIGHT FIXTURES/KITCHEN EQUIPMENT.INSTALL OF CONDUIT/WIRING FOR TELECOMMUNICATIONS, SOUND SYSTEM, POS,AND SECURITY EQUIP,INSTALL OF CONDUIT/WIRING FOR PANELS, TRANS/DISCONNECT SWITCHES PER 2005 NEC (WEST DIST)
- PermitSuppression
Permit 244054 · COMPLETED
EXTEND EXISTING SPRINKLER SYETEM INTO CONCESSION SPACE STARTING @ EXIST ZONE CONTROL VA.
- PermitUse
Permit 249519 · COMPLETED
USE TO DRY GOOD RETAIL STORE
- PermitUse
Permit 249522 · COMPLETED
USE TO NEWSTAND SELLING MAGAZINES, NEWSPAPERS, BOOKS, PREPACKAGED SNACKS AND BOTTLED DRINKS
- PermitUse
Permit 249521 · COMPLETED
USE TO EAT IN RESTAURANT SELLING PREPARED FOOD AND DRINK
- PermitUse
Permit 249575 · COMPLETED
USE TO NEWSTAND WITH RETAIL SALES OF BOOKS, MAGAZINES, PAPERS AND PRE-PACKAGED FOODS
- PermitUse
Permit 249550 · COMPLETED
USE TO PREPACKAGED FOODS AND OTHER DRY GOODS WITH IN AIRPORT COMPLEX
- PermitUse
Permit 249554 · COMPLETED
USE TO RETAIL DRY GOODS STORE
- PermitUse
Permit 249608 · COMPLETED
USE TO COMMON SEATING AREA WITH TABLES AND CHAIRS IN TERMINAL D SPACE D3S (ACCESSORY TO 2 TAKE-OUT RESTAURANTS SEE APP 249553 & 249611)
- PermitUse
Permit 249553 · COMPLETED
USE TO RESTAURANT FOR FAST FOOD TAKEOUT IN TERMINAL D SPACE D3B
- PermitUse
Permit 249611 · COMPLETED
USE TO FAST FOOD TAKE OUT IN TERMINAL D SPACE D3A
- PermitUse
Permit 249642 · COMPLETED
USE TO EAT IN RESTAURANT SELLING PREPARED FOOD AND DRINK
- PermitUse
Permit 249648 · COMPLETED
USE TO STORAGE AREA FOR PRE-PACKAGED DRY GOODS
- PermitUse
Permit 249193 · COMPLETED
CHANGE IN USE FROM ASSEMBLY RESTAURNAT TO A PUBLIC SEATING AREA
- PermitUse
Permit 249205 · COMPLETED
CHANGE IN USE FROM ASSEMBLY RESTAURANTS TO A DRY GOODS RETAIL TENANT
- PermitUse
Permit 249196 · COMPLETED
CHANGE IN USE FROM ASSEMBLY RESTARAUNT TO A DRY GOODS RETAIL
- PermitNew construction
Permit 243895 · COMPLETED
TENANT FIT-OUT FOR SPACE E12
- PermitFast form building
Permit 249110 · COMPLETED
- PermitElectrical
Permit 234134 · COMPLETED
ADD NEW DEVICES TO EXISTING SYSTEM AS PER NFPA72 (WEST DISTRICT)
- PermitMajor alteration
Permit 247446 · COMPLETED
CONSTRUCT KIOSK AS PER PLAN.
- PermitSuppression
Permit 244760 · COMPLETED
INSTALL COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS PER PLANS.
- PermitPlumbing
Permit 248288 · COMPLETED
INSTALLING FIXTURES FOR NEW MCDONALDS INSIDE THE PHILADELPHIA AIRPORT TERMINAL "E", INSTALLING NEW SINKS
- PermitElectrical
Permit 243254 · COMPLETED
REPLACE 2 480V FEEDERS (70A & 150A)), RECONECT TO EXISTING EQUIPMENT. INSTALL 5 KVA TRANSFORMER.
- PermitNew construction
Permit 245881 · COMPLETED
TENANT FIT-OUT AS PER PLANS
- PermitUse
Permit 247360 · COMPLETED
KIOSK FOR AIRPORT FOR FOOD AND BEVERAGES
- PermitElectrical
Permit 243247 · COMPLETED
RUN EMPTY CONDUIT DUCTBANK FROM BUILDING TO UNDERGROUND VALVE VAULT.( CONDUIT INFRASTRUCTURE FOR FUTURE WORK)
- PermitUse
Permit 243785 · COMPLETED
CHANGE IN USE FROM MERCANTILE AND BUSINESS OFFICES TO A STORAGE AREA WITH CAGES.
- PermitSuppression
Permit 246034 · COMPLETED
RELOCATE 9 SPRINKLER HEADS(PHILA INTL AIRPORT-B C CONNECTOR)
- PermitUse
Permit 245786 · COMPLETED
USE REGISTRATION FOR TERMINAL E-13 FOR THE SALE OF NEWSPAPERS, BOOKS, MAGAZINES, PRE-PACKAGED FOODS AND SOUVENIRS AIRPORT
- PermitMechanical
Permit 243666 · COMPLETED
INSTALL DUCTWORK AND MECHANICAL UNITS.
- PermitNew construction
Permit 242331 · COMPLETED
TENANT FIT-OUT AS PER PLANS
- PermitMechanical
Permit 244720 · COMPLETED
INSTALL HVAC AND DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 243675 · COMPLETED
HVAC, INCLUDING DUCTWORK, AND EXHAUST FAN, AS PER PLANS
- PermitMechanical
Permit 243665 · COMPLETED
HVAC, INCLUDING DUCTWORK, AND EXHAUST FAN, AS PER PLANS.
- PermitMajor alteration
Permit 243512 · COMPLETED
TERMINAL B5 LOWER LEVEL OFFICE ALTERATIONS FOR BREAK ROOM AND OFFICE
- PermitElectrical
Permit 244765 · COMPLETED
INSTALL 3/4" CONDUIT & WIRE FOR 4 DATA OUTLETS, 6 RECEPTACLES, RELOCATE EXISTING RECEPTACLES, REPAIR EXISTING LIGHT FIXTURES & REMOVE UNUSED VOICE/DATA OUTLETS.
- PermitMechanical
Permit 239120 · COMPLETED
INSTALL (2) KITCHEN EXHAUST HOODS, (2) EXHAUST FANS, (1) MAKE UP AIR UNIT AND FABRICATE AND INSTALL 16 GA BLACK IRON WELDED EXHAUST DUCT. SEPARATE PERMIT IS REQUIRED FOR HOOD FIRE SUPPRESSION SYSTEM.
- PermitSuppression
Permit 242634 · COMPLETED
INSTALL SPRINKLERS TO PROTECT TERMINAL D 1ST FLOOR DELTA BREAKROOM AND DELTA OPERATIONS AND BAGGAGE SERVICES OFFICES
- PermitElectrical
Permit 239797 · COMPLETED
PROVIDE EXISITNG 2" CNDT (4) #3/0 & 1-4# GRD THHN CU, 1 NEW 30 CRK PANEL 120/208V 3P 4 WIRE WITH 125A MCB, 17 LTG FIXTURES, 1 E-MON SUBMETER IN EXISITNG MMU-8, 1 DUP RECEP, 13 GFI OUTLERS, 1 2P/50A REC, 1 SIGN, 1 EX FAN, 1 - 110/20A HW HEATER, 2 TEL/DAT OUTLETS, 25 PR V/D CABLE IN EXISTING 1" COND. 1 RTU-1 30A 3P DISCONNECT SWITCH, 31 SP SWITCHES AND 1 TIME CLOCK AS PER 2005 NEC (WEST DISTRICT)
- PermitZoning/use
Permit 242649 · COMPLETED
USE TO CELL PHONE WAITING AREA, RE-STIPE ACC. AREA FOR PARKING , NEW CURB CUTS, CONCRETE BARRIERS AND FLIGHT INFO. ACC. SIGNAGE.
- PermitPlumbing
Permit 242908 · COMPLETED
REPLACING SOIL PIPE, GREASE TRAP, MOP RECEPTOR, REMOVING WATER CLOSET, FLOOR DRAINS
- PermitPlumbing
Permit 242075 · COMPLETED
FIXTURE INSTALLATION
- PermitElectrical
Permit 242672 · COMPLETED
INSTALL CONDUIT AND WIRE FROM KIOSK PANEL TO KIOSK LIGHTS, AND OUTLETS AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 238203 · COMPLETED
INSTALLATION OF CONDUIT & WIRE FOR NEW RECEPTS, TIME CLOCK, & SIGNAGE CLEAN, RELAMP U REPAIR EXISTING LIGHT FIXTURES, INSTALL CONDUIT & CAT5E PLENUM CABLE FOR VD DROPS, CONDUIT & WIRING FOR PLASMA MONITOR, RECEPTS IN CASEWORK AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 227925 · COMPLETED
ALTERATIONS AS PER PLANS
- PermitMajor alteration
Permit 235129 · COMPLETED
UPGRADING CURRENT BAGGING SYSTEM. NEW FL. MACHINES, ROOF OPENING FOR CONVEYOR MODIFICATIONS. DESIGN OF THE CROSSOVER WALKWAY STRUCTURE TO ACCESS VARIOUS AREAS OF AE6, DESIGN OF A REMOVABLE HATCH FOR THE CAROUSEL 5 OPENINGS. REPAIR OF AE6 FL.REPAIR SLAB IN BASEMENT TO FACILITATE INSTALLATION OF A FLAT PLATE MAKE UP UNIT. MODIFICATIONS AS PER PLAN.SEPARATE PERMIT REQUIRED BEYOND COUNTY LINE.
- PermitPlumbing
Permit 240904 · COMPLETED
FIXTURE INSTALLATION
- PermitMajor alteration
Permit 238984 · COMPLETED
FOR THE INSTALLATION OF A TEMPORARY DELTA AIRLINES MOBILE OFFICE FACILITY TO BE USED FOR UNDER 6 MONTHS IN CONTINUATION OF PERMIT #220280
- PermitSuppression
Permit 233563 · COMPLETED
EXTEND EXISTING SPRINKLER SYS. INTO CONCESSION SPACE. AS PER PLANS
- PermitMajor alteration
Permit 236669 · COMPLETED
INTERIOR DEMO AND RENNOVATIONS TO EXISTING SPACE PER PLANS
- PermitNew construction
Permit 219765 · COMPLETED
INSTALL UNDERGROUND FUEL PIPES FOR A HYDRANT LOOP SYSTEM. ALSO FOR THE INSTALLATION OF AN 18' X 28' UNDERGROUND VALVE VAULT. FUEL SYSTEMS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH NFPA 407.
- PermitSuppression
Permit 239008 · COMPLETED
RELOCATE 3 SPRINKLER HEADS (SPACE #D6E)
- PermitSuppression
Permit 239013 · COMPLETED
RELOCATE 43 SPRINKLER HEADS (SPACE #BC13)
- PermitSuppression
Permit 239014 · COMPLETED
RELOCATE 6 SPRINKLER HEADS (SPACE #C12B)
- PermitRough-In
Permit 239034-RI · Expired
TENANT FIT-OUT, NEW HOT AND COLD DOMESTIC WATER PIPING, GAS METER AND PIPING, NEW FLOOR DRAINS, VENT PIPING, SANITARY BRANCH LINES
- PermitUse
Permit 238763 · COMPLETED
USE TO RETAIL SALE OF ELECTRONICS IN BC CONNECTOR SPACE BC-30 IN EXISTING AIRPORT
- PermitElectrical
Permit 238821 · COMPLETED
INSTALL 3-PHASE, 4-WIRE 50 AMP FEEDER THROUGH EXISING CONDUIT FROM LANDLORD PANEL TO NEW KIOSK. INSTALL (1) TELECOMMUNICATION CABLE THROUGH EXISTING CONDUIT FROM LANDLORD D-MARK TO NEW KIOSK, ALL AS PER 2005 NEC (WEST DIST)
- PermitMechanical
Permit 234803 · COMPLETED
INSTALLATION OF PACKAGED HVAC UNIT, DUCTWORK & SIX DIFFUSERS. EAST CONCOURSE AREA.
- PermitElectrical
Permit 237652 · COMPLETED
INSTALL 1 175A MCB PANEL, 26 LIGHT FIXTURES, 17 GFCI RECEPTACLES, 1 POWER OUT, 1 HWH CONNECTOR, 1 60A 3 POLE NON FUSE DISCONNECT, 2 POKE-THRUS, 1 RECEPTACLE & 2 208V RECEPTACLES.
- PermitElectrical
Permit 237651 · COMPLETED
INSTALL 3 PANELS, 45 KVA TRANSFORMER, 77 LIGHT FIXTURES, 20 RECEPTACLES, 3 GFCI'S, 3 QUADS, 3 208 3P RECEPTACLES, 4 SIGN CONNECTORS, 1 HOT WATER HEATER & 1 A/C UNIT.
- PermitMajor alteration
Permit 188314 · COMPLETED
MOBILE SATELLITE FOOD FACILITY TO SERVE ONLY SOFT PRETZELS AND BEVERAGES. THE BAKING OF THE SOFT PRETZELS WILL BE COMPLETED AT COMISSARY LOCATED IN TERMINAL B. THE UNIT WILL BE PRE-FABIRCATED OFF SITE AND ASSEMBLED ON SITE.
- PermitMechanical
Permit 231484 · COMPLETED
HVAC ALTERATION AS PER PLAN.
- PermitMajor alteration
Permit 227352 · COMPLETED
INTERIOR RENOVATIONS AND FITOUT AS PER ATTACHED DRAWINGS
- PermitMajor alteration
Permit 227355 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN.
- PermitPlumbing
Permit 234924 · COMPLETED
RELOCATE FIXTURES,INSTALL WATER HEATER
- PermitPlumbing
Permit 234921 · COMPLETED
RELOCATE FIXTURES
- PermitMechanical
Permit 229301 · COMPLETED
INSTALL NEW HVAC EQUIPMENT AS PER PLANS
- PermitMechanical
Permit 229495 · COMPLETED
INSTALL NEW HVAC SYSTEM AS PER PLANS
- PermitElectrical
Permit 232914 · COMPLETED
INSTALL RECEPTACLES, PANELS & 75KVA TRANSFORMER.
- PermitMajor alteration
Permit 190939 · COMPLETED
TENANT FIT-OUT AS PER PLAN.
- PermitMajor alteration
Permit 201353 · COMPLETED
TENANT FIT OUT OF EXISTING SPACE WITHIN THE AIRPORT. THE ENTIRE SPACE WILL BE DEMOLISHED AND BUILT ALL NEW WITHIN THE SAME FOOT PRINT AS PER PLANS
- PermitDemolition
Permit 235077 · COMPLETED
INTERIOR NON-LOAD BEARING DEMOLITION (PHILA. AIRPORT, TERMINAL BC CONNECTOR - BC-13-TGIF)
- PermitElectrical
Permit 234033 · COMPLETED
INSTALL CONDUIT FOR POWER FOR TRANSMITTERS & CAT 6 DATA CABLES FOR ANTENNAS AT 11 LOCATIONS.
- PermitSuppression
Permit 234098 · COMPLETED
RELOCATE 4 SPRINKLER HEADS (US AIR STORAGE ROOM @ GATE B2)
- PermitAdministrative
Permit 207758 · COMPLETED
REVISIONS TO PRIOR PERMIT #188285, AS PER SUBMITTED PLANS.
- PermitPlumbing
Permit 232912 · COMPLETED
DEMO: 2 WATER HEATERS, 10 WATER CLOSETS, 8 LAVYS, 1 URINAL AND 1 WATER COOLER. INSTALL: 2 WATER HEATERS, 10 WATER CLOSETS, 8 LAVYS 1 URINAL, 1 WATER COOLER, 2 KITCHEN SINKS AND SANITARY AND WATER LINES FROM TRAILER
- PermitElectrical
Permit 233687 · COMPLETED
PROVIDE POWER FROM EXISTING POWER OUTLET UP TO NEW ATM BLADE SIGN AS PER 2005 NEC (EAST DIST)
- PermitElectrical
Permit 233688 · COMPLETED
INSTALL POWER FROM EXISTING OUTLET UP TO ATM BLADE SIGN AS PER 2005 NEC (EAST DIST)
- PermitElectrical
Permit 232701 · COMPLETED
RELOCATE EXISTING FIDS MONITOR & TIME CLOCK TO NEW LOCATION ACROSS HALLWAY FROM NEW DGS BREAK ROOM TO NEW DGS BREAK ROOM. ALL NEW INSTALLATION WILL BE INSTALLED IN CONDUIT FOR EXISTING POWER WIRING AND DATA CABLES, 2 POWER OUTLETS, 2 DATA OUTLETS, 1 COAV OUTLET FOR FIDS MONITOR AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 213442 · COMPLETED
REMODEL OF EXISTING STORAGE FOR RESTAURANT IN SPACE E-8B AS PER PLAN.
- PermitMajor alteration
Permit 220280 · COMPLETED
RELOACTE AIRLINE CARRIERS WHICH WILL CONTINUE TO USE THE EXISTING FACILITIES FOR SAME USE. RENOVATION OF THE VACATED AIRTRAN OPERATION SPACE IN TERMINAL "D" FOR DELTA AIRLINES. INTERIOR RENOVATIONS AS PER PLANS.INCLUDES INSTALLATION OF A TEMPORARY CANOPY FROM TERM."E" TO TEMP. DELTA ATO FACILITY.SEPARATE PERMIT IS REQUIRED FOR THE MOBILE OFFICE
- PermitMajor alteration
Permit 221833 · COMPLETED
CONSTRUCTION OF DEMISING WALLS, STORAGE FENCE WALLS AND SIGNAGE BRACKETS WITHIN EXISTING BUILDING FOR FUTURE CONCESSION TENANTS. CERTIFICATE OF OCCUPANCY REQUIRED.
- PermitElectrical
Permit 223306 · COMPLETED
INSTALL 3 PULL STATIONS, 12 SPEAKER STROBES, 10 SMOKE DETECTORS & 1 SPEAKER, ALL DEVICES WILL BE CONNECTED TO THE EXISTING SYSTEM, AS PER NFPA-72 (WEST DIST)
- PermitElectrical
Permit 229969 · COMPLETED
GPS ANTENNA, 2 COAX CABLES, 480V NEMA 3R TRANSFORMER FOR POWERING ANTENNAS AND GENERATOR 10 KW, ALL AS PER 2005 NEC (WEST DIST)
- PermitElectrical
Permit 225652 · COMPLETED
INSTALL 1" CONDUIT FOR NEW TELEPHONE SERVICE FROM CUB TO TERMINAL A-WEST AS PER 2005 NEC (WEST DIST)
- PermitPlumbing
Permit 229156 · COMPLETED
REPLACE FIXTURES AND WATER HEATER
- PermitElectrical
Permit 229345 · COMPLETED
INSTALL 150 LIGHT FIXTURES, 7 GFCI RECEPTACLES, 50 RECEPTACLES, 67 DATA OUTLETS, 3 DISCONNECTS, 2 TRANSFORMERS & 2 PANELS.
- PermitMajor alteration
Permit 226815 · COMPLETED
ERECT 2 CONCRETE SLAB, ERECT GPS ANTENNA, ERECT 12 BOLLARDS, INSTALL 2 COAX CABLES, ERECT GENERATOR, ERECT NATURAL GAS FEED, ERECT ICE BRIDGE, ERECT 2 EQUIPMENT CABINETS AND ERECT 480 VOLT PRIMARY NEMA 3R TRANSFORMER AS PER PLAN.
- PermitElectrical
Permit 229479 · COMPLETED
PROVIDE 2 RECEPTACLES & 2 TELEDATA OUTLETS.
- PermitSuppression
Permit 223239 · COMPLETED
EXTEND EXISTING SPRINKLER SYSTEM IN CONCESSION, SPACE D-6
- PermitUse
Permit 228698 · COMPLETED
CHANGE USE FROM ASSEMBLY AREA TO A FAST FFOD TAKE-OUT CONCESSION SPACE
- PermitUse
Permit 228720 · COMPLETED
CHANGE IN USE FOR TAKE-AWAY PRE-PACKAGED FOOD CONCESSION SPACE
- PermitUse
Permit 228718 · COMPLETED
CHANGE USE FROM ASSEMBLY AREA TO RESTAURANT CONCESSION TENANT WITH SIT DOWN SEATING.
- PermitUse
Permit 228719 · COMPLETED
CHANGE USE FROM ASSEMBLY AREA TO NEWSTAND CONCESSION SPACE WITH THE SALE OF MAGAZINES, BOOKS, NEWSPAPERS AND PRE-PACKAGED SNACKS.
- PermitAddition
Permit 178697 · EXPIRED
BUILDING ADDITION TO EXISTING BAGGAGE CLAIM D AND E FORMING A SINGLE CONTINOUS SPACE WITH ANCILLARY SPACES ON ONE STORY OVER EXISTING VEHICLE ACCESS AT BASEMENT LEVEL CURRENTLY OPEN TO THE SKY. REPLACEMENT AND ADDITION OF BAGGAGE HANDLING EQUIPMENT IN EXISTING AND NEW BASEMENT TUG TUNNEL AND ON FIRST FLOOR.
- PermitMajor alteration
Permit 224169 · EXPIRED
UPGRADE OF EXISTING ADDITIONS TO BAGGAGE CLAIM "D" FROM CONSTRUCTION TYPE IIB (UNPROTECTED STEEL) TO TYPE IB. SEE A/P 178697 FOR APPROVED PLANS.
- PermitZoning/use
Permit 219430 · COMPLETED
ERECT 2 GPS ANTENNA AND OMNIPOINT ANTENNA, ERECT GENERATOR ON CONCRETE SLAB, ERECT EQUIP GENERATOR CABINETS ON CONCRETE SLAB, ERECT ICEBURG, ERECT SINGLE PHASE AND SECONDARY TRANSFORMER, ERECT NATURAL GAS FEED, ERECT BOLLARDS.
- PermitSuppression
Permit 223241 · COMPLETED
EXTEND EXISTING SPRINKLER SYSTEM IN SEATING AREA OF CONCESSION, SPACE D-6
- PermitUse
Permit 226464 · COMPLETED
FOR THE SALE OF PRE-PACKAGED FOOD FOR TAKE-OUT IN SPACE C8-A WITHIN AND EXISTING AIRPORT COMPLEX
- PermitElectrical
Permit 220415 · COMPLETED
100AMP LOAD CENTER, EMON METER, 20 LIGHT FIXTURES, 6 RECEPTS AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 220416 · COMPLETED
100AMP LOAD CENTER, EMON METER, 20 LIGHT FIXTURES, 8 RECEPTS AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 213074 · COMPLETED
REMODEL OF EXISTING RESTAURANT FOOD COURT SPACE COMPLETE GUT EVERYTHING NEW AS PER PLAN.
- PermitFast form building
Permit 223514 · COMPLETED
- PermitMajor alteration
Permit 219434 · COMPLETED
REMODEL LOUNGE OF AIRPORT AS PER PLAN.
- PermitUse
Permit 221845 · COMPLETED
ADD WALK-IN FREEZER TO EXISTING STORAGE. FOR SPACE E 517-LL2
- PermitElectrical
Permit 221580 · COMPLETED
PROV/INSTALL COND/WIRE FOR (110)PWR OUTLETS,(12) V/D OUTLETS,(6)COAXIAL CON'R OUTLETS FOR (6)NEW MONITORS/INST DIR TV SATALITE ON TWR ROOF AREA W/ALL CONNEC'S.PROV/INST (1)24 PT PATCH PAN'L FOR ALL DATA TERM'S/V&D JKS,ALL MON'S/DIR TV SUP'D BY US AIRWAYS,PER 2005 NEC(ED)
- PermitUse
Permit 221836 · COMPLETED
CHANGE IN USE FROM EXISTING DRY RETAIL SPACE SELLING JEWELRY TO A CONCESSION SPACE - SELLING TAKE AWAY FOOD AND DRINK (GRAB AND GO)
- PermitElectrical
Permit 209186 · COMPLETED
DEMO EXIST ELEC,INSTALL NEW 2 SECTION 200A PANEL,25 GFI OUTLET,11 SPEC RECEPT'S 2 DISCON'S FOR 2 HW HTRS,3 SWS,1 NEW BW,120/208V,125A SWITCH,4 DISCONNECT SW'S,7 DATA OUTLETS,1 CONECTOR FOR ANSUL/CONTROL,2 GAR DISP CON'S,1 ICE MACH,1 COFFEE MACH CONNECT 38 NEW LT FIX,2 EXIT LTS, 4 EMER LT FIX,ALL WK WILL BE IN 3/4 EMT CONDUIT,2 ROOF TOP EXH FANS, 1 HVAC UNIT CONNECTION,REPLACE ESISTING FA PANEL AND ALL DEVICES WITH NEW
- PermitMechanical
Permit 215229 · COMPLETED
INSTALL HVAC DUCTWORK & LOUVERS AS PER PLANS.
- PermitElectrical
Permit 219376 · COMPLETED
INSTALL POWER, SWITCHING & LIGHTING, RELOCATE SELECTED POWER, SWITCHING, LIGHTING & DATA.
- PermitZoning/use
Permit 217124 · COMPLETED
WORK CONSISTS OF INSTALLATION OF A FACTORY MADE CONSTRUCTION TRIALER WITH ADJACENT YARD WITH SECURITY FENCE. USE FOR AN OFFICE FOR SECURITY SCREENING.
- PermitElectrical
Permit 215324 · COMPLETED
PROVIDE PWR CONDUIT FOR (5)DUS-300-480V, 30KW CHARGERS W/(5) 60A 3/P NEMA 3R FUSED DISCONNECT.PROVIDE CONDUIT/(3) 250 NEW CABLES/(1)#4 GROUND FROM EXISTING USA PWR SUBSTATION TERMINAL "B" TO TAP BOX NEMA 4X.ALL CONDUIT WILL BE RGS.DUS-300-30KW UNITS SUPPLIED BY US AIRWAYS,A PER 2005 NEC
- PermitMajor alteration
Permit 216540 · COMPLETED
INTERIOR ALTERATIONS AS PER PLANS
- PermitMajor alteration
Permit 216549 · COMPLETED
INTERIOR ALTERATIONS AS PER PLANS
- PermitMechanical
Permit 211616 · COMPLETED
INSTALL HVAC, INCLUDING DUCTWORK, AS PER PLANS FOR OFFICE/STORAGE
- PermitSuppression
Permit 215163 · COMPLETED
COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEMS AS PER PLAN.
- PermitUse
Permit 216420 · COMPLETED
TERMINAL D SPACE 5A USE TO RETAIL SPACE OF NEWSPAPERS, BOOKS, AND RETAIL SALE OF GENERAL MERCHANDISE AND PREPACKAGED FOODS
- PermitUse
Permit 216422 · COMPLETED
B/C TERMINAL SPACE K-1 LL USE TO RETAIL SALE OF NEWSPAPERS, BOOKS, AND RETAIL SALE OF GENERAL MERCHANDISE AND PREPACKAGED FOODS
- PermitElectrical
Permit 213113 · COMPLETED
INSTALL LIGHTING, SWITCHING, POWER CONNECTIONS, EXIT/EMEGENCY LIGHTING, CONDUIT/WIRING FOR DATA/SECURITY/POS SYSTEMS.
- PermitElectrical
Permit 210962 · COMPLETED
REPLACE 40 RECESSED LIGHTS (2X4 & DOWNLIGHTS) WITH NEW RECESSED LIGHTS, 70-4' STRIP FIXTURES WITH NEW, REUSE EXISTING CIRCUITS, INSTALL 30 NEW DATA JACKS, 2 NEW 100AMP PANELS FROM EXISTING LOC IN PANEL AND 60 NEW RECEPTS WITH NEW CIRCUITS AS PER 2005 NEC (WEST DISTRICT) REPLACE 25 FIRE ALARM DEVICES WITH NEW NO ADDITIONAL WIRE
- PermitElectrical
Permit 210311 · COMPLETED
ELECTRICAL FIT OUT OF RENTAL SPACE AT PHILA AIRPORT IN FOOD COURT AS PER 2005 NEC (WEST DISTRICT) NO FIRE ALARM ON THIS PLAN.
- PermitElectrical
Permit 214619 · COMPLETED
INSTALLATION OF 1" CONDUIT AND 12 STRAND AND 6 STRAND FIBER OPTIC CABLE FOR DATA TRANSFER, AS PER 2005 NEC (WEST DIST)
- PermitMajor alteration
Permit 121262 · COMPLETED
RENOVATION OF EXISTING TERMINALS AS PER PLAN.REMOVAL OF EXISTING BAGGAGE HANDLING EQUIPMENT, RELOCATION OF AIRLINE TICKETING OFFICES, AND EXPANDED PUBLIC QUEUING SPACE. RENOVATION OF PUBLIC CIRCULATION, NEW RESTROOMS, RELOCATION OF RETAIL AND MERCANTILE SPACES AS NEW SHELL SPACE.
- PermitMechanical
Permit 213782 · COMPLETED
INSTALLATION OF NEW KICHEN HOOD AND DUCT WORK FOR SPACE MO6 IN THE B/C CONNECTOR.
- PermitFast form building
Permit 214150 · COMPLETED
- PermitElectrical
Permit 205693 · COMPLETED
REPLACEMENT OF 6 SUB-STATIONS - 2 IN EACH CONCOURSE. ELECTRICAL ROOMS EXPANDED, FIRE ALARM MOVED PER 2005 NEC & NFPA-72 (WEST DIST)
- PermitFast form building
Permit 212531 · COMPLETED
- PermitUse
Permit 212286 · COMPLETED
SPACE E8-B FOOD COURT RESTAURANT
- PermitMechanical
Permit 208188 · COMPLETED
INSTALL POINT SOURCE CAPTURE SYSTEM AND EXHAUST FANS, AS PER SUBMITTED PLANS AND SPECS, PHASE 2.
- PermitMajor alteration
Permit 207553 · COMPLETED
INTERIOR/EXTERIOR ALTERATIONS FOR SUBSTATION WORK, INSTALLATION OF NEW EQUIPMENT, RECONFIGURATION OF SPACES, UPGRADES, AS PER SUBMITTED PLANS.
- PermitPlumbing
Permit 211283 · COMPLETED
FIXTURE INSTALLATION
- PermitPlumbing
Permit 210677 · COMPLETED
COMNNECTION TO A 6" FORCE MAIN
- PermitMajor alteration
Permit 193252 · COMPLETED
REMODEL OF EXISTING PIZZA SHOP TO INCLUDE RELOCATION AND REPLACEMENT OF CERTAIN WALLS,EQUIPMENT.
- PermitElectrical
Permit 209873 · COMPLETED
A/B,D,E,F DOCK. INSTALL WIRING FOR TRASH COMPACTORS.
- PermitNew Construction
Permit 208996 · Issued
TRAC LIGHTING FOR MENU BOARD. TIE IN TO EXISTING 20-AMP CIRCUIT. TWO NEW LIGHTS INSTALLED IN TRAC.... IN ACCORDANCE WITH 2005 NEC
- PermitPlumbing
Permit 209856 · COMPLETED
INSTALLATION OF DRAIN, WASTE AND VENT SYSTEM, WATER SUPPLY FOR THE FOLLOWING: 4 FLOOR SINKS, 1 - 3 COMPARTMENT SINK, 1 GREASE INTERCEPTOR, 1 MOP SINK, 1 ELECTRIC WATER HEATER, 3 HAND SINKS, 1 PREP SINK
- PermitPlumbing
Permit 209865 · COMPLETED
FIXTURE REPLACEMENT
- PermitElectrical
Permit 209433 · COMPLETED
INSTALL (4) PENDANT MOUNT FIXTURES OVER NEW COUNTER, (3) POWER OUTLETS AND (1) DATA OUTLET IN NEW COUNTER, AS PER 2005 NEC (WEST DIST)
- PermitElectrical
Permit 187703 · COMPLETED
ELECTRICAL INSTALLATION FOR ATM & TENANT FUTURE DRY SPACE INTERNATIONAL AIRPORT, INSTALLATION OF 3/4 CONDUIT FOR POWER AND SECURITY DATA WIRING AS PER 2005 NEC (WEST DIST)
- PermitPlumbing
Permit 209274 · COMPLETED
BATHROOMS 133 & 136, REPLACE 6 WATER CLOSETS, 5 LAVYS, 2 URINALS, 1 ELECTRIC WATER COOLER, 1 KITCHEN SINK, 1 SERVICE SINKS, LIFTR STATION#6 RELOCATE LAUNDRY TUB AND EYEWASH
- PermitMajor alteration
Permit 203746 · COMPLETED
RENOVATION AS PER PLANS.
- PermitElectrical
Permit 205366 · COMPLETED
INSTALL CONDUIT/WIRE FOR (7) CONVEYOR MOTOR/CONTR WIRE,PROVIDE/INSTALL (1)NEW 3-POLE 480 VOLT BKR IN EXIST 400A-AIRPORT PANEL,INSTALL PWR WIRING/CONDUIT TO NEW MCP-MU5 CONTR, PROVIDE/INSTALL (7)DISCONNECTS FOR @ CONVEYOR LOCAT,ALL WORK DONE IN CONDUIT,PER 2005 NEC (WEST DIST)
- PermitUse
Permit 202972 · COMPLETED
VARIOUS USES AS PER ATTACHED SHEET.
- PermitMechanical
Permit 202989 · COMPLETED
REPLACE COLLARS AND DIFFUSERS FOR AIRPORT
- PermitElectrical
Permit 203581 · COMPLETED
INSTALL PANEL FOR WALK IN BOX, PROVIDE 1-208/120V, 30AMP 3 SINGLE POLE WIRE WITH 1-2P-20 AND 5 SINGLE POLE PANEL FEEDER CONDUIT FROM MPR PANEL AND INSTALL 1-3 POLE 30AMP BREAKER 1 E-MON METER CONNECTOR FOR 1 LIGHT, 1 HVAC UNIT, 1 SWITCH AND HEAT TRACE, PROVIDE AND INSTALL CONDUIT FOR 3 WALL OUTLETS AND 1 PHONE, DATA OUTLET IN STORAGE ROOM AREA AS PER 2005 NEC (WEST DISTRICT)
- PermitMechanical
Permit 206166 · COMPLETED
HVAC INSTALLATION IN SPACE MO6 IN THE B/C CONNECTOR AS PER PLAN.
- PermitMajor alteration
Permit 206075 · COMPLETED
INTERIOR FIT-UP OF SPACE MO6 IN THE B/C CONNECTOR.
- PermitFast form building
Permit 206129 · COMPLETED
- PermitNew construction
Permit 189611 · COMPLETED
CONSTRUCTION OF A 60'X40' STRUCTURE - ACCESSORY STORAGE BLDG AS PER PLAN.
- PermitElectrical
Permit 198338 · COMPLETED
PROVIDE NEW RECEPTACLES, SWITCHES, LIGHTING FIXTURES, EMERGENCY & EXIT LIGHTING, PANELS WITH PANEL FEEDERS,, FA DEVICES/EQUIPMENT, PHONE/DATA DEVICES & EQUIPMENT, SOUND SYSTEM DEVICES & EQUIPMENT, HVAC EQUIPMENT POWER WIRING, AS PER 2005 NEC/NFPA-72 (WEST DIST)
- PermitMechanical
Permit 197674 · COMPLETED
INSTALL HVAC DUCT WORK AS PER PLAN
- ViolationVIOL C&I MESSAGE
Case 193078 · Violation 1258079 · Code A-000.0/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationHAZMAT-LIC REQ¿D
Case 193078 · Violation 1258083 · Code FC-2701.5/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEGRESS EXIT SIGNS VISIBILITY
Case 193078 · Violation 1258081 · Code FC-1011.1/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationANNUAL CERT FIRE ALARM
Case 193078 · Violation 1258080 · Code FC-914.1/3 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFIRE-ELECT OPEN JUNCTION BOX
Case 193078 · Violation 1258084 · Code FC-605.6/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationANNUAL CERT STANDBY/EMERG LITE
Case 193078 · Violation 1258082 · Code FC-914.1/5 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFIRE SUPP-REPLACE SPRKLR HEAD
Case 193078 · Violation 1258094 · Code FC-901.6/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationHAZMAT ID STATIONARY CONTAINER
Case 193078 · Violation 1258093 · Code FC-2703.5/3 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFIRE EXTING-INSTALL TYPE K
Case 193078 · Violation 1258092 · Code FC-904.11/5 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationINT MATERIAL STORAGE EQUIP RM
Case 193078 · Violation 1258091 · Code FC-315.2/4 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationFA-REP SYS SMOKE DET
Case 193078 · Violation 1258090 · Code FC-907.20/3 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEGRESS EXIT SIGNS REQ
Case 193078 · Violation 1258089 · Code FC-1011.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEGRESS-INT CLEAR OBSTRUCTION
Case 193078 · Violation 1258088 · Code FC-1027.4/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationELEVATORS POST EMERGENCY SIGN
Case 193078 · Violation 1258087 · Code FC-607.2/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationEGRESS LANDING SIGN IN STAIRS
Case 193078 · Violation 1258086 · Code FC-1019.1/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationANNUAL CERT FIRE SUPP
Case 193078 · Violation 1258085 · Code FC-914.1/4 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- PermitPlumbing
Permit 202764 · COMPLETED
INSTALLATION OF 1 CONDENSATE DRAIN FROM WALK IN BOX
- PermitMajor alteration
Permit 198797 · COMPLETED
MAKE OPENING IN EXISTING DRYWALL FOR NEW BAGGAGE CONVEYOR TRACK. EXISTING BAGGAGE WALL TO BE PATCHED DOORS INSTALLED. FABRICATE AND INSTALL CONVEYOR BRIDGE OVER EXISTING DOOR WAY.
- PermitElectrical
Permit 198880 · COMPLETED
INSTALL NEW LIGHTING, ELECTRICAL PANEL & 1 FIRE ALARM DEVICE.
- PermitSuppression
Permit 196101 · COMPLETED
INSTALL CLEAN AGENT AUTOMATIC FIRE SUPPRESSION SYSTEM FOR TERMINAL D-E EXPANSION.
- PermitUse
Permit 201255 · COMPLETED
FOR PREPARING AND SERVING OF FOOD IN SPACE #D6E, SPACE #C12-B AND SPACE #BC-K2-LL ALL WITHIN AN EXISTING AIRPORT WITH ALL USES AS PREVIOUSLY APPROVED.
- ViolationVIOL C&I MESSAGE
Case 191839 · Violation 1242140 · Code A-000.0/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationCI INSP
Case 191839 · PASSED
The cited inspection visit was marked passed.
- PermitFast form building
Permit 200368 · COMPLETED
- PermitSuppression
Permit 199298 · COMPLETED
RELOCATE APPROXIMATELY 18 SPRINKLERS
- PermitMajor alteration
Permit 197780 · COMPLETED
INSTALL NEW WALK-IN COOLER, CHAIN LINK FENCING AND SHELVING UNITS IN EXISTING STORAGE AREA FOR AIRPORT COFFEE SHOP.
- PermitElectrical
Permit 196083 · COMPLETED
INSTALL 1" & 3/4" CONDUIT FOR 9 208V RECEPTACLES FOR HEATERS, 6 FROM AN EXISTING PANEL & 3 FROM A NEW 120/208V 3-PHASE 4 WIRE PANEL.
- PermitSuppression
Permit 197857 · COMPLETED
TIE INTO EXISTING FIRE PROTECTION MANIFOLD AND ADD A NEW 4" DRY VALVE. INSTALL FIRE SPRINKLERS TO PROTECT NEW BAGGAGE CONVEYOR AND WALKWAY PER SUBMITTED SEALED PLANS AND HYD. CALS.
- AppealBuilding standards appeal
Appeal 7988 · OPEN · APPROVED
Related permit 178697 · ON 11/13/08 DEPARTMENT OF LICENSES AND INSPECTIONS ISSUED REFUSAL OF PERMIT FOR APPLICATION #178697.
- PermitMajor alteration
Permit 188292 · COMPLETED
CONSTRUCTION OF DECORATIVE NEUTRAL PIERS AND INSTALLATION OF UTILITY STUBS FOR FOR FINAL CONNECTION OF FUTURE TENANT. REPLACEMENT OF CEILING TILES AND REMOVAL OF DECORATIVE LIGHTING.
- PermitMajor alteration
Permit 188285 · COMPLETED
INTERIOR ALTERATIONS FOR FUTURE TENANT SPACE. NEW CEILING,LIGHTING FLOOR AND SOFFIT FINISHES.
- PermitSuppression
Permit 192812 · COMPLETED
INSTALLATION OF CLEAN AGENT AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 2001 AND THEIR LISTINGS
- PermitElectrical
Permit 195408 · COMPLETED
DISCONNECTION AND RECONNECTION OF CASH WRAP AREA AS PER 2005 NEC (WEST DIST)
- PermitSuppression
Permit 190254 · COMPLETED
INSTALL SPRINKLER SYSTEM IN NEW ADDITION
- PermitDemolition
Permit 196727 · COMPLETED
REMOVE 3 UNDERGROUND, 8,000 GALLON, GASOLINE INTERCEPTORS, LOCATED WITHIN CONFINES OF OLD OVERSEES TERMINAL (PHILA. INTERNATIONAL AIRPORT).
- PermitElectrical
Permit 194847 · COMPLETED
FIT OUT OF EXISTING SPACE, RELOCATE 7 CEILING SPEAKERS, 1 CAMERA, INSTALL 48 TELE/DATA OUTLETS, 32 DUPLEX RECEPTS, LIGHT FIXTURES, SWITCHES, 1 SPLIT SYSTEM A/C, REPLACE EXISTING 12 CIRCUIT 100AMP PANEL WITH 30 CIRCUIT 100AMP PANEL AS PE R2005 NEC (WEST DISTRICT)
- PermitDemolition
Permit 194045 · COMPLETED
REMOVAL OF 2 1,00 GALLON ABOVE GROUND STORAGE TANKS
- PermitElectrical
Permit 196064 · COMPLETED
INSTALLATION OF A LOW VALTAGE 12 VOLT BURGLAR ALARM SYSTEM AS PER 2005 NEC (WEST DISTRICT)
- PermitMechanical
Permit 194931 · COMPLETED
INSTALL HVAC AS PER PLAN.
- PermitMajor alteration
Permit 194536 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN INCLUDES DEMO OF EXISTING WALLS AND CEILINGS & INSTALL NEW DOORS.
- PermitMajor alteration
Permit 117710 · COMPLETED
ADD ON TO EXISTING MILLWORK
- PermitMajor alteration
Permit 117709 · COMPLETED
ADD ON TO EXISTING MILLWORK
- PermitMajor alteration
Permit 117708 · COMPLETED
ADD ON TO EXISTING MILLWORK
- PermitMajor alteration
Permit 117704 · COMPLETED
ADD ON TO EXISTING MILLWORK
- PermitMajor alteration
Permit 166519 · COMPLETED
TENANT FIT OUT FOR NEW RETAIL SPACE AS PER PLANS
- PermitMajor alteration
Permit 163735 · COMPLETED
INTERIOR ALTERATIONS FOR ELECTRONICS STORE (SPACE DE2) AS PER PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL AND ELECTRICAL.
- PermitElectrical
Permit 191342 · COMPLETED
INSTALL 125AMP PANEL BOARD, FEEDER AND METER CABINET, CONDUIT AND PULL STRING FOR POWER AND TELE/DATA TO FUTURE KIOSK LOCATIONS AS PER 2005 NEC (WEST DISTRICT)
- PermitAlteration
Permit 195532 · COMPLETED
REMOVE AND REPLACE 13 TOILET PARTITIONS IN EXISTING REST ROOMS. NO NEW AND/OR RELOCATION OF ANY FIXTURE(S), OR ANY OTHER WORK TO BE PERFORMED UNDER THIS PERMIT.
- PermitAlteration
Permit 188102 · COMPLETED
MINOR ALTERATIONS TO INCLUDE CHANGING THE CASH WRAP, FLOOR REPAIR WORK AND CHANGE SIGN TO READ GAP
- PermitAdministrative
Permit 191855 · COMPLETED
TCO FOR SECURITY SCREENING CHECK POINT LOCATED AT THE 2ND FLOOR OF THE D-E SCREENING BLDG AND THE ASSOCIATED PUBLIC CIRCULATION PATHS WHICH PROVIDE ACCESS FROM THE ADJACENT TERMINALS D AND E. THESE INCLUDE NEW ESCALATORS FROM THE 1ST FLOOR TICKET LOBBIES IN TERMINALS D AND E AND NEW D AND E CONNECTING CORRIDORS ON THE SECURE SIDE OF THE CHECKPOINT.
- PermitPlumbing
Permit 191144 · COMPLETED
INSTALL NEW RWC AND RELOCATE ONE RWC
- PermitElectrical
Permit 189554 · COMPLETED
SECURITY ACCESS SYSTEM AND SECURITY SURVEILLANCE SYSTEM AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 191229 · COMPLETED
INSTALLATION OF A LOW VOLTAGE (12 VOLTS) BURGLAR ALARM SYSTEM AS PER 2005 NEC (WEST DIST)
- PermitElectrical
Permit 186111 · COMPLETED
REMOVAL & REPLACEMENT OF LIGHT FIXTURES, WIRING DEVICES, SOUND SYSTEM SPEAKERS, DISPLAY SYSTEMS, INSTALLATION OF TELECOM CABLES, NEW PANEL BOARD TRANSFORMERS AND DISCONNECT SWITCHES AS PER 2005 NEC (WEST DISTRICT) REMOVAL & INSTALL FIRE ALARM DEVICES AS PER NFPA72
- PermitElectrical
Permit 186112 · COMPLETED
INSTALLATION OF CONDUIT AND WIRING FOR LIGHTING, WIRING DEVICES, CONNECTIONS TO EF FANS, FIRE ALARM MODIFICATIONS, SECURITY SYSTEM INSTALLATION AND GROUNDING AS PER 2005 NEC (WEST DISTRICT)
- PermitSuppression
Permit 174922 · COMPLETED
INSTALL/MODIFY SPRINKLERS FOR NEW RENOVATION AREA- SPRINKLERS TO BE INSTALLED/MODIFIED AS PER NFPA 13 AND THE PHILADELPHIA FIRE CODE
- PermitSuppression
Permit 179426 · COMPLETED
INSTALLATION OF NEW AUTOMATIC SPRINKLER SYSTEM
- PermitUse
Permit 188231 · COMPLETED
CHANGE USE FROM A HOLD ROOM TO A GRAB AND GO (SALE OF PRE-PACKAGED FOODS) FOR SPACE F8 OF THE AIRPORT.
- PermitUse
Permit 188236 · COMPLETED
CHANGE USE FROM JANITORS CLOSET/STORAGE ROOM TO QUICK SERVE.
- PermitSuppression
Permit 179135 · COMPLETED
INSTALL NEW SPRINKLER SYSTEM IN BAGGAGE CLAIM AREAS, GROUND AND CONCOURSE LEVEL AS PER PLAN.
- PermitElectrical
Permit 186734 · COMPLETED
NEW 20AMP FEEDER 3/4" CONDUIT #12 WIRE FOR CHARGING STATION AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 185600 · COMPLETED
CLEAN/RELAMP LIGHT FIXTURES. INSTALL NEW RECEPTACLE & SWITCHING WITH BRANCH CIRCUIT WIRING. INSTALL TELE/DATA RACEWAYS, WIRING & JACKS.
- InvestigationCI INSP
Case 73055 · CLOSED
City marked the record closed; open the case for the closing reason.
- PermitUse
Permit 186003 · COMPLETED
ADDING FREE CHARGING STATION AND SIGNAGE. INSTALL PREFAB MULTI SEAT FREE CHARGING STATIONS AT 2 SITES ON CONCOURSE E, ONE STATION HAS SIX SEAT CONFIGURATION AND ONE STATION HAS 8 SEAT CONFIGURATION.
- PermitElectrical
Permit 185542 · COMPLETED
INSTALL 2 QUAD AND 4 SINGLE DROPS, CAT5E PLENUM LOW VOLTAGE COMMUNICATION WIRING 500' WITH THE LONGEST RUN OF 75' PHONE AND DATA APPLICATION (CLASS 3) AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 169502 · COMPLETED
INSTALL 3/4" EMT CONDUIT FOR 8 RECEPTACLES & 2 CIRCUITS FOR KIOSKS. INSTALL 1" EMPTY CONDUIT FOR VOICE/DATA CABLES.
- PermitMajor alteration
Permit 166207 · COMPLETED
INTERIOR RENOVATIONS FOR MUSIC STORE, ETC.
- PermitElectrical
Permit 183790 · COMPLETED
INSTALLING 700' PLENUM LOW VOLTAGE CABLE TO 18 COMMUNICATION POINT FOR PHONE/DATA EQUIPMENT AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 178245 · COMPLETED
INTERIOR ALTERATIONS AS PER PLAN. SEE A/P 182934 FOR MECHANICAL PLAN.
- PermitMechanical
Permit 182934 · COMPLETED
HVAC INSTALLATION AS PER PLAN.
- PermitElectrical
Permit 181475 · COMPLETED
REMOVE EXISTING LTG (2),REMOVE VOICE/DATA & RELOCATE 4,INSTALL NEW OUTLETS 2,PROVIDE NEW FA AS AIRPORT REQUEST 1,PROVIDE NEW DATA OUTLETS 2, INSTALL NEW FXTS 4, REPLACE ALL EXISTING LTING SWS 3,INSTALL NEW LT SWS 1,RELOCATE OUTLETS 9,RELOCATE AUDIO VISUAL EQUIP 2.(WEST DIST)
- PermitElectrical
Permit 181476 · COMPLETED
DEMO EXIST AREA POWER RECEPTS & TELE/DATA OUTLETS.REMOVE EXIST 30KVA T.FORMER, REPL WITH 75KVA 1,REPL EXIST PANEL,INSTALL NEW 3V 4W PANEL 2,INSTALL NEW POWER OUTLETS 34,INSTALL NEW FXTS 7,NEW EXIST SIGN 2, REPL EXISTING LT WITH NEW LAMPS & BALLASTS 70,REPL EXIST FEEDER CONDUIT & WIRE 1, REPL MAIN BREAKER IN MPR MDP 225/3 BREAKER.INSTALL NEW EMERG LGS 4. (WEST DIST)
- PermitPlumbing
Permit 182800 · COMPLETED
INSTALL LATERAL
- PermitElectrical
Permit 183402 · COMPLETED
PROVIDE CONDUIT AND POWER WIRING ONLY FOR 4 NEW POKE THRU RECEPTACLE OUTLETS AS PER 2005 NEC (WEST DIST)
- PermitPlumbing
Permit 182913 · COMPLETED
INSTALL FIXTURE
- PermitPlumbing
Permit 175591 · COMPLETED
ALTERATIONS AND REPAIR TO INCLUDE THE FOLLOWING; FRESH AIR INLET, WATER SUPPLY PIPING TO FIXTURES AND INSTALLATION OF SOIL AND WASTE PIPE FROM FIXTURES, INSTALLING FIXTURES SUCH AS FLOOR DRAINS, ROOF DRAINS, LAVY, URINAL, WATER CLOSET
- PermitAddition
Permit 161992 · COMPLETED
ERECT TWO STY. ADDITION TO EXIST. CONCOURSE "E" BLDG. PROVIDING SEVEN PASSENGER BOARDING GATES
- PermitSuppression
Permit 179433 · COMPLETED
INSTALL NEW AUTOMATIC SPRINKLER HEADS
- PermitSign
Permit 181321 · COMPLETED
INSTALL SIGN ON WALL (FLAT WALL SIGN)
- PermitUse
Permit 181184 · COMPLETED
USE TO REGISTRATION OFFICES FOR PILOTS OF US AIRWAYS IN SPACE B-7 TERMINAL B
- PermitMechanical
Permit 179568 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLAN.
- PermitMechanical
Permit 178320 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLAN.
- PermitMajor alteration
Permit 176571 · COMPLETED
INSTALLATION OF STORAGE CAGES AND UTILITY RE-CONFIGURE
- PermitMechanical
Permit 178775 · COMPLETED
INSTALLATION OF NEW RETURN AIR GRILL AND RELOCATION OF DIFFUSERS.
- PermitNew Construction
Permit 173793 · Expired
INSTALLATION OF CONTROL PANEL, PULL AND ABORT STATIONS, HEAT & PHOTO SENSOR, AUDIBLE & VISUAL DEVICES AS PER 2005 NEC (WEST DISTRICT) INSTALLATION OF CONTROL PANEL, PULL AND ABORT STATIONS, HEAT & PHOTO SENSOR, AUDIBLE & VISUAL DEVICES AS PER 2005 NEC (WEST DISTRICT)
- PermitNew Construction
Permit 173794 · Expired
INSTALLATION OF CONTROL PANEL, PULL AND ABORT STATIONS, HEAT & PHOTO SENSOR, AUDIBLE & VISUAL DEVICES AS PER 2005 NEC (WEST DISTRICT) INSTALLATION OF CONTROL PANEL, PULL AND ABORT STATIONS, HEAT & PHOTO SENSOR, AUDIBLE & VISUAL DEVICES AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 173795 · COMPLETED
INSTALLATION OF CONTROL PANEL, PULL AND ABORT STATIONS, HEAT & PHOTO SENSOR, AUDIBLE & VISUAL DEVICES AS PER 2005 NEC (WEST DISTRICT)
- PermitMajor alteration
Permit 165646 · COMPLETED
RENOVATIONS FOR COFFEE HOUSE AS PER PLANS.WORK TO INCLUDE NEW WALL PARTIONS,NEW KITCHEN,SEATING AREA,FURNITURE. NEW CEILING,NEW FRONT GRILLE,WATER HEATER ON PLAN.SEPERATE PERMIT REQUIRED FOR SPRINKLER SYSTEM, MECHANICAL KITCHEN FIRE SUPPRESSION AND SIGNS.
- PermitPlumbing
Permit 174838 · COMPLETED
A NEW 1 1/2" WATER SERVICE AND 5" SANITARY LATERAL, INSTALL 150' 4" SANITARY DRAIN AND CAP IT BELOW GRADE FOR A FUTURE OFFICE TRAILER
- PermitElectrical
Permit 175018 · COMPLETED
RETAIL SPACE FIT OUT, 54 LIGHTS, 16 RECEPTS, 5 MILLWORK CONNECTORS, 1 MECHANICAL CONNECTOR AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 176693 · COMPLETED
PROVIDE/INSTALL: (6) LTG FIX'S, (1) NEW PANEL 100A, 3P, 30 CICUIT, (1) SIGN CONN, (13)PWR OUTLETS, (1) 15KVA TRANSF, (6) DATA OUTLETS, (2) GFI RECEPT'S, (7) WALL SW, (3) EXIT LTS, (1) DISCONNECT SW, (29) TRACK LTG, ALL WORK WILL BE DONE IN CONDUIT (WEST DIST)
- PermitElectrical
Permit 173849 · COMPLETED
PROVIDE AND INSTALL 1 HOT WATER HEATER, 27 NEW LIGHT FIXS, 2 SIGN CONNS, 2 EXIT LIGHTS, 2 POWER OUTLETS, 6 DATA OUTLETS, 22 RECEP/OUTLETS, 1 TRANS 45KVA, 2 DISCONN SWITCHES, 4 GFI OUTLETS, 2 LIGHT SWITCHES, 0 DIMMERS, 1 NEW PANEL ALL INSTALL WILL BE IN CONDUIT, AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 173850 · COMPLETED
PROVIDE AND INSTALL, 38 LIGHT FIXS, 1 SIGN CONNS, 1 EXIT LIGHTS, 7 FLOOR OUTLETS, 30 RECEPT/OUTLETS, 1 SWITCH, 0 DIMMERS, 1 NEW PANEL, 0 GFI OUTLETS, 1 DISCONNECT SWITCH, 3 DATA OUTLETS, 1 TRANSFORMER 30 KVA ALL INSTALL WILL BE IN CONDUIT, AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 175019 · COMPLETED
PROVIDE & INSTALL 39 LIGHTING FIXTURES, 2 SIGN CONNECTORS, 2 EXIT LIGHTS, 2 POWER OUTLETS, 10 RECEPTS/OUTSIDE, 1 TRANSFORMER L 15KVA, 1 NEW PANEL 24 CKT, 2 GFI OUTLETS, 1 DISCONNECT SWITCHES, 7 SWITCHES, 4 DATA OUTLETS, ALL INSTALLATION IN CONDUIT AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 175020 · COMPLETED
RETAIL SPACE FIT OUT 31 LIGHTS, 22 RECEPTS, 3 MECHANICAL CONNECTORS, 2 KITCHEN EQUIPMENT CONNECTORS, 1 SIGN CONNECTOR AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 175024 · COMPLETED
RETAIL STORE ELECT FIT OUT - 38 LTS, 18 RECEPTS, 1 MECHANICAL CONNECTOR, 1 ROLLING DOOR, ` SIGN CONNECTOR. (WEST DIST)
- PermitElectrical
Permit 175015 · COMPLETED
RETAIL SPACE FITOUT - 16 RECEPTS, 66 LT FXTS (WEST DIST)
- PermitUse
Permit 177861 · COMPLETED
USE TO STORAGE CAGES. (COMMERCIAL)
- PermitSuppression
Permit 170610 · COMPLETED
TIE INTO EXISTING SYSTEM AND INSTALL AUTOMATIC SPRINKLER SYSTEM AS PER PLAN.
- PermitMechanical
Permit 167031 · COMPLETED
NEW DUCTWORK AND DIFFUSERS
- PermitMechanical
Permit 156996 · COMPLETED
HVAC / DUCTWORK AND COMMERCIAL KITCHEN EXHAUST
- PermitMajor alteration
Permit 156827 · COMPLETED
INTERIOR TENANT BUILD OUT WITH EXISTING SPACE
- PermitPlumbing
Permit 176626 · COMPLETED
INSTALL DRAIN, WASTE & VENT PIPING, DOMESTIC HOT & COLD WATER PIPING FOR THE FOLLOWING, 3 FLOOR SINKS, 1 GREASE INTERCEPTOR, 1 POT SINK, 2 HAND SINKS, 1 - 3 COMP SINK, 1 MOP RECEPTOR, AND 1 ELECTRIC WATER HEATER
- PermitMechanical
Permit 174824 · COMPLETED
PROVIDE AND INSTALL NEW SUPPLY AND RETURN DUCTWORK FOR HVADC SYSTEM FOR AIRPORT
- PermitMechanical
Permit 175066 · COMPLETED
INSTALL KITCHEN HOOD DUCT WORK (CADDY AIR SYSTEM). SEE A/P 149095 FOR PLAN.
- PermitSuppression
Permit 171595 · COMPLETED
INSTALL KICTCHEN FIRE SUPRESSION SYSTEM
- PermitSuppression
Permit 171598 · COMPLETED
COMMERICAL A COMMERCIAL COOKING EXTINGUISHING SYSTEM.
- PermitMechanical
Permit 174353 · COMPLETED
HVAC, INCLUDE DUCTWORK AS PER PLANS
- PermitMajor alteration
Permit 173803 · EXPIRED
INTERIOR RENOVATIONS AS PER PLAN.
- PermitMajor alteration
Permit 174153 · COMPLETED
INTERIOR RENOVATION AS PER PLANS TO CHEIF PILOTS LOCATION
- PermitElectrical
Permit 173974 · COMPLETED
PROVIDE NEW RECEPTS, SWS, LGT FXTS, EXISTING BR CIRCUIT WIRING. PROVIDE TELE AND DATA SYSTEM WIRING AND WALL JACKS, RELOCATE 2 EXISTING FA HORN STROBE DEVICES (NO CHANGES TO EXISTING SYSTEM, RELOCATE 1 FOR 1 ONLY). (WEST DIST)
- PermitMajor alteration
Permit 174720 · COMPLETED
CONSTRUCT PARTITION FOR CONFERENCE ROOM
- PermitMechanical
Permit 165542 · COMPLETED
HVAC.
- PermitMajor alteration
Permit 167621 · COMPLETED
TENANT FIT-UP @ THIS SPACE.
- PermitSuppression
Permit 167964 · COMPLETED
INSTALL SPRINKLER SYSTEM IN NEW TENANT SPACES. WATER SUPPLY FROM 2ND FLOOR OF BLDG. PER SUBMITTED SEALED PLANS AND HYD. CALS
- PermitUse
Permit 173808 · COMPLETED
USE TO POTBELLY SANDWICH WORKS RESTAURANT
- PermitAdministrative
Permit 171430 · COMPLETED
REFER TO BUILDING PERMIT #187053 WE ARE REQUESTING ISSUE OF TEMPORARY(PARTIAL) CERTIFICATE OF OCCUPANCY FOR THE DIVISION OF AVICTION OFFICES ON LEVEL 3 OF THE NEW SCREENING BUILDING INCLUDING FIRE EXISTS AND ENTRANCE LOBBIES
- PermitElectrical
Permit 171949 · COMPLETED
RENOVATION INCLUDING NEW (2) PANELBOARDS, (1) TRANSFORMER, (25) LIGHTS, (14) RECEPTACLES AND VOICE/DATA WIRING AS PER 2005 NEC (WEST DIST)
- PermitElectrical
Permit 167955 · COMPLETED
INSTALL PARKING GUIDANCE SYSTEM:LOW VOLTAGE SENSORS & POWER, 120V TO LED SIGNS. INSTALL LICENSE PLATE RECOG SYSTEM USING CCTV CAMERAS & LOW VOLTAGE WIRING.INSTALL 60KW GENERATOR & ASSOCIATED WIRING & EQUIPMENT.
- PermitMechanical
Permit 163181 · COMPLETED
INSTALLATION OF HVAC DUCTWORK AS PER PLAN.
- PermitPlumbing
Permit 172518 · COMPLETED
FURNISH AND INSTALL 1 GREASE INT, SOIL PIPE AND WATER FOR KITCHEN. 3 COMP SINK, WC, LAV, FL DR, HAND S,
- PermitMechanical
Permit 169413 · COMPLETED
FOR THE HVAC SYSTEM AS PART OF THE FIT-OUT OF A NEW TENANT SPACE IN D-E CONNECTOR LOCATION SPACE D-E-1 FOR A SMALL ELECTRONICS STORE. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS AND BE PERFORMED BY A LICENSED WARM AIR CONTRACTOR.
- PermitMajor alteration
Permit 167557 · COMPLETED
FOR THE FIT-OUT OF A NEW TENANT SPACE IN D-E CONNECTOR LOCATION SPACE D-E-1 FOR A SMALL ELECTRONICS STORE. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS AND SHALL BE PERFORMED BY A LICENSED CONTRACTOR.
- PermitPlumbing
Permit 171811 · COMPLETED
SEAL LATERALS
- PermitMechanical
Permit 163594 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLAN.
- PermitElectrical
Permit 166019 · COMPLETED
DEMO EXISTING LIGHTING AND POWER DEVICES, INSTALL NEW LIGHTING & DEVICES. INSTALL 15 KVA TRANSFORMER, INSTALL NEW PANEL 50A MAIN, INSTALL SPEAKER & PHONE DATA SYSTEM AS PER 2005 NEC (WEST DIST)
- PermitMajor alteration
Permit 168772 · COMPLETED
CONTRUCTION OF NEW RETAIL STORE AS SHOWN ON PLAN WITHIN SPACE DE3. AT PHILA. INTERNATIONAL AIRPORT. SEE PERMIT # 169324 FOR HVAC.ALL WORK TO BE BY LICENSED CONTRACTOR
- PermitMechanical
Permit 169324 · COMPLETED
NEW HVAC SYSTEM AS SHOWN FOR RETAIL STORE. SEE PERMIT 168772 FOR PLANS MP1.0,2.0 &MP2.1
- PermitElectrical
Permit 169961 · COMPLETED
PROVIDE (2) TEMPORARY LIGHTS, (23) NEW 2 X 2 FIXTURES AND (2) EMERGENCY LIGHTS, AS PER 2005 NEC (WEST DIST)
- PermitMajor alteration
Permit 124932 · COMPLETED
INTERIOR RENOVATIONS AS PER PLAN. INCLUDES CONSTRUCTION FOR VISUAL DISPLAYS, CEILINGS RESTROOM FINISHES, ADDITION OF CURB-SIDE BOLLARDS, COLUMN TREATMENT A-EAST. PERMIT FOR WORK ONLY IN THE CITY OF PHILADELPHIA. SEPARATE PERMIT IS REQUIRED BY OTHER COUNTY.
- PermitMechanical
Permit 163598 · COMPLETED
INSTALL SUPPLY AND RETURN DUCTWORK TO FUTURE TENANT SPACE ONLY
- PermitMajor alteration
Permit 165339 · COMPLETED
TENANT FIT-OUT OF RESTAURANT/WINE BAR (VINO VOLA).HVAC AND RELATED DUCTWORK COVERED UNDER PERMIT # AP 165882. CO AND LO INCLUDED IN THIS PERMIT.
- PermitMechanical
Permit 165882 · COMPLETED
INSTALLATION OF HVAC AND RELATED DUCTWORK. SEE AP#165339 FOR APPROVED PLANS.
- PermitDemolition
Permit 166644 · COMPLETED
SELECTED INTERIOR BUILDING DEMOLITION AT EAST END OF FLOORS 1 & 2 IN THE EXISTING CONCOURSE 'E' BUILDING IN PREPARATION FOR THE CONSTRUCTION OF A TWO STORY CONCOURSE ADDITION. TO INCLUDE SITE DEMO AND REMOVAL OF THE EXISTING CONCRETE AIRCRAFT PARKING APRON IN THE PROJECT AREA DOWN TO THE EXISTING GRAVEL SUBBASE EXCEPT IN LOCATIONS WHERE BUILDING FOUNDATIONS AND TRENCHING FOR UTILITIES WILL OCCUR.
- PermitElectrical
Permit 159839 · COMPLETED
REMOVAL 39 POWER/DATA OUTLETS BACK TO SOURCE & RELOCATION OF MIC CABLES TO EXISTING GATE READERS AT ALL 39 LOCATIONS.
- PermitMajor alteration
Permit 161955 · COMPLETED
FITOUT FOR BORDERS BOOK STORE.
- PermitElectrical
Permit 166676 · COMPLETED
PROVIDE NEW RECEPTS, SWITCHES, LIGHTING FIXTURES, EMERGENCY & EXIT LIGHTING, PANELS WITH PANEL FEEDERS, FIRE ALARM DEVICES & EQUIPMENT, SECURITY ALARM DEVICES Y EQUIPMENT, PHONE/DATA DEVICES & EQUIPMENT, SOUND SYSTEM DEVICES & EQUIPMENT AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 163464 · COMPLETED
DEMO AND REMOVE ALL EXISTING WIRING AND EQUIPMENT, NOT USED, RELOCATE MAIN PANEL, RE INSTALL, NEW LIGHTS, DEVICES AND EQUIPMENT AS PER 2005 NEC, RELOCATE FIRE ALARM DEVICE, INSTALL NEW CONDUIT AND WIRING TO EXISTING FIRE ALARM JUNCTION BOX (WEST DISTRICT)
- PermitElectrical
Permit 162666 · COMPLETED
REVISE AND INTERGRATE WIRING IN SPACE 22 AND 23, RELOCATE PANEL AND EXTEND EXISTING FEEDER, INSTALL NEW OUTLETS AND LIGHTING, RECONNECT ALL EQUIPMENT TO REMAIN, RELOCATE FIRE ALARM DEVICES ALL AS PER 2005 NEC AND NFPA-72 (WEST DIST)
- PermitElectrical
Permit 138440 · COMPLETED
EXISTING 20' OF CONVEYOR EDS #8 LOCATED IN TERMINAL B BAGGAGE AREA, REMOVAL OF ALL CONTROL AND POWER CONDUIT AND WIRE BACK TO MAIN CONTROL PANEL. INSTALL NEW CONDUIT FOR CONTROL & POWER AND REINSTALL EXISTING WIRING AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 167850 · COMPLETED
INSTALL POWER FOR QUAD OUTLET FOR CHARGE STATION CABINET LOCATED AT TERMINAL B LOWER CONCOURSE IN OFFICE BCDU 1068 (50' OF 3/4 EMT & #3 #12 THNN WIRE FOR 1 QUAD OUTLET AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 167851 · COMPLETED
PROVIDE AND INSTALL 3/4 EMT CONDUIT FOR QUAD OUTLET FOR CHARGE STATION CABINET LOCATED IN TERMINAL C LOWER CONCOURSE OFFICE CCAO 1048. INSTALL CONDUIT AND WIRE FROM P3Q-I PANEL TO OFFICE CCAO 1048 (40' OF 3/4 EMT WITH 3 #12 THNN WIRE 20AMP CIRCUIT FOR 1 QUAD OUTLET AS PER 2005 NEC (WEST DISTRICT)
- PermitZoning
Permit 150036 · COMPLETED
ERECTION OF FENCE ENCLOSURE
- PermitMajor alteration
Permit 162471 · COMPLETED
TENEANT FIT OUT AS PER PLANS.
- PermitMechanical
Permit 162726 · COMPLETED
INSTALL HVAC FOR TENEANT FIT OUT AS PER PLANS.
- PermitElectrical
Permit 147033 · COMPLETED
INSTALL (4) NEW DUPLEX RECEPTACLES, (4) DATA OUTLETS, 1000' CAT 5 CONDUIT FOR PODIUM MONITORS, AS PER 2005 NEC. ALL WORK DONE AT NIGHT IN CONDUIT (WEST DIST)
- PermitMechanical
Permit 163597 · COMPLETED
INSTALLATION OF HVAC INCLUDING DUCTWORK AS PER PLAN. SEPARATE PERMIT REQUIRED BEYOND COUNTY LINE.
- PermitElectrical
Permit 163986 · COMPLETED
INSTALLATION OF A LOW VOLTAGE (12 VAC) BURGLAR ALARM SYSTEM AS PER 2005 NEC (WEST DIST)
- PermitAdministrative
Permit 162982 · COMPLETED
AMEND A/P-144539 TO REFLECT CORRECT LOCATION ( TERMINAL "B")
- PermitPlumbing
Permit 162195 · COMPLETED
TEMPORARY FACITITY DURING CONSTRUCTION
- PermitFast form building
Permit 162464 · COMPLETED
- PermitFast form building
Permit 162465 · COMPLETED
- PermitZoning/use
Permit 159654 · COMPLETED
DEMOLITION OF OLD OVERSEAS TERMINAL AND CONVERT TO SURFACE PARKING LOT CONTAINING 840 SPACES
- PermitPlumbing
Permit 162651 · COMPLETED
DEMOLITION OF EXISTING SPACE
- PermitSuppression
Permit 156169 · COMPLETED
TERMINAL A-EAST BAG CLAIM: RELOCAT 22 SPRINKLER HEADS;INSTALL 6 NEW SPRINKLER HEADS
- PermitAddition
Permit 152184 · COMPLETED
THIS WORK INCLUDES A NEW BAGGAGE CONVEYER SYSTEM SUPPORTED FROM TERMINAL A-WEST BAGGAGE AREA TO THE ROOF ABOVE TERMINAL A-EAST. ENCLOSED SCREENING AREA. BRIDGE INCLUDES MAINTENANCE WALKWAY FOR CONVEYOR SYSTEM ALL ENCLOSED.
- PermitUse
Permit 161229 · COMPLETED
DESIGNATE USE OF LEASED SPACE EXTERIOR BLDG. SIGNAGE NOT INCLUIDED IN THIS APPLICATION
- PermitMajor alteration
Permit 159395 · COMPLETED
INTERIOR ALTERATIONS IN PREPARATION FOR FUTURE TENANT FIT-OUT.
- PermitMajor alteration
Permit 159450 · COMPLETED
SELECTIVE DEMOLITION OF PODIUMS - TERMINAL 'F" ELECTRICAL PERMIT REQUIRED
- PermitElectrical
Permit 159819 · COMPLETED
INSTALL CAT5 DATA OUTLETS & 1 S/P TOGGLE SWITCH, RELOCATE 1 RECEPTACLE, 5 FIXTURES, 1 FIRE ALARM DEVICE & 1 THERMOSTAT. IN ACCORDANCE WITH 2005 NEC
- PermitElectrical
Permit 159827 · COMPLETED
INSTALL 1 20A CIRCUIT & 1 3/4" CONDUIT WITH 2 CAT5 DATA CABLES FROM CABLE TRAY TO C-19 COMM ROOM. CHANGE EXISTING RECEPTACLE TO QUAD.
- PermitElectrical
Permit 159834 · COMPLETED
INSTALL 1 20A CIRCUIT & 1 3/4" CONDUIT WITH 2 CAT5 DATA CABLES FROM CABLE TRAY TO B-6 COMM ROOM. CHANGE EXISTING RECEPTACLE TO QUAD.
- PermitMajor alteration
Permit 142542 · EXPIRED
INSTALL NEW OFFICE SPACE INTO EXISTING/BUILD WALLS, HANG DOORS,PAINT CARPET
- PermitMajor alteration
Permit 142534 · EXPIRED
BUILD A SAFE HOLDING ROOM INSIDE EXISTING OFFICE SPACE @ 2 LOCATIONS
- PermitUse
Permit 159407 · COMPLETED
USE CHANGE: SERVING WINE & LIGHT FOOD FARE W/SEATING
- PermitUse
Permit 159409 · COMPLETED
USE CHANGE TO: RETAIL SALE OF HATS,TEAM JERSEYS, APPAREL & ACCESSORIES
- PermitUse
Permit 159404 · COMPLETED
CHANGE IN USE: SELLING SMALL ELECTRONIC DEVICES, HOUSEHOLD ITEMS,APPAREL & LUGGAGE
- PermitUse
Permit 159405 · COMPLETED
CHANGE IN USE: RETAIL SELLING OF EYEGLASSES & ACCESSORIES AS PART OF THE PHILA INT'L AIRPORT COMPLEX
- PermitUse
Permit 159399 · COMPLETED
CHANGE IN USE FROM BAR W/SEATING SERVING BEE, LIQUOR & LIGHT FARE TO QUICK SERVE FOOD CONCESSION-SERVING TAKE OUT
- PermitUse
Permit 159406 · COMPLETED
CHANGE IN USE: RETAIL SALES OF HANDBAGS, PENS, BRIEFCASES & ACCESSORIES,AS PART OF THE PHILA INT'L AIRPORT COMPLEX
- PermitUse
Permit 159403 · COMPLETED
USE CHANGE: RETAIL SALE OF SMALL ELECTRONIC DEVICES (PDA'S, CELL PHONES, MP3'S, & ACCESSORIES)
- PermitUse
Permit 159411 · COMPLETED
USE CHANGE: RETAIL SALES OF JEWELRY & ACCESSORIES AS PART OF THE PHILA. INT'L AIRPORT COMPLEX.
- PermitUse
Permit 159412 · COMPLETED
USE CHANGE: RETAIL SALES OF BOOKS, AUDIO BOOKS, EDUCATIONAL GAMES & ACCESSORIES AS PART OF THE PHILA. INT'L AIRPORT COMPLEX.
- PermitUse
Permit 159410 · COMPLETED
USE CHANGE: RETAIL SALES OF MUSICE DVD'S, SMALL ELECTRONIC DEVICES & ACCESSORIES AS PART OF THE PHILA. INT'L AIRPORT COMPLEX.
- PermitUse
Permit 159408 · COMPLETED
USE CHANGE: SNACK TENANT SERVING COFFEE & LIGHT FOOD FARE W/SEATING AS PART OF THE PHILA. INT'L AIRPORT COMPLEX.
- PermitFast form building
Permit 159589 · COMPLETED
- PermitPlumbing
Permit 157043 · COMPLETED
RELOCATE FIXTURES
- PermitMajor alteration
Permit 147417 · COMPLETED
CONSTRUCTION OF DEMISING WALLS, AND THE INSTALLATION OF SIGNAGE FOR FUTURE CONCESSION TENANTS.
- PermitElectrical
Permit 156066 · ABANDONED
SECURITY, ACCESS CONTROL, TELECOMM, LAN, CABLING, BACKBONE CABELING, FIBER, COPPER CCTV, CLOSED CIRCUIT, SECURITY CAMERAS AS PER 2005 NEC, FIRE ALARM AS PER NFPA72, USE OF SPACE, OFFICE SPACE, AIRPORT CHECK-IN/ SECURITY, BAGGAGE HANDELING (WEST DISTRICT)
- PermitElectrical
Permit 151205 · COMPLETED
(35) NEW RECEPT,(9)WALL SW'S,(2)DIM'S DTV SYS (TV),(27) FI RECPT,(7)PWR JUNC.FOR EQUIP,(3) EXH FAN (3) V/D OUTLETS/POS SYST,(2)HOT WTR HTRS,(3) AC UNITS/MAU/CMU.LTG:REMOVE EXISTING/INSTALL NEW (57)RECESS DOWN LTS, 44 FT TRK LT, 22 HDS, (3) 2X4 LAYIN, (1) 2X2 LAYIN, (3) EX LTS, SIGN CONNECTION. FA: REPLACE EXIST W/NEW DEVICES WITH SIMPLEX GRINNELL. EX. AIRPORT SYS. SER: UPGRADE EXIST 200A TO 35A, RELOCATE 2 EXIS PANELS, INSTALL (1) NEW AS PER 2005 NEC/NFPA-72 (WEST D)
- PermitMajor alteration
Permit 153267 · COMPLETED
EXPANSION OF EXISTING TENANT SPACE INTO ADJACENT TENANT SPACE AS PER PLAN.
- PermitMechanical
Permit 155777 · COMPLETED
HVAC EXPANSION OF EXISTING TENANT SPACE.
- PermitSuppression
Permit 147611 · COMPLETED
INSTALL AN AUTOMATIC SPRINKLER SYSTEM.
- PermitNew Construction
Permit 146096 · Expired
COMPLETE INSTALLATION OF CONDUIT AND WIRING FOR A NEW CLEAN AGENT SYSTEM. (FIRE ALARM) (WEST DIST) COMPLETE INSTALLATION OF CONDUIT AND WIRING FOR A NEW CLEAN AGENT SYSTEM. (FIRE ALARM) (WEST DIST)
- PermitElectrical
Permit 149152 · COMPLETED
RENOVATION TO EXISTING FACILITY INCL.NEW CONDUIT/WIRING FOR NEW PANELS,TRANSFORMER/THE RELOCATION OF EXISTING SUBSTATION.INSTALLATION OF CONDUIT/WIRE FOR NEW LIGHT FIXTURES, WIRING DEVICES/ASSOCIATE EQUIPMENT. INSTALL.OF CONDUIT,WIRE PANELS,TRANS,LIGHTING/WIRING DEV.FOR NEW ADD.AT BAGGAGE CLAIM "D" (WEST DIST)
- PermitDemolition
Permit 149232 · COMPLETED
COMPLETE DEMO TO BUILDING.
- PermitFast form building
Permit 153120 · COMPLETED
- PermitUse
Permit 153262 · COMPLETED
EXPANSION OF EXISITNG TENANT SPACE ADJACENT TO TENANT SPACE - SPACE M23A EXISTING RETAIL SALES OF JEWELRY & PRECIOUS STONES. BOTH SPACES TO BE USE FOR RETAIL SALES OF JEWELRY & PRECIOUS STONES
- PermitZoning/use
Permit 148436 · COMPLETED
NEW BAGGAGE CONVEYOR SYSTEM SUPPORTED BY A BRIDGE FROM THE TERMINAL A WEST BAGGAGE RECHECK AREA TO THE ROOF
- PermitElectrical
Permit 148411 · COMPLETED
PROVIDE SITE LIGHTING AND POWER & LIGHTING FOR BUS SHELTERS AS PER 2005 NEC (WEST DISTRICT)
- PermitZoning
Permit 149227 · COMPLETED
PARTIAL DEMO TO BUILDING. TAKING PART OF IT DOWN
- PermitPlumbing
Permit 151683 · COMPLETED
REMOVE FXTS AND RE INSTALL. REPLACE ANY DEFECTIVE PIPE, BRING SPACE TO CONFORM TO PHILA PLUMBING CODE. 2 HAND S, 1 PREP S, (1) 3 COMP SINK, 1 MOP SINK
- PermitPlumbing
Permit 151685 · COMPLETED
DEMO EXISTING FXTS AND PIPE AND REPLACE WITH NEW. (1) 3 COMP SINK, 1 MOP S, 1 BAR S, 2 HAND SINK UNDER COUNTER, 1 HAND S
- PermitMajor alteration
Permit 144539 · COMPLETED
INTERIOR ALTERATIONS AS PER PLANS FOR TENANT SPACE- BC-5 TERMINAL "D" TO INCLUDE DIFFUSER RELOCATION
- PermitElectrical
Permit 146871 · COMPLETED
DEMO EXISTING 5 WORK STATIONS AND BACK DROP, POWER CABLE MIC STATION AND DATA CABLE, INSTALL 5 NEW WORK STATIONS & BACK DROP, 7 POWER OUTLET, 14 QUAD, 15 TELE/DATA OUTLETS, PROVIDE CONDUIT FOR 3 - 200/3 PHASE SERVICE, DISCONNECT SWITCH 3 - 60/3 PHASE DISCONNECT SWITCHES FOR NEW PANEL FOR 3 JET BRIDGES AS PER 2005 NEC (WEST DIST) ALL WORK WILL BE DONE AT NIGHT
- PermitMajor alteration
Permit 144351 · COMPLETED
INTERIOR DEMO AND RENOVATIONS AND UPGRADES TO FINISHES,EQUIPMENT AND FURNISHINGS, STRUCTURAL MODIFICATIONS, AS PER SUBMITTED PLANS.
- PermitMechanical
Permit 149095 · COMPLETED
INTERIOR DEMO OF EXISTING HVAC AND DUCT WORK, INSTALL NEW DUCT WORK, MECHANICALS AND ACCEOSRIES AS PER SUBMITTED PLANS.
- PermitUse
Permit 148900 · COMPLETED
CHANGE USE FROM ASSEMBLY AREA TO 12 RETAIL CONCESSION TENANT SPACES
- PermitMajor alteration
Permit 135100 · COMPLETED
ALTERATIONS OF EXISTING RESTAURANT AS PER PLANS.
- PermitElectrical
Permit 140885 · COMPLETED
PROVIDE AND INSTALL NEW LIGHT FXTS AND POWER OUTLETS. ALSO, INSTALL DATA OUTLETS. RELOCATE EXISTING 200AMP PANEL TO NEW LOCATION. ALL WORK IS TO BE DONE IN CONDUIT. 18 NEW POWER OUTLETS AND 6 NEW DATA OUTLETS. (WEST DIST)
- PermitMajor alteration
Permit 137997 · COMPLETED
INSTALL NEW JET BRIDGES, NEW CARPET (JETWAY-LOADING/UNLOADING PASSENGERS)
- PermitPlumbing
Permit 145647 · COMPLETED
TENANT FIT OUT 2 SINKS, 1 FLOOR DRAIN, 1 HOTWATER HEATER
- PermitAddition
Permit 139337 · COMPLETED
RENOVATION OF EXISTING TUG TUNNEL IN BASEMENT, WITH NEW BAGGAGE HANDLING EQUIPMENT. CONSTRUCTION OF NEW , STEEL SUPPROTED CONCRETE FLOOR DECK SUBSTANTIALLY OVER EXISTING TUNNEL OPENING TO SKY. INCLUDES SECURITY FENCING AND NEW EGRESS STAIRS FROM AN EXTENSION OF THE SUBGRADE CONSTRUCTION. CONSTRUCTION WILL SUPPORT A SINGLE STORY ADDITION.
- PermitPlumbing
Permit 139530 · COMPLETED
1 NEW ADDITION 2 STORY WITH BASEMENT INSTALLING FIXTURES SUCH AS FLOOR DRAIN, LAVY, URINAL, WATER CLOSET, RENOVATION IN 2 OTHER SECTORS TO INCLUDE THE SAME FIXTURES AS THE NEW ADDITION
- InvestigationCI INSP
Case 152809 · PASSED
The cited inspection visit was marked passed.
- PermitAdministrative
Permit 143737 · COMPLETED
EXTEND TCO AT AIRPORT FOR TEMPORARY TENT STRUCTURE. SEE PREVIOUS PERMIT 1106-C-03. SEE ATTACHED GUARANTEE FROM MFG.; 5 YEAR TCO.
- PermitMajor alteration
Permit 138869 · COMPLETED
INTERIOR ALTERATIONS TO BAGGAGE CLAIM. (4) EXPLOSIVE DETECTION SYSTEM MACINES WILL BE INSTALLED WITHIN THE ENCLOSED SCREENING AREA. PEDESTRIAN DOORS AND OVERHEAD DOORS WILL PROVIDE ACCESS FOR STAFF AND EQUIPMENT TO BE SCREENING AREA CONVEYOR BELT MODIFICATIONS
- PermitElectrical
Permit 134277 · COMPLETED
RESTAURANT: FURNISH CONDUIT/PULL STRING FOR SOUND SYS., FURNISH CONDUIT & CAT 5 CABLE FOR DATA OUTLETS, FURNISH AND INSTALL SWIT., RECEPT/PANELS. INSTALL OWNER SUPPLIED LT FIXTURE PACKAGE, PER 2005 NEC,& FIRE ALARM ON THIS APPL.(WEST DIST)
- ViolationVIOL C&I MESSAGE
Case 152809 · Violation 887527 · Code A-000.0/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationF+C LIQ-PROVIDE CLOS RPT
Case 152809 · Violation 887528 · Code FC-3403.3/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationCI INSP
Case 152809 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitElectrical
Permit 139554 · ABANDONED
TEMPORARY TRAILER - EXTEND 150A SVS TO TEMP TRAILER LOCATED ADJACENT TO NATIONAL CAR RENTAL GARAGE FACILITY. SVS TO BE TAPPED FROM EXISTING BLDG SVS LOCATED AT INTERIOR OF GARAGE FOR 6 MONTHS (3-19-08 THRU 09-30-08) (WEST DIST)
- PermitUse
Permit 138866 · COMPLETED
USE CHANGE FROM TERMINAL A BAGGAGE CLAIM AREA WILL REMAIN EXEPT BAGGAGE CLAIM 6 WILL BECOME ENCLOSED BAGGAGE SCREENING AREA WITH EXPLOSIVE DETECTION SYSTEM.
- PermitElectrical
Permit 134117 · COMPLETED
DEMO EXISTING RETAIL AREA AND INSTALL IN CONDUIT, TELE/DATA CABLING AND POWER AND LIGHTING FXTS. POWER FOR 8 SIGNS, INSTALL 10 DATA OUTLETS, 15 POWER OUTLETS, 17 GFI RECEPTS, 66 NEW LTG FXTS, 2 SWS, 6 DIMMERS, REMOVE/RELOCATE EXISTING 200A PANEL TO NEW LOCATION. - E1, E2, E3, E4, E5.
- PermitMajor alteration
Permit 128114 · COMPLETED
TENANT FIT OUT - CONSTRUCTING A NEW CLINIC IN THE PHILADELPHIA INTERNATIONAL AIRPORT AS PER PLANS
- PermitMechanical
Permit 137233 · COMPLETED
TENANT FIT OUT - CONSTRUCTING A NEW CLINIC IN THE PHILADELPHIA INTERNATIONAL AIRPORT AS PER PLANS
- PermitMajor alteration
Permit 126611 · COMPLETED
INTERIOR RENOVATIONS FOR TAKE-OUT RESTAURANT AS PER PLAN.
- PermitMechanical
Permit 127930 · COMPLETED
INSTALLATION OF HVAC & DUCTWORK FOR TAKE-OUT RESTAURANT AS PER PLAN.
- PermitFast form building
Permit 134025 · COMPLETED
- PermitSuppression
Permit 129306 · COMPLETED
ADD SPRINKLERS TO EXISTING SYSTEM
- PermitPlumbing
Permit 132791 · COMPLETED
INSTALL OIL INTERCEPTOR
- PermitPlumbing
Permit 132550 · COMPLETED
INSTALLATION OF SOIL PIPE AND WATER PIPING FOR BAR/RESTAURANT, 1 - 3 COMPARTMENT SINK, 2 HAND SINKS, 1 GREASE INTERSEPTOR, 1 MOP BASIN, 1 BACK FLOW PREVENTOR, 1 UNDER COUNTER DISH WASHER, 1 UNDER COUNTER CLASS WASHER, 2 FLOOR SINKS, 2 FLOOR DRAINS
- PermitAdministrative
Permit 130925 · COMPLETED
AMEND PERMIT #86630 TO INCLUDE THE MULTI USER FLIGHT INFORMATION DISPLAY SYSTEM UPGRADE.
- PermitMajor alteration
Permit 129374 · COMPLETED
TENANT FIT OUT OF NEW BAR RESTAURANT IN SPACE OCCUPIED BY EXISTING BAR RESTAURANT.
- PermitMechanical
Permit 131432 · COMPLETED
TENANT FIT OUT OF NEW BAR RESTAURANT IN SPACE OCCUPIED BY EXISTING BAR RESTAURANT.
- PermitPlumbing
Permit 130670 · COMPLETED
PROVIDE/INSTALL NEW FIXTURES FOR BAKERY STORE
- PermitMechanical
Permit 130194 · COMPLETED
RELOCATE DIFFUSERS AND REGISTERS AT THE AIRPORT MERRIOTT
- PermitMechanical
Permit 126168 · COMPLETED
HVAC, INCLUDING DUCTWORK AS PER PLANS
- PermitFast form building
Permit 127704 · COMPLETED
- PermitMechanical
Permit 108046 · COMPLETED
FURNISH & INSTALL DUCT, FLEX, DIFFUSERS
- PermitSuppression
Permit 125424 · COMPLETED
INSTALL (1) WET CHEMICAL KITCHEN FIRE SUPPRESSION SYSTEM
- PermitElectrical
Permit 116664 · COMPLETED
INSTALL LIGHT FIXTURES, SWITCHES, RECEPTS, RESTAURANT EQUIPMENT WIRING AND 225 AMP FEEDER AND 2 SECTION PANEL BOARD FOR RESTAURANT TENANT FIT OUT (WEST DISTRICT) INSTALL FIRE ALARM SYSTEM
- PermitElectrical
Permit 122035 · COMPLETED
TAL/COM:REPLACE WIRING TO A/V CLOSET,FIRE ALARM:REPLACE DEVICES & ADD 8 CORRIDOR SMOKES, ELECT: INSTALL FIXTURES IN CEILING TILE, REPLACE DIMMING SYSTEM & FIXTURES 1 FOR 1.ALL WIRING PER 2005 NEC ART. 300.21.
- PermitFast form building
Permit 124946 · COMPLETED
- PermitFast form building
Permit 124947 · COMPLETED
- PermitFast form building
Permit 124948 · COMPLETED
- PermitFast form building
Permit 124997 · COMPLETED
- PermitFast form building
Permit 124989 · COMPLETED
- PermitSign
Permit 123691 · COMPLETED
INSTALL 30 RAMP INFORMATION DISPLAY SYSTEMS (RIDS) FOR US AIRWAYS. ALL RIDS' ARE TO BE MOUNTED ABOVE EACH GATE ON THE B AND C CONCOURSES ON THE EXTERIOR OF TERMINALS TO PROVIDE INFORMATION FOR AIRPORT PERSONNEL ON ARRIVALS AND DEPARTURES.
- PermitElectrical
Permit 121707 · COMPLETED
INSTALL POWER & DATA CONDUIT & CAMERAS FOR 31 JETBRIDGES IN TERMINAL B. INSTALL POWER & DATA CONDUIT & CAMERAS FOR 30 JETBRIDGES IN TERMINAL C. ALL CONDUIT OUTLETS WILL BE RIDGED FOR OUTSIDE AND EMT FOR INSIDE CONCOURSES. (WEST DIST)
- PermitElectrical
Permit 115546 · COMPLETED
FURNISH AND INSTALL UPGRADE TO MUFIDS SYSTEM INCLUDING EXPANSION OF FIBER OPTIC AND CAT 5E NETWORK. REPLACEMENT AND ADDITION OF PUBLIC DISPLAYS. 110 VOLT CONDUIT AND CABLRE TO NEW DISPLAY LOCATIONS (WEST DIST)
- PermitMechanical
Permit 119144 · COMPLETED
HVAC INSTALLATION TO TICKETING AREA AS PER PLAN.
- PermitMajor alteration
Permit 117940 · COMPLETED
INTERIOR RENOVATIONS TO TICKETING AREA
- PermitFast form building
Permit 122970 · COMPLETED
- PermitFast form building
Permit 121593 · COMPLETED
- PermitElectrical
Permit 111317 · COMPLETED
NEW PANEL, 200AMP 3 PHASE WITH 175AMP MB-42 CIRCUIT, 20 POWER OUTLETS, 1 - 45KVA TRANSFORMER, 480/120/208V, ALL WORK DONE IN CONDUIT. 4 SWITCH, 10 RESET FIXTURES. 2 DIMMERS, 1 LOT TRACK LIGHTING, 1 EXIT SIGN WITH EMBER. LIGHT, 1 REMOTE HEAT (WEST DISTRICT)
- PermitElectrical
Permit 121705 · COMPLETED
REMOVE EXIST FEEDER WIRE & UPGRADE TO 40 AMP CRT WITH NEW (3) #8 & (1) #8 GROUND.PROVIDE 40 AMP/2 POLE BREAKER.REMOVE ALL POWER CONNECTION IN EXISTING KIOSK AND RECONNECT NEW KIOSK. INSTALL E-MON METERING. PROVIDE AND INSTALL (4) 4 FT SHELF LGT. ALL WORK DONE AFTER HOURS. (WEST DIST)
- PermitElectrical
Permit 121706 · COMPLETED
INSTALL NEEW FEEDER CONDUIT FROM MARKET PL REDWOODCLOSET PANEL MPRD-3 & TELE/DATA IN SAME LOCATION. PROVIDE 1" EMP & 3/4" EMT TO NEW KIOSK. (TOTAL FOOTAGE 75 FT EACH & INSTALL 3-38 & 1-#8 GROUND FOR POWER 2 POLE 40AMP BREAKER. INSTALL 6 SHELF LTS & MAKE UP ALL KIOSK CONNECTERS. ALL WORK DONE AFTER DARK
- PermitElectrical
Permit 120245 · COMPLETED
NEW CONSTRUCTION: INSTALL (20) OUTLETS, (17)LIGHTS AND (2) 3-WAY SWITCHES AND (2) SINGLE POLE SWITCHES (WEST DIST)
- PermitElectrical
Permit 120554 · COMPLETED
REMOVE INTA-HOT WATER HEATER BACK TO PANEL. PROVICE AND INSTALL 3/4" CONDUIT WITH 3 #12 AND 1 #12 GROUND FOR NEW ICE MACHINE. PROVIDE AND INSTALL 3/4" CONDUIT WITH 2 #12 AND 1 #12 GROUND FOR ICE BAGGER. ALL NEW CONDUIT GO TO EXISTING PANEL WITH 2 NEW CIRCUIT BREAKERS TO BE INSTALLED (EAST DIST)
- PermitElectrical
Permit 120555 · COMPLETED
REMOVE EXISTING FEEDER WIRE AND UPGRADE TO 40 AMP CIRCUIT WITH NEW (3) #8 AND (1) #8 GROUND. PROVIDE 40 AMP/2 POLE BREAKER. REMOVE ALL POWER CONNECTION IN EXISTING KIOSK AND RECONNECT NEW KIOSK. INSTALL 3-MON METERING. ALL WORK TO BE DONE AFTER HOURS (WEST DIST)
- PermitElectrical
Permit 120556 · COMPLETED
REMOVE (8) EXISTING POWER OUTLETS AND (8) DATA OUTLETS. RE-INSTALL IN NEW TICKET COUNTER WHERE NEEDED FOR NEW EASY TICKET MACHINES (WEST DIST)
- PermitElectrical
Permit 120557 · COMPLETED
REMOVE EXISTING FEEDER WIRE AND UPGRADE TO 40 AMP CIRCUIT WITH NEW (3) #8 AND (1) #8 GROUND. PROVIDE 40 AMP/2 POLE BREAKER. REMOVE ALL POWER CONNECTION IN EXISTING KIOSK AND RECONNECT NEW KIOSK. INSTALL E-MON METERING. "ALL WORK TO BE DONE AFTER HOURS" (WEST DIST)
- PermitMajor alteration
Permit 89160 · COMPLETED
RENOVATIONS TO HOTEL BALLROOM, MEETING ROOMS, AND PRE-FUNCTION AREAS.
- PermitMechanical
Permit 116353 · COMPLETED
FOR THE INSTALLATION OF A HVAC SYTEM FOR A NEW TENANT SPACE. ROOF MODIFICATION TO SUPPORT THE NEW EQUIPMENT ARE INCLUDED. ALSO FOR THE INSTALLATION OF TWO (2) COMMERCIAL KITCHEN HOOD AND EXHAUST SYSTEMS. ALL WORK SHALL CONFORM TO THE APPROVED PLANS.
- PermitElectrical
Permit 112891 · COMPLETED
INSTALL 6 NEW OUTLETS, LOCATED AT POWER STATION BETWEEN COLUMN 30 & 32, NORTH SIDE ALSO 1 FL OUTLET(POKE THRU) LOCATED BETWEEN 32 & 33 AND 1 ON SOUGHT SIDE SAME LOCATION. ALSO INSTALL 1 - 1" CONDUIT FOR 4 TV LOCATION IN CONCOURSE E. ALL WORK WILL BE EMT CONDUIT. AS PER 2005 NEC (WEST DIST)
- PermitPlumbing
Permit 118629 · COMPLETED
RELOCATE SANITARY SEWER 8" THRU 12" DIAMETER FOR PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL EXPANSION
- PermitUse
Permit 112564 · COMPLETED
DIVIDE SPACE FROM ONE TENANT INTO TWO
- PermitPlumbing
Permit 118251 · COMPLETED
REMOVING THREE (3) COMPARTMENT SINKS AND REPLACING WITH ICE MACHINE
- PermitPlumbing
Permit 115664 · COMPLETED
SPACE L11A-B INSTALL 1 JANITORS SERVICE SINK, 2 COMP SINK, W/ GARB GRINDER, 2 WALL MOUNTED HAND SINK, 1 ICE MACHINE, 2 FLOOR SINKS, WATER HEATER AND PIPING
- PermitDemolition
Permit 117947 · COMPLETED
INTERIOR NON-LOAD BEARING DEMOLITION (B/C TICKETING AREA)
- PermitElectrical
Permit 117266 · COMPLETED
PROVIDE 19 - 2X4 LAY IN FIXTURES. RELOCATE EXISTING OUTLETS. PROVIDE 20 NEW DATA OUTLETS. REPLACE EXISTING ALL EXISTING CIRCUITS WILL BE RE-USED. DATA CABLE WILL BE DONE BY AIRPORT DIVISION AS PER 2005 NEC (WEST DISTRICT)
- PermitElectrical
Permit 115806 · COMPLETED
REINSTALL EXITING DEVICES IN NEW COUNTER, PROVIDE 4 NEW CABLES & 2 INSERTS IN NEW CHECK-IN COUNTER.
- PermitMajor alteration
Permit 96387 · COMPLETED
RENOVATIONS FOR USAIRWAYS OFFICES, ETC.
- PermitSuppression
Permit 112913 · EXPIRED
INSTALL FIRE SPRINKLER SYSTEM
- PermitFast form building
Permit 115065 · COMPLETED
- PermitMechanical
Permit 112765 · COMPLETED
INSTALL WELDED HOOD EXHAUST DUCTWORK FROM FAN TO HOOD CONNECTION. INSTALL KITCHEN HOOD AS PER PLANS.
- PermitMechanical
Permit 112763 · COMPLETED
INSTALL WELDED HOOD EXHAUST DUCTWORK FROM EXISTING DUCTWORK TO HOOD CONNECTEION. RELOCATE EXISTING KITCHEN HOOD AS PER PLANS.
- PermitMechanical
Permit 113787 · COMPLETED
RELOCATE DIFFUSERS
- PermitElectrical
Permit 112890 · COMPLETED
INSTALL POWER & COMMUNICATIONS CONDUIT ALONG FENCE LINE AND UNDER EXISTING BLISS BUILDING. PROVIDE AND INSTALL NEW LOCK 2 POLE DISCONNECT SWITCH ON OUTSIDE OF TRAILER (WEST DIST)
- PermitUse
Permit 112563 · COMPLETED
SPACE NUMBER CHANGE FROM F5 TO F5A/B USE REMAINS THE SAME - TAKE-OUT RESTAURANT
- PermitUse
Permit 112565 · COMPLETED
CHANGE ART DISPLAY AREA TO A FOOD TENANT SEATING AREA EXISTING M26 TO EXPAND TO ART DISPLAY AREA AND FOR THE CHANGE OF SPACE # FROM M26 TO BC27S.
- PermitMajor alteration
Permit 97973 · COMPLETED
RENOVATIONS TO EXISTING OFFICE SPACE.
- PermitMajor alteration
Permit 86630 · COMPLETED
INTERIOR ALTERATIONS TO INCLUDE CONSTRUCTION OF NEW MULTI-USER FLIGHT INFORMATION SYSTEMS.
- PermitSign
Permit 92065 · COMPLETED
AS PER THE APPROVAL OF THE BOARD OF BUILDING STANDARDS CASE # 3287,FOR THE ERECTION OF TWO(2) FLAT FABRIC WRAP WALL SIGNS, LOCATED ON AN EXISTING OPEN PARKING GARAGE. THE SIZES ARE THE SAME FOR BOTH AT : 22'-0"H X 56'-0"W.AS SHOWN ON THE SUBMITTED PLANS.
- PermitFast form building
Permit 110056 · COMPLETED
- PermitFast form building
Permit 110127 · COMPLETED
- PermitSuppression
Permit 108345 · COMPLETED
INSTALL ANSUL - R-102 - 6 GAL. KITCHEN SUPPRESSION SYSTEM
- PermitSuppression
Permit 102824 · COMPLETED
INSTALL ANSUL R-102 - 6 GAL. KITCHEN FIRE SYSTEM
- PermitElectrical
Permit 108684 · COMPLETED
REMOVE EXISTING POWER 120V OUTLET AND REINSTALL IN NEW WALL LOCATION. TOTAL OF 4 NEW 120V OUTLETS, REMOVE EXISTING DATA OUTLET AND CABLE BACK TO DATA ROOM AND INSTALL NEW DATA OUTLET IN NEW LOCATION. TOTAL OF 7 NEW VOICE DATA OUTLETS, REMOVE AND INSTALL EXISTING CEILING FIXTURES AND INSTALL NEW. BATTERY BACKUP FIXTURES. 1 BATTERY BACKUP AND 5 NEW 2X4 FIXTURES (WEST DIST)
- PermitSuppression
Permit 94993 · COMPLETED
INSTALL NEW DRY SPRINKLER HEADS IN NEW SPRUNG STRUCTURE, TIE INTO EXISTING DRY SYSTEM
- PermitPlumbing
Permit 107575 · EXPIRED
FIXTURE INSTALLATION
- PermitPlumbing
Permit 107579 · EXPIRED
FIXTURE INSTALLATION
- PermitMajor alteration
Permit 102896 · COMPLETED
INSTALLATION OF NEWSSTAND AS PER PLAN.
- PermitElectrical
Permit 106973 · COMPLETED
INSTALL 4 CIRCUITS, 1 CIRCUIT TO 2 KIOSKS WITH QUAD RECEPTACLE, CONDUIT FOR TELE/DATA, 9 CAT 6E FOR EACH KIOSK,2 INSERTS PER KIOSK & 4 RECEPTACLES.
- PermitElectrical
Permit 106649 · COMPLETED
TROUBLESHOOTING AND REPLACEMENT OF EXISTING CONVEYOR CONTROL DEVICES ON VARIOUS CONVEYORS THROUGHOUT TERMINALS "B" AND "C".(WEST DIST)
- AppealBuilding standards appeal
Appeal 3287 · OPEN · APPROVED
ON 8/3/07 DEPARTMENT OF LICENSE AND INSPECTION ISSUED REFUSAL OF PERMIT FOR APPLICATION #92065.
- PermitElectrical
Permit 98668 · COMPLETED
REPLACE EXISTING DATA JACKS, INSTALL NEW INSERT 7,708, NEW 3/4 EMT-2608', 2" EMT-720', 1" EMT-3,200'. NEW CAT #6 CABLE-202,200', 900,000 IN EXISTING CONDUIT OR CABLE TRAY AND IN NEW CONDUIT. POWER RECEPTACLE OUTLETS - B THRU F, TOTAL 17 & 12 NEW BREAKERS. TERMINAL B CONC.-24,000 SQ. FT, TERM. C CONC.-24,000 SQ. FT., TERMINAL B/C CONC - 12000 SQ. FT,, TERM. F - 16,000 SQ. FT.(WEST DIST)
- PermitElectrical
Permit 104949 · COMPLETED
INSTALL CONDUIT FOR LIGHT SENSOR TO BE MOUNTED ON 2 JET BRIDGES. 120V POWER SUPPLY BY EA JET BRIDGE CONTROLLERS. ALL INSTALLATION WILL BE IN EMT CONDUIT FROM EA CONTROLLER TO WIRELESS LIGHT SENSORS WHICH WILL BE MOUNTED ON TOP OF EACH JET BRIDGE. SENSORS SUPPLIED BY SW AIRLINES (WEST DIST)
- PermitElectrical
Permit 104053 · COMPLETED
CLEAN AND RE-LAMP LIGHTING FXTS. RELOCATE F/A STROBE LIGHT (SAME MAKE/MODEL, 6 OUTLETS, EXTEND EXISTING CIRCUITS, 2 TELE/DATA OUTLETS. (WEST DIST)
- PermitPlumbing
Permit 9 · COMPLETED
TENANT FIT-OUT OF EXISTING SPACE FOR A NEW RESTAURANT. INSTALL 9 SINKS, 9 FL SINKS, 1 MOP RECEPT, 14 PIECES OF KITCHEN EQUIPMENT REQUIRING INDIRECT WASTE
- PermitFast form building
Permit 101718 · COMPLETED
- PermitElectrical
Permit 99375 · COMPLETED
REMOVE EXISTING 8 POWER OUTLETS AND REINSTALL IN NEW TICKET COUNTERS WERE NEEDED FOR NEW EASY TICKET MACHINES(WEST DIST)
- PermitPlumbing
Permit 94715 · COMPLETED
SUPPLY AND INSTALL THE NECESSARY FIXTURES AND ASSOCIATED PIPE TOLL PLAZA ALSO RAIN WATER CONDUCTORS AND DOWN SPOUTS WITH ASSOCIATED PIPES THIS BUILDING WILL BE USED FOR A TOLL BOOTH
- PermitMechanical
Permit 95154 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLAN.
- PermitPlumbing
Permit 78592 · COMPLETED
TENANT FIT-OUT FOR NEW RESTAURANT
- PermitMajor alteration
Permit 85507 · COMPLETED
ALTERATIONS AS PER PLAN. CREATION OF CHILDREN'S PLAY AREA AND STORAGE ROOM.
- PermitElectrical
Permit 78500 · COMPLETED
INSTALL POWER AND LIGHTS, DATA SYSTEM, FIRE ALARM SYSTEM, 25 LIGHTS 400W HIGH BAY LIGHTS AND WALL LIGHTS, 2 EXIT LIGHTS, 2 PANELS 1 45VA TRANSF, 16 POWER FOR INFRARED HEATERS, 7 DATA OUTLETS, FIRE ALARM SYSTEM 1 PANEL, 4 PULL STATIONS, 4 HORN & STROBE, 2 DUCT DETECTORS (WEST DIST)
- PermitUse
Permit 93551 · COMPLETED
2ND LEVEL PLAY AREA FOR PASSENGER'S CHILDREN
- PermitUse
Permit 93309 · COMPLETED
CHANGE TO DRY RETAIL
- PermitZoning/use
Permit 84977 · COMPLETED
2 NON-ILLUM FLAT WALL SIGNS
- PermitElectrical
Permit 90396 · COMPLETED
INSTALL 100' OF 3/4" CONDUIT TO NEW DUPLEX OUTLET FOR PRINTER, 100 FT 3/4" EMT AND FITTINGS, SUPPORTS, 36 FT 1/4" BOLT ROD AND NUTS. 10 FT 1/2" GREENFIELD AND FITTINGS, 1-20AM DUPLEX WITH COVER.(WEST DIST)
- PermitElectrical
Permit 85712 · COMPLETED
FURNISH AND INSTALL PANELS, LIGHTING, SWITCHES, RECEPTS, BRANCH CIRCUIT WIRING, EQUIPMENT WIRING, TELEPHONE AND DATA WIRING, PINT OF SALE WIRING, KITCHEN EQUIPMENT POWER WIRING, HEATING & AIR CONDITIONING POWER WIRING, TELEVISION WIRING, SOUND SYSTEM WIRING AND FIRE ALARM SYSTEM EQUIPMENT AND WIRING (WEST DISTRICT)
- PermitElectrical
Permit 85711 · COMPLETED
FURNISH AND INSTALL PANELS, LIGHTING, SWITCHES, RECEPTS, BRANCH CIRCUIT WIRING, EQUIPMENT WIRING, TELEPHONE AND DATA WIRING, PINT OF SALE WIRING, KITCHEN EQUIPMENT POWER WIRING, HEATING & AIR CONDITIONING POWER WIRING, TELEVISION WIRING, SOUND SYSTEM WIRING AND FIRE ALARM SYSTEM EQUIPMENT AND WIRING (WEST DISTRICT)
- PermitMechanical
Permit 87040 · COMPLETED
INSTALLATION OF RETURN AIR DUCT INSTALLATION OF NEW REGISTERS
- PermitDemolition
Permit 26329 · COMPLETED
DEMO OF EXISTING STRUCTURES
- PermitNew construction
Permit 19176 · COMPLETED
NEW CONSTRUCTION OF TOLL PLAZA CANOPY & 5 PREFAB CONTROL BOOTHS, UTILITY BLDG FOR EMPLOYEE BREAKROOM AND 4 BUS SHELTERS
- PermitElectrical
Permit 86003 · COMPLETED
NORTHWEST AIRLINE BAGGAGE AREA, 1 CAT 5 CABLE WILL BE INSTALLED IN NEW 3/4" EMT FROM EXISTING COMMUNICATIONS CLOSET TO NEW TIME CLOCK. NEW TIMECLOCK WILL USE EXISTING ELECTRICAL CIRCUIT. NORTHWEST AIRLINE CONCOURSE, 1 CAT 5 CABLE WILL BE INSTALLED TO COMMUNICATIONS CABINET. NEW TIME CLOCK WILL USE EXISTING ELECTRICAL CIRCUIT.(WEST DISTRIST)
- PermitElectrical
Permit 78537 · COMPLETED
BUILDING EXPANSION OF TERMINAL "D" AND "E" AT THE PHILADELPHIA INTERNATIONAL AIRPORT. ELECTRICAL WORK INCLUDES MEDIUM VOLTAGE DISTRIBUTION, LOW VOLTAGE POWER AND LIGHTING. (WEST DIST)
- PermitElectrical
Permit 79370 · COMPLETED
REMOVAL OF 29 BAGGAGE CART RENTAL VENDING MACHINES & REPLACING WITH NEW TO EXISTING CIRCUITS & INSTALLATION OF 4 NEW 20A 120V CIRCUITS.
- PermitMajor alteration
Permit 82933 · COMPLETED
ALTERATION TO EXISTING BUILDING TO CONNECT TO NEW SPRUNG STRUCTURE FOR BAG CONVEYING & SORTING. SEE AP 63852 FOR PLANS
- PermitNew construction
Permit 63852 · COMPLETED
ERECTION OF ONE (1) STORY SPRUNG STRUCTURE FOR BAG CONVEYING & SORTING
- PermitPlumbing
Permit 79356 · COMPLETED
WC LAV UR SK FD MR SH IW
- PermitElectrical
Permit 75902 · COMPLETED
REMOVE EXISTING LIGHTS, INSTALL NEW LIGHTS, INSTALL (2) NEW SUB PANELS, INSTALL NEW HVAC POWER REQUIREMENTS. (WEST DIST)
- PermitZoning/use
Permit 75733 · COMPLETED
NEW PREFABRICATED STRUCTURE TO PROVIDE WEATHER PROOF ENCLOSURE FOR BAGGAGE HANDLING OPERATIONS
- PermitOperations
Permit 1305 · COMPLETED
6/13/07 - TENT ERECTED @ CAR RETURN RD. - HERTZ OFFICE - PHILADELPHIA INTERNATIONAL AIRPORT.
- PermitFast form building
Permit 82383 · COMPLETED
- PermitElectrical
Permit 76430 · COMPLETED
5 NEW POWER OUTLETS, 8 NEW DATA JACKS CAT 5E PLENUM RATED, ALL WORK DONE IN CONDUIT (WEST DISTRICT)
- InvestigationCI INSP
Case 108674 · PASSED
The cited inspection visit was marked passed.
- PermitMechanical
Permit 71881 · COMPLETED
DUCTWORK INSTALLATION IN NEW BAR/RESTAURANT TENANT SPACE L17A IN TERM C
- PermitMajor alteration
Permit 62111 · COMPLETED
REPLACE EXISTING BAR/RESTAURANT TENANT SPACE W/NEW BAR/RESTAURANT INCLUDING DEMOLITION,NEW MILLWORK, RELOCATED KITCHEN & BARS PLUS ALL NEW FINISHES
- PermitElectrical
Permit 65110 · COMPLETED
PROVIDE 10 NEW 277 FXTS/1 NEW EXIT.REPL OLD WITH NEW.PROV. CONDUIT & WIRE FOR 5 NEW 20A RECS, OUTLS NEW CRT.INSTALL 4" STEEL CONDUIT FROM E BAGG CLAIM TO D BAGG CLAIM.20X24 BAGG CLAIM SVS OFFICE IN TERM D. RELOCATE 2 2X2 LAYOUT.RELOCATE 1 SW.INSTALL 1 NEW 20A SW.ALL WORK DONE IN 3/4" EMT & #12 THNN WIRE.3 RECPTS & 2 DATA J.
- PermitMajor alteration
Permit 65494 · COMPLETED
INTERIOR RENOVATIONS-TENANT FITUP FOR COFFEE SHOP, JUICES, BAKED GOODS IN SPACE E6B
- ViolationF+C LIQ-PROVIDE CLOS RPT
Case 108674 · Violation 542287 · Code FC-3403.3/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- ViolationVIOL C&I MESSAGE
Case 108674 · Violation 542288 · Code A-000.0/10 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
- InvestigationCI INSP
Case 108674 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- PermitMajor alteration
Permit 59141 · COMPLETED
INTERIOR RENOVATIONS OF EMPLOYEE BREAKROOM IN TERM D. SEE 58289 FOR PLANS
- PermitMechanical
Permit 62841 · COMPLETED
DUCTWORK INSTALLATION FOR BSO OFFICE IN TERM D.
- PermitMechanical
Permit 62842 · COMPLETED
DUCTWORK INSTALLATION FOR BREAKROOM IN TERM D
- PermitMajor alteration
Permit 58289 · COMPLETED
INTERIOR RENOVATIONS OF BSO OFFICE IN TERM D.
- PermitFast form building
Permit 65118 · COMPLETED
- PermitMajor alteration
Permit 62113 · COMPLETED
REPLACE EXISTING BAR/RESTAURANT TENANT SPACE W/NEW BAR/RESTAURANT INCLUDING DEMOLITION,NEW MILLWORK, RELOCATED KITCHEN & BARS PLUS ALL NEW FINISHES
- PermitUse
Permit 65166 · COMPLETED
TAKE-OUT RESTAURANT WITH SEATING FOR 58 IN TERMINAL B/C CONNECTOR IN SPACE M-31
- PermitElectrical
Permit 57836 · COMPLETED
NEW CONDUIT, FIBER OPTIC CABLE, ADDITIONS TO EXISTING FIBER NETWORK, NEW CONDUIT CAT 6 CABLE, DATA OUTLETS TO TSA EQUIPMENT.
- PermitElectrical
Permit 56880 · COMPLETED
TERM B: 24 NEW DATA JACKS. REMOVE EXISTING CAT 3 CABLE. REPLACE WITH CAT5E DATA CABLE. REPLACE DATA JACKS. 3 LOCATIONS CONCOURSE B. (5) NEW 120V RECEPTACLES AND 2 EXISTING REPLACED BY QUAD. TERM C: INSTALL 21 NEW DATA JACKS. REMOVE EXISTING CAT 3 CABLE. REPLACE WITH CAT 5E DATA CABLE. REPLACE DATA JACKS. 4 LOCATIONS CONCOURSE C (3) NEW 120V RECEPTACLES AND 8 EXISTING REPLACED BY QUAD. ALL WORK IN CONDUIT AND CAT 5 CABLE.
- PermitAddition
Permit 48109 · COMPLETED
FOUNDATION FOR JET BRIDGE
- PermitElectrical
Permit 57239 · COMPLETED
NEW PARKING LOT LIGHTING, DEMO, NEW TOLL PLAZA, PARTIAL DEMO OF OLD TOLL PLAZA, DEMO SUBSTATION, NEW SUBSTATION & EMPTY CONDUIT FOR MALSR LIGHTING.
- PermitElectrical
Permit 63458 · COMPLETED
RELOCATE (2) EXISTING SWITCHES AND CONDUIT AND LIGHT CIRCUITS TO NEW LOCATION. RELOCATE (2) RECEPTACLES TO NEW LOCATION. ALL WORK DONE IN CONDUIT. (WEST DISTRICT)
- PermitMajor alteration
Permit 60532 · COMPLETED
INTERIOR ALTERATIONS TO CREATE TWO TENANT SPACES FROM ONE SPACE. SPACE 117-24 FOR OFFICES, MAINTENACE AND STORAGE AREAS FOR NORTHWEST AIRLINES; SPACE 125-131 TO BE VACANT (USE REGISTRATION/CO PERMIT REQUIRED PRIOR TO OCCUPANCY. CO FOR SPACE 117-24 INCLUDED IN THIS PERMIT.
- PermitMechanical
Permit 61585 · COMPLETED
DUCTWORK ALTERATIONS TO TWO TENANT SPACES (117-24 AND 125-31 IN CONCOURSE E
- PermitSuppression
Permit 62380 · COMPLETED
RELOCATION OF 15 SPRINKLER HEADS: PHILA INTERNATIONAL AIRPORT = TERMINAL "B", 3RD FLOOR = MECHANICAL ROOM #8. CONTRACTOR = WAYMAN FIRE PROTECTION = 302-994-5757
- PermitElectrical
Permit 52944 · COMPLETED
PROVIDE 8 NEW TEMP LTG,3 EM.LTS,2 EXITS LTS, ROTATE 4 EXIST PANELS, REL EXIST KIOSK TO NEW LOC,POWER/DATA,UPGR 2 EXIST MARKET PL PANEL FEEDS,REMOVE EXIST CONDUIT,4 WIRE/INSTALL NEW UPGR CONDUIT WIRE.
- PermitElectrical
Permit 61084 · COMPLETED
INSTALL 6 GFI OUTDOOR RECEPTS FOR LAB TRUCKS. OUTSIDE - USING RIGID CONDUIT WITH WATERPROOF RECEPT BOXES. INSIDE - USING 3/4" EMT CONDUIT. ALL CIRCUITS WILL BE 20 AMP RECEPTS WITH #12 WIRE.(WEST DIST)
- PermitSuppression
Permit 54479 · COMPLETED
INSTALL (37) SPRINKLERS UNDER DUCT AND UNIT HEATERS IN TERMINAL B/C AS PER PLANS.
- PermitMajor alteration
Permit 40890 · COMPLETED
INTERIOR ALTERATIONS TO RETAIL SOUVENIR AND GIFT STORE AS PER PLANS
- PermitUse
Permit 60294 · COMPLETED
CREATE TWO (2) SPACES FROM ONE SPACE
- PermitSuppression
Permit 55131 · COMPLETED
INSTALL AUTOMATIC SPRINKLERS ON 2ND FLOOR IN TERMINAL E SPACES E6A & E6B
- PermitMechanical
Permit 57523 · COMPLETED
INSTALL (1) DIFFUSER AND (1) RETURN REGISTER FOR SPACE E-6A AND E-6B AND CAPPING OTHER EXISTING DUCTWORK IN SPACE FOR FUTURE TENANTS
- PermitElectrical
Permit 58630 · COMPLETED
1 DISCONNECT SW 30 AMP - 2 POLE, 6 OUTLETS 20 AMP - 1 POLE, 2 GFI OUTLETS, 1 SW TO EXISTING LTS, ALL WORK TO BE DONE IN 3/4 CONDUIT EMT. (WEST DIST)
- PermitElectrical
Permit 58633 · COMPLETED
INSTALL LT FXTS,REPLACE ALL EXISTING HANGERS, IF NEEDED.CONFIRM ALL EXISTING WIRING CONDUIT, RE-CERTIFY EXISTING PANELS.CONFIRM DISCONNECTS. ALL WIRING DONE IN CONDUIT.CONFIRM ALL FITTINGS TO BE COMPRESSION TYPE, CONFIRM AND LABEL ALL CONDUIT AND JUNCTION BOXES.(WEST DIST)
- PermitPlumbing
Permit 58031 · COMPLETED
REPLACEMENT OF TRIPLE BOWL SINK GREASE TRAP, INSTALLING NEW SINK , WATER HEATER REPLACDING MOP SINK AND SINK WITH GRINDER
- PermitElectrical
Permit 57818 · COMPLETED
INSTALL POWER CONDUIT TO 2 CIRCUITS FORM ELECTRICAL PANL RBH 3, PROVIDE 1 CIRCUIT FOR 2 KIOSKS WITH 1 QUAD FOR EACH KIOSK. PROVIDE FOR TELE/DATA FROM COMMUNICATION CLOSET 4 CAT 5E BLUE DATA CABLE AND 4 CAT 5 YELLOW ONE FOR EACH KIOSK
- PermitElectrical
Permit 57835 · COMPLETED
5 NEW POWER OUTLETS FOR 3 POWER WINDOW CURTAINS AND 2 CONVENIENCE OUTLETS IN LOUNGE. RELOCATE TV MONITOR TO NEW LOCATION
- PermitPlumbing
Permit 57536 · COMPLETED
REPLACE 1 WATER HEATER, (85 GALLON) AND REPLACE 1 MOP RECEPTOR
- PermitPlumbing
Permit 55111 · COMPLETED
INSTALL A 2" DOMESTIC WATER LINE UP TO TENANT SPACE AND CAP FOR FUTURE USE. MAKE A SANITARY TIE-IN ON SOIL LINE IN CEILING BELOW AND RUN PIPING TO TENANTS SPACE AND LEAVE A FUTURE LINE. A VENT TIE-IN WILL BE DONE AND A FUTURE LINE WILL BE LEFT FOR EACH TENANT.
- PermitMajor alteration
Permit 53616 · COMPLETED
RENOVATION OF AN EXISTING KITCHEN SPACE INSIDE PHILA. INTERNATIONAL AIRPORT. NEW EQUIPMENT IN EXISTING SPACE.
- PermitElectrical
Permit 48867 · COMPLETED
INSTALL NEW WIRE AND CONDUIT FOR NEW GATE POWER AS PER ATTACHED DRAWINGS: E1.1, E2.1, E3.1, E4.1, BASIC PROJECT ONLY. NOT ALTERNATE AT THIS TIME
- PermitFast form building
Permit 53784 · COMPLETED
- PermitUse
Permit 53625 · COMPLETED
FOR RETAIAL GIFT AND SOUVENEERS SHOPS
- PermitElectrical
Permit 44254 · COMPLETED
INSTALLATION OF 6 CIRCUITS AT KIOSKS IN CONCOURSES, ALL WORK IN ACCORDANCE WITH PHILADELPHIA ELECTRICAL CODE & 2002 NEC
- PermitFast form building
Permit 51862 · COMPLETED
- PermitMajor alteration
Permit 44063 · COMPLETED
DEMOLITION OF EXISTING TENANT SPACE, AND NEW CONSTRUCTION OF DEMISING WALLS AND UTILITY STUBS IN PREPARATION FOR FUTURE FOOD TENANTS.CREATE TWO TENANT SPACES (WHITE BOXES) E-6A AND E-6B FROM ONE TENANT SPACE (E6)-SEPARATE USE AND CO PERMITS REQUIRED FOR EACH TENANT PRIOR TO OCCUPANCY
- PermitElectrical
Permit 50542 · COMPLETED
INSTALL 2" EMT CONDUIT FOR 60 AMP 3 PHASE 18 CIRCUIT PANEL FROM MARKET/PLACE REDWOOD DISTRIBUTION PANEL TO 2ND FLOOR STORAGE SPACE, LOCATE AT A/B LINK PHL.07-105
- PermitElectrical
Permit 50546 · COMPLETED
INSTALL POWER CABLE TO EXISTING 150 AMP DISCONNECT SWITCH. CONNECTION TO 400 HERTZ UNIT. ALL LABOR SUPPLIED BY EAGLE I. ELECTRIC. ALL MATERIALS SUPPLIED BY OWNER.
- PermitElectrical
Permit 50551 · COMPLETED
RELOCATE EXISTING POWER AND DATA CABLE WITHIN 10 FEET FOR 4 FIDS MONITORS. AIRPORT PERMIT #06-62
- PermitMajor alteration
Permit 47466 · COMPLETED
INTERIOR ALTERATIONS TO COMBINE 2 TENANT SPACES INTO ONE SPACE FOR TAKE-OUT RESTAURANT W/SEATING. DUCTWORK IS NOT INCLUDED
- PermitMechanical
Permit 43458 · COMPLETED
DEMO/INSTALL DUCTWORK. INSTALL ONE (1) EXHAUST FAN
- PermitMechanical
Permit 45068 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLANS
- PermitMechanical
Permit 45080 · COMPLETED
HVAC INCLUDING DUCTWORK AS PER PLANS
- PermitElectrical
Permit 47932 · COMPLETED
INSTALL POWER TO SUPERVISORS BOOTH INSIDE HANGER,POWER LINE & POWER CIRCUIT. ALL WORK TO BE DONE IN CONDUIT. AS PER 2002 NEC ARTICLE 513.
- PermitElectrical
Permit 47935 · COMPLETED
INSTALL 6 GFCI OUTDOOR RECEPTACLES FOR CHARGERS AT TERMINAL F EXPRESS HANGER AS PER 2002 NEC ARTICLE 513.
- PermitElectrical
Permit 40867 · COMPLETED
INSTALL 27 LIGHT FIXTURES, 1 LIGHT CONNECTOR - ALL INSTALLATION DONE IN 3/4" CONDUIT. POWER OUTLETS 32, FLOOR OUTLETS 4, PANEL EXISTING AND FEEDERS
- PermitUse
Permit 47465 · COMPLETED
CREATION OF ONE TENANT SPACE (L11A/B)FROM TWO SPACES (SPACE L11A AND L11B)FOR USE AS A TAKE-OUT RESTAURANT WITH SEATING. CENTER DEMISING WALL TO BE REMOVED TO FORM 1 NEW SPACE. NEW FINISHES AND EQUIPMENT THROUGHOUT SPACE. UTILITY METERING TO BE COMBINED FOR THE ONE SPACE. NO STRUCTURAL CHANGES TO OCCUR TERMINAL B
- InvestigationBP_BLDG
Case 76213 · PASSED
The cited inspection visit was marked passed.
- InvestigationBP_BLDG
Case 76213 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationCI INSP
Case 82867 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationCI INSP
Case 82867 · PASSED
The cited inspection visit was marked passed.
- InvestigationCI INSP
Case 76061 · PASSED
The cited inspection visit was marked passed.
- InvestigationBP_BLDG
Case 76213 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationCI INSP
Case 76061 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
- InvestigationCI INSP
Case 73055 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Where this comes from
- Assessment, spec sheet & owner: OPA Property Assessments, Office of Property Assessment
- Sales & deed history: Realty Transfer Tax records, Recorder of Deeds
- Permits, violations & inspections: L&I Property History · Atlas
- Tax delinquency snapshot · June 2022: Real Estate Tax Delinquencies, Dept. of Revenue
- Historical tax ledger & liens · through 2016: Real Estate Tax Balances, Dept. of Revenue
- Current property-tax balance: Verify with Philadelphia Revenue
- Zoning appeals: L&I & Zoning Board appeals
- Imagery: Street photo © Google · Aerial © Esri, Maxar
Methodology & freshness
This report was assembled Jul 28, 2026, 4:21 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)
